Loading...
HomeMy WebLinkAbout20170359 Ver 2_Turbidity Testing Version 2.1_20191118Strickland, Bev From: Arrance, Keven <karrance@hazenandsawyer.com> Sent: Monday, November 18, 2019 1:03 PM To: Leslie, Andrea J; Amanda Fuemmeler (amandajones@usace.army.mil) Cc: Moore, Andrew W; Homewood, Sue Subject: RE: [External] RE: Loch Dornie IP - NCWRC comments Attachments: Grandfather Golf & Country Club Turbidity Testing Version 2.1.docx Ul"r."rExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ELort.spam@nc.gov Andrea, The revised turbidity testing protocol is attached. Thanks again for your assistance with this project! Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(a�hazenandsawyer.com I hazenandsawyer.com From: Arrance, Keven Sent: Monday, November 18, 2019 12:53 PM To: 'Leslie, Andrea J' <andrea.leslie@ncwildlife.org>; Amanda Fuemmeler (amanda.jones@usace.army.mil) <amanda.iones@usace.army.mil> Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] RE: Loch Dornie IP - NCWRC comments Andrea, We will make the requested modifications to the turbidity monitoring protocol. I will send a revised version shortly. Regarding the tall fescue, my apologies! I had coordinated a substitution and had the plan sheet revised, but I did not include it in the submittal. Please see the attached revised version of Sheet E000. Hazen is under contract for the construction oversight. We have assigned a Senior Field Coordinator to the project, with it being a 40-hour/week assignment for the duration of construction. The turbidity monitoring is one of our Senior Field Coordinator's responsibilities. Construction oversight is not specified on the plans. Thanks, Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(a�hazenandsawyer.com I hazenandsawyer.com 1 From: Leslie, Andrea J <andrea.leslie@ncwildlife.org> Sent: Monday, November 18, 2019 11:31 AM To: Arrance, Keven <karrance@hazenandsawyer.com>; Amanda Fuemmeler (amanda.iones@usace.army.mil) <amanda.iones@usace.army.mil> Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] RE: Loch Dornie IP - NCWRC comments Thank you for addressing our comments, Keven. Things look good with a couple of exceptions: We recommend revising the turbidity monitoring plan in the following ways: o Since you are working during the trout moratorium and will be moving around the impoundment, we think that keeping the minimum frequency of turbidity monitoring to 3 times a week (as opposed to Ix/week) is better. o On days you do not measure turbidity, visual observations of turbidity upstream and downstream of the lake should be performed. o Please specify when during the day you will collect turbidity samples and check turbidity visually - e.g., 2 hours after in -water work has begun. Tall Fescue is still specified for temporary seeding on p. 3 (E000) of the 10/30/2019 plan set - this is highly invasive and we recommend removing this from the temporary seed mix. We are assuming that Hazen and Sawyer staff will be on -site each day, as discussed at our on -site visit. Is this specified somewhere in the plan set? I may have missed it. Thanks, Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Arrance, Keven <karrance@hazenandsawyer.com> Sent: Friday, November 01, 2019 10:48 AM To: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Amanda Fuemmeler (a manda.*ones@usace.army.mi1) <amanda.iones@usace.army.mil>; ashuping@grandfatherclubnc.com Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Tarver, Fred <fred.tarver@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov>; Goodfred, David W.<david.goodfred@ncwildlife.org>; Wood, Chris J. <chris.wood@ncwildlife.org>; Russ, W. Thomas <thomas.russ@ncwildlife.org>; Goudreau, Chris J. <chris.goudreau@ncwildlife.org>; Schueler, Tim <tschueler@hazenandsawyer.com>; McSwain, Joel <0mcswain@hazenandsawyer.com> Subject: [External] RE: Loch Dornie IP - NCWRC comments External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Amanda and Andrea, Attached are GGCC's responses to NCWRC's comments on the Loch Dornie dredging IP. Note that the following files are the same files that were submitted to the USACE on October 25: Revised Sheets _20191025_reduced.pdf, Figure 5a — Impacts Map_REV.pdf, and Pre -Construction Notification (PCN) Form_Section D revised.pdf. Please let us know if you have any questions or remaining concerns relative to the project. Have a wonderful weekend! Ms. Keven Arrance Senior Principal Scientist I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) karrance(�0azenandsawyer.com I hazenandsawyer.com From: Leslie, Andrea J <andrea.leslie@ncwildlife.org> Sent: Wednesday, October 16, 2019 5:07 PM To: Amanda Fuemmeler (amanda.iones@usace.army.mil) <amanda.*ones@usace.army.mil> Cc: Arrance, Keven <karrance@hazenandsawyer.com>; Moore, Andrew W <andrew.w.moore@ncdenr.gov>; Tarver, Fred <fred.tarver@ncdenr.gov>; Homewood, Sue <sue.homewood@ncdenr.gov>; Goodfred, David W. <david.goodfred@ncwildlife.org>; Wood, Chris J. <chris.wood@ncwildlife.org'>; Russ, W. Thomas <thomas.russ@ncwildlife.org>; Goudreau, Chris J. <chris.goudreau@ncwildlife.org> Subject: Loch Dornie IP - NCWRC comments External Email - think before you click Hi Amanda, Attached are NCWRC's comments on the Loch Dornie dredging IP. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org Get NC Wildlife U12date delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 11/18/19 Version 2.1 Grandfather Golf & Country Club Loch Dornie Dredging Operations Turbidity Monitoring Field Procedure: 1. Turbidity sampling (grab sample tested onsite via calibrated metering device) will be employed prior to and during dredging operations —see Schedule. 2. One sample will betaken upstream of dredging operations where the Linville River crosses fairway 17 at sample station A (see map). 3. One sample will be taken downstream of Loch Dornie, downstream of the confluence of the release pipe channel and the spillway overflow channel at station B (see map). 4. Weather description at time of sampling will be recorded (e.g., temperature). Values of turbidity and weather conditions will be tracked and graphed. Benchmark and Response Actions: 1. If the downstream sample site turbidity is 10 NTU or less*, dredging may continue. 2. If the downstream turbidity is the same as or lower than the upstream turbidity (e.g., 15 NTU enters, 15 NTU leaves), dredging may continue. 3. If downstream site measurements exceed conditions under #1 or #2 above, active dredging is to cease until condition #1 or #2 are met again; erosion control measures (e.g., turbidity curtains) are to be examined for correct operation. Schedule: 1. Testing at locations A and B shall be daily, on dredging operation days, defined as days when machinery actively operates, moving soil or dredge material, below the pre-drawdown water surface elevation. Turbidity sampling on dredging operation days will be performed approximately two hours after in -water work commences. 2. Testing is to begin prior to dredging operations by one week, minimum, to establish a "baseline;" see #2 under "Benchmark and Response Actions" above. Hazen and Sawyer Grandfather Golf & Country Club 11/18/19 Version 2.1 3. If conditions #1 or #2 under "Benchmark and Response Actions" can be demonstrated for one calendar week, then testing may be relaxed to three times a week (e.g., Monday, Wednesday, Friday). If testing is relaxed to three times a week, turbidity will be visually monitored on non - testing, dredging operation days. 4. Violations of #1 or #2, as applicable, under "Benchmark and Response Actions" during "relaxed" timeframes will re -impose daily testing requirements. *from 15A NCAC 02B .0211 FRESH SURFACE WATER QUALITY STANDARDS FOR CLASS C WATERS: (21)Turbidity: the turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units (NTU) in streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs designated as trout waters; for lakes and reservoirs not designated as trout waters, the turbidity shall not exceed 25 NTU; if turbidity exceeds these levels due to natural background conditions, the existing turbidity level shall not be increased. Compliance with this turbidity standard can be met when land management activities employ Best Management Practices (BMPs) [as defined by Rule .0202 of this Section] recommended by the Designated Nonpoint Source Agency [as defined by Rule .0202 of this Section]. BMPs shall be in full compliance with all specifications governing the proper design, installation, operation, and maintenance of such BMPs Hazen and Sawyer Grandfather Golf & Country Club