Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG020477_COMPLETE FILE - HISTORICAL_20181211
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /VC&oUl.lq� DOC TYPE DOC DATE CAHISTORICAL FILE I-1 MONITORING REPORTS YYYYMMDD CIS ENGINEERING & ENVIRONMENTAL SCIENCE COMPANY 3008 ANDERSON DRIVE, SUITE 102 RALEIGH, NC 27609 (919) 781-7798 LETTER OF TRANSMITTAL November 21, 2018 TO: Ms. Melissa Joyner NCDEQ Fayetteville Regional Office FROM: T. Patrick Shillington, P. E. Engineering & Environmental Science Company, Inc. SUBJECT: Stormwater Plan and SPPP We]Ions Cumberland Pit #1 Stormwater Permit NCG020477 Mine Permit 26-46 Attached axe three copies of the Stormwater Plan and SPPP RECEIVED DEC 1 1 20% BEQ•FAYETTEVILLE REGIONAL OFFICE Scale: 1"-200 L -- Legend Property Line And Mine Permit Limits — — — - Adjacent Property Line — — - Perennial Stream - - - - - Limits of Disturbance ---------- Watershed Limits ---- ---------- -------- Haul Road -------------------- --------------- Duke Energy or PWC Easement Topographic Lines Wetland Limits © Future Sediment Basin Watershed Total Area Exposed Ground Gravel, Asphalt, Concrete, % Impervious Possible Pollutants No, } l----- (Acres) Acres ASurface { Acres _- - Future 1 (�) (�} (�) �'� ------- Soil Particulate 2 77.8 (2) 21.1 0.08 0.4 Soil Particulate Future 3 ------ - ('� -_-- t�} -_-- Soil Particulate (�} Sediment Basins Not installed at this time. Watershed not determined at this time. z Exposed ground acreage will very over time due to mining and reclamation activities. At this time 08/15/18 thle majority of this areas is grass covered or wooded. j1. j f I Scale 1"=1000` ., I Vicinity Map Mine Operator DEC I 1 20% Wellons Consts�Ir 'Hon�LE ��° A OFFICE P. O. Box 730 Dunn, NC 28335 2cENGINEERING & ENVIRONMENTAL SCIENCE COMPANY 3008 Anderson Drive Suite 102 Raleigh, NC 27E09 (919) 781-7798 10/05/18 Stormwater Plan Ski. ,�-- Ij r Wellons Cumberland Pit #1 -A Cumberland Cumberland Co.,NC Mine Permit No. 26-46 DATE: 10/05/ 18 DRAWN: TPS REVISED: SCALE: 1 "=200' Shee�� 1 of: STORMWATER POLLUTION PREVENTION PLAN (SPPP) Wellons Pit 4525 Claude Lee Road Fayetteville, Cumberland County, NC 28306 Prepared For: Wellons Construction, Inc. P.O. Box 730 Dunn, NC 28335 RECEIVED DEC 11 2018 pEQ-FWEITEVILLE REG4ONALOFFICE Prepared By: Engineering & Environmental Science Company 3008 Anderson Dr., Suite 102 Raleigh, NC 27609 C T. Patrick Shillington, E. President Page No. 1.0 Site Overview................................................................................. 1 1.1 Certification for Non-Stormwater Discharge ................ 1 2.0 Stormwater Management Strategy .............................................. 1 3.0 Spill Prevention and Response Procedures ................................. 2 4.0 Preventative Maintenance and Good Housekeeping ................... 3 5.0 Facility Insgcctions.............................................................. 3 6.0 Employee Training....................................................................... 4 7.0 Responsible Party..................................................................... 5 8.0 SPPP Amendment and Annual Update .................................... 5 9.0 SPPP Iznplementation........................................................... 5 T'Q FEAT. A a4r r �w �CHMENTS . ,F Attachment A: Vicinity Map Attachment B: Forms Sheet 1: Facility Stormwater Plan Stormwater Pollution Prevention Plan (SPPP) Wel] ns Pit Parze The Wellons Pit is located at 4525 Claude Lee Road in Fayetteville, Cumberland County, NC (See Attachment A, Vicinity Map). The receiving waters for the stormwater discharge is Rockfish Creek. Rockfish is a Class C stream in the Cape Fear River Basin. Other pertinent information for the facility includes: Address: 4525 Claude Lee Road, Fayetteville, NC 28306 Phone: 910-892-6630 Latitude: 340 57' 30.96" N Longitude: 78' 53' 3.12" W No buildings or permanent structures are located at the site. The Standard Industry Classification (STC) Code for the operation is 1442 (Construction Sand and Gravel). The site is an active sand & gravel mine (NCDEQ Mining Permit Number26-46). The mine was originally permitted in 1999. Currently, the mine is permitted for 70 acres, with 54 acres bonded for land disturbance. No washing or processing of materials occurs at the site. Limited vehicle refueling activities are conducted at the site. No refueling tanks are located on the site. Tanker trucks periodically arrive at the site to refill the various equipment used in the mining process. No significant spills or leaks have occurred at the site during the previous three (3) years. The Wellons Pit requires a permit to discharge storm water because materials are potentially in contact with storm water. As a requirement of this permit, the outfatls associated with storm water discharges from areas of industrial activity have been evaluated for q esence of non -storm water discharges. Based on the evaluation, to the best of r,�'i sditli@�'a nd belief, no non -storm water discharges exist Signature r zw bate DJ��> - SEAL Professional Engineering License No.: 15472 15472 =; The Wellons Pit has one (1) discharge point (See Stormwater Plan, Sheet 1). Discharge is from a sediment basin (Basin #2) that is used to treat stormwater runoff from the upslope mining areas. Possible pollutants that could discharge include soil particulate. The Facility Stormwater Plan (Sheet 1) shows the discharge point, drainage area, and the potential pollutants that could occur from the raining activities. Basin #2 outlet is a perforated corrugated riser pipe connected to a horizontal corrugated pipe. The perforated horizontal pipe is surrounded by washed stone. Storunwaler Pnllulion Prevention Plan (SPPP) Wellons Pit Paec 2 Outfall. No. l The drainage area for-Outfall No, l is approximately 16.95 acres and includes the active mine area. No impervious surface is included in the watershed.area for the outfall. See Stortnwater Plan for the location of the outfall and the drainage area. .3A SPILL PREVENTION'AND RESPONSE PROCEDURE,S- In order. to implement, maintain and revise the SPPP, Wellons Construction,. Inc. has assigned the following personnel to be members of the Pollution Prevention Team. The activitiesand-responsibilities of each team member are listed below. A responsible person shall .be on -site at, all times during .facility operations that have increased. potential to contaminate stormwater runoff through spills or exposure of materials associated -with the facility'operation; Team MemUer/,Titlie Res onsibllit Ultimate responsibility for the implementation .Seth Thomp 6n of the SPPP. Review of activities for SPPP. Responsible far allocating.funds for materials, Signature supplies, and manpower for'implementation of �/ the SPPP. � Date: „ 3U -- 1 ii a Responsible for compliance and coordination of SPPP with -all parties concerned. Document and test discharges. Provide guidance on improvement of SPPP. Wcllons Construction, Inc. is responsible for implementing Best Management ractices at the Wellons Pit. These practices include Good Housekeeping, Preventative Maintenance, Spill Prevention Control .and Counter Measures for any possible spills during vehicle/equipment refilling, record -keeping and internal reporting. Spills and leaks are a significant potential source of stormwater pollutants, and in many casesi are avoidable. The standard operating procedures such as spill prevention procedures, along with proper employee training can.reduce the potential for accidental releases. The following areas are -identified for potential spillage: Petroleum releases from constl•nction equipment and vehicles, espechilly dwing refueling. Should a spill occur during refueling or at any other time, any affected soil should be removed (excavated) and placed in appropriate containers (barrels, roll -offs, etc.). The barrels should then be properly disposed of off -site through an appropriate disposal facility. All releases should..be immediately reported,to the Storrnwater.Plan Coordinator or any of the other Pollution Prevention Team Members. 5totruwater Pollution Prevention Plan (SPPP) WeItons Pit _ _ Page 3 The following areas require Good Housekeeping Activities to minimize stormwater releases: Construction Equipment and Vehicle refueling 1. Refueling should be conducted in a manner to minimize spillage. Spills should be immediately cleaned up. The ground should be checked for any ground staining or liquid ponding before each day's use. Staining or ponding is evidence of needed vehicle maintenance. 2. Material handling equipment should be checked for hydraulic line leaks and other leaks that require maintenance. 3. Hydraulic lines should be checked by the operator before each day's use for leakage. Any spill should be cleaned immediately, and repairs made when leakage is noted. Exposed Ground and Sediment Basin l . Observe exposed ground for rill erosion. Flatten grade, divert upslope water runoff, or establish groundcover. 2. Observe sediment accumulation down stream of basin outlet. Excessive sediment accumulation could be a result of improper functioning of the basin outlet, or excessive sediment accumulation inside the basin. S O;fFACI ITZvi INSPECTIUNS�4 Inspection of the facility shall occur at a minimum of twice a year; once during the first half of the year (January to June) and once during the second half (July to December), with at least 60 days separating inspection dates. The Bi-Annual observation by qualified personnel is conducted to perform the following: o Inspect storm water drainage areas for evidence of pollutants entering the site drainage system. Inspect on -site stormwater basin for damage or deficiencies. e Evaluate the effectiveness of measures to reduce pollutant loadings and whether additional measures are needed. • Inspect any equipment needed to implement the plan, such as spill response equipment. e Revise the plan as needed within two weeks of inspection (potential pollutant source description of measures and controls). a Implement any necessary changes in a timely manner, but at least within 12 weeks of the inspection. a Prepare a report summarizing inspection and follow up actions, the date of inspection and personnel who conducted the inspection; identify any incidents of noncompliance or certify that the facility is in compliance with the plan. e Sign the report and keep it with the plan. Stormwater Pollution Prevention Plan (SPPP) Wellons Pit Pa e 4 Record keeping is important to demonstrate that the facility is operated in a way that minimizes the potential for pollutants to enter the environment. Attachment B contains forms that address the following: 1. Site Compliance Evaluation 2. SPPP Review and Update 3. Personnel Training Record 4. Spill Documentation Report 5. Equipment Inspection and Preventative Maintenance Record 5. Future BMP implementation schedule These forms, or ones containing similar information should be completed and kept on -site at all times. Employee training is essential to effective implementation of the Storm Water Pollution Prevention Plan. Each employee that works in a particular area of the plant is trained for proper material handling and spill prevention and good housekeeping practices. The training program will consist of aformal training session and regular follow-up sessions to update and reinforce the formal training. The training sessions will include an overview of the following information included in written documentation. • Written instructions for handling hazardous substances. • Facility storm water pollution prevention. • Facility spill prevention, control, and countermeasures. • Material management practices. • BMP's including spill prevention measures, equipment, and safety procedures. • Recent spills or accidents at the facility or at a similar facility with discussion about causes and corrective actions taken. • Upcoming new equipment installations at the facility that will impact pollution prevention planning or implementation of BMP's. • Inspection procedures. • Applicable environmental laws, regulations, and guidance documents. • Procedures for preventing contact between materials and storm water runoff. • Procedures for using, inspecting, repairing, and replacing facilities or equipment used for spill response. • Communications equipment and alarm systems. • Response to spills and actions required to prevent spill from reaching storm water, • 'People to contact in the event of a spill and what to do in the event of a spill. • Reporting requirements for leaks and spills. • Procedures for tank truck unloading. • Operation and maintenance of containment equipment. Slormwatcr.Pollutio:i Prevention. Plan (SPPP) Wellons Pit Pnee 5 7.0'RESPONSIBLE PARTY Name: Rohert P. Wellons Title: President Facility Name: Wellons Pit Facility Address: 4525 Claude Lee Rd. Fayetteville, Cumberland County, NC " I certify under penalty of law that this document and all attachments were prepared under. my'direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those, persons directly responsible for gathering the information, 4he. information submitted is, to the best of -my knowledge and belief, true; accurate, and complete. I am aware that, there are significant penalties for, submitting false .f mationjn luding the possibility of fine and imprisonment for knowing violations." Signature: AJ�W Date: O mare ;8.0 SPPP AMMENDMENT AND ANNUAL UPDATE, This SPPP shall be reviewed on an annual basis. The SPPP shall be amended whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features which may have a significant effect on the, potential for the discharge of pollutants to surface waters. The annual update shall include the following: -A list of significant spills or leaks of pollutants for the previous three.(3) years, or the.notation that no spills have occurred. -A written"re-certification that stormwater outfalls have been evaluated for the presence of non-stormwater discharges -A review and comparison of sample analytical data to benchmark values 9ASITP IMPLEMENTATION Wellons Construction, Inc. shall implement the SPPP consistent with the provisions of -the NCG200000 permit, in order to control contaminants entering surface waters via stormwater. Implementation of the SPPP shall include documentation of all monitoring; measurements, inspections, maintenance activities, and training provided to employees, including the.16g of the sampling data. Such documentation shall be kept on -site for a period of five (5).years anti made available to the Director or Director's authorized representative immediately upon request. ATTACHMENT B: Forms WELLONS CONSTRUCTION, INC. WELLONS PIT Inspection Form Date: Time: Area(s)Inspected: Evidence of Pollutants Entering Storm Water: Yes No BMPs in Place at This Location: BMPs Operating Properly: Yes No Corrective Action Taken: Action Taken/Date: 9 Inspected/ Documented By: Title: WELLONS CONSTRUCTION, INC. WELLONS PIT :,�rro•.,;��,¢ ens:. r}�ria v. ��.t �r #: TtY .�i>;fH. E). - WM- 7 D-_A4 RG �.,M I �uFa •NAME, r..1 •,"��'",,.^...,.- RE). REVIEWED BY AMENDED BY PROFESSIONAL ENGINEER REASON FOR REVIEW/ AMENDMENT DATE REVIEWED BY PRINTED NAME SIGNATURE STATE NUMBER REGULATORY OR FACILITY CHANGE l-YEAR 40 CFR 112 requires a review and evaluation of this SPPP plan at least once every three years or when changes are made to the facility. Any amendments to this SPPP plan pertain to oil will be certified by a registered Professional Engineer. WELLONS CONSTRUCTION, INC. WELLONS PIT J, Year Date (FnontVd.y/y.) SpjM Leak Location (as Indicated on site map) Descrijption Responce Procedure Type of Material Quantity Source, If known Reason Amount of Material Recovered Material no longer exposed to Storm Water Preventive Measures Taken Year Date (montWday/y=) Spill Lek Location (as Indicated on site map) Description Responce Procedure Type of Material Type Quantity Source, If known Reason Amount of Material Material no Longer exposed to Storm Water (ri ? Preventive Measures Taken Year Date (maniWdaytyear) Spo L,,,k Location (as Indicated 010 -ap)• Description Respouse Procedure T)Vc,of Material Quantity Source, If known Reason Amount of Material Recovered . Material no longer exposed to Storm Water run? Preventive Measuressite Taken WELLONS CONSTRUCTION, INC. WELLONS PIT -..,.r.,, ..;' r _.r,_�;I 5 e� _ `}' .} x:.�-.�' ,r t,-'t5.:r ^ � .,__-� ..,r.. _-,-_, �. .�......— ^4,., _..�` "Ip' .i't:` r:",. ,{.-, . ? �'.• I ,c--•a1,�1 rf i�--'."��`n i'._,4 J � - ,t,r � . � -.. U �) .., -,:; �4 , rc;�_ 4 , V..�t . Y ��;,.f -1', r .� +€ , ,, _ SAS), r�•'brt' Ii l�t - v[ , t,,.:. ,r'.1�}i � , I d ,�. *•;�i ��� •r :<, ,E ` UiP11'IE , T_�NSPECTION,ANA:.. r t �, >��'',, ,. t; r v ,f�I 3 -I,., � � =r s ,ors ';1 l,�('{�d3 }!l9•�n , •L;i.s .'•„ 1P,o ^•r. !.?_ , t.,.. •l�T,. 1 �h ��y r �).—.- li. �. �!}-... ..f1 11--...eJ .,.iP.r....il'.rJ:v9EJ1C111LW7i1irGu,�it.]�N ��y��fli .�*-,, .} - �. � � J �' • 1 , `t � .�� 1.+1'! 7 � l:_: i f: =I 'r �J, }ir tetra �« ! 1 a,., 4 a.^ I s �Ya• �� � ��.���;N r� .�,��,Y � PRE�ENTA:TIYE MAINT'ENANC_E'�RECORD�� ��- ���_. '� .�i�a'f4« e. .°�'�~'•'"�.%•1'i��'� ,.�tr: �`��C?�-��: _r�l. c-, ;n„�:i�� .t"$s:._:�.��.�i+4ws.ci�.fi��.Sa �r���i��'�1�'::�.1�..7';: I� Date: Time: Equipment Ins ted Weather Conditions Condition of Equipment Visable Fluid Leaks? Comments Corrective Action R uimd? Correction Action Completion Date Date Next Inspection Required Ins for WELLONS CONSTRUCTION, INC. WELLONS PIT ..... . . . . . . . . . . . . . . . . . . BMIP.DESCREMON SCHMULE RESPONSIBLE PERSON Good Housekeeping L 2. 3. Preventative Maintenance 1. 2. 3. Inspections 1. 2. 3. Spill Prevention and Response 1. 2. 3. Sediment and Erosion Control 1. :2. 3. Management of Runoff 1. 2. 3. Additional BMPs (Activity -specific and site- 12- specific) 13. 1. WELLONS CONSTRUCTION, INC. WELLONS PIT ee�ri SF�_3tir t� t K 1 -�.PERS0NNELL�T1tAINING The following information documents employee -training records. The trainer will initial the type of training performed. DATE ATTENDEE TRAINING SUBJECTS TRAINING TYPE New Employee Training Exercise Briefing Wellons CONSTRUCTION, INC. March 6, 2018 Timothy L. La Bounty, PE Department of Environmental Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Re: Notice of Violation (NOV-2018-PC-0034) NPDES Stormwater General Permit NCGO20000 Wellons Construction, Inc. Wellons Cumberland Pit #1, Certificate of Coverage NCGO20477 Cumberland County Dear Mr. La Bounty: RECEIVED MAR 12 20% DEQ.FAYETTEVILLE REUONALOFFICE This letter is in response to the aforementioned Notice of Violation. We were recently made aware that the employee we had assigned to manage the program had not fulfilled their duties and is no longer associated with this project or Wellons Construction. We have formed a three- person team that is currently implementing a plan to conform within the corrective requirements of NPDES Stormwater General Permit. The team will report to upper management the first of each month to review any activity related to the Wellons Cumberland Pit #1 including Stormwater.Pollution Prevention Plan, Inspections, and Reporting required by DEMLR. In addition, we have contacted Pat Shillington of Engineering & Environmental Science Company of Raleigh, NC and he has agreed to produce an updated map of the property which will show the drainage area boundaries and the direction of flow in each drainage area. Sediment Basin #3 will be updated with the addition of a surface dewatering device as requested. Once we have a confirmed date for the completion of the updated site map we will contact you again in writing and produce our Plan of Action and Stormwater Pollution Prevention Plan. We look forward to working with you in this matter. Si erely, Darlene.Lucas Controller Wellons Construction„ Inc. . r ...k -. 1 �,1 i•.t riL .. r I. :rl , 1 � - � 1� 510 N. Powell Ave., P.O. Box 730, Dunn North Carolina 28335 910-892-3123 or 910-892-6630 / FAX 910-892-3046 Wellons CONSTRUCTION, INC. 510 Powell Ave., P.O. Box 730, Dunn, North Carolina 28335 PCI&p o P3TM EY BOWES 7[i17 1[3QQ QQQQ 1914 7969 02 1P $ 066.670 0000308537 MAR 09 2018 to MAILED FROM ZIPCODE28334 RECEIVED { I 12 2018 Timothy L. ! aBourty, PE DEO-EAYETTE`li!-LE REGIONALOFFICE Department of Environmental Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 2r3yL�f ��=�5 t:.024 33111,1r1111111111111If1i11111131111r,111r1111311I111111111111311 do7anaa jo aol Joyner, Melissa From: Joyner, Melissa ' Sent: Friday, February 16, 2018 2:15 PM To: 'scottj@wellonsconstruction.com' Cc: Seth Thompson; Darlene Lucas; Billy Raynor Subject: RE: [External] Wellons Pit Attachments: NCG02-SW-Annual-DMR.pdf; General Permit 020000.pdf Hi, Scott, A site specific Stormwater Pollution Prevention Plan (SPPP) needs to be developed including all the required, applicable information as specified in the attached NCG020000 General Permit which was given to you during our meeting. 1. In reference to NCG020000 General Permit requirements for the Site Map (Current Mine Map) should show the drainage area boundaries and the direction of flow in each drainage area. Sediment Basin #3 should be updated with the addition of a surface dewatering device. 2. The Stormwater Pollution Prevention Plan should be annually updated including: 1. List of significant spills/or a statement about no spills occurring for the previous 3 years.; 2. Document effectiveness of on -site erosion control measures (construction entrance, diversion ditch and Sediment Basin #3).; 3. Provide a review and comparison of sample analytical data using the attached Division's Annual Summary Data Monitoring Report available on the Stormwater Permitting website at:htt://portal.denr.org/web/Ir/npdes-stormwater. l gave you a copy of this form during our meeting. This form should be mailed to the address on the form every year. by March 1st. 3. As long as the mine is active, all erosion control measures need to be inspected on a weekly basis. The Analytical and Qualitative monitoring, along with the recording of rainfall, occurs twice per year: Period 1 : Jan. 1st -June 30th and Period 2: July 1-December 31st. 4.-Active implementation of the SPPP includes documentation of all monitoring (Analytical and Qualitative), measurements, inspections, maintenance activities and annual training provided to employees. 5. Dormant Site Status only applies if all industrial activities have been suspended and the portions of the site where clearing, grading and/or excavated activities have occurred have been stabilized with vegetation. I would do an inspection of the site after this has occurred and written certification about this status would be submitted by the company. The Analytical and Qualitative Monitoring is not required, only monthly inspections of the erosion control measures are necessary and an annual inspection needs to be conducted as part of the annual update of the SPPP. If industrial activities will reoccur, the Regional Office needs to be notified prior to this reoccurance. 6. Please send a written response letter within 30 days of receipt of having received the Notice of Violation which would include a reasonable eplanation for the violations which occurred and a plan of action to prevent these violations from reoccurring. If you have any questions about this email please contact me. Sincerely, t Melissa t Melissa Joyner Environmental Specialist Division of Energy, Mineral and Land Resources Department of Environmental Quality (910) 433-3384 office melissa.ioyner@ncdenr.gov 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: scottj@wellonsconstruction.com [mailto:scottj@wellonsconstruction.com] Sent: Friday, February 16, 2018 9:11 AM To: Joyner, Melissa <meiissa.joyner@ncdenr.gov> Cc: Seth Thompson<setht@wellonsconstruction.com>; Darlene Lucas<dlucas@wellonsconstruction.com>; Billy Raynor <braynor@wellonsconstruction.com> Subject: [External] Wellons Pit CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Melissa, just checking to see when you will be sending the list we discussed Wednesday, please send as soon as you can .Thanks Sent from my iPhone 2 Permit: NCG020477 SOC: County: Cumberland Region: Fayetteville Compliance Inspection Report Effective: 10/01/15 Expiration: 09/30/20 Owner : Wellons Construction Inc Effective: Expiration: Facility: Wellons Construction Incorporated 510 N Powell Ave Contact Person: Robert Paul Wellons Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): On -site representative Related Permits: Inspection Date: 02/14/2018 Primary Inspector: Melissa A Joyner Secondary Inspector(s): Dunn NC 28334 Title: Phone: 910-892-6630 Certification: Phone: Scott Johnson 910-892-6630 Entry Time: 09:35AM Exit Time: 11:05AM Phone: Charles J Gill Reason for -Inspection: - Follow-up Inspection Type: Technical Assistance Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NCG020477 Owner - Facility: Wellons Construction Inc Inspection Data: 02r1412018 - Inspection Typo : Technical Assistance Reason for Visit: Fo!Iew-up Inspection Summary: Melissa Joyner and Jason Gill met with Scott Johnson at the Wellons Cumberland Pit #1. The requirements of the NCG020000 were discussed, including the development of a Stormwater Pollution Prevention Plan (SPPP)and what actions are necessary to implement the SPPP. The Sediment Basin with the riser obstructed by a tree was mentioned during the meeting. The accompanying email contains further details about the technical meeting. Page: 2 10 Permit: NCG020477 Owner -Facility; Wellons Construction Inc -- Inspection Sato: 0211412018 •, ---. - Inspection Type : Technical Assistance . Reason For Visit: - -- Follow-up Page- 3 CO —Womestic Mail Only, :. t� .0 F F C O A L US vo Lei U R1 Postage $ a - Certified Fee r-i C-3 Return Receipt Fee Postmark Here Q (Endorsement Required) Restricted Delivery Fee 0 (Endorsement Required) Lfl M Toial Postage & Fees M , Sent To ra-------------------------------- p Street, Apt. Na.; ar PO Box Na. Clry, State, Z1A+4 _ PS Form 3800, August 2006 tiee Reverse for Instructions I L Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY February 9, 2018 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7012 3050 0001 9398 6068 Wellons Construction, Inc. Attn: Robert P. Wellons P. 0. Box 730 Dunn, NC 28334 ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director Subject: NOTICE OF VIOLATION (NOV-2018-PC-0034) NPDES Stormwater General Permit NCG020000 Wellons Construction, Inc. Wellons Cumberland Pit #1, Certificate of Coverage NCG020477 Cumberland County Dear Mr. Wellons: On February 1, 2018, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020477, Permit coverage authorizes the discharge of stormwater'from the facility to receiving waters designated as a LIT to Rockfish Creek, a Class C waterbody in the Cape Fear River.Basjn... As a result of the site inspection, the following permit conditions violations are noted 1) Stormwater Pollution Prevention Plan SPPP A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Omen Street, Suite 714 1 Fayetteville, NC 28301 410-433-3300 Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Notices of Violation have been previously sent on February•6, 2009, December 17, 2013, December 4, 2015 and June 7, 2017. If corrective actions are not taken by April 13, 2018, this Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral and Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. During the last three years several attempts have been made to schedule inspections at the Wellons Cumberland Pit #1 with representatives of Wellons Construction, Inc. No company personnel have attended the planned inspections. Should you have any questions regarding.these matters, please contact Melissa Joyner or myself at (910) 433-3300. Sincerely, Timothy L. LaBounty, PE Regional Engineer DEMLR TL Umaj Enclosure: Compliance Inspection Report M. Seth Thompson — Vice President — Wellons Construction, inc. (via email) Scott Johnson — Superintendent — Wellons Construction, Inc. (via email) William E. (Toby) Vinson, JR:., - Interim Director - DEMLR (via email) Annette Lucas, State Stormwater Specialist - DEMLR- (via email) Laura Alexander, Administrative Assistant — DEMLR (via email) FRO — DEMLR, 'Stormwater Files-NCG020000 ■ Complete itetip-1,,2, and 3. Also complete item 4 if Resfrl�.ted Delivery is desired. a Print your name and address on the reverse so that we cars return the card to you. • Attach thi7 s card to the back of the or on the front if space permits 1, Article Addressed to; 1 . o WELLONS CONSTRU 1'f( ATTN:'TZOBERT P. W LLB PO BOX 730 DUNN NC 28334 2. Article Number — (Transfer from service label) PS Form 3811. February 2004 -�3 A. f]Ad 8. Re ed by ante me / C. flat of D. I elivery addr different from item 1? Ye: ff S. enter delivery address below- ❑ No r7 Certiflyail Registered Ssail ❑�r.,M., eei t for Merchartdisa ❑ insured Mail p C.O.D, 4. Restricted Delivery? (Extra Fee) ❑ Yes 7012 3050 0001 9398 6068 Domestic Return Receipt 102595-02-M-1546j Compliance Inspection Report Permit: NCG020477 Effective: 10/01/15 Expiration: 09/30120 Owner: Wellons'Construction inc SOC: Effective: Expiration: Facility: Wellons Construction Incorporated County: Cumberland 510 N Powell Ave Region: Fayetteville Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/01/2018 Entry'Time: 02:30PM Primary Inspector: Melissa A Joyner Secondary Inspector(s): Certification: Phone: Exit Time: 03:15PM Phone: Reason for. Inspection:., Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: [] Compliant Not Compliant Question Areas: N Storm Water (See attachment summary) Page: 1 Permit: NGG020477 Owner - Facifity: Wellons Construction Inc Inspection Date: 02101/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner attempted to meet on site with Eric Deyle on 1/24/2018. Mr. Johnson contacted Ms. Joyner on 1/24/2018 to let her know that he would be meeting with her but would not be able to meet on that date. The meeting was rescheduled for 2/1/2018 but was not attended by Mr. Johnson. Therefore the Stormwater Pollution Prevention Plan, Analytical and Qualitative monitoring forms were not available for review at the site. I conducted an inspection of the Wellons Cumberland Pit #1, observing the Outfail for Sediment Basin #2 and noted that there was a tree still growing inside of the riser of this outfall which will need removal. The side slopes of Sediment Basin #2 have gully erosion in need of stabilization with permanent groundcover. NPDES General Permit.NCG020000 requires that Best Management Practices be inspected once every 7 calendar days. Notices of Violation have been previously sent to this facility on 2/612009, 12/17/2013, 11125/2015 and 6l712017 for not having a Stormwater Pollution Prevention Plan, Analytical and Qualitative monitoring forms available for review. Page: 2 Permit: NCG020477 Owner - FaCility:wellons Construction Inc inspection Data: 0210112018 - Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes Na NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the'Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ® ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ 0 # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ M # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ M # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ ■ Comment: A Stormwater Pollution Prevention Plan (SSPPP) was not available for review. [,qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ �,.__ Comment:. The Qualitative Monitoring Records were not available for review. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ■ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: The Analytical Monitoring records were not available for review. Permit and Qutfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ 0 # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment-. Page: 3 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY February 9, 2018 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7012 3050 0001 9398 6068 Wellons Construction, Inc. Attn: Robert P. Wellons P. O. Box 736 Dunn, NC 28334 ROY COOPER Governor M[CHAEL S. REGAN Secretory WILLIAM E. (TOBY) VINSON, JR. Interim Dlrecror Subject: NOTICE OF VIOLATION (NOV-201B-PC-0034) NPDES Stormwater General Permit NCG020000 Wellons Construction, Inc. Wellons Cumberland Pit #1, Certificate of Coverage NCG020477 Cumberland County Dear Mr. Wellons: On February 1, 2018, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020477. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C waterbody in the Cape, Fear. River.Basin..... As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollutlon Prevention Plan SPPP A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. State of' orth Caroline I Fwnronmcntal Quality i Energy. Mineral and Land Resources Fayetteville Regional Offioe 1225 Green Street, Suite 714 t FayettevMe. NC 28301 410433-3300 El -Thank,you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Notices of Violation have been previously sent on February6, 2009, December 17, 2013, December 4, 2015 and June 7, 2017. If corrective actions are not taken by April 13, 2018, this Office Is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral and Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. During the last three years several attempts have been made to schedule inspections at the Wellons Cumberland Pit #1 with representatives of Wellons Construction, Inc. No company personnel have. attended the planned inspections. Should you have any questions regarding these matters, please contact Melissa Joyner or myself at'(910) 433-3300. Sincerely, Timothy L. LaBounty, PE Regional Engineer DEMLR TLLlmaj Enclosure: Compliance Inspection Report cc: Seth Thompson — Vice President — Wellons Construction, Inc. (via email) Scott Johnson — Superintendent — Wellons Construction, I nc. (via email) William E. (Toby) Vinson, JR.., - Interim Director - DEMLR (via email) Annette Lucas, State Stormwater Specialist - DEMLR (via email) Laura Alexander, Administrative Assistant — DEMLR (via email) FRO — DEMLR, Stormwater Files-NCGG020000 Compliance Inspection Report Permit: NCG020477 Effective: 10/01115 Expiration: 09/30/20 Owner: Wellons Construction Inc { SOC: Effective: Expiration: Facility: Wellons Construction Incorporated County: Cumberland 510 N Powell Ave i Region: Fayetteville Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: } System Classifications: Primary ORC:. Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: D2101I2018 Entry Time: 02:30PM Exit Time: 03:15PM Primary Inspeetar: Melissa A Joyner Phone: Secondary Inspector(s): -- Reason for. Inspection:. Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormweter Discharge COC Facility Status: Compliant Not Compliant Question Areas: Slarm Water (See attachment summary) Page: 1 permit NCG020477 Owner -Facility: Wellons Construction Inc Inapection Data,, 0210112018 - lnepaction Type :Compliance Evaluation. Inspection Summary: ReasontorVfsit. ..Roufine .-.- • ... .... .. - Melissa Joyner attempted to meet on site with Eric Deyle on 112412018. Mr. Johnson contacted Ms. Joyner on 1/24/2018 to let her know that he would be meeting with her but would not be able to meet on that date. The meeting was rescheduled for 2/1/2018 but was not attended by Mr. Johnson. Therefore the Stormwater Pollution Prevention Plan, Analytical and Qualitative monitoring forms were not available for review at the site. conducted an inspection of the Wellons Cumberland Pit #1, observing the Outfall for Sediment Basin #2 and noted that there was a tree still growing inside of the riser of this outfall which will need removal. The side slopes of Sediment Basin 92 have gully erosion in need of stabilization with permanent groundcover. NPDES General Permit NCG020000 requires that Best Management Practices be inspected once every 7 calendar days. Notices of Violation have been previously sent to this facility on 2/612009, 12/17/2013, 1112512015,and 6/7/2017 for not having a Stormwater Pollution Prevention Plan, Analytical and Qualitative monitoring forms available for review. Page: 2 r- j i Permit: NC6020477 Owner - Facility: wellons Construction Inc Inspection peter • 0210112019 Inspection Type; Compliance Evaluation Reason for Visit: Routine s 5torrnivater Pollution Prevention Plan Yea No NA NE i Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ ■ # Does the Plan inGude a General Location (USGS) map? ❑ ❑ 110 # Does the Plan include.a "Narrative Description of Practices"? ❑ 11110 i # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ R ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ ■ # Does the Plan indude a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ : # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ E. Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ M Comment: A Stormwater Pollution Prevention Plan (SPPP) was not available for review. ualitative Monitoring Yoe Na NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ — were not available for.review. �mmenk.. The Monitoring Records _.� v : Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The Analytical Monitoring records were not available for review. Permit and Outfalls # Is a copy of the Permit and the Cert!ficate of Coverage available at the site? # Were all oulfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stonTwater) discharges? Comment; Yes No NA Nh ❑❑❑■ ❑ ❑ M ❑ Yea No NA NE ❑❑❑■ ■❑❑❑ ❑ ❑ M ❑ ❑ ❑ ® ❑ Page: 3 ,. mestic Maff Only, No insurance Coverage Pravided) Ian FF�L U Er M Postage $ Certified Fee ri p Return Receipt Fee Postmark ` Here fl (Endorsement Required) O - Restricted Delivery Fee - - 0 (Endorsement Required) Ln 1--3 Total Postage & Fees M (l D ru r ro a C� sr o rear, Apt- PO Box No. 11/ lJ 7/ a _ •.!." City, State, +4 PS Form :rr August 2006 See Reverse for InstrucNortIll Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Notices of Violation have been previously sent on February 6, 2009, December 17, 2013 and December 4, 2015. if corrective actions are not taken by August 10, 2017, this Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral and Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. Should you have any questions regarding these matters, please contact Melissa Joyner or myself at (910) 433-3300. Sincerely, Timothy L. LaBOrPE Regional Engineer DEMLR TLLlmaj Enclosure: Compliance Inspection Report cc: Seth Thompson — Vice President -- Wellons Construction, Inc. Erik Deyle — Superintendent — Wellons Construction, Inc. William E. Toby Vinson, Jr., -PE, - Chief of Program Operations — DEMLR Janet Boyer, PE , State Mining Engineer Laura Alexander, Administrative Assistant — DEMLR, Stormwater Permitting Program FRO — DEMLR, Stormwater Files-NCG020000 ■ Camplete items 1, 2, and 3. A. Signatur6 ■ Print your name and address on the reverse Ll J A .Stgent so that we can return the card to you. i / ryia-Addressee ■ Attach this card to the back of the mailpiece, a eive by ( d Name)_ C. Dat of Delivery or on the front if space permits. �r1 IL ' rs� Article Addressed to: WELLONS CONSTRUCTION, ATTN'. ROBERT P. WELLONS P.O. BOX 730 DUNN, NC 28334 D. Is delivery adoss different from item t? Yes If YES, enter delivery address below: ❑ No C _ t ��III rpgArpi�` 1NH! 111 1![ jI jjII11t IEIE NN 1i1 `!f! 3 5e na re p a Adu &gnat e Restri pwB1�, ❑ e9strr dlMaiPRestricted Rer 9590 9401 0055 5071 5531 64 ❑CertifiedMa11 ❑ Certified Mail Restrie�t}�elivery RR urh Receipt for -� Cl Collect on Delivery VV rchandise 2..Arlicle,Number,(TiWnSferfrom..servicelabell. �C _�7� 0 Collect on Delivery Restricted D ivery ❑ nature Confirmation"" ed Mail nature 7012 3050 0001 9398 5 7 L 1 , ed Mail Restricted Delivery Restricted Delivery Confirmalion $500) PS Form 3811, April 2015 PSN 7530-02-000-9053 Domestic Return Receipt ; Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY June 7, 2017 CERTIFIED MAIL: 7012 3050 0001 9398 5771 RETURN RECEIPT REQUESTED Wellons Construction, Inc. Attn: Robert P. Wellons P. O. Box 730 Dunn, NC 28334 Subject: NOTICE OF VIOLATION (NOV-2017-PC-0339) NPDES Stormwater General Permit NCG020000 Wellons Construction, Inc. Wellons Cumberland Pit #1, Certificate of Coverage NCG020477 Cumberland County Dear Mr. Wellons: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director On May 26, 2017, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Wellons Cumberland Pit#1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020477. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C waterbody in the Cape Fear River Basin. As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, NC 28301 910-433-3300 Permit: NCGO20477 SOC: County: Cumberland Region: Fayetteville Compliance Inspection Report Effective: 10/01/15 Expiration: 09/30/20 Owner: Wellons Construction Inc Effective: Expiration: Facility: Wellons Construction Incorporated 510 N Powell Ave Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/26/2017 .EntryTime: 01:30PM Exit Time: 02:10PM Primary Inspector: Melissa A Joyner Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: S Storm Water (See attachment summary) Page: 1 Permit NCG020477 owner - Facility: Wellons Construction Inc Inspection Date: 05/26/2017 Inspection Type: Compliance Evaluation Reason for Visit: - Routine Inspection Summary: Melissa Joyner attempted to meet on site with Erik Deyle on 311612017, 512412017 and 5/26/2017. The first two meetings were missed by Mr. Deyle and rescheduled. The last meeting was not attended by Mr. Deyle. Therefore the Stormwater Pollution Prevention Plan, Analytical and Quantitative monitoring forms were not available for review at the site. I conducted an inspection of Wellons Cumberland Pit #1, looking at the Outfall for Sediment Basin #2 and noted that there was a tree still growing inside of the riser associated with this outfall which will require removal. The side slopes of Sediment Basin #2 have gully erosion in need of stabilization with permanent groundcover. General Permit NCG020000 requires that Best Management Practices be inspected once every 7 calendar days. Notices of Violation have been previously sent to this facility on 21612009, 12/17/2013 and 11/25/2015 for not having a site specific Stormwater Pollution Prevention Plan and completed Analytical and Qualitative monitoring forms for the site. Page: 2 e Permit., NCG020477 Owner - Facility: Wellons Construction Inc Inspection Date: 05126/2017 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ®❑ El # Does the Plan include a General Location (USGS) map? ❑ s ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ®❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ E ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ®❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ 0 ❑ #,Does the Plan include a BMP summary? ❑ ®❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ E ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ■ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ®❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ®❑ ❑ # Is the Plan reviewed and updated annually? ❑ M ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ®❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: A Stormwater Pollution Prevention Plan (SPPP) was not available for review. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑ Comment: The Qualitative monitoring records were not available for review. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ M ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehide Maintenance areas? ❑ ❑ ® ❑ Comment: The Analytical monitoring records were not available for review. Permit and Outfalts Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ®❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ■ ❑ ❑ Comment: Page: 3 1 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY June 7, 2017 CERTIFIED MAIL: 7012 3050 0001 9398 5771 RETURN RECEIPT REQUESTED Wellons Construction, Inc. Attn: Robert P. Wellons P. 0. Box 730 Dunn, NC 28334 Subject: NOTICE OF VIOLATION (NOV-2017-PC-0339) NPDES Stormwater General Permit NCG020000 Wellons Construction, Inc. Wellons Cumberland Pit #1, Certificate of Coverage NCG020477 Cumberland County Dear Mr. Wellons: ROY COOPER Governor MICHAEL S. REGAN secretary TRACY DAVIS Director On May 26, 2017, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020477. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C waterbody in the Cape Fear River Basin. As a result of the site inspection, the following permit conditions violations are noted 1) Stormwater Pollution Prevention Plan_(SPPP) A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring ' Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, NC 28301 910-433-3300 r Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Notices of Violation have been previously sent on February 6, 2009, December 17, 2013 and December 4, 2015. If corrective actions are not taken by August 10, 2017, this Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral and Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. Should you have any questions regarding these matters, please contact Melissa Joyner or myself at (910) 433-3300. Sincerely, TiiL. LaBo PE Regional Engineer DEMLR TLLlmaj Enclosure: Compliance Inspection Report cc: Seth Thompson — Vice President — Wellons Construction, Inc. Erik Deyle — Superintendent— Wellons Construction, Inc. William E. Toby Vinson, Jr., PE, - Chief of Program Operations — DEMLR Janet Boyer, PE , State Mining Engineer Laura Alexander, Administrative Assistant — DEMLR, Stormwater Permitting Program FRO — DEMLR, Stormwater Files-NCG020000 Permit: NCG020477 SOC: County: Cumberland Region: Fayetteville Compliance Inspection Report Effective: 10/01/15 Expiration: 09/30/20 Owner : Wellons Construction Inc Effective: Expiration: Facility: Wellons Construction Incorporated 510 N Powell Ave Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/26/2017 .'Entry Time: 01:30PM Exit Time: 02:10PM Primary Inspector: Melissa A Joyner Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: M storm Water (See attachment summary) Page: 1 Permit: NOG020477 Owner - Facility: Weilons Construction Inc Inspection dater- 05/26/2017 Inspection Type : Compliance Evaluation -. - . Reason for Visit: - Routine. Inspection Summary: Melissa Joyner attempted to meet on site with Erik Deyle on 3/16/2017, 5/24/2017 and 5/26/2017. The first two meetings were missed by Mr. Deyle and rescheduled. The last meeting was not attended by Mr. Deyle. Therefore the Stormwater Pollution Prevention Plan, Analytical and Quantitative monitoring forms were not available for review at the site. I conducted an inspection of Wellons Cumberland Pit #1, looking at the Outfall for Sediment Basin #2 and noted that there was a tree still growing inside of the riser associated with this outfall which will require removal. The side slopes of Sediment Basin #2 have gully erosion in need of stabilization with permanent groundcover. General Permit NCG020000 requires that Best Management Practices be inspected once every 7 calendar days. Notices of Violation have been previously sent to this facility on 2/6/2009, 12/17/2013 and 11/25/2015 for not having a site specific Stormwater Pollution Prevention Plan and completed Analytical and Qualitative monitoring forms for the site. Page: 2 Permit: NCG020477 Owner - Facility: Weltons Construction Inc Inspection Date: 05/26/2017 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USES) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? #. Does the Plan include a BM summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: A Stormwater Pollution Prevention Plan (SPPP) was not available for review. Qualitative Monitorinci Has the facility conducted its Qualitative Monitoring semi-annually? Comment: The Qualitative monitoring records were not available for review. Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The Analytical monitoring records were not available for review. Permit and Outfalls # is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ❑®❑❑ ❑ E ❑ ❑ ❑ ® ❑ ❑ ❑ ®❑ ❑ ❑ M 110 ❑ ®❑ ❑ ❑ ❑ ® ❑ ❑■❑❑ ❑®❑❑ ❑ ® ❑ ❑ ❑ ®❑ ❑ ❑ N ❑ ❑ ❑ S ❑ ❑ ❑ ®❑ ❑ ❑®❑❑ Yes No NA NE ❑ ® ❑ ❑ Yes No NA NE Yes No NA NE ❑ ❑ ❑ ❑ ❑ M ❑ ❑a❑❑ Page: 3 ■ (Domestic Mail Only; No Insurance Coverage Provided) For delivery information visit our website at %ww.usps.coms F 0FF9C9AL UnSE rq ru Postage C3 Return Receipt Fee - FOW- - Ir to Total Postage & Fees $ r M Sent To it/F t [!�N y �•D,rf fT e/ G r or l�U Box No. ----- 71� --•------------------•----•- Gty, stare, ZIPr4 N Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations been sent previously'vil penalty assessment of up to $25,000 per on February 6, 2009 and December 17, 2013 day for each violation. Notices of Violation have for these same violations. If corrective actions are not taken by April 1, 2016, this Office may consider sending a recommendation for enforcement to the Director of the Division of Energy, Mineral 8r Land Resources regarding these issues. Should you have any questions regarding these matters, please contact Melissa Joyner or myself at (910) 433-3300. Sincerely, T mothy-L. LaBAunt , PE Regional Engine Land Quality Section TLlmaj Enclosure: Compliance Inspection Report cc: Bradley Bennett, Stormwater Program Supervisor Janet Boyer, PE, State Mining Engineer FRO — Land Quality Section, Stormwater Files-NCG020477 ■ Complete items 1, 2, and 3. Also complete Si item 4 if Restricted Delivery is desired. ' ■ Print your name and address on the reverse so that we can return the card to you ■ Attach this card to the back of the mallple a, or on the front if space permits. g R. < 1. Article Addressed to: ,; D. Is If WELLONS CONSTRUCTION, ATT\: ROBERT P. WELLONS P.O. BOX 730 UUI`dN. NC 28334 'vNnQMLeZrtified Mail® ❑ Priority Mall Express'" Registered JOWeturn Receipt for Merchandise ❑ Insured Mall 0 Collect on Delivery 4. Restricted Delivery? (Extra Fee) ❑ yes H//�,,,��Agent Addressee ed by (A ali Na e} C. Date of Delivery ery address different from item t ? L.-� yes enter delivery address below: ❑,No. DEC 1 0 ?�i5 r 2. Article Number ' 7 010 3090 0001 3 21,E 4 618 (transfer from service tabeg PS Form 3811, July 2013 Domestic Return Receipt PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Environmental Quality December 4, 2015 CERTIFIED MAIL: 7010 3090 0001 3216 4618 RETURN RECEIPT REQUESTED, Wellons Construction Inc. Attn: Robert P. Wellons P. O. Box 730 Dunn, NC 28334 Subject: NOTICE OF VIOLATION (NOV-2015-PC-0307) and Wellons Construction, Inc. Wellons Cumberland Pit #1, COC-NCGO20477 NPDES Stormwater General Permit-NCG020000 Cumberland County Dear Mr. Wellons: On November 25, 2015, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral & Land Resources, conducted a site inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the inspection report is enclosed for your review. Stacy Strickland, the site manager, was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000, Certificate of Coverage NCG020477. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C stream in the Cape Fear River Basin. As a result of the site inspection, the following permit conditions violations are noted 1) Stormwater Pollution Prevention Plan1SPPP1 A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan -of Action to prevent these violations from recurring. Division of Energy, Mineral, and Land Resources Land Quality Section Fayetteville Regional Office, 225 Green Street - Suite 714, Fayetteville, North Carolina 28301 Phone: 910-433-33001 FAX: 910-486-07071 Internet: http:llportal.ncdenr.orglweb/Irl An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Compliance Inspection Report Permit: NCG020477 Effective: 10/01/15 Expiration: 09/30/20 Owner : Wellons Construction Inc SOC: Effective: Expiration: Facility: Wellons Construction Incorporated County: Cumberland 510 N Powell Ave Region: Fayetteville Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: System Classifications: Primary ORC: . Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/25/2015 Entry Time: 09:00AM Primary Inspector: Melissa A Joyner Secondary Inspector(s): Certification: Phone: Exit Time: 10:10AM Phone: Reason for Inspection; Routine Inspection Type: Compliance Evaivation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant' ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Perrnit: NCG020477 Owner- Facility: Wcllons Construction Inc Inspection Date: 11/2612015 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: . Melissa Joyner met on the site with Stacy Strickland, Estimator, of Wellons Construction, Inc. The Anaytical Monitoring Forms were reviewed which had been recorded from January 1, 2014 through December 1, 2014. "No Flow" was documented from the outfall of Sediment Basin #2 during this time period. Analytical Monitoring has not been conducted for Period 1 of 2015 (Jan. 1, 2015 through June 30, 2015). Qualitative Monitoring has not been conducted. A Stormwater Pollulion Prevention Plan has not been developed for this facility. The outfall for Sediment Basin #2 was inspected. A tree is still growing inside the riser although it appears that it has had branches removed. There is also vegetative debris on the riprap protection inside of the riser. The swale leading to Sediment Basin #2 has gully erosion on a side slope in need of stabilization. General Permit NCG020000 requires that Best Management Practices(BMPs) be inspected once every 7 days and within 24 hours of a rainfall which is 0.50 or more inches. Notices of Violation have been previously sent to this facility on 216I2009 and 12/17/2013 for not having a site specific Storrnwater Pollution Prevention Plan and completed Qualitative and Analytical Monitoring Forms for the site. Page: 2 Permit NCG020477 Owner - Facility:WellonsConstructionInc Inspection pate: 1112512015 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ®❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfali locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ [] ❑ im # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ 91 # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ IM # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: A Stormwater Pollution Prevention Plan has not been developed for this facilit . Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑ Comment: The facility has not conducted Qualitative Monitorinq semi-annual. Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ IN El ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Analvtical Montitorina was noted for January 1. 2014 through December 1. 2014. Analytical Monitoring has not been conducted for Period 1 of 2015 (Jan. 1, 2015 through June 30, 2015). Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® [] ❑ ❑ # Were all outfalls observed during the inspection? ®❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: The Copy of the Certificate of Coverage was not available for review. Page: 3 PAT MCCRORY. d ovemdr DONALDR.- 1/Aly DE.R VAA'RT, ...... Lsecretaiy. Environmental Quality December 4, 2015 CERTIFIED MAIL: 7010 3090 0001 3216 4618 RETURN RECEIPT REQUESTED. Wellons Construction Inc. Attn: Robert P. Wellons P. O. Box 730 Dunn, NC 28334 Subject: NOTICE OF VIOLATION (NOV-2015-PC-0307) and Wellons Construction, Inc. Wellons Cumberland Pit #1, COC-NCGO20477 NPDES Stormwater General Permit-NCG020000 Cumberland County Dear Mr. Wellons: On November 25, 2015, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral &,Land Resources, conducted a site inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the inspection report is enclosed for your review. Stacy Strickland, the site manager, was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000, Certificate of Coverage NCG020477. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C stream in the Cape Fear'River Basin. , As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Pian.of Action to prevent these violations from recurring. Division of Energy, Mineral, and Land Resources Land Quality Section Fayetteville Regional Office, 225 Green Street - Suite 714, Fayetteville, North Carolina 28301 Phone: 910-433-33001 FAX: 910-486-07071 Internet: http://Dortal.ncdenr.orglwebllri An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Thank you for your attention to this matter. This office requires that the violations, as detailed above,. be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up.to $26,000 per day for each violation. Notices of Violation have been sent previously on February 6, 2009 and December 17, 2013 for these same violations. If corrective actions are not taken by April 1, 2016, this Office may consider sending a recommendation for enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues. Should you have any questions regarding these matters, please contact Melissa Joyner or myself at (910) 433-3300. Sincerely, 4 Timothy L. LaB unt , PE Regional Engine Land Quality Section TL/maj Enclosure: Compliance Inspection Report cc: Bradley Bennett, Stormwater Program Supervisor Janet Boyer, PE, State Mining Engineer FRO — Land Quality Section, Stormwater Files-NCG020477 'w lye V Compliance Inspection Report Permit: NCG020477 Effective: 10/01/15 Expiration: 09/30/20 Owner: Wellons Construction Inc SOC: Effective: Expiration: Facility: Wellons Construction Incorporated County: Cumberland 510 N Powell Ave Region: Fayetteville Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/26/2015 Entry Time: 09:OOAM Primary Inspector: Melissa A Joyner Secondary Inspector(s): Certification. Phone: Exit Time: 10:10AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: [] Compliant ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 4 0.1 permit: NCG020477 Owner - Facility: Wellons Construction Inc Inspection Date: 11/25/2015 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met on the site with Stacy Strickland, Estimator, of Wellons Construction, Inc. The Anaytical Monitoring Forms were reviewed which had been recorded from January 1, 2014 through December 1, 2014. "No Flow" was documented from the outfall of Sediment Basin #2 during this time period: Analytical Monitoring has not been conducted for Period 1 of 2015 (Jan. 1, 2015 through June 30, 2015). Qualitative Monitoring has not been conducted. A Stormwater Pollulion Prevention Plan has not been developed for this facility. The outfali for Sediment Basin #2 was inspected. A tree is still growing inside the riser although it appears that it has had branches removed. There is also vegetative debris on the riprap protection inside of the riser. The Swale leading to Sediment Basin #2 has gully erosion on a side slope in need of stabilization. General Permit NCG020000 requires that Best Management Practices(BMPs) be inspected once every 7 days and within 24 hours of a rainfall which is 0.50 or more inches. Notices of Violation have been previously sent to this facility on 2I612009 and 12/17/2013 for not having a site specific Stormwater Pollution Prevention Plan and completed Qualitative and Analytical Monitoring Forms for the site. Page: 2 "_/ ' Permit: NCG020477 Owner • Facility: Wellons Construction Inc Inspection Date; 1112512015. Inspection Type ; Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? [] ®❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ IN # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ 0 Comment: A Stormwater_ Pollution Prevention Plan has not been developed for this facility. Qualitative Monitoring — Yes No NA N£ Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑ Comment: The facility has not conducted Qualitative Monitoring semi-annuaiiy. Analytical Monitoring Yes No NA NE Has'the facility conducted its Analytical monitoring? ❑ ®❑ ❑ W Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Analytical Montitoring was noted for January 1, 2014 through December 1 2014. Analytical - Monitoring has not been conducted for Period 1 of 2015 Jan. 1 2015 throw h June 30 2015). Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: The Copy of the Certificate of Coverage was not available for review. Page: 3 Georgoulias, Bethany From: admin@ncdenr.gov Sent: Monday, November 30, 201S 5:21 PM To: SVC DENR.stormwater Subject: Confirmation for Renewal of DEMLR Stormwater NPDES General Permit ** Do not reply to this e-mail as it is from an unmonitored mailbox. ** Thanks for renewing your permit using our online option. No further action is necessary. The new General Permit is available for printing from our website at http://portal.ncdenr.org/web/Ir/stonnwater. If you have questions, please contact Bethany Georgoulias at bethany.georgoulias@ncdenr.gov phone (919) 807-6372 or Bradley Bennett at bradley.bennett@ncdenr.gov phone (919) 807-6378. If you forgot to print your Certificate of Coverage (COC), you can resubmit the data and print another copy. This COC is issued pursuant to the requirements of North Carolina General Statute 143-215.1. and the memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) The General Permit authorizes discharges of stormwater/wastewater and specifies your obligations for discharge controls, management, monitoring, reporting,, and record keeping. Please review the new permit to familiarize yourself with all of the changes. Parts V and VI contain the Standard Conditions, including Compliance and Liability; Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Your facility has six months from receipt of the COC to update its Stormwater Pollution Prevention Plan (SPPP) to comply with changes in SPPP requirements. Other changes are effective immediately. Please note that Tier 3 Actions (if applicable) are triggered by four benchmark exceedances beginning on the effective date of the renewal permit and do not count prior exceedances. Please visit our website above to review the new General Permit carefully. Your coverage under the General Permit is transferable only through the specific action of DEMLR. This permit does not affect the legal requirements to obtain other permits which may be required by DEQ, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. CONFIRMATION DETAILS Permit Number: NCG02047_7 _ Effective Date: 10-01-2015 Expiration Date: 09-30-2020 Organization Name: Wellons Construction Inc ,Facility Name: - -- -- - - - Wellons Construction Incorporated - �._ -� - -_-- - Admin Region: -- Fayetteville - - _ County Name: Cumberland Regulated Activity: Mining Activities Stormwater Discharge COC Receiving Stream Name: Rockfish Creek _ Receiving Stream Class: C 1 w—'_ Wellons CONSTRUCTION, INC. February 7, 2014 NC Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Land Quality Section Attn: Brad Cole, PE 225 Green Street, Ste. 734 Fayetteville, NC 28301-5095 Re: Notice of Violation (NOV2-2013-PC-0349) Wellons Cumberland Pit #1, COC-NCGO20477 NPCES Stormwater General Permit-NCG020000 Cumberland County Dear Mr. Cole: E E 8 1 1 2014 We submitted a letter to your office dated January 8, 2014 to explain why our Stormwater Management Program had feel short of compliancy due to change in management. We have since updated our program and A Lee, a project manager has been assigned as the site manager. Mr. Lee has since communicated with Mike Lawyer with DWQ about the monitoring and required reports. Mr. Lee has visited the site after each significant rain fall to see if runoff was evident, but no water was discharging from the structure. Mr. Lawyer also told Mr. Lee that he is glad to hear we were monitoring the site and would look forward to receiving the Benchmark Exeedence Report bi-annually and the Annual Summary DMR. We have scheduled the submittal of the benchmark report by June 1, 2014. Mr. Lee will also continue to visit the site to conduct rain fall and erosion control monitoring as needed. We have compiled a binder containing all inspection forms/logs, a copy of General Permit No. NCCO2000, Benchmark Exceedence DMR and Annual Summary SMR Reports, Stormwater Discharge Outfall Qualitative Monitoring Report, General BMP Maintenance Instructions and sample of Storm Water Pollution Prevention Plan. We feel confident we are fully compliant at this time and Mr. Lee is also in the process of training a second employee of Wellons in the event of his absence, to ensure the protocol is followed. Sincerely, L"Z&W � - Darlene Lucas Assistance Secretary' 510 N. Powell Ave., P.O. Box 730, Dunn North Carolina 28335 910-892-3123 or 910-892--6630 / FAX 910-892-3046 Wellons CONSTRUCTION, INC. January 8, 2014 NC Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Land Quality Section Attn: Brad Cole, PE 225 Green Street, Ste. 714 Fayetteville, NC 28301-5095 Re: Notice of Violation (NOV-2013-PC-0349) Wellons Cumberland Pit #1, COC-NCGO20477 j F , NPDES Stormwater General Permit-NCG020000 ` J A N 1 0 2014 Cumberland County Dear Mr. Cole: We are in receipt of your letter dated December 17, 2013. It was delivered to our post office box via Certified Mail on December 19, 2013. Our site manager, JK Lee was present at the time of the site inspection on December 11, 2013 conducted by Melissa Joyner and Mike Lawyer from the Fayetteville Regional Office. There was another site manager for Wellons Construction prior to Mr, Lee but he retired from the company over two years ago. The prior site manager was responsible for submitting monitoring documentation to NCDENR and we are unable to locate his files. Since Mr. Lee has met with your representatives at the Cumberland Pit #1 site, we have discussed and are in the process of implementing new Storm Water Management Program for Wellons Construction. Included in this program will be timely monitoring and testing as required by the permit. Reports (SWU- 242-112608) shall be submitted to your office once scheduled testing is performed. We will submit a copy of our Storm Water Management Program to you within thirty days. Please advise is further detail is requested. Sincerely, � 1 Darlene Lucas , 1 Assistant Secretary 510 N. Powell Ave., P.O. Box 730, Dunn North Carolina 28335 910-892-3123 or 910-892-6630 / FAX 910-892-3046 Wello s CONSTRUCTION, INC. W Powell Ave., P.O. Box 731 Dunn, North Carolina 28335 nIN IIII NIIIIIuIIllIlli� 7013 oeoo 0000 5591 ,.oa ,spies Pc4T � � o • � _'i'4/ �PITNEY BQ WES 02 1P $ 006.11 0003998906 JAN 09 2014 MAILED FROM ZIP CODE 28334 NC Dept. of Environment & Natural Resources, 'and Quality Section ' Attn: Brad Cole, PE i 225 Green St., suite 714 JAN } p 2014 Fayetteville, NC 2830i-5095 I i~ 1 A W NCDENR North Carolina Department of Environment'and Natural Resources Division of Energy, Mineral and Land Resources Tracy E. Davis, PE, CPM Land Quality Section Pat McCrory, Governor Director John E. Skvarla, III, Secretary December 17, 2013 CERTIFIED MAIL: 7009 3410 0001 6831 5842 RETURN RECEIPT REQUESTED Wellons Construction Inc. Attn: Robert P, Wellons P. O. Box 730 Dunn, NC 28334 Subject:, NOTICE OF VIOLATION (NOV-2013-PC-0349) and RECOMMENDATION FOR ENFORCEMENT Wellons Construction, Inc. Wellons Cumberland Pit #1, COC-NCGO20477 NPDES Stormwater General Permit-NCG020000 Cumberland County Dear Mr. Wellons: On December 11, 2013, Melissa Joyner and Mike Lawyer from the Fayetteville Regional Office of the Division of Energy, Mineral & Land Resources, conducted a site inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the inspection report is enclosed for your review. J. K. Lee, the site manager, was present during the inspection and his time and assistance is greatly appreciated. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C stream in the Cape Fear River Basin. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Perm it-NCG020000, Certificate of Cove rage-NCG020477. As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollution Prevention Plan SPPP A Stormwater Pollution Prevention Plan (SPPP) has.not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested_ Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. Fayetteville Regional Office 225 Green Street -- Suite 714, Fayetteville, North Carolina 28301-5095 Phone: 910-433-33001 FAX: 910-486-07071 Internet: http.IJportal.ncdenr.orgtwebllrlland-quality An Equal Opportunity 1 Affirmative Action Employer Thank you for your attention to this matter. This Office is considering sending a re enforcement to the Director of the Division of Energy, Your above- mentioned response to this comes g commendation for requires that the violations, as detailed above, be de Mineral will e cons Resources regarding these issues. correspondence will of considered in this process. This office violations are subject to a civil penalty assessment of u to properly resolved. These violations and any future have any questions regarding these matters, please contact Melissa Joyner or myself p $25,000 per day for each violation. Should you y ff at (940) 433-3300. BClmaj Enclosure; Compliance Inspection Report Sincerely, Brad Cole, PE Regional Engineer Land Quality Section cc: Bradley Bennett, Stormwater Program Supervisor Janet Boyer, PE State Mining Engineer FRO — Land Quality Section, Stormwater Files-NCG020477 0 Complete items 1, 2, and 3. Also complete Item 4 if Restricted Delivery is destred. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this cart! to the back of the mailpiece, or on the front if space permits. A. Slgyalpfo © Agent X �- Add see f. Rdcely by {P d fY�rrre) �` A CvDat of Wiive ti . - D. is livery address dHfeaertt from item 1? If If YES, enter delivery address below: ❑ No DEC 19 2013 Article Addressed to: WELLONS CONSTr IUC.110N ilia. e I" T ill. rZ0RER l 7-, \ S)L.L[ ONO 3. Service type la.Cermed Mali ❑ Express Mail 0� _ ❑ Registered XReturrt Recelpt far Merchandise f�).(I Ei0x i 30 I D U N N, NC G 8 3� A CI Insured Mail ❑ C.O.D. 4. Restricted Delivery? {Extra Fee) ❑ Yes 2. Article Number 7009 3410 0001 6831 5842 ` {Transfer from service lobe# i PS Form 3811, February M04 Domestic Return Recelpt =59$42-MAW : Compliance Inspection Report Permit: NCG020477 Effective: 01/01/10 Expiration: 12131114- owner: Wellons Construction Inc Effective: Expiration: Facility: Wellons Construction incorporated SOC: 510 N Powell Ave County: Cumberland Region: Fayetteville Dunn NC 28334 Phone: 910-892-6630 Contact Person: Robert Paul Wellons Title: Directions to Facility: System Classifications: Phone: Certification: Primary ORC: Secondary ORC(s):' On -Site Representative(s): Related Permits: Ent Time: 0100 PM Exit Time: 02.00 PM Inspection Date: 1211112013 Entry Phone: Primary Inspector: Melissa A Joyner Secondary Inspector(s): Phone: 910-433-3300 Ext.729 Mike Lawyer Reason for Inspection: Routine Inspection Type: Compliance Evaluation " Permit Inspection Type: Mining Activities Stormwater Discharge CDC Facility Status: ❑ Compliant ® Not Compliant question Areas: CERTIFIED MAIL,,, RECEIPT ® Storm Water rtl !Provided) CO 0FFIC���. VIE rn CO Postage Cerdited Fee attachment summary) C3 Postmark a� tptFee) (See (Endoettuum Hem O Restricted gellvery Fee 0 (EndomememRegired) L. it yy 0 I �n43 r L j -I- Total Postage a Foes rn o- en! o .r � _ drr it>✓ �L [7 ..4�'-.,�-...--1�✓-,CCU. --------- rti or PO sox tvo P /} it c..Q _._..... . ._ city., swfq pp+4 PS Form :0G Page 1 Permit: NCG020477 Owner - Facility: Wellons Construction Inc Inspection Date: 12/11/2013 inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: M. Joyner and M. Lawyer met on site with the Wellons Cumberland Pit #1 mine operator, J.K. Lee.. The Stormwater Pollution Prevention Plan, Qualitative and Analytical Monitoring Forms were not available for review because the facility had not developed a Stormwater Pollution Prevention Plan and had not conducted monitoring activities. A Notice of Violation was also sent to the facility on 2/6/2009 for not having a Stormwater Pollution Prevention Plan, Qualitative and Analytical Forms. Mr. Lee was informed that if the facility did not have these documents, another Notice of Violation would be issued. (It was later verified that the facility did not have these documents). Mr. Lee was given a.copy of the General Permit No. NCG020000 (Mine Discharge Stormwater Permit), the Qualitative and Analytical Monitoring Forms. M. Lawyer discussed with Mr. Lee about doing the Qualitative and Analytical monitoring and how to fill out the forms. He also said the General Permit required that the Best Management Practices (BMP's) be inspected once every 7 days and within 24 hours of a rainfall which is 0.50 or more inches. The outfall for Sediment Basin #2 was inspected. There is a tree growing inside the riser which will need removal. Page: 2 Permit: NOG020477 Owner - Facility; Wellons Construction Inc Inspection Date: 1211 t12013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ®❑ ❑ # Does the Plan include a General Location (USGS) map? D ❑ 0 ®' # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n ❑ Cl # Has the facility evaluated feasible alternatives to current practices? n n n # Does the facility provide all necessary secondary containment? n n n # Does the Plan include a BMP summary? n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n n # Does the facility provide and document Employee Training? n n n # Does the Plan include a list of Responsible Party(s)? n ❑ ❑ # Is the Plan reviewed and updated annually? ❑ D n In # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? In n n Comment: The facility does not have a stormwater plan. Qualitative Monitoring Yes. No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n f l ® n Comment: The facility has not conducted Qualitative Monitoring semi-annually. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ®❑ n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 12 ❑ Comment: The facility has not conducted monitoring semi-annually. Permit and Outfalls Yes -No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? n U n n # Were all outfalls observed during the inspection? ®❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? n n ® n # Has the facility evaluated all illicit (non Stormwater) discharges? ❑ Q ❑ Comment: The copy of the Permit and Certificate of Coverage are not available at this site. Page: 3 . ... ,_. -- -- ---- — --- - - '-. __ • • �a.��—_ __..11, . . .. -', I-- i (.� ,10 APPLICANT: :. WELLONS CONSTRUCTION, INC.. d MINE., -'NAME.. WELLONS CUMBERLAND PIT #1 COUNTY:. CUMBERLAND MINE MAP PREPARED BY: EDDY ENGINEERING, P.C., . BASED ON SURVEY BY MICHAEL TATE, RLS a DATES: SURVEYED DECEMBER 1998, MINE MAP PREPARE FEBRUARY 1999 t V! L. ROZIER 50' Undisturbed Buff° I~'f DB 652, PG 59 •---�� PERMIT BOUNDARY along Delineated'e 0 --- VES ---" VEGETATED EARTH EERM g Boundaries,, - Delineation• the Sediment Bain 1 SEDIMENT BASIN ! STOCKPILE AREAf f ' i ! See Detail Sheet 4. C Limits Of CONSTRUCTION `�� � �° DO DIVERSION DITCH r/ - r Diversion Ditch :� •' .; << T See Detail Sheet 7 13 o - 20,35829.71 ,- Vdgetated Earth Berm).. ......._._ r See Detail Sheet 7 �Q ....___ - ,;� - Comb. Factor. 0. 9998 77356 PIP i' i 0 C-, 40' .Undisturbed Buffer 1 ur % m scent ..to CP&L rust es ff l Q , n/ See etail Sheet 50f Combined Buffer a 0 oe \'\ CATEGORY TAILINGS/SEDIMENT PONDS AFFECTED ACREAGE 1-5 STOCKPILE AREA WASTEPILES PROCESSING AREA/HAUL: ROADS 1.0 0.0 0.5 MINE EXCAVATION 48.2 OTHER (VEB) 2A TOTAL AFFECTED AREA 53.6 - t . _ � �� .•r r � ,� �'� . ._ 60' Ad jacen Property ? -' - ' ..� •,= _ - -- --- ���� -fir Access Ease ent w/ Road f _ i' ��i5. See bet ii Sheet 7 co `� `� _ / / /ji• `; 40 Undisturbed Buffer Ad joe nt - to CP&L Structures, See .Detail Sheet 7 IV refabricated Farm Gote / Locking Device Use on' all entrance and exit "points 40 Undisturbed Buffer JAdjocent to CP&L Structures, �- X See Detail Sheet 7 Thomas J. G ood en PLS VY L. YOUNG 40 U-ndistur.bed Buffer ,� .� `: Gooden 8t Assc., Inc \ Adjacent to CP$cI,_ Struct es, , • ... .- ,-. 1745 Cypress Lakes Road .' ~ �.� �e See Detalf Sheet~, 7 r ..� ..- ; 40 ndx ur ed Buffer \,-y..;� ,-, Ajac nt /fo C !1. Structyr=es Hope Mi iFls, N.C. 2834$ See Detail Sheet 7 ' r 9I0-223-7766 Gravel Construction Entrance, construct j: in accordance with NCDENR Eroson and. NOTE; This plan revised r ised March, 2010 Sediment' Control. Planning & Design Manual f to show new Limits of Construction. 7 s�ccRoile a ,' R. LIN. COD Rll%ENBARK /e 1e 60 This area to include the D.B 230 PG 395 Undisturbed Buffers as shover:, - �.... _... - � •� ��.� . pay � f' _ - - _ ' / .. .. r ...... ~ �\ - ��• \may - $• + 1 rr'r ' bra d f NC D teno ce . MatchI1°n I I MI t I I Grdvel Construction Entrance r .�CEIVED '� 1 I APR 0 6 201 aND QUALITY SFrTjnm C TftNEERI POC4 98049 ,.r. Designed: Drown: 0 100 200 :S P.O. sox 81 R iSICH, NC 27B61 {els) 61a-t8a2 FAX {9 a) �>s-ie73 JLE PKS P PrQleci: SCALE, FEET Wellons Cumberland Pit #1 sere: • 17 AL is AS SHOWN 0 DENR Review Submittal 2/17/99 JL.E �! Cumberland Co., NC Wellons Construction, ]nc. meet No.: REV. DESCRIPTION DATE AAROVEO • :,+ v •'. !N •.•' .,�: o' o heat flue. 2 OF 10 � RlViS10NS l-' MINE MAP PART l . . - .-. . . . . . . - � . . . . . . . ". . . - .� . . %-* Ne .. . .1. -----,--- �� mn .-?- �0 m:�( � . � . . . .. ., . . ZVI. ... - . ... ,- .�� � I �, ., 4.j/ � \' ,..--�-� \ ) . � I � . m M. �. End f 1�C CT _ ",I .. .-,.. ",,I ! 4 , i,t.�. '1.-1. . I0 f ::. " -..I . ..,1.1 /-..._.. -' a tin ce I�....-. -1-'.1r - .1!..--'', .,- .. -. " -., ,-�,- ..�.7.. ..1. , .. ; .I .,. ...% :�.. -I . .-,... :r .. . 1,-.�.-- I -"., .e ..:.. . .'.,. . .. I .�. .. , .I., '�. .. ,. ..I . ..I . ... , .. I.� ..,... :.... . .._ _.... .. ...-.- I1r.�. .. .,.. ..'.-. I - ..�. .. '".. . d9 .. .,., �� , � :,-,-..,,.. 1.. ..�. ... . ,I.- , r:../. ,r, II� I...,II1- I� r - I .,. �'I *,..-. :I ; -..�%."I. .-.. .? .� . �.L. ,",,. ...--;. --.;*. ! ��: . -. . .I.. ." :� I � .�- ,.. - -I, ... .-,- . . ,..I �., -,...�. .,�.- . . I- - ,.- .�.,( -,.�,-... . -.. "-., -,, - ...-.--!r II ". , .,...rr ' .I -I, . .,.... ,t, ./ ,--% ;. :.! ., .,.--I�:'- . "1 ,.... � A I- . .'.t-.�4 I-- ,,,"!,�',-,.,- .0..1.- . -, ... ,.-. :, ",*..:7, .. ? .�,- . --I" -" . . 7; ... .: .,.-.,i-.-..I ! .-�; ,-.. .i�..1. ,.- '.�,I�, :�--. ..� ..-1.. ,,,; -. .."..-. .-,,. ,,- . ...O.-,-.f . -- ,-� -.- " -.7.... --.,,-J..-f-,. .. -:I -..- '1/ .:-.. ..I.�.....- "/.,"., - . ;-, .: . - ., .".- ." .-.I: ''. Irr ,...... -- I ,.. ,,, �... I II,'��.." ,- I-..II,��-,,-� ..1I,.,,.'".j%..,I. .. . . .. ,..1.".. .- . � -,.- `Ir1L . ',�,.- . - -... r,, I.. II I.., . . -�...'.�..,.1 .I . .- -" .��,. . ".1, --I1., ",I.,,. - �, \.,�,.. ,..", ,� ,,.. ,� ,�, r- .�".-'., . "I1.��.1 I .,, \� 1..��.1 .I:.� 1//- 4;d ,-. � .. . /.: I�1. .- ../.,I. 1. 1 .--.I .-'-� .-L-.---11-,1--" .-1 , .".<..-.....-.,1.�. '. ,..1. ." -.,.-. -- . .. " I .. .- .. 'O../.ffI-" - . , i# s,�.- S.� -. 9. "9fI-"&-I -i, A4/ ,A.,',, 11/ -9 %/. . ,.1-../. , 1-,.. I�- -,/..- . �' . �: e y''' f . ` r hl1n ` -1 /--/-�� - ,-� -�. �yiC t ,r f f' r .4 � r v '. -= C�' �,\ c e! Gor�s'tr': t.". .Entrance f . •5" _ __ _ _ s •}• " �.� . e.. /' 1 \ '\ �' Y4 . ; ' 1J1�1 . Q t �( . - Do -• �.. sJ . � . .. � . . . ." .. . . . . - .., . . I---- � .-.- - .- I - .1 ".. I . i �, " . . I . . . - . . . I , � I - )r I .�:... . ... I.. .1 � I, ... .. I.*. � -. - �.. . ...� . .I .-: , .-. .: . ..I . Ii-. .q. . . . .. �... .. . ..:�,. .- ;I. ,� . . .I. . .�. .I. .d .. .;.� . r .. I ..� ... �.. . %. � ..� .. .... .. .:-. .-. ,. . .:. I,I . I.. , .I ) ... .�.. �.. . I..I� . ,�. . -- -�..� -.: . I . -S 'S.- 1 _ . �. -.. .... . .. .r.. -.. �. �. : .. .�..:.,. _ . -. 4... ".-�1.:.I. I .� . ,:..:. -�...... . �. ...,-" . .. ..:m.. d, . : I I1. .I.. ., I1�..,-t. .'.. .:� ... -... .. .: .�. : .�.. ... . . . ..,.. . �-- .-�,... .. �.�,�,-1.�-. .�...: ._ :.1. � .-.L" '- .L..-.,�I:: .. . ... - .. �, .--. - . . - ..:.'.�� �. - . .1- �- . ....-:- ..."��. '.,...M.. -. . . ...II...,.: r..��, ...%i. �..1.,. .�,. :. ., ' ,. - .I. .. ,..�.-.�.-, --..'.�..- .�r. -.I�-. , . -- ..._.:. .- ..� - ,. --... L .-. -,. - ,.. . .. �.. . . . . L - : .. - ,... ... I .... 1.. ... . . .. . .a. ..- .- .....� �.�.� .,� .- _� .. .... ....,.., ,r4 . ..I . . . .,1.. . -...... . .I " .. �d. .. . - .. ,. .-.. .,t� -" .. :. � .; . ... - . - .. ... '. .. : . . r:. . ... �I ., .r�L .�. ....' ... '. '...� 'I I -I. .. .. ..c1: ..�... . . .-L.� ...-Lr . .-.L -. :I. . -. ... ... .I.. . -.- I- . . I. ... . '. -. . .� � . . � ... -. . .' �. ...rr. .. �.... L. -;.. , .. -. . .. ....- . �...- . ... : ... "-. .�. ..r. ---...�-�... .. .-,. -�. . .- L. �. ...�. .- ... r. � ..'.. .-I ,, .- .....--. - .-.��, I. - , . -- ..., . -,- ... . I. .r. :.-..I.. . ,,.-. .IL.1. .-. .';'1..,�.�.. rI �..--. �...,. . ..: r,. , ..'_- . ,1..' ... ., . - %v .... r '. ,I . . r,.... I, , . . ... ,. .:.r. .�.. . � ��,... : .�I : *4.II 1.. .�..�?- II-. .1 .._ -&....- . I1-. . ..,. . ".-.r.t.. . . �.,.I%". . . .� I .-., . -.z"r ..�I ...- ..I.�.. ;..`. . . �tI,� '.1.I -..I .-*I .,k� I.� \ -.. .., ,, . .. .'. , .�., L I -.��,. �. I . .. .. \:. . �., %-. -,. .I, ,, .-.... .., N,. . 0I.,�....- ' .'.,I'....%� ,.. .-"4... ,.-;. .-%I ...! ..,1- 1.,. 1,-.. . .� . 1..,.�I �.... ,1. I. . .-- ...� -.. ,.-,�..� .., ---,,,-� � -- -I.�-�� :;1"�.:r'I.., I,., .;,.l�� I... .. t.. z.::.�.,tt'..-,".1. ,.�-,.,..', . �-. '�. ..�.. "-- -.. , �... .., I'1 ,. .. -..',./ .�... *,.,\. -1I ,.. .;.. , .... ,...1. ..4 ,V..1�-0 1�L- -.�.-.- L.. I- I . - } \ ` `V _ W✓ - - - - f l - f' -... - _ ti of . P j _ , . - ',` r• .. - 1. .. - _ - ♦,' ,50' Cambiild Buffer _ r.-- f r I `,. ;r` O .. 50 Cor'h ined . Bi"f e 3 0: . . - ;• Vegetat.?d' Earkh Bean, . .' r i _ po e . -. S� Qetai! h �/- jj{ I f ` '4 ` _.... ' J. . - I!, 4 •�_ \ i 1 F -r - S . ....., . . 1 , �:.Y 3 , ,, P . SS s- _ "R S - I. _ - , \ _ - _ . ma's ' _ ... i ..-. ..... .. - - !'' f S 4 i- . •... .. ! _ _ /J/J• ... .. _ - - - _ i I3 .. +�� f i f f 1 1 O dime i \ ........ Se nt" Bos n 3 � . 4 r Q .- - 7^ 1 .. _ ', I 1 O q 1 1 0 q :o _.. ;� it i See` Deta Sht''4... e ''i . r i p .. - _ 1 _ 1 O .. . .�.. .. ,i :, -', _ `s O '4 'k ... ,. - . _ a _ - _ ..,.- - [ , 'mot , `, -%" .1�. ^. .,.,. _ _ _OIL+ i P _._- . .. 0 •1 - - J OO op . I. / `, fiver ion` Ditch I ... - 4� •, 4 ! _ , _ _ .. 2 t .. r C n - � . .. __ a See to i]' h p 7�•-. • , S eet 0 I Q .r !' t • « ... _... - _ - . I t P. . Wr _ - pp - . . 'i O ' It _ G �� V . i ., `ti O i - o - i Sedrrie, - - -r.. �L}.� �,/ , - rt.. Basin . . r / .._ p \ - % _ - �_ - J e�e' 'DetaiC�Sh�e� •�� . eo \ ,` rg .. _ , , . \, ; 5 nd5t rbed � e -. - ' - ' _ alo ,Deli eated` etland. � r j . .. - _ .. r* , 1 . . 9 r ,..- _ { . _ o k _•' _ t`- . o - Bo radar' s Se t�l tla ''d N :� - .. I . s P _ _ 1 i . _ i+p.+- ,'' " i rJ D i See �` 50: lJndi t r" f _ fine t o s bed Bu fer r' u p , ... .t' r' �... .. _ _ .. a i l ' e \ O' i i ,' 0 ,., O , Y i i \ " :4 _ `S"=1 } •� f3U L!1?leQteC�, et!{ nd; w... i i l O ~, . •/!��) ti f -♦ �Q �; "1�• � u da 'es,`, S,ee` etlan4d _ . �' f' s o. L3etin o ��.._. 1... �. -. �L�� . ... I .. . . .I-.L.r..�i '.L... . -. ,.. - , - �.. --.-.. - . � �.L.I I. . , I .. . ... L... .I �L. L r . I . .- ... .�r.� .. .. .I. ., I..I.L;:. .,..' . :. L... �.I ...-., - -..- .....- r -.. . ..I. .. ... ...-..:.. . '-.. r , .., . ,.. .�.*I... � .-. ,-. ,-� .c-�-�:I,N. . . ...-". �I ,. . : L.� .�- . , -L. j. .�-.` -..,.-L� L-',- .'. - ,--.. ' '..-. ..�. ,.�.LI. :.- .'., ,�."'.,..�. -1, L .. -� ...!.,.. I- ,,.,.;. �--'�j. ..,.�,:- .: L ,.- , - �-L, -........ . �. �. .. . -r- ..-. , . I...-�., . -,.I - .1.!.� ,..:Y. ..�.:..L.�.-I'.-:. 1!. .. .- 1. .... *. ."...-.'- . -. J. -; \:I .-.'..,.. - ..". .. .:� ..� :-iA- .. .� '....-. I: ".-... . r�I ... � . .I .',....-I,''-llII, ........ .-,.-,..." . `.. . �...�.. TL..-.. .-. -I i ; .1I.I, .. .:., �.1 1.. 1. rI. :. . - . �-I i . ... . .--�II .-- .- - ..- I. .. :... .. I. I ....... ..:,,..- �, '. %1.. .:.,. � .Lr . .I L..N '-.. .. ... . r- .,... ..... -'- 7.. I7 �. -I.. I - L' ...z ..1. . .: . . .. . ....L �r.. - --I , ...� , :. .'...I .�...� - .. .. LI.:......,. -. I. . . .:.. ,..:-.... .,. ''� .�. �.. ...: I .I '.. . f e. t n `'het, 0 �r, . . .. '.....-,-.�',- ..-..-:: r!"r... - t-L.-, - ':. ..7!..1,..;-:.IL . .- .... I. ,r..:,.-...� .. ;.,.- .. -..,:�� .. �i.,,. . -1�1... , ". \...�. ,.'.�. . ,� . .. ..:..,.. II' . . ... . -.%1. , ".-,, ... ".I .'-: . , . .,.I .� z�. . 1... .. I . , �., It.. .L.J..'1. .,, . . . -. ..�.I.-. .. .. -. V:- ,�. .- ., IL� -. . . .. "I. : 1, . .. r.. . ... .. - . L.(.: �I7 .. L. L Ir- .L- I . . . - . .-'. ' . .I r I . -...'." . r . � ..I .I. . ...... . ..r ..L. .. . �. . .. -. . . .. ...L I.�.,. - ., .I . � . ! ..�., � - ... - .. . ... ,., . L.1. .. ,'I.11 �:,, ,..'. 1-1.. ...1'. " I1�..I. ... . -� ,� ... . .. ..�,. -: -I. ." L.. I -" , I. �. ..,.� .-%,., , '..�,�'-. .- 1. �L'. �--.-.I..L , ,' N . .-.. - --� .. -LI .- r-_.. -.,.1.I - . . : . . .., ,. ......,..-L-.. ., ......�- 1,� .. .--.�,�.' ....,�,. -.1. - 11. .-. . -.1.".. , I .I . I . I ..1-..1 . . I 1,-/ L.. . . . L. . ,I. I- ., .. - -� -, , % .\'. L., ��% �L ,,.,.'% -.-*1." ",�\�,-- %.\'.L � , ��., , ,. %" '.. ,-1 :%- ", � . , ���.%..I,. . ".'.%%", II 1-�,% L I� ;�N ,- I. . -.,. ,\1. k, � -IIL '1�, .� -. , ,-. , , . -, r, �/ '/,.1, .. �� ,11I.1I .I- .-.,..-'.. . ..1.'. .,-'L.,-. . ",.�, .,`.- %,�.'' I-1.- , . .. .� . .. I....�..1. .�1 i .I. .-,,.�� r. ;e� I . ;.�.1 �-,,1I�;..,� � ��--"�--'.,1,�,. L_'/...."/... .7./..� %. . , ..%�."..., -.,- , ..lWe..... .,-. :L..- .,..,.,.� ' ...�.,i .� ...� . . !I. :�j.i. 1it- I.I : ..I, .�' -. .II,.j41-1r!.1.. .,.I . . .-.., .:- - � _, ,. .. ;� .... . ..' : . ..L . L.��,r. � .%' , . . ". %..-,. . .L I %,. , 1I,, .. .I, -..p0 L,,. l\�I. -I% , ,%. ,, I- � I-..- -YY..""�. , : ,'0I, '�I . .� ,`...F-:g, �.�. � s_,? - -" ,1. .... �L., -, . I ,, ,yf i ;�A-� .: ,. ,-t,. ., .' . �.L1I. '-0..o .. ;� , . -. A-' "�.� ,�l - ,, /`� .. f' �' R i O R 1.,.1, - , '--. ..- � .. --. .- -..--- - L. . ' ! k •�Rr E \ `a t p . r % V . 1 _ f . 1 i• f 1. . .'1 ., - _ : // ♦'i ', '` ... .. / . -', /'� j i \'. -; 'L .�-. 1, .`'�Pr.�� rr j-. . �, --, .,,.---,--, ' / .♦'.' Q I v f1 V a _ _. tt e . v i ' $ -1. D? r \ 0 ! I ♦ r� - - II i dD ,, . '% F f f ' /' ! ROC.+L`3.i ��````TTT .�L�•:r •'ti^•% ��Y r i S I . - , t �' l` -- -- - _ / i /'' i % /' / 1 II :":. J�].•��- /�].'�f��j J�Tj[�' . " - . , - - - + -ti; ' `' tit' rr•.• • i i : 5, - - . I , .:", -....'�`:., . .. .,�, - - v . N. � ?. - � ... .1�1 ,., ", � L I . . . . . �1. - � .. L - .. � . L. . I . . . . .1 . I 1� .. 1. - , , . . . . . � .. I � '.. , , /' - :" . .... . 1. .: . - ,- .., ,- ,,� '. � . I - . . . - -... . . . . . . . "r ... .. . . '. . . -. . -`.- .. -.-- . . . . . L . . . . . I . I - -.. . . . . . . - . .. .r . . -� . -1 . - .� ... . . . . . '... .. I . . .' L .- . �,., .. t .ti... J y h. ' "` y.,.,n .r%. -. I- � • • . • .. �. w. n . ... "...... - _ _..+. �. _ - . . � . . I . �., .-, . I . . L... 1�.. � -.. .. . . . LI - r . . " -� . . ... I . : . . " ". - - .. ... ' . - . . ' i f '_�• • •'1 : M� .' . ..., .... .. .. -" - _ ^L - - - _ - - .. - � . . . ,- ". . . . . L . . . .. . �' �. '- ----�-, . . . . . - � . - . .:. , . . . � - . . . , I . .. . .. � I 1 . r .. - t: . . =S� - _ .n - - - ^''.,..........•. .. :4 ./'~' :- - `..f _ _-"_ -.,, .. ' .. . .. . f .- - ' ,Z.. , . . ... ,. . ` T F;"s r �l 11 _ ... _ �. _ ... . 6. _ ,.�.n. , s ' - ... O z %s =t . ' • SO/ �[ 11 ,` • J f J4 \ LJ C c. e: ; CKETHAAl .1. 5 .1. . �. _ - I •- . .... - .. - . _ '-•-' . -.... . ,. ..____- ...... - I. i L. 1 - _ ..... . � .. � . � .. �. . .. 1 . . . \ . . . . . IV . . . � . I � -. .- .. L .. . I . -.1, .. �. ..1. . I . . ♦ �'/ ' .. CATEGORY - . - ..:." AFFECTED ACREAGE TAILINGS/SEDIMENT PONDS: :. . . " -' 1.5 - . . STOCKPILE AREA 1:.0 :.WASTEPILES . 0.0 - PROCESSINC AREA/HAUL ROADS 0.5 . MINE EXCAVATION ' 48.2 • '• OTHER (VEB) . 2.4 : TOTAL .AFFECTED AREA 53.6 1 % I / h `+`� .. ; r' f L' «,� - f,n o " . Q TRACT. .; 't . we :50' ut�t► `I ` 63 . \. _ . fY'� l - :ti,\ 22' ,semen t ;/ , ��f f1 ` . - . . � . . . . - % � - I . . , ,.� .., . , .. ; - , " I ". . - I . . � . . L i 1 I .. .. f It , 'z I , s . , �-- ,I �R -�•• i. , f ". . •cs r> . �. I - .1. �� h�flCl�A�L J. NOQNAtV . �" , - y \1 TRACT. 2 ' . .\ �� .. I �O.0 �.1 ` .1� 302 479 . . . .. ,'♦�. � 0 f ru . -r CUMBERL AND COUNTY � I . -...' J, __` ., .. - .. .. ... ' : ' -. - . APPLCANT: "' WELLONS CONSTRUCTION, INC. . - - . 1. „ , .� : MINE NAME: WELLONS CUMBERLAND -PIT #1 - . . t .-, . -COUNTY:. CUMBERLAND _ -MINE .MAP : PREPARED BY: EDDY` ENGINEERING, P.C., -BASED ON SURVEY BY MICHAEL TATE, RLS - . . -DATES SURVEYED DECEMBER 1998,. MINE '.MAP PREPARED FEBRUARY 19c9 ' . - 3 - - . - . _ . - , .- .. .. - & - .. -. . .. -. ,- S - . . . . -. . 5, .- .. ... . K.-.1. .'. -Thoma-s- J; Gooden PLS . -NOTE: This plan revised March :2010 �, ,ao goo I' -- - - - . to show new 'Limits of Constructia'n. . : Goode 8►`Assc:, �In'c. . - ,I745 Cypress Lakes .Road This area to-Anclud-e -t-h..e' - - scA- FEET , . . . - . .• : 'Hope -.Mills N:�.. 2834-8 - - Undisturbed"Buffe.rs as shown-. -910 2'23�77-6 E _ - , . . - ': . I "I " r . . _ " . . -,--� /\1 I I � - '� --- . . 0(:�4 I �\'-�--� f'> �-_ L 1'NX GROUP '�- ��7 �.7 6 MGf3RD TOLBERT 0 RE V. DENR Review. Submittal. DESCRIPTION�1 . REV1SfONS 917 �I i �, l® - - • - -- ..i . RECF,WED - - OEORGE R. SUVDERLAND . APR Q 6 7010' .. - . , - & WIFE - I LAND QUALI tY 5 C 10N,.: - . (�(�)) - : . . � . . . .._... - 2/17/99 JLE . DATE I •PPROY'ED . . . y 44 P`iect .16 EDDY EN IN�ERIN p.�: 98049 �+ �� , •• • �• J # Nsigned: Drawn: • 'Q •,, P.O. BOX Bf387 RAiFdCH, NC 27881 �819} bib-1882 FAX {9i8} Asa-e7a. JLE PKS . 9 '. . Arojeot _ SEAL � - Wellons Cumberland Pit t SCOW .. . 17604 AS SHOWN Loearion; Client: I. Cumberland Co., NC W I Iij . X. �' e Ions Construction, Inc.: sheet Na.: e-`•$nN �..o�y�'`*, Smut Tice: 0 MINE MAP PART 1I NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Tracy E. Davis, PE, CPM Land Quality Section Pat McCrory, Governor Director John E. Skvarla, III, Secretary December 17, 2013 CERTIFIED MAIL: 7009 3410 0001 6831 6842 RETURN RECEIPT REQUESTED Wellons Construction Inc. Attn: Robert P. Wellons P. O. Box 730 Dunn, NC 28334 Subject: NOTICE OF VIOLATION (NOV-2013-PC-0349) and RECOMMENDATION FOR ENFORCEMENT Wellons Construction, Inc. Wellons Cumberland Pit #1, COC-NCGO20477 NPDES Stormwater General Permit-NCG020000 Cumberland County Dear Mr. Wellons: On December 11, 2013, Melissa Joyner and Mike Lawyer from the Fayetteville Regional Office of the Division of Energy, Mineral & Land Resources, conducted a site' inspection for the Wellons Cumberland Pit #1 facility located at Claude Lee Road, Cumberland County, North Carolina. A copy of the inspection report is enclosed for your review. J. K. Lee, the site manager, was present during the inspection and his time and assistance is greatly appreciated. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Rockfish Creek, a Class C stream in the Cape Fear River Basin. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Perm it-NCG020000, Certificate of Cove rage-NCG020477. As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has.not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. _Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. Fayetteville Regional Office 225 Green Street- Suite 714, Fayetteville, North Carolina 28301-5095 Phone: 910-433-33001 FAX: 910-486-07071 Internet: http:llportal,ncdenr.org/web/Ir/land-quality An Equal Opportunity 1 Affirmative Action Employer Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding these matters, please contact Melissa Joyner or myself at (910) 433-3300. Sincerely, Brad Cole, PE Regional Engineer Land Quality Section BC/maj Enclosure: Compliance Inspection Report cc: Bradley Bennett, Stormwater Program Supervisor Janet Boyer, PE, State Mining Engineer FRO — Land Quality Section, Stormwater Files-NCG020477 Permit: NCG020477 SOC: County: Cumberland Region: Fayetteville Compliance Inspection Report Effective: 01/01/10 Expiration: 12/31/14 Owner: Wellons Construction Inc Effective: Expiration: Facility: Wellons Construction Incorporated 510 N Powell Ave Contact Person: Robert Paul Wellons Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Dunn NC 28334 Phone: 910-892-6630 Certification: Phone: Inspection Date: 12/1112013 Entry Time: 01:00 PM Exit Time: 02:00 PM Primary Inspector: Melissa A Joyner Phone: Secondary Inspector(s): Mike Lawyer Phone: 910-433-3300 Ext.729 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ' fl Compliant ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG020477 Owner - Facility: Wellons Construction Inc Inspection Date: 12/1112013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: M. Joyner and M. Lawyer met on site with the Wellons Cumberland Pit #1 mine operator, J.K. Lee.. The Stormwater Pollution Prevention Plan, Qualitative and Analytical Monitoring Forms were not available for review because the facility had not developed a Stormwater Pollution Prevention flan and had not conducted monitoring activities. A Notice of Violation was also sent to the facility on 2/6/2009 for not having a Stormwater Pollution Prevention Plan, Qualitative and Analytical Forms. Mr. Lee was informed that if the facility did not have these documents, another Notice of Violation would be issued. (It was later verified that the facility did not have these documents). Mr. Lee was given a.copy of the General Permit No. NCG020000 (Mine Discharge Stormwater Permit), the Qualitative and Analytical Monitoring Forms, M. Lawyer discussed with Mr. Lee about doing the Qualitative and Analytical monitoring and how to fill out the forms. He also said the General Permit required that the Best Management Practices (BMP's) be inspected once every 7 days and within 24 hours of a rainfall which is 0.50 or more inches. The outfall for Sediment Basin #2 was inspected. There is a tree growing inside the riser which will need removal. Page: 2 Permit: NCG020477 Owner - Facility: Wellons Construction Inc Inspection Date: 12/11/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? fl ❑ n # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ # Does the Plan include a "Narrative Description of Practices"? 0 o 0 # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ Q # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ n # Has the facility evaluated feasible alternatives to current practices? n D n # Does the facility provide all necessary secondary containment? ❑ 0 Cl # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: The facility does not have a stormwater plan. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: The facility has not conducted Qualitative Monitoring semi-annually. Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The facility has not conducted monitoring semi-annually. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: The copy of the Permit and Certificate of Coverage are not available at this site. 0 0 D m Yes No NA NE ❑000 Yes No NA NE 0 M 0 D 0D®n Yes No NA NE Page: 3 r`' 4 x NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director February 11, 2010 Robert Wellons Wellons Construction Inc PO Box 730 Dunn, NC 28334 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Wellons Construction Incorporated COC Number NCG020477 Cumberland County Dear Permittee: In response to your renewal application for continued coverage under stormwater General Permit NCG020000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage • A copy of stormwater General Permit NCG020000 • A copy of a Technical Bulletin for the General Permit • Two copies of the Tier 21 Exceedence Discharge Monitoring Report (DMR) Form for Stormwater • One copy each of the Annual Summary DMR Forms for Stormwater and Wastewater • Two copies of the Limit Violation DMR Form for Wastewater • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater and wastewater, and it specifies your obligations with respect to discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. If your Certificate of Coverage (COC) restricts authorization to discharge stormwater only (or other limited terms) based on your original application, or subsequent modifications to your COC, you must continue to meet these requirements or contact the Stormwater Permitting Unit to request a modification of this renewal COC. The more significant changes in the General Permit since your last Certificate of. Coverage include the following: Part ll: • Section B — Language referencing PAMS has been changed. Flocculants may now be used if evaluated by the Division and administered in accordance with maximum application doses and other requirements. Part III: • Section A — The permit now requires a Stormwater Pollution and Prevention Plan (SPPP) tailored to the mining industry, in lieu of a Stormwater BMP Plan. • Section A - Inactive mines may be inspected on a reduced schedule: at least once per month and after 0.5" (or more) of rain. To qualify, inactive mines must possess an "Inactive Renewal' from DLR or certify to DWQ the site has been stabilized. The permittee must notify the DWQ Regional Office of inactive status. Discharges from inactive mines must still be monitored on the same schedule as active mines. Wetlands and Stormwater Branch 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N, Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-63041 FAX: 919.807-64941 Customer Service: 1-877 623-6748 N Olrth Ca r0f f n a Internet: www,ncwaterqualit .org Aa f�i f y�jyl y An Equal Opportunity 1 APirmatiwe Action Employer 6Yi` �iLL� Permit Reiss uance — Permit Number NCGO20477 February 11, 2010 Page 2 • Section B — Revised provisions require that stormwater discharges be sampled twice per year (instead of annually), and that the sampling results be compared to new benchmark .values. (The previous cut-off concentrations have been removed.) • Section B — Revised provisions require the permittee to execute Tier One, Tier Two & Tier Three response actions, based on the first benchmark exceedence (Tier One) and the second consecutive benchmark exceedence (Tier Two). Tier Two requires that the permittee institute monthly monitoring (reported to the appropriate Regional Offices) instead of twice -per -year monitoring. Monthly monitoring shall be done until three consecutive monitoring events show no benchmark exceedences. • Section B — This part contains a new provision that four exceedences of any benchmark will trigger increased DWQ involvement in the permittee's stormwater management and control actions. DWQ may direct the permittee to apply for an individual permit, institute specific monitoring, or may direct the implementation or installation of specific stormwater control measures. • Section B — The definition of "Representative Storm Event" (RSE) now allows 48 hours (instead of 72 hours) of little or no precipitation to precede an RSE. • Section B — Stormwater discharges from a basin designed to contain the 10-year storm must now be monitored. • Sections B & C — Failure to monitor according to permit terms triggers monthly monitoring for the remainder of the permit. • Section C — Analytical monitoring for Total Petroleum Hydrocarbons (TPH) has replaced the Oil & Grease parameter in the previous permit. • Section D — Qualitative monitoring must now be conducted during the same representative storm event as the analytical monitoring. • Section D — The permittee is required to keep a written record of his response to problems identified by his qualitative monitoring observations. • Section D — If the permittee fails to respond effectively to problems identified by qualitative monitoring, the permittee may be required by DWQ to perform corrective action. • Section D — Qualitative ROS: Representative Outfall Status may be granted for qualitative monitoring for some Stormwater Discharge Outfalls (SDOs). • Section D — If mines do not respond to problems seen in visual monitoring, DWQ may now require that mines change the monitoring frequency, apply for an individual permit, implement in -stream monitoring, install or modify structural stormwater controls, or implement other controls. • Sections B, C, & D — Inability to sample due to adverse weather must be reported in the SPPP and recorded in the Annual Summary DMR. • Section E — A lower TSS Wastewater limit for PNA waters is included in the permit. • Section E — All mining operations are now required to monitor TSS in wastewater effluent discharges (not only industrial sand mines). However, TSS limits only apply to industrial sand ruining operations. • Section E — Turbidity limits on effluent discharges have been removed; however, turbidity standards still apply in the receiving waters. • Section E — Approval of a Pumping O&M Plan may be required prior to coverage (for sites with dewatering activities that have the potential to drain wetlands or other surface waters). • Section E — ATC Requirements have been changed for clarity. These requirements are now outlined for Mine Dewatering Wastewater, Process Wastewater, Overflow From Non -Closed -Loop Process Recycle Wastewater Systems, and Overflow From A Closed -Loop Process Recycle (CLPR). • Section E — Monitoring for Fecal coliforms in discharges to SA waters has been clarified. Fecal coliform monitoring is now required for all process and mine dewatering wastewater discharges to SA waters. Part IV: • Section E — Items 1. and 2, require submittal of a new reporting form: the Annual Summary DMR. This annual summary of the analytica! monitoring results should be submitted to the DWO Central Office by March 1 of each year. • Section E — Exceedences and violations must be sent to the appropriate DWQ Regional Office within 30 days of receipt from the lab. • Section E — Results of "No Flow" or "No Discharge" must be recorded within 30 days from the sampling period in the SPPP. "No flow" or "No Discharge" must also be reported on the Annual Summary DMR form. Permit Reissuance — Permit Number NCG020477 February 11, 2010 Page 3 Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact these members of the Stormwater Permitting Unit: Jennifer Jones at (919) 807-6379 or Bethany Georgoulias at (919) 807-6372. Sincerely, for Coleen H. Sullins cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020477 STORMWATER, MINE DEWATERING WATER AND/OR PROCESS WASTEWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wellons Construction Inc is hereby authorized to operate approved wastewater treatment system(s) and discharge stormwater and/or wastewater, as approved in the original permit/application or subsequent permit modification, from a facility located at: Wellons Construction Incorporated 510 N Powell Ave Dunn Cumberland County to receiving waters designated as UT to Rockfish Creek, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective February 11, 2010. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 111h day of February, 2010. for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission MINING PERMIT APPLICATION REVIEW FORM for the DIVISION OF WATER QUALITY ato - 4L0 Project/Number: W��ldhs _CAMnb�, Iona f2ij �►1 County: !ZLA nb 1pt) Please return comments back to: Comments due by: Will the operation, as proposed, violate standards of water quality? Comments: Watershed/Stream Name & Classification: C,G Q C NPDES permit required NPDES permit existing Nondischarge permit required YE5 . (Permit # G4ct) Nondischarge permit existing (Permit # ) Wetlands disturbed 18 2 �7 e�0'5. NO 401 Wetland Cert. required 674 401 Wetland Cert. existing (Permit # ) Reviewed b� Date. Print Name: 09/2005 Central Office Reviewer, North Carolina .Department of Environment and Natural Resources Beverly Eaves Perdue, Governor Dee Freeman, Secretary NCDENR James D. Simons, P.G., P.E. Director and State Geologist Division of Land Resources LETTER FOR RECENTLY EXPIRED PERMIT September 16, 2009 CERTIFIED MAIL 7008 1300 0001 1492 9377 RETURN RECEIPT REQUESTED Wellons Construction, Inc. _ �u Attn: Mr. Robert P. Wellons, President 2004 West Cumberland Street. .....; Dunn, North Carolina 28334 DWQ RE: Expired Mining Permit No. 26-46 Wellons Cumberland Pit #1 Cumberiand County Cape Fear River Basin Dear Mr. Wellons: This is to advise you that the above referenced mining permit expired on May 11, 2009 and has not been renewed. Inspections by personnel of the Department on September 15, 2009 revealed little or no reclamation efforts have been undertaken on the site. Expiration of the permit only precludes further mining operations; reclamation requirements continue to remain in effect. Section 74-56 of the Mining Act of 1971 mandates initiation of bond forfeiture proceedings for failure to reclaim in accordance with the reclamation plan. Also, civil penalties of up to $500.00 per day for each day of the violation may assessed under G.S. 74-64, Additionally, under G.S. 74-64, the penalty for operating a mine without a permit is a civil penalty of up to $5,000.00 per day for each day of the violation. Therefore no further mining may- _occur at the above mentioned site until you have applied for and obtained a valid mining permit from this Department. Please contact this office immediately at Land Quality Section, Fayetteville Regional Office, 225 Green St., Suite 714, Fayetteville, NC 28301, (910) 433-3300 to clarify your intention at this site. Only the issuance of a mining permit, and not the mere submittal of an application, will enable you to lawfully resume the mining operation. Land Quality Section (910) 433-3300Fax (910) 486-0707 225 Green Street, Suite 7I4/ Systel Building, Fayetteville, North Carolina 28301-5043 AN EQUAL OPPORTUNITY 1 AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED 110% POST CONSUMER PAPER Recently Expired Permit September 16, 2009 Page 2 of 3 You are required to submit an application for a new mining ermit and it must be approved before_ you may continue mining. You may elect to close and completely reclaim the mine and not apply for a new permit. In light of the above, you have two options to maintain compliance at this site. - (A) If you desire to continue mining operations at the site, you must: (1) Complete and file the attached application form for a new mining permit for this site along with the required corresponding mine maps. The appropriate mining permit application processing fee is also required (see attached fee schedule). No mining operations may be conducted until a mining permit is issued for this site. This corrective action must be completed WITHIN 30 DAYS OF RECEIPT OF THIS NOTICE_ (2) Commence adequate reclamation activities on the inactive sections of the affected areas at the site and continue said activities until all affected areas where mining has terminated have been sufficiently reclaimed). This corrective action must commence WITHIN 30 DAYS_ OF RECEIPT OF THIS NOTICE. (3) Repair sheet and gully erosion of diversion ditch and side slopes of mine. This corrective action must commence WITHIN 30 DAYS OF RECEIPT OF THIS NOTICE. (4) Permanently mark all permit boundaries approximately every 100' unless the line of site allows for larger intervals. This corrective action must commence WITHIN 30 DAYS OF RECEIPT OF THIS NOTICE. (5) Submit an Annual Reclamation Report for 2008. This corrective action must commence WITHIN 30 DAYS OF RECEIPT OF THIS NOTICE. 2 Recently Expired Permit September 16, 2009 Page 3.of 3 (B) If you desire to permanently close the mine, you must: (1) Provide this office with three (3) copies of a complete mine map at a scale of 1 "=50'. This map must delineate all affected areas at the site and those items listed on page 4 of the application form. This corrective action must be completed WITHIN 30 DAYS OF RECEIPT OF THIS NOTICE. (2) Provide this office with a complete reclamation plan for all affected areas at the mine site. This plan must include final slopes throughout the site, final cross -sections of all affected areas, permanent measures and/or devices to ensure that all reclaimed areas will be nonerosive, a complete revegetation plan for final reclaimed areas, etc. Said plan must include a time frame and sequence for each phase of reclamation for the entire mine site This corrective action must be completed WITHIN 30 DAYS OF RECEIPT OF THIS NOTICE. Should you fail to comply with the terms of this letter within the prescribed time frames, a formal Notice of Violation may be issued. The responsibility for understanding and complying with the requirements of the Act rests upon the individuals and firms who are subject to its requirements. The responsibility also rests with you for notifying this office of your intentions at this site. Please do not hesitate to contact Mr. Steve Cook or Melissa Joyner at (910) 433- 3300 regarding any questions you might have on this matter. Sincerely, M. Step n Cook, C.P.E.S. C. Regional Engineer Land Quality Section MSC/maj Enclosures: Mining Inspection Report Mining Permit Application. Mining Act of 1971 Mining Administrative Code Annual Reclamation Report For 2008 cc: Mr. Floyd Williams, PG Ms. Belinda Henson - DWQ 3 1 #4 VJellons CONSTRUCTION, INC. March 3, 2009 NC Department of Environment and Naturat"Resources Division of Water Quality Attn: Belinda S. Henson 225 Green Street, Ste. 714 Fayetteville, NC 28301 Re: Notice of Violation (2009-PC-0093) Wellons Cumberland Pit #1 Dear Ms. Henson am in receipt of your letter dated February 6, 2008 regarding the aforementioned violation. My project superintendents and I have since that time developed and implemented a Stormwater Management Program that is within the guidelines of the permit requirements. DENR -i - Monitoring, testing and proper recordkeeping will be put into effect immediately. We will begin taking water samples April 1, 2009 and will submit to Microbac in Fayetteville for testing. Please advise if further detail is requested. re y, Robert P. Wellons President RPW/dhl -JA DWQ 510 N. Powell Ave., P.O. Box 730, Dunn North Carolina 28335 910-892-3123 or 910-892-6630 / FAX 910-892-3046 Bevarly Eaves Perduo Governor MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen K Sullins Di ector February 6, 2009 CERTIFIED MAIL: 7006 21.50 0005 2109 8150 RETURN IIECEIPT REQUESTED NVOlons Construction, Inc. Attn: Robert P. Wellons PO Box 730 Dunn. INrC 28334 Subject: NOTICE OF VIOLATION (NOV-2009-PC-0093) NVellons Construction, Inc. Wellons Cumberland Pit #1 NPDES Storniwat.er General Permit-NCG020477 Cumberland County Dear Mr. Wellons: - Dee Freeman SeUrelaryr On January 29, 2009, Mike Lawyer from, the Fayetteville Regional Office of the Division of Water Quality conducted a site inspection for the Wellons Cumberland Pit #1 facility located on Claude Lee Road in Cumberland County; North Carolina. A copy of the Compliance Inspection Report is attached for your review. Mr. Bryan Milligan, General Superintendent, was also present during the inspection and his time and assistance is greatly appreciated. Stormwater from the facility drains to an unnamed tributary to Rockfish Creek, a Class C water located in the Cape Fear River Basin. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit-NCG020477. Accordingly; the following observations and/or permit conditions violations were noted during the Division of Water Quality inspection: 1) Stormwater Hest Alana ,einent Practices I3MI's Plan A Stormwater Best Management Practices (BMPs) Plan has been developed, recorded, and properly implemented. Yes ❑ No 2) Qualitative IVIonitoring Qualitative monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No Loc�i on: 225 Gran Street, Suije 714. Fay iir;ville, North Garr'IiP , Mol ?;,cne: E i?•d3: 3 00 i FA;,.. 010-48 i-07N % Cuslomei Service: 1-877.32"-6748 In,enzer tnr.r: cvra,erqualily ora ..�'�rual Op,:rr„;i;y t„Irmatl•,�� :�c,�en = ,�, iryrr 0 11 No3-tiiCai-oliMi FA'WI111'711 3) Anahytical,Njonitorin� Analvtical Monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No Other Observations: I'lease refer to the enclosed Compliance inspection Report for additional comments and observations made during the inspection. Requested Response You are asked to respond to this office, in writing, within 30 calendar days fi-om receipt of this letter'. Your response should include a plan of action to address the aforementioned violations as well as a reasonable time frame that you expect to be in full compliance with the conditions of the general permit. Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $2! 000 per day for each violation. Should you have any questions regarding these matters, please contact Nike Lawyer or myself.at (910) 433-3300. 13SH: ML/mI Attachment cc: FRO -Surface Water Protection NPS-Assistance & Compliance Oversight Unit Ln..t?iiu�: 225 ,racer, Sire-l. Stjitc 7 l,`, Faveiteville. North Carolina 2630i ?Frcit 910-433.3301 1 F�, `. 910_., )G-07 77 1 Customer 41'S�r.ci: PAL',^rJ.i'ri.F`Ic!?rl;i!"c. i�IV.�Ir ,fir, E; Opi:�rluit ' „iiun. [iv�� ra!i�r. F:r,pr;y�r Ln ED Sincerely, Belinda S. Henson Regional Supervisor Surface Water Protection Section U.S. Postal Service TM CERTIFIED MAIL3M RECEIP (Domestic Mall Only; No Insurance Coverage rovided) O r f C ' t_ USF Cr C3 Postage $ ru � Certified Fee Ln C3 Return Receipt Fee (Endorsement Required) M O Restricted Deiivery Fee (Endorsement nequired) Postmark Here C3 1n Total Postage r1-:1ia Wellons Construction. Inc. am o Attn: Robert I'. Wellons C3 Sireer;;npCiVo:: P.O. Box 730 Q or PO Box No. City State,ZlP+ Dunn, NC 28334 � :rr 0I1 j i ti� o l 1. i� C.ttL;1 I Ct Compliance Inspection Report Permit: NCG020477 Effective: 01/19/05 Expiration: 12/31/09 Owner: Wellons Construction Inc SOC: Effective: Expiration: Facility: Wellons Construction Incorporated County: Cumberland PO Box 730 Region: Fayetteville Dunn NC 28334 Contact Person: Robert Paul Wellons Title: Phone: 910-892-6630 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Bryan Milligan Phone: 919-868-1812 Related Permits: Inspection Date: 01/2912009 Z Time: 10:00 A Exit Time: 11:00 AM Primary Inspector: Mike Lawyer Phone: 910-433-3300 p Ex;,725' . �• 33z� Belinda 5 Henson Phone: 910-433-3300 Ex Reason for Inspection: Routine Inspection Type: Compliance Evaluation 33zc, Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: n Compliant ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG020477 Owner - Facility: Wellons Construction lnc Inspection Date: 01129/2009 Inspection Type: Compliance Evaluation Inspection Summary: Reason for Visit: Routine Met with Mr. Bryan Milligan, General Superintendent, at the mine site. Facility does not appear to have any wastewater discharges as there is no mine dewatering or material washing activities and no recycle system. Vehicle maintenance is not performed onsite. The NCG020000 general permit requires the development of a Best Management Practices (BMP) Plan in place of the usual Stormwater Pollution Prevention Plan. The BMP Plan should contain documentation pertaining to the implementation of stormwater BMPs, management of stormwater runoff and runon, inspection and maintenance of stormwater BMPs, implementation of the mining permit issued by Land Quality, preventative maintenance and good housekeeping practices and the provision of secondary containment if applicable. According to Mr. Milligan, a BMP Plan has not been developed or provided to him. The NCG020000 permit also contains visual and analytical monitoring requirements for wastewater and stormwater discharges. Monitoring has not been conducted. This facility has a single basin to which ali runoff is conveyed prior to discharging through outfall. Repair work has recently been done to an area of the basin's side slope where a breach had occurred previously. Although there are no wastewater discharges at this facility, monitoring of the site's outfall should be conducted in compliance with the stormwater monitoring section of the NCG020000 permit. Where were no apparent water quality impacts at the time of inspection. ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach -this card to the back of the mallplece, or onjthze front if space permits. 1. Article"Addressed to: Weilo-]IS CollStrUCtiOn, Inc. Attn: Robert 1'. Wellons P.O. Box 730 Dunn, NC 28334 A. �� ❑ Agent ❑ Addre. i ecel%ed by (Print d Name} C. Date of ery V d e vie Elk( &S 1 ') . -a 'D. Is delivery address different from item 17 ❑ Yes If YES, enter delivery address below: ❑ No w 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Reglstered ❑ Return Recelpt for Merchandise ❑ Insured Mall ❑ C.O.D. 4. Restricted Delivery? (Extra Fee} ❑ Yes 2. Article Number _ - -_ (Transfer from service labeq 7 0 0 6 2150 0005 2109 8150 - - 1 P5Form 3811, February 2004 Domestle Return Receipt 102595-02-W1540? Page: 2 't Permit: NCG020477 Owner - Facility: wellons Construction Inc Inspection bate: 01/29/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? n o n n # Does the Plan include a General Location (USGS) map? n n # Does the Plan include a "Narrative Description of Practices"? n n EE n # Does the Plan include a detailed site map including outfall locations and drainage areas? n rl ® n # Does the Plan include a list of -significant spills occurring during the past 3 years? n ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ n # hoes the facility provide all necessary secondary containment? n n C) # Does the Plan include a BMP summary? n n n p # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n n # Does the facility provide and document Employee Training? n n 13 n # Does the Plan include a list of Responsible Party(s)? n n K3 # Is the Plan reviewed and updated annually? ❑ n ® ❑ # Does the Plan include a Stormwater Facility Inspection Program? n n n Has the Stormwater Pollution Prevention Flan been implemented? n n n I2 Comment: Permit requires development of a BMP Plan instead of a SPPP, which the facility does not have, Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n ® ❑ n Comment: No records were available at the time of inspection to show that visual monitoring of the site's outfall has been conducted. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ® n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n W n Comment: No records were available for analytical monitoring as well. Facility has stormwater only discharges as there is no mine dewatering or material washing occuring at this facility. There is no recycle system present at this facility either. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? n ® n n # Were all outfails observed during the inspection? ® I l n n # If the facility has representative outfall status, is it properly documented by the Division? n n ® n Page: 3 Permit: NCG020477 Owner - Facility: Welions Construction Inc Inspection Date: 01/29/2009 Inspection Type: Compllance Evaluallon Reason for Visit: Routine # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Ail stormwater runoff is conveyed to a single detention pond with one outfall to be monitored. nnign Page: 4 Wellons Construction Company Cumberland Pit #1 Wetland Violation Subject: Wellons Construction Company Cumberland Pit #1 Wetland Violation From: Melissa Baker <Melissa.Baker@ncmail.net> Date: Fri, 12 Sep 2008 11:52:35 -0400 To: Mike Lawyer <Mike.Lawyer@ncmail.net>, Chad Turlington <C1iad.Turlington@ncniail.net> Mike and Chad, I did an inspection recently of a mine in Cumberland county (Wellons Construction Company Cumberland Pit 41, Cumbe 26-46) located near the Fayetteville Regional Airport. You take 301/Bus. 95 to Doc Bennett Rd. (W), which feeds into Claude Lee Road. The mine is located at the end of Claude Lee Rd. There were wetland buffer and wetland impacts due to a berm which had been breached, resulting in off -site sedimentation (approx. 250'x154' .impact, moderate to heavy amount). Sediment was also seen in sewer line easement. See attached photos. If you have any questions about this information, please let me know. Have a great Friday!! Melissa Wellons Cumberland Pit #1 01102008.doc Content -Type: application/msword Content -Encoding: basc64 4� X/ t'l I ?.,^ — W F, /Je/z (70, pi z - �f6 3 0 9�0_ g:,7z - 3r 03 1 of 1 1/28/2009 3:41 PNl Robert Paul Wellons Wellons Construction Inc PO Box 730 Dunn, NC 28334 Dear Permittee: Michael K Easley, Governor V William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality February 7, 2005 )ENn—r"' FEB z i za Subject: NPDES Stormwater Permit Coverage Renewal Wellons Construction Incorporated COC Number NCG020477 Cumberland County In response to your renewal application for continued coverage under general permit NCG020000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. The general permit authorizes discharges of stormwater and some types of wastewater. You must meet the provisions of the permit for the types of discharges present at your facility. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of General Stormwater Permit NCG020000 • A copy of a Technical Bulletin for the general permit + Five copies of Discharge Monitoring Report (DMR) Forms - wastewater and stormwater • Five copies of Qualitative Monitoring Report Form Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Ken Pickle of the Central Office Stormwater Permitting Unit at (919) 733-5083, ext.584. Sincerely, for Alan W. Klimek, P.E. cc: Central Files Stormwater & General Permits Unit Files Fayetteville Regional Office No��n Carolina alarally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.uslsulstormwaterhtml 512 N. Salisbury St. Raleigh, NC 276()4 FAX (919) 733-9612 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer — 50% Recycledll0% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020477 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wellons Construction Inc is hereby authorized to discharge stormwater and to operate treatment systems and discharges associated with mine dewatering wastewater and process wastewater from a facility located at Wellons Construction Incorporated PO Box 730 Dunn Cumberland County to receiving waters designated as UT to Rockfish Creek, a class C stream in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, ll, III, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective February 7, 2005. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day February 7, 2005 for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission o�O� W A rE Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources February 7, 2005 Robert Paul Wellons Wellons Construction Inc PO Box 730 Dunn, NC 28334 Alan W. Klimek, P.H. Director Division of Water Quality Subject: NPDES Stormwater Permit Coverage Renewal Wellons Construction Incorporated COC Number NCG020477 Cumberland County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG020000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. The general permit authorizes discharges of stormwater and some types of wastewater.. You must meet the provisions of the permit for the types of discharges present at your facility. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of General Stormwater Permit NCG020000 • A copy of a Technical Bulletin for the general permit - • Five copies of Discharge Monitoring Report (DMR) Forms - wastewater and stormwater • Five copies of Qualitative Monitoring Report Form Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable' federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Ken Pickle of the Central Office Stormwater Permitting Unit at (919) 733-5083, ext.584. Sincerelv. for Alan W. Klimek, P.E. cc: Central Files Stormwater & General Permits Unit Files Fayetteville Regional Office Onc NprthCarolina Vatural North Carolina Division of Water Qua]it), 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service lntemet: h2o.enr.state.nc.uslsulstormwaterhtml 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer-50% Recyded110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020477 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wellons Construction Inc is hereby authorized to discharge stormwater and to operate treatment systems and discharges associated with mine dewatering wastewater and process wastewater from a facility located at Wellons Construction Incorporated PO Box 730 Dunn Cumberland County to receiving waters designated as UT to Rockfish Creek, a class C stream in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, 1V, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective February 7, 2005. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day February 7, 2005 for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr, Robert P. Wcllons Wellons Construction, lnc. PO Box 730 Dunn. NC 28335 Dear Mr. Wellons: NORTH CAROLINA, DEFAR.T.MENT ENV IRON ME NT,AND■NATL3RAL RESOURCES 0 [ a 1b:,% l� El 'd rev September 15. 2000 SEp 2 u 2000 REG. OFFiCE Subject: General Permit No. NCG020000 Wellons Cumberland Pit # 1 COC NCGO20477 Cumberland County In accordance with your application for discharge permit received on March L 1999, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December G, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance. of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or pen -nits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Mack Wiggins at telephone number 919/733-5083 ext. 542. Sincerely, ORIGINAL SIGNED By WILLIAM C. MILLS Kerr T. Stevens cc: �}'i✓ttc� illy Regional Of#ice�� Central Files Stormwater and General Permits Unit Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020477 STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM PROCESS WATER RECYCLE SYSTEMS DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wellons Construction, Inc. is hereby authorized to discharge stormwater from a facility located at Wellons Cumberland Pit # 1 on Claude Lee Road (NCSR 2341) east of Ardulusa Cumberland County to receiving waters designated as an unnamed tributary to Rockfish Creek, class C waters, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, III, IV, V, VI and VII of General Permit No. NCO020000 as attached. This certificate of coverage shall become effective September 15. 2000. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 15, 2000, 0R1GINPL SIGNED BY 1NILLWAO C, 'LLS Kerr'1'. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Z A JIV '4 ffDraq Stflp A0. mt % 'V�d P 7fi Nit> %.A� r4, a., 50 Ling, 3, T-JP -Q1 .r ;Lx. ol tai 'f �Ar Aw� "R I ka i�v Ig" 4A F XWO 'AA 3 3 8 5. 80 %N Uopyrignt (U) 1997, MaptOGrI. InC. ''"'State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director September 15, 2000 Mr. Robert P. Wcllons Wcllons Construction, Inc. PO Box 730 Dunn, NC 28 335 4 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: General Permit No. NCGO20000 Wellons Cumberland Pit # I COC NCG020477 Cumberland County Dear Mr. Wellons: In accordance with your application for discharge permit received on March 1, 1999, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .l and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application" Unless such demand is made, this certificate of coverage shall be final and binding" Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Mack Wiggins at telephone number 919/733-5083 ext. 542. Sincerely, ®�VA� ABM C Map SY Kerr T. Stevens cc: Fayetteville Regional Office Central Files Stormivater�and`General"I'ermitsUnit Files. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733.9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020477 STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM PROCESS WATER RECYCLE SYSTEMS DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wellons Construction, Inc. is hereby authorized to discharge stormwater from a facility located at Wellons Cumberland Pit # 1 on Claude Lee Road (NCSR 2341) east of Ardulusa Cumberland County to receiving waters designated as an unnamed tributary to Rockfish Creek, class C waters, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, Ill, IV, V, VI and VII of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective September 15, 2000. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 15, 2000. O �IL� AM C MED ILLS Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission VOR `cafe d 1A CW ce 6 2239' 22M 8'W Copyright (C) 1997, MapteCh, Inc. -i,. g,; Prt 0 m I a "- - o Markers Name: Discharge Site-NCG020477 Short Name: Dschrg Coordinates: 034" 57' 31.7" N, 0780 53' 02.7" W Comment: Wellons Construction, Inc., Wellons Cumberland Pit # 1, Subbasin-030815, Cape Fear River Basin, Cumberland County, UT to Rockfish Creek, Class-C, Quad -H23NW ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TOCENTRAL OFFICE General Permit No. NCG020000 Calendar Year "Report ALL STORMWATER monitoring data on this.form (include "No Flow"1 No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH .I of each year. Certificate of Coverage No. NCG02 ❑❑ Facility Name: County: Phone Number: (�) Certified Laboratory Lab # Lab # Total no. of SDOs monitored Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency Yes, received approval from DEMLR to reduce monitoring frequency El No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No. 0RoMurbidity, mll NTU Upstream (U] Turlbitfity, NTU Downstream (D) Torpidity, Non -polar O&G, mgll (VMA) New Motor Oil Usage allmo. Stormwater ' Benchmarks indicate NO a�1lrca6le Circle Benchmark 00150 �• 1 " Circle Benchmark JQI25110 NIA standaiU apP� ea NIA: ... Water Quality Standard applies 1 `� >55 gaUmo. average requires TSS and Non -polar s O&G monitoring Date Sample Collected, Wm—btdd1yrMWE MMM Permit Date 10/1/2015 - 9/30/2020 Last Revised 10-2-2015 k Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VIVIA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ UUttall'NO,�a. Total° Ralnfall, inches T$S mgllmlll Mc- .Turbidity, NTU k, ��- (lJ) Turbidity NTUNTU �, n(D],TurbtdItyn A£O��G;�mgflUsage "` -UDownstream (VMAj, : ,SQ ' New, �. allma. Stormwater Benchmarks Indicate NO aF`O able Circle - Bencill.— 100150 _ 0.1 - circle Benchmark 50/2511 O NIA standard applies .< NIA standard appllies _ >55 gallmo. average requires �oaGnmonitering Date Sam -le Collected; Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No Additional Outfall Attachment (make copies as needed for additional outfalls) NCG02 ❑❑❑❑ Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Qutfall No. Total Rainfall, inches TSS mgll SS mill Turbidity, tY NTU U stream p U Turbid) () tY �jNTtl�l '' .Downstream D Turbidi ( ) f ,, , . hl? NTU ` n ; Neon polar Q8tG, mgll '(VMA) New Motor Oil °Usage �`allrrio: Benchmarks lndka[n ND ee1 app K Circle eeaark 00/50 0• Benchmark 50/25 NIA Water Standard applies NIA Water Quality Standard apple 15 .le >SSeeSformwater average requires Tand ri�lar O&Gmonitorig DatewSariiple N , Collected, mo/ddlyr' ME E N Permit Date 1011/2015 -- 9130/2020 Last Revised 10-2-2015 .. j- Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.22] Signature Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? - Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG020000 Calendar Year Report ALL STORMWATER monitoring data on this form (include "No Flow°I" No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 9 of each year. Certificate of Coverage No. NCG02 ❑❑❑❑ Facility Name: County: Phone Number: ( -} Total no. of SDOs monitored Certified Laboratory Lab # Lab # Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No 'Total _,.. Rainfall, ;inches TSS, mgli E SS, = mill i urbial " r NTU - Ups rcam-' , (U} Turbldlty, � NTU �• -[VMA) Downstream g• (D) Turbidity, NTU Ivan polar 08rG; m 11 9 New Mato 491r , Usage . ,allmo. [+ 5tormWater Benchmarks IndicateNO� apLOWifplicable licable Circle Belnchmark 100I50 0.1 Circle - Benchmarks- 50/26/10 NIA Standard apWater iity plies - NIA. Water standard apiplies - C n 15 >55 gailmo. averagerequiree T08Gand monitorNon-polar .'.DateSampley �Gollected, mo-1dd1'yrr.'jM MMMEMMM Permit Date 101112015 — 9130/2020 Last Revised 10-2-2015 A. Certificate of Coverage No. N0002 ❑❑❑❑ .1i Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No Tatar Ramfali,�:mgli�mlll°� inches TSS .� ASS Turbtdsty, N7U Upstream ' ; ;Turb�di tY. , = f�TU �: `Downstream' D Turbidity, ( )&G t NTU Non olar P Mgt g (VMA} New:, Motor Oil ` ��Usage. allmo: Benchmarks ,k.,NO applicable a Circle Bemarl( h 100150 0• 1 Circle Benchmark 501266/� O -N/A Standard appWater lies s _ NIA Standard aWater pplies l _ 15 eraeaStormwater average requires TSS andO&G m nRurrtnJar Date.Sample; Collected, -` moltldlyr Permit Date 10/1/2015 — 9130/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑O❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No. Total Rainfall, inches TSS, mgll SS, mlll Turbidity, NTU Upstream (U) Turbidity, NTU Downstream {©) Turbidity, NTU Non -polar O&G, mg/1 (VIVIA) New. Motor Oil Usage allmo. Stormwater Benchmarks lndicareNO FLOa le circie Benchmark oor5a a. 7 Circie Benchmark 50125N O NIA e° ali cnda7pps NIA WaterQuality Standard appies 5 >56 gaumo. average requires TSS and Non-polarap ORG mn Date Sample Collected, molddl r Permit Date 101112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION " I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR §122.22] Signature Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 -Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015