Loading...
HomeMy WebLinkAboutNCG210369_COMPLETE FILE - HISTORICAL_20140829STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. I DOC TYPE i tA HISTORICAL FILE ❑ MONITORING REPORTS Doc Dare a11319 a � a g YYYYMMDD Aja NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Pat McCrory, Governor August 29, 2014 Parker Bark Company 3295 US Highway 117 Rose Hill, NC 28458 John E. Skvarla, III, Secretary SUB-JECT: NPDES Compliance Inspection Report Permit Number NCG210369 Parker Bark Company Duplin County Dear Ms. Parker : On August 26, 2014, staff from the Wilmington Regional Office conducted an inspection of the Parker Bark Mulch facility on Highway 117, Duplin County, North Carolina. Mr. Ashley Guy met with me during the inspection. Enclosed is the Compliance Inspection Report. If you have any questions or need further assistance, do not hesitate to contact me at 910-796-7314 or brian.lambe@ncdenr.gov rely, tan Lambe Environmental Specialist Enclosures: Inspection Report cc: NPDES General Permit Inspection Files Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: 910-796-7215 / FAX: 910-350-2004 An Equal Opporiunity/Affirmative Action Employer 50% Recycled/ 10% Post Consumer Paper NorthCarolina AwAurally Customer S , .,� Permit: NCG210396 SOC: County: Duplin Region: Wilmington Compliance Inspection Report Effective: 08/01 / 13 Effective: Contact Person: Susannah Parker Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/26/2014 Primary Inspector: Brian P Lambe Secondary Inspector(s): Expiration: 07/31/18 Owner: Parker Bark Company Inc Expiration: Facility: Parker Bark Company - Rose Hill Parker Bark Rd 3295 US Hwy 117 Rose Hill NC 28458 Title: Phone: 910-289-3672 Certification: Phone: Entry Time: 11:30AM Exit Time: 01:OOPM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG210396 Owner - Facility: Parker Bark Company Inc Inspection Date: 08126/2014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Ashley Guy on site, new yard manager. Discussed ways of reducing sampling results. Needs to install rock check dams near outlets to filter yard debris. Berms should be installed to keep mulch onsite. Include in SPPP all BMPs installed. Sampling results indicate that you should be on tier three sampling. Please follow the protocols and install additional measures to reduce numbers. On the next sampling event, sample all outfalls plus the outfall of the take. Then we can discuss the consolodation of 3-5. In the case the sampling proves successful at lake outfall, the discussed BMPs for 3-5 would be unnecessary and focus can be shifted to outfalls 1 and 2. Then you would do the vehicle maintenance ampling on the lake outfall. Page. 2 Permit: NCG210396 Owner - Facility: Parker Bark Company Inc Inspection Date: 08/26/2014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # floes the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility'lnspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: The deisei storage needs secondary containment. The mobile drum, if kept in use, should have SOP associated with it. Fluids inside the storage building, oil recycling drum, should have secondary containment. Implement and document employee training once a year. Revise and continually update the SPPP. Change of personnel, practices, or conditions should all be updated yearly to keep a working SPPP. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Yes No NA NE Comment: Hiah sample results must be reduced. Discussed Dossible solutions at all outfalls includina rock check dams and sampling points. Discussed representative outfall status. Determination regarding the Vehicle Maintenance area needs occur within the next six months. Vehicle maintenance should only occur at a designated area where SOPs can be utilized. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ Page: 3 permit: NCG210396 owner • Facility: parker Bark Company Inc it Inspection Date: 08/2612014 Inspection Type : Compliance Evaluation Reason for visit: Routine # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # 1f the facility has representative outfall status, is it property documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: You may for representative outfall status. for outfalls 3. 4. 5. You will need to get the results below the limits. However, pending determination from the Division of Water Quality, you may be allowed to consolodate 3,4, and 5 into one at the outlet of the pond, which would provide cleaner samples. Suggest contacting DWQ for a written letter saving that the lake is not waters of the state. Page: 4 Compliance Inspection Report Permit: NCG210396 Effective: 08/01/13 Expiration: 07/31118 Owner : Parker Bark Company Inc SOC: Effective: Expiration: Facility: Parker Bark Company - Rose Hill County: Dupiin Parker Bark Rd Region: Wilmington 3295 US Hwy 117 Rose Hill NC 28458 Contact Person: Susannah Parker Title: Phone: 910-289-3672 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/26/2014 Entry Time: 11:30AM Exit Time: 01:OOPM Primary Inspector: Brian P Lambe Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page: 1 . ,% permit; NCG210396 Owner - Facility: Parker Bark Company Inc Inspection Date: 08/2612014 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Ashley Guy on site, new yard manager, Discussed ways of reducing sampling results. Needs to install rock check dams near outlets to filter yard debris. Berms should be installed to keep mulch onsite. Include in SPPP all BMPs installed. Sampling results indicate that you should be on tier three sampling. Please follow the protocols and install additional measures to reduce numbers. On the next sampling event, sample all outfalls plus the outfall of the lake. Then we can discuss the consolodation of 3-5. In the case the sampling proves successful at lake outfall, the discussed BMPs for 3-5 would be unnecessary and focus can be shifted to outfalls 1 and 2. Then you would do the vehicle maintenance ampling on the lake outfall. Page. 2 permit: NCG210396 Owner - Facility: Parker Bark Company Inc Inspection Date: 0812612014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yea No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Pady(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ E ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The deisel storage needs secondary containment. The mobile drum, if kept in use, should have SOP associated with it. Fluids inside the storage building, oil recycling -drum, should have secondary containment. Implement and document employee training once a year. Revise and continually update the SPPP. Change of personnel, practices, or conditions should all be updated yearly to keep a working SPPP. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Yes No NA NE ❑ ❑ ❑ ❑ M ❑ ❑ Comment: High sample results must be reduced. Discussed possible solutions at all outfalls includinq rock check dams and sampling points. Discussed representative outfall status.__ Determination regarding the Vehicle Maintenance area needs occur within the next six months. Vehicle maintenance should only occur at a designated area where SOPs can be utilized. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ Page: 3 permit: NCG210396 owner - Facility: Parker Bark Company Inc Inspection Date: 08/2612014 Inspection Type : Compliance Evaluation Reason for Visit: Routine # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: You may apply for representative outfali status for outfalls 3, 4, 5. You will need to get the results below the limits. However,pending determination from the Division of Water Quality, you may be allowed to consolodate 3A and 5 into one at the outlet of the pond, which would provide cleaner samples. Suggest contacting DWQ for a written letter saving that the lake is not waters of the state. Page. 4