Loading...
HomeMy WebLinkAboutNCG210356_COMPLETE FILE - HISTORICAL_20141028STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V uc, a, I 3S,42 DOC TYPE f �5 HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ c�(Di q / 0 a$ YYYYMMDD a-613- Blue Ridge Labs PO Bvx 2940 Lenoir, Ne 28645 828-728-0149 Client : Parton Lumber Co. 251 Parton Road Rutherfordton.. NC 28139 Attention: Mr. Shane Poindexter Date Received: 30-Sep-14 Report Date: 03-Nov-14 Sample Date: 30-Sep-14 BRL.#: l3Rl- 2014-0688 Lab Sample Ill: 1_SID-2014-03035 Client Sample ID: Pond blueridgelabstenoir@gma il.com Analysis Analysis Parameter Result MQL Unit Method `rime Date Analvst COD 562 V 20 T EnVI SM 5220D 10f2812014 WtrQtly /107 Reported By:=.";rir::'�- S. J.',Johnson, D.R. Wessinger * Concentrations are below Minimum Quantification Limit except where noted. NC Laboratory Certificate No. 275 Page:4 of 4 NPDS Reporting Groundwater Report Ter R2rtOn Li4mier G � Blue Ridge Labs, Inc. P.O, Box 2940 Lenoir, NC 28645 Telephone (828) 728-0149.Fax (828) 728-0131 Chain of. Custody Sanitary Landfill Hazardous Wasitz Industrial or QC Non State Reporting _ UST/Trust Fund Reporting, l3ill.To: Project Name: PO Numbcr: Ice Present: Y 'N Field PreseNativcs Lab Check Sample ID Sample Type Datc Time Time & Temp HR:MM "C Field Sulfide Check Y N Field Sulfide Present/ Removed Y N Resid Chlor 'Field Check Y N Field Dechlorination Y N pH Resid C6tlor PorA Temp °C . Sampler initials Analysis Requested - G l,; C,elw �� Ga Relinquished By: Date: Tithe: R-e eiyed Byy Date: Time:, t� Upon submission of samples. client agrees that invoices are due at the time work is completed. Open accounts are due 20 days following invoice dale, A finance charge of L5% per month wW hc.imposcd on'all pAuc. accogws: When relinquishing swnplc� to Him; RiSgc Labs (nRI). buyer authori-res BRI. to perlbrin onl • the analysis indicated above and also agrees to pay collection and attorney feef il}c accotynt'.hecorlcs delinquent. 141uc Ridge Labs reservcs the righi to deny documentation Ihr any work where payntett( has no( been made, in etfectsendering that data unsupported for regulatory purposes. 13RL cannot guarantee that any regulatory authority will accept any work Submitted, therelgre it is the client;s rrsponsihility to request on this ibmi appropriate teSrs. NC DENR Certified I.ah #275 Blue Ridge Labs PO Box 2940 Lenoir, NC 28645 828-728-0149 Client : Parton Lumber Co. 251 Parton Road Rutherl'bedton, NC 28139 Attention: Mr. Shane Poindexter Date Received: 30-Sep-14 Report Date: 03-Nov-14 Sample Date: 30-Sep-14 BRL #; 13RL-2014-0688 Lab Sample ID: LSID-2014-03032 Client Sample 1D: Pond Parameter Result MQL TDS 311 1 blueridgelabslenoir@gmail.com Analysis Analvsis Unit Method Time Date Analvst mg/I SM 19 2540C 12:09^ 10/3/2014 KCJ' Reporter! By � ~ S. J lnson, D.R. Wessinger Concentrations are below Minimuni Quantification Limit except where noted. NC Laboratory Certificate No. 275 Page I of 4 I Blue Ridge Labs PO Box 2940 Lenoir, INIC 28545 828-728-01.49- blueridgela bslenoir@gmail.com Client : Parton Lumber Co. 251 Parton Road Rutherfordton; NC 28139 Attention: Mr. Shane Poindexter Date Received- 30-Sep-14 Report Date: 03-Nov-14 Sample Date: 30-Sep-14 BRL. it: BRL-2014-0688 Lab Sample ID: LSID-2014-03033 Client Sample ll): fond Analysis Analysis Paranieter Result MQL Unit Method Time Date Analyst Phenols 0.023 0.01 mg/l EPA 420:1 16:40 10/15/2014 KCJ f Reported By:-- S. son,.D.R. Wessinger * Concentrations are below Minimum Quantification Limit except v.-here noted. NC Laboratory Certificate No.. 275 Page 2 of 4 e Blue Ridge Labs PO Boos 2940 Lenoir, NC 28645 828-72870149 Client : Parton L«rnber Co. 251. Parton Road liutherfordton, NC 28139 Attention: Mr. Shane Poindexter Date..Received: 30-Sep--1 4 Report Date: 03-Nuv-14 Sample Date: 30-Sep-14 l3RL #: BRL-2014-0688 Lab Sample 10: LSID-2014-03034 Client Sample lD: Pond Parameter Result MQL Chloride blueridgelabslenoir@gmail.com Unit Method 1 mg<i SM 19 4500-C Analysis Analysis Time Date. Analyst 10:15 10/2/2014 KC3 Reported 13y: S. j fiAnson, D.R. Wessinger Concentrations are below Minimum Quantification Limi{ except where noted. NC Laboratory Certificate No. .275 Page 3 of 4 WATER QUALITY LAB & OPERATIONS, INC. P.O. BOX 1167 BANNER ELK, NC 28604 (828) 698-6277 CLIENT: BLUE RIDGE LABS LOGIN TIME: ADDRESS: P.O. BOX 2940 SAMPLER: CITY: LENOIR RECEIVED DATE: STATE., NC ZIP 28645 REPORTED DATE: ID#.- 31-Oct-14 .......... ..... ......... ............ ............................ ............. ....... .................. . ........ •; TO ........ .......... ...... .. .. LOC Aysit T z�: ....... -. -.r ::INT"..'.'. ...... ....... COD 3035 562 20 MG/L 28-Oct-14 P1 COD 3052 218 20 MG/L 28-Oct-14 pt COD 3173 1084 20 MG/L 28-Oct-14 Pi COD 3176 75 20 MG/L 28-Oct-14 PI COD 3250 1010 20 MGIL 28-0rt-14 PI COD 3329 <20 20 MGIL- 28-Oct-1 4 Pi COD 3343 1880 20 MG/L. 28-Oct!.14 PI COD 3362 930 20 MGfL 28-Oct-14 pl COD 33661 766 1 20 MGIL_=1 28-Oct-14 Pi REPORTED BY:, NC CERTIFIED LAB A 544 1 Liza-1 PAUL ISENHOUR, SUPERVISOR Sampling Event Number Sample Date Sampler Outfall Number Contract Laboratory Results Parameter (Units) Tier 1 Checklist SD000282 10/16/2014 Jason Bartley RNC-5D00 or RNC SD002 ESC Lab Sciences Value Benchmark Values Benchmark Exceedance? BOD 9.5 30 mg/L NO COD 38 120 mg/L NO PH 6.1 Standard (6-9) NO Nitrate -Nitrite O.S1 10 mg/L NO Phosphorus,Total 0.30 2 mg/L NO Kjeldahl Nitrogen, TKN 2.3 20 mg/L NO Suspended Solids(TSS) 20 100 mg/L NO 0 Tier I Checklist Stormwater inspection conducted within 2 weeks? Yes List of possible Causes leaves, product on ground from unloading/operations Potential Solutions housekeeping Actions Taken (include dates of implementation) inform Area supervisor Keep a record of all Tier 1 actions with facility SWPPP Tier 1 Checklist Sampling Event Number SDO00282 Sample Date 10/16/2014 Sampler Jason Bartley Outfall Number RNGSD001 or NC SD002 Contract Laboratory ESC Lab Sciences Results . Parameter (Units) Value Benchmark Values Benchmark Exceedance? BOD 7 30 mg/L NO COD 30 120 mg/L NO ph 6 Standard (6-9) NO Nitrate -Nitrite 0.86 10 mg/L NO Phosphorus,Total 0.56 2 mg/L NO Kjeldahl Nitrogen, TKN 1.7 20 mg/L NO Suspended Solids(TSS) 53 100 mg/L NO 0 Tier I Checklist Stormwater inspection conducted within 2 weeks? Yes List of possible Causes leaves, product on ground from unloading/operations Potential Solutions housekeeping Actions Taken (include dates of implementation) inform Area supervisor * Keep a record of all Tier 1 actions with facility SWPPP Is Tier 2 Checklist ri addition to repeating the steps for Tier 1, monthly sampling is required tor all parameters at every outfall where an exceedance was recorded until 3 consecutive sampling events results are below benchmarks. Sampling Event Number SDO00282 Sample Date 10/16/2014 Sampler Jason Bartley Outfall Number RNC-SID001 or RNC SDO02 Contract Laboratory ESC Lab Sciences Results RNC SDO01 Parameter (Units) Value Benchmark Values Benchmark Exceedance? BOD 9.5 30 mg/L NO COD 38 120 mg/L NO pH 6.1 Standard (6-9) NO Nitrate -Nitrite 0.51 10 mg/L NO Phosphorus,Total 0.30 2 mg/L NO Kjeldahl Nitrogen, TKN 2.3 20 mg/L NO Suspended Solids(TSS) 20 100 mg/L NO Results RNC SDO02 Parameter (Units) Value Benchmark Values Benchmark Exceedance? BOD 7 30 mg/L NO TSS 53 100 mg/L NO Total Kjeldahl Nitrogen 1.7 20 mg/L NO Nitrate -Nitrite 0.86 10 mg/L NO Total Phosphorus 0.56 2 mg/L NO COD 30 120 mg/L NO IpH 6 Standard NO * Keep a record of all Tier 1 actions with facility SWPPP "Weather History for Raleigh -Durham Airport, NC I Weather Underground Page 1 of 4 Weather History for Raleigh -Durham Airport, NC Wednesday, October 15, 2014 Wednesday, October 15, 2014 « Previous Day ! October 15 2014 View Next Day kx Daily Weekly ,t Mo�hly Custom Actual Average Record Temperature Mean Temperature fib °F 61 °F Max Temperature 75 °F 73 °F 88 °F (1985) Min Temperature 57'F 5o °F 33 °F (2006) Degree Days Heating Degree Days 0 5 Month to date heating degree days 25 54 Since 1 July heating degree days 35 75 Cooling Degree Days 1 1 Month to date cooling degree days 60 37 Year to date cooling degree days 1652 1705 Growing Degree Days 14 (Base 50) Moisture Dew Point 61 °F Average Humidity 81 Maximum Humidity 93 Minimum Humidity 68 Precipitation Precipitation 0.62 in 0.10 in 4.04 in (1954) Month to date precipitation 2.00 1.63 Year to date precipitation 46.32 35.53 Sea level Pressure Sea Level Pressure 29.86 in Wind Wind Speed 7 mph (SSW) Max Wind Speed 18 mph Max Gust Speed 25 mph Visibility 8 miles Events Rain T = Trace of Precipitation, MM = Missing Value Source: NWS Daily Summary http:llwww.wunderground.comlhistorylairportlKRDU/2014110115/DailyHistory.html?rec_... 11 /1 /2014 'Weather History for Raleigh -Durham Airport, NC I Weather Underground Page 2 of 4 F 80 75 70 65 60 55 50 midnightl 2 3 4 5 6 7 8 9 10 11 noon 1 2 3 4 5 6 7 8 9 10 11 in Hq Barometric Pressure 30.0 f _ I _ 29.9 29.8 midnights 2 3 4 5 6 7 8 9 10 11 noon 1 2 3 4 5 6 7 8 9 10 11 m h F 35.0 30.0 25.0 20.0 15.0 10.0 5.0 00 midnightl 2 3 4 5 6 7 8 9 10 11 noon 1 2 3 4 5 6 7 8 9 10 11 360.0 270.0 180.0 90.0 00 Wind Dir (deg) ` I I midnightl 2 3 4 5 6 7 8 9 10 11 noon 1 2 3 4 5 6 7 8 9 10 Vm w Certify This Report Hourly Weather History & Observations C 27 24 21 18 16 13 10 hPa 1016 1013 mM 56 48 40 32 24 16 8 0 Time (EDT) i Temp. i Dew Point f Humidity I Pressure Visibility Wind Dir Wind Speed E Gust Speed Pre( a 12:51 AM 75.0 T 69.1 -F 82% 1 29.90 in 10.0 mi South 12.7 mph E 21.9 mph NIA 1:51 AM ) 75.2 °F 69.8 °F 83% 29.89 in 10.0 mi South 13.8 mph 24.2 mph NIA 2:51 AM 75.0 °F E 68.0 °F 79% 29.88 in i 10.0 mi South 13.8 mph j 26.3 mph N/A 3 51 AM 75.0 'F ' 68.0 'F 79% 29.85 in I 10.0 mi SSW i 10.4 mph i 20.7 mph 0.00 4:51 AM 73.0'F 69.1 "F �87% 29.83 in 9.0 mi SSW 6.9 mph i - 0A6 5:51 AM 71.1 °F 66.9 °F 87% 29.85 in 10 0 m� SW I 11.5 mph i - 0.04 -0.00 6:18 AM I � 69.8 'F 66.2 "F 88% 29.85 in 10:0 mi WSW 4.6 mph i � E Show full METARS I METAR FAQ I Comma Delimited File http:Hwww.wunderground.com/history/airport/KRDU/2014/10/ 15/DailyHistory.html?req_... 11 /l /2014 -Weather History for Raleigh -Durham Airport, NC I Weather Underground Page 3 of 4 Time (EDT) I Temp. I Dew Point Humidity I Pressure Visibility Wind Dir Wind Speed Gust Speed Pre( 6:35 AM 69.8 °F i 66.2 F 88% 29.85 in , 10.0 mi WSW 3.5 mph 0.01 I 6:51 AM i 70.0 °F 66.9 °F 90% 29.83 in 10.0 mi Calm Calm - 0.01 7:25 AM 68.0 °F 64.4 °F 88% 29.85 in 7.0 mi Variable 5.8 mph - 0.01 7:44 AM € 66.2 °F - 62.6 °F 88% r 29.86 in 2.0 mi NW f 5.8 mph 0.01 7:51 AM 64.9 °F 64.4 °F h 63.0 °F ! 60.8 °F 93% 88% 29.86 in i 29.89 in 2.0 mi 2.0 mi Variable Variable 6.9 mph 0.01 8:35 AM 3.5 mph Calm - 0.09 0.16 8:51 AM ; 63.0 °F 61.0 °F 93% 29.88 in t 2.0 mi Calm 9:29 AM 62.6 °F 60.8 °F 94% ! 29.91 in 2.0 mi NW 3.5 mph 0.09 9 41 AM I 62.6 °F 60.8 °F 94% 1 29.91 in ? 5.0 mi Calm Calm 0.10 9 51 AM 63.0 °F ! 61A °F ' 93% 29.91 in 4.0 mi Caim Calm 0.10 10:30 AM 62.6 °F ; 59.0 °F 88% I 29.91 in 2.0 mi Calm Calm I 0.04 10:51 AM i 61.07 i 57.0 F 87 /° 29.91 in 2.0 mi WSW 9.2 mph 0.13 11:13 AM I 60.8 °F i 57.2 °F 88% I 29.91 in 3.0 mi Variable 3.5 mph l - 0.06 11:51 AM ! 60.1 'F 55.9 °F 86% 29.89 in i 7.0 mi SSW 6.9 mph 0.10 12:51 PM I 62.1 °F ' 57.0 °F 84% i 29.87 in 1 10.0 mi SSW 6.9 mph - 0.01 1:51 PM i 62.1 °F 55.9 °F 80% 29.84 in i 10.0 mi SW 9.2 mph - NIA i 2:51 PM 63.0 °F S5.9 °F 78% } 29.83 in { 10.0 mi South 6.9 mph - NIA 3:51 PM i 64.9 °F 57.0 °F 75% I 29.81 in ! 10.0 mi SSW I 6.9 mph NIA 4:03 PM 64.4 °F 57.2 °F 77% 29.82 in 10.0 mi SW I 8.1 mph NIA 4:51 PM ! 66.0 °F i 57.0 °F 73% } 29.81 in 10.0 mi { SSW 9.2 mph I - NIA r 5:51 PM i 68.0 °F I 57.0 °F 68% 29.81 in j 10.0 mi SSW 8.1 mph - NIA 6:51 PM 3 63.0 °F i 59.0 °F 87% 29.82 in i 10.0 mi SE 4.6 mph - NIA I 7 . _- ..... i..... _.. _ - _ ........ .. - - - 7:51 PM ! 62.1 °F 57.9 °F 86% 29.82 in 10.0 mi SE I i 5.8 mph NIA i 8:51 PM I 61.0 °F ; 57.9 °F 90% 29.83 in 10.0 mi SSE 1 8.1 mph NIA 9:51 PM 61.0 °F E 57.9 °F 90% 29.84 in 10.0 mi South 4.6 mph NIA Show full METARS I METAR FAQ I Comma Delimited File http:llwww.wunderground.com/historylairport/KRDU/2014110115/DailyHistory.html?req_... 11 /l /2014 'Weather History for Raleigh -Durham Airport, NC I Weather Underground Page 4 of 4 Time (EDT) Temp. ; Dew Point Humidity Pressure Visibility Wind Dir Wind Speed j Gust Speed Pre4 10:51 PM ! 60.1 "F 1 57.0 "F 90% 29.84 in 10.0 mi SSW 3.5 mph - NIA i 11;51 PM 60.1 °F 55.9 °F 86% 29.83 in 10.0 mi SSW i 4.6 mph NIA Show full METARS 1 METAR FAQ I Comma Delimited File http;//www.wunderground.com/history/airport/KRDU/2014/ t0/15/DailyHistory. htnil'?req_... 11 /l/2014 Facility: �s-`� Date: 6 1--4, 1 19 Location Address: w1.4 ll COC#: 3 Contact Name: � J Phone #: lar- Contact Mailing Address: County: r Directions: Routine Compliance Inspection Rescission Request Complaint Investigation Other - Explain: A Storm Water Pollution Prevention Plan Yes No N/A Comments 1 Is a copy of the permit and the Certificate of Coverage available at the site? -- — w l ' 2 Is a copy of the signed and certified SWPPP at the facility? 3 Does the Plan include a "Narrative Description of Practices"? 4 Does the plan include a general location (USGS) map? S Does the plan include a detailed site map including outfall locations and drainage areas? 6 Does the plan include a Spill Prevention and Response Plan? (SPRP) 7 Does the plan include a Preventative Maintenance and Good Housekeeping Plan? Does the plan include a Stormwater Facility Inspection Program? 9 Does the Plan include a BMP Summary? 10 Does the plan include a list of Responsible Party(s)? 11 lHas the SWPPP been implemented? B 11VIonitoring and Records Yes No N/A 1 Does the plan include a fist of significant spills occurring during,`, the past 3 years? 2 Does the facility provide and document employee training? [/ Has the facility conducted its Qualitative Monitoring? (sealk annual) 4 Has the facility conducted its Analytical Monitoring? (s-a) 5 Is the facility meeting all permit specified benchmark goals? / !/ 6 Is the facility following the tiered response? 7 Has the facility conducted its Analytical Monitoring from vehicle Maintenance areas? / (/ C Waste Management Yes No N/A 1 Does the facility provide all necessary secondary containment? t� 2 Are current BMPs in material storage areas adequate? 3 Are appropriate spill containment and cleanup materials kept on site and in convenient locations? D Outfalls Yes No N/A 1 Were all outfalls observed during the inspection? 2 if the facility has representative outfall status, is it properly documented by the Division? 3 Has the facility evaluated all illicit (non stormwater) discharges? E Sector specific questions Yes No j N/A 1 Have zinc or copper benchmarks been exceeded in the past 3 / sampling periods? 2 Have potential sources for copper and zinc been evaluated at your facility? 3 4 6 Comments r s- • Compliance Inspection Report Permit: NCG210356 Effective: 08/01/13 Expiration: 07/31/18 owner: Parton Lumber Company Inc SOC: Effective: Expiration: Facility: Parton Lumber Log Wetting Facility County: Rutherford 251 Parton Rd Region: Asheville Rultlerfordton NC 2$134 Contact Person:-Shanr-Prrin axt 3 Title: Safety Manager Phone: 828-287-4257 Directions to Facility: From Rutherfordton, take Hwy 64 east to Parton Lumber on right just before crossing the Second Broad River. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection pate: 10/1312014 Entry Time: 01:00PM Exit Time: 03:00PM Primary Inspector: Darlene J Kucken Phone: Secondary Inspector(s): Reason for Inspection: Follow-up Inspection Type: Technical Assistance Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status. ❑ Compliant Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 permit: NCG210356 Owner - Facility: Parton Lumber Company Inc Inspection Date: 10113t2014 Inspection Type: Technical Assistance Reason for Visit: Follow up Inspection Summary: This inspection was conducted as follow-up technical assistance to the new contact person, BJ Morgan. A copy of the SWPPP was uncovered and we went through this document to assess what needed to be updated or added. 1. Add an updated signature and certification page to the document. 2. Add a Stormwater Facility Inspection Program documentation. 3. Update the list of Responsible Parties to the document. 4. Update signatures on page 2 of the Emergency Response Plan for spills. 5. Update the employee training section. 6. Request documentation from Shane on the Qualitative Monitoring, 7. Request documentation from Shane on the Analytical Monitoring. 8. Assure that current BMPs in material storage areas are adequate. 9. Assure appropriate spill containment and cleanup materials are kept on site and in convenient locations. Page: 2 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor October 6, 2014 Patrick Parton, Co -Owner Parton Lumber Company, Inc. 251 Parton Road Rutherfordton, NC 28139 SUBJECT: Compliance Sampling Inspection Parton Lumber Log Wetting Facility Permit No: WQ0020493 Rutherford County Dear Mr. Parton: John E. Skvada, III Secretary Enclosed please find a copy of the Compliance Sampling Inspection Form from the inspection conducted on 912412014. The facility was found to be in compliance with permit WQ0020493. Please keep in mind that seven feet of freeboard is required in the recycle pond even when the system is not operating. Although residuals were not determined to be the cause of the pond overflow in 2013, you may need to monitor the depth of residuals to ensure adequate capacity for recycled water. The freeboard monitoring results should be submitted each month on Form NDMR as required in Permit Condition 16. As discussed during the inspection, the area where mulch is stored may need to have management practices installed to prevent runoff. It appeared that runoff to the creek had occurred from this area, Please contact the Division of Energy, Mineral and Land Resources (DEMLR) concerning your stormwater permit as it relates to this site. Results for samples that were collected will be reviewed and forwarded to you when they become available. Please refer to the enclosed inspection report for additional observations and comments. The assistance of Mr- Shane Poindexter was appreciated during your inspection. If you or your staff have any questions, please call me at (828) 296-4685. Sincerely, Btvm-A� Alt�� Beverly Price Environmental Specialist Enc. cc: B.J. Morgan, Environmental Safety Manager _ Darlene Kucken, ARO DEMLR ----Water Quality Central"Files --- _ � "�— " Water Quality Asheville Files G:1WRlWQIRutherfordlWastewater\Non-discharge\Parton Lumber1WQ0020493 CE114.doc Received OCT - O 2014 Water Quality Regional Operations —Asheville Regional Office Land Quality Section 2090 U.S. Highway 70, Sxannanoa, North Carolina 28778 Asheville 828-296.4500 FAX: 828-299-7043 Internet: hftp:llportal.nodenr.org/webtwq An Equal Opportunity l Affirmative Action Employer 'l Compliance Inspection Repo Permit: W00020493 Effective: 06/15107 Expiration: 05131/16 Owner: Parton Lumber Company Inc SOC: Effective: Expiration: Facility: Parton Lumber Log Wetting Facility County: Rutherford 251 Parton Rd Region: Asheville Rutherfordton NC 28139 Contact Person: B J Morgan Title: Environmental Safety Manager Phone: 828-287-4257 Directions to Facility: From Rutherfordton, take Hwy 64 east to Parton Lumber on right just before crossing the Second Broad River. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representatives): 24 hour contact name Shane Poindexter 828-287-4257 On -site representative Shane Poindexter 828-287-4257 Related Permits: Inspection Date: 09/24/2014 Entry Time: 09:30AM Exit Time: 11:00AM Primary Inspector: Beverly Price Phone: 828-296-4500 Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Closed -Loop Recycle Facility Status: Compliant Not Compliant Question Areas: Miscellaneous Questions Treatment (See attachment summary) Inspection Type: Compliance Sampling ■ Record Keeping Permit: W00020493 Owner - Facifity: Parton Lumber Company Inc Inspection Date: 09/2412014 Inspection Type: Compliance Sampling Reason for Visit: Routine Inspection Summary: Freeboard is being maintained. Freeboard was approximately 7'8" at the time of inspection. A new gauge has been installed in the pond. Two feet of freeboard is required even when the system is not in operation. The overflow pipe has been removed from the dam. Additional sprayheads have been added to the system. All of the above improvements were a result of the Notice of Violation issued in June 2013 for an unpermitted discharge from the recycle pond. The engineer's report (October 2013) regarding removal of residuals from the pond indicated that the residuals would not need to be removed. There was standing water just below the mulch pile. It appeared that runoff from the mulch pile had occurred in the past. Please contact the Division of Energy, Mineral and Land Resources (DEMLR) for recommendations regarding your stormwater permit as it relates to runoff. Page: 2 IN Permit: WQ0020493 owner • Facility: Parton Lumber Company Inc Inspection Data: 0912412014 Inspection Type r Compliance Sampling Reason for Visit Routine Type Yes No NA NE Single Family Spray, LR ❑ Activated Sludge Spray, LR ❑ Lagoon Spray, LR ❑ Infiltration System ❑ Reuse (Quality) ❑ Recycle/Reuse ❑ Single Family Drip ❑ Activated Sludge Drip, LR ❑ Activated Sludge Spray, HR ❑ Treatment Yes No NA NE Are Treatment facilities consistent with those outlined in the current permit? ❑ ❑ ❑ Do all treatment units appear to be operational? (if no, note below.) ❑ ❑ ❑ Comment: Record Keeping Yes No NA NE Is a copy of current permit available? ■ ❑ ❑ ❑ Are monitoring reports present: NDMR? ❑ ■ ❑ ❑ NDAR? ❑ ❑ 0 ❑ Are flow rates less than of permitted flow? ❑ ❑ ❑ M Are flow rates less than of permitted flow? ❑ ❑ ❑ M Are application rates adhered to? ❑ ❑ ❑ Is GW monitoring being conducted, if required (GW-59s submitted)? ❑ ❑ M ❑ Are all samples analyzed for all required parameters? M ❑ ❑ ❑ . Are there any 2L GW quality violations? ❑ ❑ 0 ❑ Is GW-59A certification form completed for facility? ❑ ❑ M ❑ Is effluent sampled for same parameters as GW? ❑ ❑ 0 ❑ Do effluent concentrations exceed GW standards? ❑ ❑ ❑ Are annual soil reports available? ❑ ❑ ■ ❑ .- -- -Are PAN records r`equired?- - _ -._- . _ _. _ _ __---- _ -- .. - -_ _ — # Did last soil report indicate a need for lime? ❑ ❑ 0 ❑ If so, has it been applied? ❑ ❑ ■ ❑ Are operational logs present? Q ❑ ❑ ❑ Are lab sheets available for review? ❑ ❑ ❑ ■ Do lab sheets support data reported on NDMR? ❑ ❑ ❑ ■ Do lab sheets support data reported on GW-59s? ❑ ❑ 0 ❑ Page; 3 permit: W00020493 Owner - Facility: Parton Lumber Company Inc Inspection Date: 09/24/2014 Inspection Type: Compliance Sampling Reason for Visit: Routine Are Operational and Maintenance records present? E ❑ ❑ ❑ Were Operational and Maintenance records complete? 0 ❑ ❑ ❑ Has permittee been free of public complaints in last 12 months? N ❑ ❑ ❑ Is a copy of the SOC readily available? ❑ ❑ ® ❑ No treatment units bypassed since last inspection? ❑ ❑ ❑ Comment: Freeboard records should be submitted Wth,September sample results. Page: 4 r Ncc-- a/b35zP 251 Parton Road • Rutherfordton, NC 28139 Phone (828) 287-4257 • Fax (828) 287-3308 Parton Lumber Company • Parton Land & Timber • Parton By -Products • Parton Export NCDENR Central Files DWQ 1617 Mail Service Center Raleigh, N.C. 27699-1617 Attention: DWQ Subject: Storm Water Grab Sample Results PERMIT #NCG2.1.0000 Jan. 28, 2014 This is the results for our SWPPP grab sample. The sample was taken on 12/23/2013 and released to Blue Ridge Labs for analytical testing_ Please call me if you have any questions concerning the above information Shane Poindexter Environmental Safety Mgr_ 828-287-4257 RECEIVED JAIL 3 1 2014 CENTRAL FILES DWQ/BOG Blue Ridge Labs PO Box 2940 Lenoir, NC 28645 828-728-0149 Client : Parton Lumber Co. 251 Parton Road Rutherfordton, NC 28139 Attention: Mr. Shane Poindexter !)nte liec(:ltie(l: 19-Dec-13 Report late: 24-.1an-14 Sample Date: 23-Dec-I3 BR1.11: 13RL-2013-0928 Lab Sample ID: LSID-2013-04239 Client Sample ID: Stormwater !'arameIer Result MQL TSS 9.3 5.5 Reported Hy: " Concentrations are blueridgelabsienoir@gmaii.com Analysis Analysis Unit Method Time Date Analyst ni,ll SM 19 2540D 16:20 12/30/2013 1<C J ?)o/,,,,-M J.Jr►hnsonD.R. Wessinger inimum Quantification Limit except where noted. NC Laboratory Certificate No. 275 Page l of 2 Blue Ridge Labs PO Box 2940 Lenoir, NC 28645 828-728-0149 Client: Parton Lumber Co. 251 Parton Road Rutherfordton. NC 28139 Attention: Mr. Shane Poindexter Date Deceived: 19- Dec- 13 Report Date: 24-.1an-14 Sample hate: 23-Dee-13 13R1. /1: 13RL-2013-0928 Lab Sample ID: LSID-2013-04240 Client Sample 11), Stornmater lill'nlnClCl' Result MQI, C: O D 50 20 blueridgelabslenoir@gmail.com Analysis Analysis Unit Method 'rime Date tngll SM 5220D 1/14/2014 Reported By: J. Johnson, U.R. Wessinger ` CoucentratiflnS arc �v Minimum Quantification Limit except where noted. NC Laboratory Certificate No. 275 Page 2 of 2 Analyst WvQlty WATER QUALITY LAB & OPERATIONS, INC. P.O. BOX 1167 BANNER ELK, NC 28604 --(828)-89&6277---- CLIENT: BLUE RIDGE LABS ADDRESS: P.O. BOX 2940 CITY: LENOIR RECEIVED DATE: 10-Jan-14 STATE: NC ZIP 28645 REPORTED DATE: 24-Jan-1 4 rDM-- .............. .... ........... ...... .. .I ...... .. .............. ................: ESULTS. ITf ANAL." DA'e.. .......... ......... COD 4240 60 20 MG/L 17-Jan-141 Pt REPORTED BY: NC CERTIFIED LAB # 5" PAUL ISENHOUR, SUPERVISOR Blue Ridge Labs, Inc. P.O. Box 2940 Lenoir, NC 28645 Telephone (828) 728-0149 Fax (828) 728-013 t Chain of Custody NPDS Reporting Groundwater Sanitary Landfill Hazardous Waste Industrial or QC UST/Trust Fund Reporting Sill To: Project Name: PO Number: Field Ice Present: Y N Preservatives Lab Check Non State Reporting _ Sample III Sample Type Date Time Time & Temp HR:MM °C Field Sulfide Check Y N Field Sulfide Present/ Removed Y N Resid Chlor Field Check Y N l±ield Dechiorinatiorn Y N pH Resid Chlor PorA Temp °C Sampler Initials Analysis Requested lot V Z l E �I i RshfRec Date: Tfi�m�e: Tn Upan submission of samples, client agrees that invoices are due at the Lillie work is completed. Open accounts arc duc 20 days following invoice date. A finance charge of 1.5% permonth Will be inlposCd on all paslue accounts. When relingUiShine samples ILI Blue Ride Labs (BRL), buyer authorizes BRL to perlornl only the analysis indicated abuve and also agrees to pay cullectian and attorney ices the account becomes delinquent. I3luC Rid,-(: Labs reserves the right to (Icily doculllctltatim for any Work where paylllellL IIAS IIJL been 11186e. in cilect rlllderinL LltaL data unsupported for regulatory purposes. BRL cannot guarantCC that 1111V r%utatory atltll0rity Will RCCCpt 811y %VGrk subrnitted, therefore it is the eiient's responsibility to request on this form appropriate tests. NC DEUR Certified Lah :215 Stepp, Jonathan From: David Odom <davidodom@odomengineering.com> Sent: Thursday, September 26, 2013 4:23 PM To: Stepp, Jonathan; spoindexter@partonlumber.com Cc: Kucken, Darlene; Price, Bev; Herbert, Laura C Subject: RE: Parton Lumber Site Visit To all: It appears that the recycling system recommendations are acceptable to everyone and we can move forward. I will inform the Partons. Dave From: Stepp, Jonathan[mailto:ionathan.stepp(a)ncdenr.gov] Sent: Thursday, September 26, 2013 3:15 PM To, svoindexterCabpartonIumber. com Cc: davidodom@odomengineering.com; Kucken, Darlene; Price, Bev, Herbert, Laura C Subject: Parton Lumber Site Visit Hi Shane, Thank you for showing Darlene and me around the Parton Lumber facility last Friday. You asked that I take a quick look over your Stormwater Pollution Prevention Plan (SPPP). I noted a few areas that need to be added/ expanded. As we discussed, please send me an electronic copy of your SPPP and I will further review the plan and provide comments. We looked at the inlet for your outfall and discussed your recent TSS exceedance. We talked about some potential scenarios for the addition of some BMP's that may improve TSS. We also discussed the need to move your sample location further down the drainage way for two reasons. First this may improve TSS and second it will allow any runoff form the wood chip piles along the drainage way to be captured in your samples so that this discharge can be monitored and characterized. Finally, we discussed some proposed changes to the drainage around your deck wetting area. David Odom, of Odom Engineering, has provided me with a proposal that will redirect the roof drains from the kilns and the surrounding area away from your recycle pond to a new discharge point in the creek. If Parton Lumber decides to proceed with this plan then you will need to add the new outfall location to your SPPP (including your map) and begin sampling stormwater at the new outfall as described in your permit (twice per year unless provisions of the permit prompt monthly sampling). Don't hesitate to contact me if you have any questions regarding compliance with your permit or this correspondence. We appreciate your continued efforts toward improving your Stormwater Pollution Prevention Plan and look forward to working with further. Sincerely, Jonathan Jonathan Stepp—Jonathan.SteppPncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 ]highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. Kucken, Darlene From: Stepp, Jonathan Sent: Thursday, September 26, 2013 3.15 PM To: spoindexter@partonlumber.com Cc: davidodom@odomengineering.com; Kucken, Darlene; Price, Bev; Herbert, Laura C Subject: Parton Lumber Site Visit Follow Up Flag: Follow up Flag Status: Completed Hi Shane, Thank you for showing Darlene and me around the Parton Lumber facility last Friday. You asked that I take a quick look over your Stormwater Pollution Prevention Plan (SPPP). I noted a few areas that need to be added/ expanded. As we discussed, please send me an electronic copy of your SPPP and I will further review the plan and provide comments. We looked at the inlet For your outfall and discussed your recent TS5 exceedance. We talked about some potential scenarios for the addition of some BMP's that may improve TSS. We also discussed the need to move your sample location further down the drainage way for two reasons. First this may improve TSS and second it will allow any runoff form the wood chip piles along the drainage way to be captured in your samples so that this discharge can be monitored and characterized. Finally, we discussed some proposed changes to the drainage around your deck wetting area. David Odom, of Odom Engineering, has provided me with a proposal that will redirect the roof drains from the kilns and the surrounding area away from your recycle pond to a new discharge point in the creek. If Parton Lumber decides to proceed with this plan then you will need to add the new outfall location to your SPPP (including your map) and begin sampling stormwater at the new outfall as described in your permit (twice per year unless provisions of the permit prompt monthly sampling). Don't hesitate to contact me if you have any questions regarding compliance with your permit or this correspondence. We appreciate your continued efforts toward improving your Stormwater Pollution Prevention Plan and look forward to working with further. Sincerely, Jonathan Jonathan Stepp--Jonathan.Stepp@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. Stepp, Jonathan From: David Odom <davidodom@odomengineering.com> Sent: Tuesday, September 10, 2013 3:43 PM To: Stepp, Jonathan Cc: Kucken, Darlene; Herbert, Laura Q spoindexter@partonlumber.com: Price, Bev Subject: RE: Parton lumber pond memo with berm Ok. Let me know when you are going to be there and, if possible, I will look at it with you. Dave -----Original Message ----- From: Stepp, Jonathan [mailto:ionathan.stepp@ncdenr.govI Sent: Tuesday, September 10, 2013 3:40 PM To: David Odom Cc: Kucken, Darlene; Herbert, Laura C; spoindexter@partonlumber.com; Price, Bev Subject: RE: Parton lumber pond memo with berm Hi David, Thank you for the heads up. I spoke with Shane this morning and looked at some aerial photos. As long as the roof runoff does not come in contact with industrial materials I don't see a problem with the plan. If the runoff does come in contact with industrial materials/ processes then Parton Lumber will need to add this discharge point to the outfall list in their Stormwater Pollution Prevention Plan (SPPP) and begin sampling this new outfall. I am not sure what the volume and velocity of the water will be at the outfall but energy dissipation measures may be something to consider (it appears that the berm will convey water to a new culvert that discharges in close proximity to a creek). The next time I am in Rutherford county I will stop by Parton lumber (hopefully sometime next week) and look at the proposed location of the berm and outfall, Thanks again, Jonathan Jonathan Stepp - lonathan.Stepp@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. -----Original Message ----- From: David Odom [mailto:davidodom@odomengineering.com] Sent. Tuesday, September 10, 2013 8:59 AM To: Stepp, Jonathan Subject: FW: Parton lumber pond memo with berm Hi Jonathan hope you are well. This is regarding a different client, Parton Lumber. Attached is a memo that I have submitted to Bev Price addressing their recycle system for stormwater from the log storage yard and the sprinklers to wet the logs. The drainage Swale directs all of the runoff and sprinkler water to a recycle pond. During the heavy storms in July, the ponds overflowed several times so we are addressing that to ensure that the storage capacity is available in the pond for the 25 year storm. One solution that we have come up with is to divert the roof drains from the kilns away from this recycle system and directly into the stream with a swale (a culvert to get underneath a roadway). This is shown on the drawing with the memo. Bev suggested that I needed to contact you to ensure this doesn't have any implications with their stormwater permit. Do you see any reason why we couldn't install the diversion Swale as shown? Thanks in advance for your feedback. Dave -----Original Message ----- From: David Odom[mailto:davidodom@odomengineering.com] Sent. Tuesday, September 03, 2013 1:00 PM To: 'Price, Bev' Subject: FW: Parton lumber pond memo with berm Bev We have met with the Parton's and have revised the plan to eliminate the need for dredging or expanding the pond (other than a small height increase on the dam) by diverting flow that isn't required to go to the ponds away from the closed system. We will proceed with construction upon your review and approval. Dave -----Original Message ----- From: Chris Waters [mailto:chriswaters@odomen ineering.com] Sent: Tuesday, September 03, 2013 12:52 PM To: David Odom Subject: Parton lumber pond memo with berm Geor oulias, Bethany From: admin@ncdenr.gov Sent: Tuesday, August 13, 2013 7:45 AM To: SVC_DENR.stormwater Subject: Confirmation for Renewal of DWQ Stormwater NPDES General Permit ** ❑o not reply to this e-mail as it is from an unmonitored mailbox. ** Thanks for renewing your permit using our on-line option. No further action is necessary. The new General Permit is available for printing from our website at http://portal.ncdenr.org/web/lr/stormwa.ter . If you have questions, please contact Bethany Georgoulias at bethanygeor og ulias a n_cdenr.gophone (919) 807-6372 or Bradley Bennett at brad ley.bennett Ocncdenr..gov phone (919) 807-6378. If you forgot to print your Certificate of Coverage you can resubmit the data and print another copy. This COC is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) The General Permit authorizes discharges of Stormwater and specifies your obligations for discharge controls, management, monitoring, reporting, and record keeping. Please review the new permit to familiarize yourself with all of the changes. Parts III and IV contain the Standard Conditions, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Your facility has six months from receipt of the COC to update its Stormwater Pollution Prevention Plan (SPPP) to comply with changes in SPPP requirements. Other changes are effective immediately. Please note that Tier 3 Actions (if applicable) are triggered by four benchmark exceedances beginning on the effective date of the renewal permit and do not count prior exceedances. Please visit our website above to review the new General Permit carefully. Please note that the Stormwater Permitting unit is in the process of moving to the Division of Energy.. Mineral, and Land Resources (DEMLR). Your coverage under the General Permit is transferable only through the specific action of DWQ and/or DEMLR. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility For compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. CONFIRMATION DETAILS Permit Number: Expiration Date: Organization Name: Facility Name: Admin Region: County Name: Regulated Activity: Receiving Stream Name: Receiving Stream Class: Basin: Facility Address: NCG210356 7/31 /2018 Parton Lumber Company Inc Parton Lumber Log Wetting Facility Asheville Rutherford Timber products manufacture / Wood Chip Mills Second Broad River WS-1V Broad 251 Parton Rd Facility City: Facility State: Facility Zip: Affiliation Type: First Name: Middle Name: Last Name: Fax Number: Work Phone Number: Email: Rutherfordton NC 28139 Owner Patrick Parton (828)287-3308 (828)287-4257 spoindexternpartonlumber.com Kucken, Darlene From: Georgoulias, Bethany Sent: Thursday, June 05, 2014 11:16 AM To: Kucken, Darlene Cc: Pickle, Ken Subject: RE: Parton Lumber NCG210356 Follow Up Flag: Follow up Flag Status: Flagged Hi, Darlene, See below for my responses, I hope they help! Let me know if you have any other questions. -Bg i3ellxn -v 6ee11 gmilias. ;m-irrH11r1c trial Engineer N(A)I.NR i Division ��) I;nel' \. �Ilill'rai. and Lane! Rciut rcO Slor'nnwalcr Permittill" Prograill 1612 Xlail Service Coiicr. ItalQigll, NC 27699-1612 j 12 N. Salisbury Surct, Raleigh, NC 217604 90 ' 807-637_2 (phone): 419 1 807-6194 1 lli.x ) Wehsite: htt12:,'/porta1.ncdcnr.ors l\vebr'Ir/stor-inwaier !: xr.,i1 rr.rrr.rlrurrrf; rn t !o„ r<1 J;. +,+r dri, urf:frr s cacti hc soh1e,7 fl, ihc� \ur'r!r r ":rrrdwo VOiA- ilea, ,nl, hn, ,rind nru+ 1: ,fr. J,, r;i Irr rfrrrrl purrrrs, From: Kucken, Darlene Sent: Wednesday, .June 04, 2014 4:57 PM To: Georgoulias, Bethany Subject: Parton Lumber NCG210356 Hi Bethany, I could use a bit of help with this one. Jonathon and I did an inspection of this lumber product facility. They had some exceedances of TSS and some simple measures on site were recommended" Also, David Odom was working on a recycling system recommendation that was designed to help clear up the outfall and alleviate volume pressures on the system. These measures have been installed and I think they will help tremendously. My questions to you are: 1. They technically have two outfall pipes, but one of them Sa new pipe resulting from the system upgrades mentioned above) barely has a trickle except for major rain events. So he can't really sample this one. I believe their permit has only one outfall noted. How do they need to mention the addition of this one, and how should they handle sampling it? The nice thing about most of our storm water permits is that they don't mention specific outfalls. They just reference all SDOs, and they require the permittee to keep their. SPPP and monitoring records up to date with what SOOs (and what they're called) are on their own site. The permittee just needs to add the extra outfall to their maps and revise related information (such as drainage area details for it, etc.) The permit should only require sampling if there is a measureoble event —one that results in a discharge from the pipe [large enough to sample is implied] —during the six month [or monthly, if Tier 21 period. if that pipe that trickles doesn't ever discharge enough to sample, they simply need to report "No Discharge" on the DMR for that period and send it in. The permit still requires that they record and report it: see footnote 2 on the monitoring schedule table. The entire site is essentially the same and the current outfall would get the brunt of anything. Water from this pond is about as green as it can get right now. What do they have to do to get representative outfall status for this one outfall? Have them fill out the form on our website (see htto://portol.ncdenr,orgZweb lrinpdes -storm woter#tab-2J — the lost one in the table. The ARO will handle review and approval of that request, and should record the action in B1MS. There's guidance oo our internal guidance website on RCS, as well (http://Portal.ncdenr.orglgroup/!r/stormwater-guidance}, including example response letters to the permittee. Thanks for your thoughts on this! Darlene Kucken - Darlene.Kucken@ncdenr.Rov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. dA, Go Green! Print this email only when necessary. Thank you for helping NCDENR be environmentally responsible. Compliance Inspection Report Permit: NGG210356 Effective: 08/01/08 Expiration: 07/31/13 SOC: Effective: Expiration: County: Rutherford Region: Asheville Contact Person: Shane Poindexter Title: Safety Manager Owner: Parton Lumber Company Inc Facility: Parton Lumber Log Wetting Facility 251 Parton Rd Rutherfordton NC 28139 Phone: 828-287-4257 Directions to Facility: From Rutherfordton, take Hwy 64 east to Parton Lumber on right just before crossing the Second Broad River. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 07/17/2013 Entry Time: 10:30 AM Exit Time: 12:30 PM Primary Inspector: Jonathan Stepp Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ❑ ComplOnt C3 Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NCG210356 Owner - Facility: Parton Lumber Company Inc Inspection Date: 0711712013 Inspection Type: Technical Assistance Inspection Summary: Reason for Visit: Routine The SWPPP is minimal and needs to be updated/ revised/ expanded. Shane Poindexter is now handling this plan and requested this inspection. Shane is working to update and improve the SWPPP. A drain in the vehicle maintenance garage was noted during the inspection. Mr. Parton is not sure where the drain discharges and plans to eliminate the drain because it is no longer used. Stormwater pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ ■ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ ■ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ ■ # Does the Plan include a detailed site map including oulfall locations and drainage areas? Q ❑ ❑ ■ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ ■ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ 0 ■ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ ■ # Does the Plan include a BMP summary? ❑ ❑ ❑ ■ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ ■ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? Cl ❑ ❑ ■ # Does the facility provide and document Employee Training? ❑ ❑ ❑ ■ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ ■ # Is the Plan reviewed and updated annually? C) O ❑ ■ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ ■ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ ■ Comment: The SWPPP is minimal and needs to be updated/ revised/ expanded. Shane Poindexter is now handeling this plan and requested this inspection. Shane is woking to update and improve the SWPPP. A drain in the vehicle maintenance garage was noted during the inspection. Mr. Parton is not sure where the drain discharges and plans to eliminate the drain because it is no longer used. Permit and Qutfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ 0 0 # If the facility has representative outfali status, is it properly documented by the Division? ❑ 0 ■ I] # Has the facility evaluated all illicit (non Stormwater) discharges? ■ 0 ❑ ❑ Comment; See above. Page: 2 Rutherford County, NC Pri, lap 113ILe 1 o f 1 Rutherford County, NC Disclaimer: The information contained on this page is NOT to be construed or used as a "legal description". Map information is believed to be accurate but accuracy is not guaranteed. Parcels GPIN: 1632006272290000 ST SUFFIX: RD Neighborhood Desc: N CENTRAL RURAL COMMERCIAL Map Block Lot: 732 1 16 ST NAME: PARTON Neighborhood Code: C90J http://aregis.webgis.net/nc/Rutherford/printable.asp 7/26/2013 a Y F' \N Q r `---..W..l�4iChael_F..EasleyGov_e�+mor �O 01. 94G William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources t/3 7 Alan W. Klimek, P-E. Director Division of Water Quality 4 � Asheville Regional office SURFACE WATER PROTECTION SECTION October 6, 2006 Mr. Carl Parton Parton Lumber Company Inc. 251 Parton Road Rutherfordton, NC 28139 SUBJECT: Compliance Evaluation Inspection Status: Compliant General Stormwater Permit Parton Dumber Company Inc. Permit number NCG210356 Rutherford County Dear Mr, Parton: Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted on September 26, 2006 by Wanda Frazier of the Asheville Regional Office. The facility was found to be in compliance with permit NCG210356. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff have any questions, please call me at 828-296-4500 extension 4662. Sincerely, Wanda P. Frazier Environmental Specialist Enclosure CC: Danny Smith, NPS Assistance & Compliance Oversight Wanda Frazier - ARO ARO 7 Stormwater Compliance Files Central Files Noon rhCarolina N[TtIfCIJIlf 2090 U.S. Highway 70, 5wannanoa, NC 28778 Telephone; (828) 296-4500 Fax: (828) 299-7043 Customer Service 1 877 623-6748 United States Environmental Protection Agency Form Approved. EPA Washington, D C. 20460 OMB No. 2040-0057 Water Compliance inspection Report Approval expires 8-31-98 Section A: National' Data System Coding (i.e., PCs) Transaction Code NPOES yr/mo/day Inspection Type Inspector Fac —type 1 I td1 2 l 51 3� NCG210356 11 121 06/09/26 1 17 18LCJ '�1 Sl 201 1 L� Remarks 211 1 1 1 1 1 1 l l l_1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I l _t I I I III I I I I I I I I 111� I_I.nspection .1 Work Days Facility Self -Monitoring Evaluation Rating 131 CIA- 671 1,0 160 701 3j 71 II 721 N 1 73I I 174 75� I I 1 I 1180 _i_ �t Section 13: Facility Data Name and Location of Facility Inspected (For industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 12:30 PM 06/09/26 03/05/01 Parton Lumber Company incorporated Exit TimelOate Permit Expiration Date 251 Parton Rd Rutherfordton NC 28139 01:45 PM 06/09/26 08/04/30 Name(s) of Onsite Representative(s)Rtles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible OfficiallTitle/Phone and Fax Number Carl Parton,251 Parton Rd Rutner.fordton NC Contacted 28139//828-287-4257/6282873308 Na Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Storm Water Section D, Summary of Finding/Comments Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) AgencylOffic:elPhone and Fax Numbers Date Wanda P Frazier AzRG WQ//828-296-4500 FXt:.4662/ ^ 24 Signature of Management Q A Reviewer Agency/OfficelPhone and Fax Numbers g /±Date L-A�?I_ e: Page # 1 d i• NPDES yrlmolday Inspection Type 3I NCG210356 I11 12, 06/09/26 117 18[cl (Ccnt') 1 Section D: Summary of Finding/Comments (Attach additional streets of narrative and checklists as necessary) The following Stormwater permit requirements appeared to be compliant: 1. Implementation and documentation of required visual monitoring at all discharge voints (semi-annually). 2_ Implementation and documentation of analytical maintenance area is not required, since the facilii 3. Implementation and documentation of employee 4. Updated site map with all stormwater discharge 5, Stormwater Pollution Prevention Plan with Best I 6- Certification of non-stormwater discharges. You provided an excellent Stormwater Pollution Pre Morgan spent during the inspection and plant tour v 00� W A rFRQG co >I�; September 12, 2008 Patrick —Parton Parton Lumber Com� pany E 251 Parton Rd Rutherfordtori NC 28139 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Subject: NPDES Stormwater Permit Coverage Renewal Parton Lumber Log Wetting facility COG Number NCG210366 Rutherford County Dear Permittee: In response to your renewal application for continued coverage under stormwater General Permit NCG210000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit. This permit has been reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007. The following information is included with your permit package: • A new Certificate of Coverage • A copy of stormwater General Stormwater Permit NCG210000 • A copy of the Technical Bulletin for the General Permit • Five copies of the Discharge Monitoring Report (DMR) Form • Five copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater only, and it specifies your obligations with respect to stormwater discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. The more significant changes to the General Permit include the following: • Permit cover page, second paragraph — The General Permit now may cover activities that DWQ determines to be similar in either the process, or in the exposed materials, to the Timber Products industry. • Part I Section A — A new provision that facilities draining to 303(d) listed waters, or in watersheds with an approved TMDL, may not be eligible for continued coverage at the next renewal of the General Permit. • Part I Section B second paragraph — A new clarification that the permit does not authorize discharges that DWQ determines are wastewaters. • Part 11 Section A — The required contents of the Stormwater Pollution Prevention Plan have been expanded and clarified. • Part 11 Section B Table 1 — A new requirement to sample stormwater discharges twice per year for those facilities with exposed piles of certain materials remaining on site longer than seven days. • Part II Section B Tables 2 and 3 and following — For permittees with exposed piles, there are new provisions requiring the permittee to execute Tier One and Tier Two response actions, based on the first benchmark exceedence (Tier One) and the second consecutive benchmark exceedence (Tier Two). Tier Two requires that the permittee institute monthly monitoring instead of twice -per -year monitoring, until three consecutive monitoring events show no benchmark exceedences. • Part II Section B — For permittees with exposed piles, a new provision that four exceedences of any particular benchmark will trigger increased DWQ involvement in the permittee's stormwater management and control actions. DWQ may direct the permittee to apply for an individual permit, or may direct the implementation or installation of specific stormwater control measures. • Part II Section C — Clarification that under the qualitative monitoring provisions of the permit, the permittee is obligated to respond to repeated observations of stormwater pollution. DWQ may impose additional stormwater management requirements if the permittee is non-responsiv6, or if the responses are ineffective. Your coverage under the General Permit is transferable only through the specific action of DWQ. Nfte orthCarolina ,1VIIhrrr7111f North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Internet: h2o.enr.state.nc.uslsulstormwater.html 512 N. Salisbury St, Raleigh, NC 27604 An Equal OpportunitylAffirmadve Action Employer — 50% Recyded110% Rost Consumer Paper Phone (919) 807-6300 Customer Service FAX (919)807-6494 1-877-623-6748 NPDES Stormwater Permit Coverage Renewal Permit Number NCG_210356 Page 2 This permit does not affect the legal requirements to obtain other permits which may be required by NCDENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Be#heny'Georggulias of the Central Office Stormwater Permitting Unit at (919) 807-6376. Sincerely, for Coleen N. Sullins cc: DWO Central Files Stormwater Permitting Unit Files Ash vine Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG210000 CERTIFICATE OF COVERAGE No. NCG210356 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Parton Lumber Company Inc is hereby authorized to discharge stormwater from a facility located at Parton Lumber Log Wetting Facility, 251-Parton Rd 'Rutherfordton Rutherford County to receiving waters designated as Second Broad River, a class WS-1V, stream in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG210000 as attached. This certificate of coverage shall become effective September 15, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 12, 2008. for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission NA I Michael F. Easley, Governor �0�0 RpG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources fq Alan W. Klimek, P.E. Director j y Division of Water Quality o � April 28, 2003 Carl Parton Parton Lumber Company Incorporated 251 Parton Road Rutherfordton, NC 28139 Subject: NPDES Stormwater Permit Renewal Parton Lumber Company Incorporated COC Number NCG210356 Rutherford County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG210000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of General Stormwater Permit NCG210000 • A copy of the Analytical Monitoring Form (DMR) • A copy of the Quaiitativel Monitoring Form • A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Department of Environment and Natural Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548. Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Asheville Regional Office AVA NGDRA N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-8053 Customer Service 1 800 623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO, NCG210000 CERTIFICATE OF COVERAGE No. NCG210356 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Parton Lumber Company Inc is hereby authorized to discharge stormwater from a facility located at Parton Lumber Company Incorporated 251 Parton Rd Rutherfordton Rutherford County to receiving waters designated as the Second Broad River, a class WS-IV stream, in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG210000 as attached. This certificate of coverage shall become effective May 1, 2003. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 28, 2003. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission W A T'F Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and !Natural Resources 0 Alan W. Klimek, P,E., Director Division of Water Quality September 4, 2002 RANDY EDGERTON PARTON LUIVIf31:R COMPANY INCORPORATED 251 PARTON RI) RUTHERI:ORDTON. NC 28139 Subject: NPDES Stornlwaler Permit Coverage Renewal Parton I ttnlher Company Incorporated COC Nunther NC6210356 Rutherford County Dear Permiltee: Your facility is e:tlrrenIIy covered folr stormwater discharge under General Permit NCG210000. This permit expires on March 31, 2(x)3_ The Division staff is currently in (he process of rewriting this permit and is scheduled to have the permit reissue([ by Carly spring of 2003_ Once the permit is reissued. your fatcility would he eligible for Continued COwet'a4,c under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division ul' Water Quali(y (DWQ) for renewal of your permit coverage. To make this renewal process caster, we are informing, you in a(I\'ar1CC that your permit coverage will he expiring— Enclosed you will find a Permit Coverage Renewal Application Form. The application must he crnnpleted and returned by October 2, 2002 in order to aSSure continued coverage under the general pern►it. Due to staff and budget constraints, letters cuniirming our receipt oh the corrlpleled application will not hC se llt. Failure to re(lu"t renewal within the lime period specified, may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinyuciley of the re(luest, Discharge of storniwater front your facility without coverage under a valid siorntwater NPDI;S permit would constitute it violation of NCGS 143-215.1 and could result in assessruen[s elf eivif pulaftie s of up to MAW per day. Please note that recent federal leoislation has extended the "no exposure exclusion" to ail operators of industrial facilities in any of the 1 1 categories of " storm water discharges associated with in(lusirial activity." (except construction aclivities). If vat feel your facility can certii'y a condition of "no exposure". i.e. the facility industrial materials and operations are not exposed to storniwatcr. you can apply for the no exposure exclusion. Foradditional information contact the Central Office Slormwaler Staff nlcrnhCr listed below or check the Storrrlwatcr & General Permits Unit Weh Site at http://h2o_ciir.statc.nc.us/sti/stornlwatcr.htnti If the subject stormwater discharge: to waters of the state hit~ Ixx:ll ICrtillnaled, please Ct>I]lplete tile e llcloscd Rescission Request !'orrn. IN-lailing instructions arc listed on the botlonl of the form. You will I.Y. nolified when the rescission proc:esti has been completed, if you have any (questions regarding the permit renewal proccdures please contact Jim Reid of the Asheville Regional Oflict: at 828-251-6208 or Bill Mills of the Ccntrarl Office Stormwatler Unit at (919) 733-5083. exi. 548 Sincerely, Bradley Bennett, Sup(;rvisor Storiltwaler and General Permits Unit cc: Central files Stortnwater and General Permits Unit Files Asheville Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 ��A NCDENR Customer Service 1- 800-623-7748 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph-D., Acting Director November 30, 2001 Mr. Carl Parton, President Parton Lumber Company, Inc. 251 Parton Road Rutherfordton, NC 28139 4 e IT A0 2 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: General Permit No. NCG210356 Parton Lumber Company, Inc. COC NCG210356 Rutherford County Dear Mr, Parton: In accordance with your application for discharge permit, for coverage under NCG220000, received on December 19, 2000 and the subsequent information that you submitted at our request, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated May 9, 1994 (or as subsequently amended). Our review of the information that you submitted indicated that the Subject facility is not primarily engaged in wood chip production at this site and that coverage under the General Permit NCG210000 is appropriate. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Bill Mills at telephone number 9191733-5083 ext. 548. Sincerely, 1. Gr'�gA'. t`t'fi1?irpe cc: Asheville Regional Office Central Files Stormwater and General Permits Unit Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG210000 CERTIFICATE OF COVERAGE No. NCG210356 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Parton Lumber Company, Inc. is hereby authorized to discharge stormwater from a facility located at Parton Lumber Company, Inc. 251 Parton Road Rutherfordton Rutherford County to receiving waters designated as the Second Broad River in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I,11, III, IV, V, VI and VII of General Permit No. NCG210000 as attached. This certificate of coverage shall become effective November 30, 2001_ This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day November 30, 2001. Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality By Authority of the Environmental Management Commission