Loading...
HomeMy WebLinkAboutNCG210295_COMPLETE FILE - HISTORICAL_20170210STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. O a g� DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE CD YYYYM M D D 4 Energy, Mineral & Land Resources fN VIPONMENTAL 0DAUTV David Perdue Wilderness — NC, Inc. P.O. Box 2136 Lexington, NC 27293 February 10, 2017 Subject: Compliance Inspection Permit No. NCG 210295 Wilderness --- NC, Inc. — Thomasville Davidson County Dear Mr. Perdue: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director On February 9, 2017 Glen White of the North Carolina Department of Environmental Quality — Division of Energy, Minerals and Land Resources visited the facility located at 313 New Cut Road in Thomasville, to conduct a compliance inspection. This inspection consists of review of the facility outfalls and possible exposures. Your assistance with this inspection is greatly appreciated. A prior partial inspection was conducted in October 13, 2016 with Ms. Belinda Milan's assistance. At that time records review was completed and found to be compliant. Permit: This facility holds General Stormwater Permit NCG210295 to discharge stormwater from industrial activity associated with Lumber and Wood Products, Except Furniture [SIC 241 under the National Pollutant Discharge Elimination System (NPDES). The permit became effective August 01, 2013 and expires on July 31, 2018. The current permit was available for review and was included in the SPPP. Records/Reports: This facility was required to develop and maintain a Stormwater Pollution Prevention Plan (SPPP) in accordance with Part 1I, Section A of the permit. All qualitative and analytical monitoring records are required to be maintained with the SPPP for a minimum of five (5) years. Records appear to be current and complete. Facility Site Review: This facility is a lumber yard and dry kiln operation. Most of the product is prepared directly for the client. This yard processes hard wood only. Product is used in furniture production in many parts of the world. Much of the lumber is shipped to Australia. Sawdust is captured in semi- trailers and used to create heat for the kilns. Excess sawdust that is in excess of what can be held in trailers is stored on concrete and again used in heating the kilns. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, NC 27103 336 776 9800 This yard has two (2) outfalls on its stormwater permit and three (3) outfalls on its wastewater permit. The wastewater treatment facilities include a sand filtration system. Effluent from the system drains into a small bottle near the creek. Effluent is very clear. Results have consistently sampled within parameters. Effluent Receiving Waters: Effluent from this facility drains to flat Swamp Creek, Class "B", waters of the Yadkin Pee -Dee River Basin. Self -Monitoring Program: This facility is required to provide Qualitative Monitoring twice annually. No Analytical Monitoring is required per the stormwater permit under current operating procedures. The facility was found to be compliant with its industrial stormwater permit. If you have questions or need additional information, please contact Glen White at (336) 776-9660. Enclosures: Inspection Report Sincerely, Matthew E. Gantt, P.E. Regional Engineer Land Quality Section Winston-Salem Regional Office cc: Division of Mineral and Land Resources (WSRO) State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wknston•Salem Regional Office 1 450 Hanes Mill Road. Suite 300 1 Winston-Salem, NC 27103 336 776 9800 Compliance Inspection Report Permit: NCG210295 Effective: 08/01/13 Expiration: 07/31/18 Owner: Wilderness N C Inc SOC: Effective: Expiration: Facility: Wilderness NC, Inc. County: Davidson 7578 US 64 E Region: Winston-Salem . Thomasville NC 27361 Contact Person: Shannon Floyd Title: Phone: 336-474-2314 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/09/2017 Primary Inspector: Glen White Secondary Inspector(s): Certification: Phone: EntryTime: 01:OOPM Exit Time: 02:OOPM Phone: 336-776-9800 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: Compliant [] Not Compliant Question Areas: M Storm Water (See attachment summary) Page: Permit: NCG210295 Owner • Facility: Wilderness N C Inc Inspection Date: 02/09/2017 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: (See Compliance Letter in WSRO hard copy file.) NCG�Zi0I-Cl Of+3I�b O: ao ,of 1S5J� cAe �P. Fu nT PA- M 1 L -tJ (5r� 1-ss,s-( F.�64 L C-L-) Fr1yC_ S fee {- S I'd u, C4a1I rLQ!L fW . Lec- cvs A e il!-D6C. _.Co, it!:! t Ali% ej W U —1 !JCtft��►*`L- 1 AiJlok:l' •�- ry 4 s G�J 4- sWYE7 I asP, Page: 2 Permit: NCG210295 Owner - Facility: Wilderness N C Inc Inspection Date: 02/09/2017 Inspection Type ; Compliance Evaluation Reason for Visit: Routine Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ■ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: No analytical monitoring required for stormwater permit under current operating procedures._._ This facility also has a wastewater treatment with a sand filter system. Effluent from the system is collected at the outfall near the creek in a small bottle, Effluent is clear. Wastewater system requires analytical monitoring with parameters above stormwater requirements._ Samples result within required parameters. Permit and Outfalls Yes No NA NE # is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ■ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? M ❑ ❑ ❑ Comment: No deficiencies. Qualitative Monitoring Yes No NA NE Has the facility conducted its qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? M ❑ ❑ ❑ Page: 3 Permit: NCG210295 Owner - Facility: Wilderness N C Inc Inspection pale: 02/09/2017 Inspection Type : Compliance Evaluation Stormwater Pollution Prevention Plan # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Reason for Visit: Routine Yes No NA NE ■❑❑❑ ■❑❑❑ Page: 4 .1 ?; a Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY David Perdue Wilderness—N.C., Inc. P.O. Box 2136 Lexington, NC 27293 October 17, 2016 Subject: Compliance Inspection (Incomplete) Permit No. NCG 210295 Wilderness — N.C., Inc. - Thomasville Davidson County Dear Mr. Perdue: PAT McCRORY Governor DONALD R% VAN�,DER VAART secretory TRACY DAVIS Director On October 13, 2016 Glen White of the North Carolina Department of Environmental Quality; Department of Energy, Minerals, and Land Resources visited the facility located 313New Cut Rd in Thomasville, to conduct a compliance inspection. You were unable to attend due to a family issue. Ms. Belinda Milan assist the inspector with review of the records. Inspection typically consists of review of the Stormwater Pollution Prevention Plan, training, monitoring and spills records as well as observation of the general condition of the site. The site review and more complete document review will be completed at a later date. Permit: This facility holds General. Stormwater Permit NCG210295 to discharge stormwater from industrial activity associated with Lumber and Wood Products, Except Furniture [SIC 241 under the National Pollutant Discharge Elimination System (NPDES). The permit became effective August 01, 2013 and expires on July 31, 2018. The current permit was available for review and was included in the SPPP. Records/Reports: This facility was required to develop and maintain a Stormwater Pollution Prevention Plan (SPPP) in accordance with Part II, Section A of the permit. All qualitative and analytical monitoring records are required to be maintained with the SPPP for a minimum of five (5) years. Complete review to be conducted at later date. Facility Site Review: This facility is a lumber yard and dry kiln operation. Most of the product here is prepared directly for the client. Complete site review will be conducted at a later date. State of North Carolina I EnviranmentalQua[ity I Energy, Mineraland Land Resaurces Winston-Salem Regional Office 1 450 planes Mill Road, Suite 300.1 Wlnston-Uetn, NC 27103 336 776 9800 Effluent Receiving Waters: Effluent from this facility drains to Flat Swamp Creek, Class "B", waters of the Yadkin Pee -Dee River Basin. Self -Monitoring Program: This facility is required to provide both qualitative and analytical monitoring twice annually. If a waiver for the analytical requirement has been granted it must be presented in the SPPP documents and available for verification at the time of inspection. Please contact Glen White at 336-776-9660 to schedule a full stormwater compliance inspection at your convenience. Sincerely, Matthew E. Gantt, P.E.' Regional Engineer Land Quality Section Winston-Salem Regional Office Enclosures: Inspection Report CC: File Copy Division of Energy, Mineral and Land Resources (WSRO) State ofNorth Carolina I Environmental Quality I Energy, Mineral and Land Resources Winston-Salem Regional Offtce 1.450 Hanes Mill Road, Sdite 300.1 Winston-Salem, NC 2T103 336 776 9800 Compliance Inspection Report Permit: NCG210295 Effective: 08/01/13 Expiration: 07/31/18 Owner : Wilderness N C Inc SOC: Effective: Expiration: Facility: Wilderness NC, Inc. County: Davidson 7578 US 64 E Reaion: Winston-Salem Contact Person: Shannon Floyd Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/13/2016 Entry Time: 10:OOAM Primary Inspector: Glen White Secondary Inspector(s): Thomasville NC 27361 Phone: 336-474-2314 Certification: Phone: Exit Time: 10:3OAM Phone: 336-776-9800 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 a V permit; NCG210295 Owner - Facility: Wilderness N C Inc Inspection Date: 10/13/2046 Inspection Type : Complianoe.Evaluation Reason for Visit; , . Routine Inspection Summary: (See Compliance Letter) Full inspection will need to be scheduled at Mr. Perdue's availability. Page: 2 r Perrnit; NCG210295 Owner - Facility: Wilderness N C Inc Inspection Date: i011312016 InspectionType: Compliance Evaluation Reason for Visit: Routine Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Not Evaluated at this date. Permit and Qutfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalis observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Full inspection not conducted. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Current. Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map'? E ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ N # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Page: 3 I permit: NCG210295 owner - Facility: Wilderness N C Inc Inspection Date:-• 1011312016 Inspection Type : Compliance Evaluation . - Reason for Visit:... Routine Stormwater Pollution Prevention Plan Yes No NA NE Comment: Records review completed. Facility review not conducted. Will return at a later date to conduct full. infection with Mr. Perdue. Page: 4