HomeMy WebLinkAboutNCG210273_COMPLETE FILE - HISTORICAL_20160831STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/V Io Or)2)
DOC TYPE]
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑D1 Ce a� �r
YYYYM M D D
Energy, Mineral &
Land Resources
ENWRONMENTAL QUALITY
James Lemly
L & E Lurnber Co., Inc.
260 Huckleberry Ridge Rd
Crumpler, NC 28617
Subject: Compliance Inspection
Permit No. NCG 210273
L & E Lumber Co., Inc.
Ashe County
Dear Mr. Lemly:
August 31, 2016
PAT McCRORY
Governor
DONALD R. VAN DER VAART
Secretary
TRACY DAVIS
Director
On August 31, 2016 Glen White ofthe North Carolina Department of Environmental Quality;
Department of Energy, Minerals, and Land Resources visited the facility located at 260
Huckleberry Ridge Rd in Crumpler, to conduct a compliance inspection. This inspection
consists of review of the Stormwater Pollution Prevention Plan, training, monitoring and spills
records as well as observation of the general condition of the site.
Permit:
This facility holds General Stormwater Permit NCG210273 to discharge stormwater from
industrial activity associated with Lumber and Wood Products, Except Furniture [SIC 241
under the National Pollutant Discharge Elimination System (NPDES). The permit became
effective August 01, 2013 and expires on July 31, 2018. The current permit was available for
review and was included in the SPPP.
Records/Reports:
This facility was required to develop and maintain a Stormwater Pollution Prevention Plan
(SPPP) in accordance with Part II, Section A of the permit. All qualitative and analytical
monitoring records are required to be maintained with the SPPP for a minimum of five (S) years.
Please update. the SPPP annually and keep all records in the SPPP to be maintained onsite.
Future inspections that verify missing records may result in a notice of deficiency.
Facility Site Review:
This facility is a sawmill. Hardwood and pine are processed here. Most of the product is used in
furniture manufacturing. Sawdust is used to fuel the boilers. The site appears to be relatively
clean and well maintained.
State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, NC 77103
336 776 9800
r
Effluent Receiving Waters:
Effluent from this facility drains to Nathans Creek, Class "B", Trout waters of the New River.
Self -Monitoring Program:
This facility is required to provide Qualitative Monitoring twice annually. Analytical
Monitoring is being conducted as required. The facility was found to be compliant with its
industrial stormwater permit. If you have questions or need additional information, please
contact Glen White at (336) 776-9660.
Sincerely,
Matthew E. Gantt, P.E.
Regional Engineer
Land Quality Section
Winston-Salem Regional Office
Enclosures: Inspection Report
Cc: File Copy Division of Energy, Mineral and Land Resources (WSRO)
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Winston=Salem Regional Office 1450 Hanes Mlli Road, Suite 300 1 Winston-Salem, NC 27103
336 776 9800
Compliance Inspection Repoft
Permit: NCG210273 Effective: 08/01/13 Expiration: 07/31/18 Owner: L & E Lumber Company Inc
SOC: Effective: Expiration: Facility: L & E Lumber Co Incorporated
County: Ashe 260 Huckleberry Ridge Rid
Region: Winston-Salem
Crumpler NC 28617
Contact Person: James R Lemly Title: Phone: 336-982-3070
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/31/2016
Primary Inspector: Glen White
Secondary Inspector(s)-
Certification:
Phone:
EntryTime: 10:00AM Exit Time: 11:00AM
Phone: 336-776-9800
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NGG210273 Owner - Facility: L & E Lumber Company Inc
Inspection Date: 08/3112016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
See Compliance Letter,
Page: 2
Permit: NCG210273 Owner - Facility: L & E Lumber Company Inc
Inspection Date: 08/31/2016 Inspection Type : Compliance Evaivatian Reason for Visit: Routine
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Analytical Monitoring is not required under current operatIngprocedures.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑
# Were all outfalls observed during the inspection? ■ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ■ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: A copy of the permit should be maintained at the facility. Keep in the SPPP.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment: Qualitative Monitoring must be performed twice annually,_keep records in SPPP.
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
■ ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
E ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
E ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■ ❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
N ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
■ ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
N ❑ ❑ ❑
Page: 3
v
permit: NCG210273 owner - Facility: L & E Lumber Company Inc
Inspection Date: .08/311201 a Inspection Type : Compliance Evaluation Reason for Visit: Routine
5tormwater Pollution Prevention Plan Yes No NA NE
Comment: Ensure that the SPPP (Stormwater Pollution Prevention Plan) is maintained onsite and available
for review.
Page: 4
NC®ENR
North Carolina Department of Environment and Natural
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
March 23, 2010
Certified Mail No. 7008 1140 0003 8505 6130
Return Receipt Requested
Mr. James B. Lemly
L & E Lumber Co Incorporated
260 Huckleberry Ridge Road
Crumpler, NC 28617
Resources
Subject: NOTICE OF VIOLATION WITH INTENT TO ENFORCE
Compliance Evaluation Inspection
L & E Lumber Co Incorporated
Permit # NCG210273
Ashe County
Dear Mr. Lemlv:
Dee Freeman
Secretary
On March 11, 2010 a Compliance Evaltation Inspection was performed by George Smith, of this office. Mr. James
Lemly was present for the inspection.
Permit
The following Sections of the permit are required to be implemented by L & E Lumber Co Incorporated:
Part 1I, Section A - Stormwater Pollution Prevention Plan.
Part 11, Section B - Analytical Monitoring,
Part 11, Section C - QualitatiNre Monitoring.
Records & Reports
The Storrmvater Pollution Prevention Plan was not developed. Also, there were no monitoring reports.
There were no records for how long the mulch and sawdust were stored on site.
Facility Site Rer'iew
The facility stores mulch and sawdust for more than seven (7) days. During the inspection George Smith assigned
numbers to the Outfalls for easy identification.
North Carolina division of Water Quality, Winston-Salem Regional Office
Location. 585 Waughtown St. Winston-Salem, North Carolina 27107
Phone: 336-771-5000 L FAX 336-771-46301 Customer Service: 1.877.623-6748
Intemet: www.ncwaterquality.org
An Equal Opportunity 1 Affirmative Action Employer
Nne
orthCarolina
;Vaturallry
L &: L Lumber Co Incorporated
March 23, 2010
Page 2 of 2
Representative sampling from the following locations is required:
Outfall #001 — The stone lined ditch adjacent to Huckleberry Ridge Road.
Outfall #002 — The stormwater grate next to the building, which receives stormwater from the mulch pile.
Outfal1 #003 — The drainage ditch that receives stormwater from the sawdust pile and operations building.
Outfall #001 receives stormwater from a portion of the timber (logs) storage yard located along Huckleberry Ridge
Road.
Outfall #002 receives stormwater from storage of a mulch pile.
Outfall #003 receives stormwater from the sawdust operation building and a sawdust pile.
Self -Monitoring Program
The facility failed to develop a Stormwater Pollution Prevention Plan. This is a permit violation.
The facility failed to perform the analytical & qualitative monitoring, semi-annually, as required by the permit.
The analytical and qualitative semi-annual monitoring is required for all Three (3) outfalls. This is a permit violation
at all three (3) outfalls, and for each parameter not monitored at each outfall.
Please, be advised, these violations and any future permit violations are subject to civil penalty assessment of
up to S25,000.00 per day, per Violation, as well as other actions by the Division of Water Quality.
The analytical & qualitative sampling must be performed durinp, a representative storm event, _once for the l' six
_months of 2010, and once for the last six months of 2010. Please perform the monitoring for all three Outfalls_and
send the monitorin , results to this office. Also the Stormwater Pollution Prevention Plan must be developed, and
can be placed in a three ring binder. Please respond to this letter within 1.5 days of receipt of this notice.
The compliance evaluation inspection is noncompliant. if you have any questions please contact George Smith or me
at (336) 771-5000.
Sincerely,
r�.
Steve W. Tedder
Regional Supervisor
ATTACHMENTS
ENTS
cc: WSRO Piles
M
Compliance Inspection Report
Permit: NCG210273 Effective: 08/01/08 Expiration: 07/31/13 Owner: L & E. Lumber Company Inc
SOC: Effective: Expiration: Facility: L & E Lumber Co Incorporated
County: Ashe 260 Huckleberry Ridge Rid
Region: Winston-Salem
Crumpler NC 28617
Contact Person: James R Lemly Title: Phone: 336-982-3070
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Certification: Phone:
Inspection Date: 0311112010 Entry Time: 09 40 AM Exit Time: 10 59 AM
Primary Inspector: George S Smith Phone: 336-771-5000
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: n Compliant ■ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCG210273 Owner - Facility: L & E Lumber Company Inc
Inspoction Date: 03/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
No SPPP was developed. No analytical or qualitative monitoring was performed.
Page: 2
M
Permit: NCG210273 Owner - Facility: L & E Lumber Company inc
Inspection Date: 03/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
n
■
n
n
# Does the Plan include a General Location (USGS) map?
n
■
o
o
# Does the Plan include a "Narrative Description of Practices"?
n
■
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
n
e
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
n
■
n
n
# Has the facility evaluated feasible alternatives to current practices?
n
■
u
n
# Does the facility provide all necessary secondary containment?
n
■
n
n
# Does the Plan include a BMP summary?
n
■
n
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
n
■
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
n
■
n
n
# Does the facility provide and document Employee Training?
n
■
n
n
# Does the Plan include a list of Responsible Party(s)?
n
■
n
n
# Is the Plan reviewed and cpdated annually?
n
■
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
n
■
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
n
■
n
n
Comment: Notice of Violation with intent to enforce
Qualitative Monitorin
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
n
■
n
n
Comment: Notice of Violation with intent to enforce
Anal tical Monitorin
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
n
■
n
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
00
■
❑
Comment: Notice of Violation with intent to enforce
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
n
■
n
❑
# Were all outfalls observed during the inspection?
■
n
n
n
# If the facility has representative outfall status, is it properly documented by the Division?
n
n
■
n
# Has the facility evaluated all illicit (non stormwater) discharges?
00
■
n
Comment: NOV
Page: 3
d S` Gl
r �
� r
Lj
�vfz
r
UvTtc�, r 1