HomeMy WebLinkAboutNCG210248_COMPLETE FILE - HISTORICAL_20151026STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/v uc 0 d k
DOC TYPE
Gc HISTORICAL FILE
u MONITORING REPORTS
DOC DATE
❑ CIS la aCp
YYYYMMDD
F{L41S
North Carolina Department of Environmental Quality
Pat McCrory
Governor
October 26, 2015
Christopher & Wanda Braxton
Braxton Sawmill
7519 D Lindley Mill Rd
Graham, NC 27253
Subject: Compliance Evaluation Inspection
NPDES General Stormwater Permit NCG210000
Certificate of Coverage NCG210248
Braxton Sawmill
Alamance County
Dear Mr. Braxton•.
Donald R. van der Vaart
Secretary
Glen White of the Winston-Salem Regional Office of the NC Division of Energy, Mineral, and Land Resources
(DEMLR) conducted a compliance evaluation inspection at the subject facility on October 23, 2015. Ms.
Wanda Braxton assisted.with the inspection and her cooperation and assistance were greatly appreciated.
An inspection checklist is -attached fdr:,.your records and the inspection findings are summarized below.
1. Permit
This facility holds General Storm water Permit No. NC210248 to discharge Storm water from activities
associated with Lumber and Wood Products Except Furniture under the National Pollutant Discharge
Elimination System (NPDES). The permit became effective August 1, 2013 and expires July 31, 2018. Your
permit renewal package must be received in the Central Office in Raleigh no later than 180 days prior to the
expiration date of the permit.
2. Records/Reports
Part li, Section A of the permit requires the development of a Stormwater Pollution Prevention Plan (SPPP).
The plan must include ad nine (9) subsections of Part II, Section A of the permit. An updated copy of the
SPPP was available for review at the time of inspection. Qualitative monitoring is required to be completed
and documented twice yearly as defined in Part ll, Section C of the permit. The SPPP plan must be updated
annually and qualitative monitoring must be conducted and properly documented semi-annually to retain
compliance with the permit. Training and maintenance procedures are current and updated annually.
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section • Land Quality Section
1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • 919.707-9200 / FAX: 919-715-8801
512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet. http://portal.ncdenr.orp/webilrf
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
3. Facility Site Review
This facility mills lumber from raw timber of various species. It's operations have greatly reduced from
where they were several years ago. Now they employ 5 people, including Mr. and Ms. Braxton: No
analytical monitoring is required since all sawdust, wood chips, bark and mulch is either stored under cover
or in trailers and is not allowed to accumulate onsite. The mill has one outfall. It was observed at the time of
inspection and had a small amount of running water which was clear and odorless.
4. Effluent/Receiving Waters
Stormwater from this site discharges into Cane Creek (Class C, NSW) of the Cape Fear River Basin,
S. Self -Monitoring Program
Analytical Monitoring: This site is not required to provide analytical monitoring under current operating
procedures. ^
6. Qualitative Monitoring: All qualitative records do not need to be submitted to DEMLR, however, the
records must be kept on file at the facility for a period of five years. This site is required to complete
qualitative monitoring twice annually. Monitoring records were current and available for review at the time
of inspection.
If you have any questions concerning this letter or the attached inspection report, please contact Glen White
at (336) 776-9660.
Sincerely,
Matthew E. Gantt, P.E.
Regional Engineer
Land Quality Section
Attachments:
1. BIMS Inspection Checklist
CC: Division of Land Quality — WSRO
Compliance Inspection Report
Permit: NGG210248 Effective: 08/01/13 Expiration: 07/31/18 Owner: Braxton'sSawmill
SOC: Effective: Expiration: Facility: Braxton's Sawmill
County: Alamance 7519 D f_ind)ey Mill Rd
Region: Winston-Salem
Graham NC 27253
Contact Person: Christopher Braxton Title: Phone: 336-376-6798
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 10/20/2015
Primary Inspector: Glen White
Secondary Inspector(s):
Certification:
Phone:
Entry Time: 10:00AM Exit Time: 10:30AM
Phone: 336-776-9800
Reason for inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NCG210248 Owner - Facility: Braxton's Sawmill
Inspection Date: 10/20/2015 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
®❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
®❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
®❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
®❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
®❑ ❑ ❑
# Does the Plan include a BMP summary?
®❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
M ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®❑ ❑ ❑
# Does the facility provide and document Employee Training?
®❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
®❑ ❑ ❑
# Is the Plan reviewed and updated annually?
®❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
M ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
®❑ ❑ ❑
Comment: Compliant with permit requirements
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑
Comment: Compliant with permit requirements.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ®❑ ❑
Comment: This facility is exempt from analytical monitorin9_reguirements under current operating
procedures.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ®❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ®❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ®❑ ❑ ❑
Comment:
Page: 3
V
INCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
November 16, 2010
Christopher Braxton, Owner
Braxton's Sawmill
7519 Lindley Mill Road
Graham, North Carolina 27253
Subject: General Stormwater Permit Inspection — NPDES General Permit NCG210248
Braxton's Sawmill — Alamance County
Dear Mr. Braxton:
On November 9, 2010, Jenny Graznak of this office performed a Stormwater Permit
Inspection at Braxton Sawmill located at 7519 Lindley Mill Road in Graham, North Carolina.
This facility holds General Stormwater Permit No. NCG210248 under the National Pollutant
Discharge Elimination System (NPDES) to discharge Stormwater from activities classified as
Timber Products. You and your wife Wanda Braxton were present for the inspection. This type
of inspection consists of two basic parts: an in -office review of facility files and self -monitoring
data and an on -site inspection of the facility's discharge. This particular -inspection evaluated
five (5) areas, and observations from each area are addressed below:
1. Permit
'The permit became effective August 1, 2008 and expires July 31, 2013.
2. Records/Reports
After the last inspection of this facility in 2006, a Stormwater Pollution Prevention Plan (SPPP)
was created for the site. A copy of this document was received by our office on April 17, 2006.
There are site and location maps, which describe the site's storage practices and show the
location of the storm water outfall.
3. Facility Site Review
Due to the recent economy, Braxton Sawmill has downsized considerably since the last
inspection in 2006. In regard to fuel storage, there is one 1,000 gallon tank and one 1,500
gallon tank maintained inside the shop building with a covered roof. However, very little fuel is
stored on site at this time. No vehicle maintenance is done on site. The amount of logs and
lumber maintained on site is much reduced. Sawdust, woodchips, mulch, and bark are stored in
trailers and then immediately removed from the site. None of these materials were on site
during the inspection.
4. Effluent/Receiving Waters
Stormwater from the property discharges to Cane Creek (Class C, NSW) in the Cape Fear River
Basin. The facility has two containment ponds to collect stormwater runoff from the site.
Overflow from Pond #1 discharges to Pond #2, and overflow from Pond # 2 discharges to
North Carolina Division of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 One
Phone: 336-771-50001 FAX: 336-771-46301 Customer Service 1-877-623-6748 NorthCarrolina
Internet www.ncwaterquality.org Naturally
J� atura l l
An Equai Opportunity ti Affirmative Action Employer �/ j/ "y
surface waters (i.e. Stormwater Discharge Outfall). No discharge was observed at the time of
the inspection.
5. Self -Monitoring Program
The permit requires you to perform inspections of the Stormwater Discharge Outfall on a semi-
annual basis. Records from these inspections were available during the inspection. This facility
is exempt from analytical monitoring requirements due to the fact that sawdust, wood chips,
bark, and mulch are not maintained.at the site for longer than seven (7) days, as stated in the
permit. On -site vehicle maintenance monitoring requirements at the site are also waived, since
these activities at the site do not use more than 55 gallons on new motor oil per month
(average).
We appreciate your efforts to comply with NPDES General Permit NCG210248. If you
have any questions concerning this letter or the attached inspection report, please contact Ms.
Graznak or me at (336) 771-5000.
Sincerely,
Steve W. Tedder.
Regional Supervisor
Surface Water Protection Section
cc: WSRO — SWP._-
Central Files — SWP
Compliance Inspection Report
Permit: NCG210248 Effective: 08/01/08 Expiration: 07/31/13 Owner: Braxton's Sawmill
SOC: Effective: Expiration: Facility: Braxton's Sawmill
County: Alamance 7519 D Lindley Mill Rd
Region: Winston-Salem
Graham INC 27253
Contact Person: Christopher Braxton Title: Phone: 336-376-6798
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
On -site representative
Related Permits:
Christopher Braxton
Inspection Date: 11109/2010 Entry Time: 01:C0 PM
Primary Inspector: Jennifer F Graznak
Secondary Inspector(s):
Certification: Phone:
Exit Time: 02 30 PM
Phone: 336-376-6798
Phone: 336-771-5000
Reason for inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: ® Compliant ❑ Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NCG210243 Owner -Facility: Braxton's Sawmill
Inspection Date: 1110912010 Inspection Type: Compfance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
®
n
❑
n
# Does the Plan include a General Location (USGS) reap?
®
In
n
n
# Does the Plan inciude a "Narrative Description of Practices"?
®
n
n
n
it Does the Plan Include a detailed site map including outfall locations and drainage areas?
®
n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
®
n
n
n
# Has the facifEty evaluated feasible alternatives to current practices?
®
n
n
n
# Does the facility provide all necessary secondary containment?
®
n
n
n
# Does the Plan include a BMP summary?
®❑
n
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
n
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®
n
n
n
# Does the facility provide and document Employee Training?
®n
n
n
# Does the Plan include a list of Responsible Party(s)?
®n
# Is the Plan reviewed and updated annually?
®n
n
n -
# Does the Plan include a Stormwater Facility Inspection Program?
®❑
❑
n
Has the Stormwater Pollution Prevention Plan been implemented?
®
n
n
n
Comment:
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®
n
n
n
Comment
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
n
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
n
n
®
n
Comment: This facility is exempt from analytical monitoring requirements.
Permit and Outfalis
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
n
n
n
# Were all outfalls observed during the inspection?
®
n
n
n
# If the facility has representative outfall status, is it properly documented by the Division?
n
❑
®
n
# Has the facility evaluated all illicit (non stormwater) discharges?
®
n
n
n
Comment
Page: 3