Loading...
HomeMy WebLinkAboutNCG210239_COMPLETE FILE - HISTORICAL_20120130STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. l V L& c,�i D,)3 q DOC TYPE Df HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ a a Oi 8D YYYYM M D D fi N NA.- AWA NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director January 30, 2012 Mr. Bruce Church Church & Church Lumber Co Inc P.O. Box 457 North Wilkesboro, NC 28659 Subject: Compliance Evaluation Inspection (CEI) Saw Mill (BFRI) Permit # NCG210239 Wilkes County Dear Mr. Church: Dee Freeman Secretary A Compliance Evaluation Inspection was performed on January 18, 2012 by George Smith, of this office. Ms. Wilma Shell, Office Manager, was present for the records and data review. Permit The NPDES general permit.became effective on August 1, 2008 and expires on July 31, 2013. Please make yourself familiar with the new monitoring requirements in this permit. A copy of the permit was given to Ms. Wilma Shell. Analytical Monitoring is required if the exposed sawdust pile is on site for more than seven (7) days. (Part II, Section B, Table 1) 2. Qualitative Monitoring is required per Part II, Section C, and Table 4 Records & Reports The qualitative monitoring and Stormwater Pollution Prevention Plan (SPPP) were kept in a 3-ring binder. They are both meeting the permit requirements. Facility Site Review A facility site inspection showed four (4) stormwater Outfalls. The stormwater from the mill and timber yards does not appear to reach the surface waters. North Carolina Division of Water Quality, Winston-Salem Regional Oifioe Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-7714630 Internet: www.ncwaterquality.org An Equal Opportunity l Affirmative Action Employer NotrhCarolina Naturally CEl January 30, 2012 Page 2 of 2 The site is well maintained and there are no signs of any spills. Self -Monitoring Program The qualitative monitoring records for the four (4) Outfalls were documented and performed as required by the permit. The analytical monitoring for on -site vehicle maintenance is not required since 55 gallons or greater per month of new motor is not used. It is my understanding that the saw dust is not kept on the site for more than seven days. It is hauled to Louisiana Pacific. You must keep records that document that the saw dust is not present for more than seven days. Otherwise, analytical monitoring as described below will need to be implemented. Below you will find four certified labs that are capable of performing the stormwater analysis for pH, Chemical Oxygen Demand (COD), and Total Suspended Solids (TSS). Please perform these tests twice a year. (Once during January — June, and once during July — December) �� � face Analytica{ Services, lnc. j 2 Meritech, Inc i 3 Water Quality Lab & Operations, Inc. 205 East Meadow Road - Suite A 642 Tamco Rd, PO Box 27 PO Box 1167 4 Blue Ridge Labs - ^_ ^ _ j P.O. Box 2940 Reidsville, NC 27320 336-623-8921 336-342-4748 828-898-6277 828-728-0149 The compliance evaluation inspection is satisfactory. If you have any questions or need assistance, please contact George Smith or me at (336) 771-5000. Sincerely, W. Corey Basinger Regional Supervisor cc: WSRO Files -1 Permit: NCG210239 SOC: County: Wilkes Region: Winston-Salem Compliance Inspection Report Effective: 08101/08 Expiration: 07/31/13 Owner: Church and Church Lumber Company Effective: Expiration: Facility: Church And Church Lumber Co-BFR 1, 798 New Browns Ford Rd Contact Person: Bruce M Church Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Inspection Date: 01/18/2012 Entry Time: 11:00 AM Primary Inspector: George S Smith Secondary Inspector(s): Wilkesboro NC 28697 Phone: 910-973-5700 Certification: Exit Time: 11:55 AM Phone: Phone: 336-771-5000 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: ■ Storm Water (See attachment summary) Page: 1 Permit: NCG210239 Owner -Facility: Church and Church Lumber Company Inspection Date: 01/1812012 Inspection type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? SOD ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ■ Cl ❑ ❑ # Does the Plan include a BMP summary? ■ Cl ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ 0 ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ r! ❑ ❑ # Is.the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ Cl ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ■ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n ❑ ■ n Comment: The saw dust pile must be documented to be not on the site more than seven days. It is hauled to LP. Page: 2