Loading...
HomeMy WebLinkAboutNCG210073_COMPLETE FILE - HISTORICAL_20180207STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. %V DOC TYPE �N HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ D YYYYMMDD 4 Compliance Inspection Report Permit NCG210073 Effective 08/01/13 Expiration 07131I18 owner Bill Hanks Lumber Co SOC Effective Expiration Facility Bill Hanks Lumber Cc County Stokes 2655 Piney Grove Church Rd Region Winston-Salem Danbury NC 27016 Contact Person M A Cohen Title Phone 336-593 2022 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On -Site Representative(s) Related Permits Inspection Date 02/07/2018 EntryTime 10 00AM Exit Time 11 OOAM Primary Inspector Glen White Phone 336 776-9800 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Spill/Emergency Response Permit Inspection Type Timber Products Stormwaier Discharge COG Facility Status ■ Compliant Not Compliant Question Areas ■ Storm Water (See attachment summary) Page 1 *' . Permit NCG210073 Owner Facility Bill Hanks Lumber Co Inspection Date 02/0712018 Inspection Type SpIlVEmergency Response Reason for Visit Routine Inspection Summary On February 7 2018 Glen White of DEMLR visited the facility as part of the follow-up response after spill reporting to NCDEQ DWR visited the facility days prior after the facility reported a hydraulic spill and fire suppression spill that reached the stormwater outfalls The cause of the spill was related to a fire at the facility and the required fire suppression The spill was properly documented and clean-up was initiated immediately Fire suppression does involve heavy detergents but the detergents breakdown quickly through dilution The major harm to humans and wildlife is skin and eye irritation rashes Fish may be harmed No fish kill was reported Fire suppression detergents are an allowable discharge Glen White NCDEQ-DEMLR(WSRO) Page 2 permit NCG210073 Owner Facility Bill Hanks Lumber Co Inspection Date 02/0712018 Inspection Type $pdt/Emergency Response Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a Narrative Descnphon of Practices ? ® ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurnng dunng the past 3 years? ® ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a l3MP summary? ® ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ® ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? i ❑ ❑ ❑ Comment Analyttcal Monitoring Yes No NA NE Has the facility conducted its Analytical monitonng? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ! ❑ ❑ ❑ # Were all outfalls observed dunng the inspection? ❑ ❑ ❑ # If the facility has representative outfall status is it property documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? S ❑ ❑ ❑ Comment Properly reported and documented spill See Summary Page 3 i�I �O�b� ��� C�'��T_J - - � North Carolina Department of Environmental Quality Pat McCrory Governor November 23, 2015 Jeff Hanks, President Bill Hanks Lumber Company P O Box 99 Danbury, NC 27016 Subject Compliance Evaluation Inspection NPDES General Stormwater Permit NCG210000 Certificate of Coverage NCG210073 Bill Hanks Lumber Company Stokes County Dear Mr Hanks Donald R van der Vaart Secretary On November 10, 2015 Glen White of the Winston-Salem Regional Office of the NC Division of Energy, Mineral, and Land Resources (DEMLR) conducted a compliance evaluation inspection at the subject facility located at 26SS Piney Grove Church Road Jane Mabe, Purchasing and Safety Manager assisted with inspection Her assistance and cooperation were greatly appreciated The facility was found to be in compliance with its permit requirements An inspection report is attached for your records and the inspection findings are summarized below 1 Permit This facility holds General Storm water Permit No NC210073 to discharge Storm water from activities associated with Lumber and Wood Products Except Furniture under the National Pollutant Discharge Elimination System (NPDES) The permit became effective August 1, 2013 and expires July 31, 2018 Your permit renewal package must be received in the Central Office in Raleigh no later than 180 days prior to the expiration date of the permit 2 Records/Reports Part II, Section A of the permit requires the development of a Stormwater Pollution Prevention Plan (SPPP) The plan must include all nine (9) subsections of Part II, Section A of the permit The SPPP plan must be updated annually and qualitative and analytical monitoring must be conducted and properly documented semi-annually to retain compliance with the permit Training and maintenance procedures must be current and updated annually The SPPP Plan and monitoring records, both current and for recent years, were maintained in two 3-ring binders and found to be complete and compliant with requirements Division of Energy Mineral and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh North Carolina 27699 1612 • 919-707 9200 / FAX 919-715-8801 512 North Salisbury Street, Raleigh North Carolina 27604 • Internet http //portal ncdenr org/web/Ir/ An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper 3 Facility Site Review This site manufactures lumber from raw timber At the time of inspection the area had received heavy rains for several days and being a very active site, much of the traffic areas were very muddy Ms Mabe walked the site with the inspector and outfalls were observed 4 Effluent/Receiving Waters Effluent from this site drains to the Dan River, Class "C", "Trout waters" of the Roanoke River Basin 5 Self -Monitoring Program Analytical Monitoring The facility has been conducting its analytical monitoring as required twice annually and results are kept with the SPPP Results were available for review The site, in the past had an issue with TSS and BOD and was placed in a Tier 2 Reponse That response was lifted in 2012 and normal sampling requirements were resumed Results have been within required parameters since that time 6 Qualitative Monitoring All qualitative records do not need to be submitted to DEMLR, however, the records must be kept on file at the facility for a period of five years This site is required to complete qualitative monitoring twice annually Monitoring records were current and available for review at the time of inspection If you have any questions concerning this letter or the attached inspection report, please contact Glen White at (336) 776-9660 Sincerely, r-N...��� Matthew E Gantt, P E Regional Engineer Land Quality Section Attachments 1 BIMS Inspection Checklist CC Dmsion of Land Quality -- WSRO Compliance Inspection Report Permit NCG210073 Effective 08/01/13 Expiration 07/31/18 Owner Bill Hanks Lumber Co SOC Effective Expiration Facility Bill Hanks Lumber Co County Stokes 2655 Piney Grove Church Rd Region Winston Salem Danbury NC 27016 Contact Person M A Cohen Title Phone 336 593 2022 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On Site Representative(s) Related Permits Inspection Date 11/10/2015 Entry Time 09 OOAM Exit Time 09 40AM Primary Inspector Glen White Phone 336 7769800 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Timber Products Stormwater Discharge CCC Facility Status ® Compliant Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 permit NCG210073 Owner Facility Bill Hanks Lumber Co Inspection Date 11/10/2015 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary See attached letter Page 2 Permit NCG210073 Owner Facility Bill hanks Lumber Co Inspection Date 11/10/2015 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan Include a General Location (USGS) map? IN ❑ ❑ ❑ # Does the Plan Include a Narrative Description of Practices ? 11 ❑ ❑ ❑ # Does the Plan Include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan indude a list of significant spills occurring during the past 3 years? ❑ ❑ ® ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a BMP summary? ® ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ® ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annual#y? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? IN ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ®❑ ❑ ❑ Comment Stormwater Pollution Prevention Plan and documents are current and updated annually Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi annually? ® ❑ ❑ ❑ Comment Per permit requirements Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ❑ # Has the facility conducted its Analytical monitonng from Vehicle Maintenance areas? ❑ ❑ ❑ ❑ Comment Per permit requirements Has had some issues with results_ exceeding parameters in the past but latest results are good od Permit and Outfalts Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ 1111 # If the facility has representative outfaO status is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ® ❑ ❑ ❑ Comment Page 3 rr� 'A' 13, MC©ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P E Dee Freeman Governor Director Secretary 24 September 2012 Mr Jeff Hanks, President Bill Hanks Lumber Company 1 P O Box 99 !�3 Danbury, NC 27016 OCT 0 1 291Z Subject Compliance Evaluation Inspection DENRLWA'e rpi-A i F NPDES General Stormwater Permit NCG210000 I '�, Certificate of Coverage NCG210073 Bill Hanks Lumber Company Stokes County Dear Mr Hanks Mike Thomas of the Winston-Salem Regional Office of the North Carolina Division of Water Quality (DWQ) conducted a compliance evaluation inspection at the subject facility on 19 September 2012 The assistance and cooperation of Ms Jane Mabe during the inspection was greatly appreciated An inspection checklist is attached for your records and the inspection findings are summarized below The facility is located at 2655 Piney Grove Church Rd, in Danbury, Stokes County, North Carolina Stormwater related to industrial activity is discharged to an unnamed tributary to Bond's Branch, which is currently classified as Class C, trout waters in the Roanoke River Basin Documentation and Monitoring Review The Stormwater Pollution Prevention Plan (SP3) is complete and well implemented Required documentation was present and the plan is being reviewed and updated annually The site has one stormwater outfall discharge Analytical and qualitative was complete and comprehensive Records were well organized and readily accessible This facility was placed under Tier II sampling requirements for exceeding benchmark values after the last compliance evaluation inspection As of the last round of sampling your facility has met the three consecutive samples within benchmark range requirement and may return to your normal sampling regime as defined in your permit Site Review The site was very clean and extremely well maintained The receiving waters appeared'to be in good shape and free of indicators of pollution at the time of inspection North Carolina Division of Water Quality Winston Salem Regional office Location 685 Waughtown St Winston Salem North Carolina 27107 One Phone 336 771 50001 FAX 336 77146301 Customer Service 1-877-623 6748 Nor ChCarollna Intemet www ncwaterquahty org Nay ulla/Y An Equal Opportunely l Affirmative Action Employer !Ld ibi " 24 September 2012 Page 2 of 2 We greatly appreciate your efforts to develop and implement an effective stormwater pollution prevention plan Please continue your efforts to help safeguard the waters of our State Sincerely, W Corey Basinger II Regional Supervisor Surface Water Protection Winston-Salem Region Attachments 1 BIMS Inspection Report 2 No Exposure Application Cc WSRO — SWP w/ atch Central Files w/ atch cNP-DES West,Unit� 0 Compliance Inspection Report Permit NCG210073 Effective 08/01/08 Expiration 07/31/13 Owner Bill Hanks Lumber Co SOC Effective Expiration Facility Bill Hanks Lumber Co County Stokes 2655 Piney Grove Church Rd Region Winston-Salem Danbury NC 27016 Contact Person Jeffrey Hanks Title Phone 336-593-2022 Directions to Facility System Classifications Primary ORC Secondary ORC(s) On -Site Representative(s) Related Permits Certification Phone Inspection Date 09/19/2012 Entry Time 01 00 PM Exit Time 02 00 PM Primary Inspector Michael S Thomas Phone Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Timber Products Stormwater Discharge COC Facility Status ■ Compliant Q Not Compliant Question Areas E Storm Water (See attachment summary) Page 1 0 Permit NCG210073 Owner Facility Bill Hanks Lumber Co Inspection Date 09119l2012 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary Page 2 Permit NCG210073 Owner Facility Bill Hanks Lumber Co Inspection Date 09/19/2012 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a Narrative Description of Practices ? ■ ❑ 0 0 # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ■ D # Has the facility evaluated feasible alternatives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ■ ❑ U # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ 0 0 # Does the facility provide and document Employee Training? ■ Cl n n # Does the Plan include a list of Responsible Party(s)9 ■ ❑ Q 0 # Is the Plan reviewed and updated annually? ■ n n n # Does the Plan include a Stormwater Facility Inspection Program? ■ n n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ 0 Comment Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ■ n n n Comment Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ n n n # Were all outfalls observed during the inspection? ■ n n n # If the facility has representative outfall status is it properly documented by the Division? 0 0 ■ 0 # Has the facility evaluated all illicit (non stormwater) discharges? ® n n n Comment Page 3 „r� L1�1rv�✓ Boone, Ron From M Cohan [macohan@bhlumber cam] Sent Thursday, March 18 2010 1 37 PM To Boone Ron Subject RE Stormwater Attachments stormwater 11112009 pdf This seas the last sampling I sent You -- we had talked abt sample 3 from the boiler and decided that our ne\t sample would come from about 100' down from where the pipe outlet is for the blowdown Mary Ann From Boone, Ron [mailto ron bonne@ncdenr gov] Sent Thursday, March 18, 2010 12 05 PM To M Cohan Subject RE Stormwater I'm sorry things have slowed down so much up there When was your last sample taken and what were those results? Ron Boone NC DENR Winston-Salem Regional Office Division of Water Quality, Surface Water Protection 585 Waughtown Street Winston-Salem, NC 27107 Voice (336) 771-5000 FAX (336) 771-4630 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From M Cohan [mailto macohan@bhlumber com] Sent Thursday, March 18, 2010 11 37 AM To Boone, Ron Subject RE Stormwater Hi Ron -- we haven't stopped but like a lot of other mills logs have not been coming in much -- we've only run 2 week from 12/19 thru 2/28 (so lane & I have been laid off quite a bit) & so Iat we have onlv run 10 days this month and maybe sse'll get to 4 more days for the month We are planning on doing a slater sampling next rain Mary Ann From Boone, Ron [mailto ron Boone@ncdenr gov] Sent Thursday, March 18, 2010 10 46 AM To Cohan Subject Stormwater MaryAnn, haven't heard from you all since November Please provide another update on progress out there Thanks' Regards, Ron Boone NC DENR Winston-Salem Regional Office Division of Water Quality, Surface Water Protection 585 Waughtown Street Winston-Salem, NC 27107 Voice (336) 771-5000 FAX (336) 771-4630 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties No virus found in this incoming message Checked by AVG - www avq com Version 8 5 436 / Virus Database 271 1 112754 - Release Date 03/18/10 07 33 00 IDSPAM 4ba250132878120981198881 No virus found in this incoming message Checked by AVG - www avq com Version 8 5 436 1 Virus Database 271 1 112754 - Release Date 03/18/10 07 33 00 0 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REI'OR1 G1 NERAI PERMIT NO NCG210000 SAMPLES COLLECTED DURING CALENDAR YEAR CI'RTIFICATF OF COVERAGF NO NCG21 pnK30© (This monitoring report is due sit the Division no IatLr than 30 d r}4 from the date thL facility rLCLlves the sampling results from the. I shot ilor} ) IACiurYNA,NIF, Bill Ilanks Lumber Co COUNTY Stokes PI RSON COLLFCTING SAMPLES PHONE NO 3L3 ) 593-2022 Ci it 1 i1YLD L kBORA FORY Researc i na ytica Lab # Lab # PI EAS> SIGN ON I HE RF � LIL41 -� 1' u t A SpLcitic Nlomtoring Requirements` Outf ill No Date SamplL Colketud, mo/(Id/rr Total Rainfall, inches 00530 00400 00340 Total SuspLnded Solids, mgfL PH, Standard units Chenucal Oxygeri Demand (COD), rn L lienclimark* - - 100 Within 6 0 — 9 0 120 o y j 'Montioring is required onl) if the facility stores expotied piles of sawdust wood chips bark mulch or other sumlar material on sits, lot longer than seven (7) d i)s V thL facrhty elect~ not to monitor because accumulated material is removed within seven (7) days or less the e-crtiftcation below must be signed 1 he facihw Shall aho record and maintnkn a log in its SPPP (Stormwater Pollution Prevention Plan) of dates when materiel is generated and removed hose and by whom ' Nott if you mpoil 7 v tlue in excess of the benchmark value or outside the benchmark range (for pli) you must Implement Tier I or Tier 2 tcspouses in dIL GLileral PLi MI I iLiliti^s th i, do not stoic exposed (either exposed to incident precipitation or exposed to stormwatei run on) piles of sawdust wood chips balk mulch Of oltiu sl 1111ar to IL11,11 fui longei than seven (7) days on site MV so Lertify and the requirement for analytical monitoring nia) be waived For those facilities that qu-ihfy foi the analytical nlonitu1 " wcr IhL disch-irger Shall sign the following ceiufication statement 13 v,Ld upon my inquiry of thL person 01 persons directly responsible for managing complrince with the permit requticmcnf fot lullytl, d nionitouns I certify that to the best of my knowledge and belief no piles of sa«dusl wood Lhips bark mulch or other stnulnr ma(eri ils "ere stored exposed (either to incident precipitation or to storimvater run on) for longer than ,even (7) days before remo%ni strict, filing the list discharge monitoring report Name (Print name) Fide (Print title) (Signature) (Date) SWL 24- 072Q0 I'.igL 1 of RESEARCh & ANA1yTICAi %tts1l��i��i�r+ LkORATO&S, INC. C���o •- c!� . o?�`� Analytical/Process Consultations SILL HANKS LUMBER Date Sample Collected 02/18/09 2655 PINEY GROVE CHURCH R Date Sample Received 02/18/09 DANBURY HC 27016 Date Sample Analyzed 02/16/09 Attn Date of Report 02/27/09 Analyses Performed by AR YJ Lab Sample Number Lab Sample Number Lab Sample Number 639160 639161 639162 Parameter Storet R Results sults Results COD HIGH (00340) 5�73 mg/f 00 t 83 mg/l 0 TSS (00530) 590 rtre/L 92fig/lT 28 0 mgit igw/k re, Al /,f // 03 141 Fax 336 998 0328 � �';lJ �l L�z�- March 11, 2009 Stormwater inspection following; ti,imphng results conducted by ! Mabe & M A Cohan Observations of locations 1 2, and 3 (639160 639161 &. 639162) show that a rill has formed due to the runoff consistently going down the same track In locations 1 and 2 the vegetation is diminished to a point that increased erosion of the `channel" is apparent We recognise that this erosion is increasing the amount of suspended solids which also has a direci atTect on the COD In order to correct this situation we will create a divirsion in order to displace the rainwater Increasing the amount of vegetation in these channels may be a necessary step Michael F Easley Governor ow A r�Ap� William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources, i Coleen H Sullins Director Division of Water Quaitty 10 October 2008 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7008-0150-0002-7876-7914 Jeff Hanks, President Bill Hanks Lumber Company P O Box 99 Danbury, NC 27016 Subject Timeline to Develop Stormwater Pollution Prevention Plan RE NOV-2008-PC-0632 NPDES General Stormwater Permit NCG210000 Certificate of Coverage NCG210073 Bill Hanks Lumber Company Stokes County Dear Mr Hanks 1 We have received your response to NOV-2008-PC-0632 dated 26 September 2008 We are pleased with the steps you have taken to date to make the site less of an environmental threat, by cleaning up around the refueling and vehicle maintenance areas and moving previously exposed materials to areas that will shelter them from precipitation and prevent contamination of stormwater runoff Please continue to actively seek out ways to better develop these areas Your primary goal in doing so should be to remove such items from exposed areas, then to build shelters as needed to protect items that cannot be moved, and lastly simply begin monitoring runoff from the areas that contain such items 2 We're comfortable with the timeline (6 months) that you have proposed for the development of your Stormwater Pollution Prevention Plan (SP3) and fully understand your desire to employ the North Carolina Forestry Association's template for SP3s However, please do not allow the development of their template to delay further development of your site specific SP3 Please note that there are many environmental consultants in the local area that have a great deal of experience in developing SP3s We will expect the SP3 to be completed no later than 31 March 2009, and will either revisit the site or request a copy of the SP3 be sent to our office for review 3 Lastly, we feel we must stress to you the importance of developing and implementing the analytical and qualitative monitoring plan for the site within the next 60 days This is crucial, given that no such monitoring has ever been conducted at the site, despite the fact that the permit was originally issued in 1993 Please do whatever is necessary to identify all stormwater discharge outfalls (SDO) and implement the analytical and qualitative monitoring plan no later than 30 November 2008 We ask that you provide us a copy of the results for the first analytical and Nor�tthtCarolina Naturally North Carolina Division of Water Quality 585 Waughtown Street Winston Salem NC 27107 Phone (336) 771 5000 Custo-ner Service Internet ncwaterquali y org FAX (336) 771 4630 1 877 623 6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Mr Jeff Hanks 10 October 2008 rr-age 2 ` qualitative monitoring events Please review in detail Part II, Sections B & C of the NCG2100 0 - permit to ensure all analytical and qualitative monitoring conditions are met 4 We appreciate your timely and thoughtful response and cooperation with the NOV and the issues identified at your site Should you have any questions, please feel free to contact Mr Boone or me at (336) 771-5000 Sin rely, 4/4 el- teve W Tedder Water Quality Regional Supervisor Winston-Salem Region Division of Water Quality cc SWP — WSRO — -, Central Files Stormwater Permitting Unit 1 ,.No Insurance Coverage Pro if Er For delivery information visit oor Website at www,uses.comt rZr � .. • [ r� post-ge $ P Certified Fee ru c I� •� a Return Receipt Fee i O O(Endorsement Required) a l a o Q Restricted Delivery Fee E3 (Endorsement Required) p Zz r-:i Tole] Postaae & Fees S5. O Jeff Hanks, President c3 w++ Bill Hanks Lumber Company r` PO Box 99 Danbury, NC 27016 ■ Complete items 1 2 and 3 Also complete Item 4 if Restncted Delivery is desired ■ Print your name and address on the reverse so that we can return the card to you Y Attach this card to the back of the mailpiece or on the front if space permits i Article Addressed to A Signature 1 i X n 014 ❑ Agent❑Addressee � i B RReecceiived b ntgd Name) C Date of Delivery i l l rOT 9�[Ct _ 10-0 R D Is delivery address different from item 1? ❑ Yes If YES enter delivery address below ❑ No I/ J Jeff Hanks, President i Bili Hanks Lumber Company PO BOX 99 3 S rviceType Danbury, NC 27016 ertdiad Mail ❑ Express Mail ��� egistered ❑ Return Receipt for Merchandise - - - - ❑ Insured Mad ❑ C o D 4 Restnoted Delivery? (Extra Fee) ❑ Yes 7008 0150 0002 7876 7914 1 nllln - SPPP l PS Form 3811 February 2004 Domestic Return Receipt / �Q f Atesss-o2 M 1540 i Piney Grove Church Rd Post Office Box 99 << : Bill_Mmks r Danbury, NC 27016 Danbury, NC 27106 lumber Co., Inc., 336-593-2022 Fax 336 593-3811 Mr Steve W Tedder North Carolina Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Dear Mr Tedder September 26, 2008 RECEivEr, it . SEP 3 0 2008 r \ 3ton Sa a _ q�wnai ar«. This is in response to your letter of September 1, 2008, regarding a compliance inspection of our facility by Mr Ron Boone of your office Mr Boone identified documentation and site inspection issues and this letter is to provide an action plan to address these concerns Documentation Review A Stormwater Pollution Plan The North Carolina Forestry Association has previously developed a template for SP3 which is being revised to reflect the new requirements of the Division of Water Quality The NCFA is also planning to conduct a seminar in conjunction with the DWQ regarding the changes (expected to occur in early November) Our proposed action plan is to 1) Obtain the NCFA template as soon as it becomes available and determine if it can be adapted to our situation Completion date — November 15 (somewhat dependent upon availability of revised NCFA information) 2) Attend the NCFA/DWQ seminar to better understand the requirements and how best to develop and implement the SP3 Completion date --November 15 3) SP3 development and implementation Completion date — March 31, 2009 B Qualitative and Analytical Monitoring Implementation will be included in Step 3 above Mr Steve W Tedder Page 2 September 26, 2008 Site Review Your letter also listed a number of concerns trom Mr Boone s site inspection and while the issues will be dealt with in the SP3 (and related Best Management Practices) discussed above, this is to provide an update on actions taken to date and planned actions in the interim period while the SP3 is in development A Maintenance Refueling Area 1) We have cleaned the concrete pad at the refueling area and disposed of the cleaning materials 2) We have begun cleaning the area around the hydraulic oil tank including the removal of a small amount of soil This process is ongoing 3) The uncovered drums containing petroleum products have been relocated to a building where they will not be exposed to the elements and subject to runoff 4) The empty drums have been hauled away for recycling 5) A training meeting with our truck drivers was held on the Saturday after Mr Boone's inspection in which we discussed issues around the refueling area We also have implemented a change in the practice for fifth wheel lubrication which will minimize the likelihood of contamination 6) We have identified a person to build secondary containment barriers for the waste oil tank and the hydraulic tank located in the refueling area The target date for completion of these barriers is October 15 7) We have asked two local carpenters for proposals to build shelters over the waste oil and hydraulic oil tanks to ensure that they are not subject to the elements Target completion date for this step is December 1 Mr Steve W Tedder Page 3 September 26, 2008 8) We have implemented a weekly inspection of the refueling area to insure that we are maintaining this area to the required standards I will be in contact with Mr Boone following the NCFA/DWQ seminar to review our progress and steps which are underway If any questions arise in your review of this response, please feel free to give me a call at (336) 593-2022 I appreciate your assistance in resolving this matter Sincerely, e OeyHanks Michael F Easley Governor William G Ross Jr Sccretary North Carolina Department of Environment and Natural Resources Coleen H Sullins Director Division of Water Quality September 12 2008 Jeffrey Flanks Bill Hanks Lumber Co PO`Box 99 DanburyIVC 2 0096 Subject NPDES Stormwater Permit Coverage Renewal BIlF anks Cumber Co COC Number NCG210073 Stokes County — Dear Permittee In response to your renewal application for continued coverage under stormwater General Permit NCG210000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit This permit has been reissued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between the state of North Carolina and the U S Environmental Protection Agency dated October 15 2007 The following information is included with your permit package • A new Certificate of Coverage • A copy of stormwater General Stormwater Permit NCG210000 • A copy of the Technical Bulletin for the General Permit • Five copies of the Discharge Monitoring Report (DMR) Form • Five copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater only and it specifies your obligations with respect to stormwater discharge controls management monitoring and record keeping Please review the new permit to familiarize yourself with all the changes in the reissued permit The more significant changes to the General Permit include the following • Permit cover page second paragraph — The General Permit now may cover activities that DWQ determines to be similar in either the process or in the exposed materials to the Timber Products Industry • Part I Section A — A new provision that facilities draining to 303(d) listed waters or in watersheds with an approved TMDL may not be eligible for continued coverage at the next renewal of the General Permit • Part I Section B second paragraph — A new clanfication that the permit does not authorize discharges that DWQ determines are wastewaters • Part II Section A — The required contents of the Stormwater Pollution Prevention Plan have been expanded and clarified • Part II Section B Table 1 —A new requirement to sample stormwater discharges twice per year for those facilities with exposed piles of certain materials remaining on site longer than seven days • Part II Section B Tables 2 and 3 and following — For permittees with exposed piles there are new provisions requiring the permittee to execute Tier One and Tier Two response actions based on the first benchmark exceedence (Tier One) and the second consecutive benchmark exceedence (Tier Two) Tier Two requires that the permittee institute monthly monitoring instead of twice -per year monitoring until three consecutive monitoring events show no benchmark exceedences • Part 11 Section B — For permittees with exposed piles a new provision that four exceedences of any particular benchmark will trigger increased DWQ involvement in the permittees. stormwater management and control actions DWQ may direct the permittee to apply for an individual permit or may direct the implementation or installation of specific stormwater control measures • Part II Section C — Clarification that under the qualitative monitoring provisions of the permit the permittee is obligated to respond to repeated observations of stormwater pollution DWQ may impose additional stormwater management requirements if the permittee is non -responsive or if the responses are ineffective Your coverage under the General Permit is transferable only through the specific action of DWQ NorthCarohna Naturally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh NC 27699 1617 Internet h2o enr state nc uslsulstormwaterHnil 512 N Salisbury St Raleigh NC 27604 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Phone (9 t 9) 807 6300 Customer Service FAX (919) 807 6494 1 877 623 6748 NPDES Stormwater Permit Coverage Renewal Permit Number NC6210073 Page 2 This permit does not affect the legal requirements to obtain other permits which may be required by NCDENR nor does it relieve the permittee from responsibility for compliance with any other applicable federal state or local law rule standard ordinance order judgment or decree If you have any questions regarding this permit package please contact Ken,Pickle of the Central Office Stormwater Permitting Unit at (919) 807-6376 __ Sincerely for Coleen H Sullins cc DWQ Central Files Stormwater Permitting Unit Files V_ri ton Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG210000 CERTIFICATE OF COVERAGE No NCG210073 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended Bill Hanks Lumber Co is hereby authorized to discharge stormwater from a facility located at Bi.11 Hanks Lumber Cd 2655 Piney Grove Chu__hrcRd Danbury Stokes County to receiving waters designated as Bonds. Branch a class CC T stream in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1 II, III IV V and VI of General Permit No NCG210000 as attached This certificate of coverage shall become effective September 15, 2008 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day September 12, 2008 for Coleen H Sullins Director Division of Water Quality By Authority of the Environmental Management Commission Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources Coleen H Sullins Director Division of Water Quality September 15t 2008 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7008-0150-0002-7876-7 72 3 Jeff Hanks, President Bill Hanks Lumber Company P O Box 99 Danbury NC 27016 Subject Compliance Evaluation Inspection & Notice of Violation NOV-2008-PC- L* 5I- NPDES General Stormwater Permit NCG210000 Certificate of Coverage NCG210073 Bill Hanks Lumber Company Stokes County Dear Mr Hanks 1 Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Quality (DWQ) conducted a compliance evaluation inspection (CEI) at the subject facility on August 251" 2008 Your assistance and cooperation was greatly appreciated An inspection checklist is attached for your records and the inspection findings are summarized below 2 The facility is located at 2655 Piney Grove Church Road in Danbury, Stokes County North Carolina According to our database records the facility currently discharges stormwater to Bond s Branch which is currently classified as Class C trout waters in the Roanoke River Basin Our records reflect only one stormwater discharge outfall (SDO) however there is no site plan and you did not know the number or location of the SDO(s) at the time of the inspection Documentation Review 3 The facility does not currently have a stormwater pollution prevention plan (SP3) and neither qualitative nor analytical monitoring have been conducted as required Site Review 4 The site was generally well kept except for the vehicle maintenance refueling area The waste oil tank and another aboveground tank, which is located near the underground diesel storage tank both require secondary containment There was also a considerable amount of oil and other petroleum products on the ground in the vicinity of both tanks Additionally several drums were uncovered, exposed to the elements and contained some type of petroleum product Please note that the discharge of such substances onto the ground or into surface waters is unlawful and all spills of this nature should always be cleaned up immediately and the contaminated materials disposed of properly and in a timely fashion Please also note that such spills must be reported to the North Carolina Department of Environment and Natural Resources (DENR) Development and implementation of the SP3 if done according to the permit, should facilitate the development Best Management Practices (BMP) to address spills 5 You may wish to commission the services of a professional environmental engineering or consulting firm to help in the development and implementation of your SP3 as required by the permit Please use your local phone book and/or the Internet to locate a firm that can assist you It is best to ensure such a firm has experience in stormwater management and development of SP3s Also upon your request and once the SDOs at your facility have been identified we can provide a list of certified NC laboratories that can conduct the required analytical monitoring of the stormwater discharged from your facility North Carolina Division of Water Quality 585 Waughtown Street Winston Salem NC 27107 Phone (336) 771 5000 Intemet ncwaterquality org FAX (336) 771 4630 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/l0% Post Consumer Paper N iihCaroltna ,Aalumlly Customer Service 1 877 623 6748 A rn ru • VY �N t RW 4 Postage $ Q, ff Certified Fee - 7 C3 Return Receipt Fee t= (Endorsement Required) rk T C3 Restricted Delivery Fee (Endorsement Required) C3 irl Tolel PO4twnw R Fwwa (� S,a •Q 4 Sent To Jeff Hanks O IV, V`P ,� � Presi gt�� Bill Hanks Lumbe P D Box 99 pan o Y city sre Danbury, NC 27O16 usas SENDER, COMPLETE THIS SECTION •PAPLE-rE THIS SECTION ON DEUYERY ■ Complete Items 1 2 and 3 Also complete + item 4 If Restricted Delivery is desired %ature 13 Agent ■ Print your name and address on the reverse - ( ❑ Addressee t so that we can return the card to you B&R,ecr y {arr ae Name) C Date of Delivery cc/ ■ Attach this card to the back of the mallplece r P.yL, l01— r - v I jr or on the front if space permits f 1 Article Addressed to D Is dolly ad nos dMerent from Rem 1? ❑ Yes 13140 if YES enter delivery address below Jefl Hanks President ` Bill Hanks Lumbei Company P O Box 99 j{ 4 3 Se ce Type Certified Mail ❑ Express Mat{ f } Danbury NC 27016 } ❑ Registered ❑ Retum Receipt for Mamhandsej ❑ Insured Ma{l CI C O D { - - — - J 4 Restricted Delivery? {F-xtra Feel ❑ Yes 7008 0150 0602 7876 7723 1 1 PS Form 3811, February 20D4 Domestic Return Receipt C% •—$ --Q 102595-M W1$401 Mr Jeff Hanks September 1' 2008 Page 2 6 Please be aware that the Division may assess civil penalties of up to $25,000 per day, per violation for failure to comply with the requirements of NCG210000 Please reply to this letter within 30 days of receiving st Your response should include an action plan and implementation schedule for the correction of those violations listed above in paragraphs 3 and 4 Thank you for your cooperation in this matter Should you have any questions about the CEI this letter or the NCG210000 permit please feel free to contact Mr Boone or me at (336) 771-5000 Sinc Wye ve edder Water Quality Regional Supervisor Winston-Salem Region Division of Water Quality Attachments 1 BIMS Inspection Checklist cc SWP — WSRO Central Files Stormwater Permitting Unit Compliance Inspection Report Permit NCG210073 Effective 05/01/03 Expiration 04/30/08 Owner Bill Hanks Lumber Co SOC Effective Expiration Facility Bill Hanks Lumber Co County Stokes 2655 Piney Grove Church Rd Region Winston-Salem Danbury NC 27016 Contact Person Jeffrey Hanks Title Phone 336 593 2022 Directions to Facility System Classifications Primary ORC Secondary ORC(s) On Site Representative(s) 24 hour contact name On site representative Related Permits Inspection Date 08125/2008 Primary Inspector Ron Boone Secondary Inspector(s) Jeffrey Hanks Jeffrey Hanks gE cme 01 00 PM Certification Phone Phone 336 593 2022 Phone 336 593 2022 Exit Time 02 30 PM �yz r/2 ra b Phone 704 663 1699 Ext 2202 Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Timber Products Stormwater Discharge COG Facility Status ❑ Compliant ■ Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 Permit NCG210073 Owner Facility Bill Flanks Lumber Co Inspection Date 0&25I2008 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary Please see attached Inspection summary/NOV letter Page 2 a Permit NCG210073 Owner Facility Bill Hanks Lumber Co Inspection Date 08/25/2008 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Pan? D ■ n n # Does the Plan include a General Location (USGS) map? ❑ n ■ # Does the Plan include a Narrative Description of Practices ? n Q ■ # Does the Plan include a detailed site map including outfall locations and drainage areas? n n ■ D # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ Q ■ o # Has the facility evaluated feasible alternatives to current practices? n ■ n n # Does the facility provide all necessary secondary conta:nment? n ■ n n # Does the Plan include a BMP summary? n n ■ o # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n ■ ❑ # Does the Pian include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ■ # Does the facility provide and document Employee Training? ❑ ■ n n # Does the Plan include a list of Responsible Party(s)? Q Q ■ ❑ # Is the Plan reviewed and updated annually? n Cl ® ❑ # Does the Plan include a Stormwater Facility Inspection Program? n n ® n Has the Stormwater Pollution Prevention Plan been implemented? n n ■ n Comment No SP3 Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi annually? n o n n Comment No qualitative monitoring has been completed Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ®❑ 11 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n ■ ❑ n Comment No analytical monitoring has been completed Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? n ■ n ❑ # Were all outfalls observed during the inspection? n o n n # If the facility has representative outfall status is it properly documented by the Division? n n ® n # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ■ n n Comment Out#alls have not been identified Page 3 o�oF wa rFgQG � Y Jeffrey Hanks Bill Hanks Lumber Co PO Box 99 Danbury, NC 27016 Dear Permittee Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources Alan W Klimek P E Director Division of Water Quality April 28, 2003 Subject NPDES Stormwater Permit Renewal Bill Hanks Lumber Co COC Number NCG210073 Stokes County In response to your renewal application for continued coverage under general permit NCG210000 the Division of Water Quality (DWQ) is forwarding herewith the reissued Stormwater general permit This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between the state of North Carolina and the U S Environmental Protection Agency, dated December 6, 1983 The following information is included with your permit package • A new Certificate of Coverage A copy of General Stormwater Permit NCG210000 • A copy of the Analytical Monitoring Form (DMR) • A copy of the Qualitativel Monitoring Form • A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ The Division may require modification or revocation and reissuance of the Certificate of Coverage This permit does not affect the legal requirements to obtain other permits which may be required by the Department of Environment and Natural Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state or local law, rule, standard, ordinance, order, judgment, or decree If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc Central Files Stormwater & General Permits Unit Files Winston-Salem Regional Office N C Division of Water Quality 1617 Mail Service Center Raleigh NC 27699 1617 (919) 733 8053 Aym+h NCDENR Customer Service 1 800 623 7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG210000 CERTIFICATE OF COVERAGE No NCG210073 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-2151, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Bill Hanks Lumber Co is hereby authorized to discharge stormwater from a facility located at Bill Hanks Lumber Co 2655 Piney Grove Church Road Danbury Stokes County to receiving waters designated as Bonds Branch, a class C TR stream, in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No NCG210000 as attached This certificate of coverage shall become effective May 1, 2003 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day April 28, 2003 for Alan W Klimek, P E , Director Division of Water Quality By Authority of the Environmental Management Commission Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources Alan W Klimek P E Director Division of Water Quality SePILmbu 4 2(H)2 JE FRE) HANK, BILL HANKS LUiM131-It Co) PO BOX 99 DANBUR't NC 270I6 Suhltcl NPDI:S StorniwatLt Purmrt Co%(,i i,ac Rc,nca it Bill 11 Inks I-UIIlhLl Co CC)C NnillhLr iiLt,21007; Stokus County DL It PLrmttlLL 5 our I ILIIIIv Is turrultl} co\uLd lor.tornlw ltc.r diSch 31I1t undur CGcm r d Punlit NCG210000 This ptrnut L�I11rLs on MarLh I 2001 1 ht Ian ision st ill IC currLntl) ill OIL proLLsti of rawritln l tills IMmit Ind IS 1,Cl1LdulLd to h I\L the pLrma rLrssnLd h} u 16 4pling of 2001 f)nuu the lx initt Is rulssuatl your 11011t� \\ould hL chglhlu for continuud LovLr1�,L untlu thL tussucd pLrmit In ordu to 15511rL )our ContnulLd Lov(,r111E under the gLnu d pLrtmt you lnutit tppl) to the Div imon of W aLl Qua111) (DWQ) tol 1LnCw 11 01 \out pi-rnllt LourW-L 10 Ill Il.t this IurLW 11 proLL"s Lt,,tLr \\L iit In1ol111111`, you In tdv HILL 11) it y0ul 11Lnnit (.cnLt t�"e will ha LXPII111g l nLluu d )011 well I111d i 1'trnrit Co-*trdge Runt,s II Apphc ItIOn form I hL 1111)1IL (ton ninst bL LO111PICIL.d Intl 1611.11nu1 by OLlohLr 2 2002 ill ordLr to IssurL LOnIII1ULd LoALr I"L undo thL t-LnLi it pLrnlit DuC to St It Ind hud"Lt tonsil lints ILttLr1 L011111 1111110 our R,4-Llp[ of 111E L01n171atLd 11)1)11L 111011 '4111 not bL SLnt Faulk- to rcclutst rultw it \\ ithin the tinic ptrtod sPLul ILd Ill ly ILsnll In I LI, Il PISLY IULnt 01 it IL Ist 5250 00 Largci PCn 11trL` m 1\ hL I1,',Lsstcl dLptnding on thL di lindutnty of tilt iLyutst Drsch it-t of Stolmw 1tLr hom your I Iuht) \\ rthout GM Lr tgu under d \ did stormw ntr NPD1 S pu nIIt would LontitltutL 'I \ tol itiort of NCCiS ; I -215 1 Ind LOuld rLSult In IsstsslliLnis of Cr\ it pen III1uS 01 up to $10 000 ptr d Iy Pit- ISC rlolu tit It ICLLIII tudi rit ILglsl mon has LmLndtd OIL no L\postirt L�Llusion to all optratois of Industri it f icilitlLs in In\ (it th4 I I C IIL�'UFILS of storm \\ tlLr d11,01 Ir"L% IssoLI IILd \\ Ith Industrial aatl\ it\ (L\(-Lpl LonstrUCl1011 LCtl\HILA) If )ou ILCI )tillr lacillt\ can CL.Itll) dLo11dlllorl 01 noL`(Po`urf. I LL thL t ILlllt\ IndnStll II In llLt 111, Ind opu (lions 116 not L\poscd to StorniN\ itLr \Otl C tit Ippl\ for thL no L\POsule L\LluSlon For Ilhlitional 111110171111 Ilion L0111 ILI thL CL Ill d OIfILL Storniv.nttr St tit niunhLr 115ttd hLIOW or thud. the S101n1VA IILr & GLnu tl PLrnlrts Unit N' th tirtu it littp //h2o cnr tt 11L Ill, us/SUARA111W uLl 1111111 It thL. suhlLCI Slolnlw 11u disch it-L to w itcrs of thL 'It tit-11 IS NAM 10111111 ItLd pILISL L0111p1LIL thL unLlosLd Rescission Ruluttit 1 01 m iM Minis, Imtructrons 2rL IlsRA on 111E hotulnt of thL 101 n1 You vk Ill hL notllrud whLIl IhL iLSusvon ploLLss It Is hLtn ConlplLtLd It you h Iv6 111% yuLsliuns rug udtng IN, lx rinit rtnuwdl ptottclurLs pIL riL Lunt ILt C(IICV 13 i oli-Lr of thL 1Vlnston S IlLln RL`,111111 01[ILL It 1',6-771-4600 of Bill Mills o1 lilt C.L110 11 C)ItILL Sulrnlwatu Unit It (919) 7 ; ; 505 , uYt >) 4,8 S,//n��atlLly II 131 ItIIL\ BL IIILtl Supur\ isor "viol nnv ILLI Ind CILllur 11 PLFI1111S Unit LL C.LI111IIIIILs Stolmw ILLI Ind GLnu 11 PLI11111" Urilt FLILs Winston S slum RLglon d 0111L6 VJXF NCDENR N C Division of Water Quality 1617 Mail Service Center Raleigh NC 27699 1617 (919) 733 7015 Customer Service 1 800 623 7748 -1 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B Hunt, Jr, Governor Wayne McDevitt, Secretary A Preston Howard, Jr, P E , Director May 1, 1998 JEFFREY HANKS BILL HANKS LUMBER CO PO BOX 99 DANBURY, NC 27016 Subject Reissued Stormwater General Permit for Certificate of Coverage No NCG210073 Stokes County Dear Permittee �v E D E N F= I In response to your renewal application for continued coverage under the General Permit NCG040000, the Division of Water Quality (DWQ) is forwarding herewith the General Permit NCG210000 which is anew General Permit to cover most of the Timber Products Industry You have now been given coverage under NCG210000 and your coverage under NCGO40000 is hereby terminated This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated December 6, 1983 The following information is included with your permit package ■ A copy of the stormwater general pernut NCG210000 ■ A new Certificate of Coverage under general permit NCG210000 w A Stormwater Pollution Prevention Plan Certification Form This form certifies that you have developed and implemented the Stormwater Pollution Prevention Plan (SPPP) required in your pernut (both NCG040000 and NCG210000) This form must be completed and returned to the Division within 30 days of receipt of this letter DO NOT send the SPPP with the signed form ■ Five copies of Analytical Morutoring forms m Five copies of Qualitative Monitoring forms ■ A copy of a Technical Bulletin on the stormwater program which outlines program components and addresses frequently asked questions Your certificate of coverage is not transferable except after notice to DWQ The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage This permit does not affect the legal requirements to obtain other permits which may be required by DWQ or permits required by the Division of Land Resources, Division of Air Quality, Coastal Area Management Act or any other Federal or Local governmental permits that may be required If you have any questions concerning this permit or other attached documents, please contact the Stormwater and General Permits Unit at telephone number (919) 733-5083 _ Sincerely, for A Preston Howard, Jr, P E P O Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG210000 CERTIFICATE OF COVERAGE NO NCG210073 STORMWATER DISCHARGES In compliance with the provision of North Carolina General Statute 143-215 1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, BILL HANKS LUMBER CO is herby authorized to discharge stormwater from a facility located at PINEY GROVE ROAD DANBURY, NC STOKES COUNTY to receiving waters designated as Bonds Branch in the Roanoke River Basin in accordance with the effluent limitations monitoring requirements and other conditions set forth in Parts I, II, III and IV of General Permit No NCG210000 as attached This Certificate of Coverage shall become effective May 1, 1998 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day May 1,1998 f o r A Preston Howard, Jr , P E, Director Division of Water Quality By Authorization of the Environmental Management Com iriission State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Sahsbury Street - Raleigh, North Carolina 27604 James B Hunt, Jr, Governor Jonathan B Howes, Secretary March 26, 1993 Jeffrey Hanks P O Box 99 Danbury, NC 27016 Subject General Permit No NCGO40000 Bill Hanks Lumber Co COC NCGO40073 Stokes County Dear Mr Hanks In accordance with your application for discharge permit received on October 5, 1992, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983 If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application Unless such demand is made, this certificate of coverage shall be final and binding Please take notice that this certificate of coverage is not transferable except after nonce to the Division of Environmental Management The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required Pallutwn Prevention Pays P 0 Box 29535 Raleigh, North Carolina 27626-0535 Telephone 919 733 7015 An Equal opportunity Affirmatrve Action Employer If you have any questions concerning this permit, please contact Mr Steve Ulmer at telephone number 9191733-5083 Sincerely, irig;nal Sinned By ltsa S`f H� A "Preston ard, Jr Acting Director cc Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT MZjiiMg 11111 _: i W011AVA a :Arl = "Imlaskifftill I it STORMWATER DISCHARGES li �7�`�'i.`l1 �1►5 In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act as amended, Bill Hanks Lumber Co is hereby authorized to discharge stormwater from a facility located at Bill Hanks Lumber Co Piney Grove Road Danbury Stokes County to receiving waters designated as Bonds Branch in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements and other conditions set forth in Parts I, II, III and IV of General Permit No NCG040000 as attached This Certificate of Coverage shall become effective March 26, 1993 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day March 26, 1993 Original Signed By Coleen H Sullins A Preston Howard, Jr , P E , Director Division of Environmental Management By Authority of the Environmental Management Commission � cam, - �. t,✓� �l �`�/ , �� !��/,`' `(�!� r/ ``111 In + f \\� . ; A�39 1 000 000 FEET / �✓ ���" � ; r �! i � ' � I �� �\"`ry�� Irk � � � ��"~ 4638 � IV ko 1.4 �3940 36 � I I .. `-- I _ �l `� `� hSCh ! �✓^ LTjj; iE �ll �f r �`�\�`� i 41/ pe ��1`vrJ �^� ✓�-. , 1\ �� `�,r�'�l'i I!r 1 � `�J -J !%�� f r,� Il � `_-_/`Y./ � ��) - it NY Jl�lra 4034 �� ' \9W�, t !� r \ �1 �! ✓ �i�'i �� ��( rV//', ��� , M, it It l `�� ✓ ~_-� �\�\\t✓�i It "Tkl M /J r A + co fill e ,J 1�� �-�1 I� ! f `\� �i _�, s �'� ter~ r✓ ,� / r I ���` ,`\C,���-`� `\\\' !� N' f ` c In 0 0 O Dr mui 0 �e ..iceAll RS MN 1 996h 1 F S n 0 (A&nE?NVC) rw G nu �rancrrrr� O FAM "i 46) // r COUP� rr WDES Ncc-ol0073 MAP # bn mr DSM FLOW N/4 SUB BASIN 03-- d,2-0/ LATT PTU DE 36 0�2 t? "-217 LuE xET &- 8D`'I5'31 RECEWING STREAM ,Qv17� erRnzli STREAM CLASS G -Tf DISCHARGE CLASS 5 �ofmWA41p it EXPIRATION DATE vY-31-17 OTHER DISCHARGES WATER SOFTENER, SMALL WELL BOILER AREA N360 28 776' W800 15 210' Uses salt only Utilizes 80 al water per cycle — 2 cycles per month discharge is behind the well house onto the ground —160 gallons per month Evaporates/Infiltrates/Stream? Not specifically covered by NCG500 unless considered a "similar waste" 2 WATER SOFTENER, BIG WELL BOILER AREA N36028 757' W80015 237' Uses salt and bleach Utilizes 82 gal water per cycle — I cycle per week discharge is behind the well house onto the ground ---328 gallons per month Evaporates/Infiltrates/Stream? Not specifically covered by NCG500 unless considered a "similar waste" 3 AIR CONDITIONER OUTSIDE KILN ROOM N36028 778 W80015 246' Condensate during the hot weather months —onto the ground evaporates nu no condensate during the cold months \J Quantity? How big is AC unit9 Probably ok if it truly evaporates AIR COMPRESSORS 4 STICK MACHINE OLD STACKER Approx 5 gal week — when 2n use aRprox usage I week per month discharges on cement pad & evaporates —5 gallons per week or 5 gallons per month based on one usage per month Probably ok if it truly evaporates Though covered by NCG500 - repipe and combine PLANER approx 5 gal week — discharges on the ground -5 gallons per week or 20 gallons per month Evaporates/Infiltrates/Stream9 Probably ok if it truly evaporates Though covered by NCG500 - repipe and combine 6 KILN ROOM approx 1 gal per week discharges into drain What drain - SW or septic? —1 gallon per week or 4 gallons per month Repipe to evaporate or infiltrate or repipe to be covered by NCG500 MILL DEPENDING ON USE & AMBIENT HUMIDITY 1/2 gal to 2-1/2 gal per day per compressor 4 different com resors — normal operation is 3 com resors running at any given time discharges on the ground —2 to 10 GPD per compressor x 4 = 8 to 40 GPD x 20 work days = —160 to 800 gallons per month Covered under NCG500 EYE WASH Mill break room, boiler room, garage -- as needed, on the ground Con 9 COLD SPRAY SYSTEM KILN 5 & KILN 6 N36028 774 W80015 278' Plain Water filter rinse onto the cement pad — evaporates 20 gal_ per charge, estimate of 4 charges per month combined kilns —80 gallons per month Evaporates/Infiltrates/Stream9 Not covered by NCG500 unless considered "similar waste" Repipe to septic? Individual permit9 10 HAND SINK —KILN ROOM ** INTO DRAIN This drain collects the storm water run off from the boiler room/kiln room area and discharges into stormwater runoff in area of outfall #3 36°28 790 80015 224 Repipe to septic 11 ESTIMATED BOILER/BOILER BLOWDOWN Stormwater runoff location Latitude 36' 28 776' Longitude 80' 15 232 blow down approx 500 gal per 24 hour period or —10K gallons per month based on 20 work days Chemical used in 50 gal mix tank w/water 1340 1/2 gal -- Boiler Water Treatment Hazardous Ingredients None 1317 1 gal -- Boiler Water Treatment Hazardous Ingredients Sodium hydroxide 1541 1 gal -- Steam Line Treatment Hazardous Ingredients 2-Diethylaminoethanol Cyclohexylamine 176 1 pt -- Boiler Water Treatmnt Hazardous Ingredient Tetrapotassium pyrophosphate Consumption of this mixture is generally 3 to 4 days depending upon production rates During this amount of time, we would have turned about 28,000 — 36,000 gallons of water into steam (This is a closed system and the condensate is recycled ) 1258 on timer goes into condensate tank usage is approx 4 8 oz every 24 hrs Boiler Water Treatment Hazardous Ingredient Sodium sulfite Potassium sulfite Covered by NCG500 Maybe we should go for an individual permit for all SW and WW discharges OTHER DISCHARGES WATER SOFTENER, SMALL WELL BOILER AREA N360 28 776' W800 15 210' Uses salt only Utilizes 80 gal water per cycle — 2 cycles per month discharge is behind the well house onto the ground —160 gallons per month Evaporates/lnfi ltrates/S tream'� Not specifically covered by NCG500 unless considered a "similar waste" 2 WATER SOFTENER, BIG WELL BOILER AREA 1N36028 757' W80015 237' Uses salt and bleach Utilizes 82 izal water per cycle --I cycle per week discharge is behind the well house onto the ground —328 gallons per month Evaporates/Infiltrates/Stream9 Not specifically covered by NCG500 unless considered a "similar waste" 3 AIR CONDITIONER OUTSIDE KILN ROOM N36028 778 W80015 246' Condensate during the hot weather months — onto the ground evaporates no condensate during the cold months Quantity? How big is AC unit9 Probably ok if it truly evaporates AIR COMPRESSORS 4 STICK MACHINE OLD STACKER Approx 5 gal week — when in use approx usage 1 week per month discharges on cement pad & evaporates —5 gallons per week or 5 gallons per month based on one usage per month Probably ok if it truly evaporates Though covered by NCG500 - repipe and combine PLAINER approx 5 gal week — discharges on the ground -5 gallons per week or 20 gallons per month Evaporates/Infiltrates/Stream? Probably ok if it truly evaporates Though covered by NCG500 - repipe and combine 6 KILN ROOM approx l gal psr week discharges into drain What dram - SW or septic? —1 gallon per week or 4 gallons per month Repipe to evaporate or infiltrate or repipe to be covered by NCG500 7 MILL DEPENDING ON USE & AMBIENT HUMIDITY 1/2 gal to 2-1/2 gal per day per compressor ( 4 different compresors — normal operation is 3 compresors running at any given time) discharges on the ground —2 to 10 GPD per compressor x 4 = 8 to 40 GPD x 20 work days = —160 to 800 gallons per month Covered under NCG500 EYE WASH Mill break room, boiler room, garage -- as needed, on the ground OK 9 COLD SPRAY SYSTEM KILN 5 & KILN 6 N36028 774 W80015 278' Plain Water filter rinse onto the cement pad — evaporates 20 gal per charjZe, estimate of 4 charges per month combined kilns —80 gallons per month EvaporateslInfiltrates/Stream? Not covered by NCG500 unless considered "similar waste" Repipe to septic? Individual permit? 10 HAND SINK — KILN ROOM ** INTO DRAIN This drain collects the storm water run off from the boiler room/kiln room area and discharges into stormwater runoff in area of outfall #3 36*28 790 80015 224 Repipe to septic 11 ESTIMATED BOILER/BOILER BLOWDOWN Stormwater runoff location Latitude 36° 28 776' Longitude 80° 15 232 blow down approx 500 gal per 24 hour period or - 10K gallons per month based on 20 work days Chemical used in 50 gal mix tank w/water 1340 1 /2 gal -- Boiler Water Treatment Hazardous Ingredients None 1317 1 gal -- Boiler Water Treatment Hazardous Ingredients Sodium hydroxide 1541 1 gal -- Steam Line Treatment Hazardous Ingredients 2-Diethylaminoethanol Cyclohexylamine 176 1 pt -- Boiler Water Treatmnt Hazardous Ingredient Tetrapotassium pyrophosphate Consumption of this mixture is generally 3 to 4 days depending upon production rates During this amount of time, we would have turned about 28,000 — 36,000 gallons of water into steam (This is a closed system and the condensate is recycled ) 1258 on timer goes into condensate tank usage is approx 4 8 oz every 24 hrs Boiler Water Treatment Hazardous Ingredient Sodium sulfite Potassium sulfite Covered by NCG500 Maybe we should go for an individual permit for all SW and WW discharges l:opynght (u) 1996, MBptBCh, inn. t� � �� � ``.. LL/V4/ZVER3 Ate::)v J70-77bti]Lb r RESEARch & ANA yriCAI LZORAIO IES, INC. AnaWcaVPmcess Consukations n Or H LHDLA[N1iFCAC7 rrUt d2/ 04 • 0416381Nrrer ,ii4 fib N0#34 xl C JBILL HANKS LUKBHR CO. Date Sample Collected 11/13/08 P.O. BOX 99 Date Sample Received 11/13/06 DANBURY, NC 27016 Date Sample Analyzed 11/13/08 Attn: WARY ANN COHAN Date of Report 11/24/08 Analyses Performed by : 8K -X�T Lab Sample Number -------------- 632080 Parameter Storet # Resulte COD -HIGH (00340) 152 mg/l TSS (00530) 76.0 mg/l pli (0040D) 7.56 Std. Units -------------------- ClientS Sample Source OUTFALL Number Time Collected (Hrs) 1210 P 0. Box 473. 106 Short Street ■ Kernersv;lle. North Carolina 27284. 336.996-2841 • Fax 336.996.0326 www.re ndelebs.cam