HomeMy WebLinkAboutNCG190003_COMPLETE FILE - HISTORICAL_20180504STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOGTYPE p,HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE ❑ 3Dl �
YYYYMMDD
ROY COOPER
Governor
4
Energy, Mineral
and Land Resources
ENVIRONMENTAL OVALITY
May 4, 2018
Bock Marine Builders, Inc.
233 Core Creek Road
Beaufort, NC 28516
Subject: Compliance Evaluation Inspection
NPDES General Stormwater Permit NCG190000
Certificate of Coverage NCG190003
Bock Marine Builders, Inc
Carteret County
Dear Mr, Bock:
MICHAEL S. REGAN
.Secretwy
WILLIAM (TOBY ) VI\SO-N
1nteri01 Director
On April 30, 2018, the Wilmington Regional Office of the Division of Energy, Mineral, and Land
Resources (DEMLR), received the 2017 Annual summary Data Monitoring Report (DMR) for Bock Marine
Builders, Inc. located in Carteret County, North Carolina. The site drains to Core Creek (ICW, Adams
Creek Canal), which is currently classified as Class SA, HQW Waters in the White Oak River Basin.
The following observations were noted on the DMR:
1) The DMR states that Outfall 1 was on Tier 2 during the past year.
2) The DMR states that monthly monitoring was discontinued because "no BMP can reduce Copper
to below BMV @ reasonable cost."'
Please be advised that the submitted sampling results equate to a Tier Two and Three response by you.
Tier Three requires that you notify this office in writing within 30 days of receipt of the fourth analytical
results. This office will determine if you qualify for relief of the monthly montitoring requirements of
Tier Two.
The exceedance of the benchmarks are not permit violations, however, failure to respond to the
exceedances as outline in the NCG190000 permit is a violation of permit conditions.
Please be advised that violations of the NPDES Stormwater General Permit may be subject to a civil
penalty assessment of up to $25,000.00 per day for each violation.
A written plan of action is required to remedy site conditions. If you have any questions, comments, or
need assistance, please do not hesitate to contact Brian Lambe or me at (910) 796-7215 or
Brian. Lambe 2ncdenr.gov or Dan.Sams@ncdenr.gov.
Sincerely,
Za
Dan Sams, PE
Regional Engineer
Land Quality Section
Wilmington Regional Office
127 Cardinal Drive Ext, Wilmington, NC 28405 9 Phone: 910-796-7215
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR)
® Calendar Year 2017
General Permit No. NCG190000
Certificate of Coverage No. NCG190003
iRECENED
APR 3 0 2018
WILMINGTON RO
This monitoring report summary is due to the DWQ Regional Office no later than 30 days from the date
the facility receives laboratory sampling results from_ the,final.sample of the'calendar year.
Facility Name: Bock Marine Builders, Inc. k: ,
County: Carteret
Phone Number: (252) 728-6855 Total no. of SDOs monitored 1
Outfall No. 001
Is this outfall currently in Tier 2 (monitored monthly)? Yes E1 No ❑
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes Q No ❑
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other No BMP can reduce Copper to below BMV n reasonable cost 0
is
0
outfall 001
Total
Rainfall,
inches
00530
00400
00556
01119
01104
01094
.01114
TSS
mglL
pH,
S.U.
Oil &
Grease,
mgfL
Copper,
mg1L
Aluminum,
mglL
Zinc, mg1L
Lead,
mg1L
Benchmark
N/A
100
6.0 - 9.0
15
0.005
0.75
0.095
0.220
Date Sample
Collected,
molddlyr
-
-
09/25/15
3,38"
30.2
1 7.60
< 5.0
0.034
0.91
0.013
< 0.0050
05/29/16
0.33"
13,5
7.81
2.11
< 0.0050
0.41
< 0.010
< 0.0050
11/30/16
0,52"
27.7
7.48
< 5.0
0.046
0.56
0.018
< 0,0050
06/08/17
0.85"
13.4
7.62
< 5.0
0.11
< 0.10
< 0.010
< 0.0050
12/24/17
0.35"
< 7.4
7.53
< 5.0
0.72
< 0.10
2.0
< 0.0050
5WU-25ONCG19-092309
I certify, under penalty of law, that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing v
Signature
G
Date
Mail Annual DMR Summary Reports to:
DWQ Regional Office Contact Infonrnation:
Asheville Office ...... (828) 2964500
Fayetteville Office ... (910) 433-3300
Mooresville Office ... (704) 663-1699
Raleigh Office ........ (919) 791-4200
Washington Office ... (252) 946-6481
Wilmington Office ... (910) 796-7215
Winston-Salem ...... (336) 771-5000
Central Office .........(919) 807-6300
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLE REEGIONAL OFFICE
REGIONAL OFFICE
2090 US Highway 70
225 Green Street
_M_OORESVILLE
610 East Center Avenue/Suite 301
Swannanoa, NC 28778"
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910) 433-3300
RALEIGH REGIONAL -OFFICE
WASHINGTON REGIONAL OFFICE
WILMINGTON REGIONAL OFFICE`
127 Cardinal Drive Extension
3800 Barrett Drive
943 Washington Square Mall
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
WINSTON-SALEM REGIONAL
CENTRAL OFFICE
OFFICE
1617 Mail Service Center i "To preserve, profecf
585 Waughtown Street
Raleigh, NC 27699-1617 and enhance
Winston-Salem, NC 27107
(919) 807-6300 North Cafd+na's wafer..."
(336) 771-5000
'
SW U-250N CG 19-092309
Energy, Mineral
and Land Resources
ENVIRONMENTAL OVALITY
Bock Marine Builders, Inc
233 Core Creek Road
Beaufort, NC 28516
Subject: Compliance Evaluation Inspection
NPDES General Stormwater Permit NCG 190000
Certificate of Coverage NCG 190003
Bock Marine Core Creek/Beaufort
Carteret County
Dear Mr. Bock:
ROY COOPER
Governor
NIICHAEL S. RECAP
Secrerar"
"I'RACY DAVIS
bimctor
On January 19, 2018, Brian Lambe from the Wilmington Regional Office of the Division of Energy,
Mineral, and Land Resources (DEMLR), conducted a compliance evaluation inspection for Bock Marine
located in Core Creek Road, Carteret County, North Carolina. The site drains to Core Creek (Intracoastal
Waterway Adams Creek), which is currently classified as Class SA, HQW Waters in the White Oak River
Basin.
The following observations were noted during the DEMLR inspection (please see the attached
addendum for additional information about your permit):
1) Stormwater Pollution Prevention Plan (SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly
implemented.
Yes ■ No ❑
2) Qualitative Monitoring
Qualitative monitoring has been conducted and recorded in accordance with permit requirements.
Yes ■ No ❑
3) Analytical Monitoring
Yes ❑ No ■
Analytical monitoring has not been conducted and recorded in accordance with permit requirements.
Implement Tier Two response for 2017 sampling results and email to this office.
Other Observations:
Evaluation of the sampling points is needed, especially in regards to the filtration system.
Thank you for your assistance and cooperation during this inspection. Please be advised that violations
of the NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to
$25,000.00 per day for each violation. If you have any questions, comments, or need assistance with
Wilmington Regional Office.
127 Cardinal Drive Ext, Wilmington: NC 28405 9 Phone: 910-796-7215
J �
r
Bock Marine Core Creek Beaufort
Page 2 of 2
understanding any aspect of your permit, please do not hesitate to contact Dan Sams, PE or me at (910)
796-7215.
Sincerely, -
5
rian rube
nvironmental Specialist
Land Quality Section
Attachments:
RIMS Inspection Checklist
cc: WiRO Files — Land Quality
Central Files — DEMI_R
r .
Compliance Inspection Report
Permit: NCG190003 Effective: 06/02/15 Expiration: 05/31/20 Owner : Bock Marine Builders Inc
SOC: Effective: Expiration: Facility: Bock Marine - Core CreeklBeaufort
County: Carteret 233 Core Creek Rd
Region: Wilmington
Beaufort NO 28516
Contact Person: Kenneth Bock Title: Phone: 252-728-6855
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/1912018 Entry Time: 12:001'M
Primary Inspector: Brian P Lambe
�-
Secondary lnspector(s):
Certification:
Phone:
Exit Time: 01:OOPM
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COO
Facility Status: ❑ Compliant Not Compliant
Question Areas:
N Storm Water
(See attachment summary)
Paae- i
'Ni
Permit: NCG1C00C3 Owner- Facility: Bock Marine Builders Inc
Inspection Date: C 11157201E Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Re-evaluation of the site's discharge point(s) should be conducted. The boat lift area should be considered a discharge if it
is discharging to Adams Creek. The identified sampling point should be evaluated and dear sampling protocol established.
Review the Tier System and implement for the site. This should be done for the latest sampling result. Send 2017 sampling
data and response to me at Brian. Lambe@a ncdenr.gov
Paae: 2
e- • r
Permit: NCG190CO3 Owner - Facility: EOC{ Marine Builders Inc
Inspection Date: 0111912018 Inspection Type : Compfance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Slofmwater Pollution Prevention Plan?
0
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
N
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outiall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
M
❑ ❑ ❑
# Does the Plan include a BIAP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
�
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeepina Plan?
N
❑ ❑ ❑
# Does the facility provide and document Employee Training?
0
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
N
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑ ❑ ❑
Has the Stormwaler Pollution Prevention Plan been implemented?
N
❑ ❑ ❑
Comment
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ❑
Comment: Tier One response documentation not recorded for 2017 sampling events. The sampling events
triggered a Tier Two response. but has not been implemented. as recommended by thier
consultant.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑
# Were all oulfalls observed during the inspection? N ❑ ❑ ❑
# It the facility has representative oulfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ■ ❑ ❑
Comment: The boat lift filtration system should be considered an outfall_ If it is a recycle system. it should
be permitted by the Division of Water Resources.
Paae: 3
MINWA
4 08
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Land Quality Section
Tracy E. Davis, PE, GPM
Director
March 3, 2014
Bock Marine Builders, Inc.
Attn Kenneth Bock
223 Core Creek Road
Beaufort, NC 28516
Subject: NPDES Permit Number NCG190003
Bock Marine
Carteret County
Dear Mr. Bock:
Pat McCrory, Governor
John E. Skvada, III, Secretary
You recently inquired about releasing your facility from Tier Two monitoring requirements under the
NCG190000 permit. Personnel from this office conducted an inspection regarding this request on
February 4, 2014. During this inspection several deficiencies were noted. The goal of monthly testing is
to implement BMPs and compare the sampling data to see what is effective and what is not effective.
• Certify wastewater system with DWQ , Please contact Jim Gregson (910)796-7215 regarding
wastewater permitting and water quality standards.
• Additional rernediation of contaminated soils may be warranted. Suggest soil testing. Soil
testing should provide evidence whether there are concentrations of Copper that are
contributing to the high samples. Multiple soil samples may show any hot spots that need to be
remediated.
• BMP implementation schedule should be filled out and documented. There were several
suggestions by the preparer of the SPPP that should be implemented such as drip pans for
boats waiting for service.
• Complete all certifications in SPPP. SPPP is a working document and should be used as a
workbook, not just for reference.
• Test for contribution for adjoining land owners.
• Prepare document for "self repair" customers informing of procedures to minimize
contamination. Document procedures taken by customers.
Bock Marine
March 3, 2014
Please continue with the monthly sampling and implementation of best management practices. In
following the SPPP you should be able to document efforts made in regards to the BMPs. Sampling at
points that may contribute to the sampling that are beyond your control (adjacent property and or road
runoff) mayjustify high samples. Without documentation of actions taken, this office cannot relieve
monthly monitoring requirements.
Please contact this office if you have any questions or comments regarding your permit.
Sincerely,
Brian Lambe
Environmental Specialist
Wilmington Regional Office
Brian. lam be@ncdenr.gov
Cc: WiRO file
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, NC 28405-3845 Phone: 910-796-7215 Fax: 910-350-2004
Lambe, Brian
From: Georgoulias, Bethany
Sent: Monday, February 17, 2014 10:37 AM
To: Lambe, Brian
Cc: Bennett, Bradley; Pickle, Ken
Subject: RE: Bock Marine
Ni Brian,
Sorry again for the delayed response because of the weather interruptions. See my responses below in your message. -
Bg
Belhan-g i, Gewoulia,s, Envit-onme ntal Ei gineer
NCDENR / Division of Energy, Mineral, and Land Resources
Storrmvater Pennittin- Program
1612 Mail Service Center. Ralei-h. NC 27699-1612
512 N. Salisbury Street, Raleigh, NC 27604
919 / 807-6372 (phone): 919 1807-6494 (fax}
Website: http://portal_ncdenr_or�ZhN•eb/lr/stormwater
E-mail correspondence to and from this address maT he sul ject to the A`orth Carohna Public' h'ecoreb law and mcn• he disclosed to third purlies.
From: Lambe, Brian
Sent: Thursday, February 13, 2014 3:59 PM
To: Georgoulias, Bethany
Subject: Bock Marine
Kenny Bock is requesting to removed from tier two monitoring under 19000. 1 visited the site to review the SPPP and
familiarize myself with it again.
The review of the SPPP revealed some notions of problems:
• Certify wastewater system with DWQ {»not sure I know what you mean by this one?)
• Additional remediation of contaminated soils may be warranted. Suggest soil testing.
• BMP implementation schedule should be filled out and documented. I don't have any documentation of efforts
he has taken.
• Complete all certifications in SPPP, SPPP is a working document and should be used as a workbook, not just for
reference.
• Drip pans for boats waiting for service.
• Test for contribution for adjoining land owner.
• Prepare document for "self repair" customers informing of procedures to minimize contamination.
• Consult with Clean Marina Program and or professional.
>> If I understand you correctly here, the facility is falling short on several obligations under the permit. improvements
and corrective actions should be recommended through the Region's response and reference to requirements under
NCG190000. Some of these bullets sound like recommendations — for example, preparing guidance for self -repair
customers — rather than something spelled out in the SPPP. That's fine.
>> The recommendation for contaminated soil remediation highlights the high metals issue. From the table, the copper
values dropped significantly in June and July of last year, but otherwise they've been way over the current benchmark in
the permit of 7 ug/I total copper. It's not just a little over; values are pretty high here, and they aren't necessarily
improving.
Sampling data per Bock: Copper mg/L
11/18/12
.250
12/12/12
.0869
1/25/2013
.0651
5/2/13
.0444
6/22/13
.0050
7/28/2013
.0094
9/22/2013
.46
10/23/2013
.085
12/29/2013
.045
Cu Benchmark in the permit*
.007
*INFO ABOUT THIS BENCHMARK: This is the Cu benchmark in the permit today, put in before our revision of the Cu
benchmark to 0.010 mg/I that will go in permits starting this year. HOWEVER, marinas typically discharge to saltwater,
and we don't have a different saltwater benchmark for Total Copper. Some calculations suggest that the saltwater total
coppervalue would be lower than 10 ug/I, so right now, sticking with the 7 ug/I may not be terribly inappropriate for
this general permit.
So my question is basically what to do? Go individual permit? Require additional stormwater measures (does this mean
stormwater pond?)
Please advise.
>> I don't think moving them to an individual permit will change much. We have the tools and direction we need under
the General Permit, and an individual Permit will look very similar. It's not worth the effort at this stage (permit
development, public notice, etc.) — especially since there are probably numerous other marinas out there in a similar
situation. The advantage would only be if there were something very specific we needed to outline in the permit
language that this marina must do.
>> To go back to your original question for a minute: do we relieve the permittee from Tier 2 -> now Tier 3 monthly
monitoring? I don't think that's justified yet — they obviously have a lot to do to come into compliance with their SPPP
obligations under the permit. Also, if the permittee follows through with some of those response actions you listed, he
should be monitoring how it's affecting the concentrations in his discharge. It's tough to do that if he drops back to
monitoring once every six months. So I don't advise letting them out of monthly monitoring yet.
>> I would advise actions like the soil testing, testing for adjoining property contribution (if there's run-on?), explaining
how they treat the washing wastewater (is there a question about this, or do they have a wastewater treatment
system? I'm not clear about that from your bullets.).
>> Give him a timeline to do these things and come back to you with a good argument about (1) whether nothing's
improving and/or (2) there's contributions he can't control, and (3) to demonstrate he is diligently working on the
problem jas well as being attentive to his obligations under the permit and SPPP requirements]. After that period,
review his actions and the data, and determine whether monthly monitoring continues to help the permittee solve his
problem or tell him/us what's going on at the site, and where the problem is concentrated.
>> For example, did soil testing reveal some real hot spots for Cu, and that that's where it's coming from? Are his
customers not following proper procedures? Did he do something about it? If monthly monitoring does not serve a
purpose [whether it's to track a trend in Cu concentrations, or to identify what the problem might be], and there are
other actions he really can still be focusing his energies on to rectify it, the Region can relieve monthly monitoring with a
letter. Please be sure to document the rationale for any reduction in monitoring in that letter, or in some other form
for our permit file.
>> If there's no improvement in levels, and the permittee is cooperating with response actions, the region should also
consider potential water quality problems in the receiving waters (are WQ standards being violated?). An investment in
more expensive actions, such as structural BMPs and/or more sophisticated treatment of stormwater runoff from this
facility, could be warranted sooner rather than later if contributions from this marina are causing WQ
problems. However, at this particular stage, the permittee should be investigating other options. The biggest priority
right not is to make sure the permittee is capturing and treating all wastewater, and not discharging that water
untreated or without a proper (wastewater) permit.
hope that helps. Let us know if you have other questions about how to proceed.
Thanks,
Bethany
Brian Lambe
Environmental Specialist
Land Quality Section
NC Division of Energy; Mineral, and Land Resources
(910) 796-7314
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
BOCK MARINE
233 Core Creek Road, Beaufort, NC 28516
Phone 252-728-6855
Fax 252-728-5189
November 8, 2013
NCDENR
ATTN. Brian Lambe
127 Cardinal Drive Extension
Wilmington, NC 28405
REFERENCE: NPDES Compliance Inspection Report
Permit Number NCG 190003
Dear Mr. Lambe:
-&RCS
jV
A Z.)
I?413
bockinaritie. corn
bock marinegginail.com
I would like to address the points you made in your Inspection Report dated Oct. 22, 2013 and
ask for consideration in returning us to the semi-annual sampling of stormwater outflow instead of
the monthly sampling.
We are using tarps and side curtains under and around boats where heavy bottom work is being
performed. Ground cloths are used under boats where routine bottom work is being done including
not only the boats we are working on but also those being worked on by others. Boat owners are
instructed to utilize vacuum sanders or other means to alleviate paint residue from contaminating the
ground while our own employees are using vacuum sanders.
We are also promoting the use of ablative bottom paints as opposed to conventional bottom paints
with high copper content, which not only reduces the amount of copper in the paint, but reduces the
amount of sanding necessary for repainting, thus less ground contamination. And, we are trying
some new paints with a zero copper content on aluminum boats as well as my own personal boat.
Additionally, I have moved the fuel tank and used oil tanks away from the river bank. The rest of
the contaminated soil is scheduled to be removed as soon as possible. And I believe the powerwash
containment system is 90% efficient in alleviating discharge into the water.
I'm not sure what else we can reasonably do. Therefore, your consideration of our efforts would
be appreciated.
Sincerely,
Kenny Bock
Owner/Manager
r
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Land Quality Section
Tracy E. Davis, PE, CPM
Director
October 22, 2013
Bock Marine Builders, Inc.
Attn: Kenneth Bock
233 Core Creek Rd
Beaufort, NC 28516
Pat McCrory, Govemor
John E. Skvarla, 1I1, Secretary
SUBJECT: NPDES Compliance Inspection Report
Permit Number NCG190003
Bock Marine
Carteret County
Dear Mr. Bock:
On October 21, 2013, staff from the Wilmington Regional Office conducted an inspection of the Bock
Marine facility on Core Creek Road, Carteret County, North Carolina.
Enclosed is the Compliance Inspection Report. Deficiencies in the implementation of the Stormwater
Pollution Prevention Plan are in regard to the individual boat owners doing their own work on site must follow the
best management practices for your site. This will aid in reducing your analytical monitoring results. Further
measures should be taken to ensure that all contaminants are confined to the site. Please continue to work
towards reducing the copper sample results. Additionally, all outfalls should be identified.
If you have any questions or need further assistance, do not hesitate to contact me at 910-796-7314.
Sincerely,
Bri Lambe
Environmental Specialist
Enclosures: Inspection Report
cc: NPDES General Permit Inspection Files
Wilmington Regional Office
127 Cardinal Drive Extension Wilmington, NC 28405
Phone: 910-796-7215 / FAX: 910-350-2004
Internet: www.ncwotersguality,Qrq
NorthCarolina
naturally
An Equal Opportunity/Affirmoiive Action Employer
50% Recycled/10% Post Consumer Paper
CustomerServ;ce 1-877-623-6748
Compliance Inspection Report
Permit: NCG190003 Effective: 10/01/09 Expiration: 09/30/14 Owner: Bock Marine Builders inc
SOC: Effective: Expiration: Facility: Bock Marine - Core Creek/Beaufort
County: Carteret 233 Core Creek Rd
Region: Wilmington
Beaufort NC 28516
Contact Person: Kenneth Bock Title: Phone: 252-728-6855
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 10/21/2013 Entry Time: 01:00 PM Exit Time: 01:30 PM
Primary Inspector: Brian P Lambe Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 10/21/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Tarps and side coverings are used when sanding and painting boat bottoms, but individual boat woners are allowed to
conduct thier own maintenance and are not required to use tarps or any other protections when sanding and painting.
Some contaminated soils have been removed, while others need to be removed as soon as possible. Reccomend owner
requiring boat owners doing thier own work follow procedure set forth in stormwater pollution prevention plan.
Ensure the power wash containment system captures all wastewater and does not allow contaminated water into surface
waters.
Identify all outfalls.
Bock requests for monthly sampling to be reduced from tier 2 monthly to semiannual sampling. Please provide additional
measures to reduce the copper sample results. Submit written plan to this office.
Page: 2
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 10/21/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
■
n
n
n
# Does the Plan include a General Location (USGS) map?
®
n
n
n
# Does the Plan include a "Narrative Description of Practices"?
■
n
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
0
n
■
# Has the facility evaluated feasible alternatives to current practices?
■
fl
Q
# Does the facility provide all necessary secondary containment?
■
n
n
n
# Does the Plan include a BMP summary?
■
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
n
n
Q
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
n
C)
n
# Does the facility provide and document Employee Training?
■
00
# Does the Plan include a list of Responsible Party(s)?
■
n
00
# Is the Plan reviewed and updated annually?
■
❑
0
# Does the Plan include a Stormwater Facility Inspection Program?
®n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
n
■
n
n
Comment: Individual owners doing work on site should follow SPPP best
management practices.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ 0 Q
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
MOOD
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
■
D
❑
0
Comment:
Permit and Outfalls
Yes
No
NA
NE
# 1s a copy of the Permit and the Certificate of Coverage available at the site?
®
n
n
# Were all outfalls observed during the inspection?
■
0
❑
D
# If the facility has representative outfall status, is it properly documented by the Division?
0
■
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
n
■
n
n
Comment. Further evaluation of stormwater outfall(s) is needed.
Page: 3
4
<n
CO
1
�m
�-
0 F��
ED9
s
Postage
m
Certified Fee
nu
m
Retum Receipt Fee
O
(Endorsement Required)
f
Restricted Delivery Fee
j
(Endorsement Required)
s
r-q
Total Postage & Fees
rq
CO
n ro
i N
• b
or PO Box No. "
------ ---------
Postmark
Here
J J
■ Complbte items 1, 2, and 3. Also complete
item 4 1f Restricted Delivery is desired.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach`this card to the back of the mailpiece,
or on the front if space permits.
1.. Article Addressed to:
i
A. Signature
X ❑ Agent
❑ Addressee
B. Received by ( Printed Name) C. Date of DeIN.ry
D. Is delivery address different from item 1? ❑ Yes
If YES, enter delivery address below: ❑ No
3. Pepfoe Type
jg Certified Mail ❑ Express Mail
❑ Registered ❑ Return Receipt for Merchandise
El Insured Mail ❑ C.O.D.
4. Restrfoted Delivery? (Extra Fee) [p Yes
2. Article Number
(Transfer from ser0ce !abet) 1_ 7008 114 a O d D 2 3401 3857
PS Form 3811. February 2004 Domestic Return Receipt 102595-02-M-1540
UNITED STATES POSTAL SERVICE
First -Class Mail
Postage & Fees Paid
USPS
Permit No. G-10
• Sender: Please print your name, address, and ZIP+4 in this box •
NC DENR - Division of Water Quality
Surface Water Protection Section
127 Cardinal Drive Extension
Wilmington, INC 28405
NC DEER
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P. E. John Skvada
Governor Director Secretary
April 23, 2013
Mr. Kenneth Bock CERTIFIED MAIL #7008-1140-0002-3401-3857
Bock Marine Builders, Inc. RETURN RECEIPT REQUESTED
233 Core Creek Rd.
Beaufort, NC 28516
Subject: Denial of Monitoring Exemption for NCG190003
Notice of Violation NOV-2013-PC-0154
Bock Marine Builders Incorporated
233 Core Creek Rd. Beaufort, NC
Carteret County
Dear Mr, Bock:
The Division of Water Quality (DWQ) has reviewed your request for an exemption from monitoring requirements in your
NPDES Industrial Stormwater monitoring, and conducted a site visit on April 10, 2013. DWQ is unable to concur with
your request for exemption from monitoring at this time.
Based on observations made at your facility, Wilmington Regional Office staff found that additional BMPs can be
implemented to reduce pollutants from industrial activities taking place at your facility. Evidence of ground tarps and
plastic curtains around boats being maintained by your staff were observed but the same protection is not being
implemented for boat work being conducted by individual boat owners on the site. Staff also found evidence of
wastewater discharges from the boat washwater system where a hose allowed the concentrated wastewater to
discharge onto the ground and into surface waters. DWQ believes that more actions can be feasibly implemented to
reduce exposure to the pollutants from industrial activities at you site. Additional information can be found in the BMP
Manual for North Carolina Marinas or on the Clean Marina website: http://portal.ncdenr.org/web/cm/clean-marinas.
DWQ cannot grant your requested exemption from monitoring based on the aforementioned observations. Additionally,
you are hereby notified that the discontinuation of the required Tier Two monthly monitoring constitutes a violation of
the permit condition SECTION B: ANALYTICAL MONITORING REQUIREMENTS and SECTION A. 2: Duty to
Comply and is subject to a civil penalty not to exceed $25,000 per day for each violation. Please continue to
operate under the full conditions of General Permit NCG190000.
If you have any questions or need further information, please contact Jim Gregson at 910-796-7215, or through email at
jim.gregson@ncdenr.gov.
Sincerely,
Jame' 5 H. Gregson
Regional Supervisor
Surface Water Protection Section
Encl: Inspection Report
cc: WiRO NCG190000 (Carteret Co)
Stormwater Permitting Unit Files
DWQ Central Files
SwSG — James D Frei
On„e�
127 Cardinal Drive Extension, Wilmington, North Carolina 29405-3845 Nol hCarolina
Phone: 910-796-72151 Fax: 910-350-20041 Customer Service: 1-877-623-6748 i]���
Internet: www.0Nlftur
cwatc[qualitv.org to �t l/
Compliance Inspection Report
Permit: NCG190003 Effective: 10/01/09 Expiration: 09/30/14 Owner: Bock Marine Builders Inc
SOC: Effective: Expiration: Facility: Bock Marine - Core Creek/Beaufort
County: Carteret 233 Core Creek Rd
Region: Wilmington
Beaufort NC 28516
Contact Person: Kenneth Bock Title: Phone: 252-728-6855
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Certification: Phone:
Inspection Date: 0411012013 Entry Time: 12:00 PM Exit Time: 01:00 PM
Primary Inspector: Jean Conway Phone: 910-796-7215
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: 0 Compliant M Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NCGI90003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 0411012013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
-Bock Marine employees use tarps and side coverings when sanding and painting boat bottoms, although individual boat
owners are allowed to conduct their own maintenance and are not required to use tarps or any other protections when
sanding and painting. It appears that contaminated soils have been removed in some areas and new gravel has been
placed under most areas where boat work is being conducted. Evidence of fresh paint spills were observed on the new
gravel where boat owners were painting boats without using tarps.
-There is a filter system set up to power wash boats when hauled while on the travel lift that is designed to be a closed
loop system but the system has a holding basin that hangs over the water that does not appear to be able to capture all
the powerwash discharge and the a hose from the filter system allows the concentrated filter water to discharge onto the
ground and along the bulkhead and eventually into the waterway.
-A roll of filter fabric has been purchased to be used under boats when work is to be conducted but has not yet been
installed.
The recycle oil, antifreeze and zinc are stored in covered containers.
-The recycle oil/diesel fuel tank area has oil on the ground and it is located adjacent to a second discharge point that is
not being monitored.
-Owner has stopped conducting the required monthly monitoring. Last one was 1/25/2013.
-The one outfall that is being monitored takes in flow from the high rise bridge that extended over a large section of the
outfall ditch and also has a ditch that flows from the old Monroe Johnson Construction company and Mr. Bock believes
that there are also boat repairs being conducted on that neighboring property. The outfall monitoring is conducted
downstream from the ditch and highway runoff.
Page: 2
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 04/1012013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: Significant spill not updated yearly.
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment: Required monthly monitoring not being conducted.
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated al! illicit (non Stormwater) discharges?
Comment:
■nnn
■nn�l
■ n 00
m 0 0 0
Henn
0000
■nnn
■nnn
■nnn
®nEln
■nnn
■000
M 0 0 0
a 0 0 0
® p n n.
Yes No NA NE
Yes No NA NE
❑®00
n■nn
Yes No NA NE
Page: 3
Permit: NCG190003
SOC:
County: Carteret
Region: Wilmington
Compliance Inspection Report
Effective: 10/01/09 Expiration: 09/30/14 Owner: Bock Marine Builders Inc
Effective: Expiration: Facility: Bock Marine - Core Creek/Beaufort
233 Core Creek Rd
Contact Person: Kenneth Bock
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 04/10/2013
Primary Inspector: Jean Conway
Secondary Inspector(s):
Title:
Entry Time: 12:00 PM
Beaufort NC 28516
Phone: 252-728-6855
Certification:
Exit Time: 01:00 PM
Phone:
Phone: 910-796-7215
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: 0 Compliant ■ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCG190003 - Owner - Facility: Bock Marine Builders !nc
Inspection Date: 04/10/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
-Bock Marine employees use tarps and side coverings when sanding and painting boat bottoms, although individual boat
owners are allowed to conduct their own maintenance and are not required to use tarps or any other protections when
sanding and painting. It appears that contaminated soils have been removed in some areas and new gravel has been
placed under most areas where boat work is being conducted. Evidence of fresh paint spills were observed on the new
gravel where boat owners were painting boats without using tarps.
-There is a filter system set up to power wash boat When hauled while on the travel lift that is designed to be a closed loop
system but the system has a holding basin that hangs over the water that does not appear to be able to capture all the
powerwash discharge and the a hose from the filter system allows the concentrated filter water to discharge onto the
ground and along the bulkhead and eventually into the waterway.
-A roll of filter fabric has been purchased to be used under boats when work is to be conducted but has not yet been
installed.
The recycle oil, antifreeze and zinc are stored in covered containers.
-The recycle oil/diesel fuel tank area has oil on the ground and it is located adjacent to a second discharge point that is
not being monitored.
-Owner has stopped conducting the required monthly monitoring. Last one was 1/25/2013.
-The one outfall that is being monitored takes in flow from the high rise bridge that extended over a large section of the
outfall ditch and also has a ditch that flows from the old Monroe Johnson Construction company and Mr. Bock believes
that ther6l also boat repairs being conducted on that neighboring property. The outfall monitoring is conducted
downstream from the ditch and highway runoff.
Page: 2
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 04/1012013 Inspection Type: compliance Evaluation
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: Significant spill not updated yearly.
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment: Required monthly monitoring not being conducted.
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Reason for Visit: Routine
Yes No NA NE
■000
■00Cl
enpn
■000
n■nn
■0D0
■nnn
■000
■npn.
■nnn
■nnn
■000
■ 0 0 0
■nnn
■00❑
Yes No NA NE
Yes No NA NE
0 E D 0
❑■00
Yes No NA NE
Page: 3
Conway, Jean
From: Gregson, Jim
Sent: Tuesday, April 30, 2013 12:49 PM
To: Conway, Jean
Subject: Fw: Bock Marine Builders - NOV-2013-PC-0154
Attachments: BOCK MARINE Map 2.pdf
From: Jim Frei [mailto:jdfrei@stormwatergroup.com]
Sent: Tuesday, April 30, 2013 12:44 PM
To: Gregson, Jim
Cc: bockmarine@gmail.com <bockmarine@gmail.com>
Subject: Bock Marine Builders - NOV-2013-PC-0154
Mr. Gregson:
We are in receipt of your letter dated April 23, 2013.
We will commence with the monthly monitoring in May 2013 for Copper, the only parameter that has exceeded its
Benchmark value in two or more consecutive samples. One monthly sample between now and September 30 will
include all the parameters listed in the Permit as this will satisfy the Year 4 Period 2 sample. A copy of the DMRs will be
sent to your office as well as to Central Files.
We will also address the other issues raised in your inspection and letter.
The inspector, Jean Conway, mentioned a second outfall near the POl- tanks that is not being monitored. We do not see
a point source conveyance at this location; there may be natural undulations in the topography that tend to direct
surface flow, but in our opinion there is no outfall subject to monitoring, only sheet flow near these tanks.
If you should have any questions, please do not hesitate to call me or Kenny Bock at 252-728-6855.
Jim fret
stormwater services eroum Ilc
raleigh, nc
ph: 919.661.9954
fx: 919.661.8108
..
.
I
.................
.................. ................. . ........ .........
.........
................. ............. : ...................
..........
tipYIN
// // I
/
DA 3;8,Mf
El
{Bldq, t)
// i
IMP. 0%
�11 -------------------------------------
----------------------------
�:
i
REPAIR SHOP
'^ --
----- -- --
.....................................1........................
.... ...............................................................
MAP 2 - FA CILITYSITE PLAN
drwAwdlm
BOCK VIARINE BUILDERS, INC
Ben mfoel, Sarth Carelinn
SwSG
Permit: NCG190003
SOC:
County: Carteret
Region: Wilmington
Compliance Inspection Report
Effective: 10/01/09 Expiration: 09/30/14 Owner: Bock Marine Builders Inc
Effective: Expiration: Facility: Bock Marine - Core Creek/Beaufort
233 Core Creek Rd
Contact Person: Kenneth Bock
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 04/1012013
Primary Inspector: Jean Conway
Secondary Inspector(s):
Beaufort NC 28516
Title: Phone: 252-728-6855
Certification: Phone:
Entry Time: 12:00 PM Exit Time: 01:00 PM
Phone: 910-796-7215
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: Q Compliant ❑ Not Compliant
Question Areas:
■ Storm Water
(See attachment summary)
Page: 1
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 04110/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 04/10/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Yes No NA NE
n n n n
Yes No NA NE
nnnn
n n n n
Yes No NA NE
Page: 3
Stu
w; Qo
SwSGStormwater Services Group, LLC
February 25, 2013
Mr. Bradley Bennett, PE
Stormwater Permitting Unit
NCDENR/ DWQ
Mail Service Center 1617
Raleigh NC 27699-1617
8916 Oregon Inlet Court
Raleigh, North Carolina 27603
Phone: (919) 661-9954
Fax: (919) 661-8108
tMAR 14 2013
fl rat - WAMTE uuIrr
FEB 2 6 2013 I
RE: Petition to Reduce Frequency of Stormwater Discharge Analytical Monitoring
Bock Marine Builders Inc - Beaufort NC
NPDES General Permit NCG190003
Dear Mr. Bennett: OrMAR
12
We are submitting this request to reduce the frequency of analytical monitoring at the s0ct
facility.-----.-_
During the fourth quarter 2012, this facility conducted three monthly monitoring -events per Tier
Two requirements. This facility has not been able to consistently reduce Copper below the
Benchmark Values (see Table 1). While the metal concentrations have trended lower over the
past three years, there are no additional feasible BMPs that can be implemented to reduce these
metals below their respective Benchmark Values.
We believe this Permittee's funds would be better spent maintaining the BMPs implemented to
date instead of on expensive analytical monitoring costs. Monthly monitoring will not improve
water quality.
BMPs currently installed include placing ground tarps under boats undergoing minor hull repair
work. Boats that require extensive hull scraping, prep work, and painting are enclosed with
plastic curtains and placed over a ground tarp.
Boat washwater is captured, filtered, and reused in a closed -loop system; there is no discharge of
boat washwater into this facility's SDO or the adjacent waters of the State.
Deteriorated anodes are accumulated into a covered drum for off -site recyclin .
CEUVEm
MAR 19 2013
BY:
1
0
r.
NDENR/ DWQ
February 25, 2013
Page 2
SwSG
Another recently implemented BMP is the removal of several inches of soil from the area where
more than three decades of hull cleaning and repair work has occurred.
Other methods of sweeping and surface cleaning is not feasible as the entire site has either a
gravel or sand/ grass cover.
The Permittee is requesting a cessation of the monthly Tier Two monitoring effective
immediately. The Permittee will continue with the semi-annual analytical and qualitative
monitoring through the end of the current Permit term.
If you need to discuss this petition, you may contact me or Kenny Bock at the Bock Marine
facility (phone 252-72-6855). If we do not receive a response from NCDENR/ DWQ within 45
days from the date of this letter, we will assume our request has been approved.
Sincerely,
to mw er Services Group, LLC
ames . Frei
Senior Project Manager
Attachments.
cc: K. Bock, Bock Marine
File
Table 1- Summary of Stormwater Discharge Analysis @ SDO-001
Outfall
No.
Date
Sample
Collected
mo/dd/ r
Total
Rainfall
inches
00530
00556
00400
01119
00980
01114
01094
Total
Suspended
Solids
m l
Oil & Grease
m l
pH
S.U.
Copper
m l
Aluminum
m l
Lead
MgA
Zinc
m l
Benchmark
-
-
100
30
6.0 - 9.0
0.007
0.75
0.03
0.067
001
02/05/10
1.45"
95
8.9
8.14
0.456
0.745
0.007
( 0.198
001
09/02/10
0.81"
30.6
7.8
7.99
0.106
0.309
< 0.005
4.010
001
Q3/06111
1.02"
23.3
< 5.0
7.62
0.068
0.829
< 0.005
0.051
001
09/23/11
1.14"
26.3
< 5.0
7.06
0.112
0.446
< 0.005
0.028
001
03/24112
0.14"
14.2
< 5.0
7.63
0.0211
0.415
< 0.005
0.027
001
0911 /12
0.27"
22.4
< 5.0
7.22
0.0602 '
0.665
< 0.005
0.0287
001
11/18/12
0.39"
7.76
< 0.250
001
12/12/12
0.94"
103
< 5.0
7.57
0.0869
0.859
< 0.005
0.0498
001
01/25/13
0.14"
1
7.89
0,0651'
Permit: NCG190003
SOC:
County: Carteret
Region: Wilmington
Compliance Inspection Report
Effective: 10/01/09 Expiration: 09/30/14
Effective: Expiration:
Contact Person: Kenneth Bock
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Title:
Inspection Date: 04/07/2011 Entry Time: 01:45 PM
Primary Inspector: Dean A Hunkele
Secondary Inspector(s):
Certification:
Owner: Bock Marine Builders Inc
Facility: Bock Marine - Core Creek/Beaufort
233 Core Creek Rd
Beaufort NC 28516
Phone: 252-728-6855
Exit Time: 02:00 PM
Phone:
Phone: 910-796-7215
Reason for Inspection: Other Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
L-
Permit: NCGt90003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 04/07/2011 Inspection Type: Compliance Evaluation Reason for Visit: Other
Inspection Summary:
Drive -by Recon of facility while in the area.
Observed approx. 20-30 boats throughout the site in various degrees of having bottom hull work. No tarps beneath any of
them - most active ones (i.e. someone present) appeared to be individual owners rather than Bock employees. Visible
greenish -blue and reddish -brown fines on ground underneath most of them. Observed greenish -blue staining on boat
ramp where boats are probably powerwashed as removed from water.
No further action taken by inspector.
Page: 2
Permit: NCG190003
SOC:
County: Carteret
Region: Wilmington
Compliance Inspection Report
Effective: 10/01/09 Expiration: 09/30/14
Effective: Expiration:
Contact Person: Kenneth Bock
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/05/2010
Primary Inspector: Linda Willis
Secondary Inspector(s):
Title:
EntryTime: 10:00 AM
Certification:
Owner: Bock Marine Builders Inc
Facility: Bock Marine - Core Creek/Beaufort
233 Core Creek Rd
Beaufort NC 28516
Phone: 252-728-6855
Exit Time: 11:00 AM
Phone:
Phone: 910-796-7396
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: ■ Compliant rl Not Compliant
Question Areas:
■ storm Water
(See attachment summary)
Page: 1
Permit: NOG190003 Owner - Facility: Back Marine Builders Inc
Inspection Date: 01/05/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
SWP3 is excellent.
Please ensure the employees are trained once per year on the SWP3 and documented.
It is apparent the facility follows the SWP3 and has implemented measures to control any release of pressure
washing/boat refurbishing wastewater. The site is utilizing recycling of wastewater and purges the system to the septic
tank to avoid any surface water discharge. Currently, this is the best practicable technology available to this marina.
Excellent compliance with analytical monitoring requirements.
Page: 2
Permit: NCG190003 Owner -Facility: Bock Marine Builders Inc
Inspection Date: 01/05/2010 Inspection Type: Compliance Evaluation
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Goad Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Reason for Visit: Routine
Yes No NA NE
■000
■000
■0DEl
■ 0 Cl D
■❑❑n
■00D
■nnn
■nnp
■ 0 0 0
■nnn
■nnn
■'D0D
■❑❑n
■nnn
■n❑n
Yes No NA NE
■nnn
Yes No NA NE
■npn
■❑00
Yes No NA NE
Page: 3
_V_ i
Permit: NCG190003
SOC:
County: Carteret
Region: Wilmington
Compliance Inspection Report
Effective: 10/01/09 Expiation: 09/30/14 Owner: Bock Marine Builders Inc
Effective: Expiration: Facility: Bock Marine - Core Creek/Beaufort
233 Core Creek Rd
Contact Person: Kenneth Bock
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/0512010
Primary Inspector: Linda Willis
Secondary Inspector(s):
Title:
Entry Time: 10:00 AM
Beaufort NC 28516
Phone: 252-728-6855
Certification:
Exit Time: 11:00 AM
Phone:
Phone: 910-796-7396
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: 0 Compliant ❑ Not Compliant
Question Areas:
0 Storm Water
(See attachment summary) .
Page: 1
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 0110512010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
SWP3 is excellent.
Please ensure the employees are trained once per year on the SWP3 and documented.
It is apparent the facility follows the SWP3 and has implemented measures to control any release of pressure
washing/boat refurbishing wastewater. The site is utilizing recycling of wastewater and purges the system to the septic
tank to avoid any surface water discharge. Currently, this is the best practicable technology available to this marina.
Excellent compliance with analytical monitoring requirements.
Page: 2
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 01/05/2010 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
■
❑
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
Cl
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the facility provide all necessary secondary containment?
■
❑
❑
❑
# Does the Plan include a BMP summary?
■
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
❑
❑
❑
# Does the facility provide and document Employee Training?
■
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
■
❑
❑
❑
# Is the Plan reviewed and updated annually?
■
❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
■
❑
❑
❑
Has the Stormwater Pollution Prevention Plan been implemented?
■
❑
❑
❑
Comment:
Qualitative Monitorin
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
■
❑
❑
❑
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
■
❑
❑
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
■
❑
❑
❑
Comment:
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
❑
❑
❑
# Were all outfalls observed during the inspection?
■
❑
❑
❑
# If the facility has representative outfall status, is it properly documented by the Division?
■
❑
❑
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
■
❑
❑
❑
Comment:
Page: 3
North Carolina
Beverly Eaves Perdue, Governor
Kenneth Bock
233 Core Creek Road
Beaufort, NC 28516
Dear Mr. Bock,
PIWA
A�4 YAF
aj .
NCDENR
Department of Environment and
February 10, 2010
Natural Resources
Subject: NPDES Compliance Evaluation Inspection
NPDES Permit COC NCG 190003
Carteret County
Dee Freeman, Secretary
A compliance evaluation inspection of the Bock Marine facility was conducted on January 5, 2010. This inspection was to verify
that the facilities are operating in compliance with the requirements specified in the NPDES General Permit NCG190000. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entifled "Compliance
Inspection Report".
There were no issues of concern found at the site. Good housekeeping and best management practices are being exercised. Should
you Rave any questions concerning this correspondence or the enclosed inspection report, please contact me at 910-796-7343.
Sincerely,
Linda Willis
Wilmington Regional Office
Division of Water Quality
Surface Water Protection Section
CC: WiRO NPDES NCG 190 Carteret
CO DWQ files
1601 Mail Serri:ae Center, Raleigh, North Carolina 276119-160'1
Phone: 9,19-7334984 I FA/X- 9'19-7'15-3060'k 1rlternat: www.enr.state.tic, us/EN M
North Carolina
Aahzrally
An E,Iual 0^tsodi inity l AfFm1aiivP Aden Enplover . % % Recycled 41 0 % Po-,t Ccnsnme� P-1per
Compliance Inspection Report
Permit: NCG190003 Effective: 10/01/09 Expiration: 09/30/14 Owner: Bock Marine Builders Inc
SOC: Effective: Expiration: Facility: Bock Marine - Core Creek/Beaufort
County: Carteret 233 Core Creek Rd
Region: Wilmington
Beaufort NC 28516
Contact Person: Kenneth Bock Title: Phone: 252-728-6855
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/05/2010 Entry Time: 10:00 AM Exit Time: 11:00 AM
Primary Inspector: Linda Willis O{,a Phone: 910-796-7396
Secondary Inspector(s): i
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: ® Compliant ❑ Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
fi
of
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 01/05/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
SWP3 is excellent.
Please ensure the employees are trained once per year on the SWP3 and documented.
It is apparent the facilityfollows the SWP3 and has implemented measures to control any release of pressure
washing/boat refurbishing wastewater. The site is utilizing recycling of wastewater and purges the system to the septic
tank to avoid any surface water discharge. Currently, this is the best practicable technology available to this marina.
Excellent compliance with analytical monitoring requirements.
Page: 2
Permit: NCG190003 Owner - Facility: Bock Marine Builders Inc
Inspection Date: 0110512010 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General location (USGS) map?
■
❑
Cl
❑
# Does the Plan include a "Narrative Description of Practices"?
®
❑
Cl
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
®❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the facility provide all necessary secondary containment?
■
n
n
n
# Does the Plan include a BMP summary?
®
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
Cl
❑
n
# Does the Plan include a Preventative Maintenance and Goad Housekeeping Plan?
■
Cl
❑
❑
# Does the facility provide and document Employee Training?
®❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
®❑
❑
❑
# Is the Plan reviewed and updated annually?
®❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
■
n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑
❑
0
Comment:
Qualitative MonitOfln
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®❑
❑
❑
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
■
❑
❑
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
®❑
❑
0
Comment:
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
®n
n
❑
# Were all outfalls observed during the inspection?
®❑
❑
fl
# If the facility has representative outfall status, is it properly documented by the Division?
®Q
Q
# Has the facility evaluated all illicit (non stormwater) discharges?
®
❑
07
❑
Comment:
Page: 3
ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
October 20, 2009
Kenny Bock
Bock Marine Builders Inc
233 Core Creek Rd
Beaufort, NC 28516
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Bock Marine Builders Incorporated
COC Number NCG190003
Carteret County
Dear Permittee:
In response to your renewal application for continued coverage under stormwater General Permit NCG190000 the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit. This permit is reissued pursuant to the
requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North
Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.)
The following information is included with your permit package:
• A new Certificate of Coverage
• A copy of Stormwater General Permit NCG190000
• A copy of a Technical Bulletin for the General Permit
• Five copies of the Discharge Monitoring Report (DMR) Form
• Five copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater only, and it specifies your obligations with respect to Stormwater
discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the
changes in the reissued permit.
The more significant changes in the General Permit since your last Certificate of Coverage include the following:
• Permit cover page — Coverage is expanded to include industrial activities similar to the categorically identified industries.
• Part I Section A — This part explains that the No Exposure Exclusion from permitting option may be available to the permittee.
• Part II Section A — Several minor expansions and clarifications of the required content of the Stormwater Pollution Prevention
Plan have been added. Also, there is an added requirement for a Solvent Management Plan. Please be sure that your plan is
updated to comply with the new requirements.
• Part II Section B - Revised provisions require that stormwater discharges be sampled twice per year, and that the sampling
results be compared to new numerical benchmark values. (The previous cutoff concentrations have been eliminated.)
• Part II Section B — Monitoring for some metals has been added to the analytical monitoring requirements.
• Part 11 Section B — Beginning with monitoring in Year 3-Period 1, revised provisions require the permittee to execute Tier One
and Tier Two response actions, based on the first benchmark exceedence (Tier One) and the second consecutive benchmark
exceedence (Tier Two). Tier Two requires that the permittee institute monthly monitoring instead of twice -per -year monitoring,
until three consecutive monitoring events show no benchmark exceedences.
• Part II Section B — Beginning with monitoring in Year 3-Period 1, this part contains a new provision that four exceedences of
any particular benchmark will trigger increased DWQ involvement in the permittee's stormwater management and control
actions. DWQ may direct the permittee to apply for an individual permit, or may direct the implementation or installation of
specific stormwater control measures.
• Part 11 Section C — Qualitative monitoring must now be conducted during a representative storm event.
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisf ury St. Raleigh, North Carolina 27604
Phone: 919-807-6300 l FAX: 919-807-64941 Customer Service; 1.877-623-6748
Internet: www.newaterquality.org
An Equal Opportunity i Air rmaiive kton Employer
ACarolina
afral&
NPDES Storm water Permit Coverage Renewal
Permit Number NCG 190003
October 20, 2009
Page 2
• Part 11 Section C — The permittee is required to keep a written record of his response to problems identified by his qualitative
monitoring observations.
• Part III Section E — Items 1. and 2. require submittal of a new reporting form, the Annual Summary DMR. This annual
summary of only the analytical monitoring results should be submitted to the local DWQ Regional Office, The Annual
Summary DMR reporting form will be posted on the Stormwater Permitting Unit's website in the near future.
Your coverage under the General Permit is transferable only through the specific action of DWQ.
This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the
permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order,
judgment, or decree.
If you have any questions regarding this permit package please contact Robert Patterson of the DWQ Stormwater Permitting Unit
at (919) 807-6375.
Sincerely,
fai' Coleen H. Sullins
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG190000
CERTIFICATE OF COVERAGE No. NCG190003
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards
and regulations promulgated and adopted by the North Carolina Environmental Management
Commission, and the Federal Water Pollution Control Act, as amended,
Bock Marine Builders Inc
is hereby authorized to discharge stormwater from a facility located at
Bock Marine Builders Incorporated
233 Core Creek Rd
Beaufort
Carteret County
to receiving waters designated as the Intracoastal Waterway, a class SA waterbody in the White Oak
River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions
set forth in Parts I, 11, ill, IV, V, and VI of General Permit No. NCG190000 as attached.
This certificate of coverage shall become effective October 20, 2009.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 201h day of October, 2009.
for Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
Kerr T. Stevens, Director
August 27, 1999
KENNY BOCK
BOCK MARINE BUILDER. INC.
233 CORE CREEK RD
BEAUFORT, NC 28516
1 � •
own%-% - -
�x
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL REsouRCEs
Subject: Reissue - NPDES Stormwater Permit
Bock Marine Builder, Inc.
COC Number NCG 190003
Carteret County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG190000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A copy of general stormwater permit NCG190000
* A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to
certify that you have developed and implemented the SPPP as per the conditions of the permit. This form
must be completed and returned to the Division within 30 days of receipt of this letter.
DO NOT SEND the SPPP with the signed form.
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin on the Stormwater program which outlines program components and
addresses frequently asked questions
* A corrected Certificate of Coverage if you indicated a name change on the Renewal Application
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law rule, standard, ordinance, order, judgment, or
decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater
and General Permits Unit at (919) 733-5083, ext. 578
Sincerely,
for Kerr T. Stevens
Director, Division of Water Quality
cc: Central Files
Wilmington Regional Office
1617 Mail Service Center, Raleigh, north Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
1
r �
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG190000
CERTIFICATE OF COVERAGE No. NCG190003
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
BOCK MARINE BUILDER, INC.
is hereby authorized to discharge stormwater from a facility located at
BOCK MARINE BUILDER. INC.,
233 CORE CREEK RD
BEAUFORT
CARTERET COUNTY
to receiving waters designated as the Intracoastal Waterway in the White Oak River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, II1,
IV, V. and VI of General Permit No. NCG190000 as attached.
This certificate of coverage shall become effective August 27, 1999.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day August 27. 1999.
b")4,Z4-y
for Kerr T_ Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
r; -
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
June 23, 1995
Carol Bock
Bock Marine Builders Inc
233 Core Creek Rd
Beaufort, NC 28516
Subject: General Permit No. NCG190000
Bock Marine Builders Inc
COC NCG 190003
Carteret County
Dear Carol Bock:
In accordance with your application for discharge permit received on March 21, 1995, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and
the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management. The Division of Environmental Management may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal
Area Management Act or any other Federal or Local governmental permit that may be required.
If you have any question concerning this permit, please contact MS. AISHA LAU at telephone number
919r733-5083.
Sincerely, original Signed BY
Coleen H. Sullins
A. Preston Howard, Jr. P.E.
cc: Wilmington Regional Office
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Empbyer 50% recycled/ 10% post- onsumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
GENERAL PERMIT NO. NCG190000
CERTIFICATE OF COVERAGE No. NCG190003
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Bock Marine Builders, Inc.
is hereby authorized to discharge stormwater from a facility located at
Bock Marine Builders, Inc.
233 Core Creek Rd.
Beaufort
Carteret County
to receiving waters designated as the Intracoastal Waterway in the White Oak River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I,1I, III
and IV of General Permit No. NCG190000 as attached.
This Certificate of Coverage shall become effective June 23, 1995.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day June 23, 1995.
r;rigitlal Signed By
Coleen H. Sullins
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
It
trio
IF
IN
Al
I it
it
fit
it
It
x t7
IL
it Ip
lfIt
I
11 j
It
It
it
ki 15
it
Core
. .... 1161
i.
ROA P
5
Barg Landing
14
1159
0
5
-
I.M
-
_
63
13
ht
9
C:),c
101
FACILITY Bock Marine Builders, Inc.
COUNTY Carteret
NPDES NCG190003
MAP# H32SW
DSN FLOW NA
SUB BASIN 03-05-03
LATTITUDE 3 49' 47"
LONGITUDE 760 41' 24"
RECEIVING STREAM Intracoastal Waterway
STREAM CLASS SA
DISCHARGE CLASS ' Stormwater
EXPIRATION DATE 8/31/99
Outlets Number
Total
011 d
Cerww Certl%id Laboratory (Enter Only 1
Date Sample Total Ralrrfan
Suspended
Grease Copper
Aluminum 27nc Load
Tlmestamp COCNuRlber
Laboratory#1
#2 - OulfallFlana)_
Collected ^Qnches}-
SoOds(mpll)—pH_,_(maA)_
_-(mgll}�
T(TO)_IGounty
Facility Name
�RegionalOfCce
Notes
Bock Marine
'
NGG190003
67 -
5054
2J512010' 1.45
95
_
8.14 8.9
4,45
0.745 0.007.Carierat
Builders
.Incorporated
Wilmington
r
-_7_-
�" --_ _
- - -
-
—
Bock Manna
1016=10j
Builders
12:38:21�ncg190003
-
...-. 67_
-- 54t _,i_,�.,_-91212010y
- . --- -
- -- �.81
_30.6
---- -
7.99� 7.8
- -
0.1
0.309'<A1 <.005 Carteret
- --'-
'Incorporated
�Wilminglon
10f712011 6-- --- r
-
-
^ �{
07:09 NCG_190003
67
5054 7
3f61201i 1.02
23.3,
7,62'<5
0.088
<.005
6112Ml2,-- .-�_--A-._._.._...-..---r------
-
_._
- - - -
-_.
10:30:42'NCG190003
671
5054 1.
3124=12 0,14
14,2
TO 45
0,021
0.415 0.027 <0.005
1018/2012'
r -
15:58:00, NCG190003_
- _ _ _ -� 67,' - _-
_T_ _ _�5054+_ _ _ _ ._ , . 1
9119/2012 _ _ _0,2.7.
_ - _ rv22.4' _
7.2_2; <5_.0 _
_ _ _ _ 0_,665_ _ 0.0287e0_00.5