Loading...
HomeMy WebLinkAboutNCG170409_COMPLETE FILE - HISTORICAL_20110210STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. �v � r 76 yD 1 DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of water duality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary 10 February 2011 Mr. BB McGuire Parkdale America Plant 26 1660 US HWY 311 North Walnut Cove, NC 27052 Subject: Compliance Evaluation Inspection NPDES General Stormwater Permit NCG170000 Certificate of Coverage NCG170409 Parkdale America Plant 26 Dear Mr. McGuire: . Mike Thomas of the Winston-Salem Regional Office of the NC Division of Water Quality (DWQ) conducted a compliance evaluation inspection (CEI) at the subject facility on 8 February 2011. The assistance and cooperation of Mr. Pete Hill during the inspection was greatly appreciated. An inspection checklist is attached for your records and the inspection findings are summarized below. The facility is located at 1660 US HWY 311 North, in Walnut Cove, Stokes County, North Carolina. Stormwater related to industrial activity is discharged to an unnamed tributary to the Dan River, which is currently classified as class WS-V waters in the Roanoke River Basin. Documentation and Monitoring Review The Stormwater Pollution Prevention Plan (SP3) is complete and well implemented. Training sessions are conducted annually to keep staff informed and up to date. Records for Qualitative Analysis were available and appeared to be complete. Routine maintenance and daily site inspections were also recorded .and made available for inspection. Analytical Monitoring is not required under NCG170000. Site Review The facility was clean and well maintained at the time of inspection. Outfalls were easily accessible and well maintained. A layer of sediment was present in the discharge pipe at the time of inspection. The sediment appeared to be coming from the drop inlet located near the North Carolina Division of water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 1��One Phone: 336-771.50001 FAX 336-771�46301 Customer Service: 1-877-623-6748 1 v O hCarolina Internet: www.ncwaterquality.org Naturally An Equal opportunity 1 Affirmative Action Employer Mr. BB McGuire Parkdaie America Plant 26 Compliance Evaluation Inspection, NCG1704093 2/10/2011 Page 2 of 2 truck unloading area. This area should have the dirt and gravel removed from around the stormwater inlet to prevent further accumulation downstream. We greatly appreciate your and Mr. Hill's efforts to develop and implement an effective stormwater pollution and prevention plan. Please continue your efforts to help safeguard the waters of our State. Should you have any questions, please feel free to contact Mr. Thomas or me at (336)-771-5000. Sincerely, ` W. Corey Basinger Interim Regional Supervisor Surface Water Protection Winston-Salem Region Attachments: 1. BIMS Inspection Checklist cc: SWP — WSRO Central Files Stormwater Permitting Unit Permit: NCG170409 SOC: County: Stokes Region: Winston-Salem Compliance Inspection Report Effective: 08/01/09 Expiration: 07/31/14 Owner: Parkdale Mills Effective: Expiration: Facility: Parkdale America Plant 26 1660 US 311 Hwy Morth Contact Person: Jay Hackney Title: Directions to Facility: Located one mile north of the Highway 311/89 split. System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02f0812011 Entry Time: 08:30 AM Primary Inspector: Michael S Thomas Secondary Inspector(s): Walnut Cove NC 27052 Phone: 704-874-5100 Certification: Exit Time: 09:30 AM Phone: Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG170409 Owner - Facility: Parkdale Mills Inspection Date: 0210812011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NCG170409 Owner -Facility: Parkdale Mills Inspection Date: 02/0812011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n n ■ n # Has the facility evaluated feasible alternatives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ■ n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee gaining? ■ n n n # Does the Plan include a list of Responsible Party(s)? ■ Cl n n # Is the Plan reviewed and updated annually? ■ n n n # Does the Plan include a Stormwater Facility Inspection'Program? ■ n n n Has the Stormwater Poliution Prevention Plan been implemented? n n n n Comment: Parkdale staff conducts stormwater evaluations twice a year. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n n Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ❑ ■ n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ■ n Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ n n fl # Were all outfalls observed during the inspection? ■ n n n # If the facility has representative outfall status, is it properly documented by the Division? n ❑ ■ n # Has the facility evaluated all illicit (non stormwater) discharges? ■ n 0 n Comment: Page: 3 d ,V ti wArE ,�Qc'O - 9p6 Cam'" 0 � RECEIVED N.C. Dept. of ENR JAN 1 0 200a Winston-Salem Reniona1 Office '9'46'al Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources January 4, 2008 &tr Parkdale Mills P O Box 1787 Gastonia, North Carolina 28053 Dear Sirs: Coleen H. Sullins, Director Division of Water Quality � - At g6 v /-/wj 31, A)o—A iJr'�a✓r �oe� A.),C Subject: General Permit No. NCG 170000 �,� S� /� 4`6 V Y Parkdale Mills Plant #26 COC No. NCG170409 Stokes County In accordance with your application for a discharge permit received on October 8, 2007, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended). If any parts, measurement frequencies, or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. PIease take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Bill Diuguid at telephone number (919) 733-5083 ext. 382. Sin trrelyAL ,:SIGNED Sy BRADLEY SEMNETT Coleen H. Sullins, Director Division of Water Quality CC' Winston-Salem Regional Office Central Files Stor nwater Permitting Unit Files Attachments None Carolina Aturally North Carolina Division or Water Quality 1617 Mail service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service Internet: www.newatemualitv.or� location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG170000 CERTIFICATE OF COVERAGE No. NCG170409 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Parkdale Mills is hereby authorized to discharge stormwater from a facility located at Parkdale Mills Plant 26 1660 US 311 Hwy North Walnut Cove Stokes County to receiving waters designated as UT to Dan River, a Class WS-V, Roanoke River Basin; in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, 111, IV, V and VI of General Permit No. NCG 170000, as attached. This Certificate of Coverage shall become effective January 4, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day January 4, 2008. ORIGINAL SSIGNED 13Y BRADLEY BENNETT Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Y.. N t3t A X Parkdale Mills Plant 26 U VIA f 37 110 cry stPifs �, .4.1- . I t� VI U-7j. Latitude: 36019'05" NCG170409 Facility Longitude: W06'48" County: Stokes Parkdale Mills Location Stream Class: WS-V Plant No. 26 .Receiving Stream: UT to Dan River Sub -basin: 03-02-01 (Roanoke River Basin) NOTICAUID 9.m I __r�ff m I Permit: NCG170409 SOC: County: Stakes Region: Winston-Salem Compliance Inspection Report Effective: 01/07/08 Expiration: 10/31/12 Owner: Parkdale Mills Effective: Expiration: Facility: Parkdale America Plant 26 1660 US 311 Hwy Morth Contact Person: Jay Hackney Title: Directions to Facility: Located one mile north of the Highway 311189 split. System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative[s): 0 M,41jr,, Related Permits: I �6 � �'` ^ems` Pf� �'^1-Aj -r2 Walnut Cove NC 27052 Phone: 7-94-874-5460 336 6-9)-4VY Phone: Inspection Date: 01/15/2008 Entry Time: 08:55 AM Exit Time: 09:35 AM Primary Inspector: David C Russell Phone: 336-771-5000 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: e Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NGG170409 Owner - Facility: Parkdale Mills Inspection Date: 01/15/2008 inspection Type: compliance Evaluation Inspection Summary: Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Reason for Visit: Routine Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Permit was issued January 2008. Monitoring was performed in January 2008 on 3 outfalls. No vehicle maintenance on site. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Met with Mr. Pete Hill, Maintenance Supervisor; Mr. Jay Hackney, Plt. Mgr. and Mr. Todd Ingram, Asst. Plt. Mgr. Facility address: Parkdale America, LLC-Plant 26, 1660 US Hwy 311 North, Walnut Cove, NC 27052. 336 591-4644 Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ n ❑ n ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ n ❑ ■ ❑ ❑ ❑ ■ ❑ ■❑❑n nn■n ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑n■n 0n❑n Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE ■nnn ■nnn n ❑ ■ ❑ nn■n Page: 2 i a J Compliance Inspection Report Permit: NCG170409 Effective: 08/01/09 Expiration: 07/31/14 Owner: Parkdale Mills SOC: Effective: Expiration: Facility: Parkdale America Plant 26 County: Stokes 1660 US 311 Hwy Morth Region: Winston-Salem Contact Person:�/,Title: /� Directions to Facility: rzz 46-'q' Located one mile north of the Highway 311189 split. System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 0210812011 Entry Time: 08:30 AM Primary Inspector: Michael S. Thomas Secondary Inspector(s): Walnut Cove NC 27052 Phone: 704-874-5100 Certification: Exit Time: 09:30 AM Phone: Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NGG170409 Owner- Facility: Parkdale Mills Inspection Date: 02/0&2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NCG170409 owner -Facility: Parkdale Mills Inspection Date: 02108/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? '�o n n # Does the Plan include a General Location (USGS) map? �PQn n n # Does the Plan include a "Narrative Description of Practices"? ran n n # Does the Plan include a detailed site map including outfall locations and drainage areas? 7fo ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? �n� n +�t,l�l n # Has the facility evaluated feasible alternatives to current practices? q'n Q # Does the facility provide all necessary secondary containment? -9(0 ❑ n # Does the Plan include a BMP summary? n ❑ n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n # Does the facility provide and document Employee Training? n In n # Does the Plan include a 4ist of Responsible Party(s)? n ❑ n # Is the Plan reviewed and updated annually? In n n # Does the Plan include a Stormwater Facility Inspection Program? n ❑ Q Has the Stormwater Pollution Prevention Plan been implemented? n Q n Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually7 n n n Comment: Analytical Monitorin Yes No NA NE Has the facility conducted its Analytical monitoring? n n XI n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n nn Comment: Permit and Outfails Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 00 n n # Were all outfalls observed during the inspection? PC] n n # If the facility has representative outfall status, is it properly documented by the Division? n ❑ n n n n # Has the facility evaluated ail illicit (non stormwater) discharges? Comment: z)e_ y� Page: 3 North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secreta ry Industrial Compliance Inspection Worksheet Permit#: fo 9, .= ----County: _Compliant:. Y Facility Name: Contact Name & Title:x4F Date of Inspection: //� Time in: 9-'5-0 Time out: Who is present for the inspection?. lwlz /YA�sryF�Jl�,fG�i 4� -7-&YI4 Gw= , Watershed: Are all potentially pollutant materials stored inside or under cover and protected from stormwater runoff? Does this site perform onsite vehicle maintenance? *6 If.so, is'more than 55 Gal used per month? If so, has analytical monitoring being performed? Has this site developed a SPPP? ytEl' Is the SPPP updated annually? �$'T Does the SPPP contain an updated copy of the permit? y Does SPPP contain a siteplan showing contours, location of all outfalls, all streams and natural features, all structures on the site, roads, etc? y9:'r Note any discrepancy with permit requirements: a/ Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, -North Carolina 27699-1612,•.919-707-9200/ FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North'Carofina 27604 • Internet: http://pa rtal.ncdenr.org/web/Ir/ An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper All parts of the permit should be contained in one 3-ring binder, including permit, siteplan, qualitative and analytical monitoring records, operating procedures, employee training documentation, a record of ali spills and method of containment and corrective action. Is site compliant? Note any discrepancies: /ijAstifdF y�tSs GoT-To„� f a4�d GCOPM /001j. ' eoT�aa rT�l Trvx. mr WOLA • 1 64 V CLAW-) /GAiG�t„/-7� I, ors i� Der.. � GtJ 77. Self Monitoring: Qualitative Monitoring maintained per permit requirements? Note any discrepancies found:. `fG'S / .U.49a : fi?r4-1-7€ Is Analytical Monitoring required?J)Z#,4-- 4s monitoring being performed as required? Is pH reading taken at time of sample collection? I ` . Is pH meter calibrated regularly?., .Vofe any discrepancies in monitoring results: • - . 4 - II'- /C!o Are all records maintain for minimum of 5 years? Outfalls: Were all outfalls observed during the inspection? Does site have representative outfall status? Were all outfalls clear of debris and easily reached for inspection? Note any discrepancies found: _/ �)�y[S L1xz- ku4-uFly f`va1 a1ay , IaaAc d 607 SR-r fl Yl E- Vd2gnrr I Ta �e man -F