HomeMy WebLinkAboutNCG170068_COMPLETE FILE - HISTORICAL_20180924STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO. IV CCU (% 00 U S
DOC TYPE PK HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE ❑ 301 � DR �4
YYYYMMDD
,STATE.,
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR.
Interim Director
Milliken & Company
Attention: Adam Davis
Post Office Box 637
Columbus, North Carolina 28722
NORTH CAROLINA
Environmental Quality
September 24, 2018
Subject: Compliance Evaluation Inspection
Permit: NCG170068
Polk County, North Carolina
Dear Mr. Davis:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on September 12, 2018.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reedgncdenr.gov.
Since ,
r"
saiah Re PSCI, MS4 , ECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. H!ghway 70 1 Swannanoa, North Carolina 28778
828.296.4500
Compliance Inspection Repo
Permit: NCG170068
SOC:
County: Polk
Region: Asheville
Contact Person: Adam Davis
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Effective: 10/02/14 Expiration: 07/31/19 Owner : Milliken & Company
Effective: Expiration: Facility: Milliken and Co -Hatch Plant
960 E NC Hwy 108
Inspection Date: 09/12/2018
Primary Inspector: Isaiah L Reed
Secondary Inspeclor(s):
Title:
EntryTime: 11:30AM
Certification:
Columbus NC 28722
Phone: 828-894-7249
Phone:
Exit Time: 12:30PM
Phone: 828-2964614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Textile Mill Products Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
® Storm water
(See attachment summary)
Page: 1
Permit: NGG170068 Owner - Facility: Milliken & Company
Inspection Date: 09l122018 Inspection Type; Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
on September 12, 2018 this facility was inspected for compliance. I met with Adam Davis on site. No issues were observed
during the inspection. It was discussed that the fire prevention pond in front of the facility is pumped out periodically. As long
as the release of that water does not result in the discharge of pollutants gathered in the basin, the only other concern which
requires monitoring, is erosion at the outlet.
If you have any questions, please contact this office at (828) 296-4614
Page: 2
Permit: NCG170066 Owner - Facility: Milliken & Company
Inspection Date: 0911212018 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
® ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
[M ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
EN ❑ ❑ ❑
# Does the Plan include a detailed site map including outfali locations and drainage areas?
® ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
® ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑
# Does the Plan include a BMP summary?
® ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
® ❑ ❑ ❑
# Does the facility provide and document Employee Training?
EM ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
®❑ ❑ ❑
# Is the Plan reviewed and updated annually?
® ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
® ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
go ❑ ❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? Is ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ® ❑ ❑ ❑
Comment:
Page: 3
Permit: NCG170068
SOC:
County: Polk
Region- Asheville
Contact Person: Adam Davis
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 10/02/14 Expiration: 07/31/19 owner: Milliken & Company
Effective: Expiration: Facility: Milliken and Co -Hatch Plant
960 E NC Hwy 108
Columbus NC 28722
Title: Phone: 828-894-7249
Inspection Date: 09/1212018
Primary Inspector: Isaiah L Reed
Secondary inspector(s):
Certification: Phone:
EntryTime: 11:30AM Exit Time: 12:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit inspection Type: Textile Mill Products Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
E Storm water
(See attachment summary)
Page:
Permit: NGG170068 Owner- Facility: Milliken & Company
Inspection Date: 0911212018 inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On September 12, 2618 this facility was inspected for compliance. I met with Adam Davison site. No issues were observed
during the inspection. It was discussed that the fire prevention pond in front of the facility is pumped out periodically. As long
as the release of that water does not result in the discharge of pollutants gathered in the basin, the only other concern which
requires monitoring, is erosion at the outlet.
If you have any questions, please contact this office at (828) 296-4614
Page: 2
L1
Permit: NCG170068 Owner - Facility: Milliken & Company
Inspection Date: 0911212018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
® ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
® ❑ ❑ 0
# ❑oes the Plan include a `Narrative Description of Practices"?
® ❑ ❑ ❑
# Does the Plan Include a detailed site map including outfall locations and drainage areas?
® ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
® ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
■ ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
O ❑ ❑ ❑
# Does the Plan include a BMP summary?
® ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
® ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
® ❑ ❑ ❑
# Does the facility provide and document Employee Training?
E ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
® ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
® ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
E ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
■ ❑ ❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑
Comment:
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? N ❑ ❑ ❑
# if the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? N ❑ ❑ ❑
Comment:
Page: 3
VENDOR NO. 4007630
MILLIKtN at ,
FOR THFACWUNTVinDDIREssALL coartE"DENC=_
To P.O. rOX 1838 SPARTANBURG. S.C. 29304
INVOICE
NUMBER
INVOICE
DATE
INVOICE
AMOUNT
T ADJUSTMENT
X
DISCOUNT
MILLIKEN & COMPANY
Annual Permit Fee
2015PROO692B
OW06115
100.00
10
0.00
r
r
',✓fv� �.� i�'ti:.'-C�7i
l4i:i,�{s�.l
t p...
:E 4 f fi c" � g
� u
AL�ivnD, iI i
23 -oo
0 2015
�7
_gyp i
�i :JAUE�
t F�.i'::a ') a
07 �22- 15
NET AMOUNT $100.00
------------.
..• ..
.
MILLIKEN & COMPANY
UL
Citibank N.A.
,
c1rsCK —nio'.
Wuuzzvl'�-
PHONE (864) 503-1592
A sebsmkwy of Cjbwp
1141126
P.O. BOX 1838 M-235
One Penn's Way
SPARTANBURG, S.C. 29304-1838
RewCas>!e. of t9T20
299 ..62_-20
DATE
31i
—
`
0712415
******'
-----, AMOUNT
EXACTLY
QQ
DOLLARS 00 CENTS
$100.00
PAY TO
THE ORDER OF NCDENR DIVISION'OF WATER QUALITY MILLIKEN & COMPANY
1617 MAIL SERVICE CENTER Paying Agent
RALEIGH , NC 27699
llw
(Return This Portion With Check)
' 1111111IIL'1 Jill[ Ilill1111111IIIII III Hill 11111 IIIII11111111111111III
* 2 0 1 5 P R 0 0 6 9 2 8
ANNUAL PERMIT INVOICE
Open
Invoice Number: 201SPR006928 ual Fee Period: 2015-08-01 to 2016-07-31
r
Permit Number: NCG170099
Rutherford County s �123 ;.. . - vice Date: 71$12015
Milliken & Co -Golden Valley Due Date: B1712015
Annual Fee: 5100.00
Robert G. Gallen
C �,
RrE E t'r,
Milliken and Co
t
2080 NC Hwy 22fiG�
r} U �a �� Check Number_:
Bostic, NC 28018
C V U
0
r
STORPAV ^,TER IDERMiTTI G
9iL�11
MILLIKEN
®
December 11, 2012
Point Source Branch
Surface Water Protection Section
Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
RE: Delegation of Signatory Authority
Storm Water Permit
Permit Number NCG170000
Hatch Plant
Columbus, NC
To Whom It May Concern:
In accordance with Part III, Section B, Item 5 of the referenced permit and as a
Responsible Corporate Officer of Milliken and Company, as defined in said Part, I
hereby delegate to the,Hatch Location Manager in charge of facility operations, signatory
authority for all notices, plans, reports, certifications, or other information required by or
in connection with the referenced permit
If you have any questions or need anything further to finalize this matter, please contact
me at (864) 716-7188. Thank you.
Sincerely,
4� P sj� � �-
Bill Skinner
Manufacturing Manager
cc:
Asheville Regional Office, Surface Water Protection "
Technical Assistance and Certification Unit
Milliken & Company
PO Box 637 Hwy 108
Columbus, NC 28722
Bus: (828) 894-8222 Fax: (828) 894-7252
- yt�.i.+r�e. �•3-"�' a7•'•-r,•�a�`-,>.r,c.r:T'rF 4;
•-
IFF
�1
t4o�m^fa �e2',. } �r�- rr - .__ ' ` '` - � -`*�. --ti-+. � --� �� `�[yY,;,'++.�• -
re2'
Chocolate Drop Mountain ^-• _ ��-*-- ^� ^: w ;�" ,
er
SDo 1&2 r
W
f i * ��• j ti 1 nrk MILLIKEN m L
,.
005
•- ♦� s e a e s 1
S W 3 i •
` Coaluh%us �-
1583
i ♦ ti� -�* ` `s ;:yam w_ /7
`----.
Compliance Inspection Report
Permit: NCG170068 Effective: 08/01/09 Expiration: 07/31/14 Owner: Milliken and Co
SOC: Effective: Expiration: Facility: Milliken and Co -Hatch Plant
County: Polk 960 E NC Hwy 108
Region: Asheville
Columbus NC 28722
Contact Person: Adam Davis Title: Phone: 828-894-7249
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09/14/2010 Entry Time: 01:20 PM Exit Time: 02:15 PM
Primary Inspector: Linda S Wiggs Phone: 828-296-4500
Secondary Inspector(s): Ext.4653
Reason for Inspection: Follow-up Inspection Type: Stormwater
Permit Inspection Type: Textile Mill Products Stormwater Discharge COC
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
0 Storm water
(See attachment summary)
Page: i
Permit: NCG 170068 Owner - Facility: Milliken and Co
Inspection bate: 09/14/2010 Inspection Type: Stormwater Reason for Visit: Follow-up
Inspection Summary:
Follow up to observe improvements Milliken made to outfalls. Facility did a nice job repairing the SDO
ditchlines/ephemeral channels.
All petroleum product had been removed from outfall #4.
Dam was removed from stream and streambank were reformed and matted for stabilization. I told Adam Davis the matting
used should be removed next spring, once the streambank begins to stabilize with foliage. Matting used was plastic which
impinges amphibians and reptiles that live in the riparian area. I also told Mr.Davis he could use live stakes to speed the
stabilization of the streambanks.
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non Stormwater) discharges?
Comment: Outfall #4 petroleum product had been removed and remediated.
Outfall #1,2,3 erosion had been repaired. Channel was completely relined with riprap.
Dam had been removed from stream and streambanks had been reformed and matted
for stabilzation.
Yes No NA NE
❑ ❑ ❑ ■
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ❑ ■
Page: 2
11 It
E
•
MILLIKEN
r-- I
L APR 12 2010
I-
WATER QUALITY SECTION
P.SE-{r1. E .LE REGiOi !AL O=f=ICE
CERTIFIED NIAILIRETURN RECEIPT REQUESTED,
April 8, 2010
Ms. Linda Wiggs
Division of Water Quality
North Carolina Department of Environment
and Natural Resources
2090 U.S. Highway 70
Swannanoa, NC 28778
RE: Response to Compliance Inspection Report
Milliken & Company — Hatch Plant
Permit No.: NCG170068
Dear Ms. Wiggs:
M1 �
I,
Milliken & Company ("Milliken") has received and reviewed your Compliance Inspection Report
dated March 5, 2010 that we received on March 9, 2010. As requested, this letter is being submitted
within 45 days to describe our proposed remediation plans for the issues noted in the report.
1. Erosion at Stormwater Dischary
ge Outfalls #1-and #2
Rip rap will be placed at these outfalls to prevent additional erosion.
2. Erosion at Stormwater Dischar e Outfall #3
The length of the current ditch will be graded and then stabilized using erosion control fabric and
rip rap. The rip rap will also slow the velocity of the storm water as it travels down the hill,
making erosion less likely in the future.
3. Petroleum Product at Stormwater Discharge Outfall #4
Milliken has determined that the pipe identified as Outfall 94 in the facility storm water plan is
actually an abandoned steam condensate drain line that originates near the #6 fuel oil tanks. The
line has been out of service since 1996, when the use of fuel oil was discontinued. It is likely that
the petroleum product found in the vicinity of "Outfall #4" is fuel oil that leaked into the steam
lines used to heat the fuel oil when it was still in use. The oil was carried to the contaminated area
along with the stream condensate, where it solidified upon cooling. The berzned basin area noted
w,.
Milliken & Company, P. O. Box 1926, Spartanburg, S.C. 29304-1926
Telephone: (864) 503-2020
in your report appears to have been built as a contingency to trap fuel oil in the event of such an
occurrence, in the manner of an oil -water separator. Because of the extremely viscous nature of #6
fuel oil at ambient temperatures, and because of the design of the benned area, we do not believe
that #6 fuel oil was released to a stream. There is no evidence of petroleum contamination outside
of the berned basin.
Milliken has removed all contaminated materials, including soil and water, from the area. The
contaminated materials will be transported to appropriate waste disposal facility for incineration or
treatment. The pit has been filled in and the site covered with erosion control materials.
4. Streambank Erosion at Old Dam
Milliken has determined that the old dam described in inspection report, though formerly owned by
Milliken & Company, is now owned by Pacolet Milliken Enterprises ("Pacolet"), a real estate
management company operated separately from Milliken & Company. Milliken has discussed the
findings from your'inspection with representatives from Pacolet and they have begun investigating
potential actions to remedy the stream bank erosion. Due to the complexity associated with the
removal or construction of dams, this investigation is still underway, and a specific remedial action
cannot be proposed prior to the due date of this response. Milliken and Pacolet will, however,
provide additional details and proposed actions in the future, upon request by the Department.
If you have any questions, or need any additional information, please call me at (864) 503-1756.
Sincerely,
C�9/4k___
Lee H. Slusher
Sr. Environmental Engineer
cc: Adam Davis, Hatch Plant
P, o wr:
HU5
North Carolina
Beverly Eaves Perdue
Governor
March 5, 2010
Lee Slusher
Milliken and Company
PO Box 1926, M482
Spartanburg, SC 29303
RCDENR
Department of Environment and Natural Res1 L
our7--ces.:
Division of Water Quality "
Coleen H. Sullins
Director
SUBJECT: NPDES Stormwater Permit Compliance Inspection
Milliken Co -Hatch Plant
Permit No: NCG 170068
Polk County
Dear Mr- Slusher:
Dee Freeman
Secretary
A NPDES Stormwater Permit Compliance Inspection was conducted on February 11, 2010 at the
Milliken and Company -Hatch Plant in Polk Cattnty NC. Present during the inspection was Adam
Davis. A Division of Water Quality (DWQ) file review indicates this to be the first inspection of
the Milliken facility in Polk County, The facility was found to be in compliance with permit
NCG170068, however, the following observations and recommendations need to be addressed by
the facility.
Stormwater Discharee Outfalls
Qualitative Monitoring at Stormwater Discharge Outfalls (SDO) is a permit requirement that is a
useful tool for industries to visually evaluate if impacts to the environment are occurring from their
facility. Two discharge characteristics: oil sheen and erosion at outfall, should have been noted at
the Milliken facility SDOs. Four SDOs were observed during the inspection. SDO #1 and #2 have
minor erosion occurring at their outfalls. The placement of some filter cloth and riprap should help
to avoid further erosion by dissipating the energy from the stormwater flows. SDO #3 has
significant erosion at the outfall. The prolonged erosion has created a deep gully in the ephemeral
channel (ditch) to the receiving stream. This eroded channel needs to be repaired to a stable
channel- SDO ##4 had petroleum product solidified in a bermed basin area as well as product
evident on standing water. This contaminated bermed area needs to be remediated. The source of
this product also needs to be identified and ceased.
Stream Impacts
In the west stream adjacent to the Milliken facility an old dam has breached causing streambank
erosion. The remnants of the dam need to be removed from the channel and the streambanks need
restoration and stabilization.
Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Otte
Phone: 828-296-45001 FAX: 828.299-70431 Customer Service: 1-877.623-6748 North C arO l i l� a
Internet: www.ncwalerquality.org �����LN��`y�
An Equal Oppnrutnitf 1 Atfirmstive ACtiOn Employe(
Page Two •
Mil[ikcn NCG[ 70068
March 5, 20[0 0
Response
Please submit the proposed remediation plans for the items noted above to Division of Water
Quality -Linda Wiggs, 2090 US HWY 70, Swannanoa NC 28778 within 45 days.
Enclosed is a copy of the Compliance Inspection Report, which contains additional observations
and comments for your reference.
Please contact me at (828) 296-4653 or linda.wiggs (ncdenr.V'ov, if I can be of any further
assistance.
Sincerely,
Linda Wiggs
Environmental Specialist
Surface Water Protection
Enclosure
cc: Central Files
:. Asheville Files
Milliken Company -Adam Davis
PO Box 637, HWY 108
Columbus NC 28722
SASWP\PoIklStormwater\NCG17'rextileswilliken-NCG17006810E[.Milliken.Feb2010.doc
l�
Compliance Inspection Report
Permit: NCG170066 Effective: 08/01/09 Expiration: 07/31/14 Owner: Milliken and Co
SOC: Effective: Expiration: Facility: Milliken and Co -Hatch Plant
County: Polk 960 E NC Hwy 108
Region: Asheville
Columbus NC 28722
Contact Person: Adam Davis Title: Phone: 828-894-7249
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORCjs):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/11/2010 Entry Time: 02:15 PM Exit Time: 04:45 PM
Primary Inspector: Linda S Wiggs Phone: 828-296-4500
Ext.4653
Secondary Inspector($):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Textile Mill Products Stormwater Discharge COG
Facility Status: ® Compliant ❑ Not Compliant
Question Areas-
® Storm Water
(See attachment summary)
Page: 1
Permit: NCG170068 Owner - Facility: Milliken and Co
Inspection Date: 02/1112010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
No other inspections were found in database or files, this appears to be the first inspection of facility.
Met with Adam Davis to conduct inspection. No vehicle maintenance is performed at facility, no analytical monitoring is
required. Documents are in good order, currently Mr. Davis is updating documents.
Qualitative monitoring is performed, however needs improvement. Qualitative monitoring is a useful tool to indicate
problems occurring onsite; at the facility, at the outfall, and/or at the transitional area of land between outfall and
waterbody (ie.usually a ditchline/ephemeral channel). This facility's qualitative monitoring should have indicated "oil
sheen" at outfall #4 and "erosion at outfall" for outfalls #1,#2,#3.
Outfall #1 & #2 does have minor erosion at outfall and needs rocks placed at outfall to disperse energy and avoid further
erosion.
Outfall #3 releases to a significant erosion gully. This outfall's ditchline needs to be fixed. The ditchline between the
outfall and creek has become a deep gully that will continue to get worse and is likely sending a sediment load to
receiving stream. The gully needs to be repaired, properly armored and repaired with clean fill, to create a suitable/stable
ditchline.
Outfall #4 appears to be the outfall location of some piping from the above ground storage tanks containment area,
qualitative monitoring should have noted oil sheen here. The above ground storage tanks are no longer in use, but
stored #6 fuel. There is still minimal amounts of #6 remaining in tanks. The tanks are housed in a secondary
containment area that has a gravel bottom which could be a concern if there is a discrete under drain system.
To the SISW of the #6 fuel tank storage area (outfall#4) is a bermedlbasin area that had solidified #6 fuel in it and
petroleum residue evident on standing water. The berm/basin has what appeared to be an outlet pipe that could release
the product to the wooded area and Flow to the nearby creek. Fortunately, there was no recent evidence of any fuel
beyond the berm/basin by overland flows to the creek. The source of the solidified and residual petroleum product in the
berm/basin area needs to be identified and remediated. A feasibility study (remediation plan) needs to be evaluated at
the facility to remediate the petroleum product currently in the berm/basin and to avoid future releases. Milliken shall
report to DWQ their plans to remediate this situation.
The Milliken facility use to pipe water from the nearby creek (west of building) to their reservoir. A dam was associated
with this piping system. The dam has breached and facility is no longer piping water to reservoir. The dam failure location
is causing instream impacts, primarily to the streambanks. The remnants of the dam that remain in the stream channel
need to be removed. This area of the stream needs to be restored; the facilities old dam has caused sediment loads to
the stream as well as damage to the channel and streambanks. Since Milliken/(Pacolet Land Co) owns most of this
watershed and other adjacent watersheds, this'site lends itself as being a potentially good site for EEP mitigation funds if
any become available.
Page 2
Permit: NCG170068 Owner - Fatility: MiNken and Co
Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Rouline
Stormwater Pollution Prevention Plan
Yes
No
NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®
❑
❑ Cl
# Does the Plan include a General Location (USGS) map?
®❑
❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
®❑
❑ Q
# Does the Plan include a detailed site map including outfali locations and drainage areas?
®❑
Cl ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑
® n
# Has the facility evaluated feasible alternatives to current practices?
n
❑
♦$ ❑
# Does the facility provide all necessary secondary containment?
■
❑
n n
# Does the Plan include a BMP summary?
®❑
❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
❑
❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
m
❑
Cl ❑
# Does the facility provide and document Employee Training?
®
fl
❑ ❑
# Does the Plan include a list of Responsible Party(s)?
®❑
❑ ❑
# Is the Plan reviewed and updated annually?
®❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
®❑.
❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
S
❑
❑ ❑
Comment: No significant spills in last 3 years. Feasibility not previously needed.
However, a feasibility study or remediation plan of action needs to be undertaken by
facility in relation to the storage tanks and product at SD0#4', Storage tanks use to
hold #6 fuel but are no longer in use. Secondary containment (concrete wall) is sufficient
however the bottom is grave[ and appears to have discharge drains to outfall #4. See
summary.
Qualitative Monitofing
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®❑
❑
❑
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
❑
❑
®
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
❑
®
❑
Comment:
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
®
❑
❑
❑
# Were all outfalls observed during the inspection?
®❑
❑
n
Page: 3
Permit: NCG170068 Owner - Facility: Milliken and Co
Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Reason for Visit: Routine
D n ® 0
Page: 4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
August 4, 2004
Glenn Stoner
Milliken and Co
PO Box 1926
Spartanburg, SC 29304
William G. Ross, Jr., Secretary
Alan W. Klimek, P.E., Director
Subject: NPDES Stormwater Permit Coverage Renewal
Milliken and Co -Polk
COC Number NCG 170068
Polk County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG 170000 the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
• A new Certificate of Coverage
• A copy of General Stormwater Permit NCG 170000
• A copy of a discharge monitoring report form
• 5 copies of the qualitative monitoring report form
Your coverage under.this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by the Department of Environment and Natural
Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state, or
local law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit package please contact of the Central Office Stormwater Permitting
Unit at (919) 733-5083, ext. .
Sincerely,
for Alan W. Klimek, P.E.
cc: Central Files
Stormwater Permitting Unit
Asheville Regional Office
Surface Water Protection Section
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
512 N. Salisbury St., Raleigh, North Carolina 27604
Phone: 919-733-70151 FAX 919-733-24961 Internet: http:/lh2o.enr.state.nc.uslsulstormwater.html
An Equaf OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper
One
NorthCarolina
naturally
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERIVIIT NO. NCG170000
CERTIFICATE OF COVERAGE No. NCG170068
STORMWATIR DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission,
and the Federal Water Pollution Control Act, as amended.
Milliken and Co
is hereby authorized to discharge stormwater from a facility located at
Milliken and Co -Polk
960 E NC Highway 108
Columbus
Polk County
to receiving waters designated as a UT of White Oak Creek via the Columbus MS4, a class C stream, in
the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts 1, H, III, IV, V, and VI of General Permit No. NCG170000 as attached.
This Certificate of Coverage shall become effective August 1, 2004.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day August 1, 2004.
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management
Commission
State of North Carolina
Department of Environment
and Natural Resources A&r'*a
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary NCDENR
Kerr T. Stevens, Director NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
JIM ASHCRAFT
MILLIKEN COMPANY
920 MILLIKEN RD
SPARTANBURG, SC 29303
Dear Permittee:
July 28, 1999
Subject: Reissue - NPDES Stormwater Permit
Milliken Company
COC Number NCG170068
Polk County
In response to your renewal application for continued coverage under general permit NCG170000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A copy of general stormwater permit NCG170000
* A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to
certify that you have developed and implemented the SPPP as per the conditions of the permit. This form
must be completed and returned to the Division within 30 days of receipt of this letter.
DO NOT SEND the SPPP with the signed form.
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements,
and addresses frequently asked questions
* A Certificate of Coverage
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or
decree.
If you have any questions regarding this permit package please contact Darren England of the Central Office
Stormwater and General Permits knit at (919) 733-5083, ext. 545
Sincerely,
for Kerr T. Stevens
cc: Central Files
Stormwater and General permits Unit Files
Asheville Regional Office
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG170000
CERTIFICATE OF COVERAGE No. NCG170068
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1. other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended.
MILLIKEN COMPANY
is hereby authorized to discharge stormwaler from a facility located at
MILLIKEN COMPANY
P.O. SOX 637 HWY 108
COLUMBUS
POLK COUNTY
to receiving waters designated as Columbus MSSS & a UT of White Oak Creek in the Broad River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, Ill.
IV, V, and VI of General Permit No. NCG170000 as attached.
This certificate of coverage shall become effective August 1, 1999.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day July 28, 1999.
for Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment,
Health and Natural Resources
• Division of Water Quality
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
January 15, 1997
Mr. Glenn C. Stoner
Sr. Environmental Engineer
Milliken & Company
P.O. Box 1926
Spartanburg, S.C. 29304-1926
Subject:
Dear Mr. Stoner:
•
Stormwater Permit Modification -
Milliken & Company, Hatch Plant
NCG 170068
Polk County
r ri)
On December 23, 1996 I received your modified Notice of Intent and request for the
Certificate of Coverage (NCG170068) which Milliken holds for stormwater discharges from the
Hatch Plant. The cover letter explained that Milliken had modified the decorative pond in front of
the plant such that only stormwater was discharging from that pond (the pond had previously
contained cooling water and discharged under the provisions of NCG500028, a wastewater
general permit). You requested that the stormwater permit coverage be amended to included the
pond discharge.
After review of your request and discussion with you concerning the nature and location of
this additional stormwater discharge, we have determined that the additional discharge will not
require modification of the certification. Your request and explanation will be added to your permit
file. You should, however, modify your Stormwater Pollution Prevention Plan in the appropriate
sections to reflect these changes in discharges.
If you have questions concerning this matter, please contact me (919 f 733-5083 ext. 548).
Sincerely,
i a I s, P.E.
Environmental Engineer
Stormwater Group
cc: Asheville Regional Office
Paul Clark
Permits and Engineering
Central Files
o
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
March 24, 1995
Jim Ashcraft
Milliken & Company
920 Milliken Rd
Spartanburg, SC 29303
I LT.W;WA
qT
�Ajo
oak
E:)EHIliF1
Subject: General Permit No. NCG 170000
Milliken & Company
COC NCG170068
Polk County
Dear Jim Ashcraft:
In accordance with your application for discharge permit received on February 3, 1995, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and
the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management, The Division of Environmental Management may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal
Area Management Act or any other Federal or Local governmental permit that may be required.
If you have any question concerning this permit, please contact MR. STEVE ULMER at telephone
number 919/733-5083.
Sincerely,
Original Signed By
Coieen H. Sullins
A. Preston Howard, Jr. P.E.
cc: Asheville Regional Office
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
PAP
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
GENERAL PERMIT NO. NC 17000
CERTIFI!ATE OF COVERAGE NO. NCG170068
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Milliken & Company
is hereby authorized to discharge stormwater from a facility located at
Hatch Plant
NC Hwy 108 E
Columbus
Polk County
to receiving waters designated as the Town of Columbus Storm Sewer System and an unnamed tributary to White
Oak Creek in the Broad River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, Ill
and IV of General Permit No. NCG170000 as attached.
This Certificate of Coverage shall become effective March 24, 1995,
This Certificate of Coverage shall remain in effect for the duration of the General Permit_
Signed this day March 24, 1995. -f
%Frig;inai Signed By
Coleen H. Sullins
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
1 - y to 08 r { TanV
OF
1�((��,._ .•I.
'"h� ` — _ ,tea - � - 4�-' - ' � � l ' ) �"�_ _ • e ' y j - : - � ,
�\ ,, i i , t �_� . '•. M ` 113r • Can, — �cQ - +
y�y ice. � ('.�- (�.. -'� � i �� .��\ � •_ +a. • _--- -- #
-4A
_� Y .- � � 'JCL: \ ? � _! i _ i \ � •' z
it
Rr % ��/ y •�/ � 4 � . 1 I -��� _ ea _��+~� t •� n 1 -..� � ,J Y �• q, IORI
I ~� 151 }�� , � - � '~ � - `' � ^^� ---� • • rMna� odd ` �
• ♦ {' +Tatar .- i C)"
,' 1 �•� V \ . _L:
1 /. •'®M • r \ Water
�j.� � y M • • __ FF 11co�L �
00, us
dk
.r
1 G
• • • ,
• I
Ha 000 T I Ga�oi: 12'30• 7 n,wo�►�w, '93 y 10,
Amrww 3
SCALE 1.24 000
* 1 7 0 i MILES
% 1300 0 1000 2000 3000 A()w 5" 6000 7000 FEET
GN
1 .5 0 1 KILOMETER
iW
ma`s 0.41 CONTOUR INTERVAL 40 FEET
12 MILS NATIONAL GEODETIC VERTICAL DATUM OF 1929
MILIAkCEa
GRID AND 1990 MAGNETIC NORTH ' c� I
:CLINATION AT CENTER OF SHEET THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS
FOR SALE BY U. S. GEOLOGICAL SURVEY
DENVER, COLORADO 80225 OR RESTON. VIRGINIA 22092
A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYMBOLS IS AVAILABLE ON REQUEST
i I D
FACILITY
COUNTY
.,
HPDES
MAP # ;
DSN FLOW }
SUB BASIN
LATTITUDE
t
LONCsITUDE
i
RECEiVINC STREAM
STREAM CLASS >J
DISCHAR sE CLASS
EXF 4RA T 1.ON HATE
(qILLIK&nI &I 6b,00PANi - HAT-cq PLAWr
PDLK
NC.cal-400(o6
F 10 Svc
N'd
o3-d$-oZ
a , ,,
35 15 Zo
CdLU"3Us sTt:>a..r SE NEB sYs-rf--M be
w H ITS C7>AK G2JE-Et<
SToRMWATER
0-4-31-19