Loading...
HomeMy WebLinkAboutNCG170068_COMPLETE FILE - HISTORICAL_20180924STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. IV CCU (% 00 U S DOC TYPE PK HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ 301 � DR �4 YYYYMMDD ,STATE., ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director Milliken & Company Attention: Adam Davis Post Office Box 637 Columbus, North Carolina 28722 NORTH CAROLINA Environmental Quality September 24, 2018 Subject: Compliance Evaluation Inspection Permit: NCG170068 Polk County, North Carolina Dear Mr. Davis: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on September 12, 2018. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reedgncdenr.gov. Since , r" saiah Re PSCI, MS4 , ECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. H!ghway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Compliance Inspection Repo Permit: NCG170068 SOC: County: Polk Region: Asheville Contact Person: Adam Davis Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 10/02/14 Expiration: 07/31/19 Owner : Milliken & Company Effective: Expiration: Facility: Milliken and Co -Hatch Plant 960 E NC Hwy 108 Inspection Date: 09/12/2018 Primary Inspector: Isaiah L Reed Secondary Inspeclor(s): Title: EntryTime: 11:30AM Certification: Columbus NC 28722 Phone: 828-894-7249 Phone: Exit Time: 12:30PM Phone: 828-2964614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: ® Storm water (See attachment summary) Page: 1 Permit: NGG170068 Owner - Facility: Milliken & Company Inspection Date: 09l122018 Inspection Type; Compliance Evaluation Reason for Visit: Routine Inspection Summary: on September 12, 2018 this facility was inspected for compliance. I met with Adam Davis on site. No issues were observed during the inspection. It was discussed that the fire prevention pond in front of the facility is pumped out periodically. As long as the release of that water does not result in the discharge of pollutants gathered in the basin, the only other concern which requires monitoring, is erosion at the outlet. If you have any questions, please contact this office at (828) 296-4614 Page: 2 Permit: NCG170066 Owner - Facility: Milliken & Company Inspection Date: 0911212018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? [M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? EN ❑ ❑ ❑ # Does the Plan include a detailed site map including outfali locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ® ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ® ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? EM ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ®❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? go ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? Is ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ® ❑ ❑ ❑ Comment: Page: 3 Permit: NCG170068 SOC: County: Polk Region- Asheville Contact Person: Adam Davis Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 10/02/14 Expiration: 07/31/19 owner: Milliken & Company Effective: Expiration: Facility: Milliken and Co -Hatch Plant 960 E NC Hwy 108 Columbus NC 28722 Title: Phone: 828-894-7249 Inspection Date: 09/1212018 Primary Inspector: Isaiah L Reed Secondary inspector(s): Certification: Phone: EntryTime: 11:30AM Exit Time: 12:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: E Storm water (See attachment summary) Page: Permit: NGG170068 Owner- Facility: Milliken & Company Inspection Date: 0911212018 inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On September 12, 2618 this facility was inspected for compliance. I met with Adam Davison site. No issues were observed during the inspection. It was discussed that the fire prevention pond in front of the facility is pumped out periodically. As long as the release of that water does not result in the discharge of pollutants gathered in the basin, the only other concern which requires monitoring, is erosion at the outlet. If you have any questions, please contact this office at (828) 296-4614 Page: 2 L1 Permit: NCG170068 Owner - Facility: Milliken & Company Inspection Date: 0911212018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ 0 # ❑oes the Plan include a `Narrative Description of Practices"? ® ❑ ❑ ❑ # Does the Plan Include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ® ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? O ❑ ❑ ❑ # Does the Plan include a BMP summary? ® ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # if the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? N ❑ ❑ ❑ Comment: Page: 3 VENDOR NO. 4007630 MILLIKtN at , FOR THFACWUNTVinDDIREssALL coartE"DENC=_ To P.O. rOX 1838 SPARTANBURG. S.C. 29304 INVOICE NUMBER INVOICE DATE INVOICE AMOUNT T ADJUSTMENT X DISCOUNT MILLIKEN & COMPANY Annual Permit Fee 2015PROO692B OW06115 100.00 10 0.00 r r ',✓fv� �.� i�'ti:.'-C�7i l4i:i,�{s�.l t p... :E 4 f fi c" � g � u AL�ivnD, iI i 23 -oo 0 2015 �7 _gyp i �i :JAUE� t F�.i'::a ') a 07 �22- 15 NET AMOUNT $100.00 ------------. ..• .. . MILLIKEN & COMPANY UL Citibank N.A. , c1rsCK —nio'. Wuuzzvl'�- PHONE (864) 503-1592 A sebsmkwy of Cjbwp 1141126 P.O. BOX 1838 M-235 One Penn's Way SPARTANBURG, S.C. 29304-1838 RewCas>!e. of t9T20 299 ..62_-20 DATE 31i — ` 0712415 ******' -----, AMOUNT EXACTLY QQ DOLLARS 00 CENTS $100.00 PAY TO THE ORDER OF NCDENR DIVISION'OF WATER QUALITY MILLIKEN & COMPANY 1617 MAIL SERVICE CENTER Paying Agent RALEIGH , NC 27699 llw (Return This Portion With Check) ' 1111111IIL'1 Jill[ Ilill1111111IIIII III Hill 11111 IIIII11111111111111III * 2 0 1 5 P R 0 0 6 9 2 8 ANNUAL PERMIT INVOICE Open Invoice Number: 201SPR006928 ual Fee Period: 2015-08-01 to 2016-07-31 r Permit Number: NCG170099 Rutherford County s �123 ;.. . - vice Date: 71$12015 Milliken & Co -Golden Valley Due Date: B1712015 Annual Fee: 5100.00 Robert G. Gallen C �, RrE E t'r, Milliken and Co t 2080 NC Hwy 22fiG� r} U �a �� Check Number_: Bostic, NC 28018 C V U 0 r STORPAV ^,TER IDERMiTTI G 9iL�11 MILLIKEN ® December 11, 2012 Point Source Branch Surface Water Protection Section Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 RE: Delegation of Signatory Authority Storm Water Permit Permit Number NCG170000 Hatch Plant Columbus, NC To Whom It May Concern: In accordance with Part III, Section B, Item 5 of the referenced permit and as a Responsible Corporate Officer of Milliken and Company, as defined in said Part, I hereby delegate to the,Hatch Location Manager in charge of facility operations, signatory authority for all notices, plans, reports, certifications, or other information required by or in connection with the referenced permit If you have any questions or need anything further to finalize this matter, please contact me at (864) 716-7188. Thank you. Sincerely, 4� P sj� � �- Bill Skinner Manufacturing Manager cc: Asheville Regional Office, Surface Water Protection " Technical Assistance and Certification Unit Milliken & Company PO Box 637 Hwy 108 Columbus, NC 28722 Bus: (828) 894-8222 Fax: (828) 894-7252 - yt�.i.+r�e. �•3-"�' a7•'•-r,•�a�`-,>.r,c.r:T'rF 4; •- IFF �1 t4o�m^fa �e2',. } �r�- rr - .__ ' ` '` - � -`*�. --ti-+. � --� �� `�[yY,;,'++.�• - re2' Chocolate Drop Mountain ^-• _ ��-*-- ^� ^: w ;�" , er SDo 1&2 r W f i * ��• j ti 1 nrk MILLIKEN m L ,. 005 •- ♦� s e a e s 1 S W 3 i • ` Coaluh%us �- 1583 i ♦ ti� -�* ` `s ;:yam w_ /7 `----. Compliance Inspection Report Permit: NCG170068 Effective: 08/01/09 Expiration: 07/31/14 Owner: Milliken and Co SOC: Effective: Expiration: Facility: Milliken and Co -Hatch Plant County: Polk 960 E NC Hwy 108 Region: Asheville Columbus NC 28722 Contact Person: Adam Davis Title: Phone: 828-894-7249 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/14/2010 Entry Time: 01:20 PM Exit Time: 02:15 PM Primary Inspector: Linda S Wiggs Phone: 828-296-4500 Secondary Inspector(s): Ext.4653 Reason for Inspection: Follow-up Inspection Type: Stormwater Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 Storm water (See attachment summary) Page: i Permit: NCG 170068 Owner - Facility: Milliken and Co Inspection bate: 09/14/2010 Inspection Type: Stormwater Reason for Visit: Follow-up Inspection Summary: Follow up to observe improvements Milliken made to outfalls. Facility did a nice job repairing the SDO ditchlines/ephemeral channels. All petroleum product had been removed from outfall #4. Dam was removed from stream and streambank were reformed and matted for stabilization. I told Adam Davis the matting used should be removed next spring, once the streambank begins to stabilize with foliage. Matting used was plastic which impinges amphibians and reptiles that live in the riparian area. I also told Mr.Davis he could use live stakes to speed the stabilization of the streambanks. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non Stormwater) discharges? Comment: Outfall #4 petroleum product had been removed and remediated. Outfall #1,2,3 erosion had been repaired. Channel was completely relined with riprap. Dam had been removed from stream and streambanks had been reformed and matted for stabilzation. Yes No NA NE ❑ ❑ ❑ ■ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ■ Page: 2 11 It E • MILLIKEN r-- I L APR 12 2010 I- WATER QUALITY SECTION P.SE-{r1. E .LE REGiOi !AL O=f=ICE CERTIFIED NIAILIRETURN RECEIPT REQUESTED, April 8, 2010 Ms. Linda Wiggs Division of Water Quality North Carolina Department of Environment and Natural Resources 2090 U.S. Highway 70 Swannanoa, NC 28778 RE: Response to Compliance Inspection Report Milliken & Company — Hatch Plant Permit No.: NCG170068 Dear Ms. Wiggs: M1 � I, Milliken & Company ("Milliken") has received and reviewed your Compliance Inspection Report dated March 5, 2010 that we received on March 9, 2010. As requested, this letter is being submitted within 45 days to describe our proposed remediation plans for the issues noted in the report. 1. Erosion at Stormwater Dischary ge Outfalls #1-and #2 Rip rap will be placed at these outfalls to prevent additional erosion. 2. Erosion at Stormwater Dischar e Outfall #3 The length of the current ditch will be graded and then stabilized using erosion control fabric and rip rap. The rip rap will also slow the velocity of the storm water as it travels down the hill, making erosion less likely in the future. 3. Petroleum Product at Stormwater Discharge Outfall #4 Milliken has determined that the pipe identified as Outfall 94 in the facility storm water plan is actually an abandoned steam condensate drain line that originates near the #6 fuel oil tanks. The line has been out of service since 1996, when the use of fuel oil was discontinued. It is likely that the petroleum product found in the vicinity of "Outfall #4" is fuel oil that leaked into the steam lines used to heat the fuel oil when it was still in use. The oil was carried to the contaminated area along with the stream condensate, where it solidified upon cooling. The berzned basin area noted w,. Milliken & Company, P. O. Box 1926, Spartanburg, S.C. 29304-1926 Telephone: (864) 503-2020 in your report appears to have been built as a contingency to trap fuel oil in the event of such an occurrence, in the manner of an oil -water separator. Because of the extremely viscous nature of #6 fuel oil at ambient temperatures, and because of the design of the benned area, we do not believe that #6 fuel oil was released to a stream. There is no evidence of petroleum contamination outside of the berned basin. Milliken has removed all contaminated materials, including soil and water, from the area. The contaminated materials will be transported to appropriate waste disposal facility for incineration or treatment. The pit has been filled in and the site covered with erosion control materials. 4. Streambank Erosion at Old Dam Milliken has determined that the old dam described in inspection report, though formerly owned by Milliken & Company, is now owned by Pacolet Milliken Enterprises ("Pacolet"), a real estate management company operated separately from Milliken & Company. Milliken has discussed the findings from your'inspection with representatives from Pacolet and they have begun investigating potential actions to remedy the stream bank erosion. Due to the complexity associated with the removal or construction of dams, this investigation is still underway, and a specific remedial action cannot be proposed prior to the due date of this response. Milliken and Pacolet will, however, provide additional details and proposed actions in the future, upon request by the Department. If you have any questions, or need any additional information, please call me at (864) 503-1756. Sincerely, C�9/4k___ Lee H. Slusher Sr. Environmental Engineer cc: Adam Davis, Hatch Plant P, o wr: HU5 North Carolina Beverly Eaves Perdue Governor March 5, 2010 Lee Slusher Milliken and Company PO Box 1926, M482 Spartanburg, SC 29303 RCDENR Department of Environment and Natural Res1 L our7--ces.: Division of Water Quality " Coleen H. Sullins Director SUBJECT: NPDES Stormwater Permit Compliance Inspection Milliken Co -Hatch Plant Permit No: NCG 170068 Polk County Dear Mr- Slusher: Dee Freeman Secretary A NPDES Stormwater Permit Compliance Inspection was conducted on February 11, 2010 at the Milliken and Company -Hatch Plant in Polk Cattnty NC. Present during the inspection was Adam Davis. A Division of Water Quality (DWQ) file review indicates this to be the first inspection of the Milliken facility in Polk County, The facility was found to be in compliance with permit NCG170068, however, the following observations and recommendations need to be addressed by the facility. Stormwater Discharee Outfalls Qualitative Monitoring at Stormwater Discharge Outfalls (SDO) is a permit requirement that is a useful tool for industries to visually evaluate if impacts to the environment are occurring from their facility. Two discharge characteristics: oil sheen and erosion at outfall, should have been noted at the Milliken facility SDOs. Four SDOs were observed during the inspection. SDO #1 and #2 have minor erosion occurring at their outfalls. The placement of some filter cloth and riprap should help to avoid further erosion by dissipating the energy from the stormwater flows. SDO #3 has significant erosion at the outfall. The prolonged erosion has created a deep gully in the ephemeral channel (ditch) to the receiving stream. This eroded channel needs to be repaired to a stable channel- SDO ##4 had petroleum product solidified in a bermed basin area as well as product evident on standing water. This contaminated bermed area needs to be remediated. The source of this product also needs to be identified and ceased. Stream Impacts In the west stream adjacent to the Milliken facility an old dam has breached causing streambank erosion. The remnants of the dam need to be removed from the channel and the streambanks need restoration and stabilization. Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Otte Phone: 828-296-45001 FAX: 828.299-70431 Customer Service: 1-877.623-6748 North C arO l i l� a Internet: www.ncwalerquality.org �����LN��`y� An Equal Oppnrutnitf 1 Atfirmstive ACtiOn Employe( Page Two • Mil[ikcn NCG[ 70068 March 5, 20[0 0 Response Please submit the proposed remediation plans for the items noted above to Division of Water Quality -Linda Wiggs, 2090 US HWY 70, Swannanoa NC 28778 within 45 days. Enclosed is a copy of the Compliance Inspection Report, which contains additional observations and comments for your reference. Please contact me at (828) 296-4653 or linda.wiggs (ncdenr.V'ov, if I can be of any further assistance. Sincerely, Linda Wiggs Environmental Specialist Surface Water Protection Enclosure cc: Central Files :. Asheville Files Milliken Company -Adam Davis PO Box 637, HWY 108 Columbus NC 28722 SASWP\PoIklStormwater\NCG17'rextileswilliken-NCG17006810E[.Milliken.Feb2010.doc l� Compliance Inspection Report Permit: NCG170066 Effective: 08/01/09 Expiration: 07/31/14 Owner: Milliken and Co SOC: Effective: Expiration: Facility: Milliken and Co -Hatch Plant County: Polk 960 E NC Hwy 108 Region: Asheville Columbus NC 28722 Contact Person: Adam Davis Title: Phone: 828-894-7249 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORCjs): On -Site Representative(s): Related Permits: Inspection Date: 02/11/2010 Entry Time: 02:15 PM Exit Time: 04:45 PM Primary Inspector: Linda S Wiggs Phone: 828-296-4500 Ext.4653 Secondary Inspector($): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COG Facility Status: ® Compliant ❑ Not Compliant Question Areas- ® Storm Water (See attachment summary) Page: 1 Permit: NCG170068 Owner - Facility: Milliken and Co Inspection Date: 02/1112010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: No other inspections were found in database or files, this appears to be the first inspection of facility. Met with Adam Davis to conduct inspection. No vehicle maintenance is performed at facility, no analytical monitoring is required. Documents are in good order, currently Mr. Davis is updating documents. Qualitative monitoring is performed, however needs improvement. Qualitative monitoring is a useful tool to indicate problems occurring onsite; at the facility, at the outfall, and/or at the transitional area of land between outfall and waterbody (ie.usually a ditchline/ephemeral channel). This facility's qualitative monitoring should have indicated "oil sheen" at outfall #4 and "erosion at outfall" for outfalls #1,#2,#3. Outfall #1 & #2 does have minor erosion at outfall and needs rocks placed at outfall to disperse energy and avoid further erosion. Outfall #3 releases to a significant erosion gully. This outfall's ditchline needs to be fixed. The ditchline between the outfall and creek has become a deep gully that will continue to get worse and is likely sending a sediment load to receiving stream. The gully needs to be repaired, properly armored and repaired with clean fill, to create a suitable/stable ditchline. Outfall #4 appears to be the outfall location of some piping from the above ground storage tanks containment area, qualitative monitoring should have noted oil sheen here. The above ground storage tanks are no longer in use, but stored #6 fuel. There is still minimal amounts of #6 remaining in tanks. The tanks are housed in a secondary containment area that has a gravel bottom which could be a concern if there is a discrete under drain system. To the SISW of the #6 fuel tank storage area (outfall#4) is a bermedlbasin area that had solidified #6 fuel in it and petroleum residue evident on standing water. The berm/basin has what appeared to be an outlet pipe that could release the product to the wooded area and Flow to the nearby creek. Fortunately, there was no recent evidence of any fuel beyond the berm/basin by overland flows to the creek. The source of the solidified and residual petroleum product in the berm/basin area needs to be identified and remediated. A feasibility study (remediation plan) needs to be evaluated at the facility to remediate the petroleum product currently in the berm/basin and to avoid future releases. Milliken shall report to DWQ their plans to remediate this situation. The Milliken facility use to pipe water from the nearby creek (west of building) to their reservoir. A dam was associated with this piping system. The dam has breached and facility is no longer piping water to reservoir. The dam failure location is causing instream impacts, primarily to the streambanks. The remnants of the dam that remain in the stream channel need to be removed. This area of the stream needs to be restored; the facilities old dam has caused sediment loads to the stream as well as damage to the channel and streambanks. Since Milliken/(Pacolet Land Co) owns most of this watershed and other adjacent watersheds, this'site lends itself as being a potentially good site for EEP mitigation funds if any become available. Page 2 Permit: NCG170068 Owner - Fatility: MiNken and Co Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Rouline Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ Cl # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ®❑ ❑ Q # Does the Plan include a detailed site map including outfali locations and drainage areas? ®❑ Cl ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ® n # Has the facility evaluated feasible alternatives to current practices? n ❑ ♦$ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ n n # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? m ❑ Cl ❑ # Does the facility provide and document Employee Training? ® fl ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ®❑ ❑ ❑ # Is the Plan reviewed and updated annually? ®❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ®❑. ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? S ❑ ❑ ❑ Comment: No significant spills in last 3 years. Feasibility not previously needed. However, a feasibility study or remediation plan of action needs to be undertaken by facility in relation to the storage tanks and product at SD0#4', Storage tanks use to hold #6 fuel but are no longer in use. Secondary containment (concrete wall) is sufficient however the bottom is grave[ and appears to have discharge drains to outfall #4. See summary. Qualitative Monitofing Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ® ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? ®❑ ❑ n Page: 3 Permit: NCG170068 Owner - Facility: Milliken and Co Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Reason for Visit: Routine D n ® 0 Page: 4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor August 4, 2004 Glenn Stoner Milliken and Co PO Box 1926 Spartanburg, SC 29304 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director Subject: NPDES Stormwater Permit Coverage Renewal Milliken and Co -Polk COC Number NCG 170068 Polk County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG 170000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of General Stormwater Permit NCG 170000 • A copy of a discharge monitoring report form • 5 copies of the qualitative monitoring report form Your coverage under.this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Department of Environment and Natural Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact of the Central Office Stormwater Permitting Unit at (919) 733-5083, ext. . Sincerely, for Alan W. Klimek, P.E. cc: Central Files Stormwater Permitting Unit Asheville Regional Office Surface Water Protection Section 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 512 N. Salisbury St., Raleigh, North Carolina 27604 Phone: 919-733-70151 FAX 919-733-24961 Internet: http:/lh2o.enr.state.nc.uslsulstormwater.html An Equaf OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper One NorthCarolina naturally STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERIVIIT NO. NCG170000 CERTIFICATE OF COVERAGE No. NCG170068 STORMWATIR DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended. Milliken and Co is hereby authorized to discharge stormwater from a facility located at Milliken and Co -Polk 960 E NC Highway 108 Columbus Polk County to receiving waters designated as a UT of White Oak Creek via the Columbus MS4, a class C stream, in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, H, III, IV, V, and VI of General Permit No. NCG170000 as attached. This Certificate of Coverage shall become effective August 1, 2004. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 1, 2004. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment and Natural Resources A&r'*a Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary NCDENR Kerr T. Stevens, Director NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES JIM ASHCRAFT MILLIKEN COMPANY 920 MILLIKEN RD SPARTANBURG, SC 29303 Dear Permittee: July 28, 1999 Subject: Reissue - NPDES Stormwater Permit Milliken Company COC Number NCG170068 Polk County In response to your renewal application for continued coverage under general permit NCG170000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A copy of general stormwater permit NCG170000 * A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to certify that you have developed and implemented the SPPP as per the conditions of the permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT SEND the SPPP with the signed form. * Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form * A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements, and addresses frequently asked questions * A Certificate of Coverage Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Darren England of the Central Office Stormwater and General Permits knit at (919) 733-5083, ext. 545 Sincerely, for Kerr T. Stevens cc: Central Files Stormwater and General permits Unit Files Asheville Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG170000 CERTIFICATE OF COVERAGE No. NCG170068 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1. other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended. MILLIKEN COMPANY is hereby authorized to discharge stormwaler from a facility located at MILLIKEN COMPANY P.O. SOX 637 HWY 108 COLUMBUS POLK COUNTY to receiving waters designated as Columbus MSSS & a UT of White Oak Creek in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, Ill. IV, V, and VI of General Permit No. NCG170000 as attached. This certificate of coverage shall become effective August 1, 1999. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 28, 1999. for Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment, Health and Natural Resources • Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director January 15, 1997 Mr. Glenn C. Stoner Sr. Environmental Engineer Milliken & Company P.O. Box 1926 Spartanburg, S.C. 29304-1926 Subject: Dear Mr. Stoner: • Stormwater Permit Modification - Milliken & Company, Hatch Plant NCG 170068 Polk County r ri) On December 23, 1996 I received your modified Notice of Intent and request for the Certificate of Coverage (NCG170068) which Milliken holds for stormwater discharges from the Hatch Plant. The cover letter explained that Milliken had modified the decorative pond in front of the plant such that only stormwater was discharging from that pond (the pond had previously contained cooling water and discharged under the provisions of NCG500028, a wastewater general permit). You requested that the stormwater permit coverage be amended to included the pond discharge. After review of your request and discussion with you concerning the nature and location of this additional stormwater discharge, we have determined that the additional discharge will not require modification of the certification. Your request and explanation will be added to your permit file. You should, however, modify your Stormwater Pollution Prevention Plan in the appropriate sections to reflect these changes in discharges. If you have questions concerning this matter, please contact me (919 f 733-5083 ext. 548). Sincerely, i a I s, P.E. Environmental Engineer Stormwater Group cc: Asheville Regional Office Paul Clark Permits and Engineering Central Files o P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director March 24, 1995 Jim Ashcraft Milliken & Company 920 Milliken Rd Spartanburg, SC 29303 I LT.W;WA qT �Ajo oak E:)EHIliF1 Subject: General Permit No. NCG 170000 Milliken & Company COC NCG170068 Polk County Dear Jim Ashcraft: In accordance with your application for discharge permit received on February 3, 1995, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management, The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any question concerning this permit, please contact MR. STEVE ULMER at telephone number 919/733-5083. Sincerely, Original Signed By Coieen H. Sullins A. Preston Howard, Jr. P.E. cc: Asheville Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper PAP STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO. NC 17000 CERTIFI!ATE OF COVERAGE NO. NCG170068 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Milliken & Company is hereby authorized to discharge stormwater from a facility located at Hatch Plant NC Hwy 108 E Columbus Polk County to receiving waters designated as the Town of Columbus Storm Sewer System and an unnamed tributary to White Oak Creek in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, Ill and IV of General Permit No. NCG170000 as attached. This Certificate of Coverage shall become effective March 24, 1995, This Certificate of Coverage shall remain in effect for the duration of the General Permit_ Signed this day March 24, 1995. -f %Frig;inai Signed By Coleen H. Sullins A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission 1 - y to 08 r { TanV OF 1�((��,._ .•I. '"h� ` — _ ,tea - � - 4�-' - ' � � l ' ) �"�_ _ • e ' y j - : - � , �\ ,, i i , t �_� . '•. M ` 113r • Can, — �cQ - + y�y ice. � ('.�- (�.. -'� � i �� .��\ � •_ +a. • _--- -- # -4A _� Y .- � � 'JCL: \ ? � _! i _ i \ � •' z it Rr % ��/ y •�/ � 4 � . 1 I -��� _ ea _��+~� t •� n 1 -..� � ,J Y �• q, IORI I ~� 151 }�� , � - � '~ � - `' � ^^� ---� • • rMna� odd ` � • ♦ {' +Tatar .- i C)" ,' 1 �•� V \ . _L: 1 /. •'®M • r \ Water �j.� � y M • • __ FF 11co�L � 00, us dk .r 1 G • • • , • I Ha 000 T I Ga�oi: 12'30• 7 n,wo�►�w, '93 y 10, Amrww 3 SCALE 1.24 000 * 1 7 0 i MILES % 1300 0 1000 2000 3000 A()w 5" 6000 7000 FEET GN 1 .5 0 1 KILOMETER iW ma`s 0.41 CONTOUR INTERVAL 40 FEET 12 MILS NATIONAL GEODETIC VERTICAL DATUM OF 1929 MILIAkCEa GRID AND 1990 MAGNETIC NORTH ' c� I :CLINATION AT CENTER OF SHEET THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS FOR SALE BY U. S. GEOLOGICAL SURVEY DENVER, COLORADO 80225 OR RESTON. VIRGINIA 22092 A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYMBOLS IS AVAILABLE ON REQUEST i I D FACILITY COUNTY ., HPDES MAP # ; DSN FLOW } SUB BASIN LATTITUDE t LONCsITUDE i RECEiVINC STREAM STREAM CLASS >J DISCHAR sE CLASS EXF 4RA T 1.ON HATE (qILLIK&nI &I 6b,00PANi - HAT-cq PLAWr PDLK NC.cal-400(o6 F 10 Svc N'd o3-d$-oZ a , ,, 35 15 Zo CdLU"3Us sTt:>a..r SE NEB sYs-rf--M be w H ITS C7>AK G2JE-Et< SToRMWATER 0-4-31-19