Loading...
HomeMy WebLinkAboutNCG160176_COMPLETE FILE - HISTORICAL_20170110STORMWATER DIVISION CODING SHEET NCG PERMITS . PERMIT N0. DOC TYPE ISTORICAL FILE I ❑ MONITORING REPORTS DOC DATE ❑ 2 oil D YYYYMMDD r- w GREENSBORO NORTH CAROLINA WATER RESOURCES January 10, 2017 John Riley Sharpe Brothers P.O. Box 35387 Greensboro, NC 27409 RE: Industrial Compliance Inspection Inspection location: Sharpe Brothers 6311 Bunit Poplar Rd. SW Permit V: NCG160176 Dear Mr. Riley: On January 3, 2017 the City of Greensboro Stormwater Management Division completed an industrial compliance inspection of Sharpe Brothers. Local regulations permit an inspection of industrial facilities under authority granted by City of Greensboro Code of Ordinance Chapter 30, article 12, Section 7.1 (C-5). This inspection consisted of two parts: a review of the facility files/records and an on -site facility inspection. f The inspection was performed by McKenzie Smith, and the following; deficiencies/observations were noted during the inspection. Starm►vater Pollution .Prevention PlanlSpill Plan Review Sitc Maps and SWP3 • Update and sign the SWPPP plan and permit annually. Please refer to permit Part 11, Section A(8). • Evaluate the outfall for non-stormwater discharges annually and complete the certification. Please refer to permit Part 11, Section A(1.e). Spill Prevention and Response Plan + 1Jpdatc/add the following to the Stormwatef Pollution Prevention Plan: o Contact information (names, phone numbers, and other pertinent information) o Spill occurrences. i I I PO BOX 1170 • GREENSBORO NC 27402-1170 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) John Riley January 10, 2017 Page 2 Monitoring • No record of analytical or qualitative monitoring. Please refer to permit Part 11, Section B-D for minimum monitoring and reporting requirements. If you have any questions contact Glen White at glen.whitc@ncdenr.gov or 336-776-9660. Employee Training,. • Regularly train all employees on stormwat.er issues and practices, and maintain specific, up-to-date. training records -with the SWPPP plan. At the time of inspection, there was no documentation provided to'demonstrate that training is occurring. Please refer tci permit Part 11, Section A(6). Site Inspection Preventative Main ten ancelCood Housekeeping • No deficiencies observed. Non-Stormwater Discharges • No deficiencies observed. It is recommended that Sharpe Brothers take appropriate actions to correct the noted deficiencies. 1f you have any questions concerning this inspection, please contact me at 336-373-7665 or McKenzie.Smith@greensboro-nc.gov. Sincerely, McKenzie Smith, Water Quality Specialist City of Greensboro, Water Resources Department CC' Peter Schneider,'VlWater Quality Supervisor Glen White, N.C. Dept. of Environment Quality Industrial Inspection File 1 Permit: NCG160176 SOC: County: Guilford Region: Winston-Salem Contact Person: John Riley Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 10/02/14 Expiration: 09/30/19 Owner: Sharpe Bros Division of Vecellio & Grogan Effective: Expiration: Facility: Sharpe Bros. A Division of Vecellio & Grogan, Inc. 6311 Bumt Poplar Rd Greensboro NC 27409 Title: Phone: 336-235-2756 Inspection Date: 01/03/2017 Primary Inspector: Glen White Secondary Inspectors): Certification: Phone: Entry Time: 10:OOAM Exit Time: 12:OOPM Phone: 336-776-9800 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: ■ Storm Water (See attachment summary) Page: 1 L Permit: NCG160176 Owner • Facility: Sharpe Bros Division of Vecellio & Grogan Inspection Date: 01103/2017 Inspection Type: Complianoe Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted by McKenzie Smith of the City of Greensboro Water Resources Department. Several deficiencies were noted. The SPPP has not been maintained and it hasn't been updated annually. Responsible Parties are not current and haven't been updated annually. Training not conducted as required. No Qualitative and No Analytical Monitoring has ever been performed. This facility will be reinspected in the following months by NCDEQ - DEMLR, WSRO to determine if the owner is willing to work on correction of issues before further action is taken. Page: 2 t Permit: NCG160176 Owner - Facility: Sharpe Bros Division of Vecellio & Grogan Inspection Date: 01/03/2017 Inspection Typo; Complianoe Evaluation Reason for Visit: Routine Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: No record of ever conducting anal icai monitoring per the permit. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Evaluate outfall for non-stormwater discharges, Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: No record of ever conducting Qualitative monitoring, Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a 'Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include -a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ® ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ® ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Page: 3 permit: NCG160176 Owner - Facility: Sharpe Bros Division of Vecellio R Grogan Inspection Date: 01103/2017 inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Comment: Several deficiencies noted. The SPPP has not been annually updated and responsible parties are not current. Evaluate outfall for non-stormwater discharges and complete certification. All required annually. Page: 4 December 6, 2011 Vecellio and Grogan, Inc. Attn: Joru� Riley, Division safety Manager P.O. Box 35387 Greensboro, NC 27425 RE: Industrial Compliance Inspection Inspection location: Vecellio and Grogan, Inc. 6311 Burnt Poplar Road SW Permit 4. NCG 160176 Dear Mr. Riley: On December 5, 2011 the City of Greensboro Stormwater Management Division completed an industrial compliance inspection of the Vecellio and Grogan, Inc.. Local regulations permit an inspection of industrial facilities under authority granted by City of Greensboro Code of Ordinance Chapter 30, Article 12, Section 7.1 (C-5). This inspection consisted of two parts: a review of the facility files/records and an on -site facility inspection. The inspection was performed by Rebecca Wells, and the following deficiencies/observations were noted during the inspection. Stormwater Pollution Prevention Plan/Spill Plan Review Site Maps and SWP3 ♦ No deficiencies observed. Spill Prevention and Response Plan ♦ No deficiencies observed. Monitoring ♦ Conduct and document water quality sampling. Employee Training ♦ Properly train employees on appropriate record keeping and inspections of the stormwater drainage network. ♦ Keep employee training records in the Stormwater Pollution Prevention Plan. Site Inspection Preventative Maintenance/Good Housekeeping ♦ No deficiencies observed. Non-Stormwater Discharges ♦ No deficiencies observed. It is recommended that Vecellio and Grogan, Inc. take appropriate actions to correct the noted deficiencies. If you have any questions concerning this inspection; please contact me at 336-373- 2516 or Rebecca.Wells@greensboro-nc.gov. Sincerely, Rebecca Wells, Water Quality Analyst City of Greensboro, Water Resources Department cc: Peter Schneider, Water Quality Supervisor Mike Mickey, NC Department of Environment and Natural Resources Industrial Inspection File W A TF O�G RQG Michael F. Easley, Governor William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources Q Alan W. Klimek, P.E. Director Division of Water Quality August 18, 2006 Mr. Bob Kennedy Vecelho & Grogan, Inc. 6311 Burnt Poplar Road Greensboro, NC 27409 Dear Mr. Kennedy: Subject: NPDES General Permit NCG160000 Certificate of Coverage NCG160176 Veceflio & Grogan, Inc. Formerly Sharpes Hot Mix Asphalt Plant Guilford County Division personnel have reviewed and approved your request to transfer coverage under the General Permit, received.on June 3, 2006. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the 'requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. ,If.you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. Sincerely, ORIGINAL SIGNED BY KEN PICKLE Alan W. Klimek P. E. CC DWQ Central Files Winston-Salem Regional Office, Watcr Quality Section Stormwater Permitting Unit NolthCarolina Alatumlly North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N. Salisbury St, Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper ,j STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160176 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215,1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, VECELLIO & GROGAN, INC. is hereby authorized to discharge stormwater from a facility located at VECELLIO & GROGAN, INC. 6311 BURNT POPLAR ROAD GREENSBORO GUILFORD COUNTY to receiving waters designated as an unnamed tributary to the East Fork Deep River, a class WS IV stream, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 1I, 111, IV, V, and VI of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective August 18, 2006. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 18, 2006. ORIGINAL SIGNED BY KEN PICKLE Alan W. Klimek, Director Division of Water Quality By Authority of the Environmental Management Commission o�,oF WA r�RQG o -c September 14, 2005 Mr. James I. Womble Sharpe Brothers Grading 2854 Hacketts Lake Road Greensboro, NC 27406 Michael F. Easley, Governor . William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality Subject: General Permit No. NCG 160000 Sharpes Hot Mix Asphalt Plant COC No. NCG160176 Guilford County Dear Mr. Womble: In accordance with your application for a discharge permit received on July 25, 2005 we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state -- NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended). If any parts, measurement frequencies, or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions concerning this permit please contact Aisha Lau at telephone number (919) 733-5083 ext. 578. Sincerely, ORIGINAL SIGNED BY BRADLEY BENNETT Alan W. Klimek, P.E. cc: Winston-Salem Regional Office Central Files Stormwater Permitting Unit Files Attachments No Carolina Nturrrl1y North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Intemet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recyded130% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160176 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Sharpe Brothers Grading is hereby authorized to discharge stormwater from a facility located at Sharpes Hot Mix Asphalt Plant 6311 Burnt Poplar Road Greensboro Guilford County to receiving waters designated as an unnamed tributary to the East Fork Deep River, a class WS IV stream in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, 1I1, IV, V and V I of General Permit No. NCG 160000 as attached. This Certificate of Coverage shall become effective September 14, 2005, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 14, 2005, ORIGINAL_ SIGNED BY BRADLEY BENNEiT Alan W. Klimek, P.E. Director Division of Water Quality By Authority of the Environmental Management Commission IOU Rog 'Vow won !a (U11:1 am ;• fir! �r ,.`• .� � : �" . � , ,�, � � � �%,' _� ��rl 977 • `�.1 l� yr��#� r ;., ^�'1�, � .� � ��� �'�.fi '\` ���.'�j'� 7. }r PIN Nt Syl � Y � _ � � l� _ � w ��Gs�pl�n»� ���.. � � •'�. rfr.. r /. _�tR'. I �v� !y� ll won �..W rC .t "•��y ,ti - i"`�f' '` �.._/ �, aft ..g�;"J" 1 3 •F�i in Q1IIl4�y�7i0Y _..'-� �4i - , €f �:/ 7 K's KQQ f ~ r 15 � � ���.. �' �� -tee _ e � a� � , -� • ��f . ..� ff'IryJ •1 dNa � t x�} r� +.� \ ,•r'i'" � �-" C'--. �� '� �. '. .� = , .�� NAP ,,, �lsh'�r' i S (— - = Ql- c ,. _- �L��£ � I i� +.---/ • _ %� . ' -� , �.�• �:t''� �.. i/l � r �'` .,ter W ! �i�>,. [:.a.�° x {�e✓� ,� `" '�' I + �ti p •� ems` "�„ 7[ N .ss �T' y/ ,`-.-...~.,...x.�.' ��. A. •0� � � - ti g, . 1 -'-'+' _ 1 dr � �etj �,� .� ;•'+ � w %•� F.�y�-,,M�„ �.^. �'•' i'""i 92$ t .� f� -�\,;�j� I ��� K ..r' f , i � - _ .\� � � � R � � - _: ✓la... -��+ 1 � � � .� � I � I . - moo'` r • :r I �,� ~ •� j�; �%` I�l�� 4. i r�1 "`� � �: irls4iY1...'�` � - I ,z, .,. � � NJ I' ~ Copyright (C) 1998. Maptech, Inc. Permit: NCG160176. SOC: County: Guilford Region: Winston-Salem Contact Person: John Riley Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Insnection Report Effective: 10/02/14 Expiration: 09/30/19 owner: Sharpe Bros Division of Vecellio & Grogan Effective: Expiration: Facility: Sharpe Bros. A Division of Vecellio & Grogan, Inc. 6311 Burnt Poplar Rd Greensboro NC 27409 Title: Phone: 336-235-2756 Certification: Phone: Inspection Date: 07/28/2017 Entry Time: 10:OOAM Exit Time: 11:00AM Primary Inspector: Jack Kitchen Phone: 919-218-8409 Secondary Inspector(s): Reason for Inspection: Routine inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page: 1 permit: NCG160176 Owner - Facility: Sharpe Bros Division of Vecellio & Grogan Inspection Date: 07/28/2017 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary; The Facility no longer manufactures asphalt or maintains above ground storage tanks (AST). The only activity performed at this location is processing of Reclaimed Asphalt Shingles (RAS). Piles of shingles and RAS were observed. Stormwater migrates to a centrally located storm drain that is surrounded by filter booms and riprap. The runoff water is collected in a retention basin. The retention basin is equipped with an overflow drain that discharges to a smaller basin. The water level in the first and larger retention basin was approximately four feet below the overflow drain. Rainwater may collect in the in the smaller basin. No sediment or oil sheen was observed in the water collected in either of the basins. Mr. Riley and Mr. Martin, of Sharpe Brothers of Vecellio/Grogan, stated that they have not observed a discharge from the retention basin. The storm water Pollution Prevention Plan/ Spill plan(SPPP) was made available for review and appeared to be complete. Employee training records are maintained at a corporate office. Routinely only one employee is stationed at this facility. The facility does not store large volumes of liquid on site. All above ground storage tanks have been removed. The SPP is being updated to reflect the removal of ASTs. No vehicle maintenance is conducted on the property. The facility has contracted with Prism Laboratories, Inc. to conduct monitoring. On March 31, 2014, Qualitative and Analytical samples from outfall #001 were documented. Total Suspended Solids results were 44mg/L and below benchmark requirements. On January 3, 2017, the City of Greensboro Stormwater Management Division completed an inspection at Sharpe Brothers. The deficiencies observed by McKenzie Smith appeared to have been addressed and no deficiences were observed on July 28, 2017. Page: 2 Permit: NCG160176 Owner - Facility: Sharpe Bros Division of Vecellio & Grogan Inspection Date: 0712812017 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ! ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? G ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ! ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ 11 ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Emplovee training records are located at a corporate office_ Routinelv only one emolovee is stationed at this facility. Quj lita ive Monaoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ 110 Comment: Conducted on March 31 2017._ The total precipitation recorded was 0.43 inches. Outfall #001 Pipe to the level separator (before outfall) The sample was described as light, brown without odor. Clary was recorded as moderately cloudy (3 of 5) and no floating solids. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑❑■❑ Comment: Samole collected on March 31. 2017_ Results for TSS: 44 ma/L. No asphalt production on site and no vehicle maintenance is perfomed at this location. A retention basin is utilazed and samples may have collected grior_to outfall location. No Discharge / No Flow reporting and documentation was reviewed with the facilily contact. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ Cl 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ® ❑ Comment: The outfall is below a retention basin and overflow outlet / level separator Page: 3