Loading...
HomeMy WebLinkAboutNCG160133_MONITORING INFO_20190122STORMWATER DIVISION CODING SHEET NC6 PERMITS PERMIT NO. DOC TYPE ❑HISTORICAL FILE � MONITORING REPORTS DOC DATE ❑ � � I _I C � ,� �` YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 01/09/2019 CERTIFICATE OF COVERAGE NO NCG16 0 1 3 3 FACILITY NAME Piedmont Asphalt,-I_C - Pelham Plant COUNTY Caswell PERSON COLLECTING SAMPLES Julian Stinson LABORATORY Pace Analytical Lab Cert. # Comments on sample collection or analysis: 633 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June Q July -Dec or ❑ Monthly' (monthl DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE -) ❑ No discharge this period?' Outfall No Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 12/17/2018 0 04" 3 0 mg/L RECOvED AN 11 zols UTVR SECTlO I I Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on -site ram gauge Unattended sites maybe eligible for a waiver of the ram gauge requirement 4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported In the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ;12 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, IncheS3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part 8 Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ No ❑ REGIONAL OFFICE CONTACT NAME Mari an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED' "I certify, under penalty of law, that this document and all attachments were prepared under my direction or Supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " 1100 (Date) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 06/07/2018 CERTIFICATE OF COVERAGE NO. NCG16 0 1 3 3 FACILITY NAME Piedmont Ash- LLC -_Pelham Plant COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical Lab Cert. # 633 Comments on sample collection or analysis. Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD 0 Jan -June ❑ July -Dec or ❑ Monthly) (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑zero -flow [—]Water Supply [:]SA Other C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period 22 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 05/31/2018 0011, 3 7 mg/L RECFI\/F-D JUN I 1 2018 CENTkAL FILES DWR SECTION Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on -site rain gauge Unattended sites maybe eligible for a waiver of the rain gauge requirement 4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. For example, do_not_report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported in the format. "<XX mg/L where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date 10/1/2014-9/31/2019 5WU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this perlod?2 Qutfall No, Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks = => _ - 15 mg/L 100 mg/t or 50 mg/L Footnotes from Part A also apply to this Part 0 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3• HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMITS YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME Mail an onainal and one cony of this DMR, rncludrna all "No Drscharae" reports, within 30 days of receipt of the lab results for at end of monitorina period in the case of "No Discharae" reports) to Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " (Signature o ermittee) (D e) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted CERTIFICATE OF COVERAGE NO. NCG16 o 1 3 3 FACILITY NAME Piedmont Asphalt, LLC - Pelham Plant COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical _ Lab Cert. # 633 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2011 SAMPLE PERIOD [Jan -June ❑ July -Dec —� or ❑ Monthly" (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this pernod;�' Outfail No. Date Sample Collected) (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids Benchmarks ===> - - 100 mg/L or 50 mg/0 0(ollgi oil 051 ' 1 � MAP, ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here -1Thetotal precipitation must be recorded using data from an on -site ram gauge Unattended sites may be eligible for a waiver of the rain gauge requirement ° See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported in the format, "<XX me/L". where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 ISGT-HEM) Total Suspended Solids Benchmarks 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME Mail an original and one copy of this_DMR including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " Permittee) 6 Uze 7 (Date) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 f - 7 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 12/12/2016 CERTIFICATE OF COVERAGE NO. NCG16 0 1 3 3 FACILITY NAME Piedmont Asphalt. LLC - Pelham Plant COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical Lab Cert. # 633 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June Q July -Dec or ❑ Monthly' (month} MO TO CLASS ❑ORW ❑HQW - []Trout ❑PNA RECEM ❑Zero -flaw ❑Water Supply [:]SA DEC 19 2A []Other CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION ❑ No discharge this period ;2 Outfall Na. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches} Total Suspended Solids Benchmarks =__> _ - 100 mg/L or 50 mg/0 001 11/29/2016 0 32" 10 5 mg/L 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on -site rain gauge Unattended sites may be eligible for a waiver of the rain gauge requirement ° See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. Far example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported in the format, "<XX mg L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. Permit Date 10/1/2014-9/31/2019 5WU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period," Outfall No. Date Sample Collected mo/dd/yr 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> _ - 15 ►rig/L 200 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 2, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND KART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMITS YES ❑ NO Cj REGIONAL OFFICE CONTACT NAME Mail an on final and one capy of this DMR, includingall "No Di har e" reports, within 30 days of receipt of the lab results for of end of monitoring period n the case o "No i har e" reports) o: Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " of Permit Date 10/1/2014-9/31/2019 /Z/12-LOAC (Date) SWU-252, last revised 9/17/2014 Page 2 of 2 (�5a'ceAnalytical' wwwpecam .com Pace Anatytical Services, LLC 205 East Meadow Road - Suite A Eden NC 27288 {336}623-8921 ANALYTICAL RESULTS • Project Pelham Asphalt Plant 001 Pace Project No 92321239 Sample Pelham Asphalt Plant 001 Lab ID 92321239001 Collected 11129/16 13 15 Received 11130116 1100 Matnx Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No Qual 25400 Total Suspended Solids Analytical Method SM 25400 Total Suspended Solids 105 mg1L 25 1 12101l16 15 20 HEM, Olt and Grease Analytical Method EPA 1664B Oil and Grease <5 0 mg/L. 50 1 12/09/16 08 00 Date 12/09/2016 04 50 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Without the written consent of Pace Analytical Services, LLC Page 5 of 12 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 7/12/2016 CERTIFICATE OF COVERAGE No. NCG16 0 1 3 3 FACILITY NAME PledmontAsohalt,LLC - Pelham Plant COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical Lab Cert. a 633 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results ao/. SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD Q An=June ❑ July -Dec orb® Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA .tom ❑Zero -flow ❑Water Supply ❑SA ,e ❑Other F PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Outfali No. pate Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/0 001 06/15/2016 1 82" 20 2 mg/L No discharge this period �" RFOR ED JUL 15 2016 UWR :TI-CTION J."I ORNIATION PROCESSING UNIT ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the ram gauge requirement ' See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non- numericalformat When results are below the applicable limits, they must be reported in the format, "<XX me/l� where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text. Permit Date 10/1/2014-9/31/2019 5WU-252, last revised 9/17/2014 Page 1 of 2 Part B: t Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new ail per month. No dischorge this period;" Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids 'Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALO YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME Mail an oriainal and one copv of this DMR, includina all "'No Discharae" reports, within 30 days of receipt of the lab results for at end of monitorina period in the case o "No Discharge' reports) to: Division of Water Resources Attn DWR Central Files 1617 Mail Servue Center ' Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of,law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " of Permittee) 02i r,2/,zoa (Date) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 aceAnalytical wmvpacelabs corn 1 i ANALYTICAL RESULTS Project PELHAM ASPHALT PLANT Pace Project No 92301673 Pace Analytical Serves, Inc r. 205 East Meadow Road - Suite A Eden NC 27288 (336 )6'2 3-8921 Sample PELXAM ASPHALT PLAINT Lab ID 92301673001 Collected 06/15/16 21 00 Received 06/16/16 13 52 Matrix `hater 001 Parameters Results Units Report Limit Dr Prepared Analvzed CAS No Qua! 2540D Total Suspended Solids Analytical Method SM 2540D Total Suspended Solids 202 mg/L 2 8 1 06/16/16 15 27 Date 07/06/2016 09 21 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full, without the wntten consent of Pace Analytical Services Inc Page 5 of 8 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 -Asphalt Date submitted CERTIFICATE OF COVERAGE NO. NCG16 0 1 3 3 FACILITY NAME Piedmont Asphalt. LLQ - Pelham Plant COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical Lab cent. q 633 Comments on sample collection or analysis. Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD ❑ Jan -tune M July -Dec or []Monthly' _ (month) DISCHARGING TO CLASS ❑ORW ❑HQW [-]Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 3 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 11/19/15 1 32" 6 9 mg/L No discharge this period ;12 R EEGEIVED DEC 10 Z015 CENTRAL FILES DWR SECTION 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3 The total precipitation must be recorded using data from an on -site rain gauge Unattended sites may be eligible for a waiver of the rain gauge requirement ° See General Permit text, Table 3, identifying the especially sensitive receiving water classificattons where the more protective benchmark applies Note Results must be reported in numerical format. For examle, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this perrod?z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, inches' Non -polar O&G by EPA 1.664 (SGT-HEM) Total Suspended Solids Benchmarks 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 9 responses See General Permit text. FOR PART A AND PART B MONITORING RESULTS A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3' HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME Mail an_oriarnal and one Cony Of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring, period in the case of "No Discharae" rep_ortsl to: Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing vtolattons " I Z 7 'Z "1S (Date) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 ac;Analytical' w�rwpacefabsoom ANALYTICAL RESULTS Pace Analytical Services, Inc / 245 East Meadow Road - Suite A Eden NC 27288 (336)623-8921 Project PELHAM PLANT 001 Pace Project No 92277066 Sample PELHAM PLANT 001 Lab ID 92277066001 Collected 11/19/15 12 10 Received W20/15 11 09 Matrix Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No Qual 2540D Total Suspended Solids Analytical Method SM 2540D Total Suspended Solids 69 mg1L 25 1 11/23/15 14 37 HEM, Oil and Grease Analytical Method EPA 1664B Oil and Grease <5 0 mg/L so 1 12102115 06 10 Date 12/02/2015 03 22 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Seances Inc Page 5 of 11 �-PaceAnalytical' i wuw oir elate cam CHAIN -OF -CUSTODY 1 Anaiytical Request Document The Chaln-of Custody Is a LEGAL DOCUMENT All relevant fields must be completed accurately Sectton A Section 8 Section C UP Page of M d Required Client Information Required Protect Infor lm Invo,ee infonnatjon Company f Report To S Aitenhph 184 5236 o Add, s Copy To Gonrpany Name REGULATORY AGENCY a ! f Address F NPDES f GROUND WATER r DRINKING WATER UST j RCRA I " OTHER Emed To Purchase Order No Pace Quote rr . L /e l Reference Pawn F I I'rDleci Na^ie Pace P,olesl Site Location .% �• Manager STATE Requested Duo DalarrAT Prtryect Number Pncrr Profile a Requested Analysis Filtered {Y/N) Section D Matrix Codes g a r 2 Required Client lnfomttian MATRIX f CODE g COLLECTED Preservatives i. Dnnking WaleT ❑W 8 0 4','aI WT Wasin Water WW U COMPOSITE COMPOSITE Product P s m START rNDIGRA13 W _Z Soil/Snlid SL y X t, p in SAMPLE ID wipe wP o g r C �j (AZ Fur AR o w a H Sample IDS MUST OE UNIQUE Tlss�TS L) U a }. z 175 , Other ar Other 1 N 7E .ti 1Y fl a.a Iss O rri Q O) to L f,fr F+ p y V L _ a m N DATE T-IML DATE TIML rn u 7 i i x Z Z 70 y x Pace Project No ! Lab I D e l Pia -COL VT C, 111191K 0:100.1 X X 2 Pia -ao it 1 3 4 5 6 T 8 g 10 71 12 ADDITIONAL COMMENTS RELINQUISHED 13Y 1 AFF1LtAT10N DATE TIME ACCEPTED BY f AFFILIATION DATE TIME SAMPLE CONDITIONS 1 e?e low", I SAMPLER NAME AND SIGNATURE ORIGINAL Q p tl N C PRINT Nome of SAMPLER ] DATE Signed V N p • SIGNATURE of SAMPLER ,�y'�� (MMfODfYY) � (X`—' � Important Note ay srpnmg this form you are apeephng Paces NET 30 day payment te"S end agrverrig to Late crurges of 1 5% per month hx any m� not Pad wnnm 30 days F-ALL-0-020fev 07 15-May 2007 Semi-annual Stormwater Discharxe Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 06/23/2015 CERTIFICATE OF COVERAGE NO. NCG16 0 1 3 3 FACILITY NAME Piedmont Asphalt_ LLC - Pelham Planj COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical Lab Cert. # 633 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD 0 Jan -June ❑ July -Dec or ❑ Monthly' month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow [:]WaterSupply []SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids Benchmarks 100 mg/L or 50 mg/L 001 06/14/15 0561. 113 mg/L No discharge this period 72 kl�_CEIVED JUN 2 5 ZU15 CENTRAL FILES DWR SECTION ' Monthly sampling (instead of semi-annual) mast begin with the second consecutive benchmark exceedance for the same parameter at the same outfall For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on -site rain gauge Unattended sites maybe eligible for a waiver of the rain gauge requirement See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Titer 3 responses. See General Permit text. Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 ;riLY, Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period Outfall No. Date Sample Collected' (mo/dd/ r 24-hour rainfall amount, Inches" Non -polar O&G by EPA 1664 SGT-HEM Total Suspended Solids Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note, if you report a sample value in excess of the benchmark, you must Implement Tiler 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES 1N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME Mail an original and one copy of this DMR, including all "No Discharae" reports, within 30 days of receipt of the lob results for at end of monitoring period In the case of "No Discharae" reports) to. Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED, "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system desgned to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false mformatton, including the possibility of fines and imprisonment for knowing violations " 'm- zz (Signature ermittee) (Date) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 acmnalytical e WWpacelah&WM 1 ANALYTICAL RESULTS Paco Anslyttcat Services -Inc 205 East Meadow Road - Suite A Eden NC 27288 {336)6234WI ` Project PELHAM PLANT Pace Project No 92254720 Sample PEL"AM PLANT 001 Lab 10 92254720001 Collected 06/14/15 17 40 Received 06/1711510 00 Matrix Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No Qual 2540D Total Suspended Solids Analytical Method SM 2540D Total Suspended Solids 113 mg1L 26 1 06/18/15 13 36 bate 06/21/2015 03 15 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Services Inc Page 5 of 10 Semi-annual Stormwater DischaEgee Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 11-26-14 CERTIFICATE OF COVERAGE NO. NCG16 0 1 3 3 FACILITY NAME COUNTY Caswell PERSON COLLECTING SAMPLES Steven Ashworth LABORATORY Pace Analytical Lab Cert. # 633 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ® July -Dec R�� � �� or ❑ monthly'-. __ Imonthl ING TO CLASS ❑ORW ❑HQW []Trout ❑PNA DEC 0 1 2014 []Zero -flow []Water Supply []SA ®Other C CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4 No discharge this period Outfall No. Date Sample Collected (me/dd/yr) 24-hour rainfall amount, Inches Total suspended Solids Benchmarks 100 mg/L or 50 mg/L 001 11 /17/14 038 2 8 m /L Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on -site rain gauge Unattended sites may be eligible for a waiver of the rain gauge requirement See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies Note Results must be reported in numerical format. For example. do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format When results are below the applicable limits, they must be reported in the format, "<XX mx/L" where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc in mg/L Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period;" Outfall No. Date Sample Collected' mo/dd/ r 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 SGT-HEM Total Suspended Solids Benchmarks ==> - 15 mg/L 100 mg/L or 50 mg/L Not Applicable Footnotes from Part A also apply to this Part B Note. If you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS • TIER 3- HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMITS YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME Mail an orraJnal and one -cony of this DJWR, J Edina a_I!! "No Dis�h�r a".repp , within dons of re-ceint of the lab results for at end of monitorina period in the case of "No OJscharae" renortsl to: Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFQRMATION REPORTED: t "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " Permittee) Dcs­-G4 AA C'hWS:A, G+-\ + z5 (Date) Permit Date 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) GENERAL PERMIT NO. NCG160000 DISCHARGE MONITORING REPORT (DMR) CERTIFICATE OF COVERAGE NO. NCG16Q[�Q 3[] FACILITY NAME Piedmont Asphalt, LLC - Pelham Plant PERSON COLLECTING SAMPLES _Steven Ashworth CERTIFIED LABORATORY_ Pace Analyticai Lab # 633 Pace Analytical Lab # 12 Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2Q14 (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory) COUNTY Caswell PHONE NO.( 336 ) 388-9581 RECEIVED AUG 2 6 2014 e->= k' Outran No, Date Sample Collected, mo/dd/ r Total Ruitdat), inches 00530 00556 Total Suspended Solids, mg/l p 800 Standard units Total Petroleum Hydrocarbons, mg/l EPA Method 1664 SGT-HEM l3enchmark - - 100 Within 6.0 - 9.0 1S 1 08118/14 022 167m /1 64 ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier I or Tier 2 responses in the General Permit Mail original and one copy to: Division of Water Quality Attn Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based un my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " 9�-2� , 'M , '5��—' �8 Aa -e /a. (SignaturiAr Permittee) (Date) SWU-252-051409 Page IofI ceAnaVical nwwwabbs.com ANALYTICAL RESULTS Pace Analytical Services, Inc 205 East Meadow Road - Suite A Eden, NC 27288 r (336)623-6921 Protect Piedmont Asphalt, LLC Pace Protect No 92213808 Sample PELHAM PLANT- Lab ID 92213808001 Collected 08/18/14 11 30 Received 08/19/14 09 45 Mabu Water OUTFALL 001 Parameters Results Unrts Report Limit DF Prepared Analyzed CAS No Qual 2540D Total Suspended Solids Analytical Method SM 2540D Total Suspended Solids 16 7 mg/L 25 1 08/20/14 15 23 HEM, Oil and Grease Analytical Method EPA 1664E Oil and Grease ND mg/L 5 0 1 08/21/14 10 58 Date 08/21 /2014 03 15 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full without the written consent of Pace Analytical Services tnc Page 5 of 12 RECEIVED N C Dept of ENR !AN 31 2013 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) 9onwofice Calendar Year 2012 General Permit No NCG160000 Certificate of Coverage No NCG16 0❑F1100❑ This monitoring report summary is due to the DWO Regional Office no later than 30 days from the date the facility receives laboratory sampling results from the final sample of the calendar year. Facility Name Piedmont Asphalt, LLC - Pelham Plant County Caswell Phone Number 3( 36 J 388-9581 Total no of SDOs rnonitoreo Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Nf- Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No 9 If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Outfalt 1 Total Rainfall inches 00530- 00400 Vehicle Maintenance Activities TSS, mglt, pH, s it. Method 1664A (SGT-HEM) Non-Polar O&GI Total Petroleum Hydrocarbons, m IL New Motor Oil Usage, gal/month Benchmark N/A 100 6 0—. 9 0 1s N/A Date Sample Collected mofddlyr y r , ..y i'1l.A f�,l' i��iP•,�{� =`h 1°5�, ".� f 1'i •5 !4 ��r vi�l.a% S, ��i �L'r rE. z �;.4'��+3' . � �� tr'.v3.' iSS� S i4 �l�i� ..-ar"� T s�;if: �.a `.3 .k l _ <_ a^-`aY�?-�..: ii'" w.--+" ��', X' r' t»-•ice;. 1 .:t _• ✓- • s-�•_-_ -<. �54��.u�."-. ��! � t: i,•�5�. �-., � �i t - % T'il, t1.:•e="F �¢.r ..�.:,.Tt... �.,. •T_� f AS��.iw ' �sf,.,.• %`."� ' rE•"=.-[7a.:- I ' � �v` V"` =_ i�'i' t-'-4=d.�-1`',�1 �`I � �tiT`�ry 4# z �': `-w"r, i,- , �.: � _ �S £1 fr YY • - �'� �� , �+'� q..c � � - 05114112012 068 6 1 6 4 ND ---- 03 Last Devised 7-1-2010 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " Signature Date I Mall Annual DMR Summary Reports to: DWQ Ropional Office Contact Information- AsheWle Office Fayetteville Office Mooresviile Office Raleigh Office Washington Office Wilmington Office Winston-Salem Central Office (828) 296-4500 (910) 433-3300 (704) 663-1699 (919)791-4200 (252) 946-6481 (910) 796-7215 (336) 771-5000 (919) 807-6300 ASHEVILLE REGIONAL OFFICE `FAXETTEVILI,E REGIONAL OFFICE' MOORESVILLE REGIONAL OFFICE i 2090 US Highway 70 ` 225 Green Street 610 Bast Center Avenue/Suite 301 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville NC 28115 (828) 296-4500 i Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 WII.,MI. NAL OFFICE NGTON REGIO 1__R_-�.__ _._-.-_�_____ L_0___ RAI,E[GH EZw:GIUNAL OFFICE —W_ �—.—__ � WASHINGTON 12EGIONAI.OFFICE 3800 Bariett Drive 943 Washington Square Mall 127 Cardinal Drive Extension Raletgh, NC 27609 I Washington, NC 27889 Wilmington NC 28405-2845 (919)791-4200 (252)946-6481 1 (910)796-7215 WINSTON-SALEM REGIONAL I - - - CENTRAL Ofr'FICR - - - _ ' OFFICE ` 1617 Mail Service Center 585 Waughtown Street # Raleigh, NC 27699-1617 Winston-Salem, NC 27107 (919) 807-6300 (336) 771-5000 l "To Pteserve grotery and enhance Norlh ("a(oflniss S iVdiEr Last Revised 7-1-2010 RKEIVED N C De;� of ENR NOV 1 � 2012 STORMWATER DISCHARGE OUTFALL (SDO)walem Reyston-Sornai Ofrtoe ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year ).Qt I General Permft No. NCG160000 Certificate of Coverage No. NGG 1 fi0ID0ID❑ This monitodng deport summary is dua to the DW O Regional Office no later than 30 days from the date the facility receives laboratory sampling results from the Met sample of the calendar year. Facility Name: Li e&nOnj County ig f Phone Number: i33 b 1; Total no. of SDOs monitored o u fall No. i is this outfall currently In Tier 2 (monitored monthly)? Yes ❑ No [!f Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No [y If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ 5WU-25ONCG16-051709 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my ingtdry of the person or persons who manage the system, or those persons directly responsible for gathermg the information, the information submitted is, to the hest of my knowledge and belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature Date i 1 Mai! Annual DMR Summary Reports tot DWQ Redbnal Office Contact triforrwAon: Asheville Office... .. (828) 2964500 FayetteAle Office ... (910) 433-3300 Mocresw"fle Office ... (704) 663-1699 Raleigh Office ....... (919) 791-42M Washington Office ...(252) 946-Ml Wilmington Offer .. (910) 796-7215 Winston-Salem . _ (336) 771-5000 f: entr-W Office ..... ..(919) 807-63M ASHEVIl3;E_;Itt3C�IONAi.�� ta'AYE'�1'EV1L � 10 AL�OF�IGE i13O�0iRk�V�I3U&REGIUNAI:�IF'�ICI?'J. 2090 US Highway 70 225 Green Street +Sl 0 East Center AveriuelSuite 301 E Swannanoa, NC 2877$ ► SystelBuilding Suite 714 Mooresville, NC 28115 j (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910)433-3300 RALEtCHiR>IiHAI! GE J WA5E3NCT7N,iONhCF,1C: wt[,MINGTON7�[�[�ION�AL�(iFi±[CF. 3800 Barrett Drive ! 943 Washington Square Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 1W- 1 '! ON=SA F fH'.REGl 3NALT - V AL C1 1617 Mali Service Center *To 585 Waughtown Street Raleigh, NC 27699-1617 an enhanm Winston-Salem, NC 27107 (919) 807-6300 (336) 771-5000 SWU-25ONCG16-051709 x qe k °B RR VE1" A 5 2a STORMWATER DISCHARGE OUTFALL (SOO) ash ANNUAL SUMMARY DATA MONITORING REPORT (D)---- Catendar Year oZflf� General Permit No. NCG160000 Certificate of Coverage No. NCG 1 fiOQL�]®❑ This monitoring report summary is due to the DWQ Reglonal Office no later than 30 days from the date the facility receives laboratory sampling results from the final sample of the calendar year Facility Nam a-Ebv"o'-i /� `-�tiA-�- T, LL C — Aec',/Ae�t R—"'wT County: H/r z- Phone Number: (33,6) �3 r1 1 Total no. of SDOs monitored outfali No. I Is this outtall currently in Tier 2 (monitored monthly)? Yes ❑ No [j� Was this outkdl ever in Tier 2 (monitored monthly) during the past year's Yes ❑ - No [9 If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough Consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ SWU-25ONCG16-051709 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to -assure that quarrWd personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly resporoble for gathering the mformabon, the information submitted is, to the best of my knowiedge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of tines and imprisonment for knowing violations." Signature -h) • "'�r'—"j Date Z/ 9 f z o Mail Annual DMR Summary Reports to: DWO Rmlonal Office Contarf lnfor nation: Asheville Office ..... (828) 296-4500 FayeitMle Office ... (910) 433-3300 Moaresvflle Office.. (704) 663-IlW9 Rak4gh Office ..... (919) 791-4200 Washvngton Office ...(252) 946-6481 Wilmington Office ... (910) 79&-7215 Winston-Salem _.... (336) 771-5000 Central Otfre .. .(919) 807-6300 i 2090 US Highway 70 Swannanoa, NC 28778 (828)296-4500 3800 Barnett Drive Raleigh, NC 27609 (919) 791-4200 -225-Green Street Syitel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 943 Washington Square Mall Washington, NC 27889 (252) 946-W I 610 East Center Avedue/Suite 301 Mooresville, NC 28115 (704)663-1699 127 Cardinal Drive Extension Wilmmgtfln, NC 28405-2845 (910) 796-7215 11'IIriS`7'QN�;�SAI{_L1G�±R_LG1�3NA1� fv�'1,1i.��1 t ?f R 1617 Mail Service Center --to Pme ve, PrWear 585 Waughtown Street Raleigh, INC 27699-1617 ;`� srid enhance Winston-Salem, NC 27107 (919) 807-6300 ith t.ern6rak ua►Qr (336) 771-5000 SWU-25CNCG16-051709 ' RECEIVED N C Dent at EMR STORMWATER DISCHARGE OUTFALL (SDO) MAR n 20)1 ANNUAL SUMMARY DATA MONITORING REPORT (DMR) w Sail Calendar Year 2010 t RF General Permit No NCG160000 Certificate of Coverage No NCG160133 This monitoring report summary is due to the OWQ Regional Office no later than 30 days from the date the facility receives laboratory sampling results from the final sample of the calendar year. Facility Name W L Construction & Paving, Inc, Plant #26 (4318) Pelham, NC County Caswell Phone Number (336) 388-9581 Outfall No. 001 Total no of SDOs monitored 1 Is this outfall currently in Tier 2 (monitored monthly)? Was this outfall ever in Tier 2 (monitored monthly) during the past year? If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecubve samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Yes ❑ No Yes ❑ No E 00530 +00400 i JD0656 Vehicle Maintenance ,Activities Oil g, 1New!Motovoil j (Dutfalll= TotallRainfalkiinches 11 TSS,,mglt- IpH,ssw 'Grease, img/! Osage, gallmonth lBenchmw* 11 IWA ,too {6:0 - six f 30 4 / V/A i Date 1Collected, S 09/27/2010 1 26.8 6.5 ND NA SWLJ-25ONCG 16-051709 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " Signature Date a^fig — L( Mail Annual DMR Summary Reports to: DWQ Renional Office Contact Information: Asheville Office (828) 296-4500 Fayetteville Office (910) 433-3300 Mooresville Office (704) 663-1699 Raleigh Office (919) 791-4200 Washington Office (252) 946-6481 Wilmington Office (910) 796-7215 Winston-Salem (336) 771-5000 Central Office (919) 807-6300 �ASHM, LE +REGIONALOF'FICE 2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 AYETTEWLEE REGIONAL OFFICE 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 ll AUEIGHREGIONAUOFFICE W. 3800 Barrett Drive Raleigh, NC 27609 (919) 7914200 OFFICE 585 Waughtown Street Winston-Salem, NC 27107 (336) 771-5000 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 1617 Mail Service Center Raleigh, NC 27699-1617 (919)807-6300 'MOORESVILL ;REGIONALFOFFICI 610 Fast Center Avenue/Suite 301 Mooresville, NC 28115 (704) 663-1699 W[L'MINGTONIR_ EGIONAIE.,OF,F3CE 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 "7o pte°serve pmfect ' and enhance i ftith Cambna s vi"r SVVU-250NCG 16-051709 11 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Dee Freeman Governor Director Secretary October 25, 2010 Ms Lori, Carter, Division Environmental Representative APAC-Atlantic, Inc — Thompson -Arthur Division Post Office Box 21088 Greensboro, North Carolina 27420 Subject. General Stormwater Permit Inspection — NPDES Permit No. NCG160133 APAC-Atlantic, Inc M-L Construction, Pelham Plant — Caswell County Dear Ms Carter On October 19, 2010, Jenny Graznak of this office performed a Stormwater Permit Inspection at the APAC-Atlantic, Inc /W-L Construction Asphalt Plant located at 1675 Rock Quarry Road in Pelham, North Carolina This facility holds General Stormwater Permit No NCG160133 under the National Pollutant Discharge Elimination System (NPDES) to discharge stormwater from activities associated with Asphalt Paving Mixtures and Blocks You, Rick Holland (Plant Manager) and Neal Echols (Plant Foreman) were present for the inspection This type of inspection consists of two basic parts a review of facility files and self -monitoring data and an inspection of the facility's storage areas and discharge points This particular inspection evaluated five (5) areas, and observations from each area are addressed below 1 Permit The permit became effective October 1, 2009 and expires September 30, 2014 2 Records/Reports As required by the Permit, the facility has a Stormwater Pollution Prevention Plan (SPPP) that was available for review during the inspection Engineering Consulting Services, Ltd (Greensboro) created the SPPP Falcon Engineering is working to prepare a new updated SPPP for the site, in order to comply with the new permit requirements and address recent changes at the site 3Effluent/Receiving Waters Stormwater from the property discharges to Dan River (Class C) in the Roanoke River Basin 4 _Facility Site Review A large portion of the site is used for aggregate storage The site has several aboveground storage tanks (with secondary containment) for diesel fuel, hot oil, industnal fuel, and hydraulic oil The site has two outfalls Ouifall 001 discharges from a large sediment basin at the outer edge of the property The basin was mostly dry on the day of the inspection and very little discharge was noted Outfall 002 discharges from a smaller sediment basin and is located below the Recycled Asphalt Product (RAP) pile on the property Paths were clear to both outfalls North Carolina Dnrtsion of Water Quality, Winston-Salem Regional Office Location 585 Waughtown St Winston-Salem, North Carolina 27107 Phone 336-771-5000 ti FAX 336-771-46301 Customer Service 1-877-623-6748 Internet www ncwaterquality org An Equal Opportunity l Affirmative Achon Employer NonrthCarolina ;Vatumlly 5 Self -Monitoring Program Pace Analytical performs the analytical monitoring for the facility Monitoring was performed on March 12, 2010 and September 27, 2010 Results have not been received yet from the latest sampling event. Please forward these to our office upon receipt Currently, Pace Analytical is performing the pH analysis for the plant, but the site will be receiving a pH meter and training on meter use by the end of the year A rain gauge is maintained at the facility, and the rainfall data is stored in the control room Qualitative monitoring is also performed on a semi-annual basis These inspection reports were available for review during the inspection On -site vehicle maintenance monitoring requirements at the site are waived, since these activities are performed off -site If you have any questions concerning this letter or the attached inspection report, please contact Ms Graznak or me at (336) 771-5000 Sincerely, Steve W Tedder Regional Supervisor Surface Water Protection Section cc WSRO;SWP V Central Files — SWP I Permit NCG160133 SOC County Caswell Region Winston-Salem Compliance Inspection Report Effective 10/01/09 Expiration 09/30/14 Owner W-L Construction & Paving Inc Effective Expiration Facility L Construction & Paving, Inc -Asphalt Plant # 4318 1675 Quarry Rd Contact Person Neal Echc s Title Directions to Facility 382 52 System Classifications Pelham NC 27311 Phone 434-773-2400 Primary ORC Certification Phone Secondary ORC(s) On -Site Representative(s) On -site representative Lon Carter ) iv Phone 336-412-6753 Related Permits Inspection Date 1011912010 EntryTime 10 00 AM Exit Time 11 15 AM Primary Inspector Jennifer F Graznak Phone 336-771-5000 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Asphalt Paving Mixture Stormwater Discharge COC Facility Status ■ Compliant n Not Compliant Question Areas E Storm Water (See attachment summary) Page 1 � Permit NCG160133 Owner - Facility W-♦. Construction & Paving Inc Inspection Date 1011912010 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n ■ n n # Has the facility evaluated feasible alternatives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan Include a BMP summary? ■ n n Q # Does the Plan Include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan Include a Preventative Maintenance and Good Housekeeping Plan ■ 0 n n # Does the facility provide and document Employee Training? ■ n n In # Does the Plan include a list of Responsible Party(s)? ■ n n n # Is the Plan reviewed and updated annually? n ■ n n # Does the Plan include a Stormwater Facility Inspection Program? ■ n n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment Falcon Engineering is working to prepare a new updated SPPP for the site, in order to comply with the new permit requirements and address recent changes at the site Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n n Comment Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical morntonng? ■ n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ■ ❑ Comment Results have not been received yet from the latest sampling event Please forward these to our office upon receipt Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ n n n # Were all outfalls observed during the inspection ■ n n n # If the facility has representative outfall status, is it properly documented by the Division? n ❑ ■ # Has the facility evaluated all illicit (non stormwater) discharges? ■ n n n Page 3 N 0. 19 N to M M 0. Id7 v 0 0 ti N 0 STORMWATFR nISCHARGE OUTFALL (SDO) GENERAL PERMIT NO. NCG160000 DISCHARGE MONITORING REPORT (DMR) CERTIFICATE OF (OVERAGE NO NCG 160 133 FACILITY NAME APAC Atlantic, Inc, Plant # 26 (0431$) PERSON COLLECTING SAMPLE(S) Kenneth N Fcholq ultl ll•IED LABORATORV(S) Pace Anal teal Lob 0 40 Lab # Monitoring Requircmenti SAMPLF—% COLLECTED DURING THY CAIRNDAR VFAIt 7010 (This monitoring report shall be received by the DIVISton no later than 30 days frorr the date the fainiq recteves the Sdmphng resuhS from the laboratory) COUNTY Caswell County_ PIIONE NO (336) 3RR-95R1 Outfall No Date 5awplc Collet led, molddlyr 'total Rainfall, Inches aasaa ounn 00556 Loral Suspended Solids, mull pH, Standard Unit* Iolal Verroteutn hydrocarbons, mgli I?PA Method 1664 SGT--HEM B¢nehsnarkl - too Within 6 0- 9 A I5 1 41a712010 1 258 65 NO 1 If a value is in excess of the benchmark, or outside the benchmark range (for PH), you must implement the Ticr I or I itir 2 rmponses in the Gencral Permit Mali Origival and une copy to Division al Water Qualuy Alto Ceow d File% 1617 Mad Servicc (_Llil[i Raleigh North Carahnu 27699-1617 YOU MUST SIGIN TIIfS CFRI IFICATION FOR ANI INFROMATION RRPORTED "I certify, under penalty of law, that this dncurnenl nnll 011 attnchmtnts were prepared under mi direction or iuperwslnn in areardance with a %ymem designrd to xsswre thitt qu.thfird personnel properly gather and evaluate Itic information submitted Bated on my Inquiry of the Pei son or ptrsnnc who manage the systm, or those persons dirrctly responsibe for gathering the informsnan, the ►nformstion submined is, to the best of m% knowledge and belief, Iruc, accurate, and complete I am aware that there are significant penalties for submitting false inrormatton, including the possibilih of Pncs and imprisionmeul for knowing vinfatlon6 " (Signature of Permfltec) (slate) Form SWU-253.051409 Page t of t Uct 2 r 1 U U4 bbp Lori Carter J,Ifj-412-blbI p 1 THDmARTDHUIt Safety Fimt,4&04V An Equal Opportunity Employer Thompson -Arthur Division APAC-Atiantic, Inc. P. 0 Box 21088 Greensboro, NC 27420 (336) 412-6800 Main FAX: (336) 412-6888 - Main (336) 412-6777 - Estimating (336) 274-5864 - Shop (336) 274-1161 - T&A Trucking (336) 574-0247 - QMS Lab (336) 412-6840 - Executive (336) 412-6751 - Human Resource (336) 275-1833 - Accounts Payable FAX TRANSMISSION COVER SHEET Date: 10 ~r -)-10 From: Ln Cb_41- Ta: Fax: Re: 336 q(. 30 Wkc_�`� YOU SHOULD RECEIVE a PAGE(S), INCLUDING THIS COVER SHEET. IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (336) 412-6800. NOTICE OF CONFIDENTIALITY THIS FACSIMILE MAY CONTAIN INFORMATION THAT IS PRIVILEGED AND CONFIDENTIAL AND/OR EXEMPT FROM DISCLOSURE UNDER APPLICABLE LAW_ THIS TRANSMISSION IS INTENDED SOLELY FOR THE INDIVIDUAL OR ENTITY DESIGNATED ABOVE. IF YOU ARE NOT THE INTENDED RECIPIENT, OR THE EMPLOYEE OR AGENT RESPONSIBLE FOR DELIVERING IT TO THE INTENDED RECIPIENT, YOU SHOULD UNDERSTAND Ti1AT ANY DISTRIBUTION. COPYING OR USE OF THE INFORMATION CONTAINED IN THIS FACSIMILE BY ANYONE OTHER THAN THE DESIGNATED RECIPIENT IS UNAUTHORIZED AND STRICTLY MHIBITED IF YOU HAVE RECEIVED THIS FACSIMILE IN ERROR, PLEASE IMMEDIATLEY NOTIFY THE SENDER BY TELEPHONE C Permit NCG160133 SOC County Caswell Region Winston-Salem Compliance Inspection Report Effective 10J02114 Expiration 09/30119 Owner Piedmont Asphalt LLC Effective Expiration Facility P�edment Asphalt LLC - Pelham Plant 1675 Quarry Rd Contact Person Steven Ashworth Title Directions to Facility System Classifications Primary ORC Secondary ORC(s) On -Site Representative(s) Related Permits Inspection Date 05119/2017 Entry Time 11 OOAM Primary Inspector Paul Williams Secondary Inspector(s) Pelham NC 27311 Phone 434-791-4480 Certification Phone Exit Time 11 45AM Phone 336-776-9660 Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Asphalt Paving Mixture Sterrnwater Discharge COC Facility Status Compliant 61 Not Compliant Question Areas Storm Water (See attachment summary) Page 1 permit. NGG160133 Owner - Facility Piedmont Asphalt LLC Inspection Date 05/19/2017 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary Intake area associated with outfall #2 (Recycled Asphalt Product - RAP area)was observed not to have any type of sediment trap/filter associated with it Mr Williams informed Mr Douglas Dawson, General Manager, and Mr Carl Mitchell, Plant Operator, that this should be corrected ASAP Page 2 Permit NCG160133 Owner - Facility piedmont Asphalt LLC Inspection Date 0511912017 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)7 # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment SPPP dated 1/23/2014 Most recent employee tratning-dated 3/14/2017 Yes No NA NE ■❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ E ❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ E ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment Most recent qualitative monitonng performed on January 9, 2017 and May 8, 2017, respectively Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment Most recent analytical monitoring performed on June 15, 2016 and November 29, 2016, respectively Vehicle maintenance is performed offsite Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 011110 Comment Facility does maintain a rain gauge onsite Page 3