Loading...
HomeMy WebLinkAboutNCG160042_MONITORING INFO_20180720STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /v Cc, / b l,)(-"1 DOC TYPE I ❑HISTORICAL FILE EY MONITORING REPORTS DOC DATE ❑ J O' Tj (i rI YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted June 6, 2018 CERTIFICATE OF COVERAGE NO. NCG160042 FACILITY NAME APAC Atlantic, Inc. Plant #40 COUNTY Forsyth _ PERSON COLLECTING SAMPLES Tommy Prokop LABORATORY ENCO Lab Cert. # 591 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ® Jan -June ❑ July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water supply ❑SA RECEIVED ®Other Class C (Leak Fork) JUL 2 a 2018 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 CEN`VRAL FILES CWR SECTfpN❑ No discharge this period?' Outfall�No. .. v Date�Samplek''_ Collected" ', {mo/dd/yr) 24-h66r rainfalh amount, ': Iriches3, Total Suspended Solids ' Benchmarks =__> _ o. il _ < 100 mg/L or 50 mg/L°. 001 04/24/2018 0.90 110 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/U' where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 ❑ No discharge this period?' Outfall No: -,.Date Sample Collected" (mo/dd/yr) 24-hour rainfall` : ' ' amount Inches 3 ... Non -polar O&G by EPA' 1664.(SGT-HEM) ; Total Suspended -Solids ' Benchmarks =-_> _ - 15 mg/L 3.00' /L or 50 mg/L° Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BYTHE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports. within 30 dovs of receipt of the lab results (or at end of_monitoring_p_.eriod in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware at there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 0fi 06 gas (Signature of Permittee) (Date) Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 f �f0 t_Laborato Accurate. Timely. Responsive, Innovative, 102-A Woodwinds Industrial Court Cary NC, 27511 Phone: 919.467.3090 FAX: 919.467.3515 Friday, May 4, 2018 EI Group, Inc. (TH005) Attn: Doug Albrecht 2101 Gateway Center Blvd., Suite 200 Morrisville, NC 27560 RE: Laboratory Results for Project Number: [none], Project Name/Desc: APAC Plant 40 ENCO Workorder(s): CB01690 Dear Doug Albrecht, Enclosed is a copy of your laboratory report for test samples received by our laboratory on Wednesday, April 25, 2018. Unless otherwise noted in an attached project narrative, all samples were received in acceptable condition and processed in accordance with the referenced methods/procedures. Results for these procedures apply only to the samples as submitted. The analytical results contained in this report are in compliance with NELAC standards, except as noted in the project narrative if applicable. This report shall not be reproduced except in full, without the written approval of the Laboratory. This report contains only those analyses performed by Environmental Conservation Laboratories. Unless otherwise noted, all analyses were performed at ENCO Cary. Data from outside organizations will be reported under separate cover. If you have any questions or require further information, please do not hesitate to contact me. Bill Scott Project Manager Enclosure(s) FINAL This report relates only to the sample as received by the laboratory, and may anly be reproduced in full. I Page 1 of % s� www.encolabs.com SAMPLE SUMMARY/LABORATORY CHRONICLE Cllentl0: PLANT40 Lab1D: C801690.01 Sampled: 04/24/18 13:30 Received: 04/25/18 11:42 Parameter Preparation HE DatelTimefs7 Prep Date/TimeW Analysis Date1Timefs] SM 254OD-1997 NO PREP 05/01/18 05/01/18 15:35 05/01/18 1535 FINAL This report relates only to the sample as received by the laboratory, and may only be reproduced in full. I Page 2 Of 7 CcEO www.enculabs.com SAMPLE DETECTION SUMMARY Client ID: PLANT 40 Lab ID: C801690-01 Analvte ResulGt ELaS MDL POL Units Method Notes Total Suspended Solids 110 12 12 mg/L SM 254OD-1997 FINAL This report relates only to the sample as received try the laboratory, and may only be reproduced In full. Page 3 Of 7 C�GMD www.encolabs.com ANALYTICAL. RESULTS Description: PLANT 40 Lab Sample ID: CB01G90-01 Received: 04/25/18 11.42 Matrix: Water Sampled.04/24/18 13:30 Work Order: CB011590 Project) APAC Plant 40 Sampled By:TOMMY PROKOP Classical Chemistry Parameters ^ - €NCO Cary—fred analyte (NC 5911 Analyte rCAS Number) Results wag Units DM MDL Pal Batch Method Analyzed By Vgtes Total Suspended SolidsA 110 mg/L 5 12 12 SE01002 SM 2540D-1997 05/01/18 15:35 OMR FINAL This report relates only to the sample as received by the laboratory, and may only be reproduced In Pull. I page 4 Of 7 (9 � �0 9 www.enmlabs.com QUALITY CONTROL DATA Classical Chemistry Parameters - Quality Control Batch SE01002 - NO PREP Blank (8E01002-111.1(l) Prepared & Analyzed: 05/01/2018 15:35 Spike Source %REC RPD Andyle Result Flan POL UniU Level Result 0/aREC waus RPD Limit Notes Total Suspended Solids 2.5 U 2.5 mg/L LCS (8E01002-BS1) Prepared & Analyzed: 05/01/2018 15:35 Spike Source %RRC RPD ADRIVIe Result ELM Pal. units Level Result %AEC .Lim ti g RPD M ii Notes Total Suspended Solids 88 2.5 mg/L 100 88 80-120 Duplicate (SE01002-DUP2) Prepared &Analyzed: 05/01/2018 15:35 Source: C901514-01 Spike Source %REC RPD Anallyte R sul Flag P-0L Wits level Resul c/o REC Limits RPD L M11 (totes Total Suspended Solids 53 10 mg/L 57 7 20 Duplicate (8E01002-13UP2) Prepared & Analyzed: 05/01/2018 15:35 Source: C001690-01 Spike Source %REC RPD Analvte Result Ban POL Units Level Result %REC Limits RPD Limit Notes Total Suspended Solids 100 12 mg/L 110 M 20 FINAL TNs report relates only to the sample as rKelved by the laboratory, and may only be reprodumd in full, Page 5 Of 7 www.encolabs.com FLAGS/NOTES AND DEFINITIONS B The analyte was detected in the associated method blank. D The sample was analyzed at dilution. ] The reported value is between the laboratory method detection limit (MDQ and the laboratory method reporting limit (MRL), adjusted for actual sample preparation data and moisture content, where applicable. U The analyte was analyzed for but not detected to the level shown, adjusted for actual sample preparation data and moisture content, where applicable. E The concentration indicated for this analyte is an estimated value above the calibration range of the instrument. This value is considered an estimate. MRL Method Reporting Limit. The MRL is roughly equivalent to the practical quantitation limit (PQL) and is based on the low point of the calibration curve, when applicable, sample preparation factor, dilution factor, and, in the case of soil samples, moisture content. PQL PQL: Practical Quantitation Limit. N The analysis indicates the presence of an analyte for which there is presumptive evidence (85% or greater confidence) to make a "tentative identification". Greater than 25% concentration difference was observed between the primary and secondary GC column. The lower concentration is reported. FINAL This report relates only to the sample as received by the IaboraWry, and may only be reproduced in tall. I Page 6 of 7 Sample Chain of Custody Form Acct#: TH005 Prelog #: CB01690 Client El Group. Inc. (TH005) Project#iReference: APAC Plant 40 Contact: Doug Albrecht Required TAT: 10 Ship To: 2101 Gateway Center Blvd., S►1i1e 20 Morrisville, NC 27560 Report To: 2101 Gateway Center Blvd., Suite 20 Morrisville, NC 27560 ENCO Contact: Lill Scott 102-A Woodwinds Industrial Court Cary, NC 27511 lvlordsville. NC 27560 CBOi690-01 % F6 / m - �,/f d f') - Analyses: TSS SM2540D Containers: 1 - 1t P sampled By: 7en3p' Pei ZEAVI,10-�Cf—'�-�_ ned by:: Condition: _Acceptable _Unacceptable C . ec1 By: l Notes -I/LS = l lig1 Date(lTime: 44 Date/Time: CcInlair:ers io ll4' 541Ir11iio I, It !ray DO, -lain ;J'wllmal r1v.%erv,;lices 0� rocFl;rt!:; bi II Ie Ut=A oendu:o:l !n!.:ra:.±avor+!110 mni7:WCan no four,o tala. 00 N01 rinse contamers prior tr use'- Y'hen t11ling pfa'C{y Ca C&Titalr..rrs uli-o G-F.II:C!1 not to Intl,99 vapi%,,hot msy �t1 4a,;Sed in !iw oler- (kii rwr.':Cri IIiY-:•t`-�M�. Its '�S,{;i1[.in A,N" 0(vati ?s r-,llaCt Sal troes in.] N _11-venlllateil area take apy vp'See c.-i:li'JasG u,:'r t±Jr;atnNt� to I! �a S,ua;;ary- of Rn' fr,anr!;,ly It is t1lo sn:ppel's respo,ssitO,ly to onsure lma! the sa,np!&5 art, vaci ed nt guff, a Magner to pro--erlt bmaKa14e am, ihrr. sl"-y rrovui,ed ternpe!ta1t4ty i5 nlafniained during minsil unlit reGE:pi at the laboratory . A ternveralu_e blank ha; been inOuded to rnetisu,e Ole arlm::enl tamperalure r,f tl,.• euo'_r x¢: ,`';e ri:e :kt t°us rF,rnr a ltr� gnl.7i,s-x tram :tea crxavr, tw:;�a:'r. steno w.tfi tna samples in a Similar manner, Th:s bottle certain oe:on _LEt earns onir, The inrOFnls;(Qlt below are PRECAUTIONARY 53 ATChi[NTS ONLY! All iY?..: :ul hs: vr�i• ;:us:eC b� tree: rla3 _'r,a:s !+er_ -t:�! !.L C!t a':l;arasxa:t r�:: arY.lilr:al ir,Crr!8€cr'. 9• assislaltce. Plr•asC Contact your organ4atiwvs safely rlfoleS iwai_ Caut ons & Abbrwiazlons HCI : HyarochIo=Acta - STRONG ACID! Avolo skin and uru canmc: 41 u..ntarl is rna:±e- r�t;a a;:,ar:++t€ pi=,�a �•rmr� __:� ricer. welt¢;. HNO3;NitricA,,iO - STRONG ACIDI SFRONG QXlOV; R" rwo'o skin arul ey<, cgnlav t[:. It,w: it matt._ l..?€i 1^R !:'d +t �05 inrnq¢4a7; ly y:il:l Astc" HVOh' PhuWhoric Acid --Gi RONG AClrl! Huai.[ sklr, Wfl;7 "' It crr-ra:t ,c e s•.i. ' to r?'T-cie-.r t,­4c VAI! WMW N'.50e : Sutftxic Acid - STRONG ACID! Avoid skin . no rat c crr.;a::. 1: r.;r ram: i5 mass f� r.r• attr:L'i. >,t" _•yr n , ?d13tr':; r,=:h rnt + Aie Acid ; Mucti6c Acid - Amid thin w d eye oonttx-l. t: cor,'o: l 15 1lf,Je. iliG!? tYl^C:e+i ra•?Qs +Fl.n>.�315;�7 ';•ll� .c WY_: ZnAc . Z;nc Acetate - Amid skin and eve Contact if oont=. t5 n.3de (lush a(feG'JC sells :mr?e;tsata!y wi;'1 s:rltCr P`J a e 1 OT NaH$Gk i $oat !11 3hlncul!alg -A or(t sl i� $n.H &yt CO S:t =. 3[ rvnllact i5 I: e, flu:Jl aft Iti MQN.s imr. !4fy Y Itt Ktl! : NaOH ; StxsiLm Hydroxide - ST[IONG CAUSTIC: Amp sk=n and eye comtact, it Gn:l[$ut -is r.,aoe. ilt:s;, rl"adsrl arnns ,ru+?Gdiotaly .=fn-nalel NIeOH :.rOelkianol • Avoid SAIn and Aye conlaiu I' COrilaC: :_ :t,atle teas;, A!!'r[led 'arena n;l rli:tVaF>. With Sr.;18r. STORMWATER DISCHARGE OUTFALL (SDO) 199 ANNUAL SUMMARY DATA MONITORING REPORT (DMR) L5 t1 V Calendar Year: 2017 FEB 2 0 2018 Individual NPDES Permit No. NCS ❑❑❑❑❑❑ or =AR 01lR Eg Certificate of Coverage (COC) No. NCG 160 442 ao1 RMifToNr; This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: APAC Atlantic, Inc. Plant # 40 County: Forsyth County Phone Number: (336) 399-3798 Total no. of SDOs monitored: 1 Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Parameter, units Total Total Rainfall, Suspended inches Solids mgil Benchmark N/A 100 Date Sample Collected, mmlddlyy 4: NOT SAMPLED SWU-264-Generic-13Dec2012 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations," Signature Date _2/14/18 For questions, contact your local Regional Office: DWQ Regional Office Contact Information: ASHEVILLE REGIONAL OFFICE 2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 RALEIGH REGIONAL OI 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4200 INSTON-SALEM REGIONAL OFFIC 585 Waughtown Street Winston-Salem, NC 27107 - - -- - (336) 771-5000 ._-- - — --- FAYETTEVILLE REGIONAL OFFICE 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 WASHINGTON REGIONAL OFFICE 943 Washington Square Mall Washington, NC 27889 (252) 946-6491 CENTRAL OFFICE 1617 Mail Service Center Raleigh, NC 27699-1617 _ _ (919) 8o7_6300 _.._.__......_.._.... MOORESVILLE REGIONAL OFFICE 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704)663-1699 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 "To preserve, prolecl and enhance Norm Carolina's waler..." S WU-264-Generic-13Dec2012 f Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted - 07116/2016 CERTIFICATE OF COVERAGE NO. NCG160042 R EC E I V E DmPLE COLLECTION YEAR 2D16 FACILITY NAME: APAC Atlantic, Inc. Plant #40 SAMPLE PERIOD ® Jan -June ❑ July -Dec COUNTY: Forsyth FEB 2 0 2017 or ❑ Monthly' (month) PERSON COLLECTING SAMPLES: Robert Settle DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY: Prism Lab Cert. N 402 CENTRAL FILES ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis: DWR SECTION ®Other. Leak Fork PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?' Outfall No. bate Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/O 001 07/06/2016 6.2 as 'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here_ 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mp,/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 n No dischorae this period?-' Outfall No. Date Sample Collected' (ma/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> - 15 mg/L 100 mg/L or 50 mg/O Footnotes from Part A also apply to this Part Et Note: if you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Ter 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE OEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of this DMR, includina all "No Discharge" reports within 30 days of receipt of the lab resultsAr at end of monitorina_period in the case of "No Discharge" reports) to: Division of water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that theregre significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations." ure of Permittee) (Date) Permit Date: 10/1/2014-9/31/200 SWU-252, last revised 9/17/2014 Page 2 of 2 P P'RCISM ► \7LhaORATORlES 1W,, Full -Service Analytical & Environmental Solutions El Group, Inc. - Morrisville Josh Dunbar 2101 Gateway Center Dr Ste. 200 Morrisville, NC 27560 NC Certification No. 402 NC Drinking Water Geri No_ 37735 SC Certification No. 99012 FL NELAC Cert No. E87519 VA NELAC Cent No, 460211 Project: APAC Stormwater Testing Project No.: Plant # 40 Lab Submittal Date: 07/08/2016 Prism Work Order: 6070145 Case Narrative 07/15/2016 This data package contains the analytical results for the project identified above and includes a Case Narrative, Sample Results and Chain of Custody. Unless otherwise noted, all samples were received in acceptable condition and processed according to the referenced methods. Data qualifiers are flagged individually on each sample. A key reference for the data qualifiers appears at the end of this case narrative. Please call if you have any questions relating to this analytical report. Respectfully, PRISM LABORATORIES, INC. Angela D. Overcash VP Laboratory Services Data Qualifiers Key Reference: BRL Below Reporting Limit MDL Method Detection Limit RPD Relative Percent Difference Reviewed By Cara C. Rusmisell For Angela D. Overcash Project Manager * Results reported to the reporting limit. All other results are reported to the MDL with values between MDL and reporting limit indicated with a J. This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc. 449 5pringbrook Road - P.U. Box 240543 - Charlotte, NC 28224-0543 Phone: 7041529-0364 - Toll Free Number: 1-800/529-6364 - Fax: 7041625-0409 Page 1 of 5 �. Full-SFull-Servicetii Sample Receipt Summary LnR I S M I Environmental Solutions 07/15/2016 LeaORIROREB AMC. Prism Work Order: 6070145 Client Sample ID Lab Sample ID Matrix Date Sampled Date Received 001 6070145-01 Water 07/06/16 07/08/16 Samples were received in good condition at 5.9 degrees C unless otherwise noted. This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc. 449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224.0543 Phone: 7041529-6364 -Toll Free Number: 1-8001629-6364 - Fax: 7041525-0409 Page 2 of 5 &)RI S M Full -Service AnalyticalEnvironmental Solutions p'R�eon�raeas ewe El Group, Inc. - Morrisville Attn: Josh Dunbar 2104 Gateway Center Dr Ste. 200 Morrisville, NC 27560 Project: APAC Stormwater Testing Project No.: Plant # 40 Sample Matrix: Water Laboratory Report Client Sample ID: 001 Prism Sample ID: 6070145-01 Prism Work Order: 6070145 Time Collected: 07/06/16 14:30 Time Submitted: 07/08/16 14:15 0711512016 Parameter Result Units Report MDL Dilution Method Analysis Analyst Batch Limit Factor DatefTime ID General Chemistry Parameters Total Suspended Solids 88 mg/L 5.0 0.80 1 -SM 2640 D 7112116 14:55 SLS P6130190 This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc. 449 Springbrook Road - P.O. Box 240643 -Charlotte, NC 28224-0543 Phone: 704l529-0364- Toll FmeNumber; l-000/529-6364- Fax: 704l52"409 Page 3 of 5 4 JII Fall -Service Analytical & - L1P L M I Environmental Solutions a.eeMzo�cs .c El Group, Inc. - Morrisville Attn: Josh Dunbar 2101 Gateway Center Dr Ste. 200 Morrisville, NC 27560 General Chemistry Parameters - Quality Control Project: APAC Stormwater Testing Project No: Plant # 40 Level II QC Report 7115/16 Prism Work Order: 6070145 Time Submitted: 7/8/2016 4:15:00PM Reporting Spike Source %REC RPU Analyte Result Limit Units Level Result %REC Limits RPD Limit Notes Batch P6G0190 - NO PREP Blank (PSG0190-BLK1) Prepared & Analyzed: 07/12/16 Total Suspended Solids BRL 5.0 mg/L LCS (P6G0190-BS1) Prepared & Analyzed: 07/12/16 Total Suspended Solids 440 5.0 mg1L 477,0 93 90-110 This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc. 449 Springbrook Road - P.O. Box 240643 - Charlotte, NC 28224.0543 Phone: 7041529-6364 -Toll Free Number: 1-6001629.6364 - Fax: 704/525-0409 Page 4 of 5 xS,�sy:; ,_ ....., [:'r.� 'fh M :pis'?r:1;'ra.:• _..s/�:•:_�!.•:-- ry..r ...-.. .._.Y.------- -__. �� � M Fuil-Service Analytical & CHAIN ®F CUSTODY RECORD �Im'�gq.� i S Environmental Solutions PAGE OF � OUOT`E aTO ENSURE PROPER BILLING: ' V1LAf30RAT0 IES. INC I 449 Springbrook Road - Charlotte, NC 28217 Phone 704629.6364 - Fax: 704625-0409 Client Company Name: Report To/Contact Name: 'I a+ S& e� Reporting Address: g136 A. C—It'jn AV,. %U-S NL 27+os Project Name: Short Hold Analysis: (Yes) (No) UST Project: (Yes) (NO) "Please ATTACK any project specific reporting (QC LEVEL 1 1)111 IV) provisions andlor QC Requirements Invoice To: Address: l,VJ1VUY5CNL7 VOLAT ILES: r-_C:1 I, PROPER CONTAR TEMP. Therm ID YE5 NO NIX. u) ! /iwSlndlcattd7 r � Q7 � ING TIME57> •� �<'- � used? .'. I� : Observed:-°C 1 Corr: , C Phone.-334 _ 70(. - 99.2ax (Yes) {No): -7L 7 - 3"i 9 ) Purchase Order No./Billing Reference Email Address: rA . Sf141ctR 440&C. CQfn Requested Due Date ❑ 1 Day ❑ 2 Days ❑ 3 Days C14 Days LI 5 Days EDO Type: P DF i!EXce l ✓other: "Working Days" O 6-9 Days ❑ Standard 10 days O RushWo;R Must Be ""— Site Location Name: ! Samples received after 14:00 will be processed next business day. Site Location Physical _Address: 14I30 u. G term J41/C Turnaround time is based on business days, excluding weekends and holidays. (SEE REVERSE FOR TERMS Y. CONDITIONS REGARDINu SERVICES i RENDERED BYMSMLABORATORIES, INC. TOCLIENT} TO BE FILLED IN BY CLIENTISAMPLING PERSONNEL Certification: NELAC DOD FL NC SC OTHER NIA Water Chlorinated: YES_ NO_ Sample iced Upon Collection: YES NO CLIENT SAMPLE OESCRIPTIDN DATE COLLECTED TIME COLLECTED MILITARY HOURS MATRIX I (SOIL, WATER OR SLUDGE) SAMPLE CONTAINER PRESERVA- TIVES ANALYSIS REQUESTED REMARKS PRISM LAB ID NO. `TYPE SEE BELOW NO. SIZE 001 7- & ita N- 3 cc�r � � � i I i r Sampler's Signature i6t:Sampled Sy (Print Name) �. SG Affiliation ;t-prt 'nAY., • • Upon relinquishing, this Chad of Custody is your authorization for Prism to proceed with the analyses as requested above. Any changes must he submitted in writing to tho Prism Project Manager. There will be charges for any changes after analyses have been initialized. R y ( net c Rel"qqJ y: (Slgnatum) ' Ro �� / I Relinqu hed ey: ($ gnatu ) j fibr—�1 y�.- -- —_ ---� , //.Ignatur ate iGtoryr ours Additional Comments: By-(Slgna urej - Date f- ly '\ r• f ` 46 ed For flrisTjisboraiories 9y: Datb I / �, L ' ,7y,- 7 ` r f d. Sit eArrival 7,me: Site Departuro Time:' " F:eid Tech Fee Mileage Method of Shipmerd: NOTE: ALL MPL 10 RS SHOULD 5 EE TAPE5H SHUT UST0DY 5 EJA LS FOR TRANSPORTATION To THE LABORA DRY. GO Gror.p No. _ SAMPLES ARE NOT ACCEPTED AND VERIFIED AGAINST COC UNTIL RECEIVED AT THE LABORATORY. .y +�� %• /.t ! �./� ❑ Fed Ear ❑ UPS l7 Hand-0elivI erad srn Field Serv+ca CI OtherNPDESLID E- OTHER: UU 0SCTER: DRINKING NC 13 NG ZI SCAR. 0 NC p 5C` NC ❑ SC ❑ NPC DONO ❑SC U El SC EERCLA NO Q SC ❑ NCFILL ❑ SC� O NC ❑CC� o rJ . i . 'CONTAINER TYPE CODES: A = Amber C = Clear G= Glass P = Plastir', TL = Teflon -Lined Cap VOA = Volatile Organics Analysis .(Zero Head Space) - QREG11`J.4L Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted _07116/2.016 CERTIFICATE OF COVERAGE NO. NCG160042 FACILITY NAME: APAC Atlantic, Inc. Plant #40 COUNTY: Forsyth ^ PERSON COLLECTING SAMPLES: Robert Settle LABORATORY: Prism Lab Cert. # 402 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ® Jan -June ❑ July -Dec RUpp � i\ j� nor ❑ Monthly' month !'t k-O SCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA AUG 12 ZUlb ❑Zero -flaw ❑Water Supply ❑SA ®Other: Leak Fork CENTRAL FILES D`jVR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE ❑ No discharge this period?2 Outfall No. pate Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L4 001 07/06/2016 0.2 88 i Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or othersimilar non - numerical format. When results are below the applicable limits, they must be reported -in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 "'40 No discharge this period?2 Outfal! No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L° Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, includiny_all "No Discharge" reports, within 30 days of receipt of the_lab results for at end ofmo_nitorina period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee Permit Date:10/1/2014-9/31/2019 7_i) -1�, (Date) SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 11/24/2015 CERTIFICATE OF COVERAGE NO. NCG160042 FACILITY NAME: APAC Atlantic, Inc. Plant #40 COUNTY: Forsyth PERSON COLLECTING SAMPLES: Robbie Doub LABORATORY: Prism Lab Cert. # 402 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD Q Jan -June ® July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA RE «V-L) ❑Zero -flaw ❑Water Supply ❑SA AUG 12 Z016 ®Other: Leak Fork CE-lT RAL F-IL.ES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SE(3TION No disc , rge• is period 3I Outfall No. pate Sample Collected:' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids Benchmarks ==_> _ 100 mg/L or 50 mg/L° 001 -10/28/2015 1.5 < 2.8 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: if you report o sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Permit Date: 10/1/2014-9/31/2019 5WU-252, last revised 9/17/2014 Page 1 of 2 ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches; Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks ==_> _ - 1S mg/L 106 mg/L or So mg/L° Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one coon of this DMR, includina all "No Discharae" reports, within 30 do vs of receipt of the lab results for at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 10/1/2014-9/31/2019 (Date) SWU-2S2, last revised 9/17/2014 Page 2 of 2 EFWA HCU R North Carolina Department of Environment and -Natural Resources Pat McCrory Governor Mr. Clarence O. Brickey APAC Atlantic lnc. - Thompson Arthur Paving & Construction Division 300 South Benbow Road Greensboro, NC 27420 Dear Mr. Brickey: July 16, 2015 Donald R. van der Vaart Secretary RECEIVED JUL 2 0 ?015 CENTRAL FILES DWR SECTi7M1J Subject: NPDES General Permit NCG160042 APAC Atlantic Inc. Formerly Larco Construction Certificate of Coverage NCG 160042 Forsyth County Division personnel received your request to revise your stormwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 707-9220. for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Winston-Salem Regional Office Storrnwater Permitting Program Files Central Files Division of Energy, Mineral, and Land Resources Energy Section • Geological Surrey Section - Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:llportal.ncdenr.org/webA An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160042 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, APAC Atlantic, Inc. Thompson Arthur Paving & Construction Division is hereby authorized to discharge stormwater from a facility located at: Plant # 40 4130 Glenn Avenue Winston-Salem Forsyth County to receiving waters designated as Leak Fork, in the Pee Dee River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, III, and IV of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective July 16, 2015, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 16, 2015. a�c , (zo for Tracy E. Davis,,P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission Division of Energy, Mineral & Land Resources Land Quality Section/Stormwater Permitting National Pollutant Discharge Elimination System NCDENR NdmC.vouru Dowwnm+r w PERMIT NAME/OWNERSHIP CHANGE FORM FOR AGENCY USE ONLY Date Received Year Month Day 1. Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N 10 19 10 1 1 1 1 N I C 10 1 1 16 1 0 10 4 2 II. Permit status prior to requested change. a. Permit issued to (company name): Larco Construction b. Person legally responsible for permit: Chris Venable First MI Last Area Manager �yu J Title 4130 North Glenn Avenue Permit Holder Mailing Address Winston-Salem NC 27115 City State Zip (336) 767-3500 { } Phone Fax c. Facility name (discharge): Glenn Avenue d. Facility address: 4130 North Glenn Avenue Address Winston-Salem NC 27115-6279 City State Zip e. Facility contact person: Julian H. Lipscomb (757) 229-2504 First / M1 I Last Phone III. Please provide the following for the requested change (revised permit). a. Request for change is a result of: ® Change in ownership of the facility ❑ Name change of the facility or owner If other please explain: b. Permit issued to (company name): APAC Atlantic Inc. - Thompson Arthur Pavingf& C D' ' onstruction tvtston c. Person legally responsible for permit: Clarence O Brickey_ First M1 Last RECEIVED President Title JUL 10 2015 300 South Benbow Road Permit Holder Mailing Address DENR-LAND QUALITY Greensboro NC 27420 STORMWATER PERMJTTING City State Zip (336) 412-6700 cobrickey@apac.com_ Phone E-mail Address d. Facility name (discharge): Plant #40 e. Facility address: 4130 North Glenn Avenue Address Winston-Salem NC 27115-6279 City State Zip f. Facility contact person: Lori W Carter First Ml Last (336) 412-6753 Iwcarter@apac.com Phone E-mail Address Revised Jan. 27, 2014 NPOES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 1V. Permit contact information (if different from the person legally responsible for the permit) Permit contact: First MI Last Title Mailing Address City State Zip Phone E-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ❑ This completed application is required for both name change and/or ownership change requests. ❑ Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): I, Chris Venable, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned incomplete. I � S Sig6ature Date APPLICANT CERTIFICATION 1, Clarence O. Bdgkey, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signat i Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Energy, Mineral and Land Resources Stormwater Permitting Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Revised Jan. 27, 2014 ----------- Book 3225 Page 1559 d c 0 4nL- ua eu e� Vc O a' ti r r � aVu .J L.tor+ W L us r t" Cl C 1L 3cm LL 'A P L. 0 L. OL L OtN S N � a7 UjWm 41 N GI u0Cu ,ace r � L as L ij �Vr r t 7 r N Mo uzm cru au Lr4- u3o m d 61 � u � mc� td0 9r is .j r i+ o L Bun � c wee to r id 2015012397 00020 FORSYTH CO. NC FEE $26.00 STATE OF NC REAL ESTATE EXTX $4000.00 PRESENTED & RECORDED 04/14f2015 09:29:28 AM C. NORMAN HOLLEMAN REGISTER OF DEEDS BY: RANDY L SMITH DPTY BK: RE 3225 PG: 1568 -1561 NORTH CAROLINA SPECIAL WARRANTY DEED Tax: i. Parcel Identifier Nam fi ��� �'��{� �3 q l.�irerified by County on the _ day of By: Mail/Box to: Polsiinelli PC. Attn, Jay Mankamyer, 1515 Wvnkootr, Suite 600 Denver. CO 80202 This instrument was prepared by:, 0*&j Hglly B . Olson Brief description for the Index: Tax Block 1504 l.ot No. 513 and Lot No. 101 THIS DEED made this Q'JI day of (kr h , 2015, by and between .VIAT -10 Reeves Construction Company, a Georgia corporation, formerly APAC-ATLANITC, INC., a Delaware corporation known as Sloan Construction Company, Inc., a South Carolina 300 South Benbow Road corporation Greensboro, North Carolina 27401 250 Plemmons Road Duncan, South Carolina 29334 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSET -t that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Winston-Salem, Winston Township, Forsyth County, North Carolina and more particularly described as follows: SEE E)CHJBIT A The property hereinabove described was acquired by Grantor by instrument recorded in Book 1963, Pages 2481 to 2484. All or a portion of the property herein conveyed does not include the primary residence of a Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtcnaoces thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, other than the following exceptions: SEE EXHIBIT B Mail after recording to: Harbor City Title Insurance Agency, Inc., 6201 Fairview Roll , Sine 325, Charlotte, NC 28210; File No. 7392R& t Book 3225 Page 1559 IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. GRANTOR: Reeves Construction Company By: Nam: Title• _ ony L MaMna, if COUFMTM State of _ �T _ County or City of _%&l/' i' J I, the undersigned Notary Public of the County or City of egar t-z t , and State aforesaid, certify that n - eft . ,� r .i of Reeves Construction Company, pammally appeared before me th day and acknowledged the d�e exeoution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this �� day of2015. My Commission Expires: Lo M- a qA P r Notary Public (Affix Seal) Notary's Printed or Typed Name ,+ SUSAN M. GRANER NOTARY PUBLIC OF NEW JQtSEY ' My Commlasion Expires 311312020 Book 3225 Page 1560 'AMR s 1 -9 tL Forsyth County, North Carolina LYING AND BEING in Winston Township, Forsyth County, North Carolina, and beginning at an iron located in the Southeast corner of Lot 28 of the Chap Bodenheimer Development, as recorded in Plat Book 2 at Page 95 of the Forsyth County Registry; from said beginning point and running thence South 06° 14' West 89.83 feet to an iron; thence running South 55" 55' 54" East 102.12 feet to an iron located within the right-of-way of Glenn Avenue Extension; thence ranking within the right-of-way of Glenn Avenue Extension South 41" 45' 39" West 113.94 feet to an iron in the West right -of --way line of Glenn Avenue Extension; thence rurming on two (2) lines with the property described in Book 1364 at Page 279 of the Forsyth Cotmty Registry and continuing on two (2) lines with the property described in Book 1542 at Page 1458 of the Forsyth county Registry North 930 11' 50" West 609.10 feet to an iron, South 050 39' 27" West 294.32 feet to an iron and South 820 49' 23" East 43553 feet to an iron in the West right-of- way line of Glenn Avenue Extension; thence running with the West right-of-way line of Glenn Avenue Extension South 370 5 V 54" West 192.68 &ct to an iron marking the Northeasterntnast corner of the property described in Book 932 at Page 506 of the Forsyth County Registry; thence running on three (3) lines with the property described in Book; 932 at Page 506 and continuing with the line of the property described in Book 304 at Page 2 of the Forsyth County Registry North 799 52' 38" West 111.20 feet to an iron, South 7° 28' 40" West 62.00 feet to an iron and North 84138' 20" West 401.62 feet to an iron; thence running on two 9) new lines with piedmont Aviation, Inc., North 05` 57' 13" Fast 62.66 feet to an iron and North W 23' 46" West 772.59 feet to an iron; thence running along the boundary of an adjoining development North 05' 11' 07" East 635.39 feet to an iron; thence running North 920 09' 31" East 234.01 feet to an iron; thence running South. 83' 00' 40" East 473.68 feet to a point located in the southern line of Lot 101 of the Chap Bodmheimer Development and continuing along the southern line of the Chap Bodenheimer Development, South 83 ° 11' 48" East 840.11 feet to an iron located at the point and place of BEGINNING, and containing 20.0 acres, more or less. The foregoing description was taken from a plat of survey prepared by Daniel W. Donathan for Laren Const., Inc. dated December M 1986 and is a portion of Lot No. 5B and Lot No. 101 as shown in Forsyth county Tax Block 1504. ---- Book 3225 Page 1561 EXHIBIT B TO SPECIAL WARRANTY DEED 1, Solid Waste Permit in favor by Forsyth County Public Health, Division of Environmental Health, as recorded in Book 1700, Page(s) 996 of the Forsyth County Registry, reference being made to the records thereof for the full -particulars. 2. Easement(s) in favor of Duke Power Company as recorded in Book 1041, Page 877; and Book 1600, Page(s)1935, all of the Forsyth County Registry, reference being made to the records thereof for the full particulars. 3. Right(s) of way in favor of Piedmont Natural Gas Company, Inc. as recorded in Book 1602, Page(s) 936 of the Forsyth County Registry, referenca being made to the records thereof for the fW l particulars. 4. Easement(s) in favor of the Board of Transportation as recorded in Book 1146, Page(s) 554 and 556, all of the Forsyth County Registry, reference being made to the records thereof for the full particulars. 5. Ordinance Amending the Winston-Salem City Zoning Ordinance and the Official Zoning Map of the City of Winston- Salem, NC as recorded in Book 1040, Page(s)1581 of the Forsyth County Registry, reference being made to the records thereof for the full particulars. 6_ Easement reserved in Deed as recorded in Book 1583, Page(s) 270 of the Forsyth County Registry, reference being made to the records thereof for the full particulars. Book 3225 Page 1562 I I 1 2015012398 00021 FORSYTH CO. NC FEE $26.00 STATE OF INC REAL ESTATE EXTX $11500.00 PRESENTED & RECORDED 04/14/2015 09:31:40 AM C. NORMAN HOLLEMAN REGISTER OF DEEDS BY: RANDY L SMITH DPTY BK: RE 3225 PG: 1562-1565 NORTH CAROLINA SPECIAL WARRANTY DEED Excise Tax: w. ParceI Identifier NoIo 2-33 . ` 3 " °5.0 y. c[ Verified by - County on the _ day of 20_ L By: vQ) e� d� 0 o�c v � c �o acu J L J OZ V F+ �dr dLy r• L ry 00 W r- LL L T 6141ia •� a `or sN m a� Q r 5 C �u 1 W � 4i L qM f�CM Mail/Box to: Polsine1ILPC, Attn. Jay Mankaniver,1515 Wvnoon k. Suite 600LDetom, CO 80202 This instrument was prepared by:Holly B . Olson Brief description for the Index- JaxRlock 2711 Lot Number 007P — THIS DEED made this day of G i , 2015, by and between GRANTOR Larco Construction, a division of Nello L. Teer Company, a Delaware corporation 432 Mclaws Circle Williamsburg, Virgin# 23189 GRANTEE APAC-ATLANTIC, INC., a Delaware corporation 300 South Benbow Road Greensboro, North Carolina 27401 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by contoxt. WITNESSET K that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Winston-Salem, Forsyth County, North Carolina and more particularly described as follows: SEE EDUBBIT A The property hereinabove described was acquired by Grantor by instrument recorded in Book 2271. Pages 1871-1973. All or a portion of the property herein conveyed does not include the primary residence of a Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, other than the following exceptions: SEE EXHIBIT B 7392738_1 Mail after recording to: Harbor City Title Insurance Agency, Inc., 6201 Fairview Ron , �I gt325, Charlotte, NC 28210; File No. Book 3225 Page 1563 fN WITNESS W MREOI , the Grantor has duly executed the foregoing as of the day and year first above written. GRANTOR: Larc , Construction, a division, of Nello L. Teer Cotngany By. - Name: Title:_ 3► �, State of . _f%•� _- County or Cityof the undersi ed Notary Public of the County or City of ,��CIG�� ` f and State aforesaid, certify that as r of Larco Construction, a division of Nano L. Teer Company, pefsonaty appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seai this _,Ayr$ay of .f , 2015. My Commission Expires: o ao , G r er Notary Public (Affix Seal) k Notary's Printed or Typed Name V:ESUSAW M. ORANERBLIC OF NEW ,IERS€Y sion E-Xp ee 3113120n Book 3225 Page 1564 i E)MBiT A TO SPECIAL WARRMT',M}j DEAD Forsyth County, North Carolina BROMING AT a right-of-way monument in the eastern right-of-way line of U.S. Highway 52, said beginning paint marking the northwest comer of that property conveyed to William D. Gutty by deed recorded in Deed Book 1647 at Page 3139 of the Forsyth County Registry; running thence from said beginning point with the eastern right-of-way line of U.S. Highway 52 North 160 54' 43" West 621.94 feet to a right-of-way monument in the eastern right-of-way line of U.S. Highway 52; thence continuing with the eastern right-of-way line of U.S. Highway 52 Notth 2311 29' 09" West 574.26 feet to a point, said point located South 23° 29' 09" East 75.94 feet from a right-of-way monument in the eastern right-of-way line of U.S. Highway 52; running thence on a new line South 880 14' 41" East 300.45 feet to a point; running thence on a new line North 01" 45' 19" East 270.00 feet to a point in the southern right -of --way line of Hodges Avenue as shown on the Plat of Lexwin as recorded in Plat Book 12, Page 74, Forsyth County Registry; tanning thence with the southern right-of-way line ofHodges Avenue South 880 14, 41" East 459.72 feet to an iron; running thence South 86' 25' 32" East 211.15 feet to an iron, the southeast corner of Lot 382 of Lexwin; running thence along anew line South 02" 3T 30" West 210.00 feet to an iron; running thence along a new line South 45' 18' 50" East 290.00 feet to an iron; running thence South 32' 46 19" West 216.83 feet to a point in the center line of a branch; running thence with the centerline of said branch as it meanders south the following sixteen (16) courses and distances: (1) North 73° 00' 17" West 50.00 feet; (2) South 810 52' 54" West 79.04 feet; (3) South 420 14' 21" West 76.70 feet; (4) South 74" 03' 28" West 116.77 feet; (5) South 51" 12 32" West 68.99 feet; (6) South 23° 03' 04" East 78.96 feet; (7) South 34° 00' 06" East 137.60 &et; (8) South 130 52' 11" East 58.87 feet; (9) South 01" 31' 35" East 55.10 feet; (10) South 37° 06' 41" West 63.01 feet; (11) South 440 23' 46" West 61.45 feet; (12) South 41* 4T 12" West 90.26 feet; (13) South 35" 21' 41" West 56.80 feet; (14) South 33" 34' 39" West 90.41 feet; (15) South 10" 27' 56" West 39.48 feet; and (16) South 02" IT 06" East 31.87 feat to a point in the northern line of the said Chitty property; running thence with the northern line of the said Chitty property North 97" 51' 00" West 197.81 feet to THE POINT AND PLACE OF BEGINNING, containing 20.207 acres, more or less, as shown on a survey prepared for Overdaie Associates, L.L.C. by Beeson Engineering, Inc., dated March 24, 2000, and last revised July 14, 2000, and designated as Job. No. 00205. Book 3225 Page 1565 r i E) BBIT B TO SPECI& WARRANTY 12 1. Easemeat(s) in favor of the City of Winston Salem as recorded in Book 993, Pages) 690; as affected by Quitclaim Deed recorded in Book 1004, Page 554, ail of the Forsyth County Registry, reference being trade to the records thmwf for the full particulars. 2. Easement(s) in favor of City of Winston Salem as recorded in Book 1004, Page(s) 556; and Boom 1753, Page 2394, all of the Forsyth County Registry, reference being made to the records thereof for the full particulars. 3. Driveway Easement and Maintenance Agreement by and among Overdale Associates, LL.C, at. als., as recorded in Book 2540, Page(s) 441 of the Forsyth County Registry, reference being made to the records thereof for the full particulars. APAC-Atlantic, Inc. Thompson -Arthur Paving & Construction P. O. Box 21088 Greensboro. NC 27420-1088 Tel: 336 412-6753 Fax 336-412-6751 July 2, 2015 Division of Energy, Mineral and Land Resources Stormwater Permitting Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Re: Ownership Change Request Certificate of Coverage NCG 160042 Dear Sir or Madam: APAC-Atlantic, Inc., Thompson Arthur Paving and Construction Division (APAC) is pleased to submit this completed Ownership Change Form for a hot -mix plant located 4130 North Glenn Avenue in Winston- Salem. Effective on March 27, 2015, APAC has purchased this facility from Lorco Construction. Also enclosed is the documentation of the ownership change. If you have any questions, please do not hesitate to contact me at (336) 412-6753 or our consultant, Josh Dunbar with The El Group, Inc. at (919) 459-5266. Sincerely, APAC ATLANTIC, INC. Lori Carter Environmental Representative Enclosures cc: Mr. Josh Dunbar, The El Group Safety First RECEIVED JUL 10 2015 DENR-LAND QUALITY �TORMWATER PERMITTING Equal Opportunity Employer STORMWATER DISC tGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG160000 SAMPLES COLLECTED DURING CALENDAR YEAR: 2014 CERTIFICATE OF COVERAGE NO. NCG16 0 0 4 2 (This monitoring report shall be received by the Division no later than 30 days from the date ��� �11ty receives the sampling results from the laboratory.) FACILITY NAME Larco Construction Co. — Winston-Salem t e�iu COUNTY GUILFORD PERSON COLLECTING SAMPLE(S) Jim Frei (SwSG) AN ���� P ONEP 336 767-3500 CERTIFIED LABORATORY(S) Pace Analytical Lab # 12167 SwSG Lab # 5---.0-54:,ENTRAL FILES GNATURE OF PERMITTEE OR DESIGNEE DWR SECTION By this signature, I certify that this report is accurate and complete to the best of my knowledge. . Outfall No. Date Sample Collected mmldd/yr Total Rainfall, inches 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard Units Total Petroleum Hydrocarbons, mg/L EPA Method 1664 (SGT-HEM) Benchmarks - - 100 6.0--9.0 15 001 02/21/14 0.40" 185 7.74 < 5.0 001 12/16/14 0.12" 58.4 6.85 < 5.0 ' If a value is in excess of the benchmark, or outside the benchmark range (for pl I), you must implement the Tier I or Tier 2 responses in the General Permit. Mail Original and one copy to: NCDENR/ DWR Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN CERTIFICATION FOR ANY INFORMATION REPORTED: 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of those persons who manage the system, or those persons directly respons le fo igathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there "sigp ant es for submitting false information, including the possibility of fines and imprisonment for knowing violations. A (o / (Date) SWU-253-051409 Page 1 of I STORMWATER DISC WE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE NO. NCG16 0 0 4 2 FACILITY NAME Larco Construction Co. — Winston-Salem PERSON COLLECTING SAMPLE(S) Jim Frei (SwSG) CERTIFIED LABORATORY(S) Pace Analytical Lab # 12/ 40 SwSG Lab # 5054 SAMPLES COLLECTED DURING CALENDAR YEAR: 2014 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY GUiLFORD P ONE 336 767-3500 GNATURE OF PERMITTEE OR DESIGNEE By this signature, I certify that this report is accurate and complete to the best of my knowledge. Outfall No. Date Sample Collected mm/dd/yr Total Rainfall, inches 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard Units Total Petroleum Hydrocarbons, mg/L EPA Method 1664 (SGT-HEM) Benchmark' - - 100 6.0 — 9.0 15 001 02/21/14 0,40" 185 7.74 ¢ 5.0 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier I or Tier 2 responses in the General Permit. Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN CERTIFICATION FOR ANY INFORMATION REPORTED: RECEIVED MAR 10 2014 CENTRAL FILES DWal80G 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of those persons who manage the system, or those persons directly responsible gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that rt�j there�agfjlificant�ge�es for submitting false information, including the possibility of fines and imprisonment for knowing violations. Of 3. ate) S WU-253-051409 Page 1 of I ' 3 ' � 1 . ., _ �I4. _... _ �. - i t. - _ . � F i . . � 1 � •4 z { f V �. � � , ••� a �� �, + 4 i 1 ! one LARCO Construction Company Stormwater Inspection Report November 10 The goal of the Stormwater permit program is to improve the quality of surface waters by reducing the amount of pollutants potentially contained in the storm water runoff being discharged. Industrial facilities subject to an NPDES permit must prepare and implement a SWPPP for their facility. The objective of this SWPPP is three -fold: (])Identify potential sources of pollution at LARCO Construction Company (2)Describe best management practices (SMPs) (3) Provide other elements such as, out not limited to, a facility inspection program, site compliance evaluation program, record keeping and reporting program that will help LARCO Construction comply with the terms and conditions of their storm water discharge permit t •� City of `Virist7on-Salem ShOrNMEE www.stormwatersmart.org Division t •} .q . _.. ._ jS..tn. f3, AJ wfx MCA'" > .. �'^_ City of Winston-Salem Stormwater Division Surface Water Inspection for Industrial Sites Part 1 'General':Inforsrration A. Official Company Name: LARCO Construction Company Winston-Salem Asphalt Plant 962 B. Physical Address: 4130 North Glenn Avenue, Winston-Salem, NC 27105 C. Telephone Number: 336-767-3500 D. Mailing Address, if different from above address: Same F. Primary contact who is authorized to represent company in environmental regulatory issues: a. Name: Mr_ Fred Fenske b. Title: Asphalt Plant Manager c. Contact Number(s): 336-767-3500 d. Email: fenskef@branscome.com F. SIC Code number of business: 2951 G. NC Stormwater NPDES Permit Number: NCG160042 a. Facility Type: Asphalt Paving Mixture H. Any other control authority Permit(s) (air quality control, wastewater, hazardous waste)& number(s): Air Quality Permit # 00464R-6 I. Brief description of industrial activities that occur on -site: LARCO Construction Company is a producer of asphalt product. This facility produces asphalt paving mix, and maintains and repairs construction vehicles. Additional operation includes truck washing and fueling. The asphalt paving mix which is a liquid asphalt cement which is mixed with coarse aggregate (which is heated and dried) and stored in enclosed silos. Fuel oil # 4 and # 2 fuel is used to heat the raw products, propane is then used to keep the asphalt viscous J. Receiving Water(s) / MS4: Leak fork Branch, a tributary of Mill Creek Page 2 of 8 Part;.1;=-lStormwaterrxontrols 1. Best management Practices A. List the non/structural controls employed by the facility: 1.A stormwater retention pond is located in the NW corner of property, which receives both non-stormwater and stormwater flows. 2. A 1,000 gallon oil & water separator receives vehicle wash water and automotive fluid spills from steam clean-up and Fleet Service Center. It is plumbed to the sanitary sewer system (MS4). 3.A 1,000 gallon oil & water separator receives any spill/leaked diesel fuel from the refueling pad. This separator is plumbed to sanitary sewer system. 4.LARCO has implemented a policy that an employee oversees all unloading activities by vendors while they are on -site S.Bulk storage tanks and hazardous waste containers have secondary containment structures. B. Are the BM Ps reasonable & appropriate for the facility: XX Yes No C. Are BMPs installed correctly, maintained, and effective operation condition: XX Yes No 2. Provide a brief description of other controls that manage/prevent/minimize stormwater runoff (e. g., erosion and sediment controls, inlet protection/control at storm drains, diversion structures): 1.Nazardous waste storage area is brimmed and covered in order to minimize rainwater contact. 2.Oil & Water separator at the fleet vehicle maintenance shop is plumbed to sanitary sewer system. 3.lnlets cover in the brimmed areas to prevent discharges in case of large spills. Part1:2e".Miscellaneous 1. Any evidence of discharge to receiving waters/MS4? (e.g., stormwater runoff, dry weather discharge, co -mingling of process wastewater): xxx Yes No i. Comments: 2. Does the stormwater outfalls on -site correspond with those listed on the site map and in SWPPP? Yes xxx No N/A i. Comments: only one outfall, SDO 001 Page 3 of 8 PMt`3 =SWPPP Review can be °cornpie#ed in office) -- General 1 Is there a SWPPP? Yes No 2) Does SWPPP identify a specific position(s) for responsible party purposes (e.g. overall coordination, development, implementation & revision) Yes No 3) Does SWPPP designate facility personnel responsible for implementing SRP? Yes No 4 Does SWPPP include a certification statement? Y No 5) Are employee training records regarding stormwater pollution prevention topics included in SWPPP? Yet s No Comments: Check to see if environmental consultant's recommendations have been implemented. Site Map NOTES 1 Is there a site map? ;Y s No 2) Drainage attems/outfalls Yes No Does not show patterns on the site map. 3) Identification of potential pollutants likely to be discharged from each drainage area? lWes No 4) Narrative description and locations of (check if resent): 1. Storage practices XX 2. Unload in/Loading activities XX 3. Outdoor processes _ 4. Particulate generating/control processes XX XX 5, Waste Disposal XX 5 Name of receiving waters or MS4's listed? Yes No 6) Locations of significant materials exposed to stormwater? Yes s No 7) Locations and descriptions of major spills occurring within the 3 previous years w/ corrective actions to prevent futurespills)? er s No Page 4 of 8 Stormwater Controls NOTES 1) Does the SWPPP describe the non-structural controls that will be used to prevent/reduce discharge of pollutants in stormwater runoff? Yei s No 2) Does the SWPPP describe the structural controls that will be used to prevent/reduce discharge of pollutants in stormwater runoff? Yer s No 3) Does the SWPPP describe other controls that will be used to prevent/reduce off -site tracking or blowing of sediment, dust, and raw, final, or waste products, or other solid materials and floating debris? Yes No 4) Does the SWPPP incorporate the 8 baseline controls (good housekeeping, BMP summary, feasibility study, PM, SRP procedures, facility inspections, and comprehensive site evaluations, employee training, seconds containment, and sediment control? Y_ e_ No 5) Does the SWPPP describe the pollutant or activity to be controlled by BMPs and assessed the need of implementation throu h data collected? Yes s No Non-stormwater Discharges NOTES 1) Certification that the facility has been tested for non- stormwater discharges from the site? Yes No 2) Description of testing method, drainage points, observed results, date, and signature? ,Yes No Page 5 of 8 Moniforinq 1) Are samples collected within 30 minutes of measurable weather events occurring 72 hours after s No previous measurable weather event? i 2) Were samples collected and preserved in accordance with 40 CFR 136? Yes s No 3) Was proper chain -of -custody procedures followed? Yes s No 4) Was analytical and qualitative monitoring Missing Year 1, Period 1 complete? Yes No analytical monitoring TSS, Benchmark is 100 5) Any exceedences of pollutant parameters in mg/l results where regards to benchmark values? Yes No 104m /I Page 6 of 8 Par'4'S `Required°Actionsto becompacilty 1. Update SWPPP to reflect directional arrows for sheet flow on site plan. 2. Annotate inspection on outfali # 1, for year 1, period 1 (analytical) or annotate that there was no flow. 3. Initiate tier 1 analytical response for the exceeding the T5S bench mark. 4. Muck out detention basin which has filled with aggregate. 5. Replace spill kit at asphalt off loading area. 6. Refresh containment berm (asphalt) at the # 2 diesel pump area. 7. Replace or extend asphalt berm at vehicle maintenance area. 8. The City of Winston-Salem Stormwater Division is requiring that Items # 1-7 be completed on or before January 6, 2011. LARCO Construction Company shall keep the Stormwater Division updated on milestones and activities completed in its progression to comply with these required actions. The Stormwater Division may conduct follow-up inspections in order to ensure completion of mandated activities. Educational Resources: 1. NC Stormwater Manual for Industrial Users: a. http://h2o.enr.state.nc.us/su/storm water.html. b. http://portal.ncdenr.org/web/wq/ws/su/bmp-manual Company Representative(s) that participated in inspection name and tit[e(s): Fred Fenske, Asphalt Plant Mana er Start of Inspection: 09:00 AM Completion of Inspection: 10:45 AM Date of inspection: 11/10/2010 Signature of Stormwater Inspector and title: William D. Baugher, Stormwater Inspector Page 7 of 8 Permit: NCG160042 SOC: County: Forsyth Region: Winston-Salem Compliance Inspection Report Effective: 10/01/09 Expiration: 09/30/14 Owner: Laroo Construction A Division of Sloan Construction Cc Inc Effective: Expiration: Facility: Larco Construction Cc - Winston-Salem 4130 N Glen Ave Contact Person: R D Reeves Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Rep rose ntative(s): Related Permits: Winston Salem NC 27115 Title: Phone: 803-271-9090 Certification: Phone: Inspection Date: 11110/2010 Entry Time: 09:00 AM Exit Time: 10:45 AM Primary Inspector: Ron Boone c Phone: 70 Ext.2021699 Secondary Inspector(s): cT Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ❑ Compliant ■ Not Compliant Question Areas: E Storm Water (See attachment summary) Page:1 Nd Permit: NCG160042 Owner - Facility: Corcoc onstruction A Division of Sloan Construction Inspection Date: 1Ill 012010 Inspection Type: Compliance Evaluation Reason for Visit_ Routine Inspection Summary: Inspection conducted by Bill Baugher WS Stormwater Division. Page: 2 Permit: NCG160042 Owner - Facility: Larco Construction A Division of Sloan Construction Co Inc Inspection date: 11/10/2010 Inspection Type: Complianoe Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Dees the Plan include a detailed site map including outfall locations and drainage areas? ® n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ n n # Has the facility evaluated feasible alternatives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ■ n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee Training? v n n n # Does the Plan include a list of Responsible Party(s)? a n n n # Is the Plan reviewed and updated annually? ■ n # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ n n Has the Stormwater Pollution Prevention Plan been implemented? ® n n n Comment: Site plan doesn't show directional arrows indicating flow. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®n n n Comment: None Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n 00 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ■ n n n Comment: Not all analytical monitoring conducted as required. Permit and Outfails Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® n Cl n # Were all outfalls observed during the inspection? ® n n n # If the facility has representative outfall status, is it properly documented by the Division? n n ® n # Has the facility evaluated all illicit (non stormwater) discharges? ® n n n Comment: None Page: 3