HomeMy WebLinkAboutNCG160031_COMPLETE FILE - HISTORICAL_20140918STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
IV UC 1(pD031
DOC TYPE
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ C�0
YYYYM M D D
A •;
.'��
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Land Quality Section
Pat McCrory
Governor
September 18, 2014
Harrison Division — APAC Atlantic, Inc.
ATTN: Don Mason
PO Box 449
Franklin, North Carolina 28734
SUBJECT: NPDES Stormwater Permit Compliance Inspection
Dillsboro Asphalt Plant
Permit No: NCG160031
Jackson County
Dear Mr. Mason:
John E. Skvarla, III
Secretary
This letter is in follow-up to the NPDES Stormwater Permit Compliance/Assistance Inspection
conducted on August 25, 2014. The facility was found to be in compliance with permit
NCG160031. Please review the summary on the inspection report for further guidance on
compliance with your permit.
Enclosed is a copy of the Compliance Inspection Report, which contains additional observations
and comments for your reference.
If I can be of any further assistance, please contact me at (828) 296-4500.
Sincerely,
Darlene Kucken
Environmental Specialist
Land Quality Section
Enclosures: Compliance Inspection Report
Technical Bulletin for NCG100000
Asheville Regional Office, 2090 US Highway 70, Swannanoa, North Carolina, 28778-8211
Telephone 828-296-4500 Fax 828-299-7043 One
http://portal.ncdenr.org/web/ir/land-gualily NorthCarotina
An Equal Opportunity / Affirmative Action Employer ;Vatmallff
0
Permit: NCG160031
SOC:
County: Jackson
Region: Asheville
Contact Person: Don Mason
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 10/01/09 Expiration: 09/30/14 Owner: Harrison Division- Apac Tennesse Inc
Effective: Expiration: Facility: Dillsboro Asphalt Plant
627 Macktown Rd
Dillsboro NC 28725
Title: Phone: 828-421-0448
Certification:
Phone:
Inspection Date: 08/25/2014 Entry Time: 10:30AM Exit Time: 12:30PM
Primary Inspector: Darlene J Kucken Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COG
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page:
permit NCG18o031 Owner - Facility: Harrison Division- Apac Tennesse Inc
Inspection Date: 08l2512014 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
1. The facility and SPPP records are in good condition, with no problems noted during this inspection.
2. Continue to maintain the ditchiine and settling ponds.
3. A skimmer was installed in a small settling pond inside the upper berm and the upper settling ponds were replaced.
4. All secondary containment is in good shape; ail valves on secondary containment structures have been removed and
any accumulated stormwater or materials are run through filter absorbant mats and pumped off.
5. Plans are underway to pipe the remaining outfall across the road to the quarry pit; thereby removing any stormwater
runoff from the facility.
Page: 2
permit: NCG160031 Owner - Facility: Harrison Division- Apac Tennesse Inc
Inspection Date: 0812512014 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Yes No NA NE
■❑❑❑
■❑❑❑
®❑ ❑ ❑
■❑❑❑
■ ❑ ❑ ❑
®❑❑❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
0❑❑❑
■❑❑❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■❑❑❑
Yes No NA NE
■❑❑❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
Yes No NA NE
■❑❑❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ M ❑
Page: 3
i
•
Facility: a t
Date: S
Location Address. S �-I�
COC#: n�G j�adp3
Contact Name: SD
Phone #: 8 S_
Contact Mailing Address:
County: �-Cxl CE 6U.
Directions:
Routine Compliance Inspection
Rescission Request
Complaint Investigation
Other- Explain:
A
Storm Water Pollution Prevention Plan
Yes
No
N/A
Comments
Is a copy of the permit and the Certificate of Coverage available
1
at the site?
O
1�r, �, �,_1 cg�l
� ��a�.1 o�_gS
--�
�t
2
Is a copy of the signed and certified SWPPP at the facility?
3
Does the Plan include a "Narrative Description of Practices"?
4
Does the plan include a general location (USGS) map?�S
5
Does the plan include a detailed site map including outfall
locations and drainage areas?
`�lr�S� 1oex-
6
Does the plan include a Spill Prevention and Response Plan?
(SPRP)
7
Does the plan include a Preventative Maintenance and Good
Housekeeping Plan?
cbV—k-c�'a
OK__0
8
Does the plan include a Stormwater Facility Inspection Program?
9
Does the Plan include a BMP Summary?
10
IDoes the plan include a list of Responsible Party(s)?
11
Has the SWPPP been implemented?
t7
B
Monitoring and Records
Yes
No
N/A
during
1
Does the plan include a list of significant spills occurring
the past 3 years?v
Does facility document
2
the provide and employee training?
0
S w
3
Has the facility conducted its Qualitative Monitoring? (semi-
annual)
4
Has the facility conducted its Analytical Monitoring? (s-a)
Is the facility meeting all permit specified benchmark goals?
6
Is the facility following the tiered response?
7
Has the facility conducted its Analytical Monitoring from vehicle
✓�.
Maintenance areas?
.
G�-C�f6 S �`��.Q_
C
Waste Management
Yes
No
N/A
Does the facility provide all necessary secondary containment?
1
/1 1 .f r�K\r� �`�
0
2 Are current BMPs in material storage areas adequate?
3 Are appropriate spill containment and cleanup materials kept or
site and in convenient locations?
D Outfalls
1 Were all outfalls observed during the inspection?
2 If the facility has representative outfall status, is it properly
documented by the Division?
3 Has the facility evaluated all illicit (non stormwater) discharges?
E Sector specific questions
1 Have zinc or copper benchmarks been exceeded in the past 3
sampling periods?
2 Have potential sources for copper and zinc been evaluated at
your facility?
3
4
5
Comments
Yes, No I N/A
Yes No N/A
NCDENR
North Carolina Department of Environment and Natural
Division of Water Quality
Beverly Eaves Perdue
Governor
December 19, 2012
Don Mason
Harrison Division- APAC Atlantic, Inc.
PO Box 449
Franklin, NC 28734
Charles Wakild, P.E.
Director
SUBJECT: NPDES Stormwater Permit Compliance Inspection
Dillsboro Asphalt Plant
Permit No: NCG 160031
Jackson County
Dear Mr. Mason:
Resources
Dee Freeman
Secretary
This letter is in follow-up to the NPDES Stormwater Permit Compliance Inspection conducted on
November 29, 2012. The facility was found to be in compliance with permit NCG160031, Tim
Fox and I appreciated your (and Mr. Maney's) assistance during the inspection.
Enclosed is a copy of the Compliance Inspection Report, which contains additional observations
and comments for your reference.
Please contact me at (828) 296-4665 or Susan.A.Wilsonnancdenr.gov, if I can be of any further
assistance.
Sincerely,
� �L\ 71
Susan A. Wilson, P.E.
Enviromnental Engineer
Surface Water Protection
Enclosure
cc: Central Files
Asheville Files
S:ISWPVackson\Stormwater\NCG16 Asphalt Paving Minires\LTR.CE].Harrison Dills Ashphalt.12 2012.doe
Location: 2090 U.S. Highway 70, Swannanoa. North Carolina 28778
Phone: 828-296A5001 FAX: 828-299-7043 One
North C airolina
Internet: www.ncraater+auafity.org Aatllrally
An Equal Oppatunity 1 Affirmative Action Employer ii
0
Compliance Inspection Report
Permit: NCG160031 Effective: 10/01/09 Expiration: 09/30/14 Owner: Harrison Division- Apac Tennesse Inc
SOC: Effective: Expiration: Facility: Dillsboro Asphalt Plant
County: Jackson 627 Macktown Rd
Region: Asheville
Dillsboro NC 28725
Contact Person: Don Mason Title: Phone: 828-421-0448
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 1112912012 Entry Time: 02:00 PM Exit Time: 03:20 PM
Primary Inspector: Susan A Wilson Phone: 828-294-4500
Secondary Inspector(s):
Timothy R Fox Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COG
Facility Status: ■ Compliant fl Not Compliant
Question Areas:
N Storm Water
(See attachment summary)
Page: 1
Permit: NCG160031 Owner -Facility; Harrison Division- Apac Tennesse Inc
Inspection Date: 11129/2012 Inspection Type: Compliance Evaluation Reason for.Visit: Routine
Inspection Summary:
Susan Wilson and Tim Fox performed a site inspection at APAC Harrison - Dillsboro Asphalt Plant. Don Mason (APAC
Harrison) and Rex Maney assisted during the inspection.
The plant is fairly old and located along a hillside across from the quarry. All drainage is eventually routed to the basin at
the entrance, which is Outfall 001 (and then goes to Mack Town Creek).
Routine maintenance needs to be performed at the facility (this is taking place now). Routine cleaning and maintenance
of the plant and secondary containment areas may need to be conducted more frequently than 1/year. The basin at 001
likely needs to be cleaned out with some frequency, as the capacity appears limited. The ditch lines at the entrance road
appear to need maintenance to ensure that stormwater enters basin 001.
DWQ recommends that the upper area be walked to determine where it is draining and re-route as necessary. It does not
appear to drain to the upper basin now (as it was intended).
Page: 2
0
0
Permit: NCG160031 Owner - Facility: Harrison Division- Apac Tennesse inc
Inspection Date: 11/29/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
D D ■
# Does the Plan include a General Location (USGS) map?
D
D ❑ ■
# Does the Plan include a "Narrative Description of Practices"?
❑
D D ■
# Does the Plan include a detailed site map including outfall locations and drainage areas?
D
D D a
# Does the Plan include a list of significant spills occurring during the past 3 years?
D
D D ■
# Has the facility evaluated feasible alternatives to current practices?
D
D D ■
# Does the facility provide all necessary secondary containment?
D
D D ■
# Does the Plan include a BMP summary?
D
D D ■
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
D
❑ D ■
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
D
D D ■
# Does the facility provide and document Employee Training?
D
D D ■
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
D
D D ■
# Does the Plan include a Stormwater Facility Inspection Program?
D
D D ■
Has the Stormwater Pollution Prevention Plan been implemented?
D
D D ■
Comment. The SWPPP was not located at the time of the inspection - so this portion
was not evaluated. Per Don Mason, 12/11/12, an updated plan is now in place. This
will be reviewed during the next quarter.
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
■
D
D
D
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
■
❑
D
D
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Cl
D
■
D
Comment:
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
D
D
D
■
# Were all outfalls observed during the inspection?
■
D
D
# If the facility has representative outfall status, is it properly documented by the Division?
D
D
■
D
# Has the facility evaluated all illicit (non stormwater) discharges?
D
0.0
■
Page: 3
0 0
Permit: NCGt60031 Owner - Facility: Harrison Division- Apac Tennesse Inc
Inspection Date: 1112912012 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: The site and other out -falls drain to one basin (Outfall 001), then is piped
across Mack Town Road and discharges to Mack Town Creek.
Page: 4
Y . *--a
Compliance Inspection Report
Permit: NCG160031 Effective: 10/01/09 Expiration: 09/30/14 Owner: Harrison Division- ApacTennesse Inc
SOC: Effective: Expiration: Facility: Dillsboro Asphalt Plant
County: Jackson 627 Macktown Rd
Region: Asheville
Dillsboro NC 28725
Contact Person: Harold Kelly Title: Phone: 423-983-3100
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 11/28/2012 Entry Time: 09:00 AM
Primary Inspector: Susan A Wilson
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 09:30 AM -
Phone: 828-294-4500
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC
Facility Status: 0 Compliant 0 Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
`=i�f� .'Page: 1
0 0
Permit: NCG160031 Owner - Facility: Harrison Division- Apac Tennesse Inc
Inspection Date: 11/28/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG160031 Owner - Facility: Harrison Division- Apac Tennesse Inc
Inspection Date: 1112812012 Inspection Type: Compliance Evaluation
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map? �.�j ��? /�o
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: 2 �J -
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?.
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
W
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
7
Comment:'` ` 5
9�
Reason for Visit: Routine
Yes No
nnnn
nnnn
nnnn
nnnn
nnnn
nnnn
n n n n
n n n n
nnnn
nnnn
nnnn
nnnn
nnnn
nnnn
nnnn
Yes No NA NE
nnn
Yes No NA NE
e0 n n
nnffifn
Yes No NA NE
-
Page: 3
0
�,-klP4 O,,
CPC
W , u(- -� 63A ScN 5
OF .W A Eq
0 QG
Wa.
.�
Governor.
illiam G. Ross Sr„ ecreta `"
North Carolina Departme of Envir d N UrL..Directif
rc
i An n /..Kiin�k,`.Q s . n ofal
Asheville Regional Office
SURFACE WATER PROTECTION
March 14, 2006
C Michael Davis
APAC Tennessee Incorporated
p.0. Box 359
Alcoa TN 37701
SUBJECT: Compliance Evaluation Inspection
APAC Tenn. Inc. -- Franklin Plant
Permit No. NCG160033
Macon County
APAC Tenn. Inc. — Dillsboro Plant
Permit No: NCG160031
Jackson County
Dear Mr. Davis:
Enclosed please find a copy of the Compliance Evaluation Inspection Reports for
the inspections which Larry Frost and I conducted at the subject facilities on February 28,
2006. Both facilities were found to be in Compliance with their respective General
Permit.
Please refer to the enclosed inspection report for additional observations and
comments. If you or your staff, have any questions, please do not hesitate to call me at
828-296-4500.
sincerely,
Keith H nes
Environmental Specialist
Enclosure
cc: Central Files
Asheville Files
NorthCaroti»a
V CltlflYl��lf
2090 U.S. highway 70, Swannanoa, NC 28778 Telephone: (828) 296-4500 Fax: (828) 299-7043 Customer Service 1 877 623-6748
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.G. 20460
OMB No. 2040-0057
Water Compliance Inspection Beport
Approval expires 8 31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yrlmolday Inspection Type Inspector Fac Type
1 1 �1 2 16I 31 1CG150031 �G2 191 cl 201 I1 11 121 1 17 181 i
Remarks
211 1 1 1 1 1 1 1 _1 1 1 1 1 1 1 1 1 1 1 1 I I I I 1[ _I I -I _ I_ I I I I I I I I_ I I I I I I I Lj6
Inspection Work Days Facility Self -Monitoring Evaluation Rating 81 CIA -----------------------Reserved-----------
671 169 701 1 71 I 1 721 tP 1 73! � tit 174 751 1 1 I , _1 1 I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
^v9:00 H 06/02/28
04/01R101
A.GBc Tennessee Tnc- Di'lsborc
Exit Time/Gate
Permit Expiration Date
2? Macktca'.z Rd
Dillsboro NC 28 2K
C9;45 AM 05/02i28
09i0%i3=
Name(s) of Onsite Representative(s)1Titles(s)lPhone and Fax Number(s)
Other Facility Data
/%,
Name. Address of Responsible OffciallTtle/Phone and Fax Number
Contacted
C [-tic-aei Dar_s,p.0. Boy. 359 Alcoa TN 3770ii!423-583-3''10;9G5°8 ah%8
_7o
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit
Section D: Summary of Finding/Comments Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
teitr Haynes /f�f :-RC .der; 823-3uC-•t_UC':
Signature of Management Q A Reviewer AgencylOffice/Phone and Fax Numbers
D+\mate
-Y
LAtrJ �U:.t r.:tr ?r�;7i ,'4ti �-�='C-•f .]f: C' Y.�_"'652/ ✓ �./
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page # 1
0 0
NPDES yrlmolday Inspection Type
3I '1CC,,C.0�]=1 I11 12� 06/02/28 I 17 18lcl
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The facility was very well maintained. All records were found to be in good order. Please make sure that
records are maintained on site for five years. Thanks for the good work.
Page #E 2
f
Permit: NCG160031 Owner - Facility: Apac Tennessee Inc- Dillsboro
Inspection Date: 02128/2006 Inspection Type: Compliance Evaluation
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new application?
Is the facility as described in the permit?
# Are there any special, conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Page # 3
United States Environmental Protection Agency
Form Approved.
EPA Washmgton, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 I NJ 2 1 1 31 NCG160033 Ill 121 Oe; Li2/2! 117 181 rl 191 gl 201 1
Remarks
211 1 1 1 I 1 1 1 ,1 1 1 1 1 1 1 1 1 1 1 I 1 I. t I Il I _I_ t_ 1 1 I I I I I I I l_ l I 1 I 1 I. 16
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA---------
671 169 701 1 711 1 721 N I 73 Lij 74 711 1 1 1 .1,._.,1 1 1 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry TimelDate
Permit Effective Date
POTW name and NPDES permit Number)
10:30 Ali 06/02/28
04/09/O1
Apac Tennessee 1n_- Franklin Asphalt
Exit Time/Date
Permit Expiration Date
Hwy 64 w By -Pass
-zank.lin NC 26734
11:15 A14 0 /02/28
09/C '31
Name(s) of Onsite Representative (s)Mtles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible OfficiallTitle/Phone and Fax Number
Contacted
C iii_hae' Davis,n.O- Box 359 Alcoa TN 37?01//423-983-3100/965;645478
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit ® Records/Reports ■ Facility Site Review
Section D: Summary of Find in/Comments Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of inspector(s) Agency/Office/Phone and Fax Numbers Date
Keith Haynes A.RO WQ//828-296-4500/ j
Signature of Management Q A Reviewer AgencylOffice/Phone and Fax Numbers Da
Lcrr; roar ARC aQ /32B-2_)G-4500 Evt.4658, 3 ��
EPA Form 3560-3 (Rev 9-'94) Previous editions are obsolete.
Page # 1
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
Kerr T. Stevens, Director
C. MICHAEL DAVIS
APAC TENNESSEE INC HARRISON DIV.
PO BOX 359
ALCOA, TN 37701
Dear Permittee:
1�•
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
July 27, 1999
Subject: Reissue - NPDES Stormwater Permit
APAC Tennessee Inc Harrison Div.
COC Number NCG 160031
Jackson County
In response to your renewal application for continued coverage under general permit NCG160000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A copy of general stormwater permit NCG160000
* A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to
certify that you have developed and implemented the SPPP as per the conditions of the permit. This form
must be completed and returned to the Division within 30 days of receipt of this letter.
DO NOT SEND the SPPP with the signed form.
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements,
and addresses frequently asked questions
* A Certificate of Coverage
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment. or
decree.
If you have any questions regarding this permit package please contact Darren England of the Central Office
Stormwater and General Permits Unit at (919) 733-5083, ext. 545
Sincerely,
for Kerr T. Stevens
cc: Central Files
Stormwater and General permits Unit Files
Asheville Regional Office
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG160000
CERTIFICATE OF COVERAGE No. NCG160031
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
APAC TENNESSEI INC HARRISON DIV.
is hereby authorized to discharge stormwater from a facility located at
APAC TENNESSEE INC HARRISON DIV.
MACKTOWN ROAD
DILLSBORO
JACKSON COUNTY
to receiving waters designated as the Tuckasegee River in the Little Tennessee River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III,
I\', V. and VI of General Permit No. NCG160000 as attached.
This certificate of coverage shall become effective August 1, 1999.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day July 27, 1999.
for Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
-Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
February 24, 1995
C. Michael Davis
Apac-Tennessee, Inc. Harrison
P.O. Box 359
Alcoa, TN 37701
•
Subject: General Permit No. NCG 160000
Apac-Tennessee, Inc. Harrison
COC NCG160031
Jackson County
Dear C. Michael Davis:
In accordance with your application for discharge permit received on December 27, 1994, we are
forwarding herewith the -subject certificate of coverage to discharge under the subject state - NPDES general -
- --permit.-This permit -is issued pursuant to the requirements of -North Carolina General Statute 143-215 A and - — the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management. The Division of Environmental Management may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other pen -nits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal
Area Management Act or any other Federal or Local governmental permit that may be required.
If you have any question concerning this permit, please contact MS. AISHA LAU at telephone number
919/733-5083.
Sincerely,
Original Signed By
Coleen H. Sullins
A. Preston Howard, Jr. P.E.
cc: Asheville Regional Office
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DMSION OF ENVIRONMENTAL MANAGEMENT
QENERAL PERMIT NO. NCG160000
-CERTIFICATE OF COVERAGE N NCQ16QQ31
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the-.-..,--. .
Federal Water Pollution Control Act, as amended,
APAC-Tennessee - Harrison Division
is hereby authorized to discharge stormwater from a facility located at
Dillsboro Plant
Macktown Road
Dillsboro
Jackson County
to receiving waters designated as the Tuckasegee River in the Little Tennessee River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III
and IV of General Permit No. NCG160000 as attached.
This Certificate of Coverage shall become effective February 24, 1995.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 24, 1995.
ptigit',�1 L t��S�11iBs
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
s1�
GREENS CREEK QORANGLE
NORTH CAROLINA n �o
7.5 MINUTE SERIES (TOPOGRAPHIC) 166-SE 1�1�
0 3 Mi. To U.S. 19A [ \�
i7'3p' 292 293 .294 130.000 FEET P 83 i5'
"jC� r-Sly\{��.�r'�'� ��� � ;:j!// •"% r���1' � f?�,' 1�!(. '-.•�=.;, 3'16
0-3 of It,u.se :
Y—'.;,: ==� �) i)3 )ram-_• .-� p , ;,'s '° r �: ���
60 !fi �rj jey (�., '' �\ 3Q•
- � - , � %�J � •i � �� 1. .��
O 1✓ ^-'ti� !/ yti ,/ FEET
3914
jet
Wit
3912
OV
,/G` \.fir �.-�� _-=' l''.. ��t • �rl _ 'o.
rim^f,�2i�,1� •1 •.:~ 7911
i
�o c; _�z,_�_
II � _ ��G
�-�'r