Loading...
HomeMy WebLinkAboutNCG140358_MONITORING INFO_20160513STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /v -3S b DOC TYPE ❑HISTORICAL FILE fjk MONITORING REPORTS DOC DATE ❑ � 0 (11 0 5 ' YYYYMMDD N-� bv,l �3� PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO NCG140000 CERTIFICATE OF COVERAGE NO NCG140238 FACILITY NAME Mocksville PERSON COLLECTING SAMPLES Rik Jones CERTIFIED LABORATORY Prism Lab # 402 LIMIT VIOLATIONS? YES ❑ NO Part A Wastewater Monitorine Reouirements SAMPLE COLLECTION YEAR 2015 SAMPLE QUARTER ❑Jul -Sept ❑Oct -Dec ®Jan March ❑April -June RECEIp VE&OUNTY Davie PHONE NO (704) 372-2930 MAY 1 c ADD TO LISTSERVE7 ❑YES ®NO EMAIL CENTRAL FILES DISCHARGING TO CLASS []SA ❑HQW ❑PNA ❑Trout ®Other DWR SECTIO",i OPTIONAL INFO OutfaU No Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) Duration (minutes) Total Flow 7 (gallons/day) - RM, MD 6-93 ° 303 s 53 (15)6 - - 001 03/31/15 No Flow ` If wastewater systems have not discharged in this quarter — report No Flow or No Discharge here Please make sure to mark the sample quarter above Report the abbreviation for the type of Authorized Wastewater Discharges here Vehicle and Equipment Cleaning (VE) Raw Material Stockpiles (RM) Mixing Drum Cleanout (MD) Report more than one type if the waste stream is commingled 3If an effluent limit is exceeded twice in a row the perm+ttee is required to institute monthly monitoring for that parameter for six months unless DWQ RO staff notifies you to continue monitoring 4 pH limits are 6-9 5 U for wastewater discharges to freshwaters and 6 8 8 5 S U for discharges to saltwaters 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters 10 mg/L for Trout and PNA waters and 30 mg/L for all other water classifications Permit Date 7/1/2010 06/30/2015 Last Revised 07/13/11 Page 1 of 2 ft� `C 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas TPH does not have a limit for wastewater ,but -Mead is subject to benchmarks and provisions of Part IV Section A including the Tiered Response Action 7 Flow rate can be measured continuously or calculated Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 028 0224 Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case by case basis MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO Division of Water Quality Attn DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those personsItheo' rectly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am a>�are the significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations {Sign ture of Permittee) (Date) Permit DLe 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 4 -- --. PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO NCG140000 c oy') G K e t- CERTIFICATE OF COVERAGE NO NCG140238 FACILITY NAME Mocksville PERSON COLLECTING SAMPLES Rik Jones t CERTIFIED LABORATORY Prism Lab # 402 Q LIMIT VIOLATIONS? YES ❑ NO ® 1 Part A Wastewater Monitonne Reouirements SAMPLE COLLECTION YEAR 2015 SAMPLE QUARTER ❑Jul -Sept ®Oct -Dec ❑Jan -March COUNTY Davie PHONE NO (704) 372-2930 ADD TO LISTSERVE? DYES ®NO EMAIL DISCHARGING TO CLASS [:]SA ❑HQW OPTIONAL INFO ❑Aprjl-Juneo ❑PNA ❑Trout ®Other Outfafl No Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) Duration (minutes) Total Flow 7 (gallons/day) - RiVI, MD 6 93 ° 303 s 53 (15)6 - - 001 12/14/15 No Flow t, ru L CENTRAL FI WR SECT(Oi LJ ' If wastewater systems have not discharged in this quarter— report No Flow or No Discharge here Please make sure to mark the sample quarter above 2 Report the abbreviation for the type of Authorized Wastewater Discharges here Vehicle and Equipment Cleaning (VE) Raw Material Stockpiles (RM) Mixing Drum Cleanout (MD) Report more than one type if the waste stream is commingled 31f an effluent limit is exceeded twice in a row the permittee is required to institute monthly monitoring for that parameter for six months unless DWQ RO staff notifies you to continue monitoring pH limits are 6 9 S U for wastewater discharges to freshwaters, and 6 8 8 5 5 U for discharges to saltwaters 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters 10 mg/L for Trout and PNA waters and 30 mg/L for all other water classifications Permit Date 7/1/2010 06/30/2015 Last Revised 07/13/11 Page 1 of 2 e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas TPH does not have a limit for wastewater bu*stead is subject to benchmarks and provisions of Part IV Section A, including the Tiered Response Action �' Flow rate can be measured continuously or calculated Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 028 0224 Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location the permittee shall notify D1h1Q, and the DWQ Regional Office may require an annual flow report on a case by case basis MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW, -NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD 1N CASE OF "NO FLOW") TO Division of Water Quality Attn DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED_ "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there acq significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations ature of Permit -tee) Permit Date 7/1/2010 06/30/2015 1(2711(. (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring ReportD� GENERAL PERMIT No NCG140000� CERTIFICATE OF COVERAGE NO NCG140238 FACILITY NAME Mocksville PERSON COLLECTING SAMPLES Rik Jones CERTIFIED LABORATORY Prism Lab # 402 LIMIT VIOLATIONS? YES ❑ NO Part A Wastewater Monitorine Reouirements © ^ SAMPLE COLLECTION YEAR 2015 RECEIVEDSAMPLE QUARTER ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June OCT 2 Z kic COUNTY Davie PHONE NO (704) 372-2930 CENTRAL FILES ADD TO LISTSERVE7 ❑YES ®NO EMAIL DWR SECTION DISCHARGING TO CLASS ❑SA ❑HQW OPTIONAL INFO ❑PNA ❑Trout ®Other Outfall No Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT HEM'' (mg/L) Duration (minutes) Total Flow (gallons/day)' - - RM, MD 6 934 3035 53 (15)6 - - 001 09/22/15 No Flow ' if wastewater systems have not discharged in this quarter — report 'No Flow or No Discharge here Please make sure to mark the sample quarter above 2 Report the abbreviation for the type of Authorized Wastewater Discharges here Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD) Report more than one type if the waste stream is commingled 3If an effluent limit is exceeded twice in a row the permittee is required to institute monthly monitoring for that parameter for six months unless DWQ RO staff notifies you to continue monitoring pH limits are 6-9 S U for wastewater discharges to freshwaters, and 6 8 8 5 S U for discharges to saltwaters 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications Permit Date 7/1/2010 06/30/2015 Last Revised 07/13/11 Page 1 of 2 e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas TPH does not have a limit for wastewater but instead is subject to benchmarks and provisions of Part IV Section A, including the Tiered Response Action Fldw ratt'tan be measured continuously or calculated Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B 0224 Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ If the permrttee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location the permrttee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case by case basis MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY_(I__NCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO Division of Water Quality Attn DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFIC4TION FOR ANY INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am as4(are Jh1t thp(e are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " ure of Permittee) Permit Date 7/1/2010 06/30/201S l cjbZt/IS (Date) - Last Revised 07/13/11 Page 2 of 2 3 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No NCG140000 CERTIFICATE OF COVERAGE NO NCG140238 FACILITY NAME Mocksville PERSON COLLECTING SAMPLES Rik Jones CERTIFIED LABORATORY Prism Lab 4 402 LIMIT VIOLATIONS? YES [:]NO Part A Wastewater Monitorine Reouirements RECEIVED JAN 2 0 2015 CENTRAL FILES DWR SECTION SAMPLE COLLECTION YEAR 2014 SAMPLE QUARTER ❑Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June COUNTY Davie PHONE NO (704) 372-2930 ADD TO LISTSERVE? ❑YES ®NO EMAIL DISCHARGING TO CLASS []SA ❑HQW OPTIONAL INFO ❑PNA ❑Trout ®Other Outfall No Date Sample Collected' (mm/dd/yr) Type Of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 2&S4A SGT-HEM' (mg/L) Discharge Duration (minutes) Total Flaw (gallons/day)' - - RM, MD- 6-934 3035 53 (15)6 - - 001 11/23/2014 No Flow If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here Please make sure to mark the sample quarter above z Report the abbreviation for the type of Authorized Wastewater Discharges here Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD) Report more than one type ,f the waste -stream is commingled 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring 4 pH limits are 6-9 S U for wastewater discharges to freshwaters, and 6 8-8 5 S U for discharges to saltwaters 5 TSS Itmits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications Permit Date 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 G Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas TPH does not have a limit for wastewater but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action 7 Flow rate can be measured continuously or calculated Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B 0224 Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case by case basis MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO_ DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO Division of Water Quality T Attn DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807 6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons dir tly ress sible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am a�rRe thg4 ere gnificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " (Signal re of Permittee) Permit Date 7/1/2010 06/30/2015 am //y (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No NCG140000 CERTIFICATE OF COVERAGE NO NCG140238 FACILITY NAME Mocksville PERSON COLLECTING SAMPLES Rik Jones CERTIFIED LABORATORY Prism Lab it 402 LIMIT VIOLATIONS? YES ❑ NO Part A Wastewater Monitorine Reouirements SAMPLE COLLECTION YEAR 2014 SAMPLE QUARTER ®Jul -Sept []Oct -Dec ❑Jan -March ❑April -June COUNTY Davie PHONE NO (704) 372-2930 ADD TO LISTSERVE? ❑YES ®NO EMAIL DISCHARGING TO CLASS ❑SA ❑HQW ❑PNA [—]Trout ®Other OPTIONAL INFO Outfall No Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-HEM" (mg/L) Discharge Duration (minutes) Total Flow (gallons/day), - - RM, MD- 6-934 3035 53 (15)6 - - 001 7/21/2014 No Flow 014 CE ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here Please make sure to mark the sample quarter above Z Report the abbreviation for the type of Authorized Wastewater Discharges here Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MID) Report more than one type if the waste -stream is commingled 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring 4 pH limits are 6-9 S U for wastewater discharges to freshwaters, and 6 8-8 5 S U for discharges to saltwaters 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications Permit Date 7/l/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 r{ � 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action Flow rate can be measured continuously or calculated Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B 0224 Permtttees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 Flow and report this information to DWQ If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO Division of Water Quality Attn DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN MIS CERTIFICATION FOR ANYINFORMAT19N REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons dirActly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aw#) that ter4e significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations " (Signature of Permittee) Permit Date 7/1/2010-06/30/2015 9f r�I/�Y (Date) Last Reused 07/13/11 Page 2 of 2 f PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NEB. NCG140000 CERTIFICATE OF COVERAGE NO NCG140238 FACILITY NAME Mocksville PERSON COLLECTING SAMPLES David Morris CERTIFIED LABORATORY Prism Lab # 402 LIMIT VIOLATIONS? YES ❑ NO Part A Wastewater Monitorine, Reoulrements SAMPLE COLLECTION YEAR 2014 SAMPLE QUARTER ❑Jul -Sept ❑Oct -Dec Dian -march ®April -June COUNTY Davie PHONE NO (704) 372-2930 ADD TO LISTSERVE? ❑YES NNO EMAIL DISCHARGING TO CLASS [:]SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO Outfall No Date Sample Collected' (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mt/L) TPH using method 1b64A S g/L) l6 (mg/L) Discharge Duration (minutes) Total Flow 7 (gallons/day} - - RM, MD- 6-934 3035 53 (15)6 - - 001 6/25/2014 No Flow ' If wastewater systems have not discharged in this quarter -- report "No Flow" or "No Discharge" here Please make sure to mark the sample quarter above I Report the abbreviation for the type of Authorized Wastewater Discharges here Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD) Report more than one type if the waste -stream is commingled 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring 4 pH limits are 6-9 S U for wastewater discharges to freshwaters, and 6 8-8 5 5 U for discharges to saftwaters s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications Permit Date 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action 7 Flow rate can be measured continuously or calculated Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B 0224 Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case by -case basis MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO - Division of Water Quality Attn DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807 6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qua tied sonnet properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons rect r sponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aw* th4 h re significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations " of Permlttee) Permit Date 7/1/2010-06/30/2015 C (Date; Last Revised 07/13/11 Page 2 of 2 � � I _ i pin, —, LEGEND —111�= 5tormwater flow direction o = Rip Rap — - _ = Chain Link I ence = Property line O = €lutfall Dmtnage Swale 3344 1IILLSB0ROU0I I S 1 SUE I U 200 RALI::[Gl I NC 27607 12Ii0NE 919 861 7772 FACSIMILE 919 961 7777 REVISION No I DATL I DESCRIPTION ENGINEERING CONSULTANTS INC SITE LAYOU T AND DRAINAGE MAP CAROLINA CONCRETE CO MOCKSVILLE, NC sc,►t.ti to ear SCAT C U 40U PROJECI No 018-07-005 DA I r_ AUGUS 12007 DRAWN 13Y 1'N1ll/'I RP CIll:cKfJ313Y FIGURE 2 = Slormwater flaw dTrechan = Prop�,rly Ime ENGINEERING CONSULTANTS INC LEGEND = Rip Rap 0 = outrall 3344 1 III-1_S130ROUG1I S 1 SUI 111 200 ItALMG1I NC 27607 — — — = Chain I ink 1 ence — — — - = Drainage',wale SITE LAYOUT AND DRAINAGE MAP CAROLINA CONCRETE CO PI IQNL 919 861 7772 MOCKSVILLE, NC SCAIFIN FPTT FACSIMILE 919 961 7777 SCALE _- o Inn RrVI510N No I DATr Df SCRIPTIDN PROJ EC 1 No 01 R-07-005 DA 1 F AUGUST 2007 DRAWN 13Y PMFI/ 1 RP C111-CK1-13 BY FIGURE f �T;T^ 1� Division of Water Qualitv / Surface Water Prottetion NC®ENR National Pollutant Discharge, Elimination System Nc f CANDONA DE —TIE , or ENviRe MC Tw o N urtwReso,�x�C9 NC;G140000 NOTICE OF INTENT AULM � I N ONI 1 —[Olt 1) lit Rctnbd 1'eAr Klonth f7fl C �f11 JIL it( VI r C J{.F�i• NCG 1 4 Ch,Lk k Arnaud YcimA Asv Heil Icf National Pollutant Discharge Elimination System application for coverage under General Permit N CG 140000 STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classifi SIC (Standard Industrial Classification) Code - 3273 Ready Mixed Concrete For new plant sites that will discharge or recycle process wastewater (even if commingled with stormwater) This NOI is also an APPLICATION FOR Authorization to Construct (ATC) wastewater treatment facilities ATC requests must be submitted at least 90 days prior to construction' For existing plant sites discharging or recycling process wastewater (even it commingled with stormwater) This NOI is also an APPLICATION FOR Authorization to continue to operate wastewater treatment facilities in place Construction, modification, or installation of any new treatment components at an existing site requires an ATC Treatment fac,lllties used to treat or recycle prMe55 %\1,3slf.N%dI ,r (including stormwatLr BMP struourts. treating; process wastewater flows commingled with stormwater) rcqutre an ATC rViior to construction per 15A NCAC 2H 0138 Z he authorization to construct or coritrriue to operate will be issued at the same lime as the Certificate of Coverage (COC) for the, NCG 14 permit Design of trcatme.nt fac IIItit S must comply with requirements of 15A NCAC 211 0138 & 0139 Construction of wastewater treatment facilities (this includes recycle systems) at new or existing plant sites requires submission of three (3) sets of plans and specifications signed and sealed by a Professional Engineer (P E ) or qualified staff2 along with this application A copy of the design calculations should be included Please see questions 14 & 15 wr For questions, please contact the DWQ Regional Office for your area (See page 5)� (Please print or type) 1) Mailing address of ownerloperator (address to which all permit correspondence will be mailed) Name Concrete Supply Company Loren Wild Street Address 3823 Raleigh Street City Charlotte State NC ZIP Code 28206 Telephone No 704 3722930 Fax 704 343 0271 2) Location of facility producing discharge Facility Name Facility Contact Street Address City County Telephone No Concrete Supply Company Mocksville Plant Laren Wild 215 Industrial Boulevard Mocksville Davie 704 372 2930 Page 1 of 5 State NC ZIP Code 27028 FaX 704 343 0271 ' 'As per 15A NCAG 2H 0106 2Unless treatment facilities are designed Constructed and put ante operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes 89C 25 (7) plans and specification, must be signed and sealed by a P E SWU 229 121206 Last revised 1211212006 d T e&4-�v 0/,7 c yam, Lk /,)4 exe1 S d F-Wf rr!'-- ►10 Add OVly c� �� s h�i fae� zss t gyt,c.o( w � 01-4 3toG — n�✓� 5ar S DIe 5i sp-ec-s 2- r2c cE,c_ 5 � wi Av - Fv�" b it (f W move 'aY vvWL'irz- 40-r ci aro( w r 65 QUGn r� A NCGI40000 N O 1 3) Physical location information Please provide a narrative description of how to get to the facility (use street names state road numbers and distance and direction from a roadway Intersection) From Exit # 174 140 to Farmington Road South to US 158 South to Milling Road to Industrial Boulevard (A copy of a county map or USGS quad sheet vnth facility clearly locates on the map is a required part of this application t 4) Latitude 35 54 09 N Longitude 80 32 36 w (deg, min, sec) 5) This NPDES Permit Application applies to which of the following ❑ New or Proposed Facility Date operation is to begin ® Existing 6) Standard Industrial Classification Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary Industrial activity at this facility SIC Code 3 2 7 3 7) Provide a brief description of the types of industrial activities and products produced at this facility (Include a site diagram showing the process areas present at this facility ) Concrete Batch Plant 8) Discharge points I Receiving waters Flow many discharge points (ditches pipes channels etc ) convey stormwater and/or wastewater from the property? one What is the name of the body or bodies of water (creek stream river lake etc ) that the facility stormwater and/or wastewater discharges end up In? Leonard Creek to Dutchman Creek If the site stormwater discharges to a separate storm sewer system name the operator of the separate storm sewer system (e g City of Raleigh municipal storm sewer) NIA Receiving water classification (If known) C Note Discharge of process wastewater to receiving waters classified as WS-11 to WS-V or SA must be approved by the N C Dept of Environmental Health If DEH does not approve, coverage under NCG140000 cannot be granted No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW 9) Does this facility have any other NPDES permits? ® No ❑ Yes If yes list the permit numbers for all current NPDES permits for this facility 10) Does this facility have any Non -Discharge permits (ex recycle permits)'? IN No ❑ Yes If yes list the permit numbers for all current Non -Discharge permits for this facility 11) Does this facility employ any best management practices for stormwater control? ❑ No ® Yes If yes please briefly describe Recycle process water from concrete basins storm water wet detention pond (see plan) SWU 229 121206 Page 2of5 Last revised 12/12/2006 r.f or NCG140000 N O 1 12) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No ® Yes If yes when was it implemented? Attached 13) Are vehicle maintenance activities occurring or planned at this facility? ® No ❑ Yes Wastewater Treatment Design Information 14) Are discharges occurring or planned from any of the following process wastewater generating activities? Vehicle and equipment cleaning ® Yes ❑ No Wetting of raw material stockpiles ® Yes ❑ No Mixing drum cleaning 'l Yes ❑ No If yes to any of the above please describe the type of process used to treat and/or recycle the process wastewater rAT For a sufficient application you must provide design specifics (e g design volume retention time surface area etc ) and calculations to demonstrate compliance with permit effluent limits (pH — 6-9 SU Total Suspended Solids (TSS)o-- 30 mgll and Settleable Solids (SS)a 5 ml/I ) [Use separate sheet(s)] If all these discharges are recycled please refer to Question 15 For plants that recycle and/or discharge process wastewater When applying for this permit, you are also applying for an authorization to construct (new treatment facilities) or authorization to continue to operate (existing treatment facilities) as part of the NOl For new sites, you must submit three (3) sets of design plans and specifications with this application and provide supporting calculations that predict compliance of final discharge with permit limits For existing sites applicants should submit three (3) sets of plans and specs for facilities as -built and provide as many design details as possible, or submit a detailed diagram of treatment systems in place that includes information such as tank volumes, dimensions, retention time, piping, settling basin details, etc Please note If new treatment systems are planned for an existing site, an ATC will be required prior to construction of those facilities Plans/specs/calculations prepared by a P E and the request for an ATC may be submitted with this NOI, or separately at a later date DWQ may request the status of your plans for requesting an A TC upon issuance of the COC 15) Does the facility use or plan to use a recycle system? ❑ No ® Yes If yes what size storm event is the system designed to hold before overflowing? (for example 10-yr 24-hr) year, 24-hr rainfall event For a recycle system (regardless of when it overflows) please provide plans calculations and design specifics (e g throughput assumptions/water balance design volume retention time surface area amount of freeboard in design storm event etc ) [Use separate sheet(s)] �Nj_' , For a sufficient application the information must demonstrate compliance of final discharge with permit effluent limits (pH — 6-9 SU Total Suspended Solids (TSS) — 30 mg/I and Settleable Solids (SS) — 5 ml/1) or must demonstrate that the recycle system has sufficient capa0y to contain runoff from a 25-year 24-hr rainfall event plus one foot of freeboard under design operating conditions SWU 229 121206 Page 3of5 Last revised 12/1212006 NCG140000 N O 1 16) Are wastewater treatment facilities (Including recycle systems) planned in the 100-year flood plain? n No ❑ Yes If so, Include Information to demonstrate protection from flooding (Minimum design requirements for treatment works Include protection from the 100-year flood per 15A NCAC 2H 0219 } 17) Hazardous Waste a) Is this facility a Hazardous Waste Treatment Storage or Disposal Facility's ® No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg of hazardous waste generated per month) of hazardous waste? El No Cl Yes c) Is this facility a Large Quantity Generator (1000 kg or more of hazardous waste generated per month) of hazardous waste? ® No ❑ Yes d) If you answered yes to questions b or c please provide the following Information Type(s) of waste How is material stored Where is material stored How many disposal shipments per year Name of transport ! disposal vendor Vendor address 18) Certification North Carolina General Statute 143-215 5 B(i) provides that Any person who knowrrrgly makes any false statement representation or certification on any applwatton record report plan or other document filed or required to be maintained under this Article or a rule implementing this Article or who knowingly makes a false statement of a material fact m a mlemaking proceeding or contested case under this Article or who falsifies tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintamed under this Article of rules of fhe [Environmental Management) Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a tine not to exceed ten thousand dollars ($10 000) I hereby request coverage under the referenced General Permit I understand that coverage under this permit will constitute the permit requirements for the discharges) and is enforceable in the same manner as an individual permit I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true complete and accurate Printed Name of Person Signing Henry Batten Title Vice President Concrete Supply Comparry (Signylule VApplicant) 7-13-c�7 (Date Signed) Notice of Intent must be accompanied by a check or money order for $80 00 made payable to NCDENR Page 4 of 5 5WU 229 1212D6 Last revised 12/12/2006 RECYCLE SYSTEM INFORMATION Concrete Supply Company plans to add a wash -water recycle system in the future at the Mocksville, North Carolina facility at 215 Industrial Boulevard On our Notice of Intent, we have checked the box that states we plan to add a recycle system in the future However, we do not have the plans in place at this time When we have our plans for the recycle system developed, we will submit an Application to Construct (A rC) with the required plans, calculations, and design specifications N 0 0.2 0.4 0.6 0.8 1 mi Map Center is 35' 54' 09"N, 80' 32' 28"W (NAD831WGS84) Mocksville Industrial Park, USGS Mocksville (NC) Quadrangle Projection is UTM Zone 17 NAD83 Datum 7�r �JRIGON Slte Location Map Concrete Supply Company - Mocksville, North Carolina JOB No: 018-07-005 DATE: August 2007 DRAWN BY: TRP r;�CO en in CO ;.0co co c° rp CORE EXIST. MH = �0 "���s INV. IN=792.2# :2 � � es sE : s ss as as —PE— ---FE----PE----PE----PE----PE----PE--------PE----PE----rE---_PE.--- PE— --- — ------PE----Pi---- -- g&---Pt----PE---__rE----R----lE----PE— --- PE— ---'c----rE----rE----rE--- 796 Z02 798 \ - --- 804 -- - 802 ---- 800 798 796 794 — 2 3+00 4+00 5 O - - 00 -g 6" GRAVEL6 a----- ------- - ------ ---+- - - - - - - - --- - --- --- - - - - - - - - - - - - - - - p \ - 6' GRAVEL"- 6" GRAVEL'S GA OApST , j . 9Y OTMER ca O +1 G \ tii i �^ o co cc N I Bi�SR ATE co v�b \ i AS —BUILT GPI yQ �o, I O ! WASH DOWN PITS a0 ' J I r I I syLo ! 10 13 L L9L Fi I y 5 In m BASIN #1 6" GRAVEL \ �yp�1QL.T, 4 \ \ % 7 I Y rn ^ '' 4270.8 GALS n Lz'L9L � BASIN #2 6" GRAVEL l I \ r/ I £'49L 5338 5 GAL5 790 C) rn N 6 GR L �\ O ���r�rr�r w `• 51 800 ----- 79 796, 794 j J n i I 1 90'SSL co cn BASIN #3 �. CONIC, CONC. 8796.5 GALS 7 I v I` I 4 m 1 J to d rn m LZ'49L J O1 ri BASIN #4 no 90 9516.4 GALS " n Zz'L9L 4`0 ,`o \ I ' G�.-..._.._..-GG. 6 EXIST• 2" GAS I/ 7D US'TRIAL BL VD. ♦ • f t �84 I � + O �,� � � 782 I 6" GRAVEL I I 1 7B12 I � I I Q CX I r , RCP / oO _, �... _.. a • 778 776 -------------------------- --- 772 a W o z l' 778 II 786 LLJ a ...--,.��.G-�-- _ li----••'.. -G -----G' G-- G G \ G---- G 4 G -G-G EXIST, 2" G - / NEW 5x4 YI W/ ``0 (2) 5'Wx6"H OPN'G ALIGNED W/ DITCH INV. OUT=770.20' INV. OPN'G=774.5 CA \p\ \ EXTEND BY 6 FT. EXIST. 24" CMP I - 1 I-^'= •� %1 i1 .�i �!: .,.:/ .: .:.7 �-1" � i r: �''J �flr? ,,� • ; -f ��+/r• `�_-„G..�= �� /�?�!�'Evt� .�/J /i � � � !- B c�• �:' d • il.r U" I'd � /? J rr JJ � or/��^/F_. ( /r'i'• fit') �r of f 0,4 L. r r l ! f / r�r' r'' •! ` ••J I T ' f ✓c� r�. ,� �r .v/ rA L� f . ! , f 0 30 60 90 120 SCALE: 1"=30' CONTOURS AT 2' LAYOUT KEYNOTES O WASTEWATER PL;MP: SEE NOTES O FORCEMAIN SHALL BE 2" SCH 40 PVC WITH MINIMUM 30" OF COV HIGH POINT OF PIPE SHALL NOT EXCEED ELEVATION 792,5, O3 2' HIGH CONCRETE WALL MADE FROM 2x2 x6L REINFORCED CONCRETE LOGS PROVIDED BY OWNER. TOP 2'# ABOVE GROUND. 4�'4' HIGH CONCRETE WALL MADE FROM 2x2 R`E FORCED CONCRETE LOGS PROVIDED BY OWNER. TQP 2'# ABOVE GROUND. O LIGHT POLES, SEE NOTES LANDSCAPING SHEET. O CONCRETE APRON: MINIMUM 10 FT WIDE, 3000 PSI WITH 5% AIR. SHALL BE 9" THICK CONCRETE OVER 4" MECHANICALLY COMPACTI 'ABC' OVER COMPACTED SUBGRADE. SEE PAVING NOTES. WASTEWATER PUMP NOTES WASTEWATER Pl hWiNG.. SYSTEW SHAE- frk--LEx STArTiON AS PROVIDED BY SHOAF PRECAST SEPTIC TANK, INC. OF LEXINGTON, NC (336 787- 5826) CONSISTING OF A COMPLETE INSTALLATION WITH AT LEAST THE FOLLOWING ELEMENTS: 1. 1000 GALLON PRECAST CONCRETE PUMP TANK WITH ALUMINUM HATCH. PROVIDE SLOPING GROUT FLOOR TO PUMP AREA. 2. 0.5 HP ZOELLER SUBMERSIBLE SEWAGE PUMP MODEL 267 WITH CAST IRON IMPELLER, 115V, SINGLE PHASE, 10.5 AMP, WITH MECHANICAL SEALS PROVIDING 50 GPM AT 15 FT TDH. 3. STAINLESS STEEL LIFTING CHAIN. 4. HIGH WATER ALARM FLOAT. 5. UNIONS, CHECK VALVE AND ISOLATION GATE VALVE IN THE PUMP TANK, NEMA 4X CONTROL PANEL WITH ALARM LIGHT AND HORN FOR HIGH WATER ALARM. PROVIDE A SAFETY YELLOW, CONCRETE FILLED, STEEL BOLLARD AT EACH TANK CORNER (4 BOLLARDS) FOR TRAFFIC CONTROL. 412 1 - J 9�q,:�-� r TOTAL BASINS VOLUME = 27922.2 GALS 5.5" OF RAINFALL OVER ENTIRE WASHDOWN PIT = 18,060 GALS WASHDOWN PIT VOLUME 10/25/05 CONCRETE SUPPLY CO. ti; ��oFEss�oNgy9 ;+ MOCKSVILLE SITE RELOCATION _ SEAL LAYOUT PLAN 15407 titi ' ... ,,��. C GREY ENGINEERING, INC.: T SHEET . !� C� C-4 8 Civil Design anSurveying P.O. Box 9 Mocksvilde, N.C. 27028 greyengineering.com (336)751-2110 DRAWN BY: G. BULLARD DESIGN BY: G. BULLARD PROD. NO.: DATE: 233.003.gE 7/23/04 DATE: ! p / 7401 D S ` �r,_ r r {Sant. of Amerlc Dncrete Salppkv co S w, K } € rw ",�4� h xt V4'{chita Falfs�t 323 Ralergh Street' ,, rl 6rlot6e28206 SA�t�,j Q7 a B 1yl*1 i )ne hund�cd ;nd xx l 100 DollaO _ r -- F _ p o s �• t r }n' •+ p r r vK L)lv ea r k R�� RALE[Gll NI USAti " O.1 ' k HUA1.1�T{Y a # r MCFNif.Et``�~�-- - �` Y� i q h e Y r > - )9 1641 - - w- v TREE EDGE TREE EDGE MPS 0 NEW FENCE ♦ LEY LEY MPS CRM CRM MPS CRM TREE EDGE w w�wE)w >s w CRM * CRM + LP 0 SEE NOTE 7 NEW FENCE SEE NOTE 7 CRM sss.�.. - - - - - - - —•— - - - - - - O o \`��a LP _ \ .....1+ ~` 6" GRAVEL ✓`-------------------------------------------------------------------- C MPS ,d 000 ` ��` 6" GRAVEL 6" GRAVEL GAL 5T 6" GRAVEL E'RS l z, 1LEY aP sus I La'�� A sdF I 8!lVgR A TE S PIG j + sss0' j " GRp�IE� ,anp GRND�787.5 TO 786,8 i T� WASH DOWN PIT 6 �EWA'101 SEE DTL SHEET LEY I w� P HC I I A — - - I P I 6" GRAVEL- F -LP 6" GRAVEL I I I MPS I I I 1 I I I I r - I I O � � � � �� ,, • E ci I I 0 1Li 1� Vc°a `prf i �I LP CRM r..-- -- I I o 6" GRAVEL s 6" GRAVEL j 10 CD Lu CRM � 3 I � * 6 GRAVE I NEW' 50' ELECTRIC GATE TO NEW 45' ELECfRIC G TIE s 1 � � TO OWNERS R QUIRE ENT; CRM MPT ' OWN�RS REQUIREMENT. i y - CRM . '� _ i y JPF TYP. x— i -- x—x--x l k—x —x—x} x—x--M�t..sx `R _ ."'�==`—�i"'x �!—�= — —� — �= �— — —��x—x�x—x—xi x—x x ��X rrxrrxTrx MPT 1 �� LP NE E E �• - c O a o o a o o ° LP ° 1 / ��',.''.: xYr,':T�*'max :.�'`''r 6"'GRAV£L,��`-� MPT MPT MPT MPT MPT MPT MPT MPT r I �# •' Xr••, ��. •r. •'a�APT °MPT • °• I ° -- -- -- -- -- CRM-- - - --- 1-��-- - -- --- -- - -- -- - �C�'----��y - -- - * MPT MPT I L ✓/_.` C CRM CRM CRM CRM CRM CRM CRM CRM j '`♦ CRM CRM CRM CRM Ld CRM ! �,.-94 -1�._- G---�,..x___r:-p,.. � .. G .—•G G G--- 3 IATD USTRIAL BL VD. NEVER CUT A LEADER WRAP TREE TRUNKS WITH BURLAP, HEAVY CREPE OR OTHER MATERIAL (3)2"x4" HARDWOOD STAKES, 1 FT. DEEPER THAN PIT 3" HIGH Z TOPSOIL BERM FINISH GRADE TOPSOIL ---- PRUNE BRANCHES & FOLIAGE (ON END TIPS) BY 1/3 AND RETAIN NORMAL PLANT SHAPE 3 STRANDS OF 9 GAUGE GALVANIZED WIRE TWISTED TURNBUCKLE 1/2 DIA RUBBER HOSE TREE SHALL BEAR SAME RELATION TO FINISH GRADE AS IT BORE TO PREVIOUS EXISTING GRADE 3" DEEP MULCH AROUND AND BEYOND PLANT BACKFILL MIXTURE OF ,• ��j``/j '. > µ .:; : `//f� BARK MULCH, TOPSOIL & SOIL REMOVE 1 /3 OF BURLAP _ ', ` !ii� — TAMP NEW TOPSOIL MIXTURE ,II=IIII111= �' IIIIiIj SUBSOIL BROKEN WITH PICK TWICE BALL DIA. TREE PLANTING DETAIL NOT TO SCALE 32 PLNTG_TREE I � r r r r I I PRUNE PROPORTIONALLY FOR ROOT REDUCTION AND RETAIN NORMAL PLANT SHAPE SHRUB SHALL BEAR SAME RELATION TO FINISH GRADE AS IT BORE TO PREVIOUS EXISTING GRADE. PLANT AZALEAS AND CAMELLIAS WITH 1/4 BALL ABOVE GROUND LEVEL. FINISH 3" DEEP MULCH AROUND GRADE AND BEYOND PLANT TOPSOIL HH 9 BACKFILL MIXTURE OF MULCH, TOPSOIL & SOIL REMOVE CONTAINER OR I-111I— 113 OF BURLAP SAUCER IIII_I _ TAMP NEW TOPSOIL MIXTURE SHAPE PIT — SUBSOIL BROKEN WITH PICK TWICE BALL DIA. SHRUB PLANTING DETAIL NOT TO SCALE 32 PLNTG-SHRUB TREE EDGE SEE NOTE 7 r X,ST. TREES n d Z n L2; EXIST. TREES MPS 0 ♦1�1 LEY CRM 6' GATE 0 MPT MPT CRM w c� w Lj C G G G TREE SHRUB SCHEDULE MIN. MIN. SPACING MIN. MAX. SYMBOL KEY QUANTITY BOTONICAL NAME COMMON NAME HGT. CALIPER • MPS 7 ACER SACCHARUM SUGAR MAPLE 80 2" 35' 100' MPT 16 ACER BUERGERIANUM TRIDENT MAPLE 5' 1.5" 15' 40' CRM 28 LAGERSTROEMIA INDICA CREPE MYRTLE 5' 1.5" 15' 35' 1p LEY 5 CYPRESSOCYPARIS BLUE PACIFICA JUNIPER 5' 1.5" 5' fi' LEYLANDII � .r. � JPF 36 JUNIPER CIMENSIS PFITZER JUNIPER 18 " ___ 5 , 6 NOTE: PLANT MATERIAL SHALL MEET OR EXCEED MINIMUM SIZES IN THIS TABLE AT THE TIME OF INSTALLATION. 0 30 60 90 120 SCALE: 1"=30' CONTOURS AT 2' LANDSCAPING NOTES: 1. ALL REQUIRED PLANTINGS SHALL BE NURSERY GROWN STOCK THAT IS FREE FROM DISEASE OR GROWTH PROBLEMS AND SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARDS FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN NURSERYMEN'S ASSOCIATION. 2. ALL REQUIRED PLANTINGS SHALL BE INSTALLED IN A MANNER THAT INSURES THE AVAILABILITY OF SUFFICIENT SOIL AND WATER FOR HEALTHY GROWTH AND THAT IS NOT INTRUSIVE TO ABOVE AND BELOW GROUND UTILITIES. 3. LANDSCAPING, INCLUDING BERMS, SHALL BE INSTALLED AND MAINTAINED SO AS TO NOT TO INTERFERE WITH THE SIGHT DISTANCE REQUIREMENTS OF THIS ARTICLE OR THE SIGHT DISTANCE NEEDS OF DRIVERS IN PARKING AREAS AND AT ENTRANCE AND EXIT LOCATIONS. 4. NATIVE SPECIES AND RELATED CULTIVARS ARE ENCOURAGED. 5. NO REQUIRED PLANTING AREA SHALL CONTAIN LESS THAN 50 SQ. FT AND NO PLANTING AREA SHALL BE LESS THAN B FT IN DIAMETER AROUND A REQUIRED TREE. 6. CONTRACTOR SHALL PROVIDE OWNER WITH LIST OF PLANTS TO BE PURCHASED AND PLANTED FOR SUBMISSION TO ZONING OFFICER. 7. TYPE 'D' BUFFER IS REQUIRED IF TREES DO NOT EXIST OR HAVE BEEN REMOVED FROM THE PROPERTY LINE. LAWN MAINTENANCE 1. CONTRACTOR SHALL WATER, MONITOR AND MAINTAIN OF ALL LAWN AREAS UNTIL AN ACCEPTABLE STAND OF SOD HAS BEEN ESTABLISHED AND REACHES A HEIGHT OF 4" TALL. 2. CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS. 3. AT THE TIME THE SOD REACHES A HEIGHT OF 4" TALL, THE CONTRACTOR SHALL CUT THE SOD TO 3" TALL AND THEN TURN OVER THE LAWN MAINTENANCE TO THE OWNER. FENCE NOTES: 1. FENCE SHALL BE CHAIN LINK. 2. THE MAXIMUM FENCE HEIGHT IN FRONT OF PROPERTY SHALL BE 6 FEET. 3. THE MAXIMUM FENCE HEIGHT ALONG BOTH SIDES AND BACK SHALL BE 8 FEET. LIGHTING NOTES: 1. PROJECTIONS OF LIGHT SHALL BE CONFINED TO STAY WITHIN PROPERTY LINES TO PREVENT LIGHT TRESPASS. 2. LIGHT POLES SHALL BE LIMITED TO 30 FT IN HEIGHT. 3. ALL EXTERIOR LIGHTING SHALL USE CUTOFF TYPE FIXTURES TO MINIMIZE THE COMPONENT OF LIGHT ABOVE HORIZONTAL (GLARE). 4. ALL ELECTRICAL CABLES SHALL BE UNDERGROUND. 9- 0- QREVISED ALL LANDSCAPING PLANTS 9/28/04 ADDED DETAILS, SCHEDULE & NOTES NO. REVISION DESCRIPTION DATE CONCRETE SUPPLY CO. N"cAR��/ '- MOCKSVILLE SITE RELOCATION �oFESSip�q'L SEAL _ LANDSCAPING AND LIGHTING PLAN 15407 NEE���;� SHEET ''••.� C. GR'.••'' GREY ENGINEERING, INC. evil C)esign and Surveyng P.C. Box 9 Mocksville, N.C. 27028 8 greyengineering.com DRAWN BY: G. BULLARD PROJ. NO.: 233.003.GE (335)751-2110 DESIGN BY: B. BROWN DATE: 7/23/04 / i Y DATE: 190 I - f 7ya i II 119-vom W��;AZTY 790 RFZYc�i.E SYSTEM I \ - 1 \ J INDUSTRIAL BLVD 611 i I pE 1 N ! I I n I OOP 01 LEGEND r~ = Stormwater flow direction = Rip Rap —•— — = Chain Link Fence = Property line = Outfall — — = Drainage Swale ENGINFERING CONSULTANTS, IN 3344 HILLSBC)ROUGH ST SUITE 200 SITE LAYOUT AND DRAINAGE MAP R-A_i._EIGH NC 27607 CONCRETE SUPPLY COMPANY PHONE 919 861 7772 MOCKSVILLE, NC FACSIMILE 919 861 7777 sCAtetN�r SCALE v REVISION No DATE DESCRIPTION PROJECT No 019-07-005 DATE SEPTEMBER 2007 DRAWN BY PMI-I/TR-P CHUCKED BY FIGURE 2 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG140000 TO DISCHARGE STORMWATER AND/OR PROCESS WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Coverage under this General Permit is applicable to all owners or operators of establishments classified as primarily engaged in ready -mixed concrete [Standard Industrial Classification Code (SIC) 3273] and like activities deemed by DWQ to be similar in the process and/or the exposure of raw materials, products, by-products, or waste materials IMPORTANT CHANGES & GUIDANCE December 8, 2011 In response to Section 9 of Session Law 2011-394, NCDWQ will not implement some of the Authorization to Construct requirements in the current version of the permit DWQ will revise the printed text of the General Permit to be consistent at the next scheduled renewal period Specifically a Note that permit requirements in Part II, Section A, numbers 1-5, and Part I1, Section B, number 1 are no longer valid per NC Session Law 2011-394 b However, note that Part II, Section A, number 6, and Part II, Section B, numbers 2-10 are unaffected by this Session Law c Your facility must notify the appropriate DWQ Regional Office at least 72 hours in advance of operation of your wastewater treatment facility d Other DWQ supporting documentation (other than the permit) will be amended to reflect these changes STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY GENERAL. PERMIT NO NCG140000 TO DISCHARGE STORMWATER AND/OR PROCESS WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Coverage under this General Permit is applicable to all owners or operators of establishments classified as primarily engaged in ready -mixed concrete [Standard Industrial" Classification Code (SIC) 32731 and like activities deemed by DWQ to be similar in the process and/or the exposure of raw materials, products, by-products, or waste materials D15charges covered under this permit are • Stormwater point source discharges (including discharges from on -site vehicle maintenance areas), and Authorized process wastewater discharges The following activities are specifically excluded from coverage under this General Permit 0 DisposaI of wastewater not specifically designated in this permit • Disposal of any concrete directly into stormwater conveyances, storm sewer outfalls, wetlands, and/or into any waters of the state In compliance with the provision of North Carolina General Statute 143-215 1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act, as amended, this permit is hereby issued to all owners or operators, hereafter permittees, which are covered by this permit as evidenced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of stormwater and process wastewater to the surface waters of North Carolina or separate storm sewer systems conveying stormwater to surface waters in accordance with the terms and conditions set forth herein The General Permit shall become effective on July 1, 2011 The General Permit shall expire at midnight on June 30, 2016 Signed this day June 24, 2011 Orcginal S�ned_by Matt Matthews for Coleen H Sullins, Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No NCG140000 TABLE OF CONTENTS PART I INTRODUCTION Section A General Permit Coverage Section B Permitted Activities PART II AUTHORIZATION TO CONSTRUCT AND OPERATE A TREATMENT FACILITY Section A Requirements for Constructing New or Expanding Wastewater Treatment Facilities Section B Requirements for Operation of Wastewater Treatment Facilities PAR F III STORMWATER POLLUTION PREVENTION PLAN PART IV MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A Stormwater Discharges - Analytical Monitoring Requirements Section B Stormwater Discharges - On -site Vehicle Maintenance Monitoring Requirements Section C Stormwater Discharges - Qualitative Monitoring Requirements Section D Process Wastewater Discharges - Analytical Monitoring Requirements PAR r V STANDARD CONDITIONS Section A Compliance and Liability 1 Compliance Schedule 2 Duty to Comply 3 Duty to Mitigate 4 Civil and Criminal Liability 5 Oil and Fiaiardous Substance Liability 6 Property Rights 7 Severability 8 Duty to Provide Information 9 Penalties for Tampering 10 Penalties for Falsification of Reports Section B General Conditions 1 General Permit Expiration 2 Transfers 3 When an Individual Permit Maybe Required 4 When an Individual Permit May be Requested 5 Signatory Requirements 0 t Permit No NCG140000 6 General Permit Modification Revocation and Reissuance, or Termination 7 Certificate of Coverage Actions Section C Operation and Maintenance of Pollution Controls 1 Proper Operation and Maintenance 2 Need to Halt or Reduce not a Defense 3 Bypassing of Stormwater Control Facilities 4 Bypassing of Wastewater Treatment Facilities Section D Monitoring and Records I Representative Sampling 2 Recording Results 3 Flow Measurements 4 Test Procedures 5 Establishing Representative Outfall 6 Records Retention 7 Inspection and Entry Section E Reporting Requirements 1 Discharge Monitoring Reports 2 Submitting Reports 3 Availability of Reports 4 Mon-Stormwater Discharges S Planned Changes 6 Anticipated Noncompliance 7 Spills 8 Reporting Bypass 9 Twenty four Hour Reporting 10 Other Noncompliance 11 Other Information PART VI LIMITATIONS REOPENER PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART V111 DEFINITIONS I0 Pernut No VCG 140000 PART I INTRODUCTION SECTION A GENERAL PERMIT COVERAGE All persons desiring to be covered by this General Permit must register with the Division of Water Quality (DWQ) by the filing of Notice of Intent (NOT) and applicable fees The NOT shall be submitted and a certificate of coverage issued prior to any point source discharge of stormwater and/or authorized discharge of process wastewater associated with industrial activity Any owner or operator not wishing to be covered or limited by this General Permit may make application for an individual NPDES permit in accordance with NPDES procedures in 15A NCAC 211 0100 stating the reasons supporting the request Any application for an individual permit should be made at least 180 days prior to commencement of discharge and must be secured prior to commencement of discharge This General Permit does not cover activities or discharges covered by an individual NPDES permit until the individual permit has expired or has been revoked Any person conducting an activity covered by an individual permit but which could be covered by this General Permit may request that the individual permit be revoked and coverage under this General Permit be provided Any facility may apply for new or continued coverage under this permit until a Total Maximum Daily Load (TMDL) for pollutants for stormwater discharges is established A TMDL sets a pollutant loading limit that affects a watershed, or portion of a watershed, draining to an impaired water For stormwater discharges to watersheds affected by a TMDL, coverage under this permit may depend on the facility demonstrating it does not have reasonable potential to violate applicable water quality standards for those pollutants as a result of discharges If the Division determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 180 days prior to the expiration date of this General Permit Once that permit is effective, the permittee will no longer have coverage under this General Permit [Note the facility must identify impaired waters (scheduled for TMDL development) and waters already subject to a TMDL in the Site Plan, as outlined in the Stormwater Pollution Prevention Plan, in Part 1111 During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater and authorized process wastewater associated with industrial activity Such discharges shall be controlled limited and monitored as specified in this permit SECTION B PERMITTED ACTIVITIES Until this permit expires, is modified, or is revoked the permittee is authorized to discharge stormwater and authorized process wastewater to the surface waters of North Carolina or separate storm sewer system which has been adequately treated and managed in accordance with the terms and conditions of this General Permit All discharges shall be in accordance with the conditions of this permit The types of authorized discharges are dependent upon DWQ approval and are detailed in the permittee's individual Certificate of Coverage (COC) Where applicable, the COC also details DWQ's Authorization to Construct (ATC), and Authorization to Operate a wastewater treatment facility Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit authorization, or approval Part. I Page 1 of 2 Perrmt No NCG 140000 The discharges allowed by this General Permit shall not cause or contribute to violations of Water Quality Standards This permit does not relieve the permittee from responsibility for compliance with any other applicable federal state, or local law rule standard, ordinance, order judgment, or decree Part I Page 2 of 2 Permit No NCG 140000 PART II AUTHORIZATION TO CONSTRUCT AND OPERATE A TREATMENT FACILITY Ready mixed operations involving construction and operation of wastewater treatment facilities for authorized process wastewater discharges are subject to construction and operation requirements for treatment facilities as outlined in Sections A and B below SECTION A REQUIREMENTS FOR CONSTRUCTING NEW OR EXPANDING WASTEWATER TREATMENT FACILITIES New or expanding wastewater treatment facilities designed to discharge wastewater covered under this permit to surface waters must receive an Authorization to Construct LTC associated with this permit Closed -Loop Recycle Systems which meet design requirements in 15A NCAC 02T 1000 and do not discharge to surface waters, do not require an Authorization to Construct associated with this permit However, these facilities must contact DWQ's Aquifer Protection Section Land Application Unit to obtain any necessary permits or approvals Application for the ATC requires that plans and specifications be submitted to the Division of Water Quality, Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699- 1617 for approval Upon approval of plans and specifications by the Division a set of approved plans and specifications for the subject project will be returned to the permittee These plans must be retained on site by the permittee for the life of the treatment facility 4 Upon receipt of an approved ATC, approved treatment facilities shall be constructed and implemented in accordance with the conditions of this permit, approved plans and specifications, and other supporting data Treatment facilities shall be constructed to meet the effluent limitations in Part IV, Section D of this General Permit Upon completion of construction and prior to operation of a permitted facility, a certification must be received from a professional engineer in accordance with G S 89-25 confirming that the permitted facility has been installed in accordance with this permit the approved plans and specifications, and other supporting materials Mail the Certification of plans and specifications to the Division of Water Quality, Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 6 The permittee shall notify the DWQ Regional Office at least seventy-two (72) hours in advance of operation of the installed facilities so that an in -place inspection can be made if the Regional Office so desires Such notification to the Regional Supervisor shall be made during normal business hours from 8 00 a in until 5 00 p m on Monday through Friday, excluding State Holidays Part II Page 1 of 2 Perm2t No NCG 140000 SECTION B REQUIREMENTS FOR OPERATION OF WASTEWATER TREATMENT FACILITIES Existing, new and expanding wastewater treatment facilities for covered wastewater discharges shall he subject to the following operational requirements Operation and maintenance of treatment facilities must be in accordance with the requirements in this General Permit For the purposes of this permit no documentation other than a signed Certificate of Coverage is required to operate an existing treatment facility New treatment facilities must also have an Authorization to Construct (ATC) permit, with the exceptions noted in Section A above Diversion or bypass of untreated wastewater from a treatment facility is prohibited except under provisions of this permit in Part V Section C 4 and Part V, Section E 8 3 In the event that a facility fails to perform satisfactorily, including the creation of nuisance conditions the permittee shall take immediate corrective action, including those actions that may be required by this Division, such as the construction of additional or replacement treatment or disposal facilities 4 The issuance of this permit shall not relieve the permittee of the responsibility for damages to surface waters of the state resulting from the operation of a treatment facility 5 Any discharge from a treatment system to groundwater must protect the groundwater standards specified in 15A NCAC 2L, Groundwater Classification and Standards Contact DWQ Aquifer Protection Section for more information 6 Any groundwater quality monitoring as deemed reasonably necessary by the Division, shall be provided 7 Flocculants evaluated by the Division may be used if administered in accordance with maximum application doses and any other current requirements No other chemical flocculants shall be used in the treatment facility without prior written authorization from the Division Polyacrylamide (PAMS) information can be found through the Stormwater Permitting Unit website 8 All discharges of process wastewater will be monitored in accordance with Part IV, Section D of this permit 9 A list of detergents additives, polymers, brighteners and any other solvent, cleaning agents, or like chemicals used on site in the industrial process, must be kept on site and up to date Additionally, this list shall include use schedule, quantity, MSDS sheets and aquatic toxicology data (if available) If phosphate -containing detergents are used on site, a feasibility study must be performed to show the viability of using phosphate -free detergents The feasibility study shall be kept on the site and updated annually 10 A record of unauthorized wastewater releases to surface waters, wetlands, or ground surface from closed -loop recycle systems permitted by the Aquifer Protection Section shall be documented and kept on site for a period of five (5) years, when stormwater discharges from these sites are permitted under NCG140000 Part Il Page 2 of 2 Permit No NCG140000 PART III STORMWATER POLLUTION PREVENTION PLAN The permittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP) This plan shall be considered public information in accordance with Part V, Standard Conditions, Section E of this General Permit The SPPP shall include, at a minimum the following items Site Plan The site plan shall provide a description of the physical facility and the potential pollutant sources which may be expected to contribute to contamination of stormwater discharges The site plan shall contain the following (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility s location in relation to transportation routes and surface waters the name of the receiving water(s) to which the stormwater outfall(s) discharges, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters, and latitude and longitude of the point(s) of discharge The general location map (or alternatively the site map) shall identify whether the receiving water is impaired (on the state's 303(d) list of impaired waters) or is located in a watershed for which a TMDL has been established, and what the parameter(s) of concern are (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas crushing activities, dust or particulate generating or control processes and waste disposal practices A narrative description of the potential pollutants which could be expected to be present in the stormwater discharge from each outfall A narrative description of handling and storage of fly ash ash by products, and recycled materials (c) A site map drawn at a scale sufficient to clearly depict the site property boundary the stormwater discharge outfalls all on -site and adjacent surface waters and wetlands industrial activity areas (including storage of materials spill kits disposal areas, process areas loading and unloading areas and haul roads), site topography all drainage features and structures drainage areas for each outfall, direction of flow in each drainage area industrial activities occurring in each drainage area buildings, existing BMPs, and impervious surfaces The site map shall include a distance legend and must indicate the percentage of each drainage area that is impervious (d) A list of significant spills or leaks of pollutants that have occurred at the facility during the three (3) previous years and any corrective actions taken to mitigate spill impacts (e) Certification that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges The certification statement will be signed in accordance with the requirements found in Part V, Standard Conditions, Section B, Paragraph 5 The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges Stormwater Management Plan The stormwater management plan shall contain a narrative description of the materials management practices employed which control or minimize the exposure of significant materials to stormwater including structural and nonstructural measures The stormwater management plan, at a minimum shall incorporate the following (a) Feasibility Study A review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater Wherever practical, the permittee shall prevent exposure of all storage areas material handling operations and manufacturing or fueling operations In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting stormwater runoff away from areas of potential contamination Part IIi Page I of 3 Permit No NCG140000 (b) Secondary Containment Requirements and Records Secondary containment is required for bulk storage of liquid materials, storage in any amount of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water priority chemicals, and storage in any amount of hazardous substances in order to prevent leaks and spills from contaminating stormwater runoff A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained If the secondary containment devices are connected to stormwater conveyance systems the connection shall be controlled by manually activated valves or other similar devices (which shall be secured closed with a locking mechanism) and any stormwater that accumulates in the containment area shall be at a minimum visually observed for color foam, outfall staining, visible sheens and dry weather flow, prior to release of the accumulated stormwater Accumulated stormwater shall be released if found to be uncontaminated by any material Records documenting the individual making the observation, the description of the accumulated stormwater and the date and time of the release shall be kept for a period of five years (c) BMP Summary A listing of site structural and non-structural Best Management Practices (BMP) shall be provided The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs The BMP Summary shall be reviewed and updated annually Spill Prevention and Response Plan The Spill Prevention and Response Plan (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility Facility personnel (or the team) responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities A responsible person shall be on site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations The SPRP must be site stormwater specific Therefore an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP but may not be sufficient to completely address the stormwater aspects of the SPRP The common elements of the SPCC with the SPRP maybe incorporated by reference into the SPRP 4 Preventative Maintenance and Good Housekeeping Program A preventative maintenance and good housekeeping program shall be developed and implemented The program shall list all stormwater control systems, stormwater discharge outfalls all on -site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas, disposal areas, process areas cement crushing areas, loading and unloading areas, ash storage areas, and haul roads), all drainage features and structures, and existing structural BMPs The program shall address and maintain a record of the handling and storage of fly ash, ash by-products, and recycled materials The program shall establish schedules of inspections maintenance, and housekeeping activities of stormwater control systems as well as facility equipment, facility areas and facility systems that present a potential for stormwater exposure or stormwater pollution Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program Timely compliance with the established schedules for inspections maintenance and housekeeping shall be recorded in writing and maintained in the SPPP All such inspections must be documented with printed name, date and signature of the individual performing the inspection(s) 5 Employee Training Training programs shall be developed and training provided at least once a year for facility personnel with responsibilities for spill response and cleanup preventative maintenance activities and for any of the facility's operations that have the potential to contaminate stormwater runoff Facility personnel (or team) responsible for implementing the Part III Page 2 of 3 Permit No NCG140000 training shall be identified, and the annual training shall be documented by the signature of each employee that participates 6 Responsible Party The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development implementation and revision to the SPPP Responsibilities for all components of the SPPP shall be documented and position assignments provided See signatory requirements in Part V Section B 5 of permit Plan Amendment The permittee shall amend the SPPP whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to surface waters All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual bans The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred The annual update shall include written re certification that the stormwater outfalls have been evaluated for the presence of non- ,,tormwater discharges Each annual update shall include a documented re-evaluation of the effectiveness of the BMPs listed in the BMP Summary of the Stormwater Management Plan The annual update shall be documented with the printed name, date and signature of the individual performing the review as well as a detailed description of the changes necessary to keep the SPPP updated B the Director may notify the permittee when the SPPP does not meet one or more of the minimum requirements of the permit Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SPPP to meet minimum requirements The permittee shall provide certification in writing (in accordance with Part V, Standard Conditions, Section B, Paragraph 5) to the Director that the changes have been made Facility Inspections Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-annuai schedule according to the schedule in Table 2 These inspections shall have at least 30 days separating inspection dates, unless inspections are required more frequently by DWQ as part of the Tiered Response These facility inspections are different from and in addition to, the stormwater discharge characteristic monitoring required in Part IV of this permit 10 Impk.mentation The permittee shall implement the Stormwater Pollution Prevention Plan Implementation of the SPPP shall include documentation of all monitoring measurements inspections maintenance activities, and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, and including vehicle maintenance activities Such documentation shall he kept on site for a period of five (5) years and made available to the Director or the Director's authorized representative immediately upon request Part III Page 3 of 3 Permit No NCG140000 PART IV MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A STORMWATER DISCHARGES -ANALYTICAL MONITORING REQUIREMENTS During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity subject to the provisions of this permit Stormwater that is commingled with wastewater shall be considered wastewater and is not covered under this section of the permit Analytical monitoring of Stormwater discharges shall be performed as specified below in Table 1 All analytical monitoring shall be performed during a measurable storm event at each stormwater discharge outfall (SDO) A measurable storm event is a storm event that results in an actual discharge from the permitted site outfall The previous measurable storm event must have been at least 72 hours prior The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and obtains approval from the local DWQ Regional Office See definitions far more information Table 1 Analytical Monitoring Requirements for Stormwater Discharges Discharge Characteristics Units Measurement Frequency' Sample Typez Sample Location' H standard Semi-annual Crab SDO Total Suspended Solids m L Semi-annual Grab SILO Event Duration minutes Semi-annual - Total Rainfall4 inches Semi-annual On -site Rain gauge Footnotes 1 Twice per year during a measurable storm event per the schedule in Table 2 See below for additional requirement for failures to monitor 2 Grab samples shall be collected within the first 30 minutes of discharge from an SDO or detention pond 3 Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status (ROS) has been granted and documented by the Division of Water Quality A copy of the letter granting ROS shall be kept on site 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on site rain gauge A minimum of 60 days must separate each monitoring event unless additional monitoring has been instituted The permittee shall complete the analytical samplings in accordance with the schedule specified in Table 2 unless adverse weather conditions prevent sample collection Inability to sample due to adverse weather conditions must be documented in the SPPP (see Adverse Weather in Definitions) and reported on the DMR Part IV Page 1 of 11 Permit No NCG140000 Table 2 Monitoring Schedule Semi -Annual Monitoring Events' Z Start Date (All Years)3 End Date (All Years) 3 1 July 1 December 31 2 anuary 1 June30 Footnotes 1 Maintain semi-annual monitoring during permit renewal process If at the expiration of the General Permit the permittee has submitted an application for renewal of coverage before the submittal deadline, the permittee will be considered for renewed coverage The applicant must continue semi annual monitoring until the renewed Certificate of Coverage is issued 2 If no discharge occurs during the sampling period the permittee must submit a monitoring report indicating No Flow within 30 days of the end of the sampling period 3 Monitoring periods remain constant throughout the five year permit term Failure to monitor semi-annually per permit terms, immediately institutes monthly monitoring for all stormwater parameters After six (6) months of monthly monitoring, the permittee may return to a semi-annual sampling monitoring schedule, unless DWQ requires continued monthly monitoring The permittee shall compare monitoring results to benchmark values in Table 3 Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program Seethe descriptions of Tier One, Tier Two, and Tier Three Response Actions, below Table 3 Benchmark Values for Analytical Monitoring Requirements Discharge Characteristics Units Benchmark Values pH standard 6 0 - 9 0 Total Suspended Solids (TSS) mg/L 100 TSS (ORW, HWQ, Trout & PNA waters mg/L 50 Part IV Page 2 of 11 Permit No NCUI Tier One If The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any stormwater parameter at any outfall, Then the permittee shall 1 Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results 2 Identify and evaluate possible causes of the benchmark value exceedence 3 Identify potential and select the specific source controls, operational controls, or physical improvements to reduce concentrations of the stormwater parameters of concern and/or to bring concentrations within the benchmark range 4 Implement the selected actions within two months of the inspection 5 Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions and the date the selected actions were implemented I xI Tier Two I If During the term of this permit the first valid sampling results from two consecutive monitoring periods are above the benchmark values, or outside of the benchmark range, for any specific stormwater parameter at a specific discharge outfall, Then the permittee shall 1 Repeat all the required actions outlined above in Tier One 2 Immediately institute monthly monitoring for all stormwater parameters at every outfall where a sampling result exceeded the benchmark value for two consecutive samples Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values or within the benchmark range 3 If no discharge occurs during the sampling period, the permittee is required to submit a monthly monitoring report indicating 'No Flow to comply with reporting requirements "No flow" reports will not be considered as one of the three consecutive sample results under the benchmark 4 Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan Part IV Page 3 of 11 Permit No NCG140000 G � Tier Three During the term of this permit if the valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific stormwater parameter at any specific outfall on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results DWQ may but is not limited to • Require that the permittee revise, increase, or decrease the monitoring frequency for the remainder of the permit, • Rescind coverage under the General Permit, and require that the permittee apply for an individual stormwater discharge permit, • Require the permittee to install structural stormwater controls, • Require the permittee to implement other stormwater control measures, or • Require the permittee to perform upstream and downstream monitoring to characterise impacts on receiving waterbodies Part IV Page 4 of 11 Permit No NCG140000 SECTION B STORMWATER DISCHARGES — ON -SITE VEHICLE MAINTENANCE AREA (VMA) MONITORING REQUIREMENTS During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with vehicle maintenance activities occurring on site Facilities which have any vehicle maintenance activity occurring on site using more than 55 gallons of new motor oil per month when averaged over the calendar year shall perform analytical monitoring as specified in Table 4 All analytical monitoring shall be performed during a measurable storm event at each vehicle maintenance outfall VMA stormwater discharges commingled with wastewater shall be considered wastewater For more information see Part IV, Section D of this permit Table 4 Stormwater Analytical Monitoring Requirements for On -Site Vehicle Maintenance Measurement Sample Sample Discharge Characteristics Units Frequency'Type' Location H standard Semi-annual Grab SDO Total Petroleum Hydrocarbons (TPH), mg/L Semi-annual Grab SDO EPA Method 1664 SGT HEM Total Suspended Solids m L Semi annual Grab SDO Event Duration minutes Semi annual - Total RainfaI14 inches Semi-annual On -site - Rain gauge Gallons/Semi-annual New Motor Oil Usage Estimate - month Footnotes 1 Twice per year during a measurable storm event per the schedule in Table 2 See below for additional requirements for failures to monitor 2 Grab samples shall be collected within the first 30 minutes of discharge from an SDO or detention pond 3 Samples shall be collected at each stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on site rain gauge A minimum of 60 days must separate each monitoring event unless additional monitoring has been instituted The permittee shall complete the analytical samplings in accordance with the schedule specified in Table 2 unless adverse weather conditions prevent sample collection Inability to sample due to adverse weather conditions must be documented in the SPPP and reported on the DMR (see Adverse Weather in Definitions) Failure to monitor semi-annually per permit terms, immediately institutes monthly monitoring for all stormwater parameters After six (6) months of monthly monitoring the permittee may return to a semi-annual sampling monitoring schedule, unless DWQ requires continued monthly monitoring The permittee shall compare monitoring results to benchmark values in Table 5 Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, Part IV Page 5 of 11 Permit No NCG140000 increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program The permittee shall comply with the required Tier One, Tier Two, and Tier Three response actions identified in Section A Table 5 Stormwater Benchmark Values for On -Site Vehicle Maintenance Activities Discharge Characteristics Units Benchmark Values pH Standard 6 0 - 9 0 Total Petroleum Hydrocarbons (TPH), EPA Method 1664 SGT HEM mg/L 15 Total Suspended Solids (TS5) mg/L 100 TSS (ORW, HWQ, Trout & PNA waters) mg/L 50 Part IV Page 6 of 11 Permit No NCG140000 SECTION C STORMWATER DISCHARGES - QUALITATIVE MONITORING REQUIREMENTS _ - - - - The purpose of qualitative monitoring is to evaluate the effectiveness of the Stormwater Pollution Prevention Plan and to assess new sources of stormwater pollution Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified below in Table 6, during analytical monitoring event (unless the permittee is required to perform further qualitative sampling per the Qualitative Monitoring Response, below) Inability to sample due to adverse weather conditions must be documented in the SPPP and reported on the DMR (see Adverse Weather in Definitions) Qualitative monitoring of stormwater outfalls must be performed during a measurable storm event Table 6 Qualitative Stormwater Monitoring Requirements Discharge Characteristics Frequency' Monitoring Location z Color Semi-annual SDO Odor Semi annual SDO Clarity Semi-annual SDO Floating Solids Semi-annual SDO Suspended Solids Semi-annual SDO Foam Semi-annual SDO Oil Sheen Semi-annual SDO Erosion or deposition at the outfall Semi-annual SDO Other indicators of stormwater P011LItion Semi-annual SDO Footnotes 1 Twice per year during a measurable monitoring event per the schedule in Table 2 2 Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status A minimum of 60 days must separate monitoring dates, unless additional sampling has been instituted as part of other analytical monitoring requirements in this permit If the permittee's qualitative monitoring indicates that existing stormwater BMPs are ineffective or that significant Stormwater contamination is present, the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those corrective actions within 60 days, per the Qualitative Monitoring Response, below A written record of the permittee s investigation, evaluation and response actions shall be kept in the Stormwater Pollution Prevention Plan Part IV Page 7 of 11 Permit No NCG140000 Qualitative Monitoring Response - - Qualitative monitoring is for the purposes of evaluating the effectiveness of the Stormwater Pollution Prevention Plan, assessing new sources of stormwater pollution, and prompting the permittee's response to pollution If the permrttee repeatedly fails to respond effectively to correct problems identified by qualitative monitoring or if the discharge causes or contributes to a water quality standard violation, DWQ may but is not limited to • Require that the permrttee revise, increase, or decrease the monitoring frequency for the remainder of the permit, • Rescind coverage under the General Permit, and require that the permrttee apply for an individual stormwater discharge permit • Require the permrttee to install structural stormwater controls, or • Require the permrttee to implement other stormwater control measures Part IV Page 8 of 11 Permit No NCG140000 _ SECTION D PROCESS WASTEWATER DISCHARGES - ANALYTICAL MONITORING REQUIREMENTS This General Permit authorizes the discharge of process wastewater associated with three distinct activities 1) vehicle and equipment cleaning - external surfaces, 2) wetting of raw material stockpiles and 3) mixing drum cleanout The authorization to discharge wastewater is specifically identified on each permittee's COC Process wastewater discharges generated by any other activity are not authorized under this permit, except allowable non stormwater discharges permitted by 15A NCAC2H 01060) Authorized process wastewater commingled with stormwater shall be considered process wastewater 1 Procesa Wastewater Assoglated. with vehicle and Equipment Cleanin During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge process wastewater associated with vehicle and equipment cleaning, subject to the provisions of this permit For the purposes of this permit vehicle and equipment cleaning is limited to the rinsing of the external surfaces of vehicles and equipment Z Process Wastewater Associated with Raw Material Stockpiles During the period beginning on the effective date of the permit and lasting until expiration the permittee is authorized to discharge process wastewater associated with wetting of raw material stockpiles subject to the provisions of this permit 3 Process Wastewater Associated with Mixing Drum Cleanout During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge process wastewater associated with mixing drum cleanout, subject to the provisions of this permit All Authorized Process WastewatCr Discharges Analytical monitoring of the above authorized process wastewater discharges shall be performed as specified in Table 7 If authorized process wastewaters commingle prior to discharge, sampling the combined discharge will meet the monitoring requirements of this permit Sampling shall be performed during discharge, these events may or may not be associated with rainfall Authorized wastewater treatment facilities may include some wastewater recycling as a means of volume management Surface water discharges from authorized wastewater treatment facilities are subject to the provisions monitoring requirements and limits of this permit Authorized wastewater treatment facilities with no wastewater discharges to surface waters are exempt from the requirements of Part IV, Section D of this permit However, these ready mixed plants with closed loop -recycle systems or other wastewater treatment facilities that do not discharge to surface waters must contact D WQ's Aquifer Protection Section Land Application Unit to obtain any necessary permits or approvals Part: IV Page 9 of 11 Permit No NCG140000 Table 7 Analytical Monitoring Requirements for Process Wastewater Discharge Characteristics Units Measurement Frequencyi Sample Type? Sample Location3= H standard guarterly Grab E Total Suspended Solids mg/L Quarterly Grab E Settleable Solids mL/L Quarterly Grab E Total Petroleum Hydrocarbons (TPH) EPA Method 1664 (SGT HEM)4 mg/L Quarterly4 Grab E Discharge Durations minutes Quarterly - Flows gallons/day Quarterly - E Fogtnotes 1 Four times peryear during a discharge event See below for additional requirements for failures to monitor or violations of permit limits 2 Grab samples shall be collected within the first 30 minutes of discharge from the outfall or detention pond 3 Effluent (E) = Process wastewater discharge outfall 4 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas S For each sampled discharge event, the total discharge duration and flow rate must be provided Flow rate can be measured continuously or calculated Failure to monitor wastewater quarterly per permit terms immediately institutes monthly monitoring for all wastewater parameters Violation of permit limits twice in a row immediately institutes monthly monitoring for all wastewater parameters In either case, after six (6) months of monthly monitoring, the permittee may return to a quarterly monitoring schedule, unless DWQ requires continued monthly monitoring Wastewater discharges must meet the requirements of the effluent limitation listed in Table 8, below An exceedence of any of these limitations will result in a violation of the permit conditions Part IV Page 10 of 11 Permit No NCG140000 Table 8 Effluent Limitations for all Process Wastewater Discharge Characteristics Units Effluent Limitations(Daily Maximum) pH Range (freshwaters) Standard 6 0 - 9 0 pH Range (saltwaters) Standard 6 8 - 8 5 Total Suspended Solids m L 30 Total Suspended Solids' H W m L 20 Total Suspended Solids' Trout & PNA waters m L 10 Settleable Solids mL L 5 Total Petroleum Hydrocarbons' (TPH) mg/L N/A' Total Volume/Day of Wastewater Discharged 4 (HQW) gallons/day 50% of the Summer 7Q10 flow4 Footnotes , 1 Per 15A NCAC 02B 0224 2 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas 3 TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action 4 Per 15A NCAC 02B 0224 Permittees who discharge wastewater to HQW waters shall obtain a summer 7Q10 flow and report this information to DWQ If the permittee cannot obtain a summer 7Q10 flow for the receiving waters at the discharge location the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case by case basis The permittee shall complete the analytical samplings of wastewater discharges in accordance with the schedule specified in Table 9 Permittees shall report any noncompliance per Part V, Section E Reporting Requirements paragraphs 9-11 Table 9 Monitoring Schedule Quarterly Monitoring Events' Start Date (All Years) End Date (All Years) 1 July 1 September 30 2 October 1 December 31 3 January 1 March 31 4 1 Aril 1 June 30 Footnotes 1 If no discharge occurs during the sampling period, the permittee must record No Flow or No Discharge within 30 days of the end of the three-month sampling period in their SPPP If detergents are used in any of the processes authorized in Section D of this permit, they must be labeled biodegradable, and the pH must be adjusted to within 6 to 9 standard units Wherever possible, permittees are encouraged to use phosphate -free detergents A list of these chemicals must be kept on site and up to date A feasibility study must he performed if phosphate -containing detergents are used (see Part 11, Section B for additional information) Part IV Page 11 of 11 Permit No NCG140000 PART-V - STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL - - PERMITS SECTION A COMPLIANCE AND LIABILITY Comaliance Schedule The permittee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the following schedule Existing facilities already operating, but applying for coverage under this General Permit for the first time The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the initial Certificate of Coverage issued pursuant to this General Permit and updated thereafter on an annual basis Secondary containment as specified in Part III Paragraph 2(b) of this permit shall be accomplished within 12 months of the effective date of the initial Certificate of Coverage New facilities applying for permit coverage for the first time All requirements, conditions, limitations, and controls contained in this permit become effective immediately upon issuance of the Certificate of Coverage The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis Secondary containment as specified in Part III Paragraph 2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity Existing facilities previously permitted and applying for renewal under this General Permit All requirements conditions limitations and controls contained in this permit (except new SPPP elements in this permit renewal) shall become effective immediately upon issuance of the Certificate of Coverage New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of the initial Certificate of Coverage issued pursuant to this General Permit and updated thereafter on an annual basis Secondary containment as specified in Part 111 Paragraph 2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity Duty to Comply The permittee must comply with all conditions of this General Permit Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action for certificate of coverage termination revocation and reissuance or modification or denial of a certificate of coverage upon renewal application The permittee shall comply with standards or prohibitions established under Section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions even if the permit has not yet been modified to incorporate the requirement b The Clean Water Act provides that any person who violates a permit condition is subject to a civil penalty not to exceed $25,000 per day for each violation Any person who negligently violates any permit condition is subject to criminal penalties of $2,500 to $25,000 per day of violation, or imprisonment for not more than 1 year, or both Any person who knowingly violates permit conditions is subject to criminal penalties of $5,000 to $50 000 per day of violation or imprisonment for not more than 3 years or both Also any person who violates a permit condition may be assessed an administrative penalty not to exceed $10 000 per Part V Page 1 of 9 Permit No NCG140000 violation with the maximum amount not to exceed $125 000 [Ref Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122 41(a) ] c Under state law a daily civil penalty of not more than ten thousand dollars ($10 000) per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions or requirements of a permit [Ref North Carolina General Statutes 143 215 6A] Any person may be assessed an administrative penalty by the Director for violating Section 301 302 306 307 306, 3113, or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under Section 402 of the Act Administrative penalties for Class I violations are not to exceed $10 000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $25 000 Penalties for Class 11 violations are not to exceed $10 000 per day for each day during which the violation continues with the maximum amount of any Class 11 penalty not to exceed $125 000 Duty to Mitigate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this General Permit which has a reasonable likelihood of adversely affecting human health or the environment Civil and Criminal Liability Except as provided in this permit regarding bypassing of stormwater control facilities, nothing in this General Permit shall be construed to relieve the permittee from any responsibilities liabilities or penalties for noncompliance pursuant to NCGS 143 215 3 143 215 6A 143 215 6B 143 215 6C or Section 309 of the Federal Act 33 USC 1319 Furthermore the permittee is responsible for consequential damages such as fish kills even though the responsibility for effective compliance may be temporarily suspended 5 Oil and Hazardous Substance Liability Nothing in this General Permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities or penalties to which the permittee is or may be subject to under NCGS 143 2lS 7S et seq or Section 311 of the Federal Act 33 USC 1321 6 Property Rights The issuance of this General Permit does not convey any property rights in either real or personal property, or any exclusive privileges nor does it authorize any injury to private property or any invasion of personal rights nor any infringement of federal state or local laws or regulations 7 Severability The provisions of this General Permit are severable and if any provision of this General Permit or the application of any provision of this General Permit to any circumstances is held invalid the application of such provision to other circumstances and the remainder of this General Permit shall not be affected thereby B Duty to Provide Information Part V Page 2 of 9 Permit No NCG140000 The permittee shall furnish to the Director within a reasonable time, any information which - the Director may request to determine whether cause exists for modifying revoking and reissuing or terminating the certificate of coverage issued pursuant to this General Permit or to determine compliance with this General Permit The permittee shall also furnish to the Director upon request copies of records required to be kept by this General Permit 9 Penalties for Tampering The Clean Water Act provides that any person who falsifies tampers with or knowingly renders inaccurate, any monitoring device or method required to be maintained under this General Permit shall upon conviction, be punished by a fine of not more than $10 000 per violation, or by imprisonment for not more than two years per violation, or by both If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph punishment is a fine of not more than $20 000 per day of violation or by imprisonment of not more than 4 years or both 10 Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation or certification in any record or other document submitted or required to be maintained under this General Permit, including monitoring reports or reports of compliance or noncompliance shall upon conviction be punished by a fine of not more than $10 000 per violation or by imprisonment for not more than two years per violation or by both SECTION B GENERAL CONDITIONS General Permit ExDiration The permittee is not authorized to discharge after the expiration date In order to discharge beyond the expiration date the permittee shall submit forms and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date Any permittee that has not requested renewal at least 180 days prior to expiration or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration will be subjected to enforcement procedures as provided in NCGS §143-2133 6 and 33 U5C 1251 et seq Transfers The certificate of coverage issued pursuant to this General Permit is not transferable to any person except after notice to and approval by the Director The Director may require modification or revocation and reissuance of the certificate of coverage to change the name and incorporate such other requirements as may be necessary under the Clean Water Act The permittee is required to notify the Division within 60 days in the event the permitted facility is sold or closed When an Individual Permit Mav be Reauired The Director may require any owner/operator authorized to discharge under a certificate of coverage issued pursuant to this General Permit to apply for and obtain an individual permit or an alternative General Permit Any interested person may petition the Director to take action under this paragraph Cases where an individual permit maybe required include, but are not limited to, the following The discharger is a significant contributor of pollutants Part V Page 3 of 9 Permit No NCG140000 b Conditions at the permitted site change altering the constituents and/or characteristics of the discharge such that the discharge no longer qualifies for a General Permit c The discharge violates the terms or conditions of this General Permit d A change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source, e Effluent limitations are promulgated for the point sources covered by this General Permit, f A water quality management plan containing requirements applicable to such point sources is approved after the issuance of this General Permit g The Director determines at his or her own discretion that an individual permit is required When an Individual Permit May be Requested Any permittee operating under this General Permit may request to be excluded from the coverage of this General Permit by applying for an individual permit When an individual permit is issued to an owner/operator the applicability of this General Permit is automatically terminated on the effective date of the individual permit _ i__ atory_Requirements All applications reports or information submitted to the Director shall be signed and certified a All notices of intent to be covered under this General Permit shall be signed as follows (1) Fora corporation by a responsible corporate officer For the purpose of this section a responsible corporate officer means (a) a president secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 198D dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures (2) For a partnership or sole proprietorship by a general partner or the proprietor respectively or (3) For a municipality, state, federal, or other public agency by either a principal executive officer or ranking elected official All reports required by the General Permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person A person is a duly authorized representative only if (1) The authorization is made in writing by a person described above (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager operator of a well or well field superintendent, a position of equivalent responsibility or an individual or Part V Page 4 of 9 Permit No NCG140000 position having overall responsibility for environmental matters for the — - company (A duly authorized representative may thus be ether a named individual or any individual occupying a named position ) and (3) The written authorization is submitted to the Director Any person signing a document under paragraphs a or b of this section shall make the following certification which shall not be modified in any way 'I certify, under penalty of law, that this document and all attachments were prepared under my direction or Supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information the information submitted is to the best of my knowledge and belief, true accurate and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations General Permit Modification. Revocation and Reissuance. or Termination The issuance of this General Permit does not prohibit the Director from reopening and modifying the General Permit, revoking and reissuing the General Permit or terminating the General Permit as allowed by the laws rules and regulations contained in Title 40 Code of Federal Regulations Parts 122 and 123, Title 15A of the North Carolina Administrative Code, Subchapter 2H 0100 and North Carolina General Statute 143-215 1 et al After public notice and opportunity for a hearing the General Permit may be terminated for cause The filing of a request for a General Permit modification revocation and reissuance or termination does not stay any General Permit condition The certificate of coverage shall expire when the General Permit is terminated Certificate gf,Cgvergge Acttgns The certificate of coverage issued in accordance with this General Permit may be modified revoked and reissued or terminated for cause The notification of planned changes or anticipated noncompliance does not stay any General Permit condition SECTION C OPERATION AND MAINTENANCE OF POLLUTION CONTROLS Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with this General Permit Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the General Permit Need to Halt or Reduce not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this General Permit Part V Page 5 of 9 Permit No NCG140000 3 - Bypassing of Stormwater Control Facilities_ Bypass is prohibited and the Director may take enforcement action against a permrttee for bypass unless Bypass was unavoidable to prevent loss of life personal injury or severe property damage and There were no feasible alternatives to the bypass such as the use of auxiliary control facilities retention of stormwater or maintenance during normal periods of equipment downtime or dry weather This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance and The permittee submitted notices as required under Section E of this Part If the Director determines that it will meet the three conditions listed above the Director may approve an anticipated bypass after considenng its adverse effects 4 Bypassing of Wastewater Treatment Facilities The permittees may allow any bypass to occur which does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to assure efficient operation These bypasses are not subject to the provisions of Part V Section C 4 a and Part V Section C 4 b Notices (1) Anticipated bypass If the permittees knows in advance of the need for a bypass, it shall submit prior notice if possible at least ten days before the date of the bypass including an evaluation of the anticipated quality and affect of the bypass (2) Unanticipated bypass The permittees shall submit notice within 24 hours of becoming aware of an unanticipated bypass as required in Part V Section h 8 of this permit b Prohibition of Bypass (1) Bypass is prohibited and the Director may take enforcement action against the permittees for bypass unless (a) Bypass was unavoidable to prevent loss of life, personal injury or severe property damage, and (b) There were no feasible alternatives to the bypass such as the use of auxiliary control facilities retention of untreated waste or maintenance during normal periods of equipment downtime This condition is not satisfied if adequate backup should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance and (c) The permittees submitted notices as required under Part V Section C 4 a of this permit Part V Page 6 of 9 Permit No NCG140000 (2) The Director may approve an anticipated bypass, after considering its - adverse affects, if the Director determines that it will meet the three conditions listed in Part V Section C 4 b (1) of this permit SECTION D MONITORING AND RECORDS Representative Sampling Samples collected and measurements taken as required herein shall be characteristic of the volume and nature of the permitted discharge Analytical stormwater sampling shall be performed during a measurable storm event Samples shall betaken on a day and time that is characteristic of the discharge All samples shall betaken before the discharge loins or is diluted by any other waste stream body of water or substance Monitoring points as specified in this permit shall not be changed without notification to and approval of the Director Recording Results For each measurement sample inspection or maintenance activity performed or collected pursuant to the requirements of this General Permit, the permittee shall record the following information a The date exact place, and time of sampling, measurements inspection or maintenance activity, b The individual(s) who performed the sampling, measurements inspection or maintenance activity The date(s) analyses were performed The individual(s) who performed the analyses, The analytical techniques or methods used and The results of such analyses Flow Measurements Where required appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215 63 et seq the Water and Air Quality Reporting Acts and to regulations published pursuant to Section 304(g) 33 USC 1314 of the Federal Water Pollution Control Act as Amended and Regulation 40 CFR 136 To meet the intent of the monitoring required by this General Permit all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure Establishing Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled the permittee may petition the Director for representative outfall status ]fit is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status then analytical sampling requirements may be performed at a reduced number of outfalls Qualitative monitoring shall be performed at all discharges locations regardless of representative outfall status (ROS) Records Retention Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan Copies of analytical monitoring results shall also be maintained on site The permittee shall retain records of all monitoring information including all calibration and maintenance records and all original strip chart recordings for continuous Part V Page 7 of 9 Permit No NCG140000 _ monitoring instrumentation, and copies of all reports required by this General Permit for a period of at least 5 years from the date of the sample measurement report or application This period may be extended by request of the Director at any time Inspection and Entry_ The permittee shall allow the Director or an authorized representative (including an authorized contractor acting as a representative of the Director) or in the case of facility which discharges through a municipal separate storm sewer system an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge upon the presentation of credentials and other documents as may be required by law, to, a Enter upon the permittee s premises where a regulated facility or activity is located or conducted or where records must be kept under the conditions of this General Permit b Have access to and copy at reasonable times any records that must be kept under the conditions of this General Permit c inspect at reasonable times any facilities equipment (including monitoring and control equipment), practices or operations regulated or required under this General Permit, and d Sample or monitor at reasonable times for the purposes of assuring General Permit compliance or as otherwise authorized by the Clean Water Act any substances or parameters at any location SECTION E REPORTING REQUIREMENTS Discharge Monitoring Reports Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on Discharge Monitoring Report forms provided by the Director Submittals shall be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory When no discharge has occurred from the facility during the report period the permittee is required to submit a discharge monitoring report within 30 days of the end of the sampling period giving all required information and indicating NO FLOW as per 15A NCAC 02B 0506 The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division and shall retain the completed forms on site Visual monitoring results should not be submitted to the Division except upon DWQ s specific requirement to do so Submitting Reports Two signed copies of the Discharge Monitoring Reports (DMRs) shall be submitted to Central Files Division of Water Quality 1617 Mail Service Center Raleigh North Carolina 27699-1617 Visual monitoring results should not be submitted to Central Files unless requested by DWQ Availability of Reports Gxcept for data determined to be confidential under NCGS 143 21S 3(a)(2) or Section 308 of the Federal Act 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division of Water Quality As required by the Act analytical data shall not be considered confidential Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143 215 6S or in Section 309 of the Federal Act Part V Page 8 of 9 Permit No NCG140000 4 - Nan stormwater Discharges - - - If the storm event monitored in accordance with this General Permit coincides with a non stormwater discharge the permittee shall separately monitor all parameters as required under the non stormwater discharge permit and provide this information with the stormwater discharge monitoring report 5 Planned Changes The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged This notification requirement includes pollutants which are not specifically listed in the General Permit or subject to notification requirements under 40 CFR Part 122 42 (a) 6 Anticipated Noncompliance The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which may result in noncompliance with the General Permit requirements 7 5zu The permittee shall report to the local DWQ Regional Office within 24 hours, all significant spills as defined in Part VIII of this permit Additionally the permittee shall report spills including any oil spill of 25 gallons or more any spill regardless of amount that causes a sheen on surface waters any oil spill regardless of amount occurring within 100 feet of surface waters and any oil spill less than 25 gallons that cannot be cleaned up within 24 hours 8 Reporting Bypass a Anticipated bypass if the permittee knows in advance of the need for a bypass it shall submit prior notice, if possible at least ten days before the date of the bypass including an evaluation of the anticipated quality and affect of the bypass b Unanticipated bypass The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass 9 Twenty four Hour Reporting The permittee shall report to the central office or the appropriate Regional Office any noncompliance which may endanger health or the environment Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances A written submission shall also be provided within five (5) days of the time the permittee becomes aware of the circumstances The written submission shall contain a description of the noncompliance and its causes the period of noncompliance, including exact dates and times and if the noncompliance has not been corrected the anticipated time compliance is expected to continue and steps taken or planned to reduce eliminate and prevent reoccurrence of the noncompliance The Director may waive the written report on a case by case basis if the oral report has been received within 24 hours 10 Other Noncomphance The permittee shall report all other instances of noncompliance not reported above under Twenty-four hour reporting; at the time monitoring reports are submitted 11 Other Information Where the permittee becomes aware that it failed to submit any relevant facts regarding this General Permit or in any report to the Director it shall promptly submit such facts or information Part V Page 9 of 9 Permit No NCG140000 PART VI LIMITATIONS REOPENER -- - - This General Permit shall be modified or alternatively revoked and reissued to comply with any applicable effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c) and (d), 304(b) (2) and 307(a) of the Clean Water Act if the effluent guideline or water quality standard so issued or approved Contains different conditions or is otherwise more stringent than any effluent limitation in the General Permit, or Controls any pollutant not limited in the General Permit The General Permit as modified or reissued under this paragraph shall also contain any other requirements in the Act then applicable PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division Failure to pay the fee in timely manner in accordance with 15A NCAC 2H 0105(b)(4) may cause this Division to initiate action to revoke the Certificate of Coverage PART VIII DEFINITIONS Act See Clean Water Act Adverse Weather Adverse conditions are those that are dangerous or create inaccessibility for personnel such as local flooding high winds or electrical storms or situations that otherwise make sampling impractical When adverse weather conditions prevent the collection of samples during the sample period the permittee must take a substitute sample or perform a visual assessment during the next qualifying storm event Documentation of an adverse event (with date time and written narrative) and the rationale trust be included with your SPPP records Adverse weather does not exempt the permittee from having to file a monitoring report in accordance with the sampling schedule Adverse events and failures to monitor must also be explained and reported on the relevant DMR ,allowable Non-Stormwater Discharges This permit regulates stormwater discharges Non stormwater discharges which shall be allowed in the stormwater conveyance system are (a) All other discharges that are authorized by a non stormwater NPDES permit (b) Uncontaminated groundwater foundation drains air -conditioner condensate without added chemicals springs, discharges of uncontaminated potable water, waterline and fire hydrant fleshings water from footing drains flows from riparian habitats and wetlands (c) Discharges resulting from fire fighting or fire -fighting training Parts VI, VII and Vlll Page 1 of 5 Permit No NCG140000 4 Best Management Practices CBMPs] Me-isures or practices used to reduce the amount of pollution entering surface waters BMPs may take the form of a process activity or physical structure More information on BMPs can be found at http //cfpub epa gov/npdes/stormwater/menuofbmps/index cfm 5 Bypass A bypass is the known diversion of stormwater or wastewater from any portion of a stormwater or wastewater control facility including the collection system or wastewater treatment facility which is not a designed or established operating mode for the facility 6 Bulk Storage of Liquid Products Liquid raw materials, manufactured products waste materials or by products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in dose proximity to each other having a total combined storage capacity of greater than 1320 gallons 7 Certificate of Coverage 1 he Certificate of Coverage (COC) is the cover sheet which accompanies the General Permit upon issuance and lists the fatality name, location, receiving stream, river basin effective date of coverage under the permit and is signed by the Director 8 Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et seq 9 Detergents Detergents, additives polymers brighteners and any other solvent or cleaning agents used on site in the industrial process shall be biodegradable and the pH must be adjusted to within 6 to 9 standard units Wherever possible permittees are encouraged to use phosphate free detergents A current last of all chemicals with use schedule, quantity MSDS sheets and aquatic toxicology data shall be kept on site and up to date in the SPPP 10 Division or DW_O the Division of Water Quality Department of Environment and Natural Resources 11 Director the Director of the Division of Water Quality the permit issuing authority 12 EMC The North Carolina Environmental Management Commission 13 Grab S-imple An individual sample collected instantaneously Grab samples must betaken within the first 30 minutes of discharge 14 Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act 15 Measurable Storm Event A measurable storm event is a storm event that results in an actual discharge from the permitted site outfall The previous measurable storm event must have been at least 72 hours prior The 72 hour storm interval may not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period and obtains approval from the local DWQ Regional Office Two copies of this information and a written request letter shall Parts VI, VII and VIII Page 2 of 5 Permit No NCG140000 be sent to the local DWQ Regional Office After authorization by the DWQ Regional Office a written approval letter must be kept on site in the permittee s SPPP 16 Municipal Separate Storm SeweE System A stormwater collection system within an incorporated area of local self government such as a city or town 17 Notice of Intent The state application form which when submitted to the Division officially indicates the facility s notice of intent to seek coverage under a General Permit 18 Permittee The owner or operator issued a certificate of coverage pursuant to this General Permit 19 Point -Source Discharge of Stormwater Any discernible confined and discrete conveyance including but not specifically limited to, any pipe, ditch, channel tunnel conduit, well or discrete fissure from which stormwater is or may be discharged to waters of the state 20 Process Wastewater For the purposes of this permit process wastewater is wastewater generated from the following activities (a) Vehicle and equipment cleaning operations For the purposes of this permit vehicle and equipment cleaning is limited to the rinsing of the external surfaces of vehicles and equipment If detergents are used, they must be biodegradable, and the pH must be adjusted to within 6 to 9 standard units Wherever possible, permittees are encouraged to use phosphate free detergents (b) Raw material stockpile wetting operations This includes wetting for control of temperature and moisture content Washing of raw materials is not authorized under this permit (c) Mixing drum cleaning operations This includes vehicle mixing drum and facility mixing drum cleaning It also includes flushing the bed of a dump truck if used to deliver concrete to a lob site If detergents are used, they must be biodegradable and the pH must be adjusted to within 6 to 9 standard units Wherever possible permittees are encouraged to use phosphate free detergents (d) Commingled stormwater and authorized process wastewater shall be considered process wastewater 21 Representative outfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant analytical representative outfall status Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls Qualitative monitoring shall be performed at all discharges locations regardless of representative outfall status (ROS) 22 Secondary C,gntainment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25 year 24-hour storm event 23 Section 313 Water Priority Chemical A chemical or chemical category which (a) Is listed in 40 CFR 372 6S pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning acid Community Right to Know Act of 1986 (b) Is present at or above threshold levels at a facility subject to SARA title Ill Section 313 reporting requirements and (c) Meets at least one of the following criteria Parts Vl, VI and VI II Page 3 of 5 Permit No NCG140000 (1) is listed in appendix D of 40 CFR part 122 on Table II (organic priority pollutants) Table III (certain metals cyanides and phenols) or Table IV (certain toxic pollutants and hazardous substances) (2) Is listed as a hazardous substance pursuant to Section 311(b)(2)(A) of the CWA at 40 CFR 116 4 or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria 24 Severe Property Damage Substantial physical damage to property damage to the control facilities which causes them to become inoperable or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass Severe property damage does not mean economic loss caused by delays in production 25 Significant Materials Includes but is not limited to raw materials fuels materials such as solvents detergents and plastic pellets finished materials such as metallic products raw materials used in food processing or production hazardous substances designated under Section 101(14) of CERCLA, any chemical the facility is required to report pursuant to Section 313 of Title III of SARA fertilizers pesticides and waste products such as ashes slag and sludge that have the potential to be released with stormwater discharges 26 Significant Spills Includes but is not limited to releases of oil or hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref 40 CFR 110 10 and CFR 117 21) or Section 102 of CERCLA (Ref 40 CFR 302 4) 27 Stormwater Discharee Outfall fSDO the point of departure of stormwater from a discernible confined or discrete conveyance including but not limited to, storm sewer pipes, drainage ditches channels spillways or channelized collection areas from which stormwater flows directly or indirectly into waters of the State of North Carolina 28 Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt 29 Stormwater Associated with Industrial Activity the discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing processing or raw material storage areas at an industrial site Facilities considered to be engaged in industrial activities include those activities defined in 40 CFR 122 26(b)(14) The term does not include discharges from facilities or activities excluded from the NPDES program 30 Stormwater Pollution Prevention Plan_(SPPPI A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site 31 Ten Year Design Storm The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten years Storm information can be found in the State of North Carolina Erosion and Sediment Control Planning and Design Manual 32 Total Flow The flow corresponding to the time period over which the entire storm event occurs Total flow shall be either (a) measured continuously (b) calculated based on the amount of area draining Parts VI, V1I and VIII Page 4 of 5 Permit No NCG140000 to the outfall the amount of built upon (impervious) area and the total amount of rainfall or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event 33 Iota] Maximum Daily Load (TMDLI TMDLs are written plans for attaining and maintaining water quality standards in all seasons, for a specific water body and pollutant (A list of approved TMDLs for the State of North Carolina can be found at http //h2o enr state nc us/tmdl/) 34 Toxic Pollutant Any pollutant listed as toxic under Section 307(a) (1) of the Clean Water Act 35 Vehicle and equipment cleaning For the purposes of this permit, this cleaning is limited to the rinsing of the external surfaces of vehicles and equipment If detergents are used they must be biodegradable and the pH must be adjusted to within 6 to 9 standard units Wherever possible permittees are encouraged to use phosphate -free detergents 36 Vghicle Maintenance Activity Vehicle rehabilitation, mechanical repairs painting, fueling lubrication, vehicle cleaning operations or airport deicing operations 37 Visible Sedimentation Solid particulate matter, both mineral and organic that has been or is being transported by water, air, gravity or ice from its site of origin which can be seen with the unaided eye 38 Summer 7Q10 The lowest average 7 day stream flow that is expected to occur once every 10 years during the summer months 39 25 year. 24 hour storm event The maximum 24 hour precipitation event expected to be equaled or exceeded on the average, once in 25 years Parts VI, VII and VIII Page 5 of 5 North Carolina Department of Environment and Natural Resources 0�oF wArfigac Technical Bulletin for N.C. General Stormwater Permit NCG140000 Technical Bulletin for NCG 140000—Ready Mixed Concrete General Permit Revised I I/16/201 1 What activities are covered by this general permW NCG 140000 coverage includes the discharge of NCG 140000 excludes coverage of ✓Stormwater point source discharges from ready -mixed concrete (SIC code . Discharges of wastewater not spe- 3273) and like activities, including on site vehicle maintenance areas cifically designated in this permit ✓Specific process wastewater discharges (wastewater associated with vehi- • Disposal of any concrete directly cle and equipment cleaning, raw material stockpiles, and/or mixing drum into stormwater conveyances, cleanout) storm sewer outfalls, wetlands, What are key stormwater requirements7 and/or into any waters of the state ,'Perform semi-annual Analytical & Qualitative Stormwater monitoring during a measurable storm event (Part 1V, Sections A and C) Seethe reverse side of this sheet for more information on the measurable storm event -'Perform semi annual analytical monitoring for vehicle maintenance areas, if present (Part IV, Section B) ✓Develop & implement a Stormwater Pollution Prevention Plan (SPPP) (Port1/1, Section A) ✓ Provide Secondary Containment for bulk storage of liquid materials (Part 1f1, Section A) What are key wastewater requirements? ✓Perform Quarterly Analytical Monitoring for wastewater discharges associated with vehicle and equipment cleaning, raw material stockpiles, and/or mixing drum cleanout, and report results to DWQ (Part IV, Section D) ✓ Maintain a list of detergents, additives, polymers, brighteners and any other solvent, cleaning agents, or like chemi- cals used on site in the industrial process Additionally, if phosphate -containing detergents are used on site, a feasi- bility study must be conducted to show the viability of using phosphate -free detergents (Part 11, Section B) ✓Wastewater discharges must meet the requirements of effluent limitations in Part IV, Section D of this permit An exceedence of any of these limitations will result in a violation of the permit conditions What has changed since the last renewah Stormwater-specific changes • The Stormwater Pollution Prevention Plan has been re- vised to reflect updated wording and specific concerns relating to ready -mixed concrete industrial activities • The monitoring scheme has been changed to semi-annual monitoring (modified from annual monitoring in years one and five) • Cut-off concentrations have been removed and replaced with Benchmark action levels When an analytical Bench- mark is exceeded, a Tiered Response applies • "Measurable Storm Event" has replaced "Representative Storm Event" See reverse srde for more information • Failure to monitor stormwater immediately institutes a minimum 6-month period of monthly monitoring • Stormwater discharges shall be monitored from vehicle maintenance areas for Total Petroleum Hydrocarbons (TPH) rather than Oil & Grease (0&G) • Qualitative monitoring is tied to the sampling event of the stormwater analytical sampling and shall be performed whenever analytical monitoring is performed Wastewater -specific changes • WW monitoring has been changed to quarterly • TSS limits were revised for receiving waters classified as PNA, Trout, and HQW per 15A NCAC 02B 0224 • 7Q10-based limits for PNA waters have been added • TPH requirements have been added when wastewa- ter commingles with vehicle maintenance area (VMA) stormwater • Specific new detergent language has been added • All permittees must monitor wastewater discharges to surface waters • Failure to monitor wastewater quarterly per permit terms immediately institutes monthly monitoring for a minimum of six months • Ready -mixed plants with closed loop -recycle systems or other wastewater treatment facilities that do not discharge to surface waters must contact DWQ's Aq- uifer Protection Section Land Application Unit to ob- tain any necessary permits I PAGE TECHNICAL BULLETIN FOR N G GENERAL STORMWATFR PERMIT NCGI40000 REVISED 11116/2011 1 Frequently Asked Questions Do I have to monitor all outfalls? Yes However you may request Repre sentative Outfall Status (ROS) for storm water only outfalls If approved this status allows analytical monitoring at fewer outfalls To request ROS, submit a ROS Request Form SWU ROS (from our website) to your nearest DWQ Re gional Office Where & when do I send DMRs7 Permittees must send all monitoring reports to DWQ Central Files These reports shall be submitted on DMR forms provide by the Director, no later than 30 days from the date the facility receives the sampling results What if I don't address qualita- tive monitoring problems? if ready -mixed concrete facilities do not respond to problems seen in visual monitoring, DWQ may require that sites change the monitoring frequency, apply for an individual permit implement in stream monitoring, install or modify structural stormwater controls or im plement other controls Can I take more samples than is required by the permit? Yes This permit does not bar the per mittee from taking multiple samples at any point while under permit coverage The permittee may find re sampling useful to quickly identify attempts to correct discharge problems What if I forget to monitor? Ready -mixed facilities that do not moni for per permit conditions shall monitor monthly for six months at a minimum The Regional Office has flexibility to extend this time period per their ludg -meet What is a "Measurable Storm Event", and do I have to wait 72 hours between storm events? A measurable storm event is an event that results in an actual discharge from the outfall The previous measurable storm event must have been at least 72 hours prior The 72 hour storm interval does not apply if the permittee is able to document that a shorter interval is typi cal for local storm events during the sampling period and obtains written approval from the DWQ Regional Office The permittee can submit data from a reputable third party such as the State Climate Office of North Carolina This data shall be submitted to the DWQ Re gional Office with a written request Is it a requirement to design a closed -loop recycle system (CLRS) for our site? Every site is different but it is not neces sary to design and operate a CLRS for many ready mixed facilities If site specific conditions prevent discharge to surface waters or make a non discharge treatment option (such as CLRS) more feasible, you must contact DWQ's Land Application Unit to obtain any necessary permits or to determine if it can qualify as a "deemed permitted system under Non Discharge Rules Do I now need an ATC? No, not any longer Per North Carolina Session Law 2011 394 industrial waste water permit dischargers with an NPDES permit no longer need additional ap- proval ' to enter into a contract for the construction installation or alteration of any treatment works or disposal sys tern or to construct, install or alter any treatment works or disposal system within the State" However, wastewater discharges must still meet effluent lima tations in Part IV, Section D of this per- mit An exceedence of any of these imi- tations is a violation of permit condi- tions Who can help mel Division of Water Quality (DWQ) Must a PE sign -off on my new or expanded treatment facility? It is no longer a requirement of this per mit application for a Professional Engi- neer to sign off on plans and calcula tions However it maybe a requirement of other North Carolina regulations such as those of the N C Board of Exam- iners for Engineers and Surveyors Why did you replace Oil & Grease with TPH in VM areas? TPH is specific for chemicals derived from crude oil so it is a better parame ter for vehicle maintenance areas The TPH method we are specifying for NCG14 is EPA 1664A (SGT HEM) It is important to note that DWQ is not specifying the mare expensive Gas Chro motograph (GQ TPH method DWQ found lab costs for EPA 1664A (SGT HEM) to be comparable to current 0&G test costs Note A lower benchmark applies for TPH 15 mg/I (not 30 mg/1) What about the Coastal Rules? New or expanding ready mixed concrete facilities in the 20 coastal counties with >10,000 square feet of built upon area may also need to obtain a State Storm water Permit if you are located in one of the 20 coastal counties, check with your nearest DWQ Regional Office What if I can't sample because of had weather? Adverse weather is dangerous or cre ates inaccessibility for personnel Docu mentation of adverse weather and the reasons for not sampling must be in eluded with your 5PPP records A substi- tute sample must be taken during the next qualifying storm event Can I use DAMS at my situ Yes, flocculants may be used A list of products can be found on our website Asheville Office (828) 296 4500 Washington Office (252) 946 6481 Fayetteville Office (910) 433 3300 Wilmington Office (910) 796 7215 Mooresville Office (704) 663 1699 Winston Salem Office (336) 771 5000 Raleigh Ofticq. (919) 791 Central Offtce� (91LJ4 f807 6300 DWQ Stormwater Permitting Unit hap /!portal nrdenr orglweblwglwslsu Impaired Waters & TMDL Lists hup 1/portal ncdenr org/weh1wq/pshntu M ! 1 Advantages Disadvahtac' SOnepermw-X,.vj '° " d Must�rrionitorif oth ' w �v � inch g sa surface waters ,'�" wl { 1: a a r starmwater"(semi-anrtuallyj v i + „ ha �� ` + ;, " , nd wastewater (quarterly] PP One Fee of $100/year less environmentally friendly due to surface water wastewater discharges *Permit to discharge wastewater to surface waters is subject to an Engineering Alternatives Analysis