HomeMy WebLinkAboutNCG140292_COMPLETE FILE - HISTORICAL_20160705STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO
/v�,� ly�a5 a
DOC TYPE
�*-HISTORICAL FILE
�j MONITORING REPORTS
DOC DATE
❑ 0,DI to D �o 5
YYYYMMDD
Georg has, Bethany, _
From Georgoulias Bethany
Sent Tuesday July 05 2016 9 22 AM
To Johnie Alexander@concretesupplyco corn
Subject NPDES NCG140000 General Permit renewed on July 1
Dear Permit Contact
Thank you for submitting the permit renewal request (received on 06/08/2016 - 11 17am) for Permit COC No
NCG140342 The NCG140000 General Permit has been reissued with no changes for one year, effective Friday, July 1,
2016 As we stated in our letter from May 31", we will not issue you a new Certificate of Coverage until next year,
when the General Permit is revised However, the cover page of the permit has been revised to reflect new effective
dates
For your records, you may print a copy of the new General Permit cover page from our website (in the NPDES Industrial
SW section, General Permits) Or, you can go to this NCG14 Renewals Map and search for your permit The "More Info"
link next the General Permit field in the pop-up box has been revised with the new permit You only need to print the
cover page that reflects the new dates for your records Please continue to use the same data monitoring forms (DMR)
As a reminder, if there has been a company ownership change, or if the Owner Affiliation needs to be updated, you
must submit the appropriate signed form to DEMLR's Stormwater Program Please contact us if you need one of those
forms or have any other questions
Sincerely,
The Stormwater Program
Bethany Gtorguulias
hrivuonment it Lngineer
Stoimwatei PcEmiuing Program, Division of L.neigy, Mineial, and Land Resources
N C Depaitm�,nt of Envuorimental Quality
919 807 6372 office
bethanygeorgouhas @ncdenr gov
1612 Mail Seivict-Centel Raleigh NC 27699-1612(mailing)
512 N Salisbury Street Raleigh NC 27604 (10c.at1011)
Website http //poi tal ncdenr org/web/Ir/stormwater
14
A'&ph-
MCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Lan Ny Section
0
il
Pat McCrory, Governor John E Skvarla, 111, Secretary
APR D Z014 April 1, 2014
r
Mr Johnnie Alexander '� p�hR'tiAfi
ACentral Carolina Concrete Ws`'srpgq�krry
3823 Raleigh Street A'�YByY
Charlotte, NC 28209
Subject General Stormwater Permit inspection NPDES Permit No NCG140292
Central Carolina Concrete -Plant 1, Guilford County
Dear Mr Alexander
On March 24, 2014, Sue White of this office performed a Stormwater Permit Inspection
at Central Carolina Concrete, located at 296 S Edwardia Drive, Greensboro, NC in Guilford
County This facility holds General Stormwater Permit No NCG140292 to discharge
Stormwater from activities associated with Ready Mix Concrete under the National Pollutant
Discharge Elimination System (NPDES)
1 Permit
The permit became effective July 1, 2011 and expires June 30, 2016
2 Records/Reports
During the inspection, it was determined that your facility has a developed Stormwater Pollution
Prevention Plan (SPPP) The SPPP was not organized in a manner that made the
information readily available It was discussed that the binder would be organized so
that employees and State Inspectors would be able to find the various components of the
plan
3 Facility Site Review
This site is a concrete ready mix plant with a recycle system for their wastewater The site is
well cared for and it is obvious that the owners and employees implement permit requirements
This facility has one outfall, which is identified in the SPPP
4 Effluent/Receiving Waters
Stormwater and occasional treated wastewater from the property discharges to S Buffalo Creek
(Class C waters) in the Cape Fear River Basin
5 Self -Monitoring Program
It was determined during the inspection that the company you hired to do your analytical
sampling was having a difficult time arriving on site during an actual discharge event It was
discussed that hiring a local firm would make it more likely to obtain results for the analytical
self -monitoring requirements of the General Permit for Stormwater Monitoring requirements for
qualitative monitoring at each stormwater discharge outfall and the wastewater discharge were
discussed Both types of stormwater monitoring must be done once per each 6 month period
Winston Salem Regional Office
585 Waughtown Street, Winston-Salem, NC 27101 • Phone 336-771 50001 FAX 336-771-4631
Central Carolina Concrete
4/1/2014
Page 2 of 2
and the wastewater discharge monitoring must be done quarterly All anaWical monitoring
results from stormwater and wastewater must be submitted to the Raleigh address as
shown on the forms
All other factions of this inspection were satisfactory This office appreciates the approach
Central Carolina Concrete takes in maintaining compliance at this site if you have any
questions concerning this letter or the attached inspection report, please contact Sue White or
me at (336) 771-5000
Sincerely,
Matthew E Gantt, PE
Regional Engineer
Land Quality Section
Attachments
RIMS Inspection Checklist
CC cNonpoint Source Assistance and Compliance Oversight Unit
Division of Land Quality — WSRO
Debbie Shoffner (City of Greensboro Stormwater Management Division, via email
deborah shoffner@greensboro-nc gov)
t
Permit NCG140292
SOC
County Guilford
Region Winston-Salem
Compliance Inspection Report
Effective 07/01/11 Expiration 06/30/16 Owner Central Carolina Concrete LLC
Effective Expiration Facility Central Carolina Concrete LLC
296 S Edwardia Dr
Contact Person Henry Batten
Directions to Facility
System Classifications
Primary ORC
Secondary ORC(s)
On Site Representative(s)
Related Permits
Inspection Date 0312412014
Primary Inspector Sue White
Secondary Inspector(s)
Greensboro NC 27409
Title Phone 704-353 2001
Certification Phone
Entry Time 09 00 AM Exit Time 10 15 AM
Phone 336 771 5000
Reason for Inspection Routine Inspection Type Compliance Evaluation
Permit Inspection Type Ready Mix Concrete Stormwater/Wastewater Discharge
COC
Facility Status ® Compliant ❑ Not Compliant
Question Areas
® Storm Water
(See attachment summary)
Page 1
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 03/2412014 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
Page 2
I
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 031242014 Inspection Type Compliance Evaluation Reason for Visit Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®❑
n
n
# Does the Plan include a General Location (USGS) map?
®
n
n
n
# Does the Plan include a Narrative Description of Practices ?
®❑
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®
Q
0
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
®
n
n
0
# Has the facility evaluated feasible alternatives to current practices?
®❑
❑
❑
# Does the facility provide all necessary secondary containment?
®
n
n
n
# Does the Plan include a BMP summary?
®
Q
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
0
n
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®
0
11
0
# Does the facility provide and document Employee Training?
®
Q
0
0
# Does the Plan include a list of Responsible Party(s)?
®
n
Cl
# Is the Plan reviewed and updated annually?
®
n
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
®
n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
®
n
n
n
Comment
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®
E!
❑
n
Comment
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
®
n
Q
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
C1
in
11
Comment
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® n p 0
# Were all outfalls observed during the inspection? ® [1 ❑ Q
# If the facility has representative outfall status is it properly documented by the Division? ®❑ ❑ 1)
# Has the facility evaluated all illicit (non stormwater) discharges? ® Q fl ❑
Comment
Page 3
Vgh
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Land Quality Section
Pat McCrory, Governor John E Skvarla, ill, Secretary
April 1, 2014
Mr Johnnie Alexander
Central Carolina Concrete
3823 Raleigh Street
Charlotte, NC 28209
Subject General Stormwater Permit Inspection NPDES Permit No NCG140292
Central Carolina Concrete -Plant 1, Guilford County
Dear Mr Alexander
On March 24, 2014, Sue White of this office performed a Stormwater Permit Inspection
at Central Carolina Concrete, located at 296 S Edwardia Drive, Greensboro, NC in Guilford
County This facility holds General Stormwater Permit No NCG140292 to discharge
Stormwater from activities associated with Ready Mix Concrete under the National Pollutant
Discharge Elimination System (NPDES)
1 Permit
The permit became effective July 1, 2011 and expires June 30, 2016
2 Records/Reports
During the inspection, it was determined that your facility has a developed Stormwater Pollution
Prevention Plan (SPPP) The SPPP was not organized in a manner that made the
information readily available It was discussed that the binder would be organized so
that employees and State Inspectors would be able to find the various components of the
plan
3 Facility Site Review
This site is a concrete ready mix plant with a recycle system for their wastewater The site is
well cared for and it is obvious that the owners and employees implement permit requirements
This facility has one outfall, which is identified in the SPPP
4 Effluent/Receiving Waters
Stormwater and occasional treated wastewater from the property discharges to S Buffalo Creek
(Class C waters) in the Cape Fear River Basin
5 Self -Monitoring Program
It was determined during the inspection that the company you hired to do your analytical
sampling was having a difficult time arriving on site during an actual discharge event It was
discussed that hiring a local firm would make it more likely to obtain results for the analytical
self -monitoring requirements of the General Permit for Stormwater Monitoring requirements for
qualitative monitoring at each stormwater discharge outfall and the wastewater discharge were
discussed Both types of stormwater monitoring must be done once per each 6 month period
Winston-Salem Regional Office
585 Waughtown Street, Winston-Salem, NC 27101 . Phone 336-771-50001 FAX 336-771-4631
Central Carolina Concrete
4/1/2014
Page 2 of 2
and the wastewater discharge monitoring must be done quarterly All analytical monitoring
results from stormwater and wastewater must be submitted to the Raleigh address as
shown on the forms
All other factions of this inspection were satisfactory This office appreciates the approach
Central Carolina Concrete takes in maintaining compliance at this site If you have any
questions concerning this letter or the attached inspection report, please contact Sue White or
me at (336) 771-5000
Sincerely,
Matthew E Gantt, PE
Regional Engineer
Land Quality Section
Attachments
BIMS Inspection Checklist
CC Nonpoint Source Assistance and Compliance Oversight Unit
cDjvision of Land Quality — WSRO �>
Debbie Shoffner (City of Greensboro Stormwater Management Division, via email
deborah shoffner@greensboro-nc gov)
III
Permit NCG140292
SOC
County Guilford
Region Winston-Salem
Compliance Inspection Report
Effective 07/01/11 Expiration 06/30/16 owner Central Carolina Concrete Lt_C
Effective Expiration Facility Central Carolina Concrete LLC
296 S Edwardia Dr
Contact Person Henry Batten
Directions to Facility
System Classifications
Primary ORC
Secondary ORC(s)
On Site Representative(s)
Related Permits
Inspection Date 03/24/2014
Primary Inspector Sue White
Secondary Inspector(s)
Title
EntryTime 09 00 AM
Greensboro NC 27409
Phone 704-353-2001
Certification
Exit Time 10 15 AM
Phone
Phone 336-771-5000
Reason for Inspection Routine Inspection Type Compliance Evaluation
Permit Inspection Type Ready Mix Concrete Stormwater/Wastowater Discharge
COC
Facility Status ® Compliart Q Not Compliant
Question Areas
® Storm Water
(See attachment summary)
Page 1
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 03/2412014 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
Page 2
i
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 03/24/2014 Inspection Type Compliance Evaluation Reason for Visit Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®
n
n
n
# Does the Plan include a General Location (USGS) map?
®
n
n
n
# Does the Plan include a Narrative Description of Practices ?
®
n
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®
n
n
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
®
n
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
®
n
n
n
# Does the facility provide all necessary secondary containment?
®
n
n
n
# Does the Plan include a BMP summary?
®
n
In
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®❑
❑
11
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
EN
❑
Q
# Does the facility provide and document Employee Training?
®
Cl
❑
n
# Does the Plan include a list of Responsible Party(s)?
®❑
n
Cl
# is the Plan reviewed and updated annually?
®❑
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
®
n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
®❑
n
n
Comment
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®❑
Comment
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
®
n
n
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Cl
n
®
Cl
Comment
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
®
n
❑
# Were all outfalls observed during the inspection?
®0
❑
❑
# If the facility has representative outfall status is it properly documented by the Division?
®
n
n
n
# Has the facility evaluated all illicit (non stormwater) discharges?
M
0
❑
❑
Comment
Page 3
le
40
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P E
Governor Director
March 19, 2012
Mr Johnie Alexander
Central Carolina Concrete
3 823 Raleigh Street
Charlotte, NC 28209
Subject Compliance Evaluation Inspection
Central Carolina Concrete — Plant 1
NPDES Permit # NCG140292
Guilford County
Dear Mr Alexander
Dee Freeman
Secretary
On March 13, 2012 a Compliance Evaluation Inspection was performed by George Smith, of this office_ Mr
Johme Alexander, Environmental Manager, Mr Robert Crews, Stormwater Plan Maintenance, and Mr ]Ray
Chancy, Plant Manager were all present for the inspection The facility located at 296 S Edwardia Dzive
Greensboro
Records & Reports
The Stormwater Pollution Prevention Plan (SPPP) is kept in a 3-ring binder and is being implemented
• The Plan has a section containing good housekeeping and chemical storage forms that are wised
to evaluate the site as defined in the SPPP
• The qualitative forms are kept in the binder
• The analytical documentation is kept in the binder
Facility Site Re-* tiew
There is one outfall, which periodically discharges under a railway track and into an adjacent field -The
discharge does not reach a stream
A large portion of the facility is gravel covered The stormwater from the inert stockpiles drains to a sumall
discharge outfall
The stormwater and process wastewater co -mingles before the discharge
North Caro€ma Division of Water Quality Winston Salem Regional Office
Location 585 Waughtown St Winston Salem North Carolina 27107
Phone 336 771 50001 FAX 336 7714630
Internet www ncwaterquahty org
NorthCarc�lYna
An Equal Opportunity 1 Affirmative Acton Employer
Compliance Evaluation Inspection
March 19, 2012
Page 2 of 2
There is a vehicle maintenance area
A recycle pond will be installed The plans are drawn and approved
Self -Monitoring Program
The analytical records show quarterly monitoring for pH, TSS, Settleable Solids, and Total Petroleum
Hydrocarbons (TPH) for the outfall
Qualitative semi-annual monitoring is performed at the outfall Rainfall amounts are recorded
Please keep in mind that all quarterly sampling that is non -compliant twice in a row with Table 7 will institute
monthly monitoring
The facility is well maintained, monitoring is performed, and the SPPP is being implemented The staff is doing
a good job The inspection is satisfactory If you have any questions please contact George Smith or me at (336)
771-5000
Sincerely,
W Corey Basinger
Regional Supervisor
Attachments
cc WSRO Piles
Permit NCG140292
SOC
County Guilford
Region Winston-Salem
Compliance Inspection Report
Effective 07/01/11 Expiration 06/30/16 Owner Central Carolina Concrete LLC
Effective Expiration Facility Central Carolina Concrete LLC
296 S Edwardia Dr
Contact Person Henry Batten
Directions to Facility
System Classifications
Primary ORC
Secondary ORC(s)
On Site Representative(s)
Related Permits
Title
Inspection Date 03/13/2012 Entry Time 10 45 AM
Primary Inspector George S Smith
Secondary Inspector(s)
Greensboro NC 27409
Phone 704-353-2001
Certification
Exit Time 11 05 AM
Phone
Phone 336-771-5000
Reason for Inspection Routine Inspection Type Compliance Evaluation
Permit Inspection Type Ready Mix Concrete StormwaterlWastewater Discharge
COC
Facility Status ■ Compliant ❑ Not Compliant
Question Areas
E Storm Water
(See attachment summary)
Page 1
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 03/1312012 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a Narrative Description of Practices ?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Pian include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment
Qualitative Monitoring
Has the faciiity conducted its Qualitative Monitoring semi annually?
Comment
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment
Yes No NA NE
■nnn
■nnn
■nnn
■nnn
■ n n n
■nnn
■nnn
■nnn
■nnn
■❑❑n
■nnn
■nn❑
■❑nn
■nnn
■❑nn
Yes
No
NA
NE
■❑❑D
Yes No NA NE
■nn❑
■nn❑
Page 2
Stormwater Inspection
Date of Inspection Inspector [�-moo►^ [ J►n � c�
Gu
Entry Time 1j) AM Exit Time
Permit Number N C 6 1 Y 0 31 ,? Activity 461
Facility Name Cc.nV-Y10C cittec hAt �oncricCG
Mailing Address o Uox 3 W PV, r,l rr
City �/"frliC`1 State Zip 8�D
County _ u + I Ford
■ ■ ■ ■ ■ ■ ■ ■ ENRON an a ■ ■ a ONE news ■ a ■ a a a a ■ ■ a a ■ ■ ■ a a a a a ■ ■ gamesome ■ among Mazda REMEM a ■ ■ a ■ ■ a ■ ■ ■ ■ ■ ■ a a ■ a ■ ■
Facility Location QS Li b crc Rd 1 �cr+r -f
Facility Representative 'Tt Am c [)�extnder _ Title Gnyi/bpMtiar-A Kuii�e
Telephone Number i o y) 3 72 r
7IrA/nq Ch2U+ s , Pl ofAi M11-
i■■■■■ a MEN ■■■■■■ az M O N 0 m o n s o a was m m r r m u s a r MEN m M w m o a s M M m m m o% r n m m i* E m m m was NOR opposes M M R M O■
Implement SPPP
Analytical Monitoring gvttif'cn
Qualitative Monitoring C?
On -site Vehicle Maint - _,y L
s■■■a■a■■■■a■■aa■■■■aa■■■■aa■■a■aa■■aa■■aaa■■■■■■■■■a■a■■■■■■ a 2 a a 500■ a 5 a a a■■ a■■a a■■a a■■■■■
AMA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H Sullins Dee Freeman
Governor Director Secretary
August 1, 2011
Henry Batten
Central Carolina Concrete LLC
3823 Raleigh St
Charlotte, NC 28206
Subject NPDES Stormwater Permit Coverage Renewal
Central Carolina Concrete LLC
COC Number NCG140292
Guilford County
Dear Permittee
In response to your renewal application for continued coverage under stormwater General Permit NCG140000
the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit This permit is reissued
pursuant to the requirements of North Carolina General Statute 143 215 1 and the Memorandum of Agreement
between the state of North Carolina and the U S Environmental Protection Agency, dated October 15, 2007 (or
as subsequently amended)
The following information is included with your permit package
• A new Certificate of Coverage
• A copy of General Permit NCG140000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form for Stormwater
• Two copies of the DMR Form for Wastewater
• Two copies of the Qualitative Monitoring Report Form
The General Permit authonzes discharges of stormwater and/or wastewater, and it specifies your obligations with
respect to discharge controls, management, monitoring and record keeping Please review the new permit to
familiarize yourself with all the changes in the reissued permit if your Certificate of Coverage (COC) restricts
authorization to discharge stormwater only (or other limited terms), you must contact the Stormwater Permitting
Unit if you would like to request a modification to your COC
The first sample period of your permit begins July 1 2011 However, because of the delayed mail out of permit
packages your facility is expected to attempt to sample during the first sampling period, and must complywith
sampling requirements beginning during the second sampling period Your facility must sample a representative
storm event between January 1 and July 30 2012 (for stormwater sampling), and/or sample wastewater between
October 1 2011 and December 31, 2011 (or if applicable, report ' No Flow , as outlined in Part V, Section E)
Additionally your facility has 6 months from the time of receipt of the permit to update SPPP to current standards
The more significant changes in the General Permit since your last Certificate of Coverage include the following
(please note the names and numbers of sections have been changed from the previous permit revision)
• Part II
• Authorization to Construct (ATC) language was added to the permit and adapted to fit NCG140000
• Part III
• The Stormwater Pollution Prevention Plan (SPPP) section has been updated to the most current
language of our permits Some additional conditions specific to this industry have been added to the
SPPP language
• Part IV
• Sections A & B Revised provisions require stormwater discharges be sampled twice per year (instead of
annually), and sampling results shall be compared to new benchmark values (The previous cut off
concentrations have been removed)
• Sections A & B Revised provisions require the permittee to execute Tier One, Two & Three response
actions Tier One requirements for a first benchmark exceedence, and/or Tier Two response for a second
consecutive benchmark exceedence, if applicable Tier Two requires that the permittee institute monthly
monitoring (reported to the appropriate Regional Offices) instead of twice per year monitoring Monthly
monitoring shall be done until three consecutive monitoring events show no benchmark exceedences
• Sections A & B This permit now contains a provision that four exceedences of any benchmark will trigger
increased DWC involvement in the permittee s stormwater management and control actions (Tier Three)
DWQ may direct the permittee to apply for an individual permit, institute specific monitoring or may direct
the implementation or installation of specific stormwater control measures
• Sections A & B Failure to perform analytical stormwater monitoring requires that the permittee begin a
monthly sampling scheme for both industrial stormwater discharges and/or stormwater discharges from
VMA areas (where applicable) After 6 months of monthly sampling the permittee may return to semi
annual sampling, unless otherwise specified by DWQ
• Sections A & B A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters was added to
this permit for these more sensitive waters
• Section B The monitoring parameter Oil & Grease has been replaced by the parameter Total Petroleum
Hydrocarbons
• Sections A, B & C Inability to sample due to adverse weather must be reported in the SPPP
• Sections A, B & C The terminology "Representative Storm Event has been replaced by Measurable
Storm Event' in response to comments from industry groups A measurable storm event is a storm event
that results in an actual discharge from the permitted site outfall The previous measurable storm event
must have been at least 72 hours prior, unless the permittee is able to document that a shorter interval is
representative for local storm events during the sampling period, and obtains written approval from the
local DWQ Regional Office
• Section C Qualitative monitoring must now be conducted semi annually and is tied to the same
measurable storm event as the analytical monitoring
• Section C If the permittee fails to respond effectively to problems identified by qualitative monitoring, the
permittee may be required by DWQ to perform corrective action
• Section D This section has now been consolidated to one section with one set of combined tables for all
types of authorized wastewater discharges
• Section D The wastewater analytical monitoring schedule has been set to quarterly
• Section D TSS limits have been revised for PNA, Trout and HQW waters per rule requirements in 15A
NCAC 026 0224
• Section D 7Q1D based flow limits have been set for PNA waters per regulations in 15A NCAC 02B
• Section D TPH monitoring requirements have been added to wastewater monitoring when stormwater
runoff from VMA areas commingles with wastewater
• Section D This wording in the permit has been removed For facilities which route stormwater and all
process wastewater to a recycle system, no analytical monitoring of process wastewater discharges is
required if that recycle system discharges as a result of a 10 year 24 hour (or larger) precipitaticn event
Part V
• Section A For existing facilities previously permitted and applying for renewal under this General Permit
New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and
implemented within 6 months of the effective date of the initial Certificate of Coverage issued pursuant to
this General Permit and updated thereafter on an annual basis
Your coverage under the General Permit is transferable only through the specific action of DWQ This permit does
not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the
permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard,
ordinance, order, judgment, or decree If you have any questions regarding this permit package please contact
these members of the Stormwater Permitting Unit Jennifer Jones (919) 807 6379, Ken Pickle (919) 807-6376, or
Bethany Georgoulias (919) 807-6372
Sincerely,
blu-zll-e� 14111-�--
for Coleen H Sullins
cc DWQ Central Files
Stormwater Permitting Unit Files
Winston Salem Regional Office
r
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B Hunt, Jr , Governor
Bill Holman, Secretary
Kerr T Stevens, Director
May 1, 2000
Mr Randall L Buchanan
P O Box 8309
Greensboro NC 27419
L1. F 18;
IT1 • •
I A
NCDENR
NORTH CAROLJNA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject General Permit No NCG 1-40000
Ready -Mix Equipment Company, L L C
COC NCG 140292
Guilford County
Dear Wlr Buchanan
In accordance with your application for a discharge permit received on April 10, 2000 we
are forwaidina herewith the subject certificate of coverage to discharge under the subject state —
NPDES general permit This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215 1 and the Memorandum of Agreement between North Carolina and the
US Environmental Protection agency dated December 6 1983
If any parts, measurement frequencies or sampling requirements contained in this permit
are unacceptable to you, you have the right to request an individual permit by submitting an
individual permit application Unless such demand is made this certificate of coverage shall be
final and binding
Please take notice that this certificate of coverage is not transferable except after notice to
the Division of Water Quality The Division of Water Quality may require modification or
revocation and reissuance of the certificate of coverage
This permit does not affect the legal requirements to obtain other permits which may be
required by the Division of Water Quality or permits required by the Division of Land
Resources, Coastal Area Management Act or any other Federal or Local governmental permit
that may be required
If you have any questions concerning this permit, please contact Aisha Lau at telephone
number (919) 733-5083 ext 578
Sincerely,
ORIGINAL
SIGNED
M
Kerr T Stevens
cc Winston-Salem Regional Office
Central Files
Stormwater and General Permits Unit Files
1617 Mail Service Center, Raleigh NC 27699 1617 Telephone 919-733-5083 FAX 919-733 9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO NCG140000
CERTIFICATE OF COVERAGE No NCG140292
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELINIINATION SYSTENI
In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards ind
regulations promulgated and adopted by the North Carolina Environmental Management Commission and the
Federal Water Pollution Control Act as amended
Randall L Buchanan
is hereby authorized to discharge stormwater from a facility located at
Ready Mix Equipment Company L L C
296 S Edwardt i Dri,,e
Greensboro
Guilford County
to receiNing waters desitinated as an unnamed tributary to South Buft110 Creek a class C NSWstream in the C tpe
Fe it Riper B1sin in accordance %%ich the effluent limitations monitoring requirements and other conditions set forth
in P1rts 1 I1 I11 and 1V of General Permit No NCG140000 as tttached
This Certificate of Coverage shall become effective M tv l 2000
This Certificate of Coverage shall rem un in effect for the duration of the General Permit
Signed this day May 1 2000
ORIGINAL
RI N A cGMED By ILLS
Kerr T Stevens Director
Di%ision of Water Quility
By Authont4 of the Environmental Management Commission
887 i==-"-{- 'II �-w•` 7� /`l ` ��� � i ice- , 0+`!:1`{ f �� u, I �� �y� � � „ i r r
JI 0 1�l�i Y` 'rda ` t} t LJS \I 696
3196
71
air
c I '
I�
1~ FF
3995
�/'�
XN
8B J�IIr �� 1 4} ��I/ tell S \ 4
f u� l It Jl -94
^---
/
I
�E7 if i�1triL Ir �07.�
"500_�„-`
(�uilfcird 1L---� ��� �J'��) } `�� e \yl 1 �i 3193
9�5 r�fr I • _ �L_� �`` 1 1r n 1 9 3
• !Persimmon GroveCh
-
e1J/ — 9 ohm
!�
! /1I m \� z
a -/Am
Rey>�ds
2
Riletgh �G
g iC��I
Ch --_• — 1 —\P n'
VIN
� I
�0-Ic SSA& � rA � /% l� ��--• ! � "'1
+} ` � 1 - 1�1\ � f'vI l t-C1"� J = J J�p� _ � .l �� i '" i %✓ 1�r�� I� � �1� --
�--
I ! ~
FACILITY Loajy - MIX Ltu,�e h� �o pk� L C
COUNTY 6 i't , ;o.,
NPDES /V c (:,> 1 Zf (7 a q
MAPS S
DSN '.'W N 1"
1a„
RE* STREAM U T S 0tA
STREAM CLASS I I L N S Vr
L
DISCHARGE CLASS
C
c� 7 O r W'lP y'
EXPIRATION DATE -7 3 t 0 z(
rc h (q (ree- �
Permit NCG140292
SOC
County Guilford
Region Winston Salem
Contact Person Henry Batten
Directions to Facility
System Classifications
Primary ORC
Secondary ORC(s)
On Site Representatives?
Related Permits
Compliance Inspection Report
Effective 07/01/16 Expiration 06/30/17 Owner Central Carolina Concrete LLC
Effective Expiration Facility Central Carolina Concrete LLC
296 S Edwardia Dr
Greensboro NC 27409
Title Phone 704 353 2001
f
Inspection Date 09/06/2016 EntryTime 10 00AM
Primary Inspector Sue L Homewood
Secondary Inspector(s)
Certification Phone
Exit Time 11 OOAM
Phone 336 7769694
Reason for Inspection Routine Inspection Type Compliance Evaluation
Permit Inspection Type Ready Mix Concrete StormwaterANastewater Discharge COC
Facility Status Compliant ❑ Not Compliant
Question Areas
Storm Water
(See attachment summary)
Page
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 09/06/2016 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
Page 2
Permit NGG140292
Inspection Date 09I0612016
Analytical Monitoring
Has the facility conducted Its Analytical monitoring?
Owner Facility Central Carolina Concrete LLC
Inspection Type Compliance Evaluation Reason for Visit Routine
# Has the facility conducted Its Analytical monitoring from Vehicle Maintenance areas?
Yes No NA NE
® ❑ ❑ ❑
❑ ❑ ® ❑
Comment Analvtical monitorina was onlv counducted when a discharae had occurred durina a storm event
Monitoring was conducted 12/30/15 and 3/24/16 Both discharges were within permit limits
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑
# Were all outfalls observed during the inspection? ® ❑ ❑ ❑
# It the facility has representative outfall status is it property documented by the Division? ❑ ® [] ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ■ ❑ ❑
Comment Outfall #2 added to plan in 2015 Both outfalls discharge to a short section of ditch next to the
railroad
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi annually? ® ❑ ❑ ❑
Comment Both outfalls dlscharae to a storm ditch along the side of the railroad tracks This ditch drains
into a drop_ inlet and stormwater is piped under the railroad The inspections are conducted
along a short length of ditch from outfall #1 to the drop inlet The ditch shows evidence of
staining and concrete discharge from past events Monitoring had been conducted 12/23115,
3/24/16, 4/15/16, 6/16/16
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a Narrative Description of Practices ?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
Yes No NA NE
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ 1710
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
® ❑ ❑ ❑
Page 3
Permit NCG140292 Owner Facility Central Carolina Concrete LLC
Inspection Date 09/0612016 inspection Type Compliance Evaluation Reason for Visit Routine
Stormwater Pollution Prevention Plan
# Is the Plan reviewed and updated annually9
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Yes No NA NE
® ❑ ❑ ❑
0 ❑ ❑ ❑
® 1107
Comment SPPP was developed 9105, revised 10/11 and certified 415116 Trainlna was completed 3/31/16
and 10/28/15 Plan was revised to include new outfall #2, this outfall only receives stormwater
when the basins are pumped out and therefore may or may not correspond to a storm event
The plant reuses as much water as possible and will only need to pump In the case of a
significant predicted storm event Overflow from the basins would discharge to outfall #1 which
is the original outfall and continues to receive runoff from the aggregate storage area of the plant
property
Page 4