Loading...
HomeMy WebLinkAboutNCG140154_MONITORING INFO_20180305STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V 4- DOC TY ❑HISTORICAL FILE „MONITORING REPORTS DOC DATE ❑ 2L)IO D3 015 YYYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) —STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year. 2017 "Report ALL STORMWATER monitoring data on this form (include "No Flow" 1"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARLH,1 of each year. Certificate of Coverage No. NCG 140154 MAR 0 5 2018 Facility Name: Southern Concrete Materials —Andrews Plant rr_�rwr Cir,i County: Cherokee ILt� € SECT10, Phone Number: (8_ 28 ) 253-6421 Total no. of SDOs monitored 1 Certified Laboratory ETA Lab # 600 - Lab # Stormwater Discharge Outfall (SDO) No. 1 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ❑ No Was this outfall ever in Tier 2 during the past year? Yes ❑ No If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Non -polar O&G Total (EPA Method New Motor Oil Total Rainfall, Suspended pH, 1664TSS, (SGT-HEM)) , Usage (gallmo.) Outfall No. inches Solids ( ) SU mgll (VMA) Sapplicable mg/1 Napplicable Stormwater Circle Benchmark lndlcate NO FLOW !f 1 D0150 � 6. �-9.0 1 � �55 gallmo. average requires T55 and Benchmarks applicable Non -polar 0&G monitoring Date Sample Collected, molddl r =M= 05/30/2017 0.40 91 8.3 12/31/2017 No flow Permit Date 811/2017 — 6/3012022 Last Revised 8-22-2015 Certificate of Coverage No. NCG14 ©[L1®V1 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.221 Signature Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: r (919) 707-9220 Permit Date 8/1/2017 - 6/30/2022 Last Revised 8-22-2015 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140154 FACILITY NAME: _Southern Concrete Materials — Andrews PERSON COLLECTING SAMPLES: _Jeff Lamm CERTIFIED LABORATORY:_ETS Lab # 600 Rogers and Calcott Lab # _27 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: _2016 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec Dian -March ❑April -June COUNTY: Cherokee PHONE NO. ( ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other. OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD)' PR (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT HEM6 [mg/L•}� Duration (minutes) Total Flow (gallons/day)' - - - 6_93A 03,5 53 (15)6 - 1 8-15-16 MD, VE 7.8 6.2 0.1 N/Af rr nEc f n �I /r ,� rr CEN T R i an r,-e, DWR SECT - ri ' if wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B :0�224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtaina,Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE-) WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW" TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date:7/1/2010-06/30/2015 8/24/2016 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14_c� I FACILITY NAME: PERSON COLLECTING SAMPLES ll L1 n r >r CERTIFIED LABORATORY f C S L b# e} Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: SAMPLING PERIOD: ❑ July -December January -June COUNTY � A,,yg �y PHONE NO. ( ) ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout [—]Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)1 PH {Standard Units} TSS (mg/L) Event Duration [minutes} Total a Rainfall {in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 5-92 1002,3 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i. A For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. COA No .1 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B:: /ehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. �- Gutfall No. Date Sample Collected /dd/ (mo/dd/yr)1 pH (Standard Units) TPH using method 1654A SGT--HEM (mg/L) Total Suspended Solids (mg/0(minutes) Event Duration Total Rainfall a (in) New Motor Oil Usage (gal/month) to Tier Z Monthly (y/n) Monitoring? # of Months in Tier 2 Sampling fi-92 152 10023 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine oeriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that th a are si n' cant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of r t e) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2