Loading...
HomeMy WebLinkAboutNCG140151_MONITORING INFO_20180305STORMWATER DIVISION CODING SHEET NCG PERMITS . PERMIT NO. /V u& 140145t DOC TYPE ❑HISTORICAL FILE MONITORING REPORTS DOC DATE O ZbI S W�+ YYYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year �A "Report ALL STORMWATER monitoring data on this form (include "No Flow"/"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG 140151 Facility Name: Southern Concrete Materials — Enka Plant MAR 0 5 2018 County: Buncombe CENTRAL FILES Phone Number: ( 828} 253-6421 Totafrno'Fof,S1DO's monitored 1 Certified Laboratory ETA Lab # 600 Lab # Stormwater Discharge Outfall (SDO) No. 1 VMA Outfall? Yes ❑ , No Is this outfall currently in Tier 2 for any parameter? Yes ❑ No Was this outfall ever in Tier 2 during the past year? Yes ❑ No If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑I• Permit Date 8/112017 — 6/3012022 Last Revised 8-22-2015 f _ Certificate of Coverage No. NCG 14 ©/❑ f �] CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.22] Signature Date a Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 8/112017 - 6/30/2022 Last Revised 8-22-2015 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCB 1-3 REGFjVg�LE COLLECTION YEAR: _2016 FACILITY NAME: _Southern Concrete Materials -Enka_ APR Z Z�SA PLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES _Jeff Lamm Q©LINTY Buncombe CERTIFIED LABORATORY ETS Lab 600 DIM, `i]I��HONE NO. Lab foli„p� LISTSERVE? DYES ❑NO EMAIL: OPTIONAL INFO: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout Part A: Stormwater Monitoring Requirements ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW}' pH {Standard Units} TSS (mg/L} Event Duration (minutes} Total a Rainfall (' in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002,3 - - - - 1 4-1-16 8.4 8.3 180 0.5 no- ff�W 11f "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range {for pH}, you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: 'Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH (Standard units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' 6-9Z 15z 1001,s 1 N/A N/A HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one cores of this DMR fincludinR all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorini? Deriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED; "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are si ificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of a ittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMIMATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG 140151 SAMPLE COLLECTION YEAR: _2016 FACILITY NAME: _Southern Concrete Materials -Enka SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES _Jeff Lamm COUNTY Buncombe CERTIFIED LABORATORY ETS Lab # 600 PHONE NO. ( ) Lab # ADD TO LISTSERVE? [—]YES ❑NO EMAIL: OPTIONAL INFO: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other, Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected {mo/dd/yr OR NO FLOW)' PH {Standard Units} TSS [mg/L} Event Duration {minutes} a Rainfall RainTotfall" {in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002.3 - - - - 1 7-5-16 7.9 22 45 0.15 N N/A r F_IVt: ,o- - ( ,ENNRAL E Lt:o DW K 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 2y , Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)i PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-92 152 1001" - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Orisinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorins period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significpnt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of S/1/2016 ( Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM ' GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140151 FACILITY NAME: Southern Concrete Materials -Enka — PERSON COLLECTING SAMPLES _Eddie Teague CERTIFIED LABORATORY ETS Lab # _600. Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Buncombe PHONE NO. ( ) ADD TO LISTSERVE? ❑YES []NO EMAIL: DISCHARGING TO CLASS: [_]SA ❑HQW ❑PNA []Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units} TSS (mg/L) Event Duration (minutes) Total n Rainfall {in} In Tier 2 Monthly Monitoring? n (y/ } # of Months in Tier 2 Sampling2 - - 6-9' 10a2,3 - - - - 1 9-29-15 7.8 <5 1140 0.50 N C� VCV NOV 0 2 2115 r' rZ cP 1 If "NO FLOW" or "NO DISCHARGE, Enter "ND FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. im Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/Yr) pH (Standard units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total c Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling 6-9z 152 1002.3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there ='fican penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permitt e) (Da e) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG14 % 4 FACILITY NAME: m7;1 PERSON COLLECTING SAMPLES L67r L CERTIFIED LABORATORY S C S Lab # ZT Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: / " SAMPLING PEOD: ❑ July December January -June COUNTY IsC6 PHONE NO. ( ) ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ❑Other. Outfakl No. Date Sample Collected [mo/dd/yr OR NO FLOW)' pH [Standard Units] T55 (mg/L) Event Duration (minutes] Total Rainfall' (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - 6-92 1002.3 - - - - E NT 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range, s TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. EI V GD 7 2015 AL FILES ECTION Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. ` Outfall No. Date Sample Collected (mo/dd/yr)1 pH (standard Units) TPH using method 1664ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/nj # of Months in Tier 2 Sampling z 6-92 152 1001,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there significant p alties for submitting false information, including the possibility of fines andimprisonmentfor knowing violations." J/ (Signature of Per to ( te) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2