HomeMy WebLinkAboutNCG140097_COMPLETE FILE - HISTORICAL_20181205STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
Iv L& 140a°t
DOC TYPE
❑ HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑
YYYYM M DD
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE
49 HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ Aol S D18 0`7
YYYYM M DD
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
WILLIAM E. (TOBY) VINSCIN, JR.
interim Director
December 5,,2018
Hamby Brothers Concrete Inc
Attention: Randall Hamby
Post Office Box-844
Lenoir, North Carolina 28645
Subject: Compliance Evaluation Inspection
Permit: NCG140097
Caldwell, North Carolina
Dear Mr. Hamby,
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on November 20, 2018.
The report should be self-explanatory, however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4S00 or by email
at Isaiah.reed@ncdenr.gov.
Enclosure: Inspection Report
Sincer. ,
Isaiah Reed, CLPSCI, MS4CI; r'l
Environmental Specialist
Land Quality Section
: Q EQ .
PnPatunl of rnrlmr.nen4ldu�\ /-`
North Carolina Department of Environmental Quality Divlslon of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carohna 28778
828.296.4500
f
Compliance Inspection Report
I Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 owner: Hamby Brothers Concrete Inc
SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
County: Caldwell 2051 Morganton E31vd SW
Region: Asheville
Lenoir NC 28645
3 Contact Person: Randall Hamby Title: Phone: 828-754-2176
Directions to Facility:
System Classifications:
l Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 11/20/2018 EntryTime: D2:00PM Exit Time: 03:ODPM
Primary Inspector: Isaiah L Reed Phone: 828-296.4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete StormwaterlWastewater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
U Storm Water
(See attachment summary)
Page: 1
Permit: NCG140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Date: 1112012018 inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On November 20, 2018 this facility was inspected concerning a newly assembled SWPPP. I met with Ben Lail on site.
During the inspection, the following items were noted;
1) The SWPPP could use some elaboration in some areas, but the essential elements are there.
2) The site map was Inaccurate with respect to the stormwater basins at the rear of the facility. The map will be revised to
accurately reflect the conditions on site.
3) Secondary containment has been constructed around the add/mix tanks.
4) Some off -site deposition was noted next to the larger basin. The permittee Is directed to evaluate and correct the indutrial
process in that area to eliminate the potential for waste concrete buildup outside of the constructed stormwater control
measures.
If you have any questions, please contact this office at (828) 296-4614
- — -- --- - - � - -- - - - --- - -Page: 2--
lob,
Permit:
NCG140097 Owner - Faclllty:Hamby Brothers Concrete Inc
Inspection Date: 11120/2018 Inspection Type : Compliance Evaluation Roason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
®
❑ ❑ ❑
# Does the Plan Include a "Narrative Description of Practices'?
■
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
E
❑ ❑ ❑
= # Does the Plan -include a list of significant spills occurring during the past 3 years?
i
®
❑ ❑ ❑
j # Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
®
❑ ❑ ❑
# Does the Plan include a BMP summary?
E
❑ ❑ ❑
i
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
N
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®❑
❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
E
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
®
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
E
❑ ❑ ❑
Comment:
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment:
Analytical_ Monitoring Ycs No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ■
Comment:
Permlt and butfalls Yes No NA IlE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑ ■
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment:
Page: 3
Permit: NCG140097
SOC:
County: Caldwell
Region: Asheville
Compliance Inspection Report
Effective: 08/01/17 Expiration: 06/30/22 Owner: Hamby Brothers Concrete Inc
Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
2051 Morganton Blvd SW
Contact Person: Randall Hamby Title:
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 11/20/2018 Entry Time: 02:00PM
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Lenoir NC 28645
Phone: 828-754-2176
Certification: Phone:
Exit Time: 03:OOPM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ® Compliant ❑ Not Compliant
Question Areas:
Storm Water
{See attachment summary}
Page: 1
Permit: NGG140097 Owner -Facility: Hamby Brothers Concrete Inc
Inspection Date: 11/2012018 Inspection Typo : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On November 20, 2018 this facility was inspected concerning a newly assembled SWPPP. I met with Ben Lail on site.
During the inspection, the following items were noted:
1) The SWPPP could use some elaboration in some areas, but the essential elements are there.
2) The site map was inaccurate with respect to the stormwater basins at the rear of the facility. The map will be revised to
accurately reflect the conditions on site.
3) Secondary containment has been constructed around the add/mix tanks.
4) Some off -site deposition was noted next to the larger basin. The permittee is directed to evaluate and correct the indutrial
process in that area to eliminate the potential for waste concrete buildup outside of the constructed stormwater control
measures.
If you have any questions, please contact this office at (828) 296-4614
Page: 2
Permit: NGG140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Date: 1112012018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
®
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
®
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
®
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
®
❑ ❑ ❑
# Does the Plan include a BMP summary?
®
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®
❑ ❑ ❑
# Does the facility provide and document Employee Training?
®
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
®
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
®
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
M
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
®
❑ ❑ ❑
Comment:
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment:
Analytical Monitoring
Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment:
Permit and Outfalls
Yes Na NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ 19
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment:
Page: 3
Ventaloro, Julie
From:
Ventaloro, Julie
Sent:
Wednesday, May 03, 2017 12:29 PM
To:
'hambybrothers@att.net'
Cc:
Conway, Jean
Subject:
NCG140097 NPDES Stormwater permit
Attachments:
NCG14 Permit Print Package 2016.pdf
Sharon,
I checked our files, but I couldn't find am a p of the facility showing the outfall. I did talk to someone in our Asheville
Regional Office. In 2012, she issued a Notice of Violation to Hamby Brothers for failing to do the required analytical
monitoring as well as failing to comply with other aspects of the facility's stormwater permit. At that time, she was
working with Betty Smith and Randall Hamby. Mr. Hamby should understand what needs to be done with your permit
and where to find a copy of it in your files.
As far as the renewal letter you received from us recently, you'll need someone to determine the GPS coordinates for
your stormwater outfall and enter it into our online database. From our file, it appears you have just one outfall.
Something you could consider is hiring an environmental consulting company to assist you with complying with your
permit. Many industrial facilities use a company to map their outfalls, do their sampling, write their stormwater
pollution prevention plan, and make sure you're keeping up with data reporting requirements. Failing to comply with
your permit can result in enforcement action and civil penalties.
Someone from our Regional Office (Jean Conway or Stan Aiken) may be in touch with you regarding your permit. In the
meantime, you can take a look at the attached General Permit which does apply to this facility. It describes the
analytical monitoring requirements as well as other requirements. One very important thing is that the facility must be
doing quarterly sampling at its outfall after a rain event. The samples must be sent to a laboratory to analyze, then the
results get reported to us.
Julie Ventaloro
Stormwater Permitting Program
NC Division of Energy, Mineral, and Land Resources
1612 Mail Service Center, Raleigh, NC 27699-1612
Phone: (919) 807-6370 Fax: (919) 807-6494
Website: http://watersupr)lvwatershed.nc.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR,
Mrerim Director
September 5, 2018
Hamby Brothers Concrete Inc
Attention: Randall Hamby
Post Office Box 844
Lenoir, North Carolina 28645
Subject: Compliance Evaluation Inspection
Permit: NCG140097
Caldwell, North Carolina
Dear Mr. Hamby:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on August 21., 2018.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincer 1�
Isaiah Reed, PSCI, MS4 (ZECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296.4500
Compliance Inspection Report
Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 Owner : Hamby Brothers Concrete Inc
SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
County: Caldwell 2051 Morganton Blvd SW
Region: Asheville
Lenoir NC 28645
Contact Person: Randall Hamby Title: Phone: 828-754-2176
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08115/2018
Primary Inspector: Isaiah L Reed
Secondary lnspector(s):
Certification:
Phone:
EntryTime: 11:30AM Exit Time: 12:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant ® Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NGG140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Date: 08/1512018 Inspection Type : Compliance Evaluation Reason for visit: Routine
Inspection Summary:
On August 21, 2018 this facility was inspected for compliance. I met with Daniel Tester on site. During the inspection, the
following items were noted:
1) No SWPPP was available on site. Daniel Tester has said that the facility will be having a SWPPP put together and
implemented soon.
2) Secondary containment is required for the add/mix storage area. Daniel Tester says that they will be lookng into the best
way to meet compliance in that area.
3) The area of the site that stormwater is leaving in a concentrated flow is allowing untreated water to leave. The facility is
directed to design and implement stormwater detention and treatment BMPs.
This site will be re -inspected on or after October 16, 2018. If the above items are not addressed, further action will be taken
Please give the above items your immediate attention.
Page: 2
Permit: NCG 140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Sato: 08115/2018 Inspection Type; Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ®❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ®❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
❑ ®❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ EP ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ®❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ a ❑
# Does the facility provide all necessary secondary containment?
❑ ®❑ ❑
# Does the Plan include a BMP summary?
❑ ®❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ 0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ® ❑ ❑
# Does the facility provide and document Employee Training?
❑ ®❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ 12 ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ®❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ®❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ M ❑ ❑
Comment: See summary for more information
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ [A ❑ ❑
Comment: See summarV for more information
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑
Comment: See_summa_ry for more information
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑
# Were all outfalls observed during the inspection? ® ❑ ❑ ❑
# if the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ El El ❑
Comment: See summary for more information
Page: 3
Compliance Inspection Report
Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 - owner: Hamby Brothers Concrete Inc
SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
County: Caldwell 2051 Morganton Blvd SW
Region: Asheville
Lenoir NC 28645
Contact Person: Randall Hamby Title: Phone: 828-754-2176
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/15/2018 EntryTime: 11:30AM Exit Time: 12:30PM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant ® Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCG140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Date: 08/1512018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On August 21, 2018 this facility was inspected for compliance. I met with Daniel Tester on site. During the inspection, the
following items were noted:
1) No SWPPP was available on site. Daniel Tester has said that the facility will be having a SWPPP put together and
implemented soon.
2) Secondary containment is required for the add/mix storage area. Daniel Tester says that they will be lookng into the best
way to meet compliance in that area.
3) The area of the site that stormwater is leaving in a concentrated flow is allowing untreated water to leave. The facility is
directed to design and implement stormwater detention and treatment BMPs.
This site will be re -inspected on or after October 16, 2018. If the above items are not addressed, further action will be taken.
Please give the above items your immediate attention.
Page: 2
Permit: NCG 140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Date: 0811512018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ®❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ®❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ E ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ® ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ®❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ®❑ ❑
# Does the facility provide all necessary secondary containment?
❑ E ❑ ❑
# Does the Plan include a BMP summary?
❑ e ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ®❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ®❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ®❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ®❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ®❑ ❑
Comment: See summary for more information
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑
Comment: See summary for more information
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑
Comment: See summary for more information
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑
# Were all outfalls observed during the inspection? ® ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ®❑ ❑
Comment: See summarV for more information
Page: 3
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
August 15, 2018
Hamby Brothers Concrete
Attention: Randall Hamby
Post Office Box 844
Lenoir, North Carolina 28645
Subject: Compliance Evaluation Inspection
Permit: NCG 140097
Caldwell County, North Carolina
Dear Mr. Hamby:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. VINSON, rR
Interim Director
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at
the -subject facility on August 7, 2018.
The report should be self-explanatory; however, should you have any questions concerning this report,
please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov.
Enclosure: Inspection Report
Sincere y', /
Isaiah Reed, CEPSCI, IS4CECI
Environmental Specialist
Land Quality Section
State of North Carolina I Environmental Quality I Energy, M inera] and Land Resources
2090 US 70 Highway I Swannanoa, NC 28778-82 €1
828 296 4500 T
Compliance Inspection Report
Permit: NCG140097 Effective: 08101/17 Expiration: 06/30/22 Owner : Hamby Brothers Concrete Inc
SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
County: Caldwell 2051 Morganton Blvd SW
Region: Asheville
Lenoir NC 28645
Contact Person: Randall Hamby Title: Phone: B28-754-2176
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/07/2018
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
EntryTime: 04:15PM
Certification:
Exit Time: 05:00PM
Reason for Inspection: Routine Inspection Type:
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant 10 Not Compliant
Question Areas:
M Storm Water
(See attachment summary)
Phone:
Phone: 828-296-4614
Compliance Evaluation
Page: 1
permit: NCG140097 Owner- Facility: Hamby Brothers Concrete Inc
Inspection Date: 08/0712018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On August 7, 2018 this facility was visited to perform an inspected for compliance. I met with Randall Hamby on site. Durin
gthe inspection, the following was noted.
1) A SWPPP could not be produced on site, and Mr. Hamby indicated that none existed to his knowledge, nor had any
monitoring been done.
A follow up inspection will be performed on August 21, 201S. Please have. all documentation required to be in your SWPPP
available, and try to take and send at least one set of samples off for analysis.
If you have any questions, please call 828-296-4614
Page: 2
Permit: NCG140097 Owner -Facility: Hamby BrothersConcrete:nc
Inspection Date: 08/07/2018 Inspection Type : Compliance Evaluation, Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stonnwater Pollution Prevention Plan?
❑ M ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ®❑ ❑
N # Does the Plan include a "Narrative Description of Practices"?
❑ is ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ M ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ M ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ im ❑ ❑
# Does the facility provide all necessary secondary containment?
❑M ❑ ❑
# Does the Plan include a BMP summary?
❑ IN El ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ®❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ®❑ ❑
# does the facility provide and document Employee Training?
❑ ®❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ®❑ ❑
# Is the Plan reviewed and updated annually?
❑ El ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ M ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ®❑ ❑
Comment: See summa for more information
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑
Comment: See summa for more information
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 12 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑
Comment: See summary for more information
Permit and Outfalls
Yes Na NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ®❑ ❑
# Were all outfalls observed during the inspection? ❑ ®❑ ❑
# 1f the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ®❑ ❑
Comment: See summary for more information
Page: 3
Compliance Inspection Repo
Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 Owner : Hamby Brothers Concrete Inc
SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
County: Caldwell 2051 Morganton Blvd SW
Region: Asheville
Lenoir NC 28645
Contact Person: Randall Hamby Title: Phone: 828-754-2176
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Rep rosentative(s):
Related Permits:
Inspection Date: 08/07/2018 Entry Tlme: 04:15PM Exit Time: 05:00PM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page:
Permit: NCG140097 Owner • Facility: Hamby Brothers Concrete Inc
Inspection Date: 08107/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On August 7, 2018 this facility was visited to perform an inspected for compliance. I met with Randall Hamby on site. burin
gthe inspection, the following was noted.
1) A SWPPP could not be produced on site, and Mr. Hamby indicated that none existed to his knowledge, nor had any
monitoring been done.
A follow up inspection will be performed on August 21, 2018. Please have all documentation required to be in your SWPPP
available, and try to take and send at least one set of samples off for analysis.
If you have any questions, please call 828-296-4614
Page: 2
Permit: NCG140097 Owner - Facility: Hamby Brothers Concrete Inc
Inspection Date: 0810712018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
®❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
B ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑
■ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
■ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
B ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
E ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
®❑ ❑
# Does the Plan include a BMP summary?
❑
® ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
M ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
®❑ ❑
# Does the facility provide and document Employee Training?
❑
■ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑
®❑ ❑
# Is the Plan reviewed and updated annually?
❑
®❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
9 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
®❑ ❑
Comment: See summary for more information
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑
Comment: See summary for more information
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑
Comment: See summary for more information
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ® ❑ ❑
# Were all outfalls observed during the inspection? ❑ ®❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ® ❑ ❑
Comment: See summary for more information
Page: 3
lz
Ventaloro, Julie
From: Ventaloro, Julie
Sent: Wed ne May 03, 2017 10:36 AM
To: rng, Melissa (p , ��� a po-i '�'a .
Cc: �`
Subject: FW: NOV to Hamby Concrete - Caldwell co
Hi Melissa,
Linda forwarded me this email string from 2015 regarding NCG140097. I got a call yesterday from this facility (not the
owner -- I think an administrative person). They were asking questions about the renewal letter we sent out to all the
NCG14 facilities. Basically, the person I spoke to didn't know anything about their permit and didn't even know where
to find their permit. It also appears they haven't done any monitoring since 2011, not even after they were issued an
NOV in 2012 by Linda.
Is this facility in your area? If so, is it one you could put on your list of facilities to visit soon? I don't think we need to
spend much more time trying to hold their hands to comply -the owner is aware of what he needs to do. Linda spent a
iot of time going back and forth helping them with their SPPP and other things. Some of those documents are on your
shared drive (which I can't access).
The 2012 NOV would still be in force, I think. Not sure if we would rather issue a new NOV or pick up where we left off
in 2012? Either way, I think this site needs some attention. They had high pH levels based on Linda's readings, and
they're located very close to a receiving water.
Thanks for your help!
Julie Ventaloro
Stormwater Permitting Program
NC Division of Energy, Mineral, and Land Resources
1612 Mail Service Center, Raleigh, NC 27699-1612
Phone: (919) 807-6370 Fax: (919) 807-6494
Website: http://watersuDplvwatershed.nc.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: King, Melissa
Sent: Friday, October 30, 2015 8:12 AM
To: Wiggs, Linda <linda.wiRgs@ncdenr.gov>
Subject: RE: NOV to Hamby Concrete - Caldwell co
Linda
The legislature has been inquiring about NOV's and this is one of the many in the state that they wanted more info on.
Thanks I will check with Raleigh to see if what has been received.
Your help is always great,
Melissa
ESSE QUAM VIOERI
Melissa J. King, PE - Melissa.King(@ncdenr.gov
North Carolina Dept. of Environmental Quality
Asheville Regional Office
Division of Energy, Mineral and Land Resources - Land Quality
2090 U.S. 70 Highway
Swannanoa, NC 28778
Tel: 828-296-4500
Fax: 828-299-7043
Notice: E-mail correspondence to and from this address may be subject to the North Carolina
Public Records Law and therefore may be disclosed to third parties.
From: Wiggs, Linda
Sent: Thursday, October 29, 2015 5:38 PM
To: King, Melissa <Melissa.King@ncdenr.gov>
Subject: RE: NOV to Hamby Concrete - Caldwell co
It did take some brain fog clearing, but I now have some recollection. I did an inspection in 2010 as noted in the file and
BIMs which I played nice with them on even trough they were not compliant. So when I went back in 2012 and they still
were not compliant I issued them a NOV. In the electronic file the "hamby.pfd" is the only sampling document they ever
could produce for me, so again the NOV.
Here is the problem with the follow up, I sent the 2012 NOV in August and took the wastewater position I am currently
in the following month. Therefore, I did not follow up on this facility and if there is nothing in any of the files then
apparently no one did. If Raleigh has not received any data from this site, regardless of whether or not we followed up,
this site remains in violation. I had to do a lot of hand holding with Mr. Hamby and his folks, so once I left if no one
carried that "coddle" then I doubt they have come into compliance on several fronts.
Ask Raleigh if they have received any data from this site (we use to access to a database, but I am not sure if that still
exists), let them know what I said and that ARO will do a follow up inspection soon. I can go with whomever wants to go
to this site since I have a history. Who in Raleigh is asking?
6��
Environmental Senior Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4500 office
828 299 7043 fax
Email: linda.wiggsQncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
Ac-
-::' Nothing Compares—.,,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: King, Melissa
Sent: Thursday, October 29, 2015 10:43 AM -
To: Wiggs, Linda <linda.wi s ncdenr. ov>
Cc: Aiken, Stan E <stan.aiken@ncdenr.gov>
Subject: NOV to Hamby Concrete - Caldwell co
,r
Linda, we got a request from Raleigh to determine if the referenced NOV has been addressed - Has Hamby come into
compliance?
I can't find anything additional in the file to document compliance - Please check your memory O and let me know if
you
know - you did the inspection that resulted in the NOV in 2012. Thanks for any information you have
Melissa
ESSE QUAK VIIIERI
Melissa J. King, PE - Melissa.King(lncdenr.gov
North Carolina Dept. of Environmental Quality
Asheville Regional Office
Division of Energy, Mineral and Land Resources - Land Quality
2090 U.S. 70 Highway
Swannanoa, NC 28778
Tel: 828-296-4500
Fax: 828-299-7043
Notice: E-mail correspondence to and from this address may be subject to the North Carolina
Public Records Law and therefore may be disclosed to third parties.
C]
Ventaloro, Julie
From: Wiggs, Linda
Sent: Tuesday, May 02, 2017 4:25 PM
To: Ventaloro, Julie
Subject: FW: Hamby Brothers Concrete NCG140097
Follow Up Flag: Follow up
Flag Status: Flagged
�O
Environmental Senior Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4500 office
828 299 7043 fax
Email: Iinda.wiggsancdenr.g_ov_
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
�~ Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Aiken, Stan E
Sent: Friday, October 30, 2015 11:21 AM
To: Pickle, Ken <ken.pickle@ncdenr.gov>
Cc: Bennett, Bradley <bradley.bennett@ncdenr.gov>; Alexander, Laura <laura.alexander@ncdenr.gov>; Wiggs, Linda
<linda.wiggs@ncdenr.gov>
Subject: RE: Hamby Brothers Concrete NCG140097
Ken,
Thank you for your help in this matter. We will follow up with the permittee and advise accordingly.
Thank You Again,
Stanley E Aiken
Regional Engineer
Land Quality Section
North Carolina Department of Environmental Quality
828 296-4500 main
828 296-4610 office
1
F- -7
14
stan,aiken(ftedenr.clov
2090 US70 Highway
Swannanoa, NC 28778-8211
C
-:: Nlothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Pickle, Ken
Sent: Friday, October 30, 2015 11:16 AM
To: Aiken, Stan E <stan.aiken@ncdenr.gov>
Cc: Bennett, Bradley <bradley.bennett@ncdenr.eov>; Alexander, Laura <laura.alexander2ncdenr.gov>; Wiggs, Linda
<Iinda.wiggs@ncdenr.eov>
Subject: Hamby Brothers Concrete NCG140097
Hi Stan,
Per your request I've been down to DWR Central Files. Diane Rodman went through what they have. I can report as
follows:
• 2012: inconclusive about whether the permittee turned in DMRs, since the 2012 stuff has been archived off site.
• 2013: other 2013 materials are still on site: No DMRs for NCG140097.
2014: other 2014 materials are still on site: No DMRs for NCG140097.
• 2015: other 2015 materials are still on site: No DMRS for NCG140097 yet in 2015.
My check of BIMS provides no other clues about DMR submittals (not that it necessarily would.)
SPP skeleton working file for NCG140097 does not have any DMRs (not that it necessarily would.)
SPP stacks of incoming and in -process DMRs in Laura's office and Bradley's office do not contain any from
NCG140097. Note: our processing of incoming DMRs is being handled by Bradley and Laura, and neither one is in the
office today. However, l think it's pretty safe to conclude that we have nothing from these folks that might be in process
at the moment.
You reported earlier that despite the 2012 NOV direction to send DMR's into ARO, there are none. We don't have any
either. Whether any were submitted in 2012 is unknown.
Summary: looks like they have sent us nothing in 2013, 2014, and nothing vet in 2015.
Ken
Ken Pickle
Stormwater Program Specialist
NCDENR I DEMLR I Stormwater Permitting Program
1612 Mail Service Center, Raleigh, NC 27699-1612
512 N. Salisbury St, Raleigh, NC 27604
Phone: (919) 807-6376
Fax: (919) 807-6494
Email: ken. pickle@ncdenr.gov
Website: httr)://i)ortal.ncdenr.org/web/Irlstormwater
** Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be
disclosed to third parties unless the content is exempt by statute or other regulations.**
5
Compliance Inspection Report
Permit:NCG14GO97 Effective: 07/01/11 Expiration: 06/30/16 Owner: Hamby Brothers Concrete Inc
SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated
County: Caldwell 2061 Morganton Blvd SW
Region: Asheville
Lenoir N C 28{i45
Contact Person: Randall Hamby Title: Phone: 828-754-2176
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 0712512012 Entry Time 12:OOPM
Primary Inspector: Linda S Wiggs
Secondary Inspectogsj:
Certification: Phone:
Exit Time: 01:40PM
Phone: 828-296-4500 Ext.4653
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Starmwater/Wastewater Discharge COC
Facility Status: [] Compliant N Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page: 1
Permit.. NCG140097 Owner -Facility: Hamby BrothersGancretalnc
inspection pate: 07t25I2012 Inspection Type : Compliance Evaluation Reason for Visit: Routins
Inspection Summary:
Met with Randall Hamby, James Triplett and Mel Skinner. Mel walked the site with me and Crystal took notes to relay to
Jenny Anders in office. Appoximately 1" of rain had fallen that morning.
Sampling data has not been produced for inspector. It could not be found during inspection and a request via email on
8l2112 has not received a response.
The site has comingled stormwater (SW) and wastewater (WW) and should have been performing quarterly sampling. Th
facility will have to institute monthly monitoring for paratmeters listed in Table 7.
pH readings were obtained during the inspection are as follows:
Truck washflow area pH=11.2 s.u,
Bermed Pit pH=11.4 s.u.
Grass pitlswale pH=10.6
pH will likely have to be reduced prior to discharge to meet benchmark. The facility needs to purchase a pH meter. pH
reading are to be obtained immediately; in -situ.
The bermed containment area is along side of the grass swalelpond area. On the day of the inspection the bermed
containment area appeared to be receiving most of the water from the site. Water was flowing through the berm towards'
grass area. It would be better if the berm was properly constructed with a rock weir to allow for a controlled release as
oppose to a funneling through the berm.
Because the area between the facilities treatment area and the receiving stream is overgrown, it was not determined if th,
berm is also directly discharging to the stream. The facility will have to determine this. The berm should not be discharge
into the receiving stream.
Page: 2
Permit: NCG14DO97 Owner -Facility: Hamby Brothers Concrete Inc
Inspection Date: 0712517.012 Inspection Type ; Compliance Evaluation Reason for V sit: Routine
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ■ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ E 110
Comment: Analytical monitoring since Janus 2011 has not been gerformed. Data was not onsite during
inspection and was not produced upon re nest. Monthly monitoring shall be instituted and
submitted to Asheville Regional Office.
Permit and Outfatls Yea No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all eutfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: SW and WW drain to one location. It is unknown where the actual discharge point is located.
The area between where the discharge should be and the receiving water is extremely
overgrown, making it difficult to determine If there is more than one discharge point. Visibility_ to
the creek/discharge location needs to be improved. See summary_.
Qualitative Monitoring Yea No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ e ❑ ❑
Comment: Qualitative reports were not presented for inspection.
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
S ❑ ❑ ❑
# Has the Facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑ 0
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
N ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
e ❑ ❑ ❑
# Does the Facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
Page: 3
Permit: NGG140097 owner-Facility:lfamby Brothers Concreto Inc
Inspection Date: 07/25/2012 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: Facilitv has a SPPP. Not all aspects of this were evaluated durina inspection
Yes No NA NE
SPPP should slate sampling occurs curs quarterly. Site has comingled stormwater (sw) and
wastewater(ww) and Is therefore required to sample quarterly. See summary and NOV for
current requirements.
The SPPP states that James Mel Skinner and James O. Triplett will ensure that all
housekeeping _and _monitoring procedures are implemented.
Page: 4
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
Kerr T. Stevens, Director
RANDALL OR CATHY HAMBY
HAMBY BROTHERS CONCRETE INC.
P.O. BOX 844
LENOIR, NC 28645
Dear Permittee:
1 • •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
July 26, 1999
Subject: Reissue - NPDES Stormwater Permit
Hamby Brothers Concrete Inc.
COC Number NCG140097
Caldwell County
In response to your renewal application for continued coverage under general permit NCG 140000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A copy of general stormwater permit NCG140000
* A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to
certify that you have developed and implemented the SPPP as per the conditions of the permit. This form
must be completed and returned to the Division within 30 days of receipt of this letter.
DO NOT SEND the SPPP with the signed form.
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements,
and addresses frequently asked questions y
* A Certificate of Coverage
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or
decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater
and General Permits Unit at (919) 733-5083, ext. 578
Sincerely.
for Kerr T. Stevens
cc: Central Files
Stormwater and General permits Unit Files
Asheville Regional Office
1617 Mail Service Center, Raleigh, Borth Carolina 27699-1617 Telephone 919-733-5083 Fax 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE No. NCG140097
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended;'
HAMBY BROTHERS CONCRETE INC.
is hereby authorized to operate a process wastewater treatment system, and is hereby authorized to discharge process
wastewater and stormwater from a facility located at
HAMBY BROTHERS CONCRETE INC.
2051 MORGANTON BLVD. SW
LENOIR
CALDWELL COUNTY
to receiving waters designated as Greasy Creek in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, 1II,
IV, V; and VI of General Permit No. NCG140000 as attached.
This certificate of coverage shall become effective August 1, 1999.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed thisday July 26, 1999.
Ley tk'l-
for Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
D,ep6Y`-tment of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
March 31, 1995
Cathy Hamby
Hamby Brothers Concrete, Inc.
131-A Piney Grove Circle
Lenoir, NC 28645
Subject: General Permit No. NCG140000
Hamby Brothers Concrete, Inc.
COC NCG140097
Caldwell County
Dear Cathy Hamby:
In accordance with your application for a stormwater discharge permit received on , we are forwarding
herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This
permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum
of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983.
The stormwater permit you are receiving, NCG 140000, does not permit wasting concrete, dumping excess
concrete, directly into storm sewer outfalls or into waters of the state. Any facility which either dumps excess
concrete or washes excess concrete into storm sewers or waters of the state will be operating in direct violation to
both the terms of this permit and the North Carolina General Statutes. Such a discharge shall be considered an
illegal discharge and may subject the owner to enforcement actions in accordance with North Carolina General
Statutes 143-215.6A
If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to
you, you have the right to request an individual permit by submitting an individual permit application. Unless
such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division of
Environmental Management. The Division of Environmental Management may require modification or revocation
and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area
Management Act or any other Federal or Local governmental permit that may be required.
If you have any question concerning this permit, please contact MS. AISHA LAU at telephone number 919/
733-5083, extension 578.
Sincerely,),y,ina µss>,11ins
Coleen
A. Preston Howard, Jr. P.E.
cc: Asheville Regional Office
Mr. Roosevelt Childress, EPA
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
r
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE _No. NCG140097
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Randall Hamby
is hereby authorized to discharge stormwater from a facility located at
Hamby Brothers Concrete, Inc.
2051 Morganton Blvd. SW
Lenoir
Caldwell County
to receiving waters designated as Greasy Creek in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, I1I
and IV of General Permit No. NCGI40000 as attached.
This Certificate of Coverage shall become effective March 31, 1995.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day March 31, 1995.
Original Signed By
Coieen H. Sullins
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Envirorunental Management Commission
/ • ////////// _ '- _ � -"\ •) ` / 111 . t.
�. ��' ,-� � ��.'' ��� ;, �•. In o��-� ,'} : i r • f~!.
Flat �� •�� • • u .. [//( 14 r�/'�:! 1 . 0`�'-' � ' •"� , �
° -- S '� I `lc--�``- }� N m j " ry: " r� l• r;•� ,• . ' �J - ' i
• o � � -.� �� . `- �' ; ,�_ •'- \� = '- -) A � e towns � � � ' �-� �. � � (�• y .
�%" �.O' .', �s, �; ", I'}~�)i /20Q � r, �� •; �'20� � _ '�' i •y � \�1•' Ce ••.,,
' o°�V �\ _ ' / ? , ��/' I .._ t �I•• ate l i'..._ • s
:L"�I Ir �• '� - 41, �� i- .."
� _ ° � / ', ii � �')� `"\/ ;C ./ '/ -/i� " : rl !•'/: rr"• �1. 1089 _ � \� , ER / ' f• � l�. � � � 1i
✓:-AQ,o, 1 Rock ek • , .'
,
/
1 ��.� _� �'• cIcb
( �1
07.7
xQ0 ,' �i; .� ;i o [i •�LLt O'}�•• t I �• .13� ' � • j! : 14 •'' �/ i,T,_�� rr
`` I./ ° � �i��, `io �n}.,�.� •�' -poi 'ii !' �'-11", �;•'. •' .i /_ .�
1075 �` �_'� o. �'/(: ^'° •.\
1073 � .. -4 ••,•' '%
r � � �� \O %� � � � o '� o.-1 1 � ems. i-- . Q` ��' • '•V
178
`:�1��� -' �o', •\ .!/08 � ) r' ♦�~Me13er. Gih ''�s `,-J / � �' - � ; °-� -�, I
CV J,.,. ."-• Grand View arkfJ� t�-==�,_".. _ ,. `-.a', • —,
257—
.� "/• `--� 11 \� + /090 9_• ?0'
1 � 1 ''O ii� tip' j;.,' oaf' �� V ' � �ll� .."-' -- ` ,._/l'-/ � .' ^'l \ - • .
- Ir
•�t� ,1053 4
I`
.�. � /'�� .Fiis t9} / •�8 1"' �, ,_1,�1! ti Sao �C ��_ ,�(�" (s•-
j
� 18 - �.�,— .. � �� vlai .-Jr,: �� �1i.. ;�? 'f -i •�;. � �.; � 4� .....-.tis�
GAMEW£LL 0.7 M1.447 35', 448 , "I (DREXEL) 450 32'30"
MORGANTON 1 r M1. 4655 1 SE
* 1 SCALE L24000
MN 1 0 1 MILE
ij GN 1000 0 1000 2000 30W 4000 5000 6000 7000 FEET
FACILITY
� ' r
Hamby Brothers Concrete, Inc.
COUNTY
Lenoir
NPDES
NCG140097
MAP#
D12NE
DSN FLOW
NA
SUB BASIN
03-08-31
LATTITUDE
35' 53' 43"
LONGITUDE
810 34' 04"
RECEIVING STREAM
Greasy Creek
STREAM CLASS
C
DISCHARGE CLASS
Stormwater
EXPIRATION DATE
7/31/99
NPDES FACILITY AND PERMIT DATA 03/20/98 13:53:33
UPDATE OPTION TRXID 5NU KEY NCG140097
PERSONAL DATA FACILITY APPLYING FOR PERMIT REGON
FACILITY NAME> HAMBY BROTHERS CONCRETE,INC. COUNTY> CALDWELL 01
ADDRESS: MAILING (REQUIRED) LOCATION (REQUIRED)
STREET: P.O. BOX 844 STREET: P.O. BOX 844
CITY: LENOIR ST NC ZIP 28645 CITY: LENOIR ST NC ZIP 28645
TELEPHONE 704 758 9995 DATE FEE PAID: 11/28/94 AMOUNT: 400.00
STATE CONTACT> LAU PERSON IN CHARGE CATHY HAMBY
1=PROPOSED,2=EXIST,3=CLOSED 1 1=MAJOR,2=MINOR 2 1=MUN,2=NON-MUN 2
LAT: 3553430 LONG: 08134040 N=NEW,M=MODIFICATION,R=REISSUE> N
DATE APP RCVD 1 1128/94 WASTELOAD REQS
DATE STAFF REP REQS 12/27/94 WASTELOAD RCVD
DATE STAFF REP RCVD 01/19/95 SCHTO ISSUE 03/31 /95
DATE TO P NOTICE 1 I DATE DRAFT PREPARED 03/24/95
DATE OT AG COM REQS 1 1 DATE DENIED 1 1
DATE OT AG COM RCVD 1 1 DATE RETURNED I 1
DATE TO EPA 1 I DATE ISSUED 03/31 /95 ASSIGN/CHANGE PERMIT
DATE FROM EPA / / EXPIRATION DATE 07/31/99
FEE CODE( 0 ) 1=(>10MGD),2=(>1MGD),3=(>O.lMGD),4=(<0.1MGD),5=SF,6=(GP25,64,79),
7=(GP49,73)8=(GP76)9=(GP13,34,30,52)0=(NOFEE) DIS/C 73 CONBILL ( }
COMMENTS:. DRAFT.REPREPARED TO ACCOMODATE SPECIAL COVER LETTER
MESSAGE: *** ENTER DATA FOR UPDATE ***