Loading...
HomeMy WebLinkAboutNCG140097_COMPLETE FILE - HISTORICAL_20181205STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. Iv L& 140a°t DOC TYPE ❑ HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYM M DD STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE 49 HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ Aol S D18 0`7 YYYYM M DD ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSCIN, JR. interim Director December 5,,2018 Hamby Brothers Concrete Inc Attention: Randall Hamby Post Office Box-844 Lenoir, North Carolina 28645 Subject: Compliance Evaluation Inspection Permit: NCG140097 Caldwell, North Carolina Dear Mr. Hamby, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on November 20, 2018. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4S00 or by email at Isaiah.reed@ncdenr.gov. Enclosure: Inspection Report Sincer. , Isaiah Reed, CLPSCI, MS4CI; r'l Environmental Specialist Land Quality Section : Q EQ . PnPatunl of rnrlmr.nen4ldu�\ /-` North Carolina Department of Environmental Quality Divlslon of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carohna 28778 828.296.4500 f Compliance Inspection Report I Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 owner: Hamby Brothers Concrete Inc SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated County: Caldwell 2051 Morganton E31vd SW Region: Asheville Lenoir NC 28645 3 Contact Person: Randall Hamby Title: Phone: 828-754-2176 Directions to Facility: System Classifications: l Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/20/2018 EntryTime: D2:00PM Exit Time: 03:ODPM Primary Inspector: Isaiah L Reed Phone: 828-296.4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete StormwaterlWastewater Discharge COC Facility Status: Compliant Not Compliant Question Areas: U Storm Water (See attachment summary) Page: 1 Permit: NCG140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Date: 1112012018 inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On November 20, 2018 this facility was inspected concerning a newly assembled SWPPP. I met with Ben Lail on site. During the inspection, the following items were noted; 1) The SWPPP could use some elaboration in some areas, but the essential elements are there. 2) The site map was Inaccurate with respect to the stormwater basins at the rear of the facility. The map will be revised to accurately reflect the conditions on site. 3) Secondary containment has been constructed around the add/mix tanks. 4) Some off -site deposition was noted next to the larger basin. The permittee Is directed to evaluate and correct the indutrial process in that area to eliminate the potential for waste concrete buildup outside of the constructed stormwater control measures. If you have any questions, please contact this office at (828) 296-4614 - — -- --- - - � - -- - - - --- - -Page: 2-- lob, Permit: NCG140097 Owner - Faclllty:Hamby Brothers Concrete Inc Inspection Date: 11120/2018 Inspection Type : Compliance Evaluation Roason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan Include a "Narrative Description of Practices'? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? E ❑ ❑ ❑ = # Does the Plan -include a list of significant spills occurring during the past 3 years? i ® ❑ ❑ ❑ j # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a BMP summary? E ❑ ❑ ❑ i # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ®❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical_ Monitoring Ycs No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ■ Comment: Permlt and butfalls Yes No NA IlE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ ■ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page: 3 Permit: NCG140097 SOC: County: Caldwell Region: Asheville Compliance Inspection Report Effective: 08/01/17 Expiration: 06/30/22 Owner: Hamby Brothers Concrete Inc Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated 2051 Morganton Blvd SW Contact Person: Randall Hamby Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/20/2018 Entry Time: 02:00PM Primary Inspector: Isaiah L Reed Secondary Inspector(s): Lenoir NC 28645 Phone: 828-754-2176 Certification: Phone: Exit Time: 03:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ® Compliant ❑ Not Compliant Question Areas: Storm Water {See attachment summary} Page: 1 Permit: NGG140097 Owner -Facility: Hamby Brothers Concrete Inc Inspection Date: 11/2012018 Inspection Typo : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On November 20, 2018 this facility was inspected concerning a newly assembled SWPPP. I met with Ben Lail on site. During the inspection, the following items were noted: 1) The SWPPP could use some elaboration in some areas, but the essential elements are there. 2) The site map was inaccurate with respect to the stormwater basins at the rear of the facility. The map will be revised to accurately reflect the conditions on site. 3) Secondary containment has been constructed around the add/mix tanks. 4) Some off -site deposition was noted next to the larger basin. The permittee is directed to evaluate and correct the indutrial process in that area to eliminate the potential for waste concrete buildup outside of the constructed stormwater control measures. If you have any questions, please contact this office at (828) 296-4614 Page: 2 Permit: NGG140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Date: 1112012018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a BMP summary? ® ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ® ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes Na NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ 19 # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page: 3 Ventaloro, Julie From: Ventaloro, Julie Sent: Wednesday, May 03, 2017 12:29 PM To: 'hambybrothers@att.net' Cc: Conway, Jean Subject: NCG140097 NPDES Stormwater permit Attachments: NCG14 Permit Print Package 2016.pdf Sharon, I checked our files, but I couldn't find am a p of the facility showing the outfall. I did talk to someone in our Asheville Regional Office. In 2012, she issued a Notice of Violation to Hamby Brothers for failing to do the required analytical monitoring as well as failing to comply with other aspects of the facility's stormwater permit. At that time, she was working with Betty Smith and Randall Hamby. Mr. Hamby should understand what needs to be done with your permit and where to find a copy of it in your files. As far as the renewal letter you received from us recently, you'll need someone to determine the GPS coordinates for your stormwater outfall and enter it into our online database. From our file, it appears you have just one outfall. Something you could consider is hiring an environmental consulting company to assist you with complying with your permit. Many industrial facilities use a company to map their outfalls, do their sampling, write their stormwater pollution prevention plan, and make sure you're keeping up with data reporting requirements. Failing to comply with your permit can result in enforcement action and civil penalties. Someone from our Regional Office (Jean Conway or Stan Aiken) may be in touch with you regarding your permit. In the meantime, you can take a look at the attached General Permit which does apply to this facility. It describes the analytical monitoring requirements as well as other requirements. One very important thing is that the facility must be doing quarterly sampling at its outfall after a rain event. The samples must be sent to a laboratory to analyze, then the results get reported to us. Julie Ventaloro Stormwater Permitting Program NC Division of Energy, Mineral, and Land Resources 1612 Mail Service Center, Raleigh, NC 27699-1612 Phone: (919) 807-6370 Fax: (919) 807-6494 Website: http://watersupr)lvwatershed.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR, Mrerim Director September 5, 2018 Hamby Brothers Concrete Inc Attention: Randall Hamby Post Office Box 844 Lenoir, North Carolina 28645 Subject: Compliance Evaluation Inspection Permit: NCG140097 Caldwell, North Carolina Dear Mr. Hamby: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 21., 2018. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer 1� Isaiah Reed, PSCI, MS4 (ZECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Compliance Inspection Report Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 Owner : Hamby Brothers Concrete Inc SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated County: Caldwell 2051 Morganton Blvd SW Region: Asheville Lenoir NC 28645 Contact Person: Randall Hamby Title: Phone: 828-754-2176 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08115/2018 Primary Inspector: Isaiah L Reed Secondary lnspector(s): Certification: Phone: EntryTime: 11:30AM Exit Time: 12:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NGG140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Date: 08/1512018 Inspection Type : Compliance Evaluation Reason for visit: Routine Inspection Summary: On August 21, 2018 this facility was inspected for compliance. I met with Daniel Tester on site. During the inspection, the following items were noted: 1) No SWPPP was available on site. Daniel Tester has said that the facility will be having a SWPPP put together and implemented soon. 2) Secondary containment is required for the add/mix storage area. Daniel Tester says that they will be lookng into the best way to meet compliance in that area. 3) The area of the site that stormwater is leaving in a concentrated flow is allowing untreated water to leave. The facility is directed to design and implement stormwater detention and treatment BMPs. This site will be re -inspected on or after October 16, 2018. If the above items are not addressed, further action will be taken Please give the above items your immediate attention. Page: 2 Permit: NCG 140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Sato: 08115/2018 Inspection Type; Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ®❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ®❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑ ®❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ EP ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ®❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ a ❑ # Does the facility provide all necessary secondary containment? ❑ ®❑ ❑ # Does the Plan include a BMP summary? ❑ ®❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ® ❑ ❑ # Does the facility provide and document Employee Training? ❑ ®❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 12 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ®❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ®❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ M ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ [A ❑ ❑ Comment: See summarV for more information Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: See_summa_ry for more information Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # if the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ El El ❑ Comment: See summary for more information Page: 3 Compliance Inspection Report Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 - owner: Hamby Brothers Concrete Inc SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated County: Caldwell 2051 Morganton Blvd SW Region: Asheville Lenoir NC 28645 Contact Person: Randall Hamby Title: Phone: 828-754-2176 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/15/2018 EntryTime: 11:30AM Exit Time: 12:30PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant ® Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Date: 08/1512018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 21, 2018 this facility was inspected for compliance. I met with Daniel Tester on site. During the inspection, the following items were noted: 1) No SWPPP was available on site. Daniel Tester has said that the facility will be having a SWPPP put together and implemented soon. 2) Secondary containment is required for the add/mix storage area. Daniel Tester says that they will be lookng into the best way to meet compliance in that area. 3) The area of the site that stormwater is leaving in a concentrated flow is allowing untreated water to leave. The facility is directed to design and implement stormwater detention and treatment BMPs. This site will be re -inspected on or after October 16, 2018. If the above items are not addressed, further action will be taken. Please give the above items your immediate attention. Page: 2 Permit: NCG 140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Date: 0811512018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ®❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ®❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ E ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ® ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ®❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ®❑ ❑ # Does the facility provide all necessary secondary containment? ❑ E ❑ ❑ # Does the Plan include a BMP summary? ❑ e ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ®❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ®❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ®❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ®❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ®❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: See summary for more information Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: See summary for more information Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ®❑ ❑ Comment: See summarV for more information Page: 3 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY August 15, 2018 Hamby Brothers Concrete Attention: Randall Hamby Post Office Box 844 Lenoir, North Carolina 28645 Subject: Compliance Evaluation Inspection Permit: NCG 140097 Caldwell County, North Carolina Dear Mr. Hamby: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. VINSON, rR Interim Director Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the -subject facility on August 7, 2018. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Enclosure: Inspection Report Sincere y', / Isaiah Reed, CEPSCI, IS4CECI Environmental Specialist Land Quality Section State of North Carolina I Environmental Quality I Energy, M inera] and Land Resources 2090 US 70 Highway I Swannanoa, NC 28778-82 €1 828 296 4500 T Compliance Inspection Report Permit: NCG140097 Effective: 08101/17 Expiration: 06/30/22 Owner : Hamby Brothers Concrete Inc SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated County: Caldwell 2051 Morganton Blvd SW Region: Asheville Lenoir NC 28645 Contact Person: Randall Hamby Title: Phone: B28-754-2176 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/07/2018 Primary Inspector: Isaiah L Reed Secondary Inspector(s): EntryTime: 04:15PM Certification: Exit Time: 05:00PM Reason for Inspection: Routine Inspection Type: Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant 10 Not Compliant Question Areas: M Storm Water (See attachment summary) Phone: Phone: 828-296-4614 Compliance Evaluation Page: 1 permit: NCG140097 Owner- Facility: Hamby Brothers Concrete Inc Inspection Date: 08/0712018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 7, 2018 this facility was visited to perform an inspected for compliance. I met with Randall Hamby on site. Durin gthe inspection, the following was noted. 1) A SWPPP could not be produced on site, and Mr. Hamby indicated that none existed to his knowledge, nor had any monitoring been done. A follow up inspection will be performed on August 21, 201S. Please have. all documentation required to be in your SWPPP available, and try to take and send at least one set of samples off for analysis. If you have any questions, please call 828-296-4614 Page: 2 Permit: NCG140097 Owner -Facility: Hamby BrothersConcrete:nc Inspection Date: 08/07/2018 Inspection Type : Compliance Evaluation, Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stonnwater Pollution Prevention Plan? ❑ M ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ®❑ ❑ N # Does the Plan include a "Narrative Description of Practices"? ❑ is ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ M ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ M ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ im ❑ ❑ # Does the facility provide all necessary secondary containment? ❑M ❑ ❑ # Does the Plan include a BMP summary? ❑ IN El ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ®❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ®❑ ❑ # does the facility provide and document Employee Training? ❑ ®❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ®❑ ❑ # Is the Plan reviewed and updated annually? ❑ El ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ M ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ®❑ ❑ Comment: See summa for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑ Comment: See summa for more information Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 12 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: See summary for more information Permit and Outfalls Yes Na NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ®❑ ❑ # Were all outfalls observed during the inspection? ❑ ®❑ ❑ # 1f the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ®❑ ❑ Comment: See summary for more information Page: 3 Compliance Inspection Repo Permit: NCG140097 Effective: 08/01/17 Expiration: 06/30/22 Owner : Hamby Brothers Concrete Inc SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated County: Caldwell 2051 Morganton Blvd SW Region: Asheville Lenoir NC 28645 Contact Person: Randall Hamby Title: Phone: 828-754-2176 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Rep rosentative(s): Related Permits: Inspection Date: 08/07/2018 Entry Tlme: 04:15PM Exit Time: 05:00PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: Permit: NCG140097 Owner • Facility: Hamby Brothers Concrete Inc Inspection Date: 08107/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 7, 2018 this facility was visited to perform an inspected for compliance. I met with Randall Hamby on site. burin gthe inspection, the following was noted. 1) A SWPPP could not be produced on site, and Mr. Hamby indicated that none existed to his knowledge, nor had any monitoring been done. A follow up inspection will be performed on August 21, 2018. Please have all documentation required to be in your SWPPP available, and try to take and send at least one set of samples off for analysis. If you have any questions, please call 828-296-4614 Page: 2 Permit: NCG140097 Owner - Facility: Hamby Brothers Concrete Inc Inspection Date: 0810712018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ®❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ B ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ■ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ■ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ B ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ E ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ®❑ ❑ # Does the Plan include a BMP summary? ❑ ® ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ M ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ®❑ ❑ # Does the facility provide and document Employee Training? ❑ ■ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ®❑ ❑ # Is the Plan reviewed and updated annually? ❑ ®❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 9 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ®❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ®❑ ❑ Comment: See summary for more information Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ®❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: See summary for more information Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ® ❑ ❑ # Were all outfalls observed during the inspection? ❑ ®❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ® ❑ ❑ Comment: See summary for more information Page: 3 lz Ventaloro, Julie From: Ventaloro, Julie Sent: Wed ne May 03, 2017 10:36 AM To: rng, Melissa (p , ��� a po-i '�'a . Cc: �` Subject: FW: NOV to Hamby Concrete - Caldwell co Hi Melissa, Linda forwarded me this email string from 2015 regarding NCG140097. I got a call yesterday from this facility (not the owner -- I think an administrative person). They were asking questions about the renewal letter we sent out to all the NCG14 facilities. Basically, the person I spoke to didn't know anything about their permit and didn't even know where to find their permit. It also appears they haven't done any monitoring since 2011, not even after they were issued an NOV in 2012 by Linda. Is this facility in your area? If so, is it one you could put on your list of facilities to visit soon? I don't think we need to spend much more time trying to hold their hands to comply -the owner is aware of what he needs to do. Linda spent a iot of time going back and forth helping them with their SPPP and other things. Some of those documents are on your shared drive (which I can't access). The 2012 NOV would still be in force, I think. Not sure if we would rather issue a new NOV or pick up where we left off in 2012? Either way, I think this site needs some attention. They had high pH levels based on Linda's readings, and they're located very close to a receiving water. Thanks for your help! Julie Ventaloro Stormwater Permitting Program NC Division of Energy, Mineral, and Land Resources 1612 Mail Service Center, Raleigh, NC 27699-1612 Phone: (919) 807-6370 Fax: (919) 807-6494 Website: http://watersuDplvwatershed.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: King, Melissa Sent: Friday, October 30, 2015 8:12 AM To: Wiggs, Linda <linda.wiRgs@ncdenr.gov> Subject: RE: NOV to Hamby Concrete - Caldwell co Linda The legislature has been inquiring about NOV's and this is one of the many in the state that they wanted more info on. Thanks I will check with Raleigh to see if what has been received. Your help is always great, Melissa ESSE QUAM VIOERI Melissa J. King, PE - Melissa.King(@ncdenr.gov North Carolina Dept. of Environmental Quality Asheville Regional Office Division of Energy, Mineral and Land Resources - Land Quality 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. From: Wiggs, Linda Sent: Thursday, October 29, 2015 5:38 PM To: King, Melissa <Melissa.King@ncdenr.gov> Subject: RE: NOV to Hamby Concrete - Caldwell co It did take some brain fog clearing, but I now have some recollection. I did an inspection in 2010 as noted in the file and BIMs which I played nice with them on even trough they were not compliant. So when I went back in 2012 and they still were not compliant I issued them a NOV. In the electronic file the "hamby.pfd" is the only sampling document they ever could produce for me, so again the NOV. Here is the problem with the follow up, I sent the 2012 NOV in August and took the wastewater position I am currently in the following month. Therefore, I did not follow up on this facility and if there is nothing in any of the files then apparently no one did. If Raleigh has not received any data from this site, regardless of whether or not we followed up, this site remains in violation. I had to do a lot of hand holding with Mr. Hamby and his folks, so once I left if no one carried that "coddle" then I doubt they have come into compliance on several fronts. Ask Raleigh if they have received any data from this site (we use to access to a database, but I am not sure if that still exists), let them know what I said and that ARO will do a follow up inspection soon. I can go with whomever wants to go to this site since I have a history. Who in Raleigh is asking? 6�� Environmental Senior Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4500 office 828 299 7043 fax Email: linda.wiggsQncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Ac- -::' Nothing Compares—.,, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: King, Melissa Sent: Thursday, October 29, 2015 10:43 AM - To: Wiggs, Linda <linda.wi s ncdenr. ov> Cc: Aiken, Stan E <stan.aiken@ncdenr.gov> Subject: NOV to Hamby Concrete - Caldwell co ,r Linda, we got a request from Raleigh to determine if the referenced NOV has been addressed - Has Hamby come into compliance? I can't find anything additional in the file to document compliance - Please check your memory O and let me know if you know - you did the inspection that resulted in the NOV in 2012. Thanks for any information you have Melissa ESSE QUAK VIIIERI Melissa J. King, PE - Melissa.King(lncdenr.gov North Carolina Dept. of Environmental Quality Asheville Regional Office Division of Energy, Mineral and Land Resources - Land Quality 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. C] Ventaloro, Julie From: Wiggs, Linda Sent: Tuesday, May 02, 2017 4:25 PM To: Ventaloro, Julie Subject: FW: Hamby Brothers Concrete NCG140097 Follow Up Flag: Follow up Flag Status: Flagged �O Environmental Senior Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4500 office 828 299 7043 fax Email: Iinda.wiggsancdenr.g_ov_ 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 �~ Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Aiken, Stan E Sent: Friday, October 30, 2015 11:21 AM To: Pickle, Ken <ken.pickle@ncdenr.gov> Cc: Bennett, Bradley <bradley.bennett@ncdenr.gov>; Alexander, Laura <laura.alexander@ncdenr.gov>; Wiggs, Linda <linda.wiggs@ncdenr.gov> Subject: RE: Hamby Brothers Concrete NCG140097 Ken, Thank you for your help in this matter. We will follow up with the permittee and advise accordingly. Thank You Again, Stanley E Aiken Regional Engineer Land Quality Section North Carolina Department of Environmental Quality 828 296-4500 main 828 296-4610 office 1 F- -7 14 stan,aiken(ftedenr.clov 2090 US70 Highway Swannanoa, NC 28778-8211 C -:: Nlothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pickle, Ken Sent: Friday, October 30, 2015 11:16 AM To: Aiken, Stan E <stan.aiken@ncdenr.gov> Cc: Bennett, Bradley <bradley.bennett@ncdenr.eov>; Alexander, Laura <laura.alexander2ncdenr.gov>; Wiggs, Linda <Iinda.wiggs@ncdenr.eov> Subject: Hamby Brothers Concrete NCG140097 Hi Stan, Per your request I've been down to DWR Central Files. Diane Rodman went through what they have. I can report as follows: • 2012: inconclusive about whether the permittee turned in DMRs, since the 2012 stuff has been archived off site. • 2013: other 2013 materials are still on site: No DMRs for NCG140097. 2014: other 2014 materials are still on site: No DMRs for NCG140097. • 2015: other 2015 materials are still on site: No DMRS for NCG140097 yet in 2015. My check of BIMS provides no other clues about DMR submittals (not that it necessarily would.) SPP skeleton working file for NCG140097 does not have any DMRs (not that it necessarily would.) SPP stacks of incoming and in -process DMRs in Laura's office and Bradley's office do not contain any from NCG140097. Note: our processing of incoming DMRs is being handled by Bradley and Laura, and neither one is in the office today. However, l think it's pretty safe to conclude that we have nothing from these folks that might be in process at the moment. You reported earlier that despite the 2012 NOV direction to send DMR's into ARO, there are none. We don't have any either. Whether any were submitted in 2012 is unknown. Summary: looks like they have sent us nothing in 2013, 2014, and nothing vet in 2015. Ken Ken Pickle Stormwater Program Specialist NCDENR I DEMLR I Stormwater Permitting Program 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 807-6376 Fax: (919) 807-6494 Email: ken. pickle@ncdenr.gov Website: httr)://i)ortal.ncdenr.org/web/Irlstormwater ** Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties unless the content is exempt by statute or other regulations.** 5 Compliance Inspection Report Permit:NCG14GO97 Effective: 07/01/11 Expiration: 06/30/16 Owner: Hamby Brothers Concrete Inc SOC: Effective: Expiration: Facility: Hamby Brothers Concrete Incorporated County: Caldwell 2061 Morganton Blvd SW Region: Asheville Lenoir N C 28{i45 Contact Person: Randall Hamby Title: Phone: 828-754-2176 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 0712512012 Entry Time 12:OOPM Primary Inspector: Linda S Wiggs Secondary Inspectogsj: Certification: Phone: Exit Time: 01:40PM Phone: 828-296-4500 Ext.4653 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Starmwater/Wastewater Discharge COC Facility Status: [] Compliant N Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit.. NCG140097 Owner -Facility: Hamby BrothersGancretalnc inspection pate: 07t25I2012 Inspection Type : Compliance Evaluation Reason for Visit: Routins Inspection Summary: Met with Randall Hamby, James Triplett and Mel Skinner. Mel walked the site with me and Crystal took notes to relay to Jenny Anders in office. Appoximately 1" of rain had fallen that morning. Sampling data has not been produced for inspector. It could not be found during inspection and a request via email on 8l2112 has not received a response. The site has comingled stormwater (SW) and wastewater (WW) and should have been performing quarterly sampling. Th facility will have to institute monthly monitoring for paratmeters listed in Table 7. pH readings were obtained during the inspection are as follows: Truck washflow area pH=11.2 s.u, Bermed Pit pH=11.4 s.u. Grass pitlswale pH=10.6 pH will likely have to be reduced prior to discharge to meet benchmark. The facility needs to purchase a pH meter. pH reading are to be obtained immediately; in -situ. The bermed containment area is along side of the grass swalelpond area. On the day of the inspection the bermed containment area appeared to be receiving most of the water from the site. Water was flowing through the berm towards' grass area. It would be better if the berm was properly constructed with a rock weir to allow for a controlled release as oppose to a funneling through the berm. Because the area between the facilities treatment area and the receiving stream is overgrown, it was not determined if th, berm is also directly discharging to the stream. The facility will have to determine this. The berm should not be discharge into the receiving stream. Page: 2 Permit: NCG14DO97 Owner -Facility: Hamby Brothers Concrete Inc Inspection Date: 0712517.012 Inspection Type ; Compliance Evaluation Reason for V sit: Routine Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ■ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ E 110 Comment: Analytical monitoring since Janus 2011 has not been gerformed. Data was not onsite during inspection and was not produced upon re nest. Monthly monitoring shall be instituted and submitted to Asheville Regional Office. Permit and Outfatls Yea No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all eutfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: SW and WW drain to one location. It is unknown where the actual discharge point is located. The area between where the discharge should be and the receiving water is extremely overgrown, making it difficult to determine If there is more than one discharge point. Visibility_ to the creek/discharge location needs to be improved. See summary_. Qualitative Monitoring Yea No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ e ❑ ❑ Comment: Qualitative reports were not presented for inspection. Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? S ❑ ❑ ❑ # Has the Facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ 0 # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? e ❑ ❑ ❑ # Does the Facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ Page: 3 Permit: NGG140097 owner-Facility:lfamby Brothers Concreto Inc Inspection Date: 07/25/2012 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Facilitv has a SPPP. Not all aspects of this were evaluated durina inspection Yes No NA NE SPPP should slate sampling occurs curs quarterly. Site has comingled stormwater (sw) and wastewater(ww) and Is therefore required to sample quarterly. See summary and NOV for current requirements. The SPPP states that James Mel Skinner and James O. Triplett will ensure that all housekeeping _and _monitoring procedures are implemented. Page: 4 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director RANDALL OR CATHY HAMBY HAMBY BROTHERS CONCRETE INC. P.O. BOX 844 LENOIR, NC 28645 Dear Permittee: 1 • • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES July 26, 1999 Subject: Reissue - NPDES Stormwater Permit Hamby Brothers Concrete Inc. COC Number NCG140097 Caldwell County In response to your renewal application for continued coverage under general permit NCG 140000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A copy of general stormwater permit NCG140000 * A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to certify that you have developed and implemented the SPPP as per the conditions of the permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT SEND the SPPP with the signed form. * Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form * A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements, and addresses frequently asked questions y * A Certificate of Coverage Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 578 Sincerely. for Kerr T. Stevens cc: Central Files Stormwater and General permits Unit Files Asheville Regional Office 1617 Mail Service Center, Raleigh, Borth Carolina 27699-1617 Telephone 919-733-5083 Fax 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140097 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended;' HAMBY BROTHERS CONCRETE INC. is hereby authorized to operate a process wastewater treatment system, and is hereby authorized to discharge process wastewater and stormwater from a facility located at HAMBY BROTHERS CONCRETE INC. 2051 MORGANTON BLVD. SW LENOIR CALDWELL COUNTY to receiving waters designated as Greasy Creek in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, 1II, IV, V; and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective August 1, 1999. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed thisday July 26, 1999. Ley tk'l- for Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina D,ep6Y`-tment of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director March 31, 1995 Cathy Hamby Hamby Brothers Concrete, Inc. 131-A Piney Grove Circle Lenoir, NC 28645 Subject: General Permit No. NCG140000 Hamby Brothers Concrete, Inc. COC NCG140097 Caldwell County Dear Cathy Hamby: In accordance with your application for a stormwater discharge permit received on , we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. The stormwater permit you are receiving, NCG 140000, does not permit wasting concrete, dumping excess concrete, directly into storm sewer outfalls or into waters of the state. Any facility which either dumps excess concrete or washes excess concrete into storm sewers or waters of the state will be operating in direct violation to both the terms of this permit and the North Carolina General Statutes. Such a discharge shall be considered an illegal discharge and may subject the owner to enforcement actions in accordance with North Carolina General Statutes 143-215.6A If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any question concerning this permit, please contact MS. AISHA LAU at telephone number 919/ 733-5083, extension 578. Sincerely,),y,ina µss>,11ins Coleen A. Preston Howard, Jr. P.E. cc: Asheville Regional Office Mr. Roosevelt Childress, EPA P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper r STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE _No. NCG140097 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Randall Hamby is hereby authorized to discharge stormwater from a facility located at Hamby Brothers Concrete, Inc. 2051 Morganton Blvd. SW Lenoir Caldwell County to receiving waters designated as Greasy Creek in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, I1I and IV of General Permit No. NCGI40000 as attached. This Certificate of Coverage shall become effective March 31, 1995. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day March 31, 1995. Original Signed By Coieen H. Sullins A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Envirorunental Management Commission / • ////////// _ '- _ � -"\ •) ` / 111 . t. �. ��' ,-� � ��.'' ��� ;, �•. In o��-� ,'} : i r • f~!. Flat �� •�� • • u .. [//( 14 r�/'�:! 1 . 0`�'-' � ' •"� , � ° -- S '� I `lc--�``- }� N m j " ry: " r� l• r;•� ,• . ' �J - ' i • o � � -.� �� . `- �' ; ,�_ •'- \� = '- -) A � e towns � � � ' �-� �. � � (�• y . �%" �.O' .', �s, �; ", I'}~�)i /20Q � r, �� •; �'20� � _ '�' i •y � \�1•' Ce ••.,, ' o°�V �\ _ ' / ? , ��/' I .._ t �I•• ate l i'..._ • s :L"�I Ir �• '� - 41, �� i- .." � _ ° � / ', ii � �')� `"\/ ;C ./ '/ -/i� " : rl !•'/: rr"• �1. 1089 _ � \� , ER / ' f• � l�. � � � 1i ✓:-AQ,o, 1 Rock ek • , .' , / 1 ��.� _� �'• cIcb ( �1 07.7 xQ0 ,' �i; .� ;i o [i •�LLt O'}�•• t I �• .13� ' � • j! : 14 •'' �/ i,T,_�� rr `` I./ ° � �i��, `io �n}.,�.� •�' -poi 'ii !' �'-11", �;•'. •' .i /_ .� 1075 �` �_'� o. �'/(: ^'° •.\ 1073 � .. -4 ••,•' '% r � � �� \O %� � � � o '� o.-1 1 � ems. i-- . Q` ��' • '•V 178 `:�1��� -' �o', •\ .!/08 � ) r' ♦�~Me13er. Gih ''�s `,-J / � �' - � ; °-� -�, I CV J,.,. ."-• Grand View arkfJ� t�-==�,_".. _ ,. `-.a', • —, 257— .� "/• `--� 11 \� + /090 9_• ?0' 1 � 1 ''O ii� tip' j;.,' oaf' �� V ' � �ll� .."-' -- ` ,._/l'-/ � .' ^'l \ - • . - Ir •�t� ,1053 4 I` .�. � /'�� .Fiis t9} / •�8 1"' �, ,_1,�1! ti Sao �C ��_ ,�(�" (s•- j � 18 - �.�,— .. � �� vlai .-Jr,: �� �1i.. ;�? 'f -i •�;. � �.; � 4� .....-.tis� GAMEW£LL 0.7 M1.447 35', 448 , "I (DREXEL) 450 32'30" MORGANTON 1 r M1. 4655 1 SE * 1 SCALE L24000 MN 1 0 1 MILE ij GN 1000 0 1000 2000 30W 4000 5000 6000 7000 FEET FACILITY � ' r Hamby Brothers Concrete, Inc. COUNTY Lenoir NPDES NCG140097 MAP# D12NE DSN FLOW NA SUB BASIN 03-08-31 LATTITUDE 35' 53' 43" LONGITUDE 810 34' 04" RECEIVING STREAM Greasy Creek STREAM CLASS C DISCHARGE CLASS Stormwater EXPIRATION DATE 7/31/99 NPDES FACILITY AND PERMIT DATA 03/20/98 13:53:33 UPDATE OPTION TRXID 5NU KEY NCG140097 PERSONAL DATA FACILITY APPLYING FOR PERMIT REGON FACILITY NAME> HAMBY BROTHERS CONCRETE,INC. COUNTY> CALDWELL 01 ADDRESS: MAILING (REQUIRED) LOCATION (REQUIRED) STREET: P.O. BOX 844 STREET: P.O. BOX 844 CITY: LENOIR ST NC ZIP 28645 CITY: LENOIR ST NC ZIP 28645 TELEPHONE 704 758 9995 DATE FEE PAID: 11/28/94 AMOUNT: 400.00 STATE CONTACT> LAU PERSON IN CHARGE CATHY HAMBY 1=PROPOSED,2=EXIST,3=CLOSED 1 1=MAJOR,2=MINOR 2 1=MUN,2=NON-MUN 2 LAT: 3553430 LONG: 08134040 N=NEW,M=MODIFICATION,R=REISSUE> N DATE APP RCVD 1 1128/94 WASTELOAD REQS DATE STAFF REP REQS 12/27/94 WASTELOAD RCVD DATE STAFF REP RCVD 01/19/95 SCHTO ISSUE 03/31 /95 DATE TO P NOTICE 1 I DATE DRAFT PREPARED 03/24/95 DATE OT AG COM REQS 1 1 DATE DENIED 1 1 DATE OT AG COM RCVD 1 1 DATE RETURNED I 1 DATE TO EPA 1 I DATE ISSUED 03/31 /95 ASSIGN/CHANGE PERMIT DATE FROM EPA / / EXPIRATION DATE 07/31/99 FEE CODE( 0 ) 1=(>10MGD),2=(>1MGD),3=(>O.lMGD),4=(<0.1MGD),5=SF,6=(GP25,64,79), 7=(GP49,73)8=(GP76)9=(GP13,34,30,52)0=(NOFEE) DIS/C 73 CONBILL ( } COMMENTS:. DRAFT.REPREPARED TO ACCOMODATE SPECIAL COVER LETTER MESSAGE: *** ENTER DATA FOR UPDATE ***