Loading...
HomeMy WebLinkAboutNCG140066_MONITORING INFO_20190305STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v U& j LI 00 L (o DOC TYPE ❑1 HISTORICAL FILE P MONITORING REPORTS DOC DATE ❑ 001 q o 30 YYYYM M DD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — WASTEWATER I SUBMIT TO CENTRAL OFFICE* 11 General Permit No. NCG140000 Calendar Year 2018 Report ALL WASTEWATER monitoring data on this form (include "No FloWl"No Discharge" and Limit Violations) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG14 0❑®®® Facility Name: Thomasville Plant County: Davidson Phone Number: (336 ) 983-2181 Certified Laboratory Prism Lab Lab # 402 Lab # Total no. of outfalls monitored 1 Wastewater (WW) Discharge Outfall No. 001 Does this outfall discharge WW to SA waters? Yes ❑ No ❑✓ Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No ✓❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑✓ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑� Were there any limit violations in the calendar year? Yes ❑ No 2) Outfall No. 001 Daily Flow Rate, cfs pH, Su TSS, mgll SS, mill if applicable Non -Polar O&G (EPA Method 1664 (SGT-HEM)), mgll Effluent Limitations Daily Maximum HQW or ORW 50% of 7Q10 Indicate NO FLOW A applicable freshwater 6.0-9.0 saltwater r 6.8-$.� Standard 30 HQW 20 HQW 1 ORW and Tr, or ANA 10 HQW, ORW, SA, SB,PNA,orany Trout C J No Limit Samples above Benchmark subject to Tiered Responses 15 Date Sample Collected, molddl r�., ° x, �r. r a t e: 3/13/2018 001 NO FLOW M—c;RVED 6/3012018 NO FLOW MAK e7 rrzm-ri;-A.l Pit PS 912512018 NO FLOW DWR SECTION 12/27/2018 NO FLOW Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2017 Certificate of Coverage No. NCG 14 ®F —0C[U. CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR §122.221 Signature Date 15 Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Piles 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 8/1/2017 — 6130/2022 Last Revised 8-22-2017 ANNUAL SUMMARY DISCHARGE MONITORING REPORT DMR — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 MAR 0 7 2018 Calendar Year 2017 CENTRAL FILES 'Report ALL STORMWATER monitoring data on this form {include "No Flow"P'No.Discharge" and Benchmark-"" Exceedances} from the previous calendar year to the DEQ by MARCH I of each year. Certificate of Coverage No. NCG14 OQ®©® Facility Name: Thomasville Plant County: Davidson Phone Number: (336 ) 451-4087 Total no. of SDOs monitored 1 Certified Laboratory Prism Lab Lab # 402 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No ❑✓ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No- ❑✓ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall inches Total Suspended Solids (TSS `)r moll pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM , { )) mgll (VMA) !f appllcable New Motor Oil . Usage (gal/mo.) Nappllcable Stormwater Benchmarks fndfcate NO FLOW if applfcabfe Circle Benchmark .� LU1.]A V /JV0 6.U-9.� .... .� C J >55 gallnro. average requires TSS and Non -polar OaG monitoring Date Sample Collected,FAY,; L ;. -S" "i �'} o , �t b' Si$'3: �; d r 5 j a i2* f 4. M1 'if'- ! s E,3 , a gyp, 4 3/6/2017 001 No Flow 6/30/2017 001 No Flow 9/28/2017 001 No Flow 12/11/2017 001 No Flow Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG14 00®® CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." !Required by 40 CFR §122. Signature ! / Date b Y/! -"' Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 8/112017 — 6/30/2022 Last Revised 8-22-2015 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Thomasville SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June PERSON COLLECTING SAMPLES: Tony Hardison RECEIV COUNTY: Davidson CERTIFIED LABORATORY: Research and Analytical Lab # 34JUL 2 7 Z017 PHONE NO. (704) 372-2930 ADD TO LISTSERVE? DYES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ® CENTRAL FILESDISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other DWR SECTION OPTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall Na. Date Sample 1 Collected Type of Wastewater (VE, RM, MD)z pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 5GT HEfte (mg/L) Duration(mm/dd/yr) (minutes) Total Flow (gallons/day), - - RM, MD- 6-93'4 303'5 53 (15), - - 001 6/30/2017 NO FLOW 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TS5 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 A 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 026 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWCL and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I an) awar4 tha Ahere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ture of Permittee) Permit Date:7/1/2010-06/30/2015 7le'5 67 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tripp Welch CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorina Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLE QUARTER: ❑Jul -Sept []Oct -Dec ®Jan -March ❑April -June COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW OPTIONAL INFO: ❑PNA [-]Trout ®Other Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z RMMD) [VE, , pH {standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SG /L)16 (mg/L) Dis charge Duration (minutes) Total Flow 7 {gallons/day] - - RM, MD- 6-93'4 303,5 53 (15)6 - - 001 3/6/2017 NO FLOW MAY'�� If wastewater systems have not discharged in this quarter -report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VNIA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly esponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thgt there re s�ioficant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." nature of/Permittee) Permit Date:7/1/2010-06/30/2015 Slg (7 (Date) Last Revised 07/13/11 Page 2 of 2 r PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 RECEIVED CERTIFICATE OF COVERAGE NO. NCG140066 JAN 2 3 2017 FACILITY NAME: Thomasville CENTRAL FILES PERSON COLLECTING SAMPLES: Tripp Welch DWR SECTION CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Manitarine Reauirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec Dian -March ❑April -June COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTS ERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [—]Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected" (mm/dd/yr) Type of Wastewater z {VE, RM, MD) pH (standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1b64A SGT HEM6 (mg/L} Discharge Duration (minutes) Total Flow 7 {gallons/day) - - RM, MD- 6-93,4 303,s 53 (15)6 - - 001 12/14/16 No Flow n � lam, l A 11 Lt �A 1111 _I v •' u� If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. i Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated_ Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL. SUMMARY (INCLUDING ALL "NO FLOW "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons din tly res risible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am ay+arg that; t eye significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature( of Permittee) Permit Date: 7/1/2010-06/30/2015 If►-7 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER— Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tony Pope CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Reauirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March []April -June COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTSERVE? [—]YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW OPTIONAL INFO: ❑PNA ❑Trout ®Other Outfall No. Date Sample 1 Collected (mm/dd/yr} Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L} Settleable Solids (mL/L} 7PH usingDischarge method 1664A SGT-HEMS (mg/L) Duration (minutes) Total Flow , (gallons/dayj - - RM, MD- 6-93,4 303,5 53 (15)6 - - 001 9/24/16 No Flow 2% FILES ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN TN15 CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dir ctly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aereye�significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) Permit Date:7/1/2010-06/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring .l GENERAL PERMIT No. NCG140000� CERTIFICATE OF COVERAGE NO. NCG140066 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tony Pope CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES [-]NO Part A: Wastewater Monitoring Requirements SAMPLE QUARTER: ❑Jul-5ept ❑Oct -Dec COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTSERVE? []YES ®NO EMAIL: ❑Jan-MarchGAF,�April-June DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected) (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 6 S mg/ (mg/L) Duration (minutes) Total Flow 7 (gallons/day} - - RM, MD- 6-93,4 303,5 53 (15)6 - - 001 6/24/16 No Flow kctjLI, v L.,rta I IG 0 9 2016 CENTRAL FILE, i DVVR SEU I Ivll ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but in°dead is subject to benchmarks and provisions of Part Iv, Section A, including the Tiered Response Action. Flow, rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NU,-C 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the nest of my knowledge and belief, true, accurate, and complete. I am awarelhat th4e are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature,df Permittee) Permit Date:7/1/2010-06/30/2015 V2 (Date) Last Revised 07/13/11 Page 2of2 ti y�-- PROCESS WASTEWATER— Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tony Pope CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES []NO Part A: Wastewater Mnnitnrine Renuirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: []Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW OPTIONAL INFO: ❑PNA [—]Trout ®Other Outfall Na. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater i (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM6 (mg/L) Duration (minutes) Total Flow , (gallons/day) - - RM, MD- 6-93A 303,5 53 (15)6 - - 001 12/14/15 No Flow 1 ` \JL1 D CENTRAL. FI DWR 5_ ED 116 _ES DN If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 e ProW- vaasl_ewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, PSG but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SfGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons df(ectly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. ►�u I am aaW tha fherp are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signatdre of Permit -tee) Permit Date-7/1/2010-06/30/2015 L7 / (Date) Last Revised 07/13/11 Page 2 of 2 r • PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tony Pope CERTIFIED LABORATORY: Research and Analytical LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorine Reauirements RECEIVED OCT 2 3 2015 SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June CENTRAL FILES COUNTY: Davidson DWR SECTION PHONE NO. (704) 372-2930 Lab ti 34 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: 0utfall Na. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-NEV (mg/L) Discharge Duration (minutes) Total Flow 7 (gallons/day) - - RM, MD- 6-93'' 303'5 53 (15)6 - - 001 09/25/15 No Flow If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 liaw 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the 5ummer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", -NO DISCHARGE-) WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those perso s directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am Avare $atOere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ature of Permittee) Permit Date: 7/l/2010-06/30/2015 lot r h (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NC6140000 CERTIFICATE OF COVERAGE NO. NCG140066 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomasville �SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec Dian -March PERSON COLLECTING SAMPLES: Tony Pope �cPl��„�JUNTY: Davidson CERTIFIED LABORATORY: Research and Analytical Lab # 34 PHONE NO. (704) 372-2930 3UL 2 4 N15ADD TO LISTSERVE? DYES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements ®April -June pWR SECT FILEMSCHARGING TON INFO: CLASS: ❑SA ❑HQW ❑PNA [:]Trout ®Other Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD) PH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM" (mg/L) Duration (minutes) Total Flow 7 (gallons/day) - - RM, MD- 6-93,4 303,5 53 (15)5 - - 001 06/29/14 No Flow ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/112010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Mow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: T Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANYINFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons dire ly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am avga/ that tore ajsignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permitteej Permit Date:7/1/2010-06/30/2015 AO�, r } ( Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomasville SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June PERSON COLLECTING SAMPLES: Tony Pope, Greg Smith COUNTY: Davidson CERTIFIED LABORATORY: Research and Analytical Lab ft 34 RECEIVPSE NO. (704) 372-2930 MAY 13 9fflD TO LiSTSERVE? _❑YES MNO EMAIL: LIMIT VIOLATIONS? YES ❑ NO M Part A: Wastewater Monitoring Requirements DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout Mother CENTRAL FILGI'IONAL INFO: DVUR SECTION autfaEl No. Date Sample i Collected (mm/dd/yrj Type of Wastewater 2 (VE, RM, MD) PH (standard) Total Suspended Solids (mg/L) Settleable Solids (mLIQ TPH usingDischarge method' 1664A 5 Duration (minutes) Total Flow r (gallons/day) - RM, MD- 6-93'6 303's 53- 001 03/23/14 No Flow 3 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ Rp staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L:for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Hate: 7/1/2010-05/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is -subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. r F!ow rate.can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02I3 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL -SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Sendce Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN .THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were.prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dir ctly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l am alyyre that Were,-�pe significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signal re of Permittee) (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tony Pope, Greg Smith CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorina Reouirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: []Jul -Sept ®Oct -Dec []Jan -March ❑April -June E PROW NO. Davidson(704) 372-2930 JAN 2 0 Apy TO LISTSERVE?, ❑YES ®NO EMAIL: CENTRAL F�IEHARGING TO CLASS: ❑SA ❑HQW DWR SECTRAIONAL INFO: ❑PNA ❑Trout ®Other Dutfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD pH (standard) (standard) Total Suspended Solids (mg/L) Settleable Solids (ml./L) TPH using method 1664A SGT-HEM' (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' - - RM, MD- 6-93.a 303s 53 (15)6 - 001 12/23/14 RM No Flow 002 12/23/14 RM No Flow If wastewater systems have not discharged in this quarter — report "No Flaw" or "No Discharge" here. Please make sure to mark the sample quarter above. a Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saitwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 '1441 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B ,0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons di ctly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aw*e that#her�re significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signatu,le of Permittee) Permit Date: 7/1/2010-06/30/2015 r2r� (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 SAMPLE COLLECTION YEAR: 2014 FACILITY NAME: Thomasville SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June PERSON COLLECTING SAMPLES: Tony Hardison CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfali No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT Hae (mg/L) Discharge Duration (minutes) Total Flow , (gallons/day) - - RM, MD- 6-93,4 303'5 53 (15)6 - - 001 9/30/14 RM No Flow 002 9/30/14 RM No Flow T16214 CENTRAL F! ES If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 026 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY(INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED, "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly r ponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware th4 therg� sjg¢;ficant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations." Permittee) Permit Date:7/1/2010-06/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140066 FACILITY NAME: Thomasville PERSON COLLECTING SAMPLES: Tony Hardison CERTIFIED LABORATORY: Research and Analytical Lab # 34 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorine Reauirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: [_]Jul -Sept []Oct -Dec ❑Jan -March ®April -June COUNTY: Davidson PHONE NO. (704) 372-2930 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: [_]SA ❑HQW OPTIONAL INFO: ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected' Imm/dd/yr} Type of Wastewater {VE, RM, MD} pH (standard) Total Suspended Solids {mg/L) Settleable Solids {mL/L} TPH usingDischarge method 1664A S mg/L)16 (ml>;/Ll Duration {minutes} Total Flow {gallons/day}7 - - RM, MD- 6-9M 303'5 53 (15)6 - - 001 6/26/14 RM 9.55 3.5 N/A N/A >1 >1 002 6/26/14 RM 9.55 4.5 N/A N/A >1 >1 Sample for Both Ontfalls were sampled in the wrong location, they were sampled from onsite holding areas, not at the point of discharge. RECEIVED , U1._ 18 20 4 WROG ' If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE -)-WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality T Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dire y re nsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am away#}at t)h a significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Ignatur4 of Permittee) (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2