HomeMy WebLinkAboutNCG140003_COMPLETE FILE - HISTORICAL_20110801PERMIT NO.
DOC TYPE
DOC DATE
STORMWATER DIVISION CODING SHEET
NCG PERMITS
` HISTORICAL FILE
MONITORING REPORTS
=)bf ) D 5 o ►
YYYYMMDD
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H Sullins Dee Freeman
Governor Director Secretary
August 1, 2011
Mitcheit Childers
Childers Concrete Co Inc
PO Box 777
High Point NC 27261
Subject NPDES Stormwater Permit Coverage Renewal
Childers Concrete
COC Number NCG140003
Guilford County
Dear Permittee
In response to your renewal application for continued coverage under stormwater General Permit NCG140000
the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement
between the state of North Carolina and the U S Environmental Protection Agency dated October 15 2007 (or
as subsequently amended)
The following information is included with your permit package
• A new Certificate of Coverage
• A copy of General Permit NCG140000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form for Stormwater
• Two copies of the DMR Form for Wastewater
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater and/or wastewater, and it specifies your obligations with
respect to discharge controls management monitoring and record keeping Please review the new permit to
familiarize yourself with all the changes in the reissued permit If your Certificate of Coverage (COC) restricts
authorization to discharge stormwater only (or other limited terms) you must contact the Stormwater Permitting
Unit if you would like to request a modification to your COC
The first sample period of your permit begins July 1 2011 However, because of the delayed mail -out of permit
packages your facility is expected to attempt to sample during the first sampling period and must comply with
sampling requirements beginning during the second sampling period Your facility must sample a representative
storm event between January 1 and July 30 2012 (for stormwater sampling) and/or sample wastewater between
October 1 2011 and December 31 2011 (or, if applicable report "No Flow" as outlined in Part V Section E)
Additionally, your facility has 6 months from the time of receipt of the permit to update SPPP to current standards
The more significant changes in the General Permit since your last Certificate of Coverage include the following
(please note the names and numbers of sections have been changed from the previous permit revision)
Part II
• Authorization to Construct (ATC) language was added to the permit and adapted to fit NCG140000
Part III
• The Stormwater Pollution Prevention Plan (SPPP) section has been updated to the most current
language of our permits Some additional conditions specific to this industry have been added to the
SPPP language
Part IV
• Sections A & 8 Revised provisions require stormwater discharges be sampled twice per year (instead of
annually) and sampling results shall be compared to new benchmark values (The previous cut-off
concentrations have been removed)
Blythe Construction Erosion %.ontrol Rainfall Inspections
IIG.AA1 nocirin Riidri FUMIQ sem
YY VV 1 MVVIMII YMIIM VI VYVV Bl" Guages to Be Inspected V e
After rain event of 1/2" or more I consirticholl,Inc-
Twice per week at Lanes Creek [303(d) Creek] ilrrrbburrlCrunpCnnrpnro
Once weekly at ALL guages
Date of
Inspection
Location
Station #
RTICLILT
Rain
Guage
Reading
Type of Report
Commentstissues
weekly
After
Rain
Lanes
Creek
343(d)
10/27/2008
LANES CREEK
120
X
X
Ram Over Weekend
10/27/2008
BCI FIELD OFFICE
070
X
Ram Over Weekend
10/27/2008
NCDOT OFFICE
1 00
X
Ram Over Weekend
10/30/2008
LANES CREEK
0 00
X
X
10/30/2008
BCI FIELD OFFICE
0 00
X
10/30/2008
NCDOT OFFICE
0 00
X
• Sections A & B Revised provisions require the permittee to execute Tier One Two & Three response
actions Tier One requirements for a first benchmark exceedence and/or Tier Two response for a second
consecutive benchmark exceedence, if applicable Tier Two requires that the permittee institute monthly
monitoring (reported to the appropriate Regional Offices) instead of twice -per -year monitoring Monthly
monitoring shall be done until three consecutive monitoring events show no benchmark exceedences
• Sections A & B This permit now contains a provision that four exceedences of any benchmark will trigger
increased DWQ involvement in the permittee's stormwater management and control actions (Tier Three)
DWQ may direct the permittee to apply for an individual permit, institute specific monitoring or may direct
the implementation or installation of specific stormwater control measures
• Sections A & B Failure to perform analytical stormwater monitoring requires that the permittee begin a
monthly sampling scheme for both industrial stormwater discharges and/or stormwater discharges from
VMA areas (where applicable) After 6 months of monthly sampling the permittee may return to semi-
annual sampling unless otherwise specified by DWQ
• Sections A & B A lower TSS benchmark of 50 mg/I for HOW ORW PNA and Tr Waters was added to
this permit for these more sensitive waters
• Section B The monitoring parameter Oil & Grease has been replaced by the parameter Total Petroleum
Hydrocarbons
• Sections A, B & C Inability to sample due to adverse weather must be reported in the SPPP
• Sections A, B & C The terminology "Representative Storm Event has been replaced by `Measurable
Storm Event' in response to comments from industry groups A measurable storm event is a storm event
that results in an actual discharge from the permitted site out#all The previous measurable storm event
must have been at least 72 hours prior unless the permittee is able to document that a shorter interval is
representative for local storm events during the sampling period and obtains written approval from the
local DWQ Regional Office
• Section C Qualitative monitoring must now be conducted semi-annually and is tied to the same
measurable storm event as the analytical monitoring
• Section C If the permittee fails to respond effectively to problems identified by qualitative monitoring the
permittee may be required by DWQ to perform corrective action
• Section D This section has now been consolidated to one section with one set of combined tables for all
types of authorized wastewater discharges
• Section D The wastewater analytical monitoring schedule has been set to quarterly
• Section D TSS limits have been revised for PNA, Trout and HOW waters per rule requirements in 15A
NCAC 02B 0224
• Section D 7Q10-based flow limits have been set for PNA waters per regulations in 15A NCAC 02B
• Section D TPH monitoring requirements have been added to wastewater monitoring when stormwater
runoff from VMA areas commingles with wastewater
• Section D This wording in the permit has been removed For facilities which route stormwater and all
process wastewater to a recycle system, no analytical monitoring of process wastewater discharges is
required if that recycle system discharges as a result of a 10-year 24-hour (or larger) precipitation event
Part V
• Section A For existing facilities previously permitted and applying for renewal under this General Permit
New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and
implemented within 6 months of the effective date of the initial Certificate of Coverage issued pursuant to
this General Permit and updated thereafter on an annual basis
Your coverage under the General Permit is transferable only through the specific action of DWQ This permit does
not affect the legal requirements to obtain other permits which may be required by DENR nor does it relieve the
permittee from responsibility for compliance with any other applicable federal state or local law rule standard
ordinance order judgment or decree If you have any questions regarding this permit package please contact
these members of the Stormwater Permitting Unit Jennifer Jones (919) 807-6379, Ken Pickle (919) 807-6376 or
Bethany Georgoulias (919) 807-6372
Sincerely
for Coleen H Sullins
cc DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
Blythe Construction Erosion 4ontrol Rainfall Inspections
US-601 Design Build 670039
1111011111 0 IM
Guages to Be Inspected
After rain event of 1/2" or more
Twice per week at Lanes Creek [303(d) Creek]
Once weekly at ALL guages
coly ma
C0 ist2' ichoIl,Inc.
t IferJrharrl (, nup Conrpna,
Date of
Inspection
Location
Station #
RTICULT
Rain
Guage
Reading
Type of Report
Comments/issues
weekly
After
Ram
Lanes
Creek
303(d)
11/312008
,
LANES CREEK
000
1
X
11/3/2008
BCI FIELD OFFICE
000
11/3/2008
NCDOT OFFICE
000
11/6/2008
LANES CREEK
0 00
X
X
11/6/2008
BCI FIELD OFFICE
0 00
X
11/6/2008
NCDOT OFFICE
000
X
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO NCG140000
CERTIFICATE, OF COVERAGE No NCG140003
STORMWATER AND/OR PROCESS WASTEWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards
and regulations promulgated and adopted by the North Carolina Environmental Management
Commission and the Federal Water Pollution Control Act as amended,
Childers Concrete Co Inc
is hereby authorized to discharge stormwater and/or wastewater from a facility located at and/or
operate an approved wastewater treatment system located at
Childers Concrete
200 Wise Ave
High Point
Guilford County
to receiving waters designated as Richland Creek a class C waterbody in the Cape Fear River Basin in
accordance with the effluent limitations monitoring requirements, and other conditions set forth in Parts
1 II III, IV V, and VI of General Permit No NCG140000 as attached
This certificate of coverage shall become effective August 1, 2011
This Certificate of Coverage shall remain in effect for the duration of the General Permit
Signed this 15' day of August 2011
,A tZj1-e
for Coleen H Sullins Director
Division of Water Quality
By Authority of the Environmental Management Commission
I
Blythe Construction Erosion control Rainfall Inspections
I IG.Rf11 nacinn RIIIIri AMnyi 8 rM
Guages to Be Inspected Blythe
After rain event of 1/2" or more Constntcttoll,Inc.
Twice per week at Lanes Creek [303(d) Creek] A Huhhu,.l <toup Co,,.mA..,
Once weekly at ALL guages
Type of Report
4
Rain
Lanes
Date of
Guage
After
Creek
Inspection
Location
Station #
RT/CL/LT
Reading
weekly
Rain
303(d)
Comments/issues
11/10/2008
LANES CREEK
000
X
11/10/2008
BCI FIELD OFFICE
0 00
11/10/2008
NCDOT OFFICE
000
11/6/2008
LANES CREEK
0 00
X
X
11/6/2008
BCI FIELD OFFICE
000
X
11/6/2008
NCDOT OFFICE
0 00
X
}
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B Hunt, Jr, Governor
Wayne McDevitt, Secretary
Kerr T Stevens, Director
M L CHILDERS SR
CHILDERS CONCRETE
200 WISE AVENUE
HIGH POINT NC 27260
Dear Permittee
1 "AA
�•r
_ 1
NCDENR
NORTH CAROLINA DEPARTMFNT OF
ENVIRONMENT AND NATURAL RESOURCES
July 26 1999
Subject Reissue - NPDES Stormwater Permit
Childers Concrete
_ COC Number NCG140003
Guilford County
In response to your renewal application for continued coverage under general permit NCG140000 the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement
between the state of North Carolina and the U S Environmental Protection Agency dated December 6 1983
The following information is included with your permit package
* A copy of general stormwater permit NCG140000
* A Stormwater Pollution Prevention Plan (SPPP) Certification Form Completion of this form is required to
certify that you have developed and implemented the SPPP as per the conditions of the permit This form
must be completed and returned to the Division v ithm 30 days of receipt of this letter
DO NOT SEND the SPPP with the sinned form
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements
and addresses frequently asked questions
* A Certificate of Coverage
Your coverage under this general permit is not transferable except after notice to DWQ The Division may require
modification or revocation and reissuance of the Certificate of Coverage This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal state or local law rule, standard ordinance order judgment or
decree
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater
and General Permits Unit at (919) 733-50S3 ext 578
Sincerely
for Kerr T Stevens
cc Central Files
_ I irmwater and General permits Unit Files
Winston-Salem Regional Office
1617 Mail Service Center Raleigh North Carolina 27699-1617 Telephone 919 733 5083 Fax 919 733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO NCG140000
CERTIFICATE OF COVERAGE No NCG140003
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215 1 other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act as amended
CHILDERS CONCRETE
is hereby authorized to operate a process wastewater treatment system and is hereby authorized to discharge process
wastewater and stormwater from a facility located at
CHIL.DERS CONCRETE
200 WISE AVENUE
HIGH POINT
GUILFORD COUNTY
to receiving waters designated as a UT of Richland Creek in the Cape Fear River Basin
in accordance with the effluent limitations monitoring requirements and other conditions set forth in Parts I II III
IV V and VI of General Permit No NCGt40000 as attached
This certificate of co%erage shall become effective August 1 1999
This Certificate of Coverage shall remain in effect for the duration of the General Permit
Signed this day July 26 1999
for Kerr T Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
4 State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B Hunt, Jr, Governor
Jonathan B Howes, Secretary
A Preston Howard, Jr, P E , Director
September 23, 1994
Mr F E Childers
Childers Concrete
200 Wise Ave
High Point, NC 27260
0-ft Ao-%m
IDEHNR
Subject General Permit No NCGO140000
Childers Concrete
COC NCGO140003
Guilford County
Dear Mr Childers
In accordance with your application for discharge permit received on October 1, 1992, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 1 and the
Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application Unless such demand is made, this certificate of coverage shall be final and binding
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management The Division of Environmental Management may require modification or
revocation and reissuance of the certiticate of coverage
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area
Management Act or any other Federal or Local governmental permit that may be required
If you have any questions concerning this permit, please contact Aisha Lau at telephone number 919/733-5083
Sincerely,Or,g.nal Sigro i BY
coleen
A Preston Howard, Jr , P E
cc Winston Salem Regional Office
P O Box 29535, Raleigh North Carolina 27626 0535 Telephone 919 733-5083 FAX 919 733 9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
GENERAL PERMIT NO NCG140000
CERTIFICATE QF COVERAGE No NCG140003
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-21 S 1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Childers Concrete
is hereby authorized to discharge stormwater from a facility located at
Childers Concrete
200 Wise Avenue
High Point
Guilford County
to receiving waters designated as an unnamed tributary to Richland Creek in the Cape Fear River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, Il, 1I1
and IV of General Permit No NCG140000 as attached
This certificate of coverage shall become effective Septermber 23, 1994
This Certificate of Coverage shall remain in effect for the duration of the General Permit
Signed this day September 23, 1994
Ct laut rl SUi,-T2s
A Preston Howard, Jr, P E , Director
Division of Environmental Management
By Authority of the Environmental Management Commission
i
if PrA Garp/
law
1
p
I
N
FACILITY C e S 6'76 z- 7
COUNTY
f E prI l 1V C G as
03—off-0�
# 'i( 0 ° 00 'D 3
1IS" A'-'
S 3 n lam' A �� N
EX F IR L 91fl- J E ti • rt oll 7
w