Loading...
HomeMy WebLinkAboutNCG130060_COMPLETE FILE - HISTORICAL_20161228STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. Iv U&I 360 (p 0 DOC TYPE R""HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑� YYYYM M D D n1 CCT /3odf:,O Oublic'Works, Dcpartmc:,t Stormwater/Erosioe and` Sedimentation Controf 0rogram City of wlnitui:Safce' �P.O:' Raa 251 i Winston-Salcm, NC 27102 CiwLink 311 U36.727.e000i Fax 336.748.3173' December 28, 2016 Mr. Randall Baker Abbey Green Inc. P.O Box 12339 Winston-Salem, N.C. 27117 Dear Mr. Baker: The Stormwater Division of the City of Winston-Salem would like to thank you for your time and professional courtesy regarding the August 26, 2016 inspection of Abbey Green Inc.... Abbey Green Inc. has provided documentation that verifies the successful completion of the corrective measures located in Part 4 — Required Actions to be completed by Facility. At this time, Abbey Green Inc. has no outstanding inspection compliance items to complete. The Stormwater Division reserves the right to enter and inspect Abbey Green Inc. as often as necessary to determine compliance with permit requirements of NCG 130060. Thank you for your continued support and implementation of the City of Winston-Salem's Stormwater Program. If you have any questions, please feel free to contact me at (336) 747-6964. Sincerely, )V*-"� �� Ladonta "Jamal" Clark Stormwater Inspector Phone: 336.747.6964 Cell: 336.416.2403 Fax: 336.748.3173 I P bSE WOil s Dcpartirietit Stozm�irpteilEinsiriin and Sediinentntioii'C6ritrol' Program C.try oF,Winuun-Salcrn C10:.u.a 2511 Winston :Cakm NG 27102 'G4Link 311 03G.727.8000) Fix 336.7483173 -marrttpnirxv+f<rimArf,t'an 9/,1/20.16 Mr. Randall Baker' Ablbey'Green Inc: P.0,BoxA 2339 Winston-Salem, N.C. 27117 Dear Mr. Baker: The" :Storinwat f Divisidfi,df the'City of Winston-Salem,would,like to;thanlryou for; your time and ptofessiotial.courtesy regarding"the-Ati st:26,;2016 inspection of Abbey Green Inc:. Asper your -request, a copy of the completed surface!water inspection. form has been:enclased,to"you. Part 4 ofthxs eep6rt (RequiredActions°to be:completi d by Facility) contains Annotations:#1 #10 that Abbey`Greenlnc.'s must complete Please provided ocumentation `thatverifie's Abbey Green Ins.'s successful completibn-of the corrective -measures tome by.Decenrb'er,712D16.,, The Stoiri water;,Division rases es;tl;e;rigiit;to enter and.insp&VAbbq Green:Ins.'s: as_o cessaryto determine compliancomith permitrequirerrients af G 130060: Thank } 6ii:f6f,your contihitea-support and iriiplenientation of the City, of.Winston- Salem's StarmwaterProgram. If you have any questions;;"please feel.free to contact. 'me at (336) 747-6964 Sinc rely;. `Ladonta`Clark St1.ormwater,Inspector Ptrone: 33 6727.6964. teh: 336.416 24a3' ,Fax: 33:6:748:3173. . City CairitFli Mayer/lilen joines; Vivian H. >1u�ke, Mawr 1'm'Cempnre: Nwthriii Wald; ihnler 1],'hlamti Nonli,Wanh Ain 6usr, Siwthwrst \Vxd:' ltoUin�C. Clare. Wcst 1C'ud; ..... .. Afdly LrigAe. Sairh W.idr Wanda 2tilredul, Nortl+mst Wud; lluwln L hlaer�omery, F,.. lt'ardi J:mu Taylor, Jr.; 5avthcart Wiids City hlanasvi Lee A. Ga iry Ca11311:or 336-727AOOO ,citylink@cityofws.org I El itotrnwatet/Efd§ion,CohttbI Mision, Surface Watex .P.ection for Indukrial'Sites- nformation= efteria ll A) Ofheial Company Name: _Abbey Green B)'PhysicailAddress: 503 . 0,0v6rdahER6a0 :Q Telcphqnc,3VuMbqr; (116) W'2.1.34-Office, D)'Ma­iIInigAd(kdssjf diff6fOht from above addres§: P.0 Box 1.2339'IWinston ;§#jtnI M, C,2714?7' :E) Authorized contactsAb represent company ,ih,-environmenfal. regulaiory, issues: PAfti4y, contact: Randall Baker Tide:,, -.G:eneta&Man:ag6e Contact.nurnb.ei(s):,(33G),795 2130,Offim .Email address rbalier(aJabl eygreen--com '5dddridary 6-6fit4et- Riiy Livirtft:in Title; -"eki4ioM Manager itle . p r Contact numbers :-(3-3fi'7,8-5.,2"1'30i)trlit )407 -4,9_3,5C,el"1".'P­h'i*�o , Email address,:. RLiverm . AngabY ,b green.com .; :5093 q) NC. Stormwaier,NPDES.7Pen-nA Number: 'NC6130060, Termit.Cafeaoryn Nonmetal'Waste &Scran 11), Any"6tfidk,, c4intf6i: Atithijfit control, -.wastewater, hazardous ppffiber( Y jj�� fim- I 1) Briefdescription' ' a c. of in.dusq'iAl activities that occur -on` -site: Abbey Gi6en is orn pany'thaf, provides a place: for:.construction, 4!emoljtioip, ctiefiris recycling -and &hr"Is transfer,f6r the,coininunity. I) IjUjinateReceNing Wafers --South Muddy TMbL Istream, MYes 'ONO L Best4Managemen - t:Praciices a..,Li-st-,theinon/structur6lcontrols7remp16-yed by the -facility. J."Abb, ey Green. Inc; has a,;str,uc.ftiraI`,rQof'coye . r� 1. oy . er .' A ofthe recyclable 11iiitCrial fid.,oievent,items m . ixin --*.Jth-.the eleinent&, 0. b. Ar6fhc BMP§ reasonable & aO}ifdpti"a-td'f6t--,'thefadilitY? ®Yes ONo Please: remove the ";oil that is. exposed on top otthe lid to tfie�biickO near ifiA . hiteita6ce, shed. c..Are BMPs installed correctly, rnairitained, and effective pvcrating.condition? ffV,6s CIN"O'. Please clean -all built,up s trash and debri'. , around the maintenance shed. I, PrbvAd'e"d,_brief description of other. controls that storffiwater runoff (e.,g.., erosion and sedirnenvcontrols inlet'protd.b.tion&6ntr6I at Mafin.dmihs', di;virsibfi Abbey Green tnc�. uses a pqp4jo hold All sto rmwa te rTru n oft ia=-col iM obj ects such as sediment, & beii, 'A n-d FAUI — Mikellhnekis M9'4?. &,g.: st6k Wat6fififfioff, dry weather discharge, co .9— minglin q process wastewater),: 'OYe's ONO' 2) Do the,stormwater outfall&on-site correspond'with.those listed on the -site map;'and.'ih,'SPPP? ®Yes ZINo com_qWpts Please add Wt he"§ if&'hiaothat Abb6y-,6eeOl Ific. discharges to.Miiddy Crcckand it is a. TMD1,11strearn. 3) Sunimary..of Stonnwaier-Discharge Outfalls.- SDO,Idehtificatioii P6teritW,P61h tants'that. -Physical Location Latitude and Longitude cpuld.be discharged SD01 Oif„hydraidie fluid; 200 feet -west of`the-p6jid`. ' -M36?,018,W'80' 1407 equipment fluid .and fuel Part`3.- SPPf Review (can be_ co" mplefed=in oTfice; Site Overview Yes No Notes Is'there a'SPPP? - ✓' Does SPPF include a; certification -statement, by. the. responsible; _ ✓ Please.sign and update _ . - car orate officer? W6—the general:map-depict`tlie facilit3PSIo64tiori on a USGS'quad' ✓" Please addAo'.the site map reap:(or-,equivalent map) with, receiving:wateis (or MS4);listed? that Abbey Green,Iuc.: dli6harge`s to•Muddy, Creek and it is a.:TMDL stream-. Identification of impaired waters orfwaterslied.(if applicable)? ✓ In,the'SPPP;•but not on•the: site ma 'Narrative, Description,oftiiese iiidusti-ial,Activities: Storage Practices '! Unloading/LoadihP, Activities Outdoor'; Processes Particulate.GeiieratingLContxoiProces5es '� Waste Disposai ✓_ Does siie:map°denote.-draiiiage items: flow direction, boundaries, Vol impervious, and: structures?, A_lso, includes SDOs, industrialactivity ,areas, -and sifeito o ra h ? Mist of major spills thathave-occurred within the pastthree years ✓ No spills in the past three will#',corrective actions to tdVent future s "ills ? yeaws A;signed,:annaaCcertiFcation that, thelfacilityhA0.6l.;teste-d,for'non- % Last_update:2010 stormwaier discharges from.the site? :Comments: NOTE:'P,ltease,upciate the Cityof Winston•Salem; St6emWatcr'Division's-.contact informati©n,to Abbey GreenInc.;,Sp' - ill Notification`Iisf. The contact Spill notification is: Mr. Keith Huff,;St6rmvrater Director (336) 747 6962-4andline (336)•,406-3332..= cell phgne number. Mr. Huff s email 4address is,lceithhl"Ca7cityofw&org:for providing:writteq. riattication Stormwater Management Strategy Does.SPPP;incorporate the_nine`baseline controls: l~easlbtlity $tUdy.,(teahn�cal &economic review to miniriiixe, Iiollutant.cxposure) -Secondary .Cotltainment,(table summary of tanks. stored,rnalerials, feleasereCords) 'J 1mP S6ffi ikf .(listing.of site structural/nonstructural tpra.ctices); ,S.PRP &,`Procedures (identified, responsible personnekv/ signatures '& dated). PK&-QH (inspection of rtidterial ifandling areas,&,regular cleaning schedules) .l`acilityJnspectlOnS (biannual mspeeti6fis6ffacility.and all'stormwatefay'stems) Eriiployee Tfalnlllg; annual basis for staff Nvho perform sRl' an PM fu ctto�is} Responsible,Party'(specific position(s)-dcveloping,'implementing, &r revising SPPP) - Amendment.&°,Annual' Update (of n,ajorspills, nonsw flows, BMPs, sampling data ✓ ✓ ✓ ✓ f ✓ please update ant! sign ;/ Doe's SPPP�contain completed.roiitinciinsPection;reports/records regarding reportable imoldrientatidn.of the nine baseline controls i.e. SPPP Itn lementation)? Analytical-Mbniiot•ing Yes No Nn£es Are -,.samples collected within'30_ibinutes ofineastirable -rain everiti� ✓ Abbey Green Inc. does, not and at least 72 hours since the last siorm;evdnt? use more than'55.4allons of new. inp#ot� oil per,month when average o_yer_ th_e ealenda -ear ,Are sarn liri events 60 da 9 Apart? (EXCEp•TION:>Tier 2 &•1responses) .Is analytical inon'ito-ring complete (including "schedule) for each SDO? (EXCEPTION'ROS) Any exceedences of;pollutant'paftf&d ras4h6 ddnijpared against the pet-init benchmark <v,alues' ' Has Facility implemented appropriate, selected actions to.ceduce: pollutantconcentrations; in response to benchmark; exceedences,(if applicable)?. Qualitativo.M6nitoring Yes, 'No Notes Is qualitative monitoring being'performed during measurable storm events? Is qualitative monitoring ;complete (including scheciuie) for each ✓ SDO? Are.rii6 itorifi events W days. -apart? (EXCEPTION: Tier 2 &'-3 responses) ✓ NIA _Any observable, excessive amounts Of pollutant indicators in stormwater,:discharge-at 500s? Rart�,4', ggi iced- ActionC.. LoEqeibmpleted kiy Facility 1. In order to<Prevent-stormwater poll ution,,ensure :the.fuel<hose=near the maintenance shed. is no longer leaking .that runs,from, the AST. 2. 'Remove he oil;,that:is expoaed,on-top of the lid".ofthe bucket near m.a.i. itenance shed storage area. 3., Please reiiair the`hytlraulie fluid Ieak°on the 621B"load r: 4; As=apartof gaoi iouselceeping;pleeremovIra' aroonitle;s maintenance shed:. '5 Concerning`the dutnp; truck'for Abliey'Green,Inc.; please remove all.unasable.items in'the 'toolbox. Also, please-install•a cover on thetoolbox5to keepritenis from mixing with the elements: .t Plea"se update and.sign certification";statement b"y`.the°:resiionsible corporate officer. 7 Please produce a:sigaed, upitated'annual certification that:tite facility has beeh::tested t6k.-h6fi7. ytvriWNdatef:-discharges frbr&-the.site:;. 8:• Tlease�-update the'City of Winston Salem, 'Stormwater.Division's-icontact informationrto Abbey: ,Greed Inc: Spiil.Notification List. 9. Please update and':sign the°section okhe SPPP for the responsible party. 10. Please.add:to'the;skt inap"tlfat.Abbey'.G' c n iuc. is ch rges"to Meidily'Creek and it is'a TMDL stream:- Nt r AIV let a74- a r iO�c f Lz fi � t � ��Y Y�.� ry f r,- F � l fit t' y �J ]]F�Fg`fi ���� �T•' T. �a"s. * Ait ,rr.0"a lu el L `4.;;7 ' Picture 5 Exposed tool box with no lid on. dump a;true-kwith old items inlf Coneerning the:dump truck -for Abbey Green Inc.., please remoye'all unusable items.;in the toolbox. Also; please'install;a cover -on the'toolbox to keeo_itelyds nuzing;with the elements. 'Company, Representative(s) that'participated in inspection:..Randall-Baker:aud.Ray'L'iveririan Titl'e(S): General Manager -and Operad'ons�Manager Start'of Inspectibm,9:30 Am; Coinpletion:of.Inspection: 12:36 Pm Date: August 26 �, 016 Signature .of-Stormwater-lnspector: O*A.'O Title: Stormwater_Inspector, To: Operators Certification Board From: Doug Whitmire (336-776-9669) Fax: 919-715-2726 Pages: 4 Phone: [phone number] Date: September 2, 2016 Re: Ooerator Info for PWS NC3017023 cc: [Namel ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle Comments: Operator info Permit: NCG130060 SOC: County: Forsyth Region: Winston-Salem Contact Person: Jim Bryan Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Repo Effective: 06/01/13 Expiration: 05/31/18 Owner: Abbey Green Inc Effective: Expiration: Facility: Abbey Green, Inc. 5030 Overdale Rd Winston Salem NC 27127 Title: Phone: 336-785-2130 Inspection Date: 09/09/2016 Entry Time: 10:OOAM Primary Inspector: Glen White Secondary tnspector(s): Certification: Phone: Exit Time: 12:OOPM Phone: 336-776-9800 Reason for Inspection: Routine inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: KCG130060 Owner - Facility: Abbey Green Inc Inspection Date: 09/09/2016 Inspection Type: Compliance Evaluation Reason for Visif: Routine Inspection Summary: (See Inspection Report by Ladonta Clark,(COWS). Page: 2 Permit: NCG130060 Owner - Facility: Abbey Green Inc Inspection Date: 09/09/2016 Inspection Type : Compliance Evaluation Reason for Visit: Routine Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Not required. Permit and Outtalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a t3MP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: See Inspection Report by Ladonta Clark. (COWS). Yes No NA NE ❑❑■❑ ❑ ❑ ® ❑ Yes No NA NE ❑ ❑ ❑ ® ❑ ❑ ❑ ❑❑❑® ® ❑ ❑ ❑ Yes No NA NE C❑❑❑ Yes No NA NE ■❑❑❑ • ❑ Cl ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ ® ❑ ❑ ❑ ® ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page: 3 "�i r■� Compliance Inspection Report Permit: NCG130060 Effective: 01/29/10 Expiration: 05/31/13 Owner: Abbey Green Inc SOC: Effective: Expiration: Facility: Abbey Green, Inc. County: Forsyth 5030 Overdale Rd Region: Winston-Salem Winston Salem NC 27127 Contact Person: Jim Bryan Title: Phone: 336-345-7793 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 02101/2011 Entry Time: 09:00 AM Exit Time: 11:15 AM Primary Inspector: Ron Boone i Phone: 336-771-4967 Secondarylnspector(s): O?IZjW]24 /f Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater Discharge COC Facility Status: 0 Compliant ■ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 NJ .4. Permit: NGG130060 Owner • Facility: Abbey Green Inc Inspection Date: 02/01/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Operations began 01/15/2011. Inspection actually conducted by City of WS Stormwater Inspector Bill Baugher. Refer to his attached inspection summary letter. Page: 2 Permit: NCG130060 Owner - Facility: Abbey Green Inc Inspection Data: 02/01/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? n n n ■ # Does the Plan include a "Narrative Description of Practices"? a ❑ n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n Q # Does the Plan include a list of significant spills occurring during the past 3 years? ® n n n # Has the facility evaluated feasible alternatives to current practices? n ■ n n # Does the facility provide all necessary secondary containment? n n n ■ # Does the Plan include a BMP summary? Q e n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n n s # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n n ■ # Does the facility provide and document Employee Training? In o n n # Does the Plan include a list of Responsible Party(s)? ■ n n n # Is the Plan reviewed and updated annually? n ❑ ❑ ■ # floes the Plan include a Stormwater Facility Inspection Program? n n n ■ Has the Stormwater Pollution Prevention Plan been implemented? n ■ n n Comment: Inspection actually conducted by City of WS Stormwater Inspector Bill Baugher. Refer to his attached inspection summary letter. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n ■ n n Comment: Operations began 01/1512011. Inspection actually conducted by City of WS Stormwater Inspector Bill Baugher. Refer to his attached inspection summary letter. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ■ ❑ n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n ®❑ n Comment: Operations began 01/15/2011. Inspection actually conducted by City of WS Stormwater Inspector Bill Baugher. Refer to his attached inspection summary letter. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? n n n ■ # Were all outfalls observed during the inspection? n n n ■ # If the facility has representative outfall status, is it properly documented by the Division? n n ■ n # Has the facility evaluated all illicit (non Stormwater) discharges? ® n n n Page: 3 Permit: NCG130060 Owner - Facility: Abbey Green Inc Inspection Date: 02/01/201 i Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Operations began 01/15/2011. Inspection actually conducted by City of WS Stormwater Inspector Bill Baugher. Refer to his attached inspection summary letter. Page: 4 U City of Winston-Salem Stormwater Division Surface Water Inspection for Industrial Sites A. Official Company Name: Abbey Green Inc. B. Physical Address: 5030 Overdale Road, Winston-Salem, NC 27107 C. Telephone Number: 336-785-2130 D. Mailing Address, If different from above address: P.O. Box 12339, Winston-Salem, NC 27117 E. Primary contact who is authorized to represent company in environmental regulatory issues: a. Name: Jim Bryan b. Title: Owner/Operator c.11E ontact Number(s): 336-785-2130 Jidmail: ibryan@abbevgreen.com r.2 i " ems -Web Site: ww.abbeygreen.com F. SIC.Code,number of business: 5093 G. N6Stormwater NPDES.Permit'.Number: NCG0130060'Effecti7elDate: 01%21%2010� xrt� a'. Facil�tY LYPe: Recycling F 14" - l ''` `i l r3 I F1. •-Ariy other.controLauthar�ty:Perm�t(s} (air quality control,' /astewater, hazardous waste)& i , i LI E +� ,� t_..j !_i .�! ,Y3 ` .� number(s). None' 1. Brief description of industrial activities that occur on -site: Abbey Greerrinc-recycle,severak.type �_of constructi_on materials such as wood, metal, concrete block and brick material. Receiving:Water(s), MS4: South Fork Muddy Creek, City of Winston-SalemM54 ti Best management Practices A. List the non/structural controls employed by the facility: 1.Containers and trailers to be used as temporary storage of received or processed materials. 2. Loading/Unloading areas, spill containment devices during activities. 3.Equipment Maintenance, preventative maintenance program for mobile equipment B. Are the BM Ps reasonable & appropriate for the facility: Yes xx No C. Are BMPs installed correctly, maintained, and effective operation condition: Yes xx No 2. Provide a brief description of other controls that manage/prevent/minimize stormwater runoff (e. g., erosion and sediment controls, inlet protection/control at storm drains, diversion structures): 1. Need to incorporate into a narrative form and placed into your SWPPP 1. Any evidence of discharge to receiving waters/MS4? (e.g., stormwater runoff, dry weather discharge, co -mingling of process wastewater): Yes No xx i. Comments: 2. Do the stormwater outfalls on -site correspond with those listed on the site map and in SWPPP? Yes xxx No N/A i. Comments: the site plan does not show any building, improvise areas, and what kind of activities processes that are going to be done and where the activities will be preformed. Part;3°T SWPPP::Review(cari'be:completednUoffice �• i General �— _Adf 1) Is there a SWPPP?� + _ `' _ _ � _Yes _ Now '" �a • ,���p..�.^a � . � ' `� ,�+` d tit ".. 2) Does SWPPP id'enti : _a-s ecific, osition s, for responsible ' • : d t, ; partyart uposes: e : p (_�g.Roveral���coordinatibn;Ae�elopment �; im lement/atian _&-revision --�-, Yes9- ,- y PN,fo2,, U N� 3) Does SWPPP tl gnate facility personnel responsible for im lementin SRP? %-� p Y sese No 4 Does SWPPP include a.certification statement? Y s No 5) Are employee training records regarding stormwater pollution prevention topics included in SWPPP? Yes No No training Comments: At time of admin review no training has been documented. Site Map NOTES 1 Is there a site map? Yes No 2 Drainage atterns/outfalls Yes LVo 3) Identification of potential pollutants likely to be discharged from each drainage area? Yes No 4) Narrative description and locations of (check if present): 1. Storage practices XX 2. Unloading/LoadingUnloading/Loading activities 3. Outdoor processes 4. Particulate generating/control processes 5. Waste Disposal 5 Name of receiving waters or MS4's listed? Y s No 6) Locations of significant materials exposed to stormwater? Yes No 7) Locations and descriptions of major spills occurring within the 3 previous years w/ corrective actions to revent futures ills ? YY S No NONE Stormwater Controls NOTES 1) Does the SWPPP describe the non-structural controls that will be used to prevent/reduce discharge of pollutants in stormwater runoff? ;Yes No 1� 2 Does the SWPPPdescribe the structural controls that will be used to-prevent/reduce discharge of `r ' JU }� pollutants in sto�rnwaer runoff? -� p Yes No, 3) Does the SWP.PP describe othet,scoritr,'ols that,will�be- to tracking,or blowing used prevent/reduce off=site of sediment dust 'a .�. �.,,.� � ;final, Tr waste,products,for t, . �nd,ra other solid -materials and-floatin d'ebns? � Yes No 'Need .a'Feasibilif Stud 4) Does the•SWPPPncorporatethe 8 baseline controls (good housekeepg �BMP- summary, feasibility study, PM, SRP�procedures, facilit&#ections, and comprehensive evaluations, employee training, site seconds containment and sediment control? Yes No Need a Feasibility Stud 5) Does the SWPPP describe the pollutant or activity to be controlled by BMPs and assessed the need of implementation through data collected? Yes No Need a Feasibility Stud 6) Does the SWPPP describe the pollutant or activity to be controlled by BMPs and assessed the need of implementation through data collected? Yes No Need a Feasibility_Stud Non-stormwater Discharges NOTES 1) Certification that the facility has been tested for non- stormwater discharges from the site? Y s No 2) Description of testing method, drainage points, At time of review no observed results, date, and signature? Yes No activity on site. Monitorina 1) Are samples collected within 30 minutes of measurable weather events occurring 72 hours after Yes No Operations started previous measurable weather event? 01/15/2011 2) Were samples collected and preserved in Operations started accordance with 40 CFR 136? Yes No 01/15/2011 3) Was proper chain -of -custody procedures Operations started followed? Yes No 01/15/2011 4) Was analytical and qualitative monitoring Operations started complete? Yes No 01/15/2011 5) Any exceedences of pollutant parameters in Operations started regards to benchmark values? Yes No 01/15/2011 n a 1 i7tidate_SWPPP�to reflect permit requirements (i.e. feasibility studies, training records). ' 2. Need to'update Site)'Plan with a Lat/Long for out fall # 001 3: = Name of reeeiAg.stream in narrative 4. <Identify.'if the receiving water is impaired on the state 303(d) list. 5. In the site plan a narrative description of and SOP that cover each activity is addressed. a. Storage practices b. Loading and unloading activities c. Outdoor process areas d. Dust or particulate generation or control processes e. Potential pollutants which could be expected to be present in the stormwater discharge from the outfalls. 6. No flow direction for the drainage area for each outfall. 7. No percentage of each drainage area that is impervious. 8. Document the training that has been done. 9. Determine if any other BMPs are need for you site threw a feasibility Study. Based on a technical and economic stand point for operations and storage. 10. Ensure that the temporary storage bins have a cover over them when in use to ensure that the items do not come into contact with stormwater. 11. Develop a SOP that covers the industrial septic system for clean out, disposal and at what time interval each should be conducted. 12. Conduct Sampling at the first rain event that produces flow from out fall # 1, to ensure that you remain in compliance with your permit. The City of Winston-Salem Stormwater Division is requiring that Items # 1-11 be completed on or before April 4, 2011 and Item # 12 after the next sampling rain event. Abbey Green Inc. shall keep the Stormwater Division updated on milestones and activities completed in its progression to comply with these required actions. The Stormwater Division may conduct follow-up inspections in order to ensure completion of mandated activities. Educational Resources: 1. NC Stormwater Manual for Industrial Users: http://h2o.enr.state.nc.us/su/storm water.html. Company�Represe Start of'Ins oection Completio'n.oNnsr ://portal_ncdenr.org/web/wq/ws/su/bmp-manual ative(s) that.participat�ed iri inspection name and tle(s)�: im BryanS ti1.�.. v I tl. )9 00 r �0& -h -0 �tion�11:1�5 Date.of-inspection-:;02/1%201°}1 'Ir Sigratuf of'5to'r"mwat_e-r°1 Spector and title William D. Baugher, Stormwater Inspector a a v.�,q i) n �,., -• � � °' --mot ��•��n —' ...f �-. • ilk '"'q• � 4'-�i :Y I..t aA ,r.�St .: �{ Y � pN - "� •yu�'T 1� 14 r pi:� Zty fS _ ''at, 4y �kr: rp,tals hfl.,,'z* :i •y Ir •+Fr sy ryxs����T,y Fa4 �, z�r,: � � ,� zs ��: r « � el f '-yFi Via• -_� � � ' t e 41 C 'er.?'3nj 77 Lt.I .�.' •r" u e;r t :►�" �Y _e a ;' � h'L,�'!}ty�-1r t �.7 mil` 'i�ti,�,i�,r �rt :.0 31 w" T. SASS t ti• t r i� n f ».� �'� f�'�J I RITZ F. Mimi 1.7 _r'Al IlidS� ram! ...JT AZ 3 say r w�F.r .y r: '•!�y`.�1: ��u �` loop AS yJk 4Y d 44 yl f 1 W .-♦ L,.`ti yyM �Ro'?r1 North Carolina Beverly Eaves Perdue Governor Mr. Jim Bryan, Secretary Abbey Green, Inc. P.O. Box 12339 Winston-Salem, NC 27117 Dear Mr. Bryan: NC EH tl Department of Environment and Natural Resources Division of water Quality Coleen H. Sullins Director January 29, 2010 '� Dee Freeman Secretary N.C. DeDL of ENR FEB .p 4 2010 .. �r,.;ton-Salem Regional Offlce Subject: General Permit No. NCG 130000 Abbey Green, Inc. COC NCG130060 Forsyth County In accordance with your application fora discharge permit received on January 8, 2010, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement betiyeen North Carolina and the US Environmental Protection Agency dated October 15; 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect_ the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of 1_arld Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Jennifer Jones at telephone number (919) 807-6379 r_ S incerely, ORIGINAL SIGNED BY KEN PICKLE for Coleen H. Sullins cc: ,Winston Salem Regional Office, Steve Tedder Central Files Stormwater Permitting Unit Files Wetlands and Sforrar:aier Branch 1617 Mail SewicQ Center, Raleigh, North Carolina 27699-1617 One Location: 512 N. S9lishury St, Raleigh, North Carnlina 27604 N or th Camfi na Phone: 919.807-63001 FAX: 919.807.6494 i C{rstomer Service: 1.877-623-6748���Lr���s , Internet: wvhv.newaterquality.org ill An Equal OppDOUwfa l AirirmaNt e Acfon Enfployer STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG.130000 CERTIFICATE OF COVERAGE No. NCG130060 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the Provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Abbey Green, Inc. is hereby authorized to discharge stormwater from a facility located at: Abbey Green, Inc. 5030 Overdale Road Winston-Salem Forsyth County to receiving waters designated as a UT to South Fork Muddy Creek, a class C water in the Yadkin River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, IV, V, and VI of General Permit No. NCG 130000.as attached. This certificate of coverage shall become effective January'29, 2010. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day January 29, 2010. ORIGINAL SIGNED BY KEN PICKLE fir Coleen H. Sullins., Director Division of Water Quality By the Authority of the Environmental Management Commission /.� ��m;. .• < !z�/�mw :� �Jw:� - . ��_\� � . ` � �. NCG13®®f0 Map Scale 1:18,521 Abbey Green, Inc. Winston-Salem, NC Latitude: 361 01' 57" N Longitude: 8011 14' 02" W County: Forsyth Receiving Stream: South Fork Muddy Creek Stream Class: C Sub -basin: 03-07-04 (Yadkin River Basin) Facility Location wj Division of Water Quality / Water Quality Section Yr. NC®ENR National Pollutant Discharge Elimination System gym, [ildar KKK P TfVMMJ.T MY, i1Y,I,� tY10lIm NCG130000 NOTICE OF INTENT FOR AGEVCY USE -ONLY Date Re=ved Year I Mnmh I Da O C,I LP CertificatedC C'hmk N I Amp®t t7 fo Permit Anisped to National Pollutant Discharge Elimination System application for coverage under General Permit NCGI30000: STORMWATER DISCHARGES associated with activities Classified as: The wholesale trade of non-metal waste and scrap (hereafter referred to as the non-metal waste recycling industry) a portion of SIC' 5093; and like activities deemed by DWQ to be similar in the process and/or the exposure of raw materials, products, by-products, or waste materials (SIC' WA) The following activities are specifically excluded from coverage under this General Permit: • Establishments primarily engaged in the wholesale trade of metal waste and scrap, iron and stGLO scrap, and nonferrous metal scrap (hereafter referred to as the metal waste recycling industry) ru • Establishments primarily engaged in waste oil recycling' _A • Establishments primarily engaged in automobile wrecking for scrap x • Standard Industrial Classification Code T (Please print or type) 1) Mailing address of owner/operator (address to which all permd coffesmnden22 will belled: Name Abbey Green, Inc. _ Street Addr@SS Post Office Box 12339 City Winston-Salem State NC ZIP Code 27117 Telephone No. 336 345-7793 Fax: 336 886-8618 E-mail Address br and ' 09mil _ cam 2) Location of facility producing discharge: Facility Name Abbey Green, Inc. Facility Contact Jim Bryan Contact E-mail J)�ryaal jq rmail _ com Street Address 5030 Overdale Road City County Winston-Salem State NC ZIP Code 27127 Forsyth Telephone No. 336 886-1192 Fax:, 886-8618 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). 1-40 to US-52S, Exit 105 (Clemmonsville Rd) , Turn Left (East), site is 1 1/4 mi. South of E. clemmonsville Rd, on West Side of Overdale Rd - (A copy of a county map or USGS quad sheet with faci.14 dearty located on the map is required to be subnn ited with this application) 4) Latitude 36° 11 55.6" N Longitude 800 13' 59.7"W (degrees, minutes, seconds) Page 1 of 4 SWU-22"71408 last Revised 7/14120D8 pr. NCG130000 N.O.I. S) This NPDES Permit Application applies to which of the following : ® New or Proposed Facility Date operation is to begin ❑ Existing 6) Standard Industrial Classification: March 2010 Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: s o 9 a 7) Provide a brief narrative description of the types of industrial activMes and products manufactured at this facility: The facilityi2roposes to recover, recycles and provide for storage, disposal, and transportation ofconstruction and demolition debria. 8) Discharge points: pond Now many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property? outlet 9) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? Unnamed tributary to South Fork Muddy Creek If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). 10) Does this facility have any other NPDES permits? ® No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: _ 11) Does this facility have any Mon -Discharge permits (ex: recycle permits)? ® No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 12) Does this facility employ any best management practices for stormwater control? ❑ No 10 Yes If yes, please brieflydesCdbe: _. A 100-foot buffer between waste boundaries and surface waters will be maintained. A stormwater pond will control quantity and quality of stormwater discharged from the site. 13) Does this facility have a Stormwater Pollution Prevention Plan? © No A SWPPP will be developed following receipt of the permit ❑ Yes If yes, when was it implemented? 14) Are vehicle maintenance activities occurring at this facility? ®No ❑Yes Page 2 of 4 SWU-228-071408 last Revised 7114rAm NCG130000 N.U.I. 15) Hazardous Waste; a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? ® No © Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? ® No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? © No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year: Name of transport 1 disposal vendor: Vendor address: 16) Certification: North Carolina General Statute 143-215.6 b (f) provides that; Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fad in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the (Environmental Managementi Commission implementing this Article shall be guilty of a pass 2 misdemeanor which may include a fine riot to exceed ten dxKtsand doliws ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. i certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: _Y; riO, :B t` 4f ra t� Title_ '-If- c.t_r. �e' z'L�t _ (Signature of Ap ( - J-7 -- / 0 (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR Page 3 of 4 SWU-228-071408 Last Revised 7/14120oa