Loading...
HomeMy WebLinkAboutNCG130012_COMPLETE FILE - HISTORICAL_20130531STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. I /v '�& 13w a DOC TYPE L9'HISTORICALFILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD Compliance Inspection Report Permit: NCG130012 SOC: County: Forsyth Region: Winston-Salem Contact Person: Jeff King Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 06/01/08 Expiration: 05/31/13 Owner: Sonoco Products Co Effective: Expiration: Facility: Sonoco Products Co -Winston-Salem 4175 Glenn Ave Inspection Date: 04/04/2013 Primary Inspector: Ron Boone Secondary Inspector(s): Title: Entry Time: 09:00 AM Winston Salem NC 27105 Phone: 336-767-0000 Certification: Exit Time: 11:15 AM Phone: Phone: 336 771-4967 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater Discharge COC Facility Status: Compliant ■ Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 tr Permit: NGG130012 Owner - Facility: 5onoco Products Co Inspection Date: 04/04/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted by City of Winston Salem Stormwater Inspection Bill Baugher. Please refer to the attached inspection summary letter. Page: 2 Permit: NCG130012 Owner -Facility: 5onoco Products Co Inspection Date: 04/04/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ❑ ■ n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ■ n n n # Has the facility evaluated feasible alternatives to current practices? n n n ■ # Does the facility provide all necessary secondary containment? n n n ■ # Does the Plan include a BMP summary? n ■ n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n -n n # Does the facility provide and document Employee Training? ■ n n n # Does the Plan include a list of Responsible Party(s)? n n n ■ # Is the Plan reviewed and updated annually? ❑ ❑ n ■ # Does the Plan include a Stormwater Facility Inspection Program? ■ n n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment: Inspection conducted by City of Winston Salem Stormwater Inspection Bill Baugher. Please refer to the attached inspection summary letter. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? D n 0 n Comment: Inspection conducted by City of Winston Salem Stormwater Inspection Bill Baugher. Please refer to the attached inspection summary letter. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ Q ■ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ■ n Comment: Inspection conducted by City of Winston Salem Stormwater Inspection Bill Baugher. Please refer to the attached inspection summary letter. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ n n n # Were all outfalls observed during the inspection? ■ Q Q n # If the facility has representative outfall status, is it properly documented by the Division? n n ■ Page: 3 Permit: NCG130012 Owner - Facility: Sonoco Products Co Inspection Date: 04/04/2013 Inspection Type: Compliance Evaluation # Has the facility evaluated all illicit (non stormwater) discharges? Reason for Visit: Routine p■pn Comment: Inspection conducted by City of Winston Salem Stormwater Inspection Bill Baugher. Please refer to the attached inspection summary letter. Page: 4 1',ulilic VL'o ic's' De�iart=pmt' Stnms�vatcrl�rosias�.and Sediis�aiation ranrral i'rogrrxm WC727 xwiF .t_ City of Winston-Salem Stormwater Division Surface Water Inspection for Industrial Sites Part I - General Information A) Official Company Name: Sonoco Recycling LLC B) Physical Address: 4175 North Glenn Ave, Winston Salem, NC 27105 Telephone Number: (336) 767-000 C) Mailing Address, if different from above address: Same as above D) Primary contact who is authorized to represent company in official business: Contact: Jeff King Title: Operational Manager Contact number(s): (336) 767-0000 Ext 102 E) SIC Code Number of business: 5093 F) NC Stormwater NPDES Permit Number: NCG # 130012 G) Any other control authority permit(s) (ex.: air control, wastewater, hazardous waste) & number(s): None Air Permit # City of Winston-Salem - IWC Permit # H) Brief description of manufacturing process of products produced on site: Wholesale trade of non-metal waste and scrap I) Any major changes in facility design, construction, operation, or maintenance in the past 5 years: ❑Yes MNo If yes, please note: .I) Any anticipated changes to facility design, construction, operation, or maintenance in the future? ❑ Yes ®No If yes, please note: K) Any enforcement actions levied against your company regarding its stormwater permit in the past 5 years? ❑ Yes ®No If yes, please note: 1' Page W L) Is there a: 1. Stormwater NPDES permit: N Yes ❑No 2. Stormwater Pollution Prevention Plan: ®Yes ❑No 3. Spill Prevention & Response Plan! ®Yes❑No 4. Stormwater Management Plan: ®Yes ❑No 5. Analytical & Qualitative Monitoring Records: ®Yes ❑No 6. Preventive Maintenance & Good Housekeeping Program: NYes ❑No 7. Training Records of Employees in regards to spill response, cleanup procedures, and preventive measures: NYes ❑No NOTES: Part II - Stormwater Pollution Prevention Plan A) Site Plan (General location map & description of physical facility and potential pollutants) 1. Ultimate receiving water(s): ®Yes ❑No 2. Accurate latitude & longitude of point(s) of discharge: NYes ❑No B) Site Map - Accurate outlay of the following items: 1. Distance legend: ®Yes❑No 2. Location of industrial activities (including storage, disposal, un/loading): ®Yes ❑No 3. Drainage structures: ®Yes ❑No 4. Drainage area for each outfall w/ activities in that area: ❑Yes NNo 5. Building locations: NYes ❑No 6. Existing BMP'S & impervious surfaces: ❑ Yes NNo 7. % of each drainage area that is impervious: N Yes ❑No Notes a narrative needs to be developed for all the Non -Structural BMP's. Sonoco has several BMP activity's in place but are not documented. C) Does each outfall have a narrative description w/ potential pollutants: El Yes NNo D) Does the facility have non-stormwater discharges?❑Yes NNo If yes, skip to question #3 1. If no, is a certification statement present? ❑ Yes ®No 2. If yes, is the following information available? a. Description of method(s) to make determination ❑ Yes NNo b. Date ❑Yes NNo c. On -site drainage points observed: ®Yes ❑No 21Page 3. If facility has non-stormwater discharges, what is NPDES permit number? NOTES: There is no NON-Stormwater observations conducted and documented. Part III - Stormwater Management Plan A) Feasibility Study 1. Any measures or practices of operation needed to be implemented / modified? ®Yes ❑No 2. If no, how is stormwater diverted from possible area of contamination? B) Storage Practices 1. Products — Raw: N Intermediate: ❑ Final: ❑ a. Storage Areas: Outdoor❑ Indoor N Both ❑ b. If outdoor, is area roofed or enclosed? ❑Yes ❑No 2. Unloading/loading dock(s) ®Yes ❑No a. If yes, is dock(s) covered? ®Yes ❑No b. Are dikes or berms constructed to covey stormwater away from docks? ❑ Yes NNo c. If a catch basin(s) is in the unloading area, is it plumbed into the stormwater collection system? ❑ Yes ❑No N NIA 3. Outdoor process (es) N Yes ❑No a. If yes,. what measure(s) is employed to reduce pollution? Small truck unloading is in a containment area, so wind and rain flow is diverted way for area. 4. Dust & particulate control process (es): El Yes ❑No ® N/A a. If yes, what measure(s) is employed to reduce pollution? Mist eliminator is utilized to capture dust emissions for chrome. 5. Waste Disposal (temporary and/or permanent) N Yes ❑No a. If yes, is waste disposal area(s) covered? El Yes NNo Dumpsters with lids, and drain plugs C) Secondary Containment for bulk storage of liquid storage, SARA, water priority chemicals, or Hazardous materials 1. Any secondary containment structures on property? ❑ Yes N No a. If yes, is water connected to a stormwater conveyance system? ❑ Yes ❑No b. If yes, what methods are used to operate valves? C. What is the protocol for determining if stormwater is contaminated? d. Where are your records of stormwater release from secondary containment area(s)? No releases * ** Look for individual making observations, description of release, date, & time) E) Analytical and/or Qualitative Monitoring N Yes ❑No Qualitative only 31l'age IS ** Observe for violations of cutoff limits, monitoring frequency, proper timetables of rr sample type, certified lab, following up violations Win 24 hours to DWQ** Comments: Part IV - Spin Prevention Plan A) Does your facility have a SWPPP? ®Yes ❑No 1. If yes, date of last revision? 6/27/2012 **�* Verify that revision date is after the last major change to industry_(Part 1, Question H) B) Has your business had a significant leak or spill in the past 5 years? ❑Yes ®No l . If yes, what corrective measures were taken to ensure future incidents would not occur? C) Is the following information incorporated into SPP/SPR? : 1. Areas prone to spills & discharge points (reference Part I11 B): ® Yes ONo 2. Spill response & equipment: ®Yes ❑No 3. Spill cleanup, containment, diversion, & isolation: ®Yes ❑No 4. Reporting procedure (including names & numbers): ® Yes ❑No F) Materials Handling & Storage 1. Does your facility practice recycling, reclaiming, and/or reuse process materials to reduce volume?®Yes ❑No 2. Any floor drains in material handling & storage areas? ❑Yes ®No a. If yes, where do they drain? General Comments: Part V - Preventative Maintenance & Good Housekeeping A) Are all equipment & systems identified for inspections? ®Yes ❑No B) Are periodic inspections/tests for above -mentioned items conducted? ®Yes ❑No C) Are spare parts for equipment available on -site? ®Yes ❑No 1. 1f not, availability? D) Are complete records Dept of all preventive maintenance repairs? ®Yes ❑No 41Page E) Does facility have an inspection form for areas w/ potential of pollution? ®Yes ❑No (Ex: unloading, storage, outdoor process, waste) 1. If yes, frequency of inspection? Daily, all areas are inspected for GH/PM by supervisors for each area. Documentation is kept in a log book and signed by the supervisors. E) Are floors & ground surfaces clean and dry to prevent contamination in the event of a storm? M Yes [:]No G) Are drums &'containers on pallets to avoid corrosion & contact w/ moisture? ❑Yes❑No M NIA H) Are stored containers out of direct traffic routes to prevent accidental spill? M Yes ❑ No Part VI - Training A) How often are employees trained 1 refreshed on SPR plan? Annually B) Prominent placement of equipment & SPR material for employees?®Yes ❑No ❑NIA Q Are signs posted for employees concerning good housekeeping measures? ❑Yes MNo D) What training resources (handbooks, film, and drills) are available for your employees? Plant manager conducts training once a year with 100% attendance Part VII - Miscellaneous Overall comments and observations: I . Identify each outfall and give a description of the potential pollutants that could be expected to present in the stormwater discharge for each outfall. 2. Drainage boundaries should be marked on the site map, with total contributing area for each outfall 3. A narrative description shall be provided of all of Sonoco's BMP's. 4. Permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharge. 5. Sonoco has a great stormwater management plan. It is very organized, detailed, and concise. We were impressed with cooperation and understanding. The Stormwater Division looks forward to a great working relationship with Mr. King. 5 1 P a g e Company representative(s) that participated in inspection: Jeff King and Debbie Griffin Title: Plant Manager, Start of Inspection: 09:00 am Completion of Inspection: 11:15 am Date: 4/4/2013 Signature of City Stormwater Inspector William Baugher Title: Stormwater Inspector 61Page Permit: NGG130012 SOC: County: Forsyth Region: Winston-Salem Compliance Inspection Report Effective: 05/01/03 Expiration: 04130/08 Owner: Sonoco Products Co Effective: Expiration: Facility: Sonoco Products Co -Winston Sal 4175 Glenn Ave Contact Person: Blake Boyd Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 01/03/2008 Primary Inspector: Rose Pruitt Secondary Inspector(s): Title: Entry Time: 11:00 AM Winston Salem NC 27105 Phone: 803-738-1900 Certification: Exit Time: 02:00 PM Phone: Phone: 338-771-5000 Reason for Inspection: Follow-up Inspection Type: Stormwater Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater Discharge COC Facility Status: Q Compliant © Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit_ NCG130012 Dwyer - Facility: Sonoco Products Co Inspection Date: 01/03/2008 Inspection Type- Stormwater Inspection Summary: Reviewed SP3, emailed Trent Mckenzie about changes Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plar? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spi#Is occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (Si # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: sp3 incomplete Reason for Visit: Follow-up Yes No NA NE ®nnn mm0n ®nnn Donn nn®n ®nnn 0 0 m 0 ennn ®nnn ®nnn 0 00 11nnn ®nnn Donn U m D 0 Page: 2 SWP3 FORMS REVISED Subject: SWP3 FORMS REVISED From: Trent.McKenzie@sonoco.com Date: Mon, 21 Jan 2008 08:06:42 -0500 To: rose.pruitt@ncmail.net Here are the two forms with the revisions you requested. Let me know if there is anything else you need. Trent McKenzie Environmental Specialist Sonoco (Phone) 843-383-7652 (Fax) 843-383-3394 ----- Forwarded by Trent McKenzie/Industrial Products/Sonoco Products Company on 01/21/2008 08:05 AM ----- Debbie Griffin To: Trent McKenzie/Industrial Products/Sonoco Products Company@Sonoco Products 01/18/2008 04:11 PM Company cc: Jeff King/Industrial Products/Sonoco Products Company@Sonoco Products Company Subject: SWP3 FORMS REVISED Please see attached. Let me know if I need to modify anything. Thank you, Debbie Griffin Office Manager Sonoco Recycling Winston-Salem Division Ph': 336/767-0000 Fx: 336/767-0850 Ce: 336/669-3375 / 336/817-6216 This e-mail message and all documents which accompany it are intended only for the Use of the individual or entity to which addressed, and may contain privileged or confidential information. Any unauthorized disclosure or distribution of this e-mail message is prohibited. If you have received this e-mail message in error, please notify the sender and delete this from all computers. Content -Type: application/x-ms-excel Safety Activity & Trng Plan 08 Proposal.xls Content -Encoding: base64 HOUSEKEEPING CHART.xIs Content -Type: application/x-ins-excel 1 of 2 1/23/2008 1.0:31 AM SIR W/S DIVISION INSPECTION CHECKLIST (WEEKLY) INSPECTOR: DATE, PLANT AREA CLEANED BY SATISFACTORY UNSAT. COMMENTS 1. TIPPING YARD - DEBRIS -PAPER .-PALLETS 2. LOADING DOCK - DEBRIS - WATER 3. BALER AREA -OIL - WIRE - DEBRIS, DUST .4 014 4. BREAKROOM/RESTROOM - FLOOR -TRASH WINDOWS Ell 22 5. OFFICE - FLOOR - TRASH/RECYCLING TRAYS - WINDOWS/MIRRORS - DUST (TABLES, DESK, BOOKSHELVES,CHAI RAILS FILE CABINETS,ACCES.) - BATHROOMS - KITCHEN . . . . . . . ... ... . . .. B. SHOPtTOOLROOM - FLOOR - CLEAN TOOLS -TOOLSTORAGE 7. WAREHOUSE -CORNERS - PLATFORMS - ELEVATIONS - RUNWAYS -FLOORS M 2 11 M, ffig :eFAM'_4M 8. PARKING LOT -TRASH PAPER WASTE DEBRIS -PALLETS OBSTRUCTIONS 9. TRUCKING WASH WEEKLY CLEAN INSIDE (DAILY) 6 IRS 10. STORMWATER CONTROLS - DEBRIS/OBSTRUCTIONS now 4 WER, po..'?T"' 55 SAFETY ACTIVITY 3 TRAINING SCHEDULE 2008 I'lant'I'ra8uctlo0nWo istics,r.'r;.; FREQUENCY W M I ISIA DI E NE a E- NI• OSHA STD CSHM Who's REF q REF # Job ZERO TOLERANCE SAFETY RULES A E - T T M_, NI f : K - HI RI f Ui "_L L L L A A Y' Y Y Y NI. L Jan DONE Feb Morph April May June July Aug Sept Oct Pendin Nov Doc ,_ X PPE 1910,132 8,45/5,10 1 1 1 X1 Pending POST OSHA 300 LOG 1904.E-12 8.10 1 1 1 X1 Pending Pending Pending EMERGENCY ACTION PLAN 1910.38 a 4,10 1 X Pending J. S.A. REVIEW 2201 DIGEST 6.30 1 X. I Pendin LOCKOUT PROCEDURE AUDIT-HECP 1910.147 7.3017.31 X I I Pending MSDS REVIEW-HAZCOM 1910.12 5,50 X' Pending CONF. SPACE ENTRY REVIEW 1910.14E d 14 7,10 X1 I Pendin SAFETY RULES REVIEW 2201 DIGEST 850 1XI, I Pending AUDIOMETRIC TESTING 1910.95 5.15 X" Pendin NOISE TRAINING 1910.95 k 515 X . I Pending STOPISAFESTART REFRESHER TRAINING DUPONT PRIMEDIA Pending X: CONF. SPACE RESCUE PRACTICE 1910.14E k 1 7.10 1 X . I Pending FORK TRUCK TRAINING 1910.17E I 7.20 x Pending CPR 1 FIRST AID TRAINING 1910.161(bl 8.30 X Pending BLOODBORNE DISEASE TRAINING 1910.1030 e 5 5.17 xPending RESPIRATOR TRAINING 1910.134 b 3 5.20 NIA X FIRE EXT, I HOSE TRAINING 1910.157 4.20 X Pendin FIRE BRIGADE TRAINING 1910A56A 2 4.20 NIA X LEAD TRAINING 1910.125 BA N/A 1XI PRESSURE WASHER TRAINING 1910.244 7,41 1XI I Pending ASBESTOS REMOVAL TRAINING 1910.151 5,3 NIA I X _ ELECTRICAL SAFETY WORK PRACTICES 1910,331 7.33 1 X 1,1 BACK SAFETY TRAINiNG1ERGONOMICS 2201 DIGEST 5.60 1. .1 xi I Pending HEAT STRESS TRAINING 2201 DIGEST 5.13 X JOB SAFETY ANALYSIS TRAINING JSA's 2201 DIGEST 6.3D X HOISTING EQJIPMENTTRAINING 1910.179 7.55 N/A X- CONTRACTOR SAFETY TRAINING 1910,119 7.70 X. EVACUATION DRII.LIEMERGENCY RESPONSE EAP 4.1D x : Pending SAFETY MEETINGS 2201 DIGEST 6,40 X•_ SAFETY COMMITTEE MEETINGS 2201 DIGEST 6.40 X SAFETY AUDITS PROGRAMS I PROCEDURES 1910.36 3.10 X SAFETY INSPECTIONS(ACTS ICONDITIONS) 1910.212 3,10 MACHINE GUARDING 1910.217 8.30 NFW EQUIPMENTIPROCESS TRAINING 1910.144 8.30 xI INJURY INVESTIGATION TRAINING 2201 DIGEST 2.30 X . DOCK SAFETY TRAINING 1910.178 7.22 x STORMWATER TRAINING X Pendin SPILL RESPONSE TRAINING X Pendingj HAZARDOUS WASTE RESPONSE 1910A2 8.30 X DEFENSIVE DRIVER COURSE TRAINING 49 CFR 49 CFR x _' Pending CONTROLLED SUBSTANCEIALCO USE& TESTIN FMCSR 382.00 X': Pending DRIVER QUALIF€CATION FMCSR 391.00 X I Pendin DRIVING.CMV'S VIDEO SET VIA JJ KELLER FMCSR 392.00 X Pendin LOAD SECUREMENT FMCSR 393.00 X Pendin HOURS OF SERVICE FMCSR' 395.00 _ X Pending Page 1 INSPECTION, REPAIR & MAINTENANCE. — FmdSk , 996.00 _ X Pending Page 2 r' Re: Paper Stock SWP3 ma lbox:///Cl/Documents%20and%24Settings/RPru itt/AppI ication%... Subject: Re: Paper Stock SWP3 From: Rose Pruitt <Rose.Pruitt@ncmail. net> Date: Wed, 02 Jan 2008 15:19:04 -0500 To: Trent.McKenzie@sonoco.com sonoco.com Trent I have reviewed your most recent SP3 submission and have found these few things that should be done to bring your facility into compliance. I. Outfalls( storm drains?), MS4 and Leak Creek are not noted on your site map, fig 2.1-1 2. Spill response training should be added to your Safety Activity and Training schedule 3. Qualitative Monitoring for Stormwater outfalls must be recorded for each outfall separately. A sample monitoring form is attached for you convenience. 4. Inspections must be made of facility stormwater controls. The addition of a #10 to accommodate this additional item on your "SR W/S Division Inspection Checklist (Weekly)" form would satisfy this requirement. 5. The GIS map view you submitted in place of an expanded view of your previous USGS map does not identify surface waters. Please resubmit. It is suggested you will find this data on the USGS map view of Walkertown NC (C 18NW) at a scale of 1:24000. You will need only to locate your facility on the map with accurate latitude longitude of the point of discharge. Please make these corrections and resubmit just these items to me by January 17, 2008 to bring your facility into compliance. Thanks. Rose Pruitt NCDENR-DWQ Winston-Salem Regional Office Division of Water Quality, Surface Water Protection 585 Waughtown"Street Winston-Salem, NC 27107 Voice: (336) 771--5000 FAX: (336) 771-4630 On 12/6/2007 10:05 AM, Trerit.McKenzie a,sonoco.com wrote: Rose Here is our updated SWP3 along with corresponding documentation. I made the changes the we had previously discussed. The housekeeping checklist is filled out on a weekly basis. The monitoring results documentation I know are probably not adequate but from this point forward we will be using the form that is in our SWP3. If there is anything else you need please let me know. Thanks again for your help in getting this resolved. Trent McKenzie Environmental Specialist Sonoco (Phone) 843-383-7652 1 of2 1/3/2008 11:26 AM Re: Nper'St&k SWP3 Subject: Re: Paper Stock SWP3 From: Trent. McKenzie@sonoco.com Date: Wed, 2 Jan 2008 15:36:51 -0500 To: Rose Pruitt <Rose.Pruitt@ncmail.net> Return Receipt Your Re: Paper Stock SWP3 document: was Trent McKenzie/Industrial Products/Sonoco Products Company received by: at: 01/02/2008 03:36:51 PM ----------------------------------------- This e-mail message and all documents which accompany it are intended only for the use of the individual or entity to which addressed, and may contain privileged or confidential information. Any unauthorized disclosure or distribution of this e-mail message is prohibited. If you have received this e-mail message in error, please notify the sender and delete this from all computers. 0 1 of 1 1/3/2008 9:43 AM Mr. Myles Cohen Paperstock Dealers 4175 Glenn Avenue Winston-Salem, NC 27105 Dear Mr. Cohen: Pal - Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality January 16, 2008 RECEIVED N.C. Deot, of ENR AUG a 4 2010 WlrtstcnSalem Regional orrice Subject: NPDES General Permit NCG130000 Certificate of Coverage NCG 130012 Paperstock Dealers Formerly Sonoco Products Company Forsyth County Division personnel have reviewed and approved your request to change your name tinder the General Permit, received on October 18, 2007. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. cc: DWQ Central Files Winston-Salem Regional Office Stormwater Permitting Unit Sincerely, _kColeen H. Sullins t• i ,�:,, 1. +•� �. i.., JA N 1 8 2008 NC DENR MRC DWQ-Surface Water Protection W oi"�ll1htCarn ina �vaiurnlj North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-16,17 ' Phone (919) 733-7015 Customer Service Intemet: h2o.enr.state.naus 512 N. Salisbury St. Raleigh, NC- 27604 YAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG130000 CERTIFICATE OF COVERAGE No. NCG130012 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PAPERSTOCK DEALERS is hereby authorized to discharge stormwater from a facility located at PAPERSTOCK DEALERS 4175 GLENN AVENUE WINSTON-SALEM FORSYTH COUNTY to receiving waters designated as the Winston-Salem MSSS to Leak Fork Creek, a class C stream, in the Yadkin -Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 1I, II1, IV, V and VI of General Permit No. NCG 130000 as attached. This certificate of coverage shall become effective January 16, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day January 16, 2008. ;I- Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission o�oF WgrE9oG. 0 'C January 16, 2008 Mr- Myles Cohen Paperstock Dealers 4175 Glenn Avenue Winston-Salem, NC 27105 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Subject: NPDES General Permit NCG130000 Certificate of Coverage NCG130012 Paperstock Dealers Formerly Sonoco Products Company Forsyth County Dear Mr. Cohen: Division personnel have reviewed and approved your request to change your name under the General Permit, received on October 18, 2007. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. Sincerely, ii-Coleen H. Sullins cc: DWQ Central Files Winston-Salem Regional Office Stormwater Pcrrnitting Unit One NplthCarolina North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Intemet: h2o.enr.state.tsc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportun4/Aifirmative Action Employer — 50% Recycledl10% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG130000 CERTIFICATE OF COVERAGE No. NCG130012 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215. I, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PAPERSTOCK DEALERS is hereby authorized to discharge stormwater from a facility located at PAPERSTOCK DEALERS 4175 GLENN AVENUE WINSTON-SALEM FORSYTH COUNTY to receiving waters designated as the Winston-Salem MSSS to Leak Fork Creek, a class C stream, in the Yadkin -Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, 111, IV, V and. VI of General Permit No. NCG 130000 as attached. This certificate of coverage shall become effective January 16, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day January 16, 2008. /7 ;,e Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission 100 P I/ aper Stock SWP3 Subject: Re: Paper Stock SWP3 From: Trent. McKenzie@sonoco.com Date: Wed. 9 Jan 2008 10:36:24 -0500 To: Rose.Pruitt@NCmail.net Rose have a form (attachment B) in our SWP3 to be filled out for the qualitative stormwater analysis for each outfall. The instructions at the top explain that. I have also modified the site map to include a smaller map on page two that shows the general location of Leak Fork and on the larger map I have a note that shows the direction and distance to leak fork. The storm drains are also depicted with the gray circles labeled 1-5 along with the two storm drains that are not on Paper Stock's property. The GIS map has also been modified in attachment D. The two documents you referenced below are being modified as well. As soon as get copies of the modified versions I will forward them on to you. Thanks again for your help on this. Trent McKenzie Environmental Specialist Sonoco (Phone) 843-383-7652 (Fax) 843-383-3394 Rose Pruitt <Rose.Pruitt@ncmai1.net> 01/02/2008 03:19 PM Please respond to Rose.Pruitt To: Trent. McKenzie@sonoco.com CC" Subject: Re: Paper Stock SWP3 Trent I have reviewed your most recent SP3 submission and have found these few things that should be done to bring your facility into compliance. 1. Outfalls( storm drains?), MS4 and Leak Creek are not noted on your site map, fig 2.1-1 2. Spill response training should be added to your Safety Activity and Training schedule 3. Qualitative Monitoring for Stormwater outfalls must be recorded for each outfall separately. A sample monitoring form is attached for you convenience. 4. Inspections must be made of facility stormwater controls. The addition of a 910 to accommodate this additional item on your "SR W/S Division Inspection Checklist (Weekly)" form would satisfy this requirement. 5. The GIS map view you submitted in place of an expanded view of your previous USGS reap does not identify surface waters. Please resubmit. It is suggested you will find this data on the USGS reap view of Walkertown NC (CI 8NW) at a scale of 1:24000. You will need only to locate your facility on the map with accurate latitude longitude of the point of discharge. Please make these corrections and resubmit just these items to me by January 17, 2008 to bring your facility into compliance. Thanks. 1 of 2 1/18/2008 1 1:51 AM Re: Paper Stock SWP3 Rose Pruitt NCDENR-DWQ Winston-Salem Regional Office Division of Water Quality, Surface Water Protection 585 Waugh.town St-reet Winston-Salem, NC 27107 Voice: (336) 771--5000 FAX: (336) 771-4630 On 12/6/2007 10:05 AM, 7`rent:McKenzie rr,sonoco.corn wrote: Rose Here is our updated SWP3 along with corresponding documentation. I made the changes the we had previously discussed. The housekeeping checklist is filled out on a weekly basis. The monitoring results documentation I know are probably not adequate but from this point forward we will be using the form that is in our SWP3. If there is anything else you need please let me know. Thanks again for your help in getting this resolved. Trent McKenzie Environmental Specialist Sonoco (Phone) 843-383-7652 (Fax) 843-383-3394 This e-mail message and all documents which accompany it are intended only for the use of the individual or entity to which addressed, and may contain privileged or confidential information. Any unauthorized disclosure or distribution of this e-mail message is prohibited. if you have received this e-mail message in error, please notify the sender and delete this from all computers. This e-mail message and all documents which accompany it are intended only for the use of the individual or entity to -ss,hich addressed, and may contain privileged or confidential information. Any unauthorized disclosure or distribution of this e-mail message is prohibited. if you have received this e-mail message in error, please notify the sender and delete this from all computers. I Content -Type: applicationloctet-stream SWU-242QualitativeMonitoringForm.pdf Content -Encoding: base64 WSPSD SWP3 - 01-03-2008.doc Content -Type: application/octet-stream i Content -Encoding: base64 2 of 2 1/l 812008 1 1:51 AM Storm Water Pollutions Prevention Plan Paper Stock Dealers — Winston Salem Industrial Storm Water Pollution Prevention Plan Paper Sock Dealers WISED 01/03/2008 Review Plan Prior To 1 Year Fronx Above Date Based on Summary Guidance for Industrial Storm Water Pollution Prevention Plans EPA 833-R-92-002, October 1992 Store: Writer Pollution Prevention Plana Paper Stock Dealers — Winston Salena CONTENTS PlanCertification............................................................................................................................... Revision Record ................................................................................................................................ Distribution........................................................................................................................................ 1.0 ORGANIZATION 1.1 Storm Water Pollution Prevention Team................................................................... 1.2 Plan Location and Public Access............................................................................... 2.0 ASSESSMENT 2.1 Site Map(s)................................................................................................................ 2.2 Materials Inventory 2.3 Significant Past Spills and Leaks............................................................................... 2.4 Site Evaluation Summary.......................................................................................... 2.5 Feasibility Study........................................................................................................ 3.0 BEST MANAGEMENT PRACTICES SELECTION.......................................................... 3.1 Good Housekeeping.................................................................................................. 3.2 Preventive Maintenance............................................................................................ 3.3 Visual Inspection....................................................................................................... 3.4 Spill Prevention and Response.................................................................................. 3.5 Sediment and Erosion Prevention... ................................................... ............. , .......... revention.............................................................................. 3.6 Other Best Management Practices............................................................................. 3.7 Employee Training................................................................................................... 3.8 Recordkeeping and Reporting................................................................................... 4.0 IMPLEMENTATION 4.1 Employee Training Program Storm Writer Pollutlo►i Prevention Plan Paper Stock Dealers — Winston Sulena CONTENTS 5.0 EVALUATION..................................................................................................................•- 5.I Annual Site EvaIuation..........................................................................................I.:... 5.2 Recordkeeping and Internal Reporting........................................................................ 5.3 Plan Revisions............................................................................................................. 6.0 MONITORING 6.1 Monitoring Requirements. .................................................. ............. 7.0 SPECIAL REQUIREMENTS............................................................................................... 7.1 Discharges Through Municipal Separate Storm Sewer Systems ................................ 7.2 EPCRA, Section 313, Reporting............................................ ...................................... 7.3 Salt Storage Piles......................................................................................................... ATTACHMENT A — Annual Facility Site Compliance Inspection Form ATTACHMENT B — Semi-annual Visual Inspection Form ATTACHMENT C — Non -Storm Water Discharge Certification Form ATTACHMENT D — GIS Map sp Storm lVater Pollution Prevention Plan Paper Stock Dealers — Winston Salein PLAN CERTIFICATION I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete_ I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Date Storm Water Pollution Prevention Plan Paper Stuck Dealers — Winston Salem REVISION RECORD The following list contains the dates and descriptions of amendments made to the Storm Water Pollution Prevention PIan. 02/10/2006: 151 Draft of Plan 09/19/2007: Update to reflect current operations and personnel 12/03/2007: Update to reflect current operations and personnel 01/03/2008: Update to reflect current operations and personnel Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem DISTRIBUTION LIST The following is a list of positions that retain a current issue of the Storm Water Pollution Prevention Plan. Any other copies that exist may not be current. Position: Plant Manager Corporate Office Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem 1.0 ORGANIZATION In planning and organizing our approach to industrial storm water pollution prevention, we have selected a team with specific responsibilities reflecting knowledge of our facility and its operations. Senior management oversees the program and holds overall responsibility for its success. As shown in the roster, communication with upper management and throughout the organization is critical. Both the Storm Water Pollution Prevention Team Roster and the Storm Water Pollution Prevention Plan itself are regularly reviewed and updated to ensure accuracy and coordination with other environmental plans. 1.1. Storm Water Pollution Prevention Team The following personnel comprise the Storm Water Pollution Prevention Team for Paper Stock Dealers. Personnel and their specific responsibilities are noted. Table 1..1-1: Pollution Prevention Team Member Roster POLLUTION PREVENTION TEAM .Completed by: Jeff King Title: Plant Manager Date: 12/03/2007 Name (Team Leader First) Title Phone Jeff King Plant Manager 336-767-0000 Debbie Griffin Office Manager 336-767-0000 Bev Pinnix Administrative Assistant 336-767-0000 Mike Geary Shop Manager 336-744-2575 Trent McKenzie Environmental Contact 843-383-7652 Storm Water Pollution Prevention Plait Paper Stock Dealers — Winston Salem Table 1.1-2: Pollution Prevention Team [Member Responsibilities Res onsibilit Team Member Holds signatory responsibility Jeff King Overall responsibility for the Storm Water JeffKing Pollution Prevention Plan Implements all general permit and pollution Bev Pinnix prevention plan requirement Revises Plan as needed Bev Pinnix Keeps pertinent records Debbie Griffin Ensures reports are submitted Debbie Griffin Defines appropriate goals for the program Mike Geary Conducts site evaluations Jeff King 1 Mike Geary Conducts inspections Jeff King / Mike Geary Determines changes required to SWPPP due to Mike Geary maintenance changes Determines changes required to SWPPP due to Jeff King operational changes Coordinates employee training program Debbie Griffin Maintains clear line of communication with Jeff King plant management Monitors other company environmental plans Debbie Griffin for changes impacting the SWPPP Storm Water Pollution Preventing Plan Paper Stock Dealers — Winston Salem 1.2 Plan Location and Public Access The current Storm Water Pollution Prevention Plan is maintained onsite at the Administrative Office. Paper Stock Dealers will retain the Storm Water Pollution Prevention Plan and all required records for a minimum of 5 years. Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem 2.0 ASSESSMENT Our assessment of Paper Stock Dealers's site was conducted on 12/03/2007. It included development of a "current" site map, a detailed materials inventory to determine both potential sources of storm water pollution and current practices and methods of control. The team collected a list of significant past spills and leaks of toxic or hazardous substances and investigated non -storm water discharges. Finally, the site evaluation is summarized to highlight activities with a high potential for storm water contamination at our site and the pollutants related to each activity. 2.1 Site Map The following map includes a footprint of all buildings, structures, paved areas, and parking lots within this facility. Figure 2.1-1, the Paper Stock Dealers Site Map, includes the following features, labeled and called out in the legend: • All outfalls and storm water discharges • Drainage areas of each storm water outfall • Current structural storm water pollution control measures • Names of receiving waters or Municipal Separate Storm Sewer Systems • Locations of exposed significant materials • Locations of past spills and leaks ■ Locations of high -risk, waste -generating areas and activities • Other areas of concern Storm drains 1-5 depicted on the map are considered outfalls 1-5. They drain to the . Winston Salem municipal separate storm sewer system (MS4). The rest of the site is non -point source discharge from surface runoff (6-7 on the map) and it drains to Leak Fork Creek in the Yadkin -Pee Dee River Basin. The majority of the site perimeter is covered with vegetation that acts as a filter for the non -point source stormwater discharge. Also, the portion of the property located on the west side of Glenn Avenue has a fence around it which acts as a filter for trash and debris. 2.2 Materials Inventory The Storm Water Pollution Prevention Team assessed all materials used, stored, or produced on our facility site. They then evaluated the materials to determine their potential to contribute pollutants to storm water runoff. Table 2.2-1 presents the list of significant materials with such potential. From our materials assessment, we have determined that the following are the significant materials either currently exposed to storm water or exposed to storm water during the past three years. Table 2.2-2 lists details of materials and amounts and types of exposure. It also provides further information on the method and location of storage and disposal areas, materials management practices, treatment practices, and structural/nonstructural control measures. Stornt Water Pollution Preve►rtiorr Phu? Paper Stock Dealers — Wi►tstm Salem Figure 2.1-1: Paper Stock Dealers Site Map o 7 /• /. / ®® K E F I 40 Leak Fort: — 500ft. G A Paper Processing Facility B Paper Processing Facility C Maintenance Shop D Administrative Building E Tanker Storage Shed F '['lash Dumpsters G Load ingtUnioadindStorage Paper Bales (Uncovered) H Unloading Loose Paper(pushed inside to be baled when unloaded Loading Paper Bales (Covered) i Unloading Loose Paper(Covered) K Old Equipment'Pallet Storage (No chemicals present) (Uncovered) L Baler M Oil Dry/Spill Response Equipment H Oil Storage 0 Temporary Bale Storage Storm Drain """ Impervious Surface Boundary — — Stormwater Flow Concrete Barrier Vegetation —•— Fenceline G-Outline Concrete Ditch Latitude, 36' 08' 43" N Longitude 800 13' 38" W Site Map Index Continued on the Next Page IConcrete 0 I i I I ... M A L M6 I� ® JD ti I g i O I I t M [. I1 ► ,. 6 B �6 I Ar II I I j II Gravel -Pavement t RR ^� Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem Figure 2.1-1: Paper Stock Dealers Site Map Drainage Area % Impervious % Pervious Potential Pollutants 1 30 70 Trash and debris from Glenn Ave. traffic and soil erosion. 2 90 10 Trash and debris from Glenn Ave. traffic and paper from production operations. Oillgasoline from spills/releases. 3 100 0 Trash and debris from Glenn Ave. traffic and paper from production operations. Oil/gasoline from spills/releases. 4 95 5 Trash and debris from Glenn Ave. traffic and paper from production operations. Oil/gasoline from spillslreieases. 5 60 40 Trash and debris from Glenn Ave. traffic and paper from production operations. Oillgasoline from spillsireleases. 6 10 90 Paper from production operations and soil erosion, Oil/ gasoline from spills/releases. 7 15 85 Paper from production operations and soil erosion. Oil/ gasoline from spills/releases. o Leak Fork ® 0.i6 F.I ML it 'B. I_ I ravekPavein�t RR Storm Water Pollution Prevention 1111an Paper Stock Dealers — Winston Salem Table 2.2-1: Significant Material Inventory SIGNIFICANT MATERIAL INVENTORY Completed by: Jeff King Title: Plant Manager Date: 12/03/2007 Significant Material Purpose/Location Quantity Total Quantity Exposed in- Last 3 Years Reason for Contact with Storm Water Past Significant Spill/Leak Used Produced Stored Baled Paper Storage Behind Maintenance Shop 100 tons 70,000 tons The storage area is not covered NA Storm Water Pollution Prevention Plat, Paper Stock Dealers — Winston Salem Table 2.2-2: Significant Materials Exposed to Storm Water in the Past Three Years Completed by: Jeff King DESCRIPTION OF EXPOSED SIGNIFICANT MATERIALS Title: Plant Manager Date: 12/03/2007 Period of Quantity Location Method of E:xposed'Significa,nt Material Exposure Exposed (units} {Site Map) Storage or Material Management Practices Disposal Outside/Ship to The material is unloaded in the storage area and is Baled Paper Every Day 100 tons/day 1 either reloaded for shipment as is or is re -baled prior customers to shipment. L= — Stone Water Pollution Prevention Plan Paper Stock Dealers — Winston Salen: 2.3 Significant Spills and Leaks Table 2.3-1 summarizes significant spills and leaks of toxic or hazardous materials that have occurred in the past three years. Locations where spills or leaks have occurred are a high priority for implementation of effective management practices. As of October 10, 2007, there have been no significant spills or leaks at the facility that could have potentially led to storm water contamination. 'cable 2.3-1: Significant Spills and leaks Event Type # Date (Spill or Location Material Qty. Leak NA NA NA NA NA NA Event Still Exposed # Source Reason Amt. Recovered to SW NA NA NA NA NA 2.4 Site Evaluation/Process Summary The only activities conducted on site with potential for storm water exposure are the loading/unloading and storage of paper bales and the unloading of loose paper. Bales of paper are unloaded at location G on the site map. They are then stored at the same location. If any of the bales are damaged and need re -baling then they are transported to either production building as shown on the site map, re -baled, and either stored in the production buildings if space is available or they are returned to the outside storage location. Loose paper is unloaded to be baled at location H on the map and bales are loaded at location I on the map. Wind and debris falling on the ground during the transfer creates potential for trash getting into the stormwater system. However, regular housekeeping is done to minimize this occurrence. There is a tanker truck on site used for refueling but it is kept under a shed which is shown on the map. 2.5 Feasibility Study After evaluating areas of potential contamination, including manufacturing buildings, loading/unloading areas, and outside storage areas, Paper Stock Dealers has determined that is not feasible from a financial standpoint to implement additional stormwater diversion methods including: covering all exposed areas/operation, building diversion systems to prevent stormwater from running through/over exposed pollutant areas, and adding additional dust/particulate control. We have a significant amount property located on the west side of Glenn Avenue behind our maintenance shop that is used for storage of paper bales. Due to the cost associated with covering such a substantial portion of our property, and the minitrzal risk associated with potential contaminants, we will not be able to implement such control measures. Through regular housekeeping (daily/weekly) and standard operating practices, such as moving loose paper operations inside on rainy/windy days and maximizing our inside storage capacity, we will try to minimize the amount of potential pollutants in our stormwater runoff. There is also a significant Storm Water Pollution Prevention Platt Paper Stock Dealers — Winston Salem amount of traffic on the site, therefore adding additional areas of vegetation is not feasible. However, a large portion of the property where there is traffic is covered with either pavement or concrete and those areas that are not are covered with gravel so as to minimize dust disturbances. In order to minimize stormwater contact with processing areas, the paved areas at the manufacturing buildings are sloped away from the processing areas Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem 3.0 BEST MANAGEMENT PRACTICES (BMP) SELECTION An extensive assessment was conducted to determine the presence of specific situations, practices, and processes that could result in storm water contamination at Paper Stock Dealers. If we found a condition was present, we examined a number of different best management practices (BMP) against criteria reflecting applicability, expertise required, implementation cost, maintenance cost, ease of implementation, and risk. The following sections describe the selected best management practices by general type and describe how they apply to each of the potential sources of storm water pollutants found at Paper Stock Dealers. 3.1 Good Housekeeping Good housekeeping practices maintain a clean and orderly work environment. Often the first step towards preventing pollution in storm water from industrial sites involves using common sense to improve the facility-'s basic housekeeping methods. The following procedures are those we have selected to incorporate into our existing housekeeping program. • Provide adequate aisle space to facilitate materials transfer and easy access for inspections. • Store containers, drums, and bags away from direct traffic routes to prevent accidental spills. • Identify all chemical substances present in the workplace that may be exposed to storm water and obtain the Material Safety Data Sheet for each. • Practice good housekeeping measures to reduce or eliminate materials being deposited on clothes and footwear. • Minimize loose paper and other waste materials on the property. Basic housekeeping activities are conducted daily which include: picking up all loose paper from around the manufacturing buildings and the maintenance shop area, blowing the parking/traffic area on the east side of Glenn Avenue, and cleaning the loading dock areas. `Phis insures that storm drains 1-5 identified on the site map are kept clean and clear from any paper, trash or debris. If excessive amounts of dirt or on the drains themselves, they are cleaned as well. Additional weekly activities are conducted that include cleaning up the loose paper from around the paper bale storage area behind the maintenance shop. 3.2 Preventive Maintenance Paper Stock Dealers has incorporated additional elements, routine inspections of facility operations to detect faulty equipment, into our preventive maintenance program to address specific needs identified in this site assessment. The hollowing procedures describe how these measures specifically address existing or potential conditions uncovered during this site assessment. Identify all facility systems, areas and equipment that may malfunction and/or lead to situations that can cause storm water contamination. This includes daily checks on the balers to test the hydraulic system for leaks and functionality. The site glass on the hydraulic tank is checked daily as well to insure the proper Storer Writer Pollution Prevention Plan Paper Stock Dealers — Winston Salem amount of hydraulic fluid is maintained in the unit to insure optimum performance. Forktrucks are also inspected daily according to OSHA guidelines in order to insure proper/safe operation. This includes checking for leaks to insure stormwater pollution is prevented. If problem areas are discovered (i.e. leaking equipment) they should be addressed as soon as possible to minimize the risk of employee safety and Stormwater pollution. 3.3 Visual Inspection Regular visual inspections ensure that all elements of our Storm Water Pollution Prevention Plan are in place and working properly to prevent pollution of storm water runoff from our facility. We have incorporated the following visual inspections into our procedures to address potential and existing problems and to ensure all records are completed and maintained appropriately. This includes daily/weekly inspections of: • Areas where spills or leaks have occurred in the past: • Material storage areas, including bale storage, and material processing areas for leaks, wind blowing, corrosion, or other deterioration or noncontainment. • Material handling areas, including loading, unloading and transfer areas and waste generation, storage, treatment and disposal areas. • Process equipment for leaks, corrosion, or other deterioration. • Material handling equipment for leaks, corrosion, or other deterioration. • Stormwater Conveyances. • Loose paper control systems (fences and concrete walls) 3.4 Spill Prevention and Response Any spill on site should be cleaned up immediately. Figure 2.1-1, the Site Map, identifies areas (oil storage area, and balers) where spills are likely to occur and their drainage points. The oil storage tanks are of steel double -wall construction therefore the likelihood.of any significant spills are minimal. The balers are only on when they are in use therefore if any spills/leaks that are detected during operation are minimized by quickly shutting the machine off. If a hydraulic line were to rupture while the machine is off, the amount of the spill would be minimal because all lines pull from the top of the hydraulic tank. Therefore the amount of the spill would only be what was in the line itself. In each of these areas where spills can occur significant amounts of oil dry are stored in the event a spill occurs. Each of these areas are covered therefore the likelihood of any spill effecting stormwater runoff is very low. Other sources for spills/leaks that could affect stormwater runoff come from the mobile equipment (trucks and forktrueks) on site. Forktrucks are used in operational areas therefore if a spill or leak were to occur on the forktruck, the operator would be close to one of the oil dry storage areas. Each truck is required to maintain a spill containment kit on the truck in the event of a spill or leak. Each kit contains: l5 Spill Pads 3 Socs Storm Water Pollution Prevention Plan Paper Snick Dealers — Winston Salem • Goggles ■ Nitrile Gloves ■ Disposal Instruction Sheet Each kit is designed to contain 7 gallons. It the spill or leak is more than the kit can handle, bales of paper can be utilized to absorb/divert the spill from the storm drains. Our Spill Prevention and Response Program includes education for employee awareness and training in proper material handling and storage. We also ensure that all employees have access to appropriate spill cleanup equipment. The following items summarize the general practices and controls we have added to our program from this site assessment. • Provide appropriate spill clean-up equipment to personnel. • Any employee cleaning up a spill must were the appropriate PPE according to the MSDS. • MSDS's are made available to all employees so that they are aware of the hazards associated with all chemicals in the workplace and proper clean up response activities can be followed. • Use brooms, squeegees, or other mechanical devices/equipment to remove small amounts of dry chemicals or dry solids from areas exposed to precipitation or storm water runoff. • Sweep up dry material spills and dispose properly. • Use shovels to remove larger quantities of dry chemical or solids, as well as wetter solids and sludge. • Locate waste and recycling drums in proper areas. • " Coordinate disposal of all wastes with site management. The site, environmental contact should be notified before final disposal is coordinated. All waste disposal activities will be in accordance with local., state, and federal regulations. Any spill should be reported immediately to the Plant Manager or designee and the Environmental Contact. Phone numbers for each of these are in table 1.1-1. Information to be reported: • Material spilled • Quantity spilled ■ Spill Location ■ Time of spill • Status of cleanup/response activities The Plant Manager or Environmental Contact will determine if third parties need to be notified. Those include: ■ Fire Department - 911 • Police Department — 911 ■ Emergency Medical Personel — 911 ■ Local Emergency Planning Committee-336-767-6161 Slorm Water Pollution Prevention Platt Paper Stock Dealers — Winston Salem ■ State --- 919-733-5291 or 800-858-0368 • Regional EPA Office — 404-562-8700 ■ National Response Center — 800-424-8802 • Cleanup Contractors • Soil Solutions — 1703 Vargrove Street, Winston Salem, 336-725-5844 ■ A&D Environmental — 2718 Uwharrie Rd, Archdale, 336-434-7750 ■ Safety Kleen - 6182 Old Mendenhall Road, Archdale, 336-861-4149 3.5 Sediment and Erosion Prevention and Control Our assessment identified no activities with a potential for significant soil erosion. Areas with potential for this are covered with significant vegetation so as to prevent soil erosion. If areas are identified with the potential for soil erosion then practices (i.e. gravel covering, vegetation installation, etc.) will be implemented to reduce this risk. 3.6 Other Best Management Practices In addition, we employ other best management practices to address specific needs of Paper Stock Dealers. These best management practices are listed below. • Recycle, reduce, re -use process materials to minimize on -site waste. • Wash vehicles to avoid transfer of pollutants across the industrial site. 3.7 Employee Training Training, itself considered a management preventive measure, is an integral part of our planning for the BMPs listed above. These training requirements include those detailed below. • Discuss good housekeeping at employee meetings. • Publicize pollution prevention concepts through posters. • Train appropriate personnel on handling procedures required to reduce spills and leaks. • Ensure employees are aware of the hazards of chemical handling and they aware of the proper spill cleanup procedures to minimize the risk to employees and the environment. 3.8 Recordkeeping and Reporting Records and reports pertinent to these best management practices are outlined below. Establish a system and maintain records of test and inspection schedules, results, and corrective actions. Storer Water Pollution Prevention Plait Paper Stock Dealers — Winston Salein 4.0 IMPLEMENTATION This Storm Water Pollution Prevention Plan, implementation schedule, and strategy have been approved by the Plant Manager. The following areas present our plan for implementation of the selected best management practices, including a schedule and a training plan that ensures our employees are trained and able to carry out the goals of the plan. In initial planning for the Storm Water Pollution Prevention Program, the Plant Manager determined appropriate goals for our facility. The Plant Manager holds overall responsibility for development of the Storm Water Pollution Plan, implementation of selected Best Management Practices, appropriate employee training, evaluation and continual improvement of the Program, and revision of the Plan. The Storm Water Pollution Prevention Team described in section 1.1 of this Plan holds responsibility for selection and maintenance of BMPs, and conducts the required evaluations, inspections, and monitoring. The Office Manager ensures that all required training is scheduled and presented. 4.1 Employee Training Program The goal of our Employee Training Program is to teach personnel, at all levels of responsibility, the components and goals of our Storm Water Pollution Prevention Plan and to create overall sensitivity to storm water pollution prevention concerns. Since employee training is an often overlooked element in the prevention and control of storm water pollution, our training program ensures that each employee receives the appropriate level of information. Training includes topics such as spill prevention and response, good housekeeping, and materials management practices as they apply to specific job responsibilities. Training will be provided annually for all site personnel and will be incorporated into the existing annual training provided for additional programs implemented on site. Storm Water Pollution Prevention Plan Paper Stock Dealers -- Winston Salem 5.0 EVALUATION In order to continually revise and improve the Storm Water Pollution Prevention Plan, we regularly update the information collected during the assessment phase of plan development and selection of the best management practices selected to prevent or diminish storm water contamination. This is accomplished by conducting annual compliance evaluations, conducting sera -annual visual monitoring, keeping records of all inspections and reports, and revising the plan as needed. 5.1 Annual Site Compliance Evaluation The SWP3. Team, responsible for conducting the Annual Facility Site Compliance Inspection (AFSCI), is fully qualified to conduct inspections and evaluations and to present findings in a formal report. The AFSCI will be documented using the form in Attachment A. The Annual Site Compliance Evaluation includes: • Inspection of storm water drainage areas for evidence of pollutants entering the drain system; • Evaluation of the effectiveness of each best management practice using appropriate metrics; • Observation of structural measures, sediment controls, and other storm water best management practices to ensure proper operation; • Revision, of the Plan as needed after each inspection; • Implementation of necessary changes after each inspection; • Preparation of a report summarizing inspection results and following actions and identifying the date of inspection and personnel conducting the inspection; • Lnsuring personnel conducting the inspection and appropriate management personnel sign the final report; and • Retention of the Site Compliance Evaluation Report with the Storm Water Pollution Prevention Plan. 5.2 Recordkeeping and Internal Reporting Paper Stock Dealers records and maintains records of relevant spills, leaks, inspections, and maintenance activities. The Office Manager is responsible for maintaining all records pertinent to storm water pollution prevention for a minimum of 5 years. These records include the NPDES permit; the Storm Water Pollution Prevention Plan itself; all revisions of the Plan; all Annual Site Compliance Evaluation reports; records of spills and leaks; records of all inspections; and relevant maintenance records. Information reported for spills and leaks includes date and time of the occurrence, weather conditions, location, cause, immediate actions taken, resulting environmental problems, and after -actions taken to prevent a reoccurrence. 5.3 Plan Revisions The Office Manager holds responsibility for revising the Storm Water Pollution Prevention Plan as needed. A revision may be triggered by major changes in our facility's design, construction activities, changes in plant operations impacting storm water Storm Water Pollution Prevention Plug Paper Stock Dealers — Winston Salem pollution prevention, maintenance activities impacting storm water pollution prevention, or a change to another company environmental plan in an area incorporated into this Plan. The Plant Manager monitors changes in plant operations that may affect the Storm Water Pollution Prevention Plan. The Maintenance Manager monitors maintenance activities that may affect the Storm Water Pollution Prevention Plan. The Plant Manager determines if the Plan needs to be revised because of any of these activities and implements changes as required. Once revised, the Plan is reviewed by appropriate staff and is presented to the Plant Manager for approval. Distribution is limited to those persons in the Distribution List at the beginning of this Plan. Storm Water Pollrrtiolr Prevention Plan Paper Stock Dealers — Winston Salem 6.0 MONITORING 6.1 Paper Stock Dealers will conduct semi-annual visual monitoring per our North Carolina General Storm Water Permit and it wilt be documented using the form in Attachment B. Inspections shall be conducted within 30 minutes of discharge or as soon thereafter as practical, but not exceeding 60 minutes. The inspection shall include any observations of color, odor, turbidity, floating solids, foam, oil sheen, or other obvious indicators of storm water pollution. Initial monitoring should be performed for non -storm water discharges and documented using the form in Attachment C. Non -storm water monitoring should be done during a time when there is no precipitation and any discharges found should be documented on Attachment C. 7.0 SPECIAL REQUIREMENTS 7.1 Discharges through Municipal Separate Storm Systems Facility Name does not discharge any storm water through a municipal separate storm sewer system. 7.2 EPCRA, Section 313, Reporting Facilities The Facility Naive facility is not covered by EPCRA, Section 313, reporting requirements. 7.3 Salt Storage Piles The Facility Name facility has no salt storage piles. Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem Atiachmenl A Annual Facility Site Compliance Inspection Report (AFSCI) I Facility Information ^ ' Facility Name Street Address County Facility Contact Person ZIP !,signature I This form must be signed by an official representative of the permitted facility. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Signature of Authorized Representative hate Signed Type or Print Name Position Title Company Name Telephone Number Mailing Address City State ZIP Code The first level of storm water monitoring consists of a comprehensive annual facility site compliance inspection (AFSCI) to determine if your facility is operating in compliance with your Storm Water Pollution Prevention Plan (SWPPP). You should use th'e results of this inspection to determine the extent to which your SWPPP needs to be updated to prevent pollution from new source areas, as well as to correct any inadequacies that the plan may have in handling existing source areas. The second level of storm water monitoring consists of Semi-annual visual observations of storm water leaving the site during runoff events caused by snow -melt or rainfall. This is a practical, low cost too; for identifying obvious contamination of storm water discharges, and can also help identify which practices are ineffective. Storm Water Pollutiar Prevention Plan Paper Stock Dealers — Winston Salem Attachment A Annual Facility Site Compliance Inspection Report (AFSCI) .Annual Facility Site Compliance Inspection The Annual Facility Site Compliance Inspection shall be adequate to verify that; your Storm Water Pollution Prevention Plan (SWPPP) remains current, potential pollution sources at your facility are identified, the facility site map and drainage map remain accurate, and Best Management Practices prescribed in your SWPPP are being implemented, properly operated, and adequately maintained. Name of Person Conducting Inspection Inspection Date Employer Telephone Number Your inspection should start with a review of your written SWPPP kept at your facility. The SWPPP should be amended if, through these inspections, you find that the provisions in your SWPPP are ineffective in controlling contaminated storm water from being discharged from your facility. Has your SWPPP been updated to include current Non -Storm Water Discharge Evaivation results? Has your SWPPP been amended for any new construction that would affect the site map or drainage conditions at the facility? ❑ NIA ❑ No ❑ Yes Has your SWPPP been amended for any changes in facility operations that could be identified as new source areas for contamination of storm water? ❑ NIA ❑ No ❑ Yes Are there any materials at the facility that are handled, stored, or disposed in a manner to allow exposure to storm water that are not currently addressed in your SWPPP? ❑ NIA ❑ No ❑ Yes Are there any maintenance or material handling activities conducted outdoors that have not been addressed in your SWPPP? ❑ NIA ❑ No ❑ Yes Are outside areas kept in a neat and orderly condition? ❑ NIA ❑ No ❑ Yes Are regular housekeeping inspections made? ❑ NIA ❑ No ❑ Yes Do you see spots, pools, puddles, or other traces of oils, grease, or other chemicals on the ground? ❑ NIA ❑ No ❑ Yes Are particulates on the ground from industrial operations or processes being controlled? ❑ NIA ❑ No ❑ Yes Do you see leaking equipment, pipes or containers? ❑ NIA ❑ No ❑ Yes Do drips, spills, or leaks occur when materials are being transferred from one source to another? ❑ NIA ❑ No ❑ Yes Are drips or leaks from equipment or machinery being controlled? ❑ NIA ❑ No ❑ Yes Are cleanup procedures used for spilled solids? ❑ NIA ❑ No ❑ Yes Are absorbent materials (floor dry, kitty litter, etc.) regularly used in certain areas to absorb spills? ❑ NIA ❑ No ❑ Yes Can you find discoloration, residue, or corrosion on the roof or around vents or pipes that ventilate or drain work areas? ❑ NIA ❑ No ❑ Yes AreBestManagement Practices implemented to reduce or eliminate contamination of storm water from source areas at the facility? ❑ NIA ❑ No ❑ Yes Are Best Management Practices adequately maintained? ❑ NIA ❑ No ❑ Yes Are there significant changes that will have to be made to your SWPPP to correct any inadequacies that the plan may have to effectively control a discharge of contaminated storm water from your facility? ❑ N/A ❑ No ❑ Yes Comments: Storm Water Polhition Prevention Plait Paper Stock Dealers — Winston Salem Attachment A Annual Facility Site Compliance Inspection Report (AFSCI) .Semi-annual.Visual Inspection Reports Semi-annual Visual Inspections at each storm water discharge outfali on your site can be a valuable assessment tool and are required by the Industrial Storm Water General Permits. These inspections should be performed when sufficient runoff occurs during daylight hours. Try to make observations within the first 30 minutes after runoff begins discharging from the outfall or soon thereafter as practical, but no later than 60 minutes. If you find visible pollution, note the probable source and list any possible Best Management Practices that could be used to reduce or eliminate the problem. Make any necessary changes to your Storm Water Pollution Prevention Plan as needed. If you were unable to evaluate an outfali during a specific quarter, this should be indicated along with a reason as to why this could not be done. Date of Inspection Outfall Number January - June Jul - August Briefly summarize what you found when conducting your Semi-annual Visual Inspections. (Include any observations of color, odor, turbidity, floating solids, foam, oil sheen, or any other indications of storm water pollution and the probable sources of any observed storm water contamination.) Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Salem Attachment B Semi-annual Visual Inspection — Field Sheet USE ONE FORM PER OUTFALL This inspection should occur when sufficient rainfall occurs during daylight hours. Try to make observations during the first 30 minutes that runoff occurs or as soon as possible thereafter, but no longer than 60 minutes. If you find visible pollution, note the probable source and list any possible Best Management Practices that could be used to reduce or eliminate the problem. Make any necessary changes to your SWP3 as needed. Facility Name Street Address City State Zip Name of Person Conducting Inpsection inspection bate Employer Telephone Number Outfall Number (Make Reference to Site Map) Description of Outfall (e.g., ditch, concrete pipe, etc.) Time of Rainfall Event Time of Visual Inspection Approximate Amount of Rainfall (Inches) Describe your observations. An easy way to conduct this inspection is to use a glass jar to collect a sample of the storm water being discharged from the facility and visually inspect the water. include any observations of color, odor, turbidity, floating solids, foam, oil sheen, or any other visual indicators of storm water pollution and the probable sources of any storm water contamination. Circle the ones that apply. Color: Clear Red Yellow Brown None Musty Sewage Rotten Egg Clear Cloudy Opaque Susp. Solids None Foam Garbage Oily Film None Oily Sludge Sediments Other: Odor: Other: Clarity: Other: Floatables: Other: Deposits/Stains: Other: Comments: This outfall could not be evaluated during this quarter due to the following reason: Storm Water Pollution Prevention Plan Paper Stock Dealers — Winston Solent Attachment C Non -Storm Water Discharge Evaluation Complete one form for each storm water outfall. `Nan -storm water discharge" means discharges other than storm water. Examples of this include: non -contact cooling water, contact cooling water or any other process waste water. Circle One or Fill in the Blank Facility Name Facility Address/Location Form Completed By Date End of Pipe Screening (Visual) Test Method Or Detailed Testing (smoke, dye, etc. Date/Time of Test Person Conducting Inspection Outfall Location and Number Visual Observations (dry weather flow, stains, sludge, color, odor, etc.) Test Results Non -Storm Water Discharge? Yes or No Potential Sources Is non-storin water discharge covered by a Yes or No T if yes, identify NPDES Permit No. WPDES Permit If answering "Yes" to the test results but a NPDES Permit has not been issued for the non -storm water discharge, please contact your Sonoco Environmental representative. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Signature Date Storm Water Pollution Prevention Plan Paper Stoek Dealers - Winsion Salem Affachment D GIS Map - . - . 4 -4- , ge J. r 'fF4 Ire, .4 n q 711� A Fork wL L Jr S1 pj.e , NIL -.Glenu Ave 0' pA Latitude: 363N�'�ir~�r;,�� ''! Longitude: 80 13 38 -N, r7k Im r -K, ve WA 7' Michael F. Easley, Governor `oho RpG North CWilliam G. Ross Jr., Secretary Noarolina Department of Environment and Natural Resources �!3 Alan W. Klimek, P.E. Director > Division of Water Quality o -c April 28, 2003 Blake Boyd Sonoco Products Co -Winston Sal North Second St S11 Hartsville, SC 29550 Subject: NPDES Stormwater Permit Renewal Sonoco Products Co -Winston Sal COC Number NCG130012 Forsyth County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG130000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: A new Certificate of Coverage A copy of General Stormwater Permit NCG130000 A copy of the Analytical Monitoring Form (DMR) • A copy of the Qualitativel Monitoring Form • A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Department of Environment and Natural Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Mack Wiggins of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 542. cc: Central Files Stormwater & General Permits Unit Files Winston-Salem Regional Office Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-8053 Customer Service 1 800 623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG130000 CERTIFICATE OF COVERAGE No. NCG130012 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Sonoco Products Co is hereby authorized to discharge stormwater from a facility located at Sonoco Products Co -Winston Sal 4175 Glenn Ave Winston Salem Forsyth County to receiving waters designated as the Winston Salem MSSS to Leak Fork Creek, a class C stream, in the Yadkin - Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, III, IV, V, and VI of General Permit No. NCG130000 as attached. This certificate of coverage shall become effective May 1, 2003. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 28, 2003. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Alan W. Klimek, P.E. Director 10/24/2002 CERTIFIED MAIL RETURN RECEIPT REQUESTED SONOCO PRODUCTS CO-WINSTON SAL NORTH SECOND ST SLI HARTSVILLE, SC 29550 Dear Permittee: 91�AA �� a NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: NOTICE OF VIOLATION FAILURE TO SUBMIT RENEWAL APPLICATION SONOCO PRODUCTS CO-WINSTON SAL NCG 130000 COC NUMBER NCG130012 FORSYTH COUNTY This letter is to inform you that, as of the date of this letter, the Division of Water Quality has not received a renewal request for the subject permit certificate of coverage. This is a violation of NCGS § 143.215.1 (c)(1) which states "All applications shall be filed with the commission at least 180 days in advance of the date on which it is desired to commence the discharge of wastes or the date on which an existing permit expires, as the case may be". Any permittee that has not requested renewal at least 180 days prior to expiration or permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subjected to enforcement procedures as provided in NCGS § 143-215.6 and 33 USC 1251 et. seq. In order to prevent continued, escalated action, including the assessment of civil penalties you must submit a completed permit coverage renewal application to the attention of the "Stormwater and General Permits Unit" at the letterhead address within ten (10) days of your receipt of this letter (renewal application enclosed). If the subject discharge has been terminated, please complete the enclosed rescission request form. A valid reason for requesting rescission is required, incomplete forms will be returned and you will still be subject to possible escalated action. Mailing instructions for submitting rescission request are listed on the bottom of the form. You will be notified when the rescission process has been completed. Thank you for your prompt attention to this situation. If you have any questions regarding this matter, please contact Mack Wiggins of the central office Stormwater and General Permits Unit at 919-733-5083, ext. 542. Sincerely, for Alan W. Klimek, P.E. Director, Division of Water Quality cc: Stormwater and General Permits Unit Files Central Files Winston-Salem Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality September 4, 2002 BLAKE BOYD SONOCO PRODUCTS CO-WINSTON SAL NORTH SECOND ST SL1 HARTSVILLF, SC 29550 Subject: NPDES Stormwater Permit Coverage Renewal Sonoco Products Co-winston Sal COC Number NCG 1300012 Forsyth County Dear Permittee: Your facility is currently covered for stormwater discharge under General Permit NCG 130000. This permit expires on March 31, 2003. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by early spring of 2003. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit coverage will be expiring. Enclosed you will find a Permit Coverage Renewal Application Form. The application must be completed and returned by October 2, 2002 in order to assure continued coverage under the general permit. Due to staff and budget constraints, letters confirming our receipt of the completed application will not be sent, Failure to request renewal within the time period specified, may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any of the 11 categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facility industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Web Site at http://h2a.enr.state,nc,ustsu/stormwater.fitml If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Corey Basinger of the Winston-Salem Regional Office at 336-77 t-4600 or Mack Wiggins of the Central Office Stormwater Unit at (919) 733-5083, ext. 542 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater and General Permits Unit Files Winston-Salem Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733.7015 eMA NCDIENR Customer Service 1-800-623.7748 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director April 30, 1998 BLAKE BOYD SONOCO PROD. CO.-WINSTON SALEM P.O. BOX 6925 COLUMBIA, SC 29260 Ar41 [D E N R Subject: Reissued Stormwater General Permit for Certificate of Coverage No. NCG130012 Forsyth County Dear Permittee. In response to your renewal application for continued coverage under the subject permit, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. The following information is included with your permit package: ■ A copy of the stormwater general permit. ■ A Stormwater Pollution Prevention Plan Certification Form. This form certifies that you have . developed and implemented the Stormwater Pollution Prevention Plan (SPPP) required in your permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT send the SPPP with the signed form. E Five copies of Analytical Monitoring forms. ■ Five copies of Qualitative Monitoring forms. ■ A copy of a Technical Bulletin on the stormwater program which outlines program components and addresses frequently asked questions. ■ A corrected Certificate of Coverage if you indicated a name or, address change on the Renewal Form returned to the Division. Your certificate of coverage is not transferable except after notice to DWQ. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DWQ or permits required by the Division of Land Resources, Division of Air Quality, Coastal Area Management Act or any other Federal or Local governmental permits that may be required. If you have any questions concerning this permit or other attached documents, please contact the Stormwater and General Permits Unit at telephone number (919) 733-5083 Sincerely, f oA. Preston Howard, Jr., P. E. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-07I9 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper i State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director December 1, 1995 Blake Boyd Sonoco Prod. Co. -Winston Salem P.O. Box 6925 Columbia, SC 29260 Subject: General Permit No. NCG 130000 Sonoco Prod. Co. -Winston Salem COC NCG 130012 Forsyth County Dear .Blake Boyd: In accordance with your application for discharge permit received on June 28, 1995, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any question concerning this permit, please contact MR. BILL MILLS at telephone number 919/733-5083. cc: Winston-Salem Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 An Equal Opportunity Affirmative Action Employer Sincerely G �Li;' 'k- ' :�'=' 3Y fJ�5 '.� �'��'c . R' r!' r:..Pliy W� C, i:.. A. Preston Howard, Jr. P.E. Telephone 919-733-7015 FAX 919-733-2496 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO. NCG130000 CERTIFICATE OF COVERAGE No. NCG130012 STORNIWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELLtiIINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Sonoco Products Co., Paperstock Dealers is hereby authorized to discharge stormwater from a facility located at Paperstock Dealers 4175 Glenn Avenue Winston-Salem Forsyth County to receiving waters designated as the City of Winston-Salem Storm Sewer System and Leak Fork Creek in the Yadkin -Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, I❑ and IV of General Permit No. NCG 130000 as attached. This certificate of coverage shall become effective December 1, 1995. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 1, 1995 Y fit.-:���.. c�i,•:bi.=Tl' A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission �50 "f J gQ"15, - the Geological Z)uivc7 ��. Mapped, edited, and published by sly` Control by USGS. NDSINDAA, and North Carolina Geoder'a hs�ey Culture and drainage in part compiled from aerial951 1p taken 1948, Topography by Plane -table surveys 951 b rid ticks based on 5SO'gh Polyconic projection, lb,pste mot g a North Carolina coordinate system 1000-meter Universal Transverse Mercator grid ticks, zone 17, shown in blue 1927 North American Daum To place on the predicted North American Datum 1983 tines I() meters south and move the prajection 19 meters west as shown by dashed corner ticks Red tint indicates area in which only landmark buildings are shown p5N GN 6- 107 MIL IL CTM GRID Alit) 19g6 OECLINATrON AT CENTER n Revisions shown in purple and woa aerial photographs taken 1982 an in}orrnation not field checked. M purple tint indicates ertension o' --- FACILITY ono CIO �f0�`� J�a�eC64o k-� COUNTY rs►�` 1 NPDES n"C L? 1 3 d v l MAP# DSN FLOW � SUB BASIN LATT1 i UDE 360 b S SS LONGITUDE �o � 13 30 RECEt;j'1NG STREAK �. STREAK} CLASS DISCHARGE CLASS'S EXPIRATION DATE 119 7 6 r •.. 16 - �Nnr; r Leak Fork � f �'..' �� ham: �„e•7. t „r� A,{i Mgntview . i H "t - :• *44 .�� '. s' .•i; a .�� (�� Latitude: 36° 08' 43" N Longitude: 80" 1 3' 38" W e I A