HomeMy WebLinkAboutNCG110155_COMPLETE FILE - HISTORICAL_20140523STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO. IQ �55
DOC TYPE
DOC DATE
( HISTORICAL FILE
MONITORING REPORTS
c)o1Vp593
YYYYM M DD
RAA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Mr. Jerry W, Pierce, Public Utilities Director
Brunswick County
P. 0. Box 249
Bolivia, North Carolina 28422
Dear Mr, Pierce:
John E. Skvarla, III
Secretary
ECEDVE
May 2-�, 2014 MAY 3 0 2014
BY:
Subject: General Permit No. NCG11O000
Ocean Isle Beach WWTP
COC No. NCG110155
Brunswick County
In accordance with your application for a discharge permit received on April 30, 2014, we are
forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state —
NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General
Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US
Environmental Protection Agency dated October 15, 2007 (or as subsequently amended).
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual
permit application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Energy, Mineral and Land Resources (Division). The Division may require modification or
revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by the Division or permits required by
the Division of Water Resources, Coastal Area Management Act or any other federal, state or local
governmental permit that may be required.
If you have any questions concerning this permit, please contact Bill Diuguid, Stormwater
Program Planner at telephone number (919) 807-6369.
Sincerely,
WG� SIIGNED WPICKLE
for Tracy E. Davis, P.E., C P M
Director, Division of Energy, Mineral
and Land Resources
cc: Wilmington Regional Office
Central Files
Stormwater Permitting Unit Files
Attachments
1612 Mail Service Center, Raleigh, North Carolina 27699-1612
Phone: 919-707.86001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer — Made in part by recycled paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
GENERAL PERMIT NO, NCG11000
CERTIFICATE OF COVERAGE No. NCG110155
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
County of Brunswick
is hereby authorized to discharge stormwater from a facility located at
Ocean Isle Beach Waste Water Treatment Plant
6049 Yarbrough Road, SW
Ocean Isle Beach
Brunswick County
to receiving waters designated as Jinnys Branch, a Class C; Sw; HQW waterbody, to Intracoastal Waterway; in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, 111, 1 V,
V and VI of General Permit No. NCG 1 10000, as attached.
This Certificate of Coverage shall become effective May 23, 2014.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day May 23, 2014,
ORIGINAL SIGNED M
KEN PICKLE
for Tracy E. Davis, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
_17
1 r
21
3
6nR
In*
J
Q7:
10
CS
4\X
2
L
L
'14
J. &7,
tq.lj
MaDWM. Irr—
�^. Ml IM 1998.
Compliance Inspection Report
Permit: NCG110155 Effective: Expiration: Owner: Brunswick County
SOC: Effective: Expiration: Facility: Ocean Isle Beach WWTP
County: Brunswick 6049 Yarbrough St SW
Region: Wilmington
Ocean Isle Beach NC 28469
Contact Person: Dixon L Medlin Title: ORC Phone: 910-579-9365
Directions to Facility:
Located on the west side of NCSR 1184 approximately 1.1 miles north of the intersection between NC Hwy. 9D4 and NC Hwy. 179
near Ocean Isle Beach
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 05/20/2014
Primary Inspector: Jean Conway
Secondary Inspector(s):
Entry Time: 02:00 PM
Exit Time: 03:00 PM
Phone: 910-796-7215
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Municipal WWTP > 1MGD, Stormwater Discharge, COC
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
M Storm Water
(See attachment summary)
Page: 1
..1
Permit: NCG110155 Owner - Facility: Brunswick County
Inspection Date: 05/2012014 Inspection Type; Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Site visit in response to NOI for Ocean Isle Beach WWTP (NCG110155 in review).
Recommend issuing the COC for this facility.
Vehicle maintenance is not done onsite_ There is a generator that is serviced by an outside contractor but they do not use
more than 55 gallons of motor/hydraulic oil per month so do not fall under the criteria for analytical monitoring.
The facility also is permitted through DWQRO (permit #WQ0006085) which covers inspections of their SBR WWTP and
spray fields.
Page: 2
f
MMA
A
NCDENR
furhowic�n.Mo 14�nwa NI'PRhl�C�► .
i I; h ii &,r4�
rQ
/
.Diivi.sion of Water Quality 1 Water Quality Section
National. Pollutant Discharge Elimination System
NCGI 10000
^►,• Y .
,,
i
ar-rw��
M1. M 111EtMM119*1
'NOT>ICE10FIN7ENT \� �0055
National Pollutant Discharge Elimination System application for coverage under General Permit
NCG1'IDOOQ:
STORMWATER DISCHARGES associated with activities classified as.
Treatment Works treating domestic sewage or any other sewage sludge or wastewater treatment
device or system, used.in the storage, treatment, recycling, and.reciamation of munic:ipal,or
domestic sewage, with a design flow of 1.0 million gallons.per day or more, or rewired to have
an approved pretreatment program under Title 40 Code of Federal Regulations (CFR) Part 403,
including lands dedicated to the disposal of sewage sludge that is located within the confines of
the facility; and like activities deemed by DWO to be,similar In the proeess,andlor the exposure
of raw materials, products,' by-products, or waste materials.
(Please � print or type)
Mailing. address of, owns rloperator.(address to whi~g all Hermit correepc�n,+iisnce will be mail!W
Name
street Address
City
Telephone No.
E-mail Address
,; " State N • C .
'Fax:It
2). Location of facility producing discharge:
Facility; Name,
Facility Contact
Contact E-mail
Street -Address
City
County
Telephone No.
i
. — f��Tr'!'w.i�� :¢' � � �-'� "��" .� � `,�\�. ,.�rw-1•c� ,r_ �•�:r� e r;:.,1Cr-+((7 Cij,� F� ...
ka..t8, ►-ic. eiZIP Code �� z,p�rs J
3) Physica[Locatibn Information;
Please provide a narrative description of how to get to the
and distance and direction from a roadway intersedion). l
Fax
(use street names, state road numbers,
(A copy of a Ca my mep ar SGS ua� heat with facility clearly located or�the neap is required to be submitted with this spplicatfon)
r k• e� r� • d o f� c�r
4) °Latltude;..a.L'ongRude""7Y 2_ t., (degfees;minutes, seconds)'
5) This NPDES Permit Application applies to which of the,following :
❑ New or. Proposed Facility Bate operation is to begin
IX Existing
I
NCG110000 N.Q.I.
6) Standard Industrial Classification:
Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial
activity at this facility
SIC Code:
7.) Provide a brief narrative description of the types of industrial activities and, products. manufactured,_
at this facility:
8) .Discharge points ! Receiving waters:
How many. dischargepoints (ditches, pipes, channels, etc.) convey stormwater from the property?
9) Receiving waters;
'Whik is'the'name'of the __ y'or t7odies of. ,water (creek,.streaiiricFiver, like, i&) that the'facllity'starriiwateT
discharges end up In? 'N - t c�eC, _ �r .c w ��� +htr ��
ht �.i L 1;, �r+s � • c�c• pr�e�S� e���.��:z,.� - 1�N �R,�A-�JC /f �d IeA o �CA'�1�
If the site stormwater discharges to a separate storm sewer systpname the operator of the separate storm
sewer system (e.g. City of Raleigh municipal storm sewer). - w
10) Does this facility have any,ather NPDES permits? S w6 5a-st4 03.- 0 _,57I:7
G+ter-s !r C } SWj HQW
qNo Z— '
❑ Yes
If yes, list the permit numbers for all current NPDES permits for this'facility:
11) Does this facility have any Non -Discharge permits (ex: recycle permits)?
❑ No
Yes
If yes, list the permit numbers.for all current Non -Discharge permits for this facility: 1j.)C
12)-Does this facility employ any best management practices for stormwater control?
❑ No
If yes, please briefly describe: h—Ib�% .• e1 u4:7'
ACu:tp:J3.s.i.4"Cheri, Ciz' _ T�:si
m
13) Does this facility gave a Stormwater Pollution Prevention Plan?
❑ No
Z Yes
If'yes, when was it implemented? Atr';1 U lLl
94)-.Are vehicle maintenance activities occurring at this facility?
�d No ❑ Yes
16) Hazardous Waste:
a} Is this facility a Hazardous Waste Treatment, Storage, or Disposal.Facility?
9 No 0 Yes
ro
NCG110000 N.O.I.
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated. per month)
of hazardous waste?
R 'No ❑ .Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per"month) of
hazardous waste?
No ❑ Yes
d) If you answered yes to questions b. or c., please provide the following information:
Type(s) of waste:
How is material stored. -
Where is material stored:
How many disposal shipments per year:
Name of tia'nsport / disposal vendor:.
Vendor address'..
16) Certification:
North Carolina General Statute 143.215.6 b (i) provides that:
Any person who knowingly makes any -false statement, represerttatlon, or certification in any applicallon, record, report, plan, or other
document filed or required to he maintained under this Article or a,rule implementing this Article; or who knowingly makes a false
statement of a material fact In a rulemaking proceeding or contested case under this Artme; or who falsifies, tampers with, or.knowingty
renders Inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
(Environmental Management) Commission implementing this Article shall be guilty of a class 2 misdemeanor which may Include a fine not to exceed
ten thousand dollars (510,000).
,I hereby request coverage under the referenced. General Permit. I understand that coverage under this
permit will constitute the permit requirements for the-discharge(s) and is enforceabie in the same manner as
an Individual permit.
I certify that I am familiar with the information contained in this application and that to the best of my
knowledge and belief such information is true, complete, and accurate.
Printed Name of Person Signing: r y ; J , P-k rc
Title: C
of Appll (Date. Signed)
Notice -of Intent must be accompanled by a checik.or money order for $100.00,made payable to NCDENR
4, ri4_,Aw�y
O 0cm 49 brought,'V,
VV i . pean Islam ,36acft- NC
M4 6 9., Us A"
11
'j
w 1w
'0k
A-Z
.4k V
-16
r
re
4.
f
t
4
ro t,
'j
A, -
!jv. * 577. . ...... t
21�
Uji
k4
v
V; - IAV
.��xy'�rH1r�.y;a•�e��''..ta`�.�, >ai i• •'�,�r��v�7,w .'k •r' V•,-e;���t, .�.- !rnk k A
VAI
o;,; L.4
AT
.., '-'7r
F NV- A
Ag
Wz
7V
or-
sx
17j
I
WIN
Fjgwe'2-Vk666onal,mm.
.WWO06085 6049 Yarbra Rd., Ocean Isle NO 28469'.
Town of Ocean Isle Beach -Latitude: 33055'06!'
Town of Ocean Isle Beach,W-WU Lon&& .780 27'03"-
wl."
Dixie LIP, -
A
u." vj
Jt
Lr' MY ILI
"Ocean vv
R
CT
E Pr a!
a.Rd
eko
A
�' '�r 7,t
SA
Yatbomuoh Rd
Tc�
-awl
1.61
CL
NYap ".-P
'Z L
k.4 4
jolt " I v .xc ..' - " i
..A
19243? MAvTE0
North Carolina Division of Water Quality Response to Comments and
Summary of Final Changes to NPDES Stormwater General Permits NCG050000,
NCG070000, NCG11,0000, and NCG130000 (2013 Renewal)
Background
NPDES Stormwater General Permits NCG050000, NCG070000, NCG110000, and NCG130000
each expire on May 31, 2013. The North Carolina Division of Water Quality (DWQ) announced
in selected newspapers across the State on or about April 2, 2013 that the draft of the
proposed renewal General Permit would be posted on our website for public comment. DWQ
also ran this notice in the North Carolina Register the same month; and on the Stormwater
Permitting Unit website Public Notice Calendar in April 2012.
DWQ revises and reissues NPDES stormwater General Permits on a five-year schedule. Every
five years we review analytical data from the previous five-year term of the permits; evaluate
identified compliance problems and problems in our enforcement of the permits; and seek to
improve the effectiveness of the permits as Stormwater management tools for the permittees.
The draft general permits and fact sheets were available on the Stormwater Permitting Unit's
website on April 1, 2013. The public comment period closed on May 2, 2013. During this time,
DWQ staff received no public comments on any of the proposed general permits.
DWQ sent the proposed general permits to EPA Region IV in Atlanta on March 1, 2013. On
March 29, 2013, EPA Region IV responded that the agency concurred with no comments. EPA's
additional review and approval would be necessary if the proposed final general permits
incorporated significant changes from the draft or if significant public comments objecting to
the permits were received. DWQ concluded that neither of these criteria was met and that
further EPA review before final issuance was not required.
Comments and Responses
DWQ received no written comments on the proposed General Permit NCG050000, NCG070000,
NCG110000, or NCG130000 during the announced public comment period. However, DWQ did
explore the necessity of the pH monitoring requirement for stormwater discharges from vehicle
maintenance areas (VMA) during the draft notice period. DWQ decided to remove pH on the
basis of minimal risk, relatively few facilities in these industrial sectors qualifying for analytical
monitoring, and data on hand. The change is discussed in further detail below.
Page 2 of 3
May 20, 2013
Response to Comments on Draft NPDES General Permits NCG050000, NCG070000, NCG110000, NCG130000
Summary of Changes to the Final Permits
DWQ made some uniform changes to the draft permits before finalizing. These changes were
minor, and DWQ concluded additional notice and/or EPA review was not necessary. The
changes were:
1. Table of Contents: Correction to Part II Section C title.
2. Part I, Section A: Removed last paragraph (redundant) with first paragraph of Part I,
Section B.
3. Part II, Section A (Stormwater Pollution Prevention Plan), 2.(b): Corrected typo.
4. Part Il, Section B, Table 1(Analytical Monitoring for Stormwater), Footnote 3: Added
qualification that representative outfall status (ROS) may apply.
5. Part II, Section B, Table 1 (Analytical Monitoring for Stormwater): Removed pH
monitoring requirement. Basis: Only a small number of permittees in these industrial
sectors perform enough vehicle maintenance to trigger analytical requirements, and
data during the previous permitting cycle show very few pH excursions below 6 or
above 9 S.U. (see fact sheets posted with the proposed permit for data summaries).
Also, DWQ notes that none of the corresponding sectors in EPA's Multi -sector
Stormwater General Permit must perform pH monitoring. We have concluded that pH
is not a parameter of concern for the majority of these sites, and removing it eliminates
the obligation of site personnel to measure the pH within 15 minutes of sampling.
While vehicle maintenance activities can introduce materials that affect pH (alkaline
cleaners, batteries, etc.), our review and assessment of facilities under the permit
suggest risk to water quality from the pH in these discharges is minimal, and that SPPP
and BMP requirements for these areas should suffice.
6. Part II, paragraph following Table 1: Removed last sentence, "Sampling is not required
outside of the facility's normal operating hours." (Redundant with first paragraph of
Section B).
7. Part II, Section B, Table 3: Removed pH benchmark range (no longer applicable).
8. Part II, Section C: Added clarification in second paragraph to explain that Qualitative
Monitoring requires inspections at all outfalls associated with industrial activity — not
just vehicle maintenance activities. The same clarification was added to Footnote 2 in
Table 4 of the same section
9. Part III, Section A, 1. (last paragraph): Corrected reference to secondary containment
requirements.
Page 3 of 3
May 20, 2013
Response to Comments on Draft NPDES General Permits NCG050000, NCG070000, NCG110000, NCG130000
Summary of Changes in New NCG050000, NCG070000, NCG110000, and
NCG130000 from Previous Permits
DWQ revised permit language and other requirements to be consistent with more recently
issued NPDES General Permit templates. Changes since the last permit cycle include, but are
not limited to:
1. Stormwater Pollution Prevention Plan requirements were revised. Please read Part II,
Section A carefully. For example, number 8 outlines requirements for the SPPP
Amendment and Annual Upate.
2. The Qualitative Monitoring section now comes after the Analytical Monitoring (for
vehicle maintenance activities only) section in the permit. All permittees must still
perform qualitative monitoring at outfalls associated with industrial activity.
3. "Non -polar Oil and Grease" analyzed by EPA Method 1664 (SGT-HEM), replaces the
previous Oil and Grease (0&G) parameter. (Note: This method is one way of estimating
"Total Petroleum Hydrocarbons" without the more expensive TPH analyses that use gas
chromatography. However, the permit does not refer to "TPH" so that permittees and
laboratories are not confused about which analysis to perform.)
4. The Non -polar 0&G benchmark is 15 mg/I instead of the previous 30 mg/1 O&G.
S. A lower benchmark for Total Suspended Solids (TSS) of 50 mg/1 applies to discharges to
sensitive waterbodies (e.g., HQW).
6. The pH monitoring requirement was removed.
7. The permit does not require monitoring outside of normal operating hours.
8. The permit specifies allowance for adverse weather conditions.
9. "Measureable Storm Event" replaces "Representative Storm Event."
10. Part III, Standard Conditions were revised to be consistent with current NPDES
Stormwater permit language and structure. Please read this section carefully.
11. Website URL references throughout the permit text were revised.
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
. DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG110090
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
for establishments primarily engaged in the following activities:
Treatment Works
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission and
the Federal Water Pollution Control Act, as amended, this permit is hereby issued to all owners or operators,
hereinafter permittees, which are covered by this permit as evidenced by receipt of a Certificate of Coverage
by the Environmental Management Commission to allow the discharge of stormwater to the surface
waters of North Carolina or to a separate storm sewer system conveying discharges to surface waters in
accordance with the terms and conditions set forth herein.
Coverage under this General Permit is applicable to:
All owners or operators of stormwater point source discharges associated with establishments
primarily engaged in activities classified as Treatment Works treating domestic sewage or any other
sewage sludge or Wastewater Treatment Device or System, used in the storage, treatment, recycling,
and reclamation of municipal or domestic sewage [including lands dedicated to the disposal of
sewage sludge that are located within the confines of the facility], with a design flow of 1.0 million
gallons per day (MGD) or more;
All owners or operators of stormwater point source discharges associated with establishments
primarily engaged in activities classified as Facilities which are required to have an approved
pretreatment program under Title 40 CFR Part 403, including lands dedicated to the disposal of
sewage sludge that are located within the confines of the facility;
Stormwater point source discharges from like industrial activities deemed by The Division of Water
Quality (DWQ) to be similar to these operations in the process, or the discharges, or the exposure of raw
materials, intermediate products, by-products, products, or waste products.
The General Permit shall become effective on June 1, 2013.
The General Permit shall expire at midnight on May 31, 2018.
Signed this day May 20, 2013.
Original signed by Matt Matthews .
for Charles Wakild, P.E., Director
Division of Water Quality
By the Authority of the Environmental Management Commission
Permit No. NCG110000
TABLE OF CONTENTS
PART 1 INTRODUCTION
Section A: General Permit Coverage
Section B: Permitted Activities
PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES
Section A: Stormwater Pollution Prevention Plan
Section B: Analytical Monitoring Requirements for Stormwater Discharges from On -Site
Vehicle and Equipment Maintenance
Section C: Stormwater Discharges: Qualitative Monitoring Requirements
PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS
Section A: Compliance and Liability
1. Compliance Schedule
2. Duty to Comply
3. Duty to Mitigate
4. Civil and Criminal Liability
S. Oil and Hazardous Substance Liability
6. Property Rights
7. Severability
8. Duty to Provide Information
9. Penalties for Tampering
10. Penalties for Falsification of Reports
11. Onshore or Offshore Construction
12. Duty to Reapply
Section B: General Conditions
1. General Permit Expiration
2. Transfers
3. When an Individual Permit May he Required
4. When an Individual Permit May be Requested
5. Signatory Requirements
6. General Permit Modification, Revocation and Reissuance, or
Termination
7. Certificate of Coverage Actions
0
Permit No. NCG110000
8. Annual Administering and Compliance Monitoring Fee Requirements
Section C: Operation and Maintenance of Pollution Controls
1. Proper Operation and Maintenance
2. Need to Halt or Reduce not a Defense
3. Bypassing of Stormwater Control Facilities
Section D: Monitoring and Records
I.
Representative Sampling
2.
Recording Results
3.
Flow Measurements
4.
Test Procedures
5.
Representative Outfall
6.
Records Retention
7.
Inspection and Entry
Section E: Reporting
Requirements
1.
Discharge Monitoring Reports
2.
Submitting Reports
3.
Availability of Reports
4.
Non-Stormwater Discharges
S.
Planned Changes
6.
Anticipated Noncompliance
7.
Spills
8.
Bypass
9.
Twenty-four Hour Reporting
10.
Other Noncompliance
11.
Other Information
PART IV DEFINITIONS
III
Permit No. NCG110000
PART I — INTRODUCTION
SECTION A: GENERAL PERMIT COVERAGE
All persons desiring to have facilities covered by this General Permit must register with the Division
of Water Quality (DWQ) by the filing of a Notice of Intent (NOI) and applicable fees. The N01 shall be
submitted and a certificate of coverage issued prior to any point source discharge of stormwater
associated with industrial activity to the surface waters of the state.
Any owner or operator not wishing to be covered or limited by this General Permit may make
application for an individual NPDES permit in accordance with NPDES procedures in 15A NCAC 2H
.0100, stating the reasons supporting the request. Any application for an individual permit should
be made at least 180 days prior to commencement of discharge.
This General Permit does not cover activities or discharges covered by an individual NPDES permit
until the individual permit has expired or has been revoked. Any person conducting an activity
covered by an individual permit but which could be covered by this General Permit may request
that the individual permit be revoked and coverage under this General Permit be provided.
If industrial materials and activities are not exposed to precipitation or runoff as described in 40
CFR §122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater
discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Exclusion
must submit a No Exposure Certification Notice of Intent (N01) form to the Division; must receive
approval by the Division; must maintain no exposure conditions unless authorized to discharge
under a valid NPDES stormwater permit; and must recertify the No Exposure Exclusion annually.
Any facility may apply for new or continued coverage under this permit until a Total Maximum
Daily Load (TMDL) for pollutants for stormwater is established. A TMDL sets a pollutant-]oading
limit that affects a watershed, or portion of a watershed, draining to a specific impaired water. For
discharges to watersheds affected by a TMDL, coverage under this permit may depend on the
facility demonstrating it does not have reasonable potential to violate applicable water
quality standards for those pollutants as a result of discharges. If DWQ determines that
discharges have reasonable potential to cause water quality standard violations, the facility shall
apply for an individual permit 180 days prior to the expiration date of this General Permit. Once
that individual permit is effective, the facility will no longer have coverage under this General
Permit. Note that the permittee must identify impaired waters (scheduled for TMDL development)
and waters already subject to a TMDL in the Site Plan, as outlined in the Stormwater Pollution
Prevention Plan, Part 1I, Section A. A list of approved TMDLs for the state of North Carolina can be
found at http:l.lilortal.nc;denr.org.IwCb.wgZpslliitultmal.
Part I Page 1 of 2
Permit No. NCG110000
SECTION B: PERMITTED ACTIVITIES
Until coverage under this permit expires or is modified or revoked, the permittee is authorized to
discharge stormwater to the surface waters of North Carolina, or to a separate storm sewer system,
which has been adequately treated and managed in accordance with the terms and conditions of
this General Permit.
Any other point source discharge to surface waters of the state is prohibited unless it is an
allowable non-stormwater discharge or is covered by another permit, authorization, or approval.
The discharges allowed by this General Permit shall not cause or contribute to violations of
Water Quality Standards.
This permit does not relieve the permittee's responsibility for compliance with any other applicable
federal, state, or local law, rule, standard, ordinance, order, or decree.
Part I Page 2 of 2
Permit No. NCG110000
PART II — MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED
DISCHARGES
SECTION A. STORMWATER POLLUTION PREVENTION PLAN
The permittee shall develop and implement a stormwater Pollution Prevention Plan (SPPP). The
SPPP shall be maintained on site unless exempted from this requirement by the Division. The SPPP
is public information in accordance with Part II1, Standard Conditions, Section E, paragraph 3 of this
permit. The SPPP shall include, at a.minimum, the following.items:
1. Site Overview. The Site Overview shall provide a description of the physical facility and the
potential pollutant sources that may be expected to contribute to contamination of stormwater
discharges. The Site Overview shall contain the following:
(a) A general location map (USGS quadrangle map or appropriately drafted equivalent map),
showing the facility's location in relation to transportation routes and surface waters; the
name of the receiving waters to which the stormwater outfalls discharge, or if the discharge
is to a municipal separate storm sewer system, the name of the municipality and the
ultimate receiving waters; and accurate latitude and longitude of the points of stormwater
discharge associated with industrial activity. The general location map (or alternatively the
site map) shall identify whether any receiving waters are impaired (on the state's 303(d)
list of impaired waters) or if the site is located in a watershed for which a TMDL has been
established, and what the parameters of concern are.
(b) A narrative description of storage practices, loading and unloading activities, outdoor
process areas, dust or particulate generating or control processes, and waste disposal
practices. A narrative description of the potential pollutants that could be expected to be
present in the stormwater discharge from each outfall.
(c) A site map drawn at a scale sufficient to clearly depict: the site property boundary; the
stormwater discharge outfalls; all on -site and adjacent surface waters and wetlands;
industrial activity areas (including storage of materials, disposal areas, process areas,
loading and unloading areas, and haul roads); site topography and.finished grade; all
drainage features and structures; drainage area boundaries and total contributing area for
each outfall; direction of flow in each drainage area; industrial activities occurring in each
drainage area; buildings; stormwater Best Management Practices (BMPs); and impervious
surfaces. The site map must indicate the percentage of each drainage area that is
impervious, and the site map trust include a graphic scale indication and north arrow.
(d) A list of significant spills or leaks of pollutants during the previous three (3) years and
any corrective actions taken to mitigate spill impacts.
(e) Certification that the stormwater outfalls have been evaluated for the presence of non-
stormwater discharges. The permittee shall re -certify annually that the stormwater
outfalls have been evaluated for the presence of non-stormwater discharges. The
certification statement will be signed in accordance with the requirements found in Part 111,
Standard Conditions, Section B, Paragraph 5.
Part 11 Page 1 of 9
Permit No. NCG110000
2. Stormwater Management Strategy. The Stormwater Management Strategy shall contain a
narrative description of the materials management practices employed which control or
minimize the Stormwater exposure of significant materials, including structural and
nonstructural measures. The Stormwater Management Strategy, at a minimum, shall
incorporate the following:
(a) Feasibility Study. A review of the technical and economic feasibility of changing the
methods of operations and/or storage practices to eliminate or reduce exposure of
materials and processes to rainfall and run-on flows. Wherever practical, the permittee
shall prevent exposure of all storage areas, material handling operations, and
manufacturing or fueling operations. In areas where elimination of exposure is not
practical, this review shall document the feasibility of diverting the stormwater run-on
away from areas of potential contamination.
(b) Secondary Containment Requirements and Records. Secondary containment is
required for: bulk storage of liquid materials including petroleum products; storage in au
amount of Section 313 of Title III of the Superfund Amendments and Reauthorization Act
(SARA) water priority chemicals; and storage in any amount of hazardous substances, in
order to prevent leaks and spills from contaminating stormwater runoff. A table or
summary of all such tanks and stored materials and their associated secondary containment
areas shall be maintained. If the secondary containment devices are connected to
stormwater conveyance systems, the connection shall be controlled by manually activated
valves or other similar devices (which shall be secured closed with a locking mechanism).
Any stormwater that accumulates in the containment area shall be at a minimum visually
observed for color, foam, outfall staining, visible sheens and dry weather flow, prior to
release of the accumulated stormwater. Accumulated stormwater shall be released if found
to be uncontaminated by any material. Records documenting the individual making the
observation, the description of the accumulated stormwater, and the date and time of the
release shall be kept for a period of five (5) years. For facilities subject to a federal oil Spill
Prevention, Control, and Countermeasure Plan (SPCC), any portion of the SPCC plan fully
compliant with the requirements of this permit may be used to demonstrate compliance
with this permit.
(c) BMP Summary. A listing of site structural and non-structural Best Management Practices
(BMPs) shall be provided. The installation and implementation of BMPs shall be based on
the assessment of the potential for sources to contribute significant quantities of pollutants
to stormwater discharges and oo data collected through monitoring of stormwater
discharges. The BMP Summary shall include a written record of the specific rationale for
installation and implementation of the selected site BMPs. The BMP Summary shall be
reviewed and updated annually.
Spill Prevention and Response Procedures. The Spill Prevention and Response Procedures
(SPRP) shall incorporate an assessment of potential pollutant sources based on a materials
inventory of the facility. Facility personnel responsible for implementing the SPRP shall be
identified in a written list incorporated into the SPRP and signed and dated by each individual
acknowledging their responsibilities for the plan. A responsible person shall be on -site at all
times during facility operations that have the potential to contaminate stormwater runoff
through spills or exposure of materials associated with the facility operations. The SPRP must
be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure
plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address
the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be
incorporated by reference into the SPRP.
Part 11 Page 2 of 9
Permit No. NCGJ 10000
4. Preventative Maintenance and Good Housekeeping Program. A preventative maintenance
and good housekeeping program shall be developed and implemented. The program shall
address all stormwater control systems (if applicable), stormwater discharge outfalls, all on -site
and adjacent surface waters and wetlands, industrial activity areas (including material storage
areas, material handling areas, disposal areas, process areas, loading and unloading areas, and
haul roads), all drainage features and structures, and existing structural BMPs. The program
shall establish schedules of inspections, maintenance, and housekeeping activities of
stormwater control systems, as well as facility equipment, facility areas, and facility systems
that present a potential for stormwater exposure or stormwater pollution where not already
addressed under another element of the SPPP. Inspection of material handling areas and
regular cleaning schedules of these areas shall be incorporated into the program. Timely
compliance with the established schedules for inspections, maintenance, and housekeeping
shall be recorded and maintained in the SPPP.
Facility Inspections. Inspections of the facility and all stormwater systems shall occur as part
of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-
annual schedule, once during the first half of the year (January to June), and once during the
second half (July to December), with at least 60 days separating inspection dates (unless
performed more frequently than semi-annually). These facility inspections are different from,
and in addition to, the stormwater discharge characteristic monitoring at the outfalls required
in Part lI B and C of this permit.
6. Employee Training. Training programs shall be developed and training provided at a
minimum on an annual basis for facility personnel with responsibilities for: spill response and
cleanup, preventative maintenance activities, and for any of the facility's operations that have
the potential to contaminate stormwater runoff. The facility personnel responsible for
implementing the training shall be identified, and their annual training shall be documented by
the signature of each employee trained.
7. Responsible Party. The SPPP shall identify a specific position or positions responsible for the
overall coordination, development, implementation, and revision of the SPPP. Responsibilities
for all components of the SPPP shall be documented and position assignments provided.
8. SPPP Amendment and Annual Update. The permittee shall amend the SPPP whenever there
is a change in design, construction, operation, site drainage, maintenance, or configuration of
the physical features which may have a significant effect on the potential for the discharge of
pollutants to surface waters. All aspects of the SPPP shall be reviewed and updated on an
annual hasis. The annual update shall include:
(a) an updated list of significant spills or leaks of pollutants for the previous three (3)
years, or the notation that no spills have occurred (element of the Site Overview);
(b) a written re -certification that the stormwater outfalls have been evaluated for the
presence of non-stormwater discharges (element of the Site Overview);
(c) a documented re-evaluation of the effectiveness of the on -site stormwater BMPs
[BMP Summary element of the Stormwater Management Strategy).
(d) a review and comparison ofsample analytical data to benchmark values (if
applicable) over the past year, including a discussion about Tiered Response status.
The permittee shall use the Division's Annual Summary Data Monitoring Report
(DMR) form, available from the Stormwater Permitting Unit's website (See
'Monitoring Farms' here: http:j/t)octal.ncdenr.orglweblwq/ws/su/npdessw).
Part 11 Page 3 of 9
Permit No. NCG110000
The Director may notify the permittee when the SPPP does not meet one or more of the
minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit
a time schedule t6 the Director for modifying the SPPP to meet minimum requirements. The
permittee shall provide certification in writing (in accordance with Part III, Standard
Conditions, Section B, Paragraph 5) to the Director that the changes have been made.
9. SPPP Implementation, The permittee shall implement the Stormwater Pollution Prevention
Plan and all appropriate BMPs to prevent contaminants from entering surface waters via
stormwater. Implementation of the SPPP shall include documentation of all monitoring,
measurements, inspections, maintenance activities, and training provided to employees,
including the log of the sampling data and of actions taken to implement BMPs associated with
the industrial activities, including vehicle maintenance activities. Such documentation shall be
kept on -site for a period of five (5) years and made available to the Director or the Director's
authorized representative immediately upon request.
Part 11 Page 4 of 9
Permit No. NCG110000
SECTION B: ANALYTICAL MONITORING REQUIREMENTS FOR STORMWATER
DISCHARGES FROM ON -SITE VEHICLE AND EQUIPMENT MAINTENANCE
Facilities that have any vehicle maintenance activity occurring on -site -which uses more than 55
gallons of new motor oil and/or hydraulic oil per month when averaged over the calendar
year shall perform analytical monitoring as specified below in Table 1. All analytical monitoring
shall be performed during a measureable storm event at all stormwater discharge outfalls (SDOs)
that discharge stormwater runoff from vehicle maintenance areas, and in accordance with the
schedule presented in Table 2. Sampling is not required outside of the facility's normal operating
hours.
A measurable storm event is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office. See Definitions. _
Table 1. Analytical Monitoring Requirements for On -Site Vehicle Maintenance
Discharge Characteristics
Units
Measurement
l:re uen 1
Sample
Type2
Sample
`Locati6n3
Non -Polar Oil & Grease by
EPA Method 1664 SGT-HEM
mg/L
semi-annual
Grab
5D0
Total Sus ended Solids (TSS)
m L
semi-annual
Grab
SDO
Total Rainfal14
inches
semi-annual
Rain gauge
New Motor Oil Usage
gallons/month
semi-annual
Estimate
Footnotes:
1 Measurement Frequency: Twice per year (unless other provisions of this permit prompt monthly
sampling) during a measureable storm event, until either another permit is issued for this facility or
until this permit is revoked or rescinded. See Table 2 for schedule of monitoring periods through the end
of this permitting cycle. If the facility is monitoring monthly because of Tier Two or Three response
actions under the previous General Permit, the facility should continue a monthly monitoring schedule.
2 Grab samples shall be collected within the first 30 minutes of discharge.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges
stormwater runoff from area(s) where vehicle maintenance activities occur, unless representative outfall
status (ROS) has been granted. A copy of the letter granting ROS shall be kept on site.
4 For each sampled measureable storm event the total precipitation must be recorded. An on -site or local
rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time, a
local rain gauge reading may be substituted for an on -site reading.
The permittee shall complete the analytical samplings in accordance with the schedule specified
below in Table 2, unless adverse weather conditions prevent sample collection (see Adverse
Weather in Definitions). A minimum of 60 days must separate Period 1 and Period 2 sample
dates, unless monthly monitoring has been instituted as part of other requirements of this permit.
Inability to sample because of adverse weather conditions must be documented in the SPPP and
recorded on the DMR. The permittee must report the results from each sample taken within the
monitoring period (see Part 111, Section E).
Part II Page 5 of 9
Permit No. NCG110000
Table 2. Monitoring Schedule
Monitoring period',?
Sample Number
Start
End.
Year 1 - Period 1
1
June 1, 2013
December 31, 2013
Year 1 - Period 2
2
January 1, 2014
June 30, 2014
Year 2 - Period 1
3
July 1, 2014
December 31, 2014
Year 2 - Period 2
4
January 1, 2015
June 30, 2015
Year 3 - Period 1
5
July 1, 2015
December 31, 2015
Year 3 - Period 2
6
January 1, 2016
June 30, 2016
Year 4 - Period 1
7
July 1, 2016
December 31, 2016
Year 4 - Period 2
8
January 1, 2017
June 30, 2017
Year 5 - Period 1
9
July 1, 2017
December 31, 2017
Year 5 -- Period 2
10
January 1, 2018
May 31, 2018
Footnotes:
1 Maintain semi-annual analytical monitoring throughout the permit renewal process (unless other
provisions of this permit prompt monthly sampling).
2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report
indicating "No Flow" or "No Discharge" within 30 days of the end of the sampling period.
Failure to monitor semi-annually per permit terms may result in the Division requiring monthly
monitoring for all parameters for a specified time period. "No discharge" from an outfall or
inability to collect a sample because of adverse weather conditions during a monitoring period, for
example, does not constitute failure to monitor, as long as it is properly reported.
The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark
values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater
Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase
monitoring, increase management actions, increase record keeping, and/or install stormwater Best
Management Practices (BMPs) in a tiered program. See descriptions of Tier One, Tier Two, and Tier
Three response actions below. In the event that the Division releases the permittee from continued
monthly monitoring under Tier Three, DWQ's release letter may remain in effect through subsequent
reissuance of this permit, unless the release letter provides for other conditions or duration.
Table 3. Benchmark Values for On -Site Vehicle and Equipment Maintenance Activities
.Discharge Characteristics ;6
Benchmark Values
Non -Polar Oil & Grease by
EPA Method 1664 SGT-HEM
15 mg/L
Total Suspended Solids TSS)
100 m L
TSS ORW, H W, Trout (Tr), and PNA waters
50 m L
Part I1 Page 6 of 9
Permit No. NCG110000
T Tier One
I lf. The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any I
Darameter at anv outfall;
Then: The permittee shall:
1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling
results.
2. Identify and evaluate possible causes of the benchmark value exceedance.
3. Identify potential and select the specific: source controls, operational controls, or physical
improvements to reduce concentrations of the parameters of concern, and/or to bring concentrations
within the benchmark range.
4. Implement the selected actions within two months of the inspection,
5. Record each instance of a Tier One response in the SPPP. Include the date and value of the benchmark
exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the
date the selected actions were implemented.
Tier Two
If: The first valid sampling results from two consecutive monitoring periods are above the benchmark values, or I
outside of the benchmark ranee, for anv specific parameter at a specific discharee outfall;
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One,
2. Immediately institute monthly monitoring for all parameters. The permittee shall conduct monthly
monitoring at every outfall where a sampling result exceeded the benchmark value for two consecutive
samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample
results are below the benchmark values or within benchmark range,
3. If no discharge occurs during the sampling period, the permittee is required to submit a monthly
monitoring report indicating "No Flow" to comply with reporting requirements.
4. Benchmark exceedances for a different parameter separately trigger a tiered response.
5. Maintain a record of the Tier Two response in the SPPP.
5. Continue Tier Two obl
monitoring, etc.) through the permit COC renewal process.
. ` "Tier Three
If the valid sampling results required for the permit monitoring periods exceed the benchmark value, or are
outside the benchmark range, for any specific parameter at any specific outfall on four occasions, the
permittee shall notify the OWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth
analytical results. DWQ may but is not limited to:
• require permittee to revise, increase, or decrease monitoring frequency for some or all parameters;
• rescind coverage under the General Permit, and require that the permittee apply for an individual
stormwater discharge permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures;
• require the permittee to perform upstream and downstream monitoring to characterize impacts on
receiving waters;
• require the permittee implement site modifications to qualify for a No Exposure Exclusion; or
• require the permittee to continue Tier Three obligations through the permit COC renewal process, and
possibly into the next permit cycle.
Part II Page 7 of 9
Permit No. NCG110000
SECTION C: STORMWATER DISCHARGES: QUALITATIVE MONITORING
REQUIREMENTS
The purpose of qualitative monitoring is to evaluate the effectiveness of the Stormwater Pollution
Prevention Plan (SPPP) and assess new sources of stormwater pollution. Qualitative monitoring of
stormwater outfalls must be performed during a measurable storm event.
Qualitative monitoring requires a visual inspection of each stormwater outfall associated with
industrial activity (not just vehicle maintenance activities), regardless of representative outfall status.
Qualitative monitoring shall be performed semi-annually as specified in Table 4, and during
required analytical monitoring events if applicable (unless the permittee is required to perform
further qualitative sampling per the Qualitative Monitoring Response below). Inability to sample
because of adverse weather conditions must be documented in the SPPP and recorded on the DMR
(see Adverse Weather in Definitions). Only SDOs discharging stormwater associated with industrial
activity must be monitored (See Definitions).
In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall
document the suspected cause of the condition and any actions taken in response to the discovery.
This documentation will be maintained with the SPPP.
Table 4. Qualitative Monitoring; Requirements
Discharge Characteristics k
..
Frequencyl
Monitoring
Location2
Color
semi-annual
SDO
Odor
semi-annual
SDO
Clarity
semi-annual
SDO
Floating Solids
semi-annual
SDO
Suspended Solids
semi-annual
SDO
Foam
semi-annual
SDO
Oil Sheen
semi-annual
SDO
Erosion or deposition at the outfall
semi-annual
SDO
Other obvious indicators of stormwater pollution
semi-annual
SDO
Footnotes:
1 Measurement Frequency: Twice per year (unless other provisions of this permit prompt monthly
sampling) during a measureable storm event. See Table 2 for schedule of monitoring periods. The
permittee must continue qualitative monitoring throughout the permit renewal process.
2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall
(SDO) associated with industrial activity, regardless of representative outfall status.
Part 11 Page 8 of 9
Permit No. NCG110000
A minimum of 60 days must separate monitoring dates, unless additional sampling has been
instituted as part of other analytical monitoring requirements in this permit.
If the permittee's qualitative monitoring indicates that existing stormwater SMPs are ineffective, or that
significant stormwater contamination is present, the permittee shall investigate potential causes, evaluate
the feasibility of corrective actions, and implement those corrective actions within 60 days, per the
Qualitative Monitoring Response, below. A written record of the permittee's investigation, evaluation,
and response actions shall be kept in the Stormwater Pollution Prevention Plan.
Qualitative monitoring is for the purposes of evaluating SPPP effectiveness, assessing new sources
of stormwater pollution, and prompting the permittee's response to pollution. If the permittee
repeatedly fails to respond effectively to correct problems identified by qualitative monitoring, or if
the discharge causes or contributes to a water quality standard violation, DWQ may but is not
limited to:
• require that the permittee revise, increase, or decrease monitoring frequency for some or
all parameters (analytical or qualitative);
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures;
• require the permittee to perform upstream and downstream monitoring to characterize
impacts on receiving waters; or
• require the permittee implement site modifications to qualify for a No Exposure Exclusion.
Part 11 Page 9 of 9
Permit No. NCG110000
PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS
SECTION A: COMPLIANCE AND LIABILITY
1. Compliance Schedule
The permittee shall comply with Limitations and Controls specified for stormwater discharges in
accordance with the following schedule:
Existing Facilities already operating but applying for permit coverage for the first time: The
Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the
effective date of the Certificate of Coverage and updated thereafter on an annual basis. Secondary
containment, as specified in Part 11, Section A, Paragraph 2(b) of this general permit, shall be
accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage.
New Facilities applying for coverage for the first time: The Stormwater Pollution Prevention Plan
shall be developed and implemented prior to the beginning of discharges from the operation of the
industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified
in Part 11, Section A, Paragraph 2(b) of this general permit shall be accomplished prior to the
beginning of discharges from the operation of the industrial activity.
Existing facilities previously permitted and applying for renewal under this General Permit:
All requirements, conditions, limitations, and controls contained in this permit (except new SPPP
elements in this permit renewal) shall become effective immediately upon issuance of the Certificate
of Coverage. New elements of the Stormwater Pollution Prevention Plan for this permit renewal
shall be developed and implemented within 6 months of the effective date of this general permit and
updated thereafter on an annual basis. Secondary containment, as specified in Part ll, Paragraph
2(b) of this general permit shall be accomplished prior to the beginning of discharges from the
operation of the industrial activity.
2. Duty to Com"ly
The permittee must comply with all conditions of this general permit. Any permit noncompliance
constitutes a violation of the Clean Water Act (CWA) and is grounds for enforcement action; for
permit termination, revocation and reissuance, or modification; or denial of a permit upon renewal
application [40 CFR 122.411,
a. The permittee shall comply with standards or prohibitions established under section 307(a) of
the CWA for toxic pollutants within the time provided in the regulations that establish these
standards or prohibitions, even if the general permit has not yet been modified to incorporate
the requirement.
b. The CWA provides that any person who violates section [s] 301, 302, 306, 307, 308, 318 or 405 of
the Act, or any permit condition or limitation implementing any such sections in a permit issued
under section 402, or any requirement imposed in a pretreatment program approved under
sections 402(a)(3) or 402(b)(8) of the Act, is subject to a civil penalty not to exceed $37,500 per
day for each violation. 133 USC 1319(0) and 40 CFR 122.41(a)(2)]
c. The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308,
318, or 405 of the Act, or any condition or limitation implementing any of such sections in a
permit issued under section 402 of the Act, or any requirement imposed in a pretreatment
program approved under section 402(a)(3) or 402(b)(8) of the Act, is subject to criminal
penalties of $2,500 to $25,000 per day of violation, or imprisonment of not more than 1 year, or
both. In the case of a second or subsequent conviction for a negligent violation, a person shall be
Part III Page 1 of 10
Permit No. NCG110000
subject to criminal penalties of not more than $50,000 per day of violation, or by imprisonment
of not more than 2 years, or both. [33 USC 1319(c)(1) and 40 CFR 122.41(a)(2)]
d. Any person who knowingly violates such sections, or such conditions or limitations is subject to
criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3
years, or both. In the case of a second or subsequent conviction for a knowing violation, a person
shall be subject to criminal penalties of not more than $100,000 per day of violation, or
imprisonment of not more than 6 years, or both. [33 USC 1319(c)(2) and 40 CFR 122.41(a)(2)]
Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act,
or any permit condition or limitation implementing any of such sections in a permit issued under
section 402 of the Act, and who knows at that time that he thereby places another person in
imminent danger of death or serious bodily injury, shall, upon conviction, be subject to a fine of
not more than $250,000 or imprisonment of not more than 15 years, or both. In the case of a
second or subsequent conviction for a knowing endangerment violation, a person shall be
subject to a fine of not more than $500,000 or by imprisonment of not more than 30 years, or
both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shalt, upon conviction
of violating the imminent danger provision, be subject to a fine of not more than $1,000,000 and
can be fined up to $2,000,000 for second or subsequent convictions. [40 CFR 122.41(a)(2)]
f. . Under state law, a civil penalty of not more than $25,000 per violation maybe assessed against
any person who violates or fails to act in accordance with the terms, conditions, or requirements
of a permit. [North Carolina General Statutes § 143-215.6A]
g. Any person may be assessed an administrative penalty by the Administrator for violating section
301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation
implementing any of such sections in a permit issued under section 402 of this Act.
Administrative penalties for Class I violations are not to exceed $16,000 per violation, with the
maximum amount of any Class I penalty assessed not to exceed $37,500. Penalties for Class Il
violations are not to exceed $16,000 per day for each day during which the violation continues,
with the maximum amount of any Class 11 penalty not to exceed $177,500. [33 USC 1319(g)(2)
and 40 CFR 122.41(a)(3)]
Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this
general permit which has a reasonable likelihood of adversely affecting human health or the
environment [40 CFR 122.41(d)],
4. Civil and Criminal Liability
Except as provided in Part 111, Section C of this general permit regarding bypassing of stormwater
control facilities, nothing in this permit shall be construed to relieve the permittee from any
responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3,143-215.6, or
Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may
be temporarily suspended,
S. Oil and Hazardous Substance Liabilirir
Nothing in this general permit shall be construed to preclude the institution of any legal action or
relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or
may be subjectto under NCGS 143-21S.75 et seq. or Section 311 of the Federal Act, 33 USC 1321.
6. Proper Rights
The issuance of this general permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any
Part 111 Page 2 of 10
Permit No. NCG110000
invasion of personal rights, nor any infringement of Federal, State or local laws or regulations [40
CFR 122.41(g)].
7. Severability
The provisions of this general permit are severable, and if any provision of this general permit, or the
application of any provision of this; general permit to any circumstances, is held invalid, the
application of such provision to other circumstances, and the remainder of this general permit, shall
not be affected thereby [NCGS 150B-23].
B. Duty to Provide Information
The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any
information which the Permit Issuing Authority may request to determine whether cause exists for
modifying, revoking and reissuing, or terminating the general permit issued pursuant to this general
permit or to determine compliancE with this general permit. The permittee shall also furnish to the
Permit Issuing Authority upon request, copies of records required to be kept by this general permit
[40 CFR 122.41(h)].
9. Penalties -for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders
inaccurate, any monitoring device or method required to be maintained under this general permit
shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by
imprisonment for not more than two years per violation, or by both. If a conviction of a person is for
a violation committed after a first conviction of such person under this paragraph, punishment is a
fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or
both [40 CFR 122.411.
10, Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement,
representation, or certification in any record or other document submitted or required to be
maintained under this general permit, including monitoring reports or reports of compliance or
noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation,
or by imprisonment for not more than two years per violation, or by both [40 CFR 122.411.
11. OnshQre or Offshore Construction
This general permit does not authorize or approve the construction of any onshore or offshore
physical structures or facilities or the undertaking of any work in any navigable waters.
12. Duty to Reanaly
Dischargers covered by this general permit need not submit a new Notice of Intent (NO]) or renewal
request unless so directed by the Division. If the Division chooses not to renew this general permit,
the permittee will be notified to submit an application for an individual permit [15A NCAC 02H
.0127(e)].
SECTION B; GENERAL CONDITIONS
General Permit Expiration
General permits will he effective for a term not to exceed five years, at the end of which the Division
may renew them after all public notice requirements have been satisfied. If a general permit is
renewed, existing permittees do not need to submit a renewal request or pay a renewal fee unless
directed by the Division. New applicants seeking coverage under a renewed general permit must
submit a Notice of Intent to be covered and obtain a Certificate of Coverage under the renewed
general permit [15A NCAC 02H .0127(e)].
Part IIi Page 3 of 10
Permit No. NCG110000
Transfers
This general permit is not transferable to any person without prior written notice to and approval
from the Director in accordance with 40 CFR 122.61. The Director may condition approval in
accordance with NCGS 143-215.1, in particular NCGS 143-215.1(b)(4)b.2., and may require
modification or revocation and reissuance of the Certificate of Coverage, or a minor modification, to
identify the new permittee and incorporate such other requirements as may be necessary under the
CWA [40 CFR 122.41(1)(3), 122.61] or state statute. The Permittee is required to notify the
Division in writing in the event the permitted facility is sold or closed.
When an Individual Permit May he_Regpired
The Director may require any owner/operator authorized to discharge under a certificate of
coverage issued pursuant to this general permit to apply for and obtain an individual permit or an
alternative general permit. Any interested person may petition the Director to take action under this
paragraph. Cases where an individual permit may be required include, but are not limited to, the
following:
a. The discharger is a significant contributor of pollutants;
b. Conditions at the permitted site change, altering the constituents and/or characteristics of
the discharge such that the discharge no longer qualifies for a general permit;
C. The discharge violates the terms or conditions of this general permit;
d. A change has occurred in the availability of demonstrated technology or practices for the
control or abatement of pollutants applicable to the point source;
e. Effluent limitations are promulgated for the point sources covered by this general permit;
f. A water quality management plan containing requirements applicable to such point sources
is approved after the issuance of this general permit;
g. The Director determines at his or her own discretion that an individual permit is required.
4. When apindividual Permit May Le Requested
Any permittee operating under this general permit may request to be excluded from the coverage of
this general permit by applying for an individual permit. When an individual permit is issued to an
owner/operator the applicability of this general permit is automatically terminated on the effective
date of the individual permit.
S. Signatory Requirement
All applications, reports, or information submitted to the Permitting Issuing Authority shall be signed
and certified (40 CFR 122.41(k)).
a. All Notices of Intent to be covered under this general permit shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a
responsible corporate officer means: (a) a president, secretary, treasurer or vice president
of the corporation in charge of a principal business function, or any other person who
performs similar policy or decision making functions for the corporation, or (b) the manager
of one or more manufacturing, production, or operating facilities, provided, the manager is
authorized to make management decisions which govern the operation of the regulated
facility including having the explicit or implicit duty of making major capital investment
recommendations, and initiating and directing other comprehensive measures to assure
long term environmental compliance with environmental laws and regulations; the manager
can ensure that the necessary systems are established or actions taken to gather complete
and accurate information for permit application requirements; and where authority to sign
documents has been assigned or delegated to the manager in accordance with corporate
procedures.
Part III Page 4 of 10
Permit No. NCG110000
(2) For a partnership or sole proprietorship: by a general partner or the proprietor,
respectively; or
(3) For a municipality, State, Federal, or other public agency: by either a principal executive
officer or ranking elected official [40 CFR 122.22].
b. All reports required by the general permit and other information requested by the Permit
Issuing Authority shall be signed by a person described in paragraph a. above or by a duly
authorized representative of that person. A person is a duly authorized representative only if:
(1) The authorization is made in writing by a person described above;
(2) The authorization specified either an individual or a position having responsibility for the
overall operation of the regulated facility or activity, such as the position of plant manager,
operator of a well or well field, superintendent, a position of equivalent responsibility, or an
individual or position having overall responsibility for environmental matters for the company.
(A duly authorized representative may thus be either a named individual or any individual
occupying a named position.); and
(3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 122,221
c. Changes to authorization: If an authorization under paragraph (b) of this section is no longer
accurate because a different individual or position has responsibility for the overall operation of
the facility, a new authorization satisfying the requirements of paragraph (b) of this section must
be submitted to the Director prior to or together with any reports, information, or applications to
be signed by an authorized representative [40 CFR 122.22]
Certification. Any person signing a document under paragraphs a. or b. of this section shall make
the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL
BE ACCEPTED:
"1 certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible forgathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. 1 am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment far knowing violations."
6. General Permit Modification. Revocation and Reissuance, or Termination
The issuance of this general permit does not prohibit the Permit Issuing Authority from reopening
and modifying the general permit, revoking and reissuing the general permit, or terminating the
general permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal
Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2H
.0100; and North Carolina General Statute 143-215.1 et al.
After public notice and opportunity for a hearing, the general permit may be terminated for cause.
The filing of a request for a general permit modification, revocation and reissuance, or termination
does not stay any general permit condition. The Certificate of Coverage shall expire when the
general permit is terminated.
Certificate of Coverage Actions
The general permit may be modified, revoked and reissued, or terminated for cause. The notification
of planned changes or anticipated noncompliance does not stay any general permit condition [40
CFR 122.41(o].
Partill Page 5 of 10
Permit No. NCG110000
Annual Administeringa,-Compliance Monitpybg Fee Requirements
The permittee must pay the administering and Compliance monitoring fee within 30 (thirty) days
after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A
NCAC 2H .0105(b)(2) may cause this Division to initiate action to revoke coverage under the general
permit.
SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
1. er Qperation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment
and control (and related appurtenances) which are installed or used by the permittee to achieve
compliance with the conditions of this permit, Proper operation and maintenance also includes
adequate laboratory controls and appropriate quality assurance procedures. This provision requires
the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee
only when the operation is necessary to achieve compliance with the conditions of this permit [40
CFR 122.41(e)].
Need to Halt or Reduce Not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been necessary
to halt or reduce the permitted activity in order to maintain compliance with the condition of this
general permit 140 CFR 122.41(c)].
Bypassing of 5tormwater Control Facilities
Bypass is prohibited and the Director may take enforcement action against a permittee for bypass
unless:
a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and
b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities,
retention of stormwater or maintenance during normal periods of equipment downtime or dry
weather. This condition is not satisfied if adequate backup controls should have been installed in
the exercise of reasonable engineering judgment to prevent a bypass which occurred during
normal periods of equipment downtime or preventive maintenance; and
c. The permittee submitted notices as required under, Part 111, Section E of this general permit.
If the Director determines that it will meet the three conditions listed above, the Director may
approve an anticipated bypass after considering its adverse effects.
SECTION D: MONITORING AND RECORDS
$gpres�ntative Samplg
Samples collected and measurements taken, as required herein, shall be characteristic of the volume
and nature of the permitted discharge. Analytical sampling shall be performed during a measureable
storm event. Samples shall be taken on a day and time that is characteristic of the discharge. All
samples shall be taken before the discharge joins or is diluted by any other waste stream, body of
water, or substance. Monitoring points as specified in this general permit shall not be changed
without notification to and approval of the Permit Issuing Authority [40 CFR 122.410)].
2. Recording Results
For each measurement or Sample taken pursuant to the requirements of this general permit, the
permittee shall record the following information [40 CFR 122.41]:
a. The date, exact place, and time of sampling or measurements;
b, The individuals) who performed the sampling or measurements;
Part III Page 6 of 10
Permit No. NCG110000
c. The datef s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
3. Flow Measurements
Where required, appropriate flow measurement devices and methods consistent with accepted
scientific practices shall be selected and used to ensure the accuracy and reliability of measurements
of the volume of monitored discharges.
4. Test_Pr_ocedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations published
pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations
published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as
Amended, and Regulation 40 CFR 136.
To meet the intent of the monitoring required by this general permit, all test procedures must
produce minimum detection and reporting levels and all data generated must be reported down to
the minimum detection or lower reporting level'of the procedure. If no approved methods are
determined capable of achieving minimum detection and reporting levels below general permit
discharge requirements, then the most sensitive (method with the lowest possible detection and
reporting level) approved method must be used.
S. Representative Qutfall
If a facility has multiple discharge locations with substantially identical stormwater discharges that
are required to be sampled, the permittee may petition the Director for representative outfall status.
if it is established that the stormwater discharges are substantially identical and the permittee is
granted representative outfall status, then sampling requirements may be performed at a reduced
number of outfalls.
6. Records Retention
Qualitative monitoring shall be documented and records maintained at the facility along with the
Stormwater Pollution Prevention Plan (SPPP). Copies of analytical monitoring results shall also be
maintained on -site. The permittee shall retain records of all monitoring information, including
o all calibration and maintenance records,
o all original strip chart recordings for continuous monitoring instrumentation,
o copies of all reports required by this general permit,
o copies of all data used to complete the Notice of Intent to be covered by this general permit.
These records or copies shall be maintained for a period of at least 5 years from the date of the
sample, measurement, report or Notice of Intent application. This period may be extended by
request of the Director at any time [40 CFR 122.41]. If this volume of records cannot be maintained
on -site, the documents must be made available to an inspector upon request as immediately as
possible.
Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an authorized
contractor acting as a representative of the Director), or in the case of a facility which discharges
through a municipal separate storm sewer system, an authorized representative of a municipal
operator or the separate storm sewer system receiving the discharge, upon the presentation of
credentials and other documents as may be required by law, to:
Part Iil Page 7 of 10
Permit No. NCG110000
a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted,
or where records must be kept under the conditions of this general permit;
b. Have access to and copy, at reasonable times, any records that must be kept under the conditions
of this general permit;
c. Inspect at reasonable times any facilities, equipment (including monitoring and control
equipment), practices, or operations regulated or required under this general permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as
otherwise authorized by the Clean Water Act, any substances or parameters at any location [40
CFR 122.41(i)].
SECTION E: REPORTING REQUIREMENTS
1. Discharge Monitoring Reports
Samples analyzed in accordance with the terms of this general permit shall be submitted to the
Division on Discharge Monitoring Report (DMR) forms provided by the Director. DMR forms are
available on the Division's website (btil):Ili)oi-tal.iicdeni-.org/web/wq/wslsti/ ndn essw). Submittals
shall be delivered to the Division no later than 30 days from the date the facility receives the
sampling results from the laboratory,
When no discharge has occurred from the facility during the report period, the permittee is required
to submit a discharge monitoring report, within 30 days of the end of the specified sampling period,
giving all required information and indicating "NO FLOW" as per NCAC TI5A 02B .0506.
If the permittee monitors any pollutant more frequently than required by this general permit using
test procedures approved under 40 CFR Part 136 and at a sampling location specified in this general
permit or other appropriate instrument governing the discharge, the results of such monitoring shall
be included in the data submitted on the DMR.
The permittee shall record the required qualitative monitoring observations on the SDO Qualitative
Monitoring Report form provided by the Division and shall retain the completed forms on site.
Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific
requirement to do so. Qualitative Monitoring Report forms are available at the website above.
Submitting Reports
Two signed copies of Discharge Monitoring Reports (DMRs) shall be submitted to:
Central Files
Division of Water Quality
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
3. "v_�tilahili of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2] or Section 308 of the
Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for
public inspection at the offices of the Division. As required by the Act, analytical data shall not be
considered confidential. Knowingly making any false statement on any such report may result in the
imposition of criminal penalties as provided for in NCGS 143-215.66 or in Section 309 of the Federal
Act.
Partill Page 8 of 10
Permit No. NCG110000
4. Non-Stormwater Discharges
If the storm event monitored in accordance with this general permit coincides with a non-
stormwater discharge, the permittee shall separately monitor all parameters as required under all
other applicable discharge permits and provide this information with the stormwater discharge
monitoring report.
S. Planned Chanties
The permittee shall give notice to the Director as soon as possible of any planned changes at the
permitted facility which could significantly alter the nature or quantity of pollutants discharged [40
CFR 122.41(1)]. This notification requirement includes pollutants which are not specifically listed in
the general permit or subject to notification requirements under 40 CFR Part 122.42 (a).
6. Anticipated Noncompliance
The permittee shall give advance notice to the Director of any planned changes at the permitted
facility which may result in noncompliance with the general permit [40 CFR 122.41(1)(2)].
7. Snills
The permittee shall report to the local DWQ Regional Office, within 24 hours, all significant spills as
defined in Part IV of this general permit. Additionally, the permittee shall report spills including: any
oil spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters,
any oil spill regardless of amount occurring within 100 feet of surface waters, and any oil spill less
than 25 gallons that cannot be cleaned up within 24 hours.
8. ]Bypass
Notice [40 CFR 122.41(m)(3)]:
a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit
prior notice, if possible at least ten days before the date of the bypass; including an evaluation of
the anticipated quality and affect of the bypass.
b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of
an unanticipated bypass.
Twenty-four Hour Reporting
a. The permittee shall report to the central office or the appropriate regional office any
noncompliance which may endanger health or the environment. Any information shall be
provided orally within 24 hours from the time the permittee became aware of the circumstances.
A written submission shall also be provided within 5 days of the time the permittee becomes
aware of the circumstances,
The written submission shall contain a description of the noncompliance, and its causes; the
period of noncompliance, including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time compliance is expected to continue; and steps taken or
planned to reduce, eliminate, and prevent reoccurrence of the noncompliance [40 CFR
122:41(1)(6)1,
b. The Director may waive the written report on a case -by -case basis for reports under this section
if the oral report has been received within 24 hours.
c. Occurrences outside normal business hours may also be reported to the Division's Emergency
Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300.
10, Other Noncompliance
The permittee shall report all instances of noncompliance not reported under 24 hour reporting at
the time monitoring reports are submitted [40 CFR 122.41(1)(7)].
Part III Page 9 of 10
Permit No, NCG110000
11. Other InfQrMation
Where the Permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent to
be covered under this general permit or submitted incorrect information in that Notice of Intent
application or in any report to the Director, it shall promptly submit such facts or information [40
CFR 122,41(l)(8)].
Part III Page 10 of 10
PART IV DEFINITIONS
Act
See Clean Water Act.
Permit No. NCG110000
Adverse Weather
Adverse conditions are those that are dangerous or create inaccessibility for personnel, such as local
flooding, high winds, or electrical storms, or situations that otherwise make sampling impractical.
When adverse weather conditions prevent the collection of samples during the sample period, the
permittee must take a substitute sample or perform a visual assessment during the next qualifying
storm event. Documentation of an adverse event (with date, time and written narrative) and the
rationale must be included with your SPPP records. Adverse weather does not exempt the permittee
from having to file a monitoring report in accordance with the sampling schedule. Adverse events
and failures to monitor must also be explained and reported on the relevant DMR.
Allowable Non-Stormwater Discharges
This general permit regulates stormwater discharges. Non-stormwater discharges which shall he
allowed in the stormwater conveyance system are:
a. All other discharges that are authorized by a non-stormwater NPDES permit.
b. Uncontaminated groundwater, foundation drains, air -conditioner condensate without added
chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant
fleshings, water from footing drains, irrigation waters, flows from riparian habitats and
wetlands.
c. Discharges resulting from fire -fighting or fire -fighting training, or emergency shower or eye
wash as a result of use in the event of an emergency.
4. Best Manaeement Practices fBMP
Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may
take the form of a process, activity, or physical structure. More information on BMPs can be found at:
http://cfpub.epa.gov/nudes/stormwaterlmeniiofl)mps f index.cfm.
S. Bypass
A bypass is the known diversion of stormwater from any portion of a stormwater control facility
including the collection system, which is not a designed or established operating mode for the facility.
6. Bulk Storage of Liquid Products
Liquid raw materials, manufactured products, waste materials or by-products with a single above
ground storage container having a capacity of greater than 660 gallons or with multiple above
ground storage containers located in close proximity to each other having a total combined storage
capacity of greater than 1,320 gallons.
7. Certificate of Coverage
The Certificate of Coverage (COC) is the cover sheet which accompanies a general permit upon
issuance and lists the facility name, location, receiving stream, river basin, effective date of coverage
under the general permit and is signed by the Director.
8. Clegn.Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33
USC 1251, et. seq.
9. Division or DWQ
The Division of Water Quality, Department of Environment and Natural Resources.
Part IV Page 1 of 4
Permit No. NCG110000
10. Directo
The Director of the Division of Water Quality, the permit issuing authority.
11. FMC
The North Carolina Environmental Management Commission,
1.2. Grab Sample
An individual sample collected instantaneously. Grab samples that will be analyzed (quantitatively
or qualitatively) must be taken within the first 30 minutes of discharge.
13, Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
14. Landfill
A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a
land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term
storage facility or a surface storage facility.
15. Measureable Storm Event
A storm event that results in an actual discharge from the permitted site outfall. The previous
measurable storm event must have been at least 72 hours prior. The 72-hour storm interval may not
apply if the permittee is able to document that a shorter interval is representative for local storm
events during the sampling period, and obtains approval from the local DWQ Regional Office. Two
copies of this information and a written request letter shall be sent to the local DWQ Regional Office.
After authorization by the DWQ Regional Office, a written approval letter must be kept on site in the
permittee's SPPP.
16. Municipal Separate Storm Sewer System (RS41
A stormwater collection system within an incorporated area of local self-government such as a city or
town.
17. No Exposure
A condition of no exposure means that all industrial materials and activities are protected by a storm
resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or
runoff. Industrial materials or activities include, but are not limited to, material handling equipment
or activities, industrial machinery, raw materials, intermediate products, by-products, final products,
or waste products. DWQ may grant a No Exposure Exclusion from NPDES stormwater permitting
requirements only if a facility complies with the terms and conditions described in 40 CFR
§122.26(g).
18. Notice of Intent
The state application form which, when submitted to the Division, officially indicates the facility's
notice of intent to seek coverage under a general permit.
19. Permit Issuing Authority
The Director of the Division of Water Quality (see "Director" above).
20. Urmitteg
The owner or operator issued a Certificate of Coverage pursuant to this general permit.
21, Pint Source Di charge of Sturmwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe,
ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be
discharged to waters of the state.
Part IV Page 2 of 4
Permit No. NCG110000
22. Representative Outfall Status
When it is established that the discharge of stormwater runoff from a single outfall is representative of the
discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall
status allows the permittee to perform analytical monitoring at a reduced number of outfalls.
23. Secondary Containment
Spill containment for the contents of the single largest tank within the containment structure plus
sufficient freeboard to allow for the 25-year, 24-hour storm event.
24. Section 313 Water Priority Chemical
A chemical or chemical category which:
b. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and
Reauthorization Act (SARA) ol' 1986, also titled the Emergency Planning and Community Right -
to -Know Act of 1986;
c. Is present at or above threshold levels at a facility subject to SARA title 111, Section 313 reporting
requirements; and
d. Meets at least one of the following criteria:
L Is listed in appendix D o.f 40 CFR part 122 on Table 11 (organic priority pollutants), Table
III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and
hazardous substances);
ii. Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR
116.4; or
iii. Is a pollutant for which EPA has published acute or chronic water quality criteria.
25, Severe Property Damage
Substantial physical damage to property, damage to the control facilities which causes them to
become inoperable, or substantial and permanent loss of natural resources which can reasonably be
expected to occur in the absence of a bypass. Severe property damage does not mean economic loss
caused by delays in production.
26. Significant Materials
Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic
pellets; finished materials such as metallic products; raw materials used in food processing or
production; hazardous substances designated under section 101(14) of CERCLA; any chemical the
facility is required to report pursuant to section 313 of Title ill of SARA; fertilizers; pesticides; and
waste products such as ashes, slag and sludge that have the potential to be released with stormwater
discharges.
27. Significant Spills
Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable
quantities under section 311 of the Clean Water Act (Ref: 40 CFR 110.3and 40 CFR 117.3) or section
102 of CERCLA (Ref: 40 CFR 302.4).
28. Stormwater Discharge Outfall (SDO)
The point of departure of stormwater from a discernible, confined, or discrete conveyance, including
but not limited to, storm sewer pipes, drainage ditches, channels, spillways, or channelized collection
areas, from which stormwater flows directly or indirectly into waters of the State of North Carolina.
29. Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately following rainfall
or as a result of snowmelt.
Part IV Page 3 of 4
Permit No. NCG110000
30. Stormwater Associated with Industrial Activity
The discharge from any point source which is used for collecting and conveying stormwater and
which is directly related to manufacturing, processing or raw material storage areas at an industrial
site. Facilities considered to be engaged in "industrial activities" include those activities defined in
40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded
from the NPDES program.
31. Stormwater Pollu,tion_Prevgntion Plan (SPPP)
A comprehensive site -specific plan which details measures and practices to reduce Stormwater
pollution and is based on an evaluation of the pollution potential of the site.
32. Total Maximum Daily Load (TMDL)
TMDLs are written plans for attaining and maintaining water quality standards, in all seasons, for a
specific water body and pollutant. A list of approved TMDLs for the state of North Carolina can be
found at http:liportal.ncdenr.orp-/weblwg/ps/mtultmd].
33. Toxic Pollutant
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
34. Vehicle Maintenance Activity
Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations,
or airport deicing operations,
35. Visible Sedimentation
Solid particulate matter, both mineral and organic, that has been or is being transported by water,
air, gravity, or ice from its site of origin which can be seen with the unaided eye.
36. 25-year. 24 hour Storm Eve
The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once
in 25 years.
Part IV Page 4 of 4
of v+nrF,�
o� North Carolina Division of Water Quality ATA
General Stormwater Permits
p Y NCDENR
NCG05, NCG07, NCG11 & NCG13
Technical Bulletin Revised May 2013
What activities are covered by these permits?
► NCG050000 allows stormwater discharges asso-
ciated with activities classified as establishments
primarily engaged in: Apparel and other finished
products made from fabrics and similar materials
[standard industrial classification (S.IC) 23]; Printing,
publishing, and allied industries [SIC 27); Converted
paper and paperboard products [SIC 267]; Paper-
board containers and boxes [SIC 265]; Miscellane-
ous manufacturing industries [SIC 391; Leather and
leather products [SIC 311; and Rubber and miscella-
neous products [SIC 301; and similar activities (see
permit.) Excluded: Leather tanning and finishing
[SIC 311] and Tires and inner tubes [SIC 301].
► NCG070000 allows stormwater discharges asso-
ciated with activities classified as establishments
primarily engaged in: Stone, Clay, Glass, and Con-
crete Products [standard industrial classification
(SIC) 32]; similar activities. Excluded: Ready -mixed
concrete [SIC 32731 and Hydraulic Cement [SIC
3241].
What do these permits require me to do?
Key Requirements
♦ Implement a Stormwater Pollu-
tion Prevention Plan (SPPP).
♦ Amend the SPPP as needed
and update the SPPP annually.
• Provide secondary containment
for all bulk storage of liquid ma-
terials, and for any amounts of
SARA 313 water priority chemi-
cals or hazardous substances.
• Annual employee training.
• Semi-annual facility and storm -
water system inspections.
• Semi-annual qualitative moni-
toring during a measureable
storm event (new definition).
• Semi-annual analytical monitor-
ing of discharges from vehicle
maintenance areas. Submit the
results to NC DWQ on the
monitoring report forms pro-
vided.
► NCG110000 allows stormwater discharges asso-
ciated with activities classified as Treatment Works
treating domestic sewage or any other sewage
sludge or wastewater treatment device or system,
used in the storage, treatment, recycling, and recla-
mation of municipal or domestic sewage, with a de-
sign flow of 1.0 million gallons per day or more, or
facilities which are required to have an approved
pretreatment program under Title 40 CFR §403, in-
cluding lands dedicated to the disposal of sewage
sludge located within the confines of the facility.
► NCG130000 allows stormwater discharges asso-
ciated with activities classified as establishments
primarily engaged in: wholesale trade of non-metal
waste and scrap (hereafter referred to as the non-
metal waste recycling industry, a portion of standard
industrial classification (SIC) 5093); similar activi-
ties. Excluded: wholesale trade of metal waste and
scrap, iron and steel scrap, and nonferrous metal
scrap; waste oil recycling; and automobile wrecking
for scrap.
Best Management Practices
The SPPP should include the use
of Best Management Practices
(BMPs) to control discharge of
pollutants from a facility's storm -
water outfalls. BMPs include a
variety of things that the industrial
facility can do to minimize the
potential for pollutants to get into
the stormwater draining from a
facility. There are different types
of BMPs:
Non -Structural BMPs
. Non-structural BMPs include
practices or activities such as:
• Eliminate exposure of materials
and equipment by moving ma-
terials and equipment to indoor
locations.
• Practice good housekeeping on
-site. Keep materials handled
and stored at the facility or-
derly.
• Exchange hazardous materials
for non -hazardous ones wher-
ever possible.
* Establish routine leak and
maintenance checks to mini-
mize the chance of spills.
• Establish storage tank proto-
cols that minimize the risk of
spills during loading and
unloading.
• Store used pallets and process
waste dumpsters inside or un-
der a roof where water cannot
flow on or around them.
Structural BMPs
• Build containment dikes around
the loading areas of bulk liquid
storage containers.
• Change painting operations
from liquid systems to
Continued on page 2
Continued from page ? Technical Bulletin for NCGO5, NCG07, NCG11 & NCG13 revised May 2013
powdered systems that do not the Name/Ownership Change Do I need a certified lab to
generate solvent wastes where Form. This form is on our website analyze stormwater
practical. at http://r)ortal.ncdenr.org/web/ samples?
• Build roofs and secondary con- wglwslsu/npdessw
tainment around materials
stored outside to protect them What has changed since the
from precipitation. last permit?
Can I be exempted from an
NPDES stormwater permit?
Possibly. A facility with any in-
dustrial activity subject to the
NPDES Stormwater regulations
that eliminates all potential storm -
water exposure may be eligible
for a No Exposure Exclusion from
a stormwater permit.
A facility that meets this condition
may submit a No Exposure Certi-
fication application form. To apply
for a No Exposure Exclusion,
please see the NC DWQ Storm -
water Permitting Unit website,
httD://Dortal.ncdenr.ora/web/wa/
ws/sul.
What if I sell my business or
the name changes?
This change is a minor modifica-
tion and requires the Director's
approval. You should complete
Updates to standard text, SPPP
requirements, and monitoring
(e.g., pH, removed, "Non -polar
O&G" replaces O&G, new storm
event) are in the new permits, but
overall, there were few changes.
Please see our website for more
details.
Can I monitor fewer
outfalls?
You must test samples from all
outfaAs associated with vehicle
maintenance. However, you may
request approval of "Represent-
ative Outfall Status" (ROS). ROS
allows analytical monitoring at
fewer outfalls. To request ROS,
use the ROS Form on our web -
site (http://portal.ncdenr.ora/web/
wq/ws/su/npdessw). Submit the
form to the DWQ Regional Of-
fice nearest your location (see
map below) with all necessary
supporting documentation.
Monitoring under all NPDES per-
mits must be conducted in accor-
dance with test procedures ap-
proved under federal regulations
in 40 CFR §136. All labs certified
by North Carolina perform analy-
sis in accordance with those pro-
cedures.
North Carolina certification re-
quirements do not apply to storm -
water only discharges, but any
data gathered under an NPDES
permit must conform to federal
requirements. Using a certified
lab is one way to ensure compli-
ance with these requirements_ A
list of certified labs is available at
htto://Dortal.ncdenr,ora/web/wo/
lab/cent.
Where can I find more
information?
In addition to our website, the
Division of Environmental Assis-
tance and Outreach has informa-
tion about minimizing industrial
pollutants. Call 877-623-6748 or
visit httD://i)ortal.ncdenr.ora/web/
deao/ealeac.
Who can help me with questions?
Please contact the Division of Water Quality office nearest your facility's location with any questions you may
have about stormwater permit requirements.
Asheville
828-296-4500
Fayetteville
910-433-3300
Mooresville
704-663-1699
Raleigh
919-791-4200
Additional online resources
Washington
252-946-6481
Wilmington
910-796-7215
Winston-Salem
336-771-5000
Central Office
919-807-6300
North Carolina Division of Water Quality: www.ncwaterguali!y.org
DWQ Stormwater Permitting Unit: http:/lportal.ncdenr.org/web/wq/ws/su/
North Carolina Stormwater Outreach & Education: www.ncstormwater.org
A
���
�e
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out thisform,pleasevisit. hum //nortal.ncden,nore/weblwy/wv/su/nDdessw#ta -44
Permit No.: N/C/_/_/_/_/_/_// or Certificate of Coverage No..
Facility Name:
County:
Inspector:
Date of Inspection:
Time of Inspection:
Total Event Precipitation (inches):
Phone No.
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
❑ Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, 1 certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designee)
Page 1 of 2
SWU-242, Last modified 10/25/2012
1. Outfall Description:
Outfall No. Structure (pipe, ditch, etc.)
Receivine Stream:
Describe the industrial activities that occur within the outfall drainage area:
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors:
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3- 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. is there an oil sheen in the stormwater discharge? Yes No
9. is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 10/25/2012
a�
NCDENR
Stormwater Discharge Dutfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit: littn://Vortal,ncdejir,org/web/wq/ws/sti/npcl,,tiaw#taf� �F
Permit No.:/C/_/_/_/_/_/_/�/ or Certificate of Coverage No.:
Facility Name:
County: Phone No.
Inspector:
Date of Inspection:
Time of Inspection:
Total Event Precipitation (inches):
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
❑ Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event' is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DW(
onal Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designee)
Pagel of 2
5wU-242, Last modified 10/25/2012
1. Outfall Description:
Outfall No. Structure (pipe, ditch, etc.)
Receiving Stream:
Describe the industrial activities that occur within the outfall drainage area:
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors:
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and S is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 10/25/2012
North Carolina Division of Water Quality
SEMI-ANNUAL STORMWATER DISCHARGE OUTFALL (SD01 MONITORING REPORT
CERTIFICATE OF COVERAGE NO. NCG
FACILITY NAME
COUNTY
PERSON COLLECTING SAMPLES
LABORATORY
Lab Cert. #
Vehicle Maintenance Activities Only
Date submitted
SAMPLE COLLECTION YEAR
PLEASE REMEMBER TO SIGN ON THE REVERSE —>
Vehicle Maintenance Area (VMA) Stormwater Monitoring Results: Only for facilities using an average of > 55 gal of new motor oil per month.
Total event rainfall' or ❑ No discharge this period'
Outfal! No..
Sample
Collected, ^
mm/dd/yr-
.Total Suspended
Solids (TSS), mg/L
Non -polar O&G/TPH; mg/L
(Method 3664 5GT-HEM)
= (if applicable),
Oil and, Grease, mg/L
(if applicable)
pH, Standard units
(if applicable)
New Motor OiVUsage,
Annual average gal/ma
`.
Benchmark
-
100 or 503
1S
30
Within 6.0 — 9.0_
-
1 The total precipitation must be recorded using data from an on -site rain gauge.
2 For sampling periods with no discharge at any outfalls. You must still submit this discharge monitoring report with a checkmark here.
3See General Permit text that identifies the especially sensitive receiving water classifications where the more protective TSS benchmark applies.
*FOR MONITORING RESULTS:
* . A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
* 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
* TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
SWU-254 Vehicle Maintenance Activities DMR Last Revised: Mav 17, 2013
Page 1 of 2
Mail an original and one copy of this DMR, including all "No Discharge" reports within 30 days of receipt of the lab results Lor at end of
monitoring period in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualifier) personnel properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
(Date)
Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wqlws/su/iipdessw
SWU-254 Vehicle Maintenance Activities DMR
Last Revised: Mav 17, 2013
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR)1 SPPP Annual Update DATA REVIEW FORM
Calendar Year
Individual NPDES Permit No. NCS❑❑❑❑❑❑ or
Certificate of Coverage (COC) No. NCG❑❑❑❑❑❑
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name:
County:
Phone Number: Total no. of SDOs monitored
Outfall No.
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑
Date Sample
"' -+%eyr• _ -- Z .tom'\• r .r. �..
mmiddlyy
SWU-264 - Generic Annuat DMR
Last revised 511712013
Additional Outfall Attachment
Outfall No.
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑
SWU-264 - Generic Annual DMR
Last revised 511712013
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Signature
Date
For questions, contact your local Regional Office:
DWQ Regional Office Contact Information:
sr' SHE- MIRE-e EGIONA00 Icil
' AVE'[7'EVILL:E REGIONAL OFFICF7
MOORESVH-A E-REGIONXL;0FFICF3
225 Green Street
610 East Center Avenue/Suite 301
2090 US Highway 70
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
910 433-3300
RALEIGH.REGIONAL OEFICI•a
WASAINGTON•REGIONAL OFFICE
,_WIi. WNGTON REGLQNAL:OFF][C
943 Washington Square Mall
127 Cardinal Drive Extension
3800 Barrett Drive
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
WINSTON-SALEM_R.EGIONAL_OFFTCO
CENTRAL OFIiICEI
1617 Mail Service Center
Raleigh, NC 27699-1617
, 7bpreserve, protect
.andenhanoe
585 Wau htown Street
g
Winston-Salem, NC 27107
(336 771-5000
) 807-6300
�' North Umfirpb s syeter.. "
SWU-264 - Generic Annual DMR
Last revised 5/17/2013
0
6kiX I- T?o viatAl �b
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
May 23, 2014
Mr. ferry W. Pierce, Public Utilities Director
Brunswick County
P. 0. Box 249
Bolivia, North Carolina 28422
Subject- General Permit No. NCG110000
Ocean Isle Beach 1WWTP
COC No. NCG110155
Brunswick County
Dear Mr. Pierce:
John E. Skvarla, III
Secretary
In accordance with your application for a discharge permit received on April 30, 2014, we are
forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state —
NPDES general permit. This permit is issued pursuant to the requirements of Nnr-rh '"--neral
Statute 143-215.1 and the Memorandum of Agree'
Environmental Protection Agency dated October ]. 1
If any parts, measurement frequencies, or: - ,it are
unacceptable to you, you have the right to request ual
P Y Y g q �-
permit application. Unless such demand is made, I h� nding.
Please take notice that this certificate of co Of o the
Division of Energy, Mineral and Land Resources (D � -1 a )n or
revocation and reissuance of the Certificate of Covt �1
requirements to obtain other permits which may b "" r Q by
the Division of Water Resources, Coastal Area Man; l
governmental permit that may be required.
If you have any questions concerning this 1� t
Program Planner at telephone number (919) 807-6 r
ORIGINAL SIGNED F-0
KEN PICKLE
for Tracy E. Davis, P.E., CPM
Director, Division of Energy, Mineral
and Land Resources
cc: Wilmington Regional Office
Central Files
Stormwater Permitting Unit Files
Attachments
1612 Mail Service Center, Raleigh, North Carolina 27699-1612
Phone: 919.707-86001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer - Made in part by recycled paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
GENERAL PERMIT NO. NCG11000
CERTIFICATE OF COVERAGE No. NCGl101SS
STORMWATER DISC14ARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
County of Brunswick
is hereby authorized to discharge stormwater from a facility located at
Ocean Isle Beach Waste Water Treatment Plant
6049 Yarbrough Road, SW
Ocean Isle Beach
Brunswick County
to receiving waters designated as Jinnys Branch, a Class C; Sw; HQW waterbody, to Intracoastal Waterway; in
accordance with the effluent limitations, monitoring requirements, And other conditions set forth in Parts I, 11, 111, IV,
V and VI of General Permit No. NCG 110000, as attached.
This Certificate of Coverage shall become effective May 23, 2014.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day May 23, 2014.
ORIGINAL SIGNED M
KEN PIS
for Tracy E. Davis, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
�`j
mv
r.ryr
,r.�
•.
�...!`�Ir`
.f,�•••
-.�-..,j�r
------------
�� �,
fl J-�V�� '
0 � � ,JC.-: �.�;r �`�
J �-��T' .. ' •:'y„�r
,` . O l� i
� ,11.
wo
LOS
~••1-._w'
rQ TIN!
-
••�.:%
n
�� ,'_•t--l���•
(ALE
E.
E�..
10
GHA
u 5
rr N
\Innb.-1. IN!
� ! + y ft r� "c' +} �•�� ;, aY'• v � t:.'rr4'A, a 4.v - ""l 7'?i• /^':'-'� i "i• yr {.x�c ,,.,,
• q J Jhhh'
1 � � ;�•� � ,ii� •t +L f r ,
' .�� .�' y I�+.cl'-$ i �; ]aX++t-' `Y;G'"4 '..ST`,..+r. �•. ,.q f r. `� 51.E f•��+ y+'1 w.�r��1f - l t rCi•
{ a �� }.r 4 �''�' 1rt'L 1�' 1' ,�4 T i+�'� •�, i 5I I �.7 ..+�
A a E 7 7 J
17
ti ..
�!L _
�i ttZy� h' �+V= •H i'- T � ..' � -�, c'�' '..'�{rx'M- ���5 t 11 S "b� , �• �' -, ,, � , -�4 � V ,�
t ` a r'1 • L L kFr' {�~� _ C * r,+ � � ...Li.""C��� 11T r N �• ' t • �L _� M � S.r •+ �y, � �i .i :€�• 'Y � �Y •, `k - - �G .. _
.�, yi tr� � ���'{ ,,,tr�,;,r ,fir. rW� • .� *i yJ. �`.� .t' � ">' I ? 1 .
'`�• � r �J J 1 - , a � ' � f•�L, �Jrt
1 °t Jr I �h ti..!{r�n:
fir �.,�,`L tiLl6i" tI7` . v•' -+`iu } j �_��w . 'Y� Ctit t;
�' ; r eot `o •x s3� 46C}49; arb�` ughi'St?ISWI--Ocean,,ISIe�Beach N28469 C.iI
T �£N }� !'r-a"�{i.'rY,7a}•+ri"�y� zz '�t �': i'-! i iu,X �E �•�' ci'�: a C'} .+ f` z "+t'=d' _ s1i tl�+'• � -J,_ } ,
{ !-
F t 7r�'J 1;- >S• ,, �r a< 7''i •,. ~ r,za, 11� �+$ 1 J „! „.'Yi 1 a.ri, t
,� F F� JAI �.q- yt,Jtf 't', �' � � f't" �' i ar4{ -i� p ��`���'i • ,f3 � i���Jtiy�•>�js, '
`rl� •4• r,'' r .} • ,. ?i '4 • t{ Iti;it 'lt` �?� t > i'L�, d I�j. , �ni4 yrFA;i",.i,tx�'� .s.'1:
i. ^ t -,�q�_,i�J A
.�cl Lr'`'S-r'f +!•-:!Y'?yti..' - ,rw '�`'.ilc "{;j.�t?•T��� ilI"r f"�.
�{1C- rt{. �.t+ X,.�C. �h•7 �� �''i{'1� � n {�J,rrt'Sr� r � `
w i i� + r :f y Tarr �. "�. jq;�! + i" II}ate
.i i'g Ii - '
w,a ;.b ..,� L i A 3•. i �Y- t� Y 9� -'� ,w• .�:M.l, ♦.E �-�1"�'•r, r ..�' SI } ;''`•' �; ..�* A:�• �J{.i L� 1,r -�i
�br( �• f � T i �. i' J' ". '[ +1' i'. r r .jr.Y" • r t, '+,� ..+ � f'� Y. J � K �:
� „ � ir., �r � �� �-'�; ,Y�ty''' J w - `^ , r ii �t iy i F r•,y p 1 + H I F � i - t'J � J'.. , r i �t r r , L i! � !.••
�:�3 z � � �.k� �S{+d �'�� � - ; � -, �,� � • ! �t�l� �e•l:i I t� �: `'r ty�� •+S'�`fi�.��r•`-
�, i-f.t•" fr �. r' ,1 �n 7
l r ,,•aE-"'r".%.'�' 5. ! f �k. ' i i Un;, ,t t4 pe hC,� 7' 1 ..r �'' A /: ^ Y�e• , jIl j1IE rii i � R Tyr �'•
fiiaYi r S!� ri7 e!- i`1'�� ii { !!!111 I•n" ,'C ��P 1� t! 71'{;,�.'d;� Yf+ Y'Cy �.�'
�y .� ,•1 . r � �i` �• �•��, 1 � .� "! � do- ,y !d �+` 14 r � c7t la w y
°'('ry ,'�k7 r,r..�� 1�• ,6� �i!*' *"".g�-^.I•f.j i iT _.e4"w,•�.r .lp'
[ + K ' a [ • + S' 4 �. a 't a ;,. C`} 7 , f Uf y 4�v. a �g i t;..�ri .1', i
/K i• ++. 1s..1}.. .M. ' `r71• �+. •t'! J ♦ � �.L,�. �•.iv� a t ? �f f.� + Y
Ss •-7 Fc- . r �•' f':'' + fft 1• A ! ♦ i r y=-, 1-*
4 4i r;san+sr �dx��? �$.; t i}i • trl�y'�F2t
� �
k. ti �,t J;- f+Y 'wf.ly C� 1, -•6_'C r 2'C r1 •,' k d a�'4 0 , ; _ :i� * ; .I , 1:1F i "1 +f 'ti'4'k �'•J t� .. � ,.'i
.'^.r r -y-?' �' - r.4'S• �a�t r.' Y. i '"F i . �]' i- .� ��b -� „i fD R J a� ,
}:. t J 4.•� .J 3Kr• r, r" i t s �`'�:i "_ 1 .`i!? r , ' +i � tt y s� t{ T #ukt a
'�-1 �� w ,',��F�{� r 7''{�`�� tip( �1� �. r tn• .��� _ q,�.� ,,,r'��q �i � •�+�r{�vi kyx""'J�4's,�"�p�„ •t!i fit! Ir��47 i�.h
f.*`�•��x 1i.l Y'Z}�_� ���•_ his 4C�`''" i r r"4� ��' �'+� i � ift � �,l.t ,R.q1 r�Z
a 1� F¢.7�'R,J4�,,('i :•' •w � i {1X{' • ft i'' /� 1'� I. i`
U e• rG 1� ~ .1 t+ .� fiC��r` t 7} 4 '(+.cst• •A` h�'19i;1`y+ J� ekS�'rf. {yfhsyya 1.,�,
't } s .Yl 'fi•.ti r ' +> I- [I f•; ne.5- d�� i'..- a Z„1�:'rs�I
cf ` 1{;.ar'C 35 ?}} • . ! r $t0 V i . a ``}„'
0 t a `� F t•wif ✓ { Jz ��, v�y.R, y �� 1 �%,L'r}'+
? ,i�r #n 7- .^•- ���.. / ••x•. { �9. � ss yn gL
•:da';.,C' 4 .� cz�a • 4 s ; ! t 1 Aa s!
+ .. CRr a a r ,r♦ N.•qt +� i 1 ► �' i 'let
:r •+ to €y S 1 t:1 sr� t 1
.•tl. .•,.�y.• .•`-^ 1 { �`. .`• ''� n- . r 5, i�.'"}`5 '?'t 1 ��.. ,�'Fr'rF•}•t•l i� ;.rK .is' • r•w�'d',q i MC `, , FI`41s�drfl L
V-,�`_ r' `' • S• i-`•,j.f s, 7d.�,�•�': •' s i ir
•!.,pf 1h d•
'S" r 1, r� i s ,• y i�• i 'p \? ,'1 } 1 - +�i -'� 3:' 3.' L !+ ,,:1 ti4y y' ,r`yL a"�`�tr H t C''iFtl Ja�'�i
n_: >S^. i l tw ✓ ' +..t i ^ ` k�r 1. is r:_..r .Y .'1i�'a`' i 1 III } 1• t� ,ski
,+ r
i`+.�wJ..
7 , . lr,. '{ r! ,T.r }b'4"s�ti,. :'v-- v'• p n dt t ,t t ti..l i i _r,w �' ,, nS '� Y� fS��Y 'r�r� S,�y�Rfr r r1•: it}i
'�i'i�4}.}�, 'kaM • v;'L .t„�. +�i : r'r t�•� ds�`.r. - - f'a' �' A �C� � '~` �.� R•.A ry �� � _ �\. '�! ,.�'�'F �:';�"•F' ..=�e rU �ti
7 t `• �' r , r. +.. L C "t• ,J a Zsr,..t- aSa�I' .,f•' .�yp� .t, o.,r � *i'-
.t•. j: �1`.7-•t sa. �. i t h i, ,t 4.1 (r r, f' 1 A 1 A", yd y! If-4� n'I r,+,'iir�.�ft lj'�'.
�, f'. +. i -}L. f
t h.
�'t`'- Li�';•rt�r'�+��Ff.r, it}� -i '�"�^ 9i•1''-S�r.tl• 1 +1J ��� } •F Fy�kJ� l.. r. rJ M 71iN +.�i�„}�+,}a14.j�,�� ��":�,Y�..�I�i=ti��.-sr•+SYI i
J ' +^!r1i S` `"l .l • ' K ' 4 r^r s(� at>.9 t i 1{# ,{rye c} � ' y?, c .'? _ ti��� dd y i�3' ;+ y r.L '�y?!!� if ji} a ji liar
*z� f y
rj L e�r4 �� t 1fF ✓t �ti t 6 [; ri. '� 2+�Z� c�{ �^ 1
yy 1}a •15 ' t •• t 4 r t, Y , c - ., s _ wY l
i,y,•rf 1,•i7, i2 ,! / •Y• rl ,y 1`-. ~v r�1 1s ! ., .r-71
t...,.• �+ *+�� ;. 'a`'i�`.�E ! y �F t'•O.h�t.{►3:./41Y*�yA;,_}"f
7k << J r.r i1. ti v' ,,..rl,T. + - t •y,� 2 Qi,�l�:��€Ef
[1� ia. is � L. +5 7 {�• ... a 1 � :^ �'' ' 14 Goole �i1 -� '•a j} y tf g���.ap� K,,., c ter'
Jy.y��`.•,i� • .�,1�.. �.+`rr`
{:{.�i+ a+e•,� s[i4 3 x* �' ccl J1�a;' �"^t ��yt�w rL 5:1 �ti��°}�. {ems n}t',r♦jst�i Ji�:�,Fypr'
P`:�.'r`:i'�-��i r!'�7}L','�' �,Jr.l�'."rL st'.�1 r~.' r'! �������n�flibY;;F�f•y�?+�f .,� +,� .'rOS3..f�' � i;rii "i+':y._4i�'.E"1y'���6r`'�'�° !. .fir:, . } f
Central Files: APS _ SWP -
5/23/2p14
1
Permit Number NCG110155
Permit Tracking Slip
Program Category
Status Project Type
NPDES SW
In review New Project
Permit Type
Version Permit Classification
Municipal WWTP > 1 MGD, Stormwater Discharge, COC
COC
Primary Reviewer Permit Contact Affiliation
bill.diuguid "
RECEIVED
Coastal SWRule
MAY Z 9 2014
Permitted Flow
CENTRAL FILES
owQrsaG
Facility
Facility Name
MajorflV4lnor
Region
Ocean Isle Beach WWTP
Minor
VAlmington
Location Address
County
6449 Yarbrough St SW
Brunswick
Facility Contact Affiliation
Ocean Isle Beach NC 28469 Dixon L. Medlin
Owner
Owner Name Owner Type
Brunswick County Government - County
Owner Affiliation
Ann B. Hardy
PO Box 249
Dates/Events Bolivia NC 28422024
Scheduled
Orig Issue App Received Draft Initiated Issuance Public Notice Issue ffective Expiration
/' 4/30/2014 -4/z9'f s/Z—q/IlF
Regulated Activities Requested /Received Events
RO staff report received 5/21/14
RO staff report requested 5/14/14
Outfall 1
Waterbody Name Streamindex Number Current Class Subbasin
Jinnys Branch 15-25.2-16-1-(1.5) C;Sw,HQW 03-07-59
� mA7 vx �Aw
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
May 23, 2014
Mr. Jerry W. Pierce, Public Utilities Director
Brunswick County
P. 0. Box 249
Bolivia, North Carolina 28422
Subject: General Permit No. NCG110000
Ocean Isle Beach WWTP
COC No. NCG110155
Brunswick County
Dear Mr. Pierce:
John E. Skvarla, III
Secretary
In accordance with your application for a discharge permit received on April 30, 2014, we are
forwarding herewith the subject certificate of coverage (CDC) to discharge under the subject state -
NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General
Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US
Environmental Protection Agency dated October 15, 2007 (or as subsequently amended).
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual
permit application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Energy, Mineral and Land Resources (Division). The Division may require modification or
revocation and reissuance of the Certificate of Coverage, This permit does not affect the legal
requirements to obtain other permits which may be required by the Division or permits required by
the Division of Water Resources, Coastal Area Management Act or any other federal, state or local
governmental permit that may be required.
If you have any questions concerning this permit, please contact Bill Diuguid, Stormwater
Program Planner at telephone number (919) 807-6369.
Sincerely,
for Tracy E. Davis, P.E., CPM
Director, Division of Energy, Mineral
and Land Resources
cc: Wilmington Regional Office
Central Files
Stormwater Permitting Unit Files
Attachments
1612 Mail Service Center, Raleigh, North CaroFna 27699-1612
Phone: 919-707-86001 Internet: www.ncdenr.gov
An Equal opportunity %Afrirmative Action Employer- Made in part by recycled paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
GENERAL ]PERMIT NO. NCG11000
CERTIFICATE OF COVERAGE No. NCGI10155
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
County of Brunswick
is hereby authorized to discharge stormwater from a facility located at
Ocean Isle Beach Waste Water Treatment Plant
6044'Yarbrough Road, SW
Ocean Isle Beach
Brunswick County
to receiving waters designated as .linnys Branch, a Class C; Sw; HQW waterbody, to Intracoastal Waterway; in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, 111, 1 V,
V and VI of General Permit No. NCG I 10000, as attached.
This Certificate of Coverage shall become effective May 23, 2014.
This Certificate of Coverage shall remain in effect for the duration of the General Pennit.
Signed this day May 23, 2014.
for Tracy E. Davis, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
7,
51
Viie' C
Ab
V.13
T V I'M!,
�lejKi
01.
A
LE
. . . . . . . . . . ......
i.r— bi t)-(-, i i-ph zz- 11141, C4
Aze+ ' '
0
.-��J F
+M.s� rrreiI
NCDENR
qr
ErlHna..fa,+r u� rivim Pznou+cc�
Division of Water Quality / Water Quality Section
National Pollutant Discharge Elimination System
NCG 110000
h'OR AGFNCY USE ONLY
Dar R eccimd
Year
Month
I Day
Cautificale covenge
i5
chcck p I Autount
3 1 13 10c)
Permit Acs' ed to
1w W61
NOTICE OF INTENT
National Pollutant Discharge Elimination System application for coverage under General Permit
NCG110000:
STORMWATER DISCHARGES associated with activities classified as:
Treatment Works treating domestic sewage or any other sewage sludge or wastewater treatment
device or system, used in the storage, treatment, recycling, and reclamation of municipal or
domestic sewage, with a design flow of 1.0 million gallons per day or more, or required to have
an approved pretreatment program under Title 40 Code of Federal Regulations (CFR) Part 403,
Including lands dedicated to the disposal of sewage sludge that is located within the confines of
the facility; and like activities deemed by DWQ to be similar in the process end/or the exposure
of raw materials, products, by-products, or waste materials.
(Please print or type)
1) Mailing address of owner/operator (address to„which all permit correspondence will be mailedl:
Name C ok. "-k / n-fart^ asw l iC
Street Address F. r�
- 'p 2-
City �1',d tom, State N �G, ZIP Code c ► Z
Telephone No, Z-5-?,� - "Z(_ 5 -1 Fax:
E-mail Address n, C-_ c-e
2) Location of facility producing discharge:
Facility Name
Facility Contact>
Y
Contact E-mail c�-j +x�.� � �r�..-�•.�,�. �
Street Address P, c>
City Pc) iv k ttate ►mac . ZIP Code 6
County 94-«
Telephone No. Cz:{.I-. Fax: eta =� _ 7_ r
3) Physical Location Information:
Please provide a narrative description of how to get to the facility (use street names, state road numbers,
and distance and direction from a roadway intersection). IDS itwtr 11 y r s_Q;_rn.,(c-
�7GAC..Y� _1 I CT-t- o - P-o t; r+cl. (D,-D eA -dco . +0Q- r i 0\4 i pi.C_11 44 ' (5
(A co
py of a win 9 or I�SCks qs� eft i`ty�clea locatedo
the map is required to be submitted with this application)
F -4e d �a f, c1
4) Latitude "3r 5.5 6 (0"
Longitude -" 73 ? r3 (degrees, minutes, seconds)
5) This NPDES Permit Application applies to which of the following :
❑ New or Proposed Facility Date operation is to begin
D( Existing
RCRO V 15 P
APR 302014
HR - WYAM OUALJW
a-.r,A a SUMMO rr r&Wxh
NCG110000 N.O.J.
6) Standard Industrial Classification:
Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial
activity at this facility SIC Code: NI A
7) Provide a brief narrative description of the types of industrial activities and products manufactured
at this facility: N l aA
8) Discharge points / Receiving waters:
How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property?_
9) Receiving waters:
What is the name of the 4ody or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater
discharges end up in? Y A— d��� � ct r ' �S � `-j +hc. c �'k
►sc3 s ar PraSS equ,��*� I' NIj $itAeJCk TO RA o%k
If the site stormwater discharges to a separate storm sewer systfrn, name the operator of the separate storm W V,
sewer system (e.g. City of Raleigh municipal storm sewer). 7
10) Does this facility have any other NPDES permits? S w PjD 3'07 S
GcAss C5W, AQW
RNo
❑ Yes
If yes, list the permit numbers for all current NPDES permits for this facility:
11) Does this facility have any Non -Discharge permits (ex: recycle permits)?
❑ No
Yes
If yes, list the permit numbers for all current Non -Discharge permits for this facility:.IL) 00o64_-18 S
12) Does this facility employ any best management practices for stormwater control?
❑ No
R Yes
If yes, please briefly describe:
�f1uPwN.naer V'�Cadu.S� .
13) Does this facility have a Stormwater Pollution Prevention Plan?
❑ No
1� Yes
If yes, when was it implemented?
14) Are vehicle maintenance activities occurring at this facility?
R No ❑ Yes
16) Hazardous Waste:
�.aaPectia,is . 5a; 11
a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility?
9 No ❑ Yes
NCG116000 N.O.I.
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month)
of hazardous waste?
R No ❑ Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of
hazardous waste?
0 No ❑ Yes
d) If you answered yes to questions b. or c., please provide the following information:
Type(s) of waste:
How is material stored:
Where is material stored:
How many disposal shipments per year:
Name of transport 1 disposal vendor:
Vendor address:
16) Certification:
North Carolina General Statute 143-215.6 b (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other
document filed or required to he maintained under this Article or a rule implementing this Article; or who knowingly makes a false
statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly
renders Inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
[Environmental Management[ Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed
ten thousand dollars ($101000).
I hereby request coverage under the referenced General Permit. I understand that coverage under this
permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as
an individual permit.
I certify that I am familiar with the information contained in this application and that to the best of my
knowledge and belief such information is true, complete, and accurate.
Printed Name of Person Signing:
Title: c-r,)r L,F
q -,;-14
(Date Signed)
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR