Loading...
HomeMy WebLinkAbout20070116 Ver 1_More Info Received_20070301E'nV ~vironmental Consulting Services Inc. February 23, 2007 Amanda D. Jones Regulatory Specialist U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 RE: Silver Creek s/d, Ashe County; changes to site plan 3764 Rominger Road Banner Elk, NC 28604 Ph/Fax: 828-297-6946 -r-~ @env-ecs.com ~~~ ~ ~ ~~~ ~'ey'Gfld l7 `''.CC' Based on recommendations made, the following changes have been made to the Silver Creek proposed subdivision site plan in Ashe County, NC. 1. Stream Impact One and Two were eliminated by re-aligning the road and utilizing an existing farm road grade. This new road alignment is shown on Map One. This new road alignment will remove and upgrade an existing 18" by 16' concrete pipe, installing a 36" by 30' CMP, with a net impact of 14' at this crossing (now Stream Impact One). Wetland Impact Two was eliminated with the new road alignment. 2. Wetland Impact One was reduced from 7,270 sf to 3,456 sf by adjusting the road and bridge alignment shown on Map Two. Lot 109 was eliminated. No changes to lots 83 and 84; however, grading and residential construction on these two lots will not impact wetland BC- 5W. 3. The bridge crossing on UT-3 is no longer being proposed; instead a proposed 48" by 40' CMP will be used as part of the road crossing (now Stream Impact Two) shown on Map Three. Included is a revised section of the original PCN submitted for the Silver Creek project with the changes being reflected in the impact table and quantified impacts. The new total permanent stream impacts have been reduced from 147 linear feet to 114 linear feet and the new total permanent wetland impacts have been reduced from 0.17-acres to 0.08-acres. Thank you, ~~~~ Jo C. Vitas President, E'nV Environmental Consulting Services Inc. C.C: Daryl Lamb, Steve Silver, McGill Engineers ~~-otter VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Provide a written description of the proposed impacts: Four permanent impacts to streams have been recognized as part of the proposed development of the road network for the Silver Creek residential subdivision. Each of these impacts involves the installation of a culvert. Stream Impact one involves removing an existin lg 8" by 16' concrete pipe up rading and installing a 36" by 30' CMP along a section of Road "F" on UT-1. Stream Impact two is a proposed 48" by 40' CMP that will substitute one of the proposed bridge placements along a section of Road "O" on UT-3. Stream Impacts three and four are along two adjoining sections of Road "K" and involve piping a total of 60'. UT-3C and UT-3B will each be culverted with a 36" by 30' CMP. Each culvert installation site will involve temporary impacts in addition to permanent impacts. Temporary impacts will consist of 5' wide sandbag dams allowing for water to be pumped around the pipe installation area, see detail. Following completion of each road segment involving a culvert installation, the temporary measures will be removed and the impacts will be fully mitigated restoring the site to its original condition. A section of wetland unit BC-5 W will be impacted byproposed road construction. Approximately 3,456 sf will be impacted by rg ailing and filling activities, this area is identified as Wetland Impact one. Two existing stream fords will be improved for temporary crossing_purposes as part of site development. These two sites are identified as Stream Impact sites five and six. Timber mats will be laid down minimizing impacts to the stream channel and aquatic habitat at the two temporary stream crossings. The four temporary sandbag dam diversions and two temporary stream crossings are being submitted under the NWP 33 pre- construction permit notification application. The four permanent stream impacts and one permanent wetland impact are being submitted under the NWP 39pre-construction permit notification application. Silver Creek PCN Revised Changes-022307 Ashe County, NC E'nV-ECS, Inc. .~ O~-~Illo 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-year Floodplain Nearest Stream Impact (acres) (indicate on map) herbaceous, bog, etc.) ( es/no) (linear feet) Wetland Impact 1 Clearing, grading, fill Forested, riparian No 35' 0.08 Total Wetland Impact (acres) 0.08 3. List the total acreage (estimated) of all existing wetlands on the property: 96,165 sf/ 2.207-ac 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma ) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) Stream Impact 1 UT-1 Permanent-culvert Perennial 3' 14' 0.001 Stream Impact 2 UT-3 Permanent-culvert Perennial 4' 40' 0.004 Stream Impact 3 UT-3C Permanent-culvert Perennial 3' 30' 0.002 Stream Impact 4 UT-3B Permanent-culvert Perennial 3' 30' 0.002 Stream Impact 1 UT-1 Temporary Perennial 3' 3' 0.0002 Stream Impact 2 UT-3 Temporary Perennial 4' 3' 0.0003 Stream Impact 3 UT-3C Temporary Perennial 3' 3' 0.0002 Stream Impact 4 UT-3B Temporary Perennial 3' 3' 0.0002 Stream Impact 5 Bear Creek Temporary Perennial 14' 10' 0.003 Stream Impact 6 Bear Creek Temporary Perennial 14' 10' 0.003 Total Stream Impact (by length and acreage) 114'/146' 0.016 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Silver Creek PCN Revised Changes-022307 Ashe County, NC E'nV-ECS, Inc. r Off- Oll L Open Water Impact Site Number (indicate on ma) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the proiect: Stream Impact (acres): 0.016 Wetland Impact (acres): 0.08 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.096 Total Stream Impact (linear feet): 114'/146' 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: Silver Creek PCN Revised Changes-022307 Ashe County, NC E'nV-ECS, Inc. ~ 0 ~ ~ o U ~ N ~~ ~ M 4~ N ~ ~ 4~ ~ 4, •~ ~ ~ ~ ~ ~ \ `_ ~ •~^ ~ ~ \ ~N~~ r'~ Q o ~ ~ ~ ~ ~ ~ ~ ~~~~ ~ ~ ~ ~ ~ _~ 1 ~ ~~ ~ \v ~ ~ ~b / -~ '~ C / OQ' / O~ / / CDO J « p ~--~/ oN ~u _ ~ Ja / ~ ~ ~'~ ' o . i i I J ~ •~ ° ~ `l / / 7 ci ~ ~ ~ .. a~ % ~N'Y - /// /V ail ~ O]- / ~~ ~^ e ~,~ ;~ /~~~ ~o o~ ~~ ~~ -- ~ ° n ~-= ~~\\" a ~~\ ¢_~ '_-_~ ~. ~ ~ l - _ N _ P \\ ,,- ,~\ ` \ `~ ~ - 5 ~ \) ~ \ o ~ ~ ~ ~~ ~_ ~~ ~ ~ ~. ~ ~ ~,~03~~~~ v . ~-~ ~ ~ \ ~~~ ~~ /~ /~ / ~~*' \ -' o 0 -_/~~ ~ ~~ ~ O i'. \1 ~~,~~ /(/// lr/ / l ~~ ~ ,~ ~,. AD ~ 1, ^ ,/ ~ ~~ i v, C ~! \ ~ M ~ -~ % l J(y -- -~~ \~ 1 --, ~ ~ ~ \\ '~\~ I~~ I!. ;~ ~~~ ~. ~. ,~ ~ , ~, o ~~ ,_ ,~ ~~ ~o p ~o -- \~ ~ o. ~. \y "^1 U / 1 \ Q \ \~ y t ~ I ~ \ ~--~ _ V ~ ! O ~, J ~ /\\\ ~ f r" j f'~ n ..% ~ ° y ~ N ~~ ,~- ~ J~ ~ \` .- C / L _ Y ~ ~~~ o~ s ~~~~ o ,_ n n ~`_^ c /~ /~~ ~ p ry ~., m o i Wpb, ~ c 3 '_ ~ / a--~ J ~ Y / ~ ._ O \~ ~ ~ p GC44 o'n ,, ~ N ~ _ Mi ~ N ci ~ a ^ 41 0 «ao _ ~' -_ - r l o .r to - _ ~ . y~ i' ~ ~ ~ i 3 9 . `~' ~ / / ~/ .fit. a ~~ ~ .~,/ ~ ~ oN _'~ /~~r, /' A ° o/ ~ /,.r !! o E $ -~ ~ ~ ~~ `moo ~~ % /' ij-~ ~~ ~ ~ ~~ ~~ ~ _-~ _ '~ U 1- U l l ~ Silver Creek ' ~ ~ ~ '~ ~ ~ j' ;' do ~ ~ , Site Plan Changes ~ -~L.O t,. -~J" Ma One ~ / ,~~~~~ ~ 0 ~ ~` „~ ~ ~ ~ '1`~// /, ~ `- .i c, .. ~ ~ ~ ~~, 1 ~ \ _` ~ O~T~R TE ~PIpE - ~, New Road Alignment '~~~ ~ ~ ~ ~~ ~~ ~ ~~. ~ ~ ~~ \ ~ UT, ~- epos.. 36 ( to _ _ ,, ~, ~ ~~`~ ~~~ ~~ ' ~ ~ re ~ ace 8'°x 1 ' cone ~ e pipe ~ J aC. , ~; ~, ~ ~ ~, ~ ~4' ropo ed it act to ~~ T-1 .. -- Road grading to use existing farts road ~ I n Grading along this section will be :.~ ~ ~ 1 W O t 32 _ - nosh of ex road ~ ~ _._. ' No grading will impact UT-1K ~ ~ ~ - UT-1K ditched channel alon ~ ex. road ~ , ~ _ _ ~~qoo 6 a c. ~ ~ ry~p~ ~ o ,... ~_ ~ . ~ ;i ,_ -:. , ,~ 2950 .. '$ ~~~~~~ ~ ~ ~~ \ \ °" ` \V ~ ~ .. , _,,, ~ L o t .... ,~.~_ ~ ~.3 mac. `. ~. ~~.:' ~~ ~ ;~. . , r ~: . ~ ~ ~ . ~;~ mho ~ i ~ ti ` ~,. ' ,, RD~D 'G' ,: - ,, .~ . . ~UT ``=~,1 ~:JT 1^ ~ ~ ry - "~ ,," ~. ~ T Lot 9 of 8 ~~ ,- a , J ac. ~ ~ ~; =~. ~;~ao ~ ~ ~o .;' ~,' ; ~ ~~ UT- ~, , ~ ; , ,, ,~ ,,; ,~ _ ,~ ~ f ,~ ,. . ~ ,~ ,"_ UT 1F ., ~~_ ,o , ~_ __ t 10 2980 ~ ~ ~ a c. ,~ ~~ ~ ~~ ~ ~~ - - 3ooa - `~ ~ a ~ '~ ~ . . .. . ~ _ ~~ ~ ~ ~'o t~ ., ~., ~, ;~~- ~, .~ C. \\ \ ~~. m,. ~/~ ~ Silver Creek ' ~ Site Plan Changes ~~ ~ ~ __ . ~A ~ ~ Map Two 4 V C ~? `t~ ~ ;; ~- ', - ~w~ x ~~L f 9~ 2 ~ac. ~ ~ ' . 2 % ~'~ 4 ~ ~, a ,. ~~ ~ ~~~ a, ., .. t- ~. t_-- _- / 1..4 ~: _ ~' ' " ~ o t 10.E ,, Cot 86 s 1.3 ac. \ . ~; 9 ~ ~ ~ ~ ., , ~ ` 1. ~ ae. ~0 ; ~ ~ ~ ~ ~ , L t 1 4 `, ~ ~~d . '~ 02 .2 a ~~ `\ ~~~:1~~a~ ~. ~~~ ,, ~- m e . ~, s ~; . , ~~~ Co 85 , ~ ~ . Lot C ~~1~~ ~ C t 4 ~ 1. ac. ~' 1. ac. / ~~ ,- ~ ~ ~1.~ \ ~Q, ~~ ; . ~ ~; ,~ ;~ ,~ ~ ~ ~~ ~ ~~~~ ~ ~~ r- ~~, ~ ~`~= ~ _~ ~~ CO ~ ~` ~' ~~ Per _ _ ~~ 3 y~, _ ~~, 1~ ~~ ~ \~ a ,. ~~ .. _ , ..~ ~, . ~ z~ _ 4 L\~t ~3 ~ Co t 41 ~ ~~~~ ~~\ a t _ ~ ' ; °~"`° ~~ ~ ~ ~ ~ .Cot ~ r~p~ _, ., ~_ ~9~ 1~. ac. ~~~~ ~ 1.5, aa. z .. . -. e11 ,~ ~~ ~~ o of / 1 a ~~ ~ ~ ~ . ~~, , ,.. ,. ,~ ; ,, 1 ; ,, ~ : . ; ;~ ~~~~ ,, ,;, ,„ Cot 81 ~, ~~ 1 ~ ~ i~ ~t `2. o ~. ~~ ~ , ~ , ~ ~ Silver Creek L~Q t 1 ~ ~ ~ ~:;~~ ~, 1:5 ac. Site Plan Changes ~. ~~ ~. , L t Map Three . ~ ~; ~ :~~ ~~ o~ Lit ~ : . ; ~, ,, , ~ ~ BC- ~ 5W Lot 108 ~~'' '~ ~' ' ~ 1.6 c. ,~ ,` Lot 110 ~~~~ Q ~~ '~ ~, ~ 2.8 ac. ~. ~. ~ 9~ ~~ dot 1~2 ~ 1 3 ac~ ~,, . 19 , _- --~ L o t_ ~ ,T 1, , ,- ~'~ 1~.~,~~ ~. ~ ~ ~" Lot 14 t ~~44 a _ ~ ~~ . , 1.5 a~. ~, ~c. Lot ~ ~~o _ ~, ~ _ ~ \ \ . = ~, ~..-- „ ~. , ~~ _~ ,~ ~ `~, ~ ~ o t 112 .- _,__ _ , Lot 5 '~ Proposed 48 "x 40' CMP 1.4 a ~ - _ replacing previously proposed bridge placement t ~ ~ L - 40' ro osed im act to UT-3 © . . t 4 1.5~ ac. o __ O Lot X45 Lot 1~~c o 1.3~ a c. ~ ~ . 2 crc ~, , ,~ 2 ac 0 ~ ~ ' ~ . . P h9~ ~ ~~ - ~, i ~. r ~ o .... _.. "- tip. ~ / / \ \~ ~ ~ ~ ~ i ~ i ~ / ~' 1 I ~~ %~ Lot 11 4 ~ l l 1..,3 a c.