Loading...
HomeMy WebLinkAboutNCG080201_COMPLETE FILE - HISTORICAL_20160721STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V OOC TYPE iVHISTORICAL FILE 1 MONITORING REPORTS DOC DATE YYYYMMDD /AfC�?o,9a2 0/ el VG Public Worla Department Stormwater/Erosion and Sedimentauoii Control Program Ciryarwinnon Salem PO Box 2511 Winston Went NC 27102 CttyLiftk 311 (336 727 9000) Fix 336 74S 3173 mtrxasaarueuWenINA14MY July 21, 2016 Johnny Sheets Maintenance Foreman HFCS Transport Company P O Box 12789 Winston Salem, N C 27117 Dear Mr Sheets The,Stormwatet Division of the City of Wmston-Salem would hke to thank you for yow time and professional courtesy regarding the July 13, 2016 inspection of HFCS Transport Company As per your request, a copy of the completed surface water inspection form has been enclosed to you Part 4 of this report (Requited Actions to be�completed by Facility) contains Annotations #147 that HFCS Transport Company must, complete Please provide documentation that verifies HFCStTransport Company successful completions of the corrective measures to me by Opffi r 21, 2016 The Stormwater Division reserves the right to enter and'inspect HFCS Transport Company as often as necessary, to determine compliance with permit requirements of NCGO80201 Thank you for your continued support and implementation of the City of Winston- Salem's Stormwater Program if you have any questions, please feel free to contact me at (336) 747-6964 Sincerely, Ladofita Clark (Jamal) Stormwater Inspector Phone 336 747 6964 Cell 336 416 2403 Fax 336 748 3173 City Coan& MawrAllm folftg ".:an K Elwke, Moyw rm rempma Nanhemt Wad Deane D Ad+mti Na nh Dan Bc S—il,.. Iv/,rd. P.*,, [ Cluk W aTud MaQV I.elght Sautlt Wsrd: Winds Mertehel Nonhwnt Wad: L)tmin I MomSomery Fin Wad: farad Taylor Jm' Sowlr t %rd, Chy Msnmger Ire D Garhy Call 311 or 336-727 8000 cltyllnk@cltVofws,org I Stormwater/Eiosion Control Division Surface Water Inspection for Industrial Sites Gene-raf Information A) Official Company Name HFCS Transport Company B) Physical Address 4001 Overdale Road Winston-Salem, NC 27107 C) Telephone,Number (336) 785-0035 Mairihne D) Mailing Address, if different from above address P O Box 12789 Winston Salem, N.0 27117 E) Authorized contacts to represent company in environmental regulatory issues Primary contact Johnny Sheets Title Maintenance Foreman Contact number(s) (336) 414-5015 Cell Phone Entail address jsheets�7a hfcstransport com Secondary contact Sherri Nelson Title Terminal Manager Contact number(s) Office (336) 785-0035 Cell Phone (336) 414-3077 Email address snelson@hfcstransport.com F) SIC Code Number of business SIC41 G) NC Stormwater NPDES Permit Number NCGO80201 Permit Categoiy Vehicle maintenance H) Any other control authority permit(s) (air duality, control, wastewater, hazardous waste) & number(s) Waste water permit # 1193 (Sur-8116) I) Brief description of industri'al, activities, that occur on -site HFCS Transport Company delivers bulk items to manufactures and repairs commercial fleet. 1) Ultimate Receiving Waters South Fork Muddy Creek TMDL stream ®Yes ❑No Part'1 Controls l Best Management Practices a List the non/structuial controls employed by the 1. AST tanks are used to safely store fuel 2. The fueling station has a roofing over it w b Are the BMPs reasonable & appropiiate for the facility? ®Yes ❑No Comments Please clears up the trash at the back side of the property near fence c Are BMPs�installed correctly, maintained, and effective operating condition? ®Yes ONo Comments The fueling station has a roofing over it to protect it from mixing with the elements 2 Provide,a,biief description of other controls that rnanage/prevent/nummize stormwater runoff (e g , erosion and sediment controls, inlet protection/control at storm drains, diversion structures) HFCS Transport Company uses a dike to prevent any contaminants from reaching stormwater runoff, 'Part,2—'Miscellaneous l Any evidence of discharge to receiving waters/MS4? (e g stormwater i unoff, dry weather discharge, co - mingling of process wastewater) ❑Yes NNo Comments 2) Do the stormwater outfafls on -site correspond with those listed on the site map and in SPPP? ®Yea t]No Comments Yes, the stormwater outfalts on -site corfespond with those listed,on the site map and in SPPP 3) Summary of Stormwater Discharge Outfalls SDO Identification Potential Pollutants that Physical Location Latitude and could be discharged Longitude Fuel, Oil, Hydraulic Fluid, Near truck parking Lat 36!039503N SDO 1 Syrup, and Powered Long-80126878W starch Fuel, Oil, Hydraulic Fluid, Near truck parking Lat 36 0381111 N SDO 2 i Syrup, and Powered Long-180 227242 W starch Fuel, Oil, Hydraulic Fluid, Near truck parking Lat 36 037922 N SDO 3 Syrup, and Powered Long 80 22700OW starch Fuel, Oil, Hydraulic Fluid, Near backside of property Lat 36 09547N SDO 4 Syrup, and Powered near Old Milwaukee Road' Long 80 227378W starch Site Overview Part,3 =SPPP+Revtew (can be completed�in office), Yes No Notes Is there a SPPP? ✓ Does SPPP include a certification statement by the responsible ✓ Please provide and update corporate officer? the signed certification, statement by the, responsible corporate. officer Does the general map depict the facility's location on a USGS ✓ quad map (or equivalent reap) with receiving waters (or MS4) listed? Identification of impaired waters or watershed (if applicable)T ✓ Nanative Description,of these Industrial Activities Stoi age Practices ✓ Unloading(Loading Activities ✓ Outdoor Processes Pailiculate,Generating/Contral Processes ✓ ✓ Waste Disposal Does site map denote drainage items flow direction, boundaries, ✓ % impervious, and sti uctures? Also includes SDOs, industrial activity areas, and site topography? A list of major spills that have occurred within the past three years ✓ No spills have occurred in with corrective actions to prevent future s ills ? the past three years A signed, annual certification that the facility has been tested for non- ✓ Please produce a signed, storinwater discharges from the site? updated annual certification, that the facility has been tested for non- stormwater discharges from the site, Comments Please find the correct latitude and longitude for SDO's,3 and 4' because both coordinates are not properly labeled on site map. Stormwater Management Strategy Yes No Notes Does SPPP incorporate the nine baseline controls Feasibility Study (technical & economic review,to minimize pollutant exposure) Secondary Containment (table summary of tanks, stored materials releaserecords) BMP Summary (listreg of site structuraUnon aructural practices) SPRP & Procedures (identified, responsible personnel wJ signatures & dated) PM &GH (inspection of material handling areas & regular cleaning schedules) I Facility nsppetions (biannual inspections of facility and all storniwater cystcros) Employee Training (annual basis for staff who perform SRP and PM functions) Resodh§ible Party (specific position(s)-dcvelopmg, implementing, &revismgSPPP) Amendment & Annual Update (of major spais, nonsw mews BmN sanrphng data ✓ ✓ ✓ ✓ ✓ Needs to be updated ✓ ✓ please update and sign ✓ Does SPPP contain completed routine inspection reportshecords regarding reportable implementation of the mne baseline controls i e SM'Im lamentation ? ✓ Analytical Monitoring Are samples collected within 30 minutes of measurable rain events ✓ No AnalyticaN monitoring and at least 72 hours since the last storm event9 was performed during Year _ 4-- Period, I Are sam lin events 60 days apart? (EXCEPTION Tier 2 & 3 responses) ✓ Currently Tier 1 Is analytical monitoring complete (including schedule) for each ✓ SDO? mxcEPT1oN PROS) In Year 3 — Period 2, TSS Any exceedences of pull`utant parameters when compared against exceeded bencliiitark values the permit Benchmark values? and no Tier one response, was conducted Has Facility implemented appropriate,, selected actions to reduce pollutant doncentiations, m response to benchmark exceedences (if applicable)? Qualitative Monitoring Yes No Notts Is qualitative monitoring being perform_ ed'during measurable,storm ✓ No qualitative monitoring events9 was performed during Year 4 - Period 1 Is qualitative monitoring complete (including schedule) for each ✓ SDO? Are mom tot ing events 60 days apart? (EXCLPTION Tier 2 & 3 responses) ✓ Any observable, excessive amounts of pollutant indicatono in stormwater discharge at SDOs? Part 4—,Requir�edAct�onsto be -completed hY Facility, 1 Please plug the white five gallon bucket with no plug in the,top of it near the gravel parking lot area If the bucket is not in use anymore, please properly dispose of it 2 Please remove all trash around the blue SS gallon drum near the gravel parking lot area Also, please remove the old, torn, and faded safety cone 3. Please update the spill response plan with procedures, responsible personnel, signatures and the current date 4 Include and update certification statement by the responsible corporate, officer in the SPPP. S Please provide a signed,,updated annual certification that the facility has been`tested for non-stormwater discharkes from the site G Please find the correct latitude and longitude for SDO's 3 and 4 because both coordinates are not properly labeled on site snap Once found, please label SDO 3 and 4 correctly. 7. Please list on site snap that South Fork Muddy Creek is a TMDL stream Company Representatives) that participated in inspection Johnny Sheets Title(s) Maintenance Foreman Stag, of Inspection 10 00am Completion of Inspection 12 30pm Date July 13, 2016 Signature of Stormwater Inspector r/D►""''� Title Stormwater_Inspeetor mm 9lMMFMIWffAl2,!W 1. AA� Alt July 21, 2016 PteblrcJohnny Sheets V(lorlcs Maintenance Foieman Department HFCS Transport Company StorenwnterMoaeon and P O Box 12789 Sedrrnmatron Control Program Winston Salem, N C 27117 City of Winston Salem PO Bnz 2511 Dear Mr Sheets Wtnston Saicm NC 27102 Citybak 311 (336 727 8000) 1= 1367483173 The,Stormwater Division of the City of Winston-Salem would like to thank you for wwrrumrmlAirenindrrrorn your,tlme and professional courtesy regarding the July 13, 2016 inspection of HFCS Transport Company As per your request, a copy of the completed surface water inspection form has been enclosed to you Part 4 of this report (Requited Actions to be completed by Facility) contains Annotations #147 that HFCS Transport Company musr� complete Please provide documentation that verifies HFCS,Transport Company successful completion of the corrective measures to me by pctbb& 21, 2616. The Stormwater Division reserves the right to enter and inspect HrcS Transport C any en as necessary, to determine compliance with permit requirements of NCG080201 Thank you for your continued support and implementation of the City of Winston- Salem's Stormwater Program If you have any questions, please feel free to contact me at,(336) 747-6964 Sincerely, Ladonta Clark (Jamal) Stoi mwater Inspector Phone 336 747 6964 Cell 336 416 2403 Fax 336 748 3173 City Conn& Mayor Allen Janis V4,." 14 elwkr M:)m Pm Trmpute Nordkw isd Demse ❑ Adamr. Nonh Wank pan gwe Satrtha Ward, Ruben C t.4ek Ww Wardi Call 311 or 336 727 8000 Mo11y Leighi South Ward Wanda hiewhel tQ.Ah t VArdt Dembi L A{oatgnmoy Fat Wank James Ti}!or ]r $audit ur Wara1 Cay Manager Lee O Cardty cltyhnk@rttyofws,org ~�1 W�UIIDW LIII Stormwater/Erosion Control Division Surface Water Inspection for Industrial Sites Ge' n al Tn�'o�rmation A) Official Company Name HFCS Transport Company B) Physical Address 4001 Overdale Road Winston-Salem, NC i7107 C) Telephone Number (336) 785-6035 Maiiifine D) Mailing Address, ►f=different from above address P O Box 12789 Winston Salem, N C 27117 E) Authorized contacts to represent company in environmental regulatory issues Primary contact Johnny Sheets Title Maintenance Foreman Contact number(s) (336) 414-5015 Cell Phone Email address }sheets@hfcstransport com Secondary contact Sherri Nelson Title Terminal Manager Contact numbei(s) Office (336) 785-0035 Cell Phone (336) 414-3077 Email address siielsoir@hfcstranspdrt cam F) SIC Code Number of business SIC41 G) NC Stormwater NPDES Permit Number NCGO80201 Permit Category Vehicle maintenance H) Any other control authority peirmit(s) (air quality control, wastewater, hazardous waste) & number(s) Waste water permit # 1193 (Sur-8116) 1) Brief description of industrial activities that occur on -site HFCS Transport Company delivers bulk items to manufactures and repairs commercial fleet 1) Ultimate Receiving Waters South Fork Muddy Creek TMDL stream ®Yes ❑No Pairt�] = Stcirmwater=Control 1 Best Management Practices a List the nonistructural, controls employed by the tacilr 1 AST tanks are used to safely store fuel 2 The fueling station has a roofing over it b Are the BMPs reasonable & appropriate for the facility? ®Yeg ONo Comments Please clean up the trash at the back side of the property near fence c Are BMPs installed correctly, maintained, and effective operating condition? ®Yes ❑No Comments The fueling station has a roofing over it to protect it from,mixing with the elements 2 Piovide a brief desw iption of other controls that manage/prevent/minimize stormwater runoff (e g , erosion and sediment controls, inlet protection/control at storm drains, diversion structures) HFCS Transport Company uses a dike to prevent'any contaminants from reaching stoi mwater runoff Part 2 —'Miscellaneous 1 Any evidence of discharge to receiving waters/MS47 (e g stormwater t unoff, dry weather discharge, co - mingling of process wastewater) ❑Yes ®No Continents 2) Do the stormwater outfalls on -site correspond with those listed on the site map and in SPPP? ®Yes ❑No Comments Yes, the stormwater outfalls on -site correspond with'those listed`on the site map and in SPPP. 3) Summary of Stormwater Discharge Outfalls SDO Identification Potential Pollutants that Physical Location Latitude and could be dtachaiged Longitude Fuel, Oil, Hydraulic Fluid, Near truck parking Lat 36 039503N SDO 1 Syrup, and Powered Long 80126878W starch 'Fuel, Oil, Hydraulic Fluid, Near truck parking Lat 36 0381111 N SDO 2 Syrup, and Powered Long 180 227242 W starch Fuel, Oil, Hydraulic Fluid, Near ti uck parking Lat 36 037922 N SDO 3 Syrup, and Powei ed Long 80 22700OW starch Fuel, Oil, Hydraulic Fluid, Near backside of property Lat 36 09547N SDO 4 Syrup, and Powered near Old Milwaukee Road Long 80 227378W star ch Partf3 ---�,SPPPrReview (can be_completed�in office) Site Overview Yes No Notes Is there a SPPP) ✓ Does SPPP include a certification statement by the responsible ✓ Please provide and update corporate officer? the signed certification statement by the, responsible corporate officer Does the general map depict the facility's location on a USGS ✓ quad map (or equivalent map) with receiving waters (or MS4) listed Identification of impaired waters or watershed (if applicable)? ✓ Nariateve Description of these Industrial Activities Storage Practices ✓ Unloading/Laading Activities ✓ Outdoor Processes Particulate Generating/Control Processes ✓ Waste Disposal Does site map denote drainage items flow detection, boundaries, ✓ % impervious, and structures9 Also includes SDOs, industrial activity Areas, and site topography9 A list of major spills that have occurred within the past three years ✓ No spills have occurred in with corrective actions to prevent futurespills)? the past three years A signed, annual certification that the facility has been tested for non- ✓ Please produce a signed, stoii_nwater discharges from the site? updated annual certification that the facility has been tested for non- stormwater discharges from the site Comments Please find the correct latitude and longitude for SDO's 3 and 4 because both coordinates are not properly labeled on site map. Storinwater Management Strategy Yes No Notes Does SPPP Incorporate the nine baseline controls Feasibility Study (tei,hmLal & economic ievicw to minimize pollutant exposure) Secondary Containment (table summary of tanks, stored materials,releaserecords) BMP Summary (listing of site structural/nonstructural practices) SPRP & Procedures (identified responsible personnel w/ signatures & dated) PM & GH (inspection of material handling areas & regular cleaning schedules) Faci l lty Inspections (biannual inspections of facility and all stormwater systems) Employee Training (annual basis for staff who perform SRP and PM functions) Responsible Party (specific position(a)-developing, implementing, &revisingSPPP) Amendment & Annual Update (of maior spais nnnsw news nmPs, =Ipling data ✓ ✓ ✓ ✓ ✓ Needs to be updated ✓ ✓ ✓ Please update and sign ✓ Does SPPP contain completed routine inspection reports/records regarding reportable Implementation of the nine baseline controls r e SPPP Implementation)? ✓ Analytical Monitoring Yes No Notes Are samples collected within 30 minutes of measurable rain events ✓ No Analytical monitonng and at least 72 hours since the last storm event? was performed during Year 4 — Period 1 Are sampling events 64 days apart? (LXCEPTION 'tier 2 & 3 responses) ✓ Currently Tier 1 Is analytical monitoring complete (including schedule) for each ✓ SDO? (r.xcr-PTION ROS) ✓ In Year 3 — Period 2, TSS Any exceedences of pollutant parameters when compared against exceeded benchmark values the permit benchmark values9 and no Tier one response Was conducted Has Facility implemented appropriate, selected actions to reduce pollutant concentrations, in response to benchmark exceedences (if applicable)? Qualitative Monitoring Yes No Note Is qualitative monitoring being performed during measurable storm ✓ No qualitative monitoring events9 was performed during Year a — Period 1 Is qualitative monitoring complete (including schedule) for each ✓ SDO? Are monitoring events 60 days apart? (EXCEPTION Tier 2 & 3 responses) ✓ Any observable, excessive amounts of pollutant indicators in stormwater discharge at SDOs? Part 4 — Required Anions"to be completed`by Facility 1 Please plug the white five gallon bucket -with no plug in the,top of it near the gravel parking lot area If the bucket is not in use anymore, please properly dispose of it 2 Please remove all trash around the blue 55 gallon drum near the gravel parking lot area. Also, please remove the old, torn, and faded safety cone 3. Please update the spill response plan with procedures, responsible personnel, signatures and the current date 4 Include and update certification statement by the responsible corporate officer in the SPPP 5 Please provide a signed, updated annual certification that the facility has been`tested for non-stormwater discharges from the site 6 Please find the correct latitude and longitude for SDO's 3 and 4 because both coordinates are not properly labeled on site map Once found, please label SDO 3 and 4 correctly. 7 Please lest on site niap that South Fork Muddy Creek is a TMI)L stream Company Representative(s) that participated in inspection Johnny Sheets Title(s) Maintenance Foreman Start of Inspection 10 00am Completion of Inspection 12 30prn Date July 13, 2016 Signature of Stormwatet Inspector Title Stormwater Inspector A 1/• 4T�)/Iljr l�'fl i-Lwrt+'y 7 £71i a 1 v ^J"ill ,'crA 4;trE , k E U •Q r y C t� / LA! ♦*�' � � R��r lSb'�,,f Iy. F. 1 V�<'i ✓Pj V. <�j�S>� �'�y,. � �1 ['1.� ,�r lei -� 4 � •].i, 1 17.J wii^ 1 �'� ram- 4 1"' • :A:,,-. rYu�"C � r sit ,, F, i. YAn1ir�, u {I j � 5 t •' ai, �' •'i1 tFk. � 4 !�! ktf +�'•t•�AS'1,J �4r•i�q'r 'r,�`., y`9y,�,r Y"k j; 1�.r � �� {�t 4 l,k�a F r/ : t � l � viWi;�i��r " l F�'� � �r�''r'r .? r � { .� j , •' ,� �. f • �', ty �t: {r �}'-s i � S f- Y F e;4 MIS ,l i � ii}I. h 1 p ftf g i dk 1 'l .s i� MEN eC: •s�s�#�F— M,iFyJ ,.rwir'. r • jYS-'"a 4. ti:Yr'�7%i r {4tx",1 �ti� �j;,r't��"+i.�l �r " r ,,.. r�� t. � r�Y`•!✓1. - � • Y�° .. .�, ny i.'h., yr r4Jio'r xi �s7»S- �Ji�r'1 ,•y�e{dd4�AS Y �dk <4.7r A Su • 4, % 'Lr -.3 ,� pia �}� fl ".ls.. S',,�5 ,�},7 •_ fi �y a � R '+-FX� ��p r Y� t ,,,.'..Ut r�( '% �. +�C7"esl �i'Ti 'y�' {F }��''Fly "�j � ,�...' 'iW • o. : ' YM. �' .. 1 1j , r - "' 1, � rwi':. S ,;, , *=� q'tr�;_ t. ��'�I', 5 Compliance Inspection Report Permit NCG080201 Effective 11101112 Expiration 10/31/17 Owner HFCS Transport Co SOC Effective Expiration Facility HFCS Transport Co W/Salem Sit County Forsyth 4001 Overdate Rd Region Wnston Salem Winston Salem NC 27107 Contact Person Johnny Sheets Tile Phone 336 785 00 35 Directions to Facility System Classifications Primary ORC Secondary ORC(s) On Site Representative(s) Related Permits Inspection Date 08/01/2016 Primary Inspector Glen While Secondary Inspector(s) Certification EntryTime 10 00AM Exit Time 12 OOPM Phone Phone 336 776 9800 Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status Compliant Not Compliant Question Areas Storm Water (See attachment summary) Page 1 Permit NCG080201 Owner Facility HFCS Transport Co Inspection Date 08/01/2016 Inspection Type Compharce Evaluation Reason for Visit Routine Inspection Summary (See Inspection Report by Ladonta Clark COWS Stormwater Inspector Dated 7/21/16 Page 2 permit NCGO80201 Owner Facility HFCSTransport Ca Inspection Date 08101/2016 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plans ❑ [� ❑ # Does the Plan Include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan Include a Narrative Description of Practices ? ❑ ❑ ❑ # Does the Plan Include a detailed site map Including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan Include a list of significant spills occurring during the past 3 years'?❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? [] ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan Include a BMP summary? E ❑ ❑ ❑ # Does the Plan Include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan Include a Preventative Maintenance and Good Housekeeping Plan'? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)v ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # does the Plan include a Stormwater Facility Inspection Program? 10 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been Implemented? M ❑ ❑ ❑ Comment (See COWS, Stormwater Inspector's Inspection Reyort attached ) Page 3 Vr L eoSciREc��vEn 2050 Northpoint Drive • Suite A ��� ~ N C aspt of DE Winston-Salem, NC 27106 P �&D JAN 2 7 Phone (336) 896-1300 9 Fax (336) 896-1020 ® "Pra=al Engineering & REGIROA"toFFICE geosci Q geotec cam Fkvwrv7Le? ll&&hmons" www geotec cam January 23, 2014 Ms Sue White Assistant Regional Engineer V Land Quality Section Division of Energy, Mineral & Land Resources North Carolina Department of Environment and Natural Resources 585 Waughtown Street Winston-Salem, NC 27107 SUBJECT Request for Representative Outfall Status, HFCS Transport Company, 4001 Overdale Road, Winston-Salem, NC 27107 Dear Ms White On behalf of HFCS Transport Company (HFCS), Geoscience and Technology, P A (GeoSci) is pleased to submit additional information pertaining to a request for "Representative, Outfall Status" (ROS) for two stormwater drainage outfalls (SDOs) Fhe facility is covered under North Carolina General Stormwater Permit #NCG080000, Certificate of Coverage #NCG080201 Based (in our conversation on November 7 2013 during a ieconnaissance of the l ll"CS site, we are forwarding laboratory results for a stormwater sampling event oil Novembei 1 2013 These data aie in support of HFCS's request for Representative Outfall Status (R.OS) for SDO's 002, 003 and 004 Please refer to the attached Figure 3 for SDO locutions Please note that the original request for ROS submitted to Corey Basinger at DWQ asked for ROS for SDO's 003 and 004, however, based on our conversation on 11/7/13, it is our understanding that if the laboratory results foi all four SDO's foi the last sampling event were relatively similar, that you would consider ROS status for SDO's 002, 003, and 004 Cho drainage area for SDO 001 is probably the "worst case" scenario for stormwater contamination as it contains all the sites ASTs and the fueling area The drainage areas for the other SDO's contain primal ily vehicle parking areas the results for the 1 l/l/13 stormwater sampling event ate summarized below in Table 1 A copy of the certified laboratory results for the 1 I/l/l3 event is attached fable I Stormwater Sampling Results Benchmark 10000 3000 Outfall # Date Collected Total Rainfall TSS O&G 001 (1 NE) 11/1/13 020 1400 <5 002 (11 SW) 11/1/13 020 800 <5 003 (IV SE) 11/1/13 020 1200 <5 004 (111 NW) 11/1/13 020 400 <5 All result values are mg/L pH is not reported as HFCS measures pH at the time of sampling and is reported on the DM foi in Figure 3 indicates that the SDO located at the northwest corner of the site is designated as SDO 004 HFCS designated this SDO as `III NW' on the sampling Chain of Custody Similarly, the SDO at the southern end of the site is designated as SDO 003 on Figure 3 and HFCS designated it as `IV SE' The SDO designations on Figure 3 will be used in all future communication MRCS understands that if ROS is granted for SDO's 002, 003, and 004, qualitative monitoring will still be required for those outfalls Please call us at 336 896 1300 or email phd@geotec cam if you have questions concerning this course of action or require additional information With best regards, GEOSCIENCE AND I ECHNOLOGY, P A V � Peter H DeVrtes Project Geologist Ms Sue White January 2 3, 2014 HFCS Stoxnnvaler Compliance Page 2 11121 /2013 1632 TAX) P 001 Meritech, Inc. Environmental Laboratory Laboratory Certification No 165 Contact_ Johnny Sheets _ Report Date 11/15/13 Client 14 PCS Transport Co 4001 Overdale Rd P O # hrcS 4426 Winston Salem, NC 27107-6155 Date Sample Rcvd 11/6/13 Mentech Work Order # 110613127 Sample W 1 NE Grassi 11/1/13 Parameters Houl Analysis Date RepoWng Limit Ngth2d Total Suspended Solids 14 mg/L 11/7/13 2 5 mg/L SM 2540 D Oil & Grease (HEM) < 5 mg/L 11/11/13 5 mg/L EPA 1664A Meritech Work Order # 110613128 Sample ID Il 5W Grab 11/1/13 Parameters Result mate Reporting Limit Method Total Suspended Solids 8 mg/L 11/7/13 2 5 mg/L 'iM 2540 D Oil & Grease (HEM) { 5 mg/L 11/11/13 5 mg/L EPA 1664A Meritech Work Order # 110613129 Sample ID III NW Grab x 11/1/13 parameters Result Analygis Date Kgporting LimrtLimI Method Total Suspended Solids 4 mg/L 11/7/13 2 5 mg/L SM 2540 D Oil & Grease {HEM) c c; mg/L 11/11/13 5 rng/L EPA 1664A Meritech Work Order # 110613130 Sample ID 1V'SE Gi ab - 11/1/13 Parameters Result Analysis Date Reny prong Limit Method Total Suspended Solids 12 mg/L 11/7/13 2 5 mg/L SM 2540 D Oil & Grease (HEM) < 5 mg/L 11/11/13 5 mg/L EPA 1664A I hereby certify that I Have reviewed and approve these data Laboratory Representative 642 Tamco Road, Reldsville, North Carolina 27320 tel (336)342-4748 fax (336)342-1522 RC W LS C SDO 00 L SDO 001 Location Lat: 36.039503 N Long: 80.226878 W SDO 003 Location Lat: 36.037922 N Long: 80.227000 W SDO 001 . l=mMM"iM"iii=rM"� iris lim rill""■ mama m"="Mmmmi=m1 ir�•��+�;Y: !ll.M"wIMimM"=m"mi"iiMnMm •mt "mi"ii""MmMMliiimmll"M"l■■■ lllli"""l""Mitii"l""mmimm==in mmm=inm=m=mminmmM"Mm""MiM""win"m"ii"Mmrimiilm=l"imrl1l l.!mmimMl"w""l"ilmll"Ml!mml"!rr i"""Mmll■ lm"i"Mmrmwiw""""=iwi•-mmmilmil� }: l==miMmmimM=="imii M"MiiM. l""M==N"==m==m====r lml mmimrl, l—wwmmm=li"=mwm=mmmr !"MMMrimlr lMli===mmMmMi�"M=mil lM"i"immwi""""��ii=il lmmulw"imllr lM=imsim=mmmmmmam==r limn Ai"iimmiminimii!•ilml �mmlCsi ■ l=m=m=Mi=mmmm=mm� mil Zm= .minim=mmmmmmmmmmi.�ml "M — l!"!� r liMiM=mmmMm==minmmm�r .ill 7i !="= i!r lii wi immmii ii miiiw•4•f lim min imm"min="min"i==1 liim "!i lmmmmmmmmmmlmmm=min"\ !il" "!i lmmmm="m=mmimmmmmin=1 � ■ 1 l""m lilt l�Mlili N""mi""ii mi M"M Mf A"ii ill 1 l""m�wy ""Mil"mmiil lwim Ms, l""i""w"��""iiii r !w"•. l! iCCCw—CC.mnCCCCCCCwCmmf lllM ' win Office & rm i"1 !Minn "lr • Maintenance!Minn"im"mMl"iM"mMMMI r—M"MmiiM liiiMmimi"MM"M"Mmmir lm►�i==iill Building ASTAl""m"MMiM"M"im""lilt limill..lM"li lMiiimM=M"MMiiiim=m1 liMv iMi i= � .imiimi mini min=mmmmmml !"m"�Mimli Q .mmmmm==m=m=mm=m=mil l""M"i=ii lllmmlm mmmmimimmlml r."miw Mill Fueling Pi ing lM����wil""iil"mmill rmm"l r.�r. ! MiM MMMMi"MM"l"""Mil 4.YI � ►.• -' +i min=m"�mmmm=m i wm=m r - iim"_Min ii mllmiimmml 1 � !m"r. �i"""liml""mill f • •ack liil mlim"imr.r�""Mmll Dike/Berm lMMM"MMMMM=msM""iim. i .. llwl"iilwmiiwwlill"1 li ii MMMli liiii MMiiil r !M""iii=•w Mwmii"=Mill l r.�f. !im=ii=iM lmlii mini mMl i r L- -^l"Mill! siniml i=mlll I 1 ! ■MlmMlm 1=Mil .Mll min- Ilimml. ■ � GRASS ■iii Mim 1M""! •------ 1---- .wwiiim .mmimwrl liw"r SDO 002 Location Lat: 36.038111 N Long: 80-227242 W SDO 003 Location Lat: 36.039547 N Long: 80.227378W Overdale Road Note: All parking areas within the chain link fence are asphalt paved SDO Total Drainage Area (Ac) Total Impervious Area (Ac) Total Pervious Area (Ac) % Area impervious 1 0.82 0.70 0.12 85.85% 2 1.34 1.23 0.11 91.93% 3 1.68 1.64 0.04 97.88% 4 0.65 0.45 0.19 70.13% Total 4.48 4.03 0.45 89.91% -iiQ z �---� .>� Gate ----- PropertyLine --- Drainage Boundary - — — — — - Chain Link Fence �i Slope/Flow Direction ® Vehicle/Fleet Parking Area Stormwater Diversion /Conveyance 0 Culvert ® Concrete Containment SDO 00 J SDO 001 Location Lat: 36,039503 N Long: 80,226878 W SDO 003 Location Lat:36.037922 N Long: 80.227000 W r• •0 -------------------------------------------------------------- � wiilii_!�i-�ii��_�_iili l_i!_i i!■ wlll iiii it li iiiiii-� .l li_!!!�- !!!!!!i_. wllliiiiilili il_i_iil wl liii_l� .!!!!!!! •+ • l!i-!_i _■ w_li li_�iiiilii!!!il w_i_!!!_ i_!ilii _■ w_l_i__l_ll_l_i l_ll .!!!!!!!!!_!!!!!ill----------_ -■ ._ l _-l_ i l__l l __ l_ l _� ��--��----iii--- �-- -----i-- w__l_i_illsilllAill� l � i wl_lii �l-i-ll!\ ilk w ill i i l l l li ii lii li �� SDO 002 Location Lat: 36.038111 N Long: 80.227242 W SDO 003 Location Lat: 36.039547 N Long: 80.227378W Uverdale Road Note: Ali parking areas within the chain link fence are asphalt paved. SDO Total Drainage Area (Ac) Total Impervious Area (Ac) Total Pervious Area (Ac) % Area Impervious 1 0.82 0.70 0.12 85.85% 2 1.34 1.23 0.11 91.93% 3 1.68 1.64 0.04 97.88% 4 0.65 0.45 0.19 70.13% Total 4.48 4.03 0.45 89.91% -------lit ._lii_llwt ill w AG7_ _l iwl will will l.i 11 will !it will irl wi-- lrt will Iwii— iw ww will will + it iw will in Anil i!__w,1 w\ i_!!llwt wllis__l� .11ll___i SDO 003 1 1, '.\ SDO 002 j ZASS I I� ® Gate —•-- Propertyl.ine --- Drainage Boundary - -. — — — - Chain Link Fence a Slope/Flow Direction qMH Vehicle/Fleet Parking Area Stormwater Diversion /Conveyance Culvert Concrete Containment r _ a eoSc](5nce & � ��0 9 TP ® "Practical Etgmeenng & Etvtmnmental Solutions" October 16, 2013 N C DeAt of ENR OCT 2 x 2013 Winston Salem uraiona! office Mi Corey Basinger Water Quality Regional Supervisor Division of Water Quality North Carolina Department of Environment and Natural Resources 585 Waughtown Street Winston-Salem, NC 27107 2050 Northpoint Drive • Suite A Winston-Salem, NC 27106 Phone (336) 896-1300 Fax (336) 896-1020 geosci @ geotec corn www geotec com SUBJECT Request for Representative Outfall Status, HFCS Transport Company, 4001 Overdale Road, Winston-Salem, NC 27107 Dear Mr Basinger On behalf of HFCS. Transport Company (HFCS), Geoscience and Technology, P A (GeoSct) is pleased to submit this request for "Representative Outfall Status" (ROS) for two storinwater drainage outfalls (SDOs) The facility is covered under North Carolina General Stormwater Permit #NCG080000, Certificate of Coverage #NCG080201 se rr l Icase V[ r to the attached F',gwes 1 and 3 foe SDO locatrotis cmul site featuttN Thv u figuies are from the SP3 and were recently updated according to comments from your office HFCS historically collects semi-annual stormwater samples at SDO 001 and SDO 002 SDO 003 was created when the parking area was extended n1 the southeast corner of the lacrhty in 2012 SDO 004 is locmated at the northwest corner of the facility and has not been previously identified as an outfall Activities occurring within the drainage areas for SDO's 003 and 004 are identical to those for SDO 002, therefore HrCS requests ROS for SDO's 003 and 004 Please note that the there is an asphalt berm that diverts stormwater drainage to the fueling rack area and from the vicinity of AST-1 towards SDO 001 therefore, the only activities within the drainage aica for SDO 004 are fleet and employee parking, which is identical to activates within drainage areas for SDO's 002 and 003 HFCS understands that if ROS is granted for SDO's 003 and 004, that qualitative monitoring will still be required for those outfalls Please call us at 336 896 1300 or email phd (-UeoteL com if you have questions conr,eining this course of action or require additional information With best regards, GEO CIENCE AND 1 ECHNOLOGY, 1' A Peter H DeVries Project Geologist Mr Corey Basinger October 18,2013 HFCS Stormwater Compliance Page 2 N _ _ j" -- ••• j l3TV i r w ti '76 i � .c a v'i,%. ' • w I v y �,' • I A_ ,� E � �y"*� � �w rf �1� fit r+� � � *'� *'f � � ....�t a� /J*•y � ��1'� 9 �,��� / ��r*�����K:,I�` �,4 EI - J'�, �� _ �£ � I I �i' —_�=yam:.,! .� �f •�' rN � . . . •F / • r n. "'"'-� '7 d ! t1�"44�1X-"` �` 1 ���`..5d�`� i ' 7-t �� �a a I � I' \� �- � t•-f r� t, �. `�^rr rk.` r� ��� f .�y�r � �� �,� 4 Fi • � � � r"T 'E1�� *�• 6 ,/frr� �w ,r�l� �a � �� �'T,.'��s vs � Al I�Jr,� t i } l3� ,f' (.��'J"1 s y �"1\i-•'^�. r�"�� If tl,`�L44 f f rF i '� � �+,y� %' �f �F - i {� t � � ��JS'7 -'�t� '+►ti. � / � .,tikt��', � �� # JA 5_ �,{ I4� � � , r$�� � � !��! � ,� a � 1� ��-�, � 1� �,1 � ,�,. �J y,5t `?`� I��t � ,,• ii it+�i� is �IL� � ♦r�"r"- �;f � ++� ff'I • *� •' � r -rw�,`'+�` 1 � s+_-��+;a��+4�� � �` � � ti-r� �/t IE r'I.... : 1j � fV t �y.'-` �`- a;/ , { L Ile, I t 1ti ���� �s �`+...; is ������1 ��� l5 �•�.:t,F ��tl 'ti 1 itJ'I ��� � `-... • ' fi ��1.... R t..,,,�.� � 1< ��17� �{I•�' � + `4Y / ��?tf i, r,� r.� 'J}y (` j • tS �_fetAl �1�1 f t �rtlL`i F �t4 p t r 4t � r- 'V d ,y�(�1'rf/'€„ '�'kk5.,��'h� t!' - �{'ti F� �r1� �1 w.�• $dlVi � � .��"�.�' " �'S�la A; Note Blue arrows Indicate general direction of stormwater flow from the subject site Ultimate discharge is to South Fork Muddy Creek, which is not listed as an Impaired water The general location of the site is 36° 2' 21 07" W, 800 13' 36 98" N SDO locations are Indicated on Figure 3 ride Project Applor Sc III Site Location Map HI=CS I ransport Co 1 - 2000' GeoScimc-e & Adapted from U S G S SW1113 flan eltrnrntdog, IP A WIltSton^SalLln haSt Job No LoLation FIOUre No PrrkucYrlFuSurrnnrx 1994 Fopooraphic. Map 06 155 Winston-Salcm, NC I Fnirna,,,ewal $Wilue„at Winston Salim NC (136) 896 1300 IV11_q'. Y, ftuencc1 E1?gIlif'Pillig UL awon nten tal Sohetoa,S April 3, 2013 Mr Corey Basinger Water Quality Regional Supervisor Division of Water Quality RECEIVED �I N C Dept of ENR APR 0 5 2013 Winsion Salem Re tonal Ofnc North Carolina Department of Environment and Natural Resources 585 Waughtown Street Winston-Salem, NC 27107 2050 Northpoint Dnve - Suite A Winston-Salem, NC 27106 Phone (336) 896-1300 Fax (336) 896-1020 geosa@geotec com WVVW geotec com SUBJECT Response to Notice of Deficiency (NOD), NOD-2013-PC-0122, HFCS Transport Company, 4001 Overdale Road, Winston-Salem, NC 27107 Dear Mr Basinger On behalf of HFCS Transport Company (HFCS), Geoscience and Technology, P A (GeoSci) is pleased to submit this letter in response to a Notice of Deficiency (NOD-2013-PC-0122) from your office dated March 21, 2013 The facility is covered under North Carolina General Stormwater Permit 4NCG080000, Certificate of Coverage #NCG080201 This response will address the deficiencies noted as a result of a site inspection by Ron Boone of your office on March 19, 2013 This response also includes an estimated timeline for compliance 1) General Location and Site Maps These two maps will be updated to the permit standards before the end of April 2013 Please note that the scale of the portion of the USGS map that we used for the General Site Local ion Map does not allow for placement of the three SDO's In fact the USGS map does not even show the facility and the approximate facility location is shown with an arrow The SDO's are ,Indicated on the Site Map with drainage areas and latitude and longitude Furthermore, the topography of the site is very flat and is not shown on the Site Map Flow directions are indicated on the site map, which is a general indicator of the topography Overall topography of the area is shown on the USGS map Please advise if this is not sufficient for the purposes of the SP3 2) Annual Reviews and Certiflcations Certifications and reviews pursuant to Pat 11, Section A, Paragraphs 1(d) 1(e) and 7 will be performed on an annual basis in the future A page will be inserted into the SP3 with spaces for annual certification of the required reviews 3) Analytical Monitoring ' The facility will perform semt-annual qualitative and quantitative analytical monitoring of all outfalls beginning in the current calendar year 4) Combining SDO's at the North End of the Facility GeoSci and HFCS are investigating the logistics of combining SDO 001 and the previously unidentified SDO at the north end of the facility The unidentified SDO is at the inlet end of an RCP culvert that flows under Overdale Road The road embankment at this location is severely eroded and must be stabilized prior to sampling at this location GeoSci is currently communicating with the City of Winston-Salem (CoWS) Stormwater Engineering Department regarding stabilization of the road embankment the road embankment is not part of the facility's property and HFCS cannot be responsible foi stabilization of the erosion Furthermore, some type of catch basin will have to be constructed to allow for collecting a stormwater sample at thts point It is not feasible to collect a sample at the discharge end of the pipe as it is on CoWS property and is secured with chain link fencing Any activity related to stabilization of the road embankment and construction of a catch basin will require approval from the CoWS and perhaps the NC Department of Transportation (D07) GeoSci will coordinate with these agencies and provide an update as to the status of combining these outfalls Please call us at 336 896 1300 if you have questions concerning this course of action or require additional information With best regards, GEOSCIENCE AND I ECHNOLOGY, P A V k Peter H DeVries Project Geologist Mr Corey Basinger April 3,2013 HFCS Stormwater Compliance Page 2 / �QF W A TF9Q �O q Michael E E.eslcy GO%Lrnor Wilham G Ross Jr Secretary North C trohna Departmcnl of hnvironmeni ind N aural RLWUTCe4 CO]tcn H Su]hnti DtrLLtor Divimon of Water Quality August 14, 2008 To Regional Office Staff From The Stormwater Permitting Unit Central Office Subject Guidance on Reviewing Requests for Representative Outfall Status At the East/West Consistency Meetings with the Regional Offices in May 2008, regional staff indicated their willingness and preference to review and document approval of representative outfall status (ROS) requests from stormwater permittees Before, these requests were processed by the Central Office (CO) However in the past some requests were neglected or approval/disapproval was left undocumented Below is a checklist of recommended review points and steps for tracking representative outfall status requests In BIMS If a request comes to the regional office that you need assistance with or would prefer CO staff to handle we will be glad to coordinate review with you 1 A word about a Representative Outfall Status request Our permittees may be eligible for representative outfall status based on the physical facts at their site and on some other qualifying criteria However granting of ROS is at DWQ discretion We owe the permittee an evaluation but not a specific outcome The SPU has routinely denied ROS based on review of the submittal documents or report from the regional office (RO) 2 Guidance on evaluating the initial request a) Does the permittee's letter identify a physical basis for the request? Does it state that the character of the stormwater pollution or the potential pollution or exposure is similar in the sub -drainage areas under consideration? b) Or, if not very similar, has the permittee indicated that the representative outfall includes the sub -drainage area with the most stormwater pollution or the potentlalfor the most pollution or exposure (i a the "worst" sub -drainage area?) c) The permittee should provide a site map or drawing to show which outfalls he/she is propos ing to be representative of which other outfalls and which ones will continue to be sampled as single olitfall5 d) While the objective of ROS is to reduce the monitoring burden on the permittee reducing the permittee's costs is absolutely conditional on establishing the representativeness of the outfall We cannot grant ROS simply because we think the permittee deserves a financial break vc°` c3rz tr�ra�, � Nonh Carolina Division of Water Quality 1617 Mail Service Center Raleigh NC 27699 1617 Phone (919) 807 63M Customer Ser%ice Internet www ncwatcruuality ore L(x icon 512 N Salisbury S1 Raleigh NC 27604 Fax 4919) 807 6494 1 377 623 6748 An Equal Opportunity/AHirmative Actien Employer — 50% Recycled110% Post Consumer Paper Guidance for Reviewing Representative Outfall Status (ROS) Requests August14 2008 e) Consider the type of industrial activity For example landfills (NCG12) and mines (NCG02) have changing footprints with higher potential for activities in a sub -drainage area to change, which might affect our discretion Also, ready -mix concrete (NCG14) and mines may have wastewater discharges on site with the potential for the two waters to commingle, which might affect the decision f) If the request is for an individual permit, are the monitoring parameters the same across all the outfalls being considered as representative/represented? g) Typically Vehicle Maintenance Activity (VMA) outfal Is may not represent non-VMA outfalls, and vice - versa 3 Review the file materials and BIMS a) What is the receiving water classification? The region may choose to consider this aspect b) Receiving water special circumstances? Impaired? For what? Is there a TMDL and if so, or what? Are there threatened or endangered species? The region may choose to factor these into its discretion c) Has permittee paid up? The region could consider withholding approval until past due amounts are paid d) Past compliance history should affect our discretion Check file and/or BIMS for violations enforcement, comments history etc and consider how this should weigh into an ROS approval For example if a facility has failed to perform any analytical or qualitative monitoring whatsoever and has never implemented a Stormwater Pollution Prevention Plan (SPPP) asking for ROS may be an attempt to get out of permit obligations they never lived up to ROS approval may not be appropriate e) Has past monitoring been complete) If not, has the permittee ignored past monitoring? Or did they request ROS and never heard back from us so they assumed it was approved? If they ignored monitoring requirements the regional office may consider denying ROS approval until either (1) there is enough monitoring data to support representativeness, or (2) the permittee demonstrates diligence in following permit conditions [How much is "enough' data? Ideally a minimum of eight (8) to 10 samples but may consider less if other evidence supports ROS request] If the permittee sent us a request that DWQ never responded to would you have approved it based on their case? Either way keep in mind the site visit will likely be the most important factor in the final decision 4 Visit the sde a) The site visit is a critical step in most cases Do the physical facts verify the characterization that one outfall should be considered representative of another? b) Look for the most consistently impacted outfall on the site especially if verifying where the "worst case" runoff flows This is usually near a highly trafficked process or activity area on the site c) How is general housekeeping? If poor consider whether the operator can confidently assert that one outfall is representative of others d) Check out the Stormwater Pollution Prevention Plan (SPPP) is the permittee using the SPPP as a management tool and living record? Does the SPPP demonstrate that the permittee is actively aware of and managing stormwater discharges from the site? If you think it is warranted the region may consider requiring an updated/sufficient SPPP before continuing review of the ROS request Page 2 of 3 Guidance for Reviewing Representative Outfall Status (ROS) Requests August 14 2008 e) Try to pre empt misunderstanding about ROS it allows the analytical monitoring at one outfall to be considered representative of other outfalls ROS does not change the monitoring frequency required nor does it change the required monitoring parameters Remind the permittee that ROS also does not reduce the qualitative monitoring (visual and odor Characterization of the discharge) required at all cutfalls f) You may need to explain that the final determination is based on the physical facts and DWQ's discretion DWQ is not obligated to approve a ROS request DWQ may also approve only part of the rE quest or grant some kind of conditional approval g) Remind the permittee that if the permit requires a tiered response to benchmark exceedencE s, then an exceedence at the representative outfall may require attention to other sub -drainage areas represented by the one outfall (when appropriate) 5 Tacking and documenting Representative Outfall Status a) Copy the ROS request letter (and site plan if submitted) to the Central Office/SPU, if it did not already go through us before getting to the region We will keep a copy in the permit file b) Update BIMS under the Events Tab with the date for "Representative Outfall Status Requested c) Log any site visit into RIMS as an inspection so you get credit for time spent on ROS review d) An electronic template of an ROS approval letter is available from the Central Office Please feel free to modify it as necessary The letter should be signed by the Regional Office Supervisor e) Copy the final ROS approval or denial letter to (1) Central Office/SPU and (2) DWQ Central Files f) If approved update BIMS under the Events Tab with date for "Representative Outfall Status Approved Be sure to include information in the 'Comments' about which outfalls are representative g) If you deny the ROS request list specifically the basis for denial in the response letter If the denial is temporary note the conditions that need to be corrected before a re -visit and granting of ROS h) If you deny the ROS request update SIMS under the Events Tab with date for "Representative Outfall Status Denied or Revoked Be sure to include comments i) If there is ever a need to revoke ROS (for example because of changes at the site or because ROS is compromised in some other way) the regional office should (1) notify the permittee in writing and specify the reason(s) why and (2) update BIMS under the Events Tab with date for "Representative Outfall Status Denied or Revoked" that records the date of revocation Be sure to include comments cc Stormwater Permitting Guidance Materials File Non -point Source Compliance and Assistance Unit (NPSC&AU) DWQ Supervisor Raleigh Regional Office DWQ Supervisor Mooresville Regional Office DWQ Supervisor Asheville Regional Office DWQ Supervisor Winston-Salem Regional Office DWQ Supervisor, Wilmington Regional Office DWQ Supervisor, Washington Regional Office DWQ Supervisor Fayetteville Regional Office Page 3 of 3 MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Chuck Wakild, P E Governor Director March 21, 2013 HFCS Transport Co Attn Sherri Nelson, Terminal Manager 4001 Overdale Road Winston-Salem, NC 27107 John E Skvarla, III Secretary Subject Compliance Evaluation Inspection & Notice of Deficiency NOD-2013-PC-0122 NPDES General Stormwater Permit NCGO80000 Certificate of Coverage NCG080201 HFCS Transport Co, Winston-Salem Terminal, 4001 Overdale Road, Winston-Salem, NC, 27107 •' Forsyth County Dear Ms Nelson Ron Boone, of the Winston-Salem Regional Office (WSRO) of the NC Division of Water Quality (DWQ or the Division), conducted a compliance evaluation inspection (C.EI) of HFCS's Winston-Salem terminal on March 19, 2013 The assistance and cooperation during the inspection of Mr Johnny Sheets was greatly appreciated An inspection checklist is attached for your records and the inspection findings are summarized below The facility is located at 4001 Overdale Road, in Winston-Salem, Forsyth County, North Carolina, at approximate coordinates 36 0392190N, -80 226940°W According to the current Stormwater Pollution Prevention Plan (SP3), stormwater related to industrial activity is discharged from stormwater discharge outfalls (SDO) 001, 002, and 003, to an unnamed tributary to South Fork Muddy Creek, which is currently classified as a Class C water and located in the Yadkin Pee -Dee River Basin Documentation & Monitoring Review HFCS's SP3, documentation, and monitoring activities were reviewed during the inspection The following deficiencies were noted • The General Location Map (GLM) does not meet all the requirements specified in Part II, Section A, Paragraph 1(a) of the NCG080000 general permit • The Site Map (SM) does not meet all the requirements specified in Part II, Section A, Paragraph 1(c) of the NCGO80000 general permit North Carolina Division of Water Quality Winston Salem Regional Office Locabon 585 Waughtown St. Winston Salem North Carolina 27107 One Phone 336 771 50001 FAX 336 771-46301 Customer Service 1 877-62M748 Noi;ffiCarohna Intemet www ncwaterquality org 'A'4044�//Y MEqual Opportunity 1 Affirmative Action Employer �/ L� d` HFCS Transport Co Attn Sherri Nelson Terminal Manager Compliance Evaluation Inspection NCGO80201 Notice of Deficiency — NOD-2013 PC-0122 3121 /2013 Page 2 of 3 o The list of significant spills has not been updated annually as required in Part II, Section A, Paragraphs 1(d) and 7 of the NCGO80000 general permit • The SDOs have not been certified annually as required by Part 11, Section A, Paragraphs 1(e) and 7 of the NCGO80000 general permit • SP3 Annual Reviews have not been accomplished as required by Part 11, Section A, Paragraph 7 of the NCGO80000 general permit o Not all Analytical Monitoring (AM) and Qualitative Monitoring (QM) has been conducted as required by Part 11, Sections B and D of the NCG080000 general permit The following table represents what AM/QM records were available during the inspection Year Analytical Monitoring Qualitative Monitoring 2008 1 event 1 event 2009 3 events 3 events 2010 1 event 2 events 2011 1 event 1 event 2012 1 event 1 event No benchmark exceedences were noted in the available analytical records Mr Sheets did state that HFCS was not able to collect one of the samples for 2012 due to the lack of, or the timing of rain events during non -business hours A DMR indicating "No Flow" was submitted to the Division for this 2012 sample Site Review In general, the site was very clean and well maintained However, Mr Boone noted the following two significant issues SDO 002, located on the southwest corner of the property, consists of a large stormwater drop inlet on the southern edge of the parking lot, followed by a rip -rapped channel that is approximately 70 feet in length During the inspection, Mr Boone noted that a large portion of the riprap stone is coated with a black substance Mr Boone asked Mr Sheets what the substance was Mr Sheets told Mr Boone he thought it was the parking lot coating material used by contractor(s) that HFCS has hired in the past to coat the parking lot Please note that discharge of this substance from the SDO is considered an illegal discharge and possibly a spill that should have been reported and recorded as per the terms of the NCG080000 general permit Mr Boone followed the rip -rapped channel to assess how far the material was carried off site The rip -rapped channel ends within the forested area to the south of it and it appears that flow then simply flows into the adjacent vegetated field to the south of the forested area It does not appear and there is no evidence of surface water impacts as a result of this release However, HFCS is strongly reminded that spills must be properly reported, recorded, and cleaned up, and that the discharge of such materials from any SDO is considered an illegal discharge There is an additional SDO on the northwest corner of the facility that is not identified in the SP3 and has not been monitored The SDO drains employeelvisitor parking areas, as well as a portion of the fueling area on the north side of the facility This SDO should be added to the SP3 and the stormwater management and monitoring program as a separate SDO r HFCS Transport Co Attn Shern Neison Terminal Manager Compliance Evaluation inspection NCG080201 Notice of Deficiency — NOD-2013 PC 0122 3/21/2013 Page 3 of 3 Alternatively, flow from this SDO and SDO 001, which is located on the northeast corner of the property, both run through a drainage ditch that parallels the northern property line, along Old Milwaukee Lane, but the flows are coming from opposing directions Monitoring could be conducted at the point at which the two flows combine, and a new single SDO could be identified which drams both drainage areas The Division requires that HFCS corrects the viol ationsldeficiencies outlined above as soon as practical Please reply in writing to this letter within 30 business days of receiving it Your written reply should detail corrective action plans with implementation schedules for each of the violations/deficiencies noted above HFCS is reminded that violations of the NCG080000 General Stormwater Permit are subject to civil penalty assessments not to exceed $25,000 per day, per violation HFCS's written reply, as well as the actual actions it takes to correct these violations/deficiencies, will weigh heavily in our decision of whether to pursue further action in order to compel full compliance with the NCG080000 general permit Should you have any questions regarding the permit, this letter, or the inspection, please do not hesitate to contact Mr Boone or me at (336) 771-5000 Sincerely, l W Corey Basinger Water Quality Regional Supervisor Winston-Salem Region Division of Water Quality Attachments 1 BIMS Inspection Checklist cc SWP — WSRO Central Files Stormwater Permitting Unit Compliance Inspection Report Permit NCGO80201 Effective 11/01/12 Expiration 10/31/17 Owner HFCS Transport Co SOC Effective Expiration Facility HFCS Transport Co-WilSalem Sit County Forsyth 4001 Overdale Rd Region Winston-Salem Winston Salem NC 27107 Contact Person Johnny Sheets Title Phone 336-785-0035 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) I i On Site Representative(s) i i Related Permits f Inspection Date 03119=13 Time 09 00 AM Exit Time 1121 AM Primary Inspector Ron Boone ;2 ! Phone 336-771-4967 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status ❑ Compliant ! Not Compliant Question Areas ■ Storm Water t (See attachment summary) Page 1 Pennrt NCG080201 Owner Facility HFCS TranspartCo r Inspection Date 03/19/2013 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary Please refer to the attached Inspection summary letter Page 2 I Permit NGG080201 Owner - Facility HFCS Transport Co Inspection Date 0311912013 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices ? ®❑ D ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ Q # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ m ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® n Cl ❑ # Does the facility provide all necessary secondary containment? a ❑ ❑ ❑ # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment Please refer to the attached Inspection summary letter Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment Please refer to the attached Inspection summary letter Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitonng from Vehicle Maintenance areas? Comment Please refer to the attached Inspection summary letter Permit and Out#allls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfails observed during the inspection? # If the facility has representative outfall status is it properly documented by the Division? # Has the facility evaluated all illicit (non Stormwater) discharges? Comment Please refer to the attached Inspection summary letter ® l:1 ❑ ❑ I ®n0❑ ®000 ® ❑ ❑ ❑ ®npn ®nnp Yes No NA NE ❑®�❑ Yes No NA NE i ❑®❑❑ i! Yes No NA NE ❑110E ®00D nn®n ■ ❑ ❑ ❑ Page 3 fjiq r Winston -Sale m 1 Industrial Surface Water Reinspection Form Name of Facility HFCS Transport Company Date 10/21 /2009 Time 9 00 A M Comments & Observations 1) Analytical and qualitative monitoring was conducted on June 3, 2009 at Outfalls #1 & #2 No exceedences of benchmark values or indicators of pollutants were denoted 2) HFCS Company has completed/incorporated the following permit components into its SWPPP facility inspections, employee spill response training, and a feasibility study 3) Ms Shen Nelson, Terminal Manager, has signed the SWPPP certification statement 4) Drainage areas {and their corresponding percent of impervious coven have been incorporated into HFCS's site man 5) The secondary spill containment basin, which serves as a spill reservoir for AST #1 and fuel delivery _ tankers, has been repaired In addition, the containment area's release valve is locked 6) HFCS Company has successfully completed all outstanding issues from the City's 1/27/2009 industrial surface water inspection Facility representative that attended reinspection Mr Johnny Sheets Title Safetv and Environmental Manager Signature of City Stormwater Inspector Title Special Protects Coordinator Andrew K Allen TO February 17, 2009 Mr Johnny Sheets Safety and Environmental Manager HFCS, Inc P O Box 12789 Winston-Salem, N C 27117 Dear Mr Sheets The Stormwater Division of the City of Winston-Salem would like to thank you for your time and professional courtesy regarding the January 27, 2009 inspection of HI -CS, Inc A photocopy of the completed inspection form has been enclosed to you The Stormwater Division is requesting notification upon completion of Requirements ##1 — 4, that are denoted in Part 4 of the industrial surface water inspection form Upon notification an informal inspection will be scheduled for verification purposes Thank you for your continued support and implementation of the City of Winston-Salem s Stormwater Program If you have any questions, please feel free to contact me at (336) 727-2729 Sincerely, Donald P Donadio Stormwater Industrial Irispector City of Winston-Salem Cc Rose Pruitt, Environmental Specialist with the North Carolina Division of Water Quality City of Winston-Salem Stormwater Division Surface Water Inspection for Industrial Sites Part 'I - General Information A) Official Company Name HFCS Transport Company B) 1 Physical Address 4001 Overdale Road, Winston-Salem 2 Telephone Number 336 785-0035 C) Mailing Address, if different from above address D) 1 Primary contact who is authorized to represent company in official business Sherri Nelson Title Terminal Man Contact number(s) 336-78 5-0035 2 Secondary contact John Sheets Title Safety&Environmental Contact number(s) 336-785-0035 E) SIC Code Number of business 4213 F) NC Stormwater NPDES Permit Number'L nca080201 Facility Type Transit & Trans ortation with Vehicle Maintenance G) Any other control authority permits) (ex air control, wastewater, hazardous waste) & number(s) Possible IWC H) Brief description of manufacturing process of products produced on site Transportation facility, Transportation terminal for general maintenance and cleaning of transfer trucks and tanker trailers used for food grade products Diesel fuel, lubricating oil and other fleet maintenance fluid are stored on site The site is secured and manned 1) Receiving Water(s)IMS4 Lower South Fork of Muddy Creek Part 1 - Stormwater Controls , 1 Best Management Practices a List the non/structural controls employed by the facility 1 Oillwater separator in maintenance facility connected to sanitary sewer_ 2 Vegetated buffer around perimeter of property - 4 Block walled containment are facing Old Milwaukee Lane is leaking and should be repaired V 3141s iZ Iy,vq � b Are the BMPs reasonable & appropriate for the facility F X yes no `Comments c Are BMPs installed correctly, maintained, and effective operating condition? X yes no Comments 2 Provide a brief description of other controls that manage/prevent/minimize stormwater runoff (e g , erosion and sediment controls, inlet protection/control at storm drains, diversion Structures) Run off is sheet flow to grassy areas of outfall 1 on Old Milwaukee Lane, and the other side of ridgeline is channeled to outfall 2 parallel to Overdale Road - Part 2 - Miscellaneous , 1 Any evidence of discharge to receiving watersIMS4? (e g stormwater runoff, dry weather discharge, co -mingling of process wastewater) Yes X No Comments 2) Do the stormwater outfalls on -site correspond with those listed on the site map and in SPPP? t X IYes No NIA Comments Part 3 - SPP,PReview can be com feted in office ,3,_ __ _ Genera! NOTES 1 Is there a SPPP? Yes No 2) Does SPPP identify a specific position(s) for responsible party purposes (e g overall coordination, development, implementation, & revision No Sherry Nelson Yes. 3) Does SPPP designate facility personnel responsible for implementing SPR? Yjes No 4 Does SPPP include a certification statement? Yes No 5) Are employee training records regarding stormwater pollution prevention topics included in SPPP? No Yes, Comments Site Map NOTES 1 Is there a site map? Yes No 2 Drainage atterns/outfalls Yes No No Rid eline 3) Identification of potential pollutants likely to be discharged from each drainage area? No Yes 4) Narrative Description and locations of (check if present) 1 Storage Practices 2 Unloading/Loading activities 3 Outdoor processes 4 Particulate generating/control processes 5 Waste Disposal Y na na Y 5 Name of receiving waters or MS4's listed? Yes No 6) Locations of significant materials exposed to stormwater? No Yes 7) Locations and descriptions of major spills occurring within the the 3 pervious years (w/ corrective actions to prevent future spills)? No Y s Stormwater Controls NOTES 1) Does the SPPP describe the non-structural controls that will be used to prevent/reduce discharge of pollutants in stormwater runoff? No I Ye_ s 2) Does the SPPP describe the structural controls that will be used to prevent/reduce discharge of pollutants in stormwater runoff? No housekeeping Yes 3) Does the SPPP describe other controls that will be used to prevent/reduce off -site tracking or blowing of sediment, dust, and raw, final, or waste products, or other solid materials and floating debris? No Yes 4) Does the SPPP incorporate the 8 baseline controls (good housekeeping, BMP summary, feasibility study, PM, SPR procedures, facility inspections, and comprehensive site evaluations, employee training, secondary containment, and sediment control? Yes Need the Feasibility Study Training Records Facility inspection records � N_O 5) Does SPPP contain completed routine inspection reports/logs regarding reportable implementation of the 8 baseline controls? Yes No 6) Does the SPPP describe the pollutant or activity to be controlled by BMP's and assessed the need of implementation through data collected? No pg 7 sect 5 2 of SWPPP Yes F Non-stormwater Discharges NOTES 1) Certification that the facility has been tested for non-stormwater discharges from the site? Yes Nq 2) Description of testing method, drainage points, observed results, date, and signature? Yes No Monitonng 1) Are samples collected within 30 minutes of measurable weather events occurring 72 hours after previous measurable weather event? Yes `No, -,- 2) Were samples collected and preserved in accordance with 40 CFR 136? Yes No 3) Was proper chain -of -custody procedures followed? Yes v No' . 4) Was analytical and qualitative monitoring complete? Any exceedences of pollutant parameters in regards to cutoff concentrations/effluent limits? Yes Yes No No L' Part 4 - Re 1114red Actions to be com feted 1 Monitoring needs to be performed Both analytical and qualitative must be topermit, 20 was absent, on a six month Intervals according 03 monitoring .,,,. 2 Documentation for facility inspection records, employee spill response training, and feasibility statement must be added to SWPPP 3 Sianed certification statement for SWPPP 4 Site map must show ridge lines and specify Impervious surface area for each designated outfall Educational resources 1 NC Stormwater Manual for Industrial Users http //h2o enr state nc us/su/PDF Files/SW Documents/SWPPP GD PDF Company representative(s) that participated in inspection Johnny Sheets Title Safety and Environmental Manager Start of Inspection 9ooam Completion of Inspection Date 111/2709 11 30 Signature of City Stormwater Inspector Title Industrial Stormwater Inspector I Ni. - I , Qk X, w, 4. 2N, jljt,,. 1, i I Zj J, F�l p kN 14 ti �j �1. 941 W t'- Michael F Eisley Governor Wilhara G Ross Jr Secretary North Carolina Department of Environment utd N'rlural Resources Coleen H Sullins Director Division or Water Quality May 2, 2008 Certified Mail 7007 3020 0000 6279 7860 Ms Sherri Nelson `i eiminal Manager 4001 Overdale Road Winston-Salem, NC 27107 Re Notice of Violation NCGO80201 Forsyth County Dear Ms Nelson A storm water inspection was performed at HI✓CS rransport on May 1, 2008 by the Winston- Salem Regional Office of the Division of Watcr Quality Phis inspection falls under the provisions of North Carolina General Statute 143-215 1 At the completion of the inspection the following item as noted below was found to be in noncompliance with hermit NCGO80201 1 1he Storniwater Pollution Prevention Plati was unavailable for review The Stormwater Pollution Prevention flan is currently under development by a consulting firm Although the plan is not available the facility is currently complying with components of the plan which include i Qualitative nionitoinig 2 Analytical monitoring 3 Training 4 inspections, and others The facility has also undertaken improvements to the two disc,liarge locations oit site It is felt, the facility with a minimal amount of improvements would qualify for a non -exposure exemption North0irolin i X7111111111J North Carolina Divtsion of Water Quality 595 Wiughtown street Winston Sflem NC 27107 Phone (336) 771 4600 Fax (336) 771-463 t Internet h2o enrstate nc us An Equal opportunity/Affirmative Action Employer — 50% Recyoled110% Post Consumer Paper U.S. Postal Service,,, M� CERTIFIED MAIL,,, RECEIPT U l� (Domestic Mail Only; No insurance Coverage Provided) k, T U S E Er r` Postage $ E "' la Nov 1 i1J i 1 —0 Carllfled Fee Zf , Return flecelpR Fee f' �- j trx Postmark 1 Q (Erniorsemarrt Reaulred)O� t Here I M Restricted Dellvery Fee (Endorsement Required) �r y I M ,I �Ar rU Total Pnamn R P-- B"` ' Ms Sherri Nelson I o vteet Terminal Manager % I o -PO 4001 Hrdale Road l' O's Winston Sale 107 Ms Sherri -Nelson May 2 2008 pg 2 I his office is appreciative of the cooperative attitude shown by the facility personnel Please respond to this office within 30 days of ieceipt of this correspondence advising of corrective actions undertaken concerning the aforementioned violation If there are questions please contact Marc Stokes at (336) 771-5000 Sincerely (;Y /Z /wel- Steve W Tedder Water Quality Regional Supervisor Winston-Salem Region Division of Water Quality Cc R Pruitt WSRO riles u Compliance Inspection Report Permit NCG080201 Effective 11/01/07 Expiration 10/31/12 Owner HFCS Transport Co SOC Effective Expiration Facility HFCS Transport Co W/Salem Sit County Forsyth 4001 Overdale Rd Region Winston-Salem Wnston Salem NC 27107 Contact Person Johnny Sheets Title Phone 336-785 0035 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On Site Representative(s) Related Permits Inspection Date 05/0112008 Entry Time 1000 AM Exit Time 11 15 AM Primary Inspector Marc Stokes Phone 336 771 5000 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Stormwater Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status ❑ Compliant ® Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 Permit NCGO80201 Owner Facility HFCS TransportCo inspection pats 05101/2008 Inspection Type Stormwater Inspection Summary Facility does components of the SP3 plan although the plan is development Qualitative Monitorin Has the facility conducted its Qualitative Monitoring semi annually Comment Analytical Monitoring Has the facility conducted its Analytical monitonng9 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection'? # If the facility has representatwe outfall status is it properly documented by the Division? # Has the fatality evaluated alE illicit (non stormwater) discharges? Comment Facility has not completed evaluation for discharges Reason for Visit Routine Yes No NA NE ■nnn ■nnn ■ n n n Page 2 o�o� w A rF9p� Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources JOHNNY SHEETS Hl-CS TRANSPORT CO WIISALEM SIT PO BOX 12789 WINSTON SALEM NC 27117 Dear Permittee Alan W Klimek P E Director Division of WaterQuality August 23 2002 Subject NPDES Stormwater Permit Renewal HFCS Transport Co-Wi/Salem Sit COC Number NCG080201 Fors} th County In response to your renewal application for continued cover ige under general pei mit NCG080000 the ]Division of Water Quality (DWQ) is torwarding herewith the reissued Stormwater general permit I his permit is re issued pursuant to the requirements of North Carolina General St itute 143-215 1 and the Memorandum of Agi cement between the state of North Carolina and the U S Environmental Protection Agency, dated December 6 1983 The following information is included with your permit package A new Certificate of Coverage A copy of General Stormwater Permit NCG080000 A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ The Division may require modification or revocation and reissuance of the Certificate of Coverage This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from rerponsibihty for compliance with any other applicable federal state or local law, rule standard ordinance order judgment, or decree If you have any questions regarding this permit package please contact Deionda Alexander of the Central Office Stormwater and General Permits Unit at (919) 733-5083 ext 584 Sincerely Bradley Bennett Supervisor Stormwater and General Permit, Unit Lc Central Files Stormwater & General Permits Unit Files Winston-Salem Regional Office TA NCQENR N C Division of Water Quality 1617 Mail Service Center Raleigh NC 27699 1617 (919) 733 7015 Customer Service 1 800 623 7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG080000 CERTIFICATE OF COVERAGE No NCG08020I STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYS FEM In compliance with the provision of North Carolina General Statute 143-215 f, other lawful standards and rt.gulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Wati-r Pollution Control Act, as emended, HFCS I RANSPORT CO is hun-by uutlion/W to d1%Lhargc, stormwater from a lacality foe ited at HFCS TRANSPORT CO-WI/SALEM SIT 4001 OVERDALE RD WINSTON SALEM FORSYTH COUNTY to receiving waters designat(d -is a Ur to South Fork Muddy Creek a (.lass C stream in the, Yadkin - Pei DI.L RIVer Basin in accordance, with the effluent limitations monitoring n.quiremc.nts and other condition~ set forth in Parts 1, 11 1[] IV V, and VI of General Permit No NCG080OW as attached This c.erttf-te ate of cov( rage shall hc(.OML (.ffUttva. Seplember 1 2002 This CUtificate of Coverage %hall runain in effect !or the duration of the, General Permit Signed this day August 23 2002 for Alan W Klimek P E Dire( for Division of Water Quality By Authority of the, Environnmental ManageniLrit Commission Michael F Eac ley Governor William G Ross Jr Secretary North Carolina Department of Ervironmeni and Natural Resources Gregory J Thorpe PhD Acting Director Division of Water Quality DLLLInl 27 2(H)I J()IINNY SHll Hill I RANSPOIZ I Co) WlPsAI FM 51 I 110 BOX 127S() WINS ION SALEM NC 27107 iutllLLI NPDES Storin%� itt r PLinitl RLm,%% 11 1-11"CI, TRANSPOR Y CO WI/SALENI Is] COC Nulilb(,r NCG080201 Fors) Ill County DL it PLi iniat, YOM I IL1111y I1 LuirLntl} LON1,1i lot 1toini%au-r dt1L11 ii un(ILr GLnLr d PLruilt NCGil I his pL1111II LCl)itL1 On All 31 2(X)2 I hL I)1Vt11011 a tit i1 Lutri-ntly in IN, proLL11 of rc,Wnting this pLnnit Inca 11, VAL(Ili ul 11IV(- Ill pu 11111 1Li1SlILd by 1 111L 1IIn1111M of 2(X)2 Ill lhL po nlit 11 rL111uLd your I ILlhty would Ill LhgIIAL for LOnllntiLd (.(IVLi I"L UI1dL1 111L. ILI%sLILd P0Illlt 111 01 (ILI to 1SSUIL )Our LtlntlnLILd LONLI I'll-i1dLr 1 thL -LnL1 it pLitnit you alum 1ppl) to IN, DIV1110i1 01 Ail IILI Qtl dlty (DWQ) tOi 1LnLW it (it y(lln 1)LII111t LOVLI ISSk, 170 111 16- 11111 ILfli Il pli L V,1L1 WL IIL In1O11n111g VOLI In IdV BILL th 11 )Out I)LI1111t Will hL Lxl)Il111" I'11001Ld YOU �k ill hnd I Gul(.r11 Pcrnnt Goi Lr tgL RLiv w ll ApphL rturri I orni 1 hL 111I111L uilln nnitit hL L01np1LILd lull rLturnud by M irdi 4 2002 In ORILl Itl I11LnL ulnllnuLd LOVLI IgL Undcr thL �'LnLI 11 I)LI n111 I' UIL1IL 10 ILLluL1t i iLb1' It within Ibis 11111L 1)Lr10d ill ly IL` Ult Ill t 011 a15L11InLnt 01 it IL Ist $250 00 L u Lr 1)Lil 1111L1 In ty hL 111Lti11,Ll dt-I)LIldIn" Oil IhL dLh1l(jULnL) 01 IbL ILL1lILtI D11Lh ll`_'L 01 SI01I11W IILI 11nn1 )'Mil t,iLlllty W10101.11 L(1VL1 Ill(, u1)(10 .l V Ihd ',Ioilnw il(,r NPI)ll I)LIIIIIt 1AOL 111 corii I viol ition of NCGi 141-215 1 uld L(luld 1i In V sLY1IllLllts oil LIk II I101 1111L1 01 tip to $100N) pLr d Ly PIL 11L ROIL 111 11 ILI-Lilt ILdLI 11 ILg11t ItIOII 11 11 LVILIIdLd 111E 110 LXPOsurL cxdumOn to Ill 0[-X t ttllll QI 1ndLl111 t 11 I ILIIIIILI in ill) 01 l I I L 1IL`I'OI IL1 01 %totni w oLr (Ill Ill 111(1LL ItLd with industri It 1Ltivit) (L\LLpl LOIikIL1IOn ILI]' It1i 11 )OU ILLI y01.111 I ILIIIIy L III LLI Illy I Londition of no LxPO%UIL I L IIlL I UJIly IndtI%lll 11 III itLrl IN Ind ol1Lt ilior a1L ri Lxl)oNLd to slo11n" IILI )ou L in apply for IIIL no Lxposii 1ALIl lulu I -Or iddluon 11 In1011111 11110111 4,0111 ILI lhL, CLiltl Ill 011IIU. SIL)I low tIL1 Sit Ili 1114,11ill 111tL(I l lo\v 01 LhL(,k ik Stoll tl(,i cti GLIiLI 11 PLtnnI1 Unit WLh S11L it hill) //h20 Lnl st IIL I14, L1%A11./401111A tlLr htinl 11 t11L 1L1b1LLl sturinN 1tL1 Lh1c11 trgL 10 W lit i 1 01 IhL tit ItL 11 is 11LLn ti-1 n1111 ItLd pIL iti(, LOIIIJ)ILIL Il1L L11LlO1Ld RLSLISSIQn RLgii I Orin Mailing 11111rL1L(rons IIL 1111LL1 011 111� bOttOitl 01 thL 1Or111 You �1Ill hi, 11nu1ILLI \41101 1hL r(,1Li11ion prnLL11 h 11 bLLrl Lt11np1LILd 11 YOU 11 IIL Ill) (1UL11Elllri ILL' uLIInLI lhL l)Lrnllt ILIlLVt it prOLL(IuILti pIL 15L Lonlact Coil) B Of (hL Winston S ilLn) lzt-own Il (lttiLL it 116 771 4600 of Ddond i A1Lr indLr of IhL CLIIII Il 011iLL Sloini",itLr Unit (LJ 19) 711-5{}81 L\l 584 SIIILLILI4 Br aIILy Bt-nnut SupLl 11nr ,�t011nw IILI Lind GLnLr it PLtnull Unit LL Unit it Fik's Wl1lslOn-" 11Li11 i6-t 10n 11 011iLL N C Division of Water Quality 1617 Mail Service Center Raleigh NC 27699 1617 (919) 733 7015 ®gin NCDENR Customer Service 1 80C 023 7748 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B Hunt, Jr , Governor Jonathan B Howes, Secretary A Preston Howard, Jr, P E , Director August 26, 1994 Mr Philip H Enscoe HFCS Transport Company P O Box 12789 Winston Salem, NC 27107 �EHNF1 Subject General Permit No NCGO80000 HFCS Traqnsport Comapy COC NCGO80201 Forsyth County Dear Mr Enscoe 1n accordance with your application for discharge permit received on June 27, 1994, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983 If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application Unless such demand is made, this certificate of coverage shall be final and binding Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required If you have any questions concerning this permit, please contact Aisha Lau at telephone number 919/733-5083 Sincerely, Original Signed By COieen H Sullins A Preston Howard, Jr, P E cc Winston Salem Regional Office P 0 Box 29535, Raleigh, North Carolina 27626 0535 Telephone 919 733 50B3 FAX 919-733 9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DMSION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO, NCQQ80000 CERTIFICATE ERA E No. NCGO80201 STORMWATER DISCHARGES NATIONAL POLLUTANT 1215CHARGE ELIMINATION SYSTE d In compliance with the provision of North Carolina General Statute 143-215 1, other Lawful standards and regulations promulgated and adopted by the Korth Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, HFCS Transport Company is hereby authorized to continue operation of an oil water separator and discharge stormwater from a facility located at HCFS Transport Company 4001 Overdale Road Winston-Salem Forsyth County to receiving waters designated as an unnamed tributary to South Fork Muddy Creek in the Lumber River Basin in accordance with the effluent limitations, monitoring regwrements, and other conditions set forth to Parts I, II, III and IV of General Permit No NCGO80000 as attached This certificate of coverage shall become effective August 26, 1994 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day August 26, 1994 OrlR;itat 5►��ual�s ccoeo H A Preston Howard, Jr, P E , Director Division of Environmental Management By Authority of the Environmental Management Commission 1 L%--rll I1111Y.1".\\\\ti �\\C`�\�141��/rA!�Jl((�'6'+l°)li':s"�`'i��F\..\\\\l\\\�tt\�—':�Y:':�///l�Js!"�i/'._�—�.—�i✓/�� `,-%`�,._.' c r r c,,,i. i 9Y n W 4 COUNTY For 5 � f NPDES C 0 <7 0 01 MAP St �FR BASIN o 0 -7 `- oq LAR,WDE Ep O Q ;2 / 3 /( I. 4NCITUDE V o 1 3) 3 1" RECc"IVIIgG STREAM V 7" 4-o Sou +d STREAM CLASS DISCHARGE CLASS 5 f 6 r ir/A f e o ,a EXPIRATION DATE �l� � � � R 7