HomeMy WebLinkAbout20091061 Ver 1_More Info Received_20091020Chapman, Amy
From: scales07l3@aol.com
Sent: Tuesday, October 20, 2009 1:42 PM
To: Chapman, Amy
Cc: divbusform@aol.com
Subject: Re: Drainage problem application at 103 Bentbrook Ct
The length of pipe that will be installed is about 70' (will use 4 sections of 20 feet pipe). This is also listed in the proposal
from the contractor that I submitted to you.
"Do all you can with what you have, in the time you have, in the place you are". Bernard E. Scales, President & CEO
Bernard Scales & Associates
-----Original Message-----
From: Chapman, Amy <amy.chapman@ncdenr.gov>
To: scales07l3@aol.com <scales07l3@aol.com>
Sent: Tue, Oct 20, 2009 12:32 pm
Subject: Drainage problem application at 103 Bentbrook Ct
Hi Mr. Scales.
I need to have you email me the length of pipe you will be installing to pipe the stormwater to the stream at your property
so I can calculate the buffer impacts on your application.
Thanks.
-Amy
Amy Chapman
NC Division of Water Quality
401/Wetlands Unit
2321 Crabtree Blvd, Suite 250
Raleigh, NC 27604
Phone: 919-715-6823
Fax: 919-733-6893
E-mail: amy.chapman@ncdenr.gov
"Please note my email address has changed"
Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
Chapman, Am
From: Matt. Flynn@TownofCary.org
Sent: Wednesday, October 14, 2009 8:47 AM
To: amy.chapman@ncmail.net
Subject: Bernard Scales pipe info
Amy - hope you are well. Please find info regarding pipe below
Pipe: 15" RCP
Slope :.08% (1 ft over 125 foot length)
Full flow capacity per Dan Clinton stormwater Engineer: 3.1 cfs
Let me know if you need anything else.
Thanks again - Matt
Matthew Flynn
Stormwater Field Services Administrator
Engineering Department
Town of Cary
P.O. Box 8005
Cary, NC 27512-8005
Office -(919)469-4347
1