Loading...
HomeMy WebLinkAboutWQ0002431_Staff Report_20191115State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Permitting Regional Staff Report FORM: APSRSR 04-10 Page 1 of 3 November 15, 2019 To: DWR Water Quality Permitting Section Central Office Application No.: WQ0002431 Attn: Ranveer Katayal Regional Login No.: From: Bev Price Asheville Regional Office I. GENERAL SITE VISIT INFORMATION 1. Was a site visit conducted? Yes or No a. Date of site visit:11/12/2019 b. Site visit conducted by: Mikal Willmer c. Inspection report attached? Yes or No In LF d. Person contacted: Bob Branch & Shuford Wise and their contact information: (336)-312-9007 e. Driving directions: From Hickory go North on Hwy. 321. Cross the Catawba River; facility is located approximately ½ mile on the left. II. PROPOSED FACILITIES FOR NEW AND MODIFICATION APPLICATIONS 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) 2. Are the new treatment facilities adequate for the type of waste and disposal system? Yes or No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? Yes No N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? Yes No N/A If no, please explain: 5. Is the proposed residuals management plan adequate? Yes No N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? Yes No N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? Yes No N/A If yes, attach list of sites with restrictions (Certification B) DocuSign Envelope ID: 6218B31B-B827-41C9-A102-8EEE92833F42 FORM: APSRSR 04-10 Page 2 of 3 III. EXISTING FACILITIES FOR MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? Yes No N/A ORC: Bob Branch Certificate #:15676 Backup ORC: Ray Gambill Certificate #:985951 BIMS needs to be updated with the appropriate ORC & BORC. 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? Yes or No If no, please explain: 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? Yes or No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? Yes or No If yes, please explain: Miller field is no longer in the program; however, remaining acreage appears to be adequate for residuals management based on dry tons previously applied and reduced flows. 5. Is the residuals management plan adequate? Yes or No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? Yes or No If no, please explain: 7. Is the existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? Yes or No If no, please explain: 10. Were monitoring wells properly constructed and located? Yes No N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? Yes No N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ 12. Has a review of all self-monitoring data been conducted (e.g., NDMR, NDAR, GW)? Yes or No Please summarize any findings resulting from this review: Reviewed laboratory results submitted with application. Facility has not land applied since 2014. 13. Are there any permit changes needed in order to address ongoing BIMS violations? Yes or No If yes, please explain: 14. Check all that apply: No compliance issues Current enforcement action(s) Currently under JOC Notice(s) of violation Currently under SOC Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) 15. Have all compliance dates/conditions in the existing permit been satisfied? Yes No N/A If no, please explain: DocuSign Envelope ID: 6218B31B-B827-41C9-A102-8EEE92833F42 FORM: APSRSR 04-10 Page 3 of 3 16. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? Yes No N/A If yes, please explain: IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? Yes or No If yes, please explain: 2. List any items that you would like APS Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: Hold, pending receipt and review of additional information by regional office Hold, pending review of draft permit by regional office Issue upon receipt of needed additional information Issue Deny (Please state reasons: ) 6. Signature of report preparer: Signature of WQ regional supervisor: Date: V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS John Miller Field appears to no longer be in the program. Total acreage will be reduced by 3.6. BIMS should be updated with the correct ORC as the currently listed LA ORC does match the O&M plan. The soil series for fields 2 & 4 should also be updated to reflect correct soil series. Permit and land application Site certification indicates a Clifford soil series, but the last field summary form in 2015 and the web soil survey lists Fairview as the dominate soil series. DocuSign Envelope ID: 6218B31B-B827-41C9-A102-8EEE92833F42 11/18/2019