Loading...
HomeMy WebLinkAboutNCG030578_MONITORING INFO_20140724STORMWATER DIVISION CODING SHEET NCG PERMITS . PERMIT N0. 3 C) DOC TYPE ❑ HISTORICAL FILE EX MONITORING REPORTS DOC DATE ❑ �� 4 Dr1 a� YYYYM MDD STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 QQ SAMPLES COLLECTED DURING CALENDAR YEAR: Zap CERTIFICATE OF COVERAGE NO. NCG03 � S�-V _ (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME, "_ ___ _ COUNTY v+ PERSON COLLECTEN AMPLES PHONE NO. a- A2J 2kq,C4i!0 CERTIFIED LABORATORY s+ 'N Lab # I 1e5 Lab # PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected, mo/dd/ r 00530 00400 01051 00556 78 t41 Total Suspended Solids, m , pH, Standard units Lead, mgfl, Oil and Grease, mgfL Total Toxic Organics', m Benchmark - 100 Within 6.0 — 9.0 0.033 30 t b .ts. k4 z+ Co• C ,0to Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 response sR Eu E �� % E D See General Permit text. 1 V Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? — yes —no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected, molddl r 00556 00530 00400 Oil and Grease, mWT, Total Suspended Solids, m9VL pH, Standard units New Motor Oil Usage, Annual average al/mo Benchmark - 30 100 6.0 — 9.0 - Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date a (first event sampled) Total Event Precipitation (inches): Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 JUL 2 4 2014 CENTRAL FILES DWQIBOG SWU-245-031308 Page 1 of 2 I Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definitio of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. i further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." fliu 1 Se yV LL/IO4. rJ�7.J __ Name (Print name) Title(.Print title) 0 7- z_z- zcy-4 (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7-Zz-z-/ (Date) S WU-245-031308 Page 2 of 2