Loading...
HomeMy WebLinkAbout20191579 Ver 1_PCN Form Submission (2)_20191118DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20191579 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: Bridge 320054 replacement in Edgecombe County 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* tccoggins@ncdot.gov Date Submitted 11/18/2019 Nearest Body of Water Tar River Basin Tar -Pamlico Water Classification C NSW Site Coordinates Latitude: 35.97301 A. Processing Information County (or Counties) where the project is located: Edgecombe Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: B-320054 WBS#M 17BP.4.R.101 1a. Type (a) of approval sought from the Corps: Longitude: -77.71557 Version#* 1 Reviewing Office* Central Office - (919) 707-9000 1c. Primary Contact Phone:* (252)640-6400 V W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of North Carolina (NCDOT) 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address PO Box3165 Address Line 2 City State / Rovince / Rion Wilson NC Rostal / Zip Code Country 27893 USA 2e. Telephone Number: 2f. Fax Number: (252)640-6400 2g. Email Address:* r Yes r No r Yes r No tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Chad Coggins 3b. Business Name: NCDOT 3c.Address Street Address PO Box3165 Address Line 2 city Wilson Postal / Zip Code 27893 3d. Telephone Number: (252)640-6400 3f. Email Address:* tccoggins@ncdot.gov State / Rovince / Region NC Country USA 3e. Fax Number: C. Project Information and Prior Project History O [Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Rocky Mount 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Tar River 3b. Water Resources Classification of nearest receiving water:* C NSW 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201010903 4. Project Description and History 2b. Property size: State / Province / Region Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Forestry and Agriculture are the predominant land uses 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Edge 54 Topo Map.pdf 1.94MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Edge 54 Soils Map.pdf 1.48MB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 200 4h. Explain the purpose of the proposed project:* Replace Bridge 320054 which is structurally deficient per current NCDOT standards with a new bridge meeting these standards. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Replace Bridge 320054 which is structurally deficient per current NCDOT standards with a new bridge meeting these standards. There will perm. stream impacts related to the construction of 2 interior bents and stream bank stabilization and some temp impacts related to work bridges and old bridge bent removal. Heavy road and bridge building equipment will be used. 4j. Please upload project drawings for the proposed project 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Chad Coggins Agency/Consultant Company: NCDOT DEO Other: 5d1. Jurisdictional determination upload 6. Future Project Plans r Unknown 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries W Buffers r Open Waters r Pond Construction 3. Stream Impacts F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* S1 Site 1 stabilization Permanent Bank Stabilization Tar River Perennial Both 130 71 Average (feet) (lir�rfee[) S2 Site 1 temp bridges and Temporary Workpad/Causeway Tar River Perennial Both 130 50 possible dewatering for Average (fee) (ii ear fcet) interior bent removal 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 71 31. Total stream and ditch impacts: 121 3i. Total temporary stream impacts: 50 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. r Neuse P Tar -Pamlico r Catawba r Randleman r Goose Creek F Jordan Lake r Other b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact �e 1 P Tar River No 2,181 1,353 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 2,181.00 1,353.00 Zone 1 Zone 2 Total combined buffer impacts: 2,181.00 1,353.00 6i. Comments: Supporting Documentation Edge 54 Permit drawings.pdf Edge 54 buffer draWngs.pdf E. Impact Justification and Mitigation 1. Avoidance and Minimization 2.03MB 923.17KB V 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The new bridge has less bents in the water. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: All construction equipment Wil be staged and operated from upland areas. DOT will also install silt fencing to protect the streams and wetlands adjacent to the project. Safety fencing will be used to delineate jurisdictional and environmentally sensitive areas from encroachment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Under Thresholds F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SM/Vf) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen * Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation Edge 54 SMP.pdf 119.55KB 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPAUSEPA)? * r Yes r No Comments:* MCDC available upon request 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. just a bridge replacement project 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPAC lists Red -cockaded Woodpecker Picoides borealis, Neuse River Waterdog Necturus lewisi, Carolina Madtom Noturus furiosus, Atlantic Pigtoe Fusconaia masoni, and Tar River Spinymussel Elliptio steinstansana. Additioanally NMFS has designated the Tar River critical habitat for Atlantic Sturgeon Acipenser oxyrinchus oxyrinchus -Red-cockaded Woodpecker Picoides borealis- no habitat, no occurrences within a mile, no affect -Neuse River Waterdog Necturus lewisk not currently listed, found within project area in 2018, NCDOT is working on a programmatic that will address this species, the appropriate biological conclusions, and the required mitigation prior to its formal listing, at the time of its formal listing NCDOT make the appropriate biological conclusion according to the programmatic and will adhere to the required mitigation in the programmatic in order to comply with section 7. -Carolina Madtom Noturus furiosus- not currently listed, found roughly 18 river miles downstream in 2007 , NCDOT is working on a programmatic that will address this species, the appropriate biological conclusions, and the required mitigation prior to its formal listing, at the time of its formal listing NCDOT make the appropriate biological conclusion according to the programmatic and will adhere to the required mitigation in the programmatic in order to comply with section 7. -Atlantic Pigtoe Fusconaia masoni-MA-LAA, payment made per programmatic. -Tar River Spinymussel Elliptic steinstansana-MA-LAA, payment made per programmatic. -Atlantic Sturgeon Acipenser oxyrinchus oxyrinchus-MANLAA-consultation and conditions attached Consultation Documentation Upload project report_b_320054_22031 _22031. pdf Edge 54 NMFS consultation. pdf 17BPA.R.101 Aquatic Species Survey Report.pdf Species List_ Raleigh Ecological Services Field Office.pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* non coastal 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 1.08MB 554.11 KB 3.73MB 211.05KB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU clearance 7c. Historic or Prehistoric Information Upload PA 17-08-0018 Edgecombe (NHP).pdf 2.23MB 17-08-0018NoSurvey.pdf 1.79MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: MOA approved 8c. What source(s) did you use to make the floodplain determination?* FRIS Miscellaneous Comments Agreed to Moratorium for this project is Feb 15th-June 30th and Aug 15th-Oct 31st. Travis agreed to this on 11/14/2019 and NMFS concurrence email is below. Miscellaneous attachments not previously requested. Re_ [External] Re_ Tar River SR 1243 Bridge 54 Replacement moratorium issue. pdf 333.48KB Signature * P By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature Date 11/18/2019