Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030543_COMPLETE FILE - HISTORICAL_20180815
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. � /v D 30 5V,65 DOC TYPE )-� HISTORICAL FILE L- MONITORING REPORTS DOC DATE ❑ �OI � o D /6 YYYYMMDD No- OCG d 3050 RP%euvivu� W lx- e k P `fiN CK.bk Index,Na: fv' 7 ROY COOPER August 15, 2018 Unison Engine Components Attention: Michelle Hendrich 401 Sweeten Creek Industrial Park Asheville, -North Carolina 28803 Subject: Compliance Evaluation Inspection Permit: NCG030685 and NCG030543 Buncombe County, North Carolina Dear Mrs. Hendrich: Gotivemor MICHAEL S. REGAN Secretary WILLIAM E. VINSON, J R Interim Director Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 8, 2018. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Enclosure: Inspection Report Sincer , Isaiah Reed, C SCi, MS4 ECI Environmental Specialist Land Quality Section State of North Carolina I Enviromuental Quality I Energy, Mineral and Land Resources 2090 US 70 Highway I Swanoanoa, NC 28778-8211 8782%4500 T Compliance Inspection Report Permit: NCG030685 Effective: 11/16/17 Expiration: 10/31/18 Owner : Unison Engine Components SOC: Effective: Expiration: Facility: Unison Engine Components County: Buncombe 502 Sweeten Creek industrial Park Rd Region: Asheville Asheville NC 28803 Contact Person: Michelle Hedrich Title: Phone: 829-232-8455 Directions to Facility: from 1.40 take 25 Alt south for 112 mile to Sweeten Creek Industrial Park Road, 502 is at the end of Sweeten Creek Industrial Park Road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/08/2018 Entry Time: 01:00PM Exit Time: 02:15PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COG Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG030543 30C: County: Buncombe Region: Asheville Contact Person: Jeff Bowman Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 11116117 Expiration: 10/31/18 Owner: Unison Engine Components Inc Effective: Expiration: Facility: Unison Engine Components Inc 401 Sweeten Creek Industrial Park Asheville NC 28803 Title: Phone: 828-274-4540 Inspection Date: 08/08/2018 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 01:00PM Exit Time: 02:15PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Perot Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG030543 Owner -Facility: Unison Engine Components Inc Inspection hate: 0810812018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 8, 2018 this facility was inspected for compliance. I met with Michelle Hendrich on site. During the inspection the following items were noted. 1) Secondary containment was not provided for all areas where containers stored in close proximity had a total capacity greater than 1320 gallons. These containers shall be moved to areas where secondary containment is provided. 2) Housekeeping at the rear of the facility is needed. Excessive Industrial material and waste was observed on the ground. These areas shall be maintained to remain in compliance with the housekeeping requirements of the permit. If you have any questions, please call 828 296-4614 Page: 2 permit; MCG030685 Owner - Facility: unison Engine Components Inspection Date: 08/08/2018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 8r 2018 this facility was inspected for compliance. I met with Michelle Hendrich on site. No issues were observed during the inspection. If you have any questions, please call 828-296-4614. Page: 2 Permit: NCGO30685 Owner- Facility: Unison Engine Components Inspection Date: 08/08/2018 Inspection Type : Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®❑ 110 # Does the Plan include a General Location (LISGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ®❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ®❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ®❑ ❑ ❑ # Does the Plan include a BMP summary? EM ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ®❑ ❑ ❑ # Does the facility provide and document Employee Training? Is ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ®❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ®❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? No ❑ 1111 Comment: Analytical Monitories Yes No NA NE Has the facility conducted its Analytical monitoring? Im ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ® ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ® ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? E ❑ ❑ ❑ Comment: Page: 3 Permit: NCG030543 Owner- Facility: Unison Engine Components Inc Inspection Date: 0810812018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ®❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility, evaluated feasible alternatives to current practices? ®❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ®❑ ❑ ❑ # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? UM ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ®❑ ❑ ❑ # Does the facility provide and document Employee Training? ®❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ®❑ ❑ ❑ # Does the Plan include a Stormwater facility Inspection Program? go ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ®❑ ❑ Comment: See summary for more information_ Qualitative Monitoring Yes No NLA, NE Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑ Comment: Analytical MonitorinSt Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative.outfall status, is it property documented by the Division? ®❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? M ❑ ❑ ❑ Comment: Page: 3 Permit: NCG030543 SOC: County: Buncombe Region: Asheville Contact Person: Jeff Bowman Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Com fiance Inspection Repo Effective: 11/16/17 Expiration: 10/31/18 Owner : Unison Engine Components Inc Effective: Expiration: Facility_ Unison Engine Components Inc 401 Sweeten Creek Industrial Park Inspection Date: 08/08/2018 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: Certification: Asheville NC 28803 EntryTime: 01:OOPM Exit Time: 02:15PM Reason for Inspection: Routine Inspection Type Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Comp5anl M Not Compliant Question Areas: ® Storm Water (See attachment summary) a Phone: 828-274-4540 Phone: Phone: 828-296-4614 Compliance Evaluation Page: 1 permit: NCG030543 Ownor - Facility: Unison Engine Components Inc Inspection Date: 08/08l2018 Inspection Type: Compliance Evaluation Reason for visiC Routine Inspection Summary: On August 8, 2018 this facility was inspected for compliance. I met with Michelle Hendrich on site. During the inspection the following items were noted. 1) Secondary containment was not provided for all areas where containers stored in close proximity had a total capacity greater than 1320 gallons. These containers shall be moved to areas where secondary containment is provided. 2) Housekeeping at the rear of the facility is needed. Excessive Industrial material and waste was observed on the ground. These areas shall be maintained to remain in compliance with the housekeeping requirements of the permit. If you have any questions, please call 828 296-4614 Page: 2 Permit; NCO030543 Owner - Facility: Unison Engine Components Inc Inspection Date: 08/08/2018 Inspection Type ; Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a BMP summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ©❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Parly(s)? N ❑ ❑ ❑ # Is the Plan reviewed and updated annually? a ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Yes No NA NE Has the facility conducted its {qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ! ❑ ❑ ❑ # Were all outfalls observed during the inspection? a ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? N ❑ ❑ ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? ® ❑ ❑ ❑ Comment: Page: 3 CL�:CD)( Facility Name: LA Son Permit{l. D3a5`� Time in/out: tl Date: 's �,5 {' 4 Stormwater Pollution Prevention Plans Does the site have a SWPPP? Does the Plan include a General Location (USGS) map? Does the Plan include a "Narrative Description of Practices"? Does the Plan include a detailed site map including outfall locations and drainage areas? iDoes the Plan include a list of significant spills occurring during the past 3 years? Has the facility evaluated feasible alternatives to current practices? rpoes the facility provide all necessary secondary containment? Does the Plan include a BMP summary? _ - bo-es the Plan include a Spill Prevention and Response Plan (5PRP)? Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? !Does the facility provide and document Employee Training? Does the Plan include a list of Responsible Party(s)? Its the Plan reviewed and updated annually?~ Does the Plan include a Stormwater Facility Inspection Program? Has the stormwater Pollution Prevention Plan been implemented?— - - - Qualitative Monitoring ;Has the facility condusted its Qualitative monitoring semi-annually? :Omments Yes Energy Mineral and Land ftesour-ces c n V i n 0""E .TA6 cl UAWIY No NA NE Yes No NA NE Analytical Monitoring Yes No NA NE lHas the facility conducted Its Analytical monitoring? Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? I I I I _I Yes No NA NE Es a copy of the Permit and the Certificate of Coverage available at this site? Were all outfalls observed during the inspection? Iif tthe facility has representative outfall status, is it properly documented by the Division? T w ✓ r Has the facility evaluated all illicit (non stormwater) discharges? - :omments and Others Present: � d t� 6 Al Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Unison Engine Components — GE Aviation Attn: Michael Meguiar 502 Sweeten Creek Industrial Park Road Asheville, NC 28803 N4av 4. 2018 Subject: NPDES Stormwater Permit Permit No. NCO030543 Representative Outfall Status Request Unison Engine Components - GE Aviation Buncombe County Dear Mr. Meguiar: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. VINSON, JR. Interim Director, The Asheville Regional Office staff have reviewed your request dated March 16, 2018, for a determination that stormwater discharge outfall (SDO) 001 be granted representative outfall status for stormwater outfalls 002 and 005. Based on the information and maps provided and a site inspection on February 20, 2018, we are approving this request. In accordance with 40 CCR § 122.21(g)(7), you are authorized to sample outfall number 001 as a representative outfall. This approval is effective with the next sampling event. We also want to remind you that the permit still requires Qualitative Monitoring be performed at all SDOs, regardless of representative status. Please remember that any actions you initiate in response to benchmark exceedances as directed in the tiered response provisions of your permit must address all drainage areas represented by 001, where appropriate. Please append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit to document that representative outfall status has been approved. if changes in drainage areas, structures, processes, storage practices, or other activities occur that significantly alter the basis of this approval, representative outfall status may no longer be valid. You should either resume sampling at all SDOs, or reapply to this office for representative outfall status based on updated information. If you have any questions or comments concerning this letter, please contact Sbawna Riddle or me at 828-296-4500. Sincerely, 14 ;;4 Stanley E. Aiken, A Regional Engineer Land Quality Section Enclosure: Inspection Report ec: Bethany.Geor oig_ l lias cr,ncdenr.gov, Environmental Engineer Lucy.Crocker cr,ge.com, Lead EHS Specialist, GE Aviation State of Narth Carolina I Environmenua Quality I Energy, Mineral and Land Resources 2090 US 70 Highway I Swannanoa, NC 28778-8211 828 296 4500 T Compliance Inspection Report Permit: NCG030543 Effective: 11/16/17 Expiration: 10/31/18 owner: Unison Engine Components Inc SOC: Effective: Expiration: Facility: Unison Engine Components Inc County: Buncombe 401 Sweeten Creek Industrial Park Region: Asheville Asheville NC 28803 Contact Person: JejLBowrr mr— Title: Phone: 828=274=4540— Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site represenlalive Lucy Cracker Related Permits: Inspection Date: 02/20/2018 Entry Time: 11:00AM Exit Time: 12:45PM Primary inspector: Shawna Riddle Phone: Secondary inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: ■ Storm water (See attachment summary) Page: 1 Permit: NCG030543 Owner- Facllity: Unison Engine Components Inc Inspection Date: OPJ20/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Lucy Crocker for the inspection. Inspection was to determine representative outfall status for the Building 401 NCG030543 permit. The $PPP is current and monitoring is being conducted as required. Representative outfall status will be approved for this site. You are authorized to sample Outfall 001 as a representative outfall for outfalls 002 and 005. This approval is effective with the next sampling event. Page: 2 Permit: NGG030543 Owner - Facility: Unison Engine Components Inc Inspection Date: 0212012018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? e ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible altematives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include.a BIM summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? O ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Parly(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? o ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0[] 0 ❑ # if the facility has representative outfall status, is it property documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: Page: 3 Division of Water Quality 1 Surface Water MM F-09 AGE.M! ' SE-0t%SK Uatc Rec Ye' Month National Pollutant Discharge Elimination Syste w� REPRESENTATIVE OUTFALL STATUS (ROS) eye A Colo REQUEST' FORM if a facility is required to sample multiple discharge locations with very similar stormwater discha�, tHP permittee may petition the Director for Representative Outfall Status (ROS). DWQ may grant Represen Outfall Status if stormwater discharges from a single outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of outfalls where analytical sampling requirements apply. to If Representative Outfall Status is granted, ALL outfalls are still subject to the qualitative monitoring requirements of the facility's permit --unless otherwise allowed by the permit (such as NCG020000) and DWQ approval. The approval letter from DWQ must be kept on site with the facility's Stormwoter Pollution Prevention Plan. The facility must notify DWQ in writing if any changes affect representative stotus_.�) Coin — For questions, please contact the DWQ Regional Office for your area (see page tz (Please print or type) 1) Enter the permit number to which this ROS request applies: QVd Individual Permit (or) Certificate of Coverage 'f� e1.ys�, -C s -,N . C: 4,G. 3 o s 05 , Z7 Z) Facility Information: Owner/Facility Name Facility Contact Street Address City County Telephone No. son FV)AIvie (A hoIGI rYl P�UI qr ``I D l S 1N ( G Cif C 5he 4 r &vl n LO r-1 b<_ - be �1 vE,01 b 'o n State N ",_ ZIP Code Z-5 C, D E-mail Address hlyCENOL - Me9ta,C(t Cie^ Fax: 3) List the representative outfalls) information (attach additional sheets if necessary)::( � � ,,d Outfall(s) J_ is representative of Outfallfs) Z 6 ► # G Outfalls' drainage areas have the same or similar activities? )(Yes ❑ No Outfalls' drainage areas contain the same or similar materials? )&es ❑ No Outfalls have similar monitoring results? ;Yes ❑ No ❑ No data* Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? o Yes ❑ No Outfalls' drainage areas contain the same or similar materials? ❑ Yes ❑ No Outfalls have similar monitoring results? ❑ Yes o No u No data* Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? o Yes ❑ No Outfalls' drainage areas contain the same or similar materials? (3 Yes ❑ No Outfalls have similar monitoring results? ❑ Yes o No ❑ No data* *Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. Page 1 of 3 SWU-ROS-2009 last revised 12/30/2009 Representative Outfall Status Request 4) Detailed explanation about why the outfalls above should be granted Representative Status: (or, attach a letter or narrative to discuss this information.) For example, describe how activities and/or materials are similar. 5) Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document Filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the ]Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 1 hereby request Representative Outfall Status for my NPDES Permit. I understand that ALL outfalls are still subject to the qualitative monitoring requirements of the permit, unless otherwise allowed by the permit and regional office approval. I must notify DWQ in writing if any changes to the facility or its operations take place after ROS is granted that may affect this status. If ROS no longer applies, I understand I must resume monitoring of all outfalls as specified in my NPDES permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing; /�/�c ice f Al P!Ffuf4r Title: OLD&- f A^a ore- _ /Signature of Ap cant) (Date Signed) Please note: This application for Representative Outfall Status is subject to approval by the NCDFNR Regional Office. The Regional Office may inspect your facility for compliance with the conditions of the permit prior to that approval. Final Checklist for ROS Request This application should include the following items: 10 This completed form. Letter or narrative elaborating on the reasons why specified outfalls should be granted representative status, unless all information can be included in Question 4. Two (2) copies of a site map of the facility with the location of all outfalls clearly marked, including the drainage areas, industrial activities, and raw materials/finished products within each drainage area. Summary of results from monitoring conducted at the outfalls listed in Question 3. ❑ Any other supporting documentation. Page 2 of 3 SWt1-ROS-2009 Last revised 12/3012009 Shawna Riddle from local Asheville NCDEQ office was onsite February 20, 2018 for storm water inspection for both buildings (401 and 502). Building 401 (401 Sweeten Creek Industrial Park): The property is bordered on the north by a tributary to Sweeten Creek and on all other downgradient side by industrial properties. The manufacturing operations are enclosed in buildings covered by a roof and the surrounding vehicle operation areas are paved with asphalt and gravel. Trialers are parked in the southern portion of the property (lot leased to UPS). Shipping and receiving areas are located on the south and southwest corner of building 401. Employee parking is the west of building 401. Employee and visitor parking are also present in an asphalt paved, unfenced lot to the north of building 401. The remainder of the property consists of landscaped property (grassed yard) north of building 401. Rain water falling on the property is primarily collected in the catch basins or drainage ditches and is discharged offsite to roadside ditches north and northeast of the plants which subsequently discharge to the Sweeten Creek tributary. Building 401 site is approximately 8.6 acres in area and is currently occupied by a one-story facility with about 102, 051 square feet of office, manufacturing and warehouse space. A one-story chemical building (2,170 sq. ft.) is present south of building 401. The plant is bordered to the south, west and north by pavement, consisting of parking lots, loading docks, or driveways. The basic layout of the plant is such that the truck loading and unloading docks are out the south and southwest sides of the building and the administrative offices are on the north side of the building. Most of the plant space is devoted to manufacturing activities and product storage. The stormwater runoff from roof drains, the above ground storage tank area, loading docks, material storage areas and surrounding driveways or parking lots is generally collected by catch basins located on the around the perimeter of the plant. The catch basins on the south, east and north side of the plant discharge to Outfall 001. The catch basins on the east and northeast side of the plant discharge to Outfall 002. One catch basin on the south side of the plant is routed to the adjoining UPS property (shared outfall) and discharges to Outfall 005. Please note that Outfall 003, 004 and 006 drain other portions of sweeten creek industrial park not occupied by GE Aviation. We are wanting to move to ONLY sample from outfall #1. Outfall #2 borders with another facility and only grass and parking lot. Outfall #5 is a shared outfall with UPS next door due to storm drain leading into their storm drain. The tank located near the storm drain has adequate secondary containment and truck operators have been instructed to use a drain cover during water removal from tank. Shawna Riddle from Asheville Local NCDEQ office has advised from her site visit that Outfall #1 would be a representative outfall for both. Buildiniz 502 (502 Sweeten Creek Industrial Park): Very little exists at this location would cause a concern related to stormwater runoff. However, this 120,000 SIC building does have loading and unloading operations and parking on the southern and eastern sides. Therefore, in an abundance of caution, this site decided to permit building 502 rather than maintain exemption. The exposed pollutants would be limited to vehicle traffic and unloading/loading operations. Building 502 should be and would qualify for a no exposure certification. Our parent company of GE likes to air on the side of caution and has advised us to stay permitted under the General Storm water Permit. Outfall ##5 is the only outfall that would see any action due to the covered areas for trash, recycling and waste. Also, due to the amount of new machines we are installing, occasionally there might be packing material staged outside for removal. Shawna Riddle from Asheville Local NCDEQ office has advised from her site visit that Outfall 915 would be a representative outfall for all others due to no activity outside. SHEALY ENVIRONMENTAL SERVICES, INC. Detection Summary Bunnell-Lammons Engineering, Inc. Lot Number: SJ25054 Sample Sample ID Matrix Parameter Method Result Q Units Page 001 OUTFALL 001 Aqueous TSS SM 2540D- 14 mg]L 5 001 OUTFALL 001 Aqueous HEM (oil and grease) 1664B 1.9 J mglL 5 001 OUTFALL 001 Aqueous Copper 200.8 3.3 J ug/L 5 001 OUTFALL 001 Aqueous Lead 200.8 0.96 J ug/L 5 001 OUTFALL 001 Aqueous Zinc 200.8 80 ug/L 5 002 OUTFALL 002 Aqueous TSS SM 2540D- 10 mg/L 6 002 OUTFALL 002 Aqueous Copper 200.8 1.8 J ug/L 6 002 OUTFALL 002 Aqueous Lead 200.8 0.46 J ug/L 6 002 OUTFALL 002 Aqueous Zinc 200.8 180 ug/L 6 003 OUTFALL 005 Aqueous TSS SM 2540D- 98 mg/L 7 003 OUTFALL 005 Aqueous HEM (oil and grease) 1664E 3.5 J mg/L 7 003 OUTFALL 005 Aqueous Copper 200.8 8.8 ug/L 7 003 OUTFALL 005 Aqueous Lead 200.8 2.8 ug/L 7 003 OUTFALL 005 Aqueous Zinc 200.8 190 ug/L 7 (14 detections) Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www.shealylab.com Page 4 of 20 Client: Bunnell-Lammons Engineer tnc. - Laboratory ID:SJ25054-001 Description: OUTFALL 001 Matrix: Aqueous Date Sampled:l Dt2312017 0955 ]ate Received:1012512017 Inorganic non-metals Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 (TSS) SM 2540D-2011 1 10/26/2017 1529 KNF 55311 1 (HEM (oil and) 1664B 1 10/27/2017 0930 ARP 55408 CAS Analytical Parameter Number Method Result Q LOG DL Units Run TSS - SM 254OD-20 14 1.0 0.50 mg1L _.. _..I HEM (oil and grease) 1664E 1.9 J 4.5 1.6 mg1L 1 ICP-MS Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 200.2 200.8 1 10t2712017 2017 BNW 10126/2017 0839 55257 CAS Analytical Parameter Number Method Result Q LOQ DL Units Run Copper 7440-50-8 200.8 3.3 J 5.0 0.63 ug1L 1 Lead 7439-92.1 200.8 0.95 J 1.0 0.25 ug1L 1 Zinc 7440.66-6 2002 Bill 10 2.5 ug/L 1 LOO - Limit of Ouantltalion B - Detected in the method blank E = DuaRtltation of Compound e.ceeded the calibration range DL = ❑etection Limit ND = Not detected at dr above the DL N - Recovery is out of criteria P = The RPD behveen two GC columns exceeds 40% J = Estimated result c LOO and > OL H - Out of holding time W = Reported on wet weight basis Shealy Environmental Services, Inc. 106 Vantage Pant Drive West Columbia. SC 29172 (803) 791-9700 Fax (603) 791.9111 www,sheaWb.com Page 5 of20 Client:Bunnell-Lammons Engineering, )oratory ID:SJ25054-002 Description: OUTFALL 002 Matrix: Aqueous Date Sampled:10/2312017 0950 Date Received: 1012512017 Inorganic non-metals _ Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch T 1 (TSS) SM 25400-2011 1 10/26/2017 1529 KNF 55311 1 (HEM (oil and) 1664B 1 10/27/2017 0930 ARP 55408 CAS Analytical Parameter Number Method Result Q LOG} DL Units Run TSS 5M 2540D-20 10 1.4 0.50 mg1L 1 HEM (oil and grease) 1664E ND 4.7 1.6 mg1L 1 ICP-MS Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 200.2 200.8 1 10/27/2017 2040 BNW 10/26/2017 0839 55257 CAS Analytical Parameter _ _ Number Method Result Q LOQ DL _ Units Run Copper 7440-50-8 200.8 1.8 J 5.0 0.63 ug1L i Lead 7439-92-1 200.8 0.46 J 1.0 0,25 ug1L i Zinc 7440.66.6 200.8 180 10 2.5 ug1L 1 LOO = Limii of OuanlRatjCn B = Detected in the method blank E = Ouantilation of compound exceeded the calibration range DL = Deteewn Limit ND = Not detected at or ;Dove the DL N = Recovery is out of criteria P = The RPD between tutu GC columns exceeds 4C°% J = Estimaled Mutt < LOO and > DL H = Out of holding ume W = Reported on wet weight basis Shealy Environmental Services, Inc. 106 Vantage Point Drive WeSt Columbia, SC 29172 (803) 791-9700 Fax (803) 791-9111 www.shealylab.com Page 6 of20 Client: Bunnell-Lammons Engineers- Inc. Laboratory ID:SJ25054-003 Description: OUTFALL 005 Matrix: Aqueous Date Sampled:1012312017 1000 Date Received:10125/2017 Inorganic non-metals Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Date Batch 1 (TSS) SM 254OD-2011 1 10126/2017 1529 KNF 55311 1 (HEM (oil and) 1664B 1 10/27/2017 0930 ARP 55408 CAS Analytical Parameter _ Number _ Method _ Result 'Q Ili DL Units Run TSS SM 254OD-20 98 10 0.50 mg1L 1 HEM (oil and grease) 16648 3.5 J 4.8 1.7 mg1L 1 ICP-MS Run Prep Method Analytical Method Dilution Analysis Date Analyst Prep Bate Batch 1 200,2 200.8 1 10/27/2017 2103 BNW 10/26/2017 0839 55257 CAS Analytical Parameter Number Method Result Q LOQ OIL Units Run Copper 7440-50-8 200.8 8.8 5.0 0.63 1 1 Lead 7439-92-1 200.8 2.8 1.0 0.25 ug1L 1 Zinc 7440-66-6 200.8 190 10 2.5 ug1L 1 LOO = Limit of quantitation B = Detected In the method blank E . Qoantitatlon of compound exceeded the calibration range DL = Detection Limit WD = Not detected at or above the DL N = Reoovery is out of criteria P = The RPD bem een two GC columns exceeds 40% J = Estimated resutl , LOG and ?_ DL H = Out of holding time W = Reported on wet weight basis Shealy Environmental Services, Inc. 106 Vantage Point Drive West Columbia, SC 29172 (803) 791-9700 Fax (803) 791.9111 www.shealylab.com Page 7 of 20 Permit: NCG030543 5OC: County: Buncombe Region: Asheville Compliance Inspection Report Effective: 11/01/12 Expiration: 10/31/17 Owner: Unison Engine Components Inc Effective: Expiration: Facility: Unison Engine Components Inc 401 Sweeten Creek Industrial Park Asheville NC 28803 Contact Person: Z W Michaely Title: Phone: 828-2744540 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Andy Alexander Phone: 864-288-1265 Related Permits: Inspection Date: 02/1412013 EntryTime: 10:00 AM Exit Time: 11:30 AM Primary Inspector: Timothy R Fox Phone: 828-296-4500 Secondary Inspector(s): Jonathan Stepp Phone: Reason for inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Q Compliant ❑ Not Compliant Question Areas: e storm Water (See attachment summary) Page: 1 Permit: NCG030543 Owner - Facility: Unison Engine Components Inc Inspection Date: 02/14/2013 Inspection Type: Technical Assistance Reason for Visit: Routine Inspection Summary: Tim Fox and Jonathan Stepp with DENR DWQ met with Andy Alexander P.G. and Ben Nisbeth with Bunnell-Lammons Engineering, Inc. (BLE) and Jeff Bowman (Unison EH&S and Facilities Manager) and Jennifer Rendon (Unison Environmental Health & Safety Coordinator). The purpose of this site meeting was to discuss, problem solve, and evaluate recent bench mark exceedance of copper and zinc at the facility. We toured the facility and looked at all outfalls. Important points to note: Outfalls 1,3,4,5,and 6 had exceedance of Zinc and Copper. One could speculate that if bench mark exceedance occurred it would most likely occur at outfalls 1 & 4 due to the location of the material stored on -site. The site is being well maintained and the facility has begun evaluating any possible sources of copper and zinc. Appropriate paperwork was provided to regional office. Since drainage areas contain large amounts of pavement it could be assumed that a potential non -point source of zinc and copper contamination could be coming from parking lot sediments. There are also galvanized culverts at outfalls. Items that were discussed during the visit included: Re -testing for Copper and Zinc. Seperating coloidal material or filtering samples. Split sampling Sampling other parking lots (nearby or other locations to compare values). Unison and Environmental Representatives are dedicated to being pro -active in problem solving and addressing any concerns at their facility. The Asheville Regional Office will review materials, continue to assist and re -visit the site as needed. Page: 2 Permit: NCGO30543 owner • Facility: Unison Engine components Inc Inspection Date: 02/14/2013 Inspection Type: Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a $MP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? a # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: This inspection was to help determine and evaluate cause of zinc and copper bench mark exceedance. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? S ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Outfalls 001, 003, 004, 005 and 006 (Exceedance of Zinc and Copper). Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? Cl ❑ ❑ 0 # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ■ Cl ❑ Cl # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Page: 3 f Permit: NCG030543 Owner - Facility: Unison Engine Components Inc Inspection Date: 0211412013 Inspection Type: Technical Assistance Reason for Visit: Routine Comment: We toured the facility and the site is being maintained well. The only comment would include continuing to monitor and maintain the gravel pad appropriately at the back of the facility which receives high truck volume. Page: 4 Division of Energy, Mineral, and Land Resources Land Quality Section / Stormwater Program j: National Pollutant Discharge Elimination System (NPDES) Energy. Mineral & PERMIT OWNER AFFILIATION DESIGNATION FORM LandResources ENVtA0014ErR 4L (SUeLS7Y (individual Legally Responsible for Permit) Use this form if there has been: FOR AGENCY USE ONLY Date Received Year Month D.tiy NO CHANGE in facility ownership or facility name, but the individual .-.:who. is legally responsible for the permit has changed. If the name of the facility has changed, or if the ownership of the facility has changed, do NOT use this form. Instead, you must fill out a Dame -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual" mean? The person is either: RECEIVE[ • the responsible corporate officer (for a corporation); JUL 12 2017 • the principle executive officer or ranking elected official (for a municipality, state, federal or other public agency); I?ENR-LAND QUALITY • the general partner or proprietor (for a partnership or sole proprictorship);STORMWATER PERMITTING • or, the duly authorized representative of one of the above. 1) Enter the permit number for which this change in Legally Responsible Individual ("Owner Affiliation") applies: Individual Permit N I C I S 2) Facility Information: Facility name: Company/Owner Organization Facility address: (or) Certificate of Coverage N Ic I G I o[3 1 01-5Lq 1.31 ELF - 1 i '.".tom I i r `' • i• Address 1 1M ! City State Zip To find the current legally responsible person associated with your permit, go to this website: http.Ifdcq.nc.gov/about/divisions/energy-mineral-Land-resc)urces/energy-mineral-bind-permits/storinwaIcr-nrt)graiii and run the Permit Contact Summary Report. 3) OLD OWNER AFFILIATION that should be removed: Previous legally responsible individual: � ty eowmak1 First Mt last 4) NEW OWNER AFFILIATION (legally responsible for'the permit): Person legally responsible for this permit: iCAW Meulav" First Nil Lass Page 1 of 2 V/ 5 W U-OWNI, RMF11,21March2t117 NPDES Stormwater Permit OWNER AFFILATION DESIGNATION Form (if no Facility Name/Ownership Change) Sr L e, JPr Title YO we•r r.. Creek Z.J, 17,. Mailing Address 25963 City State lip ($47 7 7 V 73,07 A4: c k,%0 (_ M��y cr a—r . C_to) "Telephone E-mail Address Fax Number 5) Reason for this change: A result of: ® Fmployee or management change ❑ Inappropriate or incorrect designation before ❑ Other If rather please explain: The certification below must be completed and signed by the permit holder. PERMITTEE CERTIFICATION: attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this form are not completed, this change may not be processed. 7--7-17 ignature PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Date For more information or staff contacts, please call (919) 707-9220 or visit the website at: http://deq.nc.gflv/about/divisions/energy-mineral-land-resources/stormwater Page 2 of 2 S W U-o W N E RAF Fll,23 Ma r20l 7 i ■ 1,...� Li'lW ON Unison Engine Components -Asheville Stormwater Pollution Prevention flan CERTIFICATION Management Certification "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." By signing below, management approves the contents of the SPPP and commits the necessary resources to ensure implementation ensure implementation of the Plan. Name and Official Title Area Code and Phone Number Michael Meguiar (847) 774-3387 Plant Leader Signature --`—Date Signed VE -' , 6 Division of Energy, Mineral, and Land Resources r rr Land Quality Section / Stormwater Program National Pollutant Discharge Elimination System (NPDES) Energy. Mineral & )-andResources PERMIT OWNERAFFILIATION DESIGNATION FORM ENVIilgnM[HT A4 gWLITY (Individual Legally Responsible for Permit) Use this form if there has been: A 1//Oji FOR AGENCY U51i ONLY t we Received Yeu Mom Da NO"CHANGE in facility owriership or facility name, but the individual .....who is legally responsible, for the permit has changed. If the name of the facility has changed, or if the ownership of the facility has changed, do NOT use this form. Instead, you must fill out a Name -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual' mean? The person is either: • the responsible corporate officer (for a corporation); • the principle executive officer or ranking elected official (for a municipality, state, federal or other public agency); • the general partner or proprietor (for a partnership or sole proprietorship); • or, the duly authorized representative of one of the above. 1) Enter the permit number for which this change in, Legally Responsible Individual ("Owner Affiliation") applies: Individual Permit (or) Certificate of Coverage 2) Facility Information: Facility name: V A& Company/Owner Organization: GE AVI 10i& Facility address: i)!- S14—Ci f ushfia/ AwK 12L�ad Address R huil(2 NG 29303 City Stale Zip To find the current legally responsible person associated with your permit, go to this website: ht de .ne. ova ut dv's- ns ener -mines -land-re ounces er -mineral-land- errnits slarmvtt+ cr- ro rum and run the Permit Contact Summary Report. 3) OLD OWNER AFFILIATION that should be removed: Previous legally responsible individual: _ .1OIL L;)-1 r�y _ Sowmapi First M1 last 4) NEW OWNER AFFILIATION (legally responsible for the permit): Person legally responsible for this permit: 5 W U-O WNERAFFIL-23h4aich2017 Page 1 of 2 First — M1 t,ast NPDES Stormwater Permit OWNER AFFIL.ATION DESIGNATION Form (if no Facility Name/Ownership Change) 51 T{ Le.cIN Title y0 wer r.. Creek ZwJ' prrF. tir. Mailing Address Aleto tic N c. Z$ 7 2 City state Zip (8117 ) 7-?V-3J'fZ Al-Vt;..l—utkP:L4rQ 9e.ra�, Telephone E-mail Addrreems Fax Number 5) Reason for this change: A result of: ® Employee or management change ❑ Inappropriate or incorrect designation before ❑ Other If other please explain: The certification below must be completed and signed by the permit holder. PERMiTTEE CERTIFICATION: attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this form are not completed, this change may not be processed. tgnature Date PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 For more information or staff contacts, please call (919) 707-9220 or visit the website at: http://deg.nc.p-ov/about/divisions/energy -mineral-land-resources/stormwater Page 2 of 2 5 W U-O W NE RAF FnG23 Ma r2017 U%YMON Unison Engine Components - Asheville Stormwater Pollution Prevention Plan CERTIFICATION Management Certification °I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." By signing below, management approves the contents of the SPPP and commits the necessary resources to ensure implementation ensure implementation of the Plan. Name and Official Title Area Code and Phone Ntunber Michael Meguiar (847) 774-3387 Plant Leader 7- '7 - 17 Signatur Date Signed vt . A7jA NCDENR C North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy Davis, PE, CPM Pat McCrory, Governor Director John E. Skvarla, III, Secretary January 21, 2014 ECEI V ED Mr. Jeff Bowman MAR 2 1 2014 Unison Engine Components, Inc. CENTRAL FILES 401 Sweeten Creek Industrial Park Asheville, North Carolina 28803 SUBJECT: NPDES Stormwater Permit: Request for Regulatory Relief Unison Engine Components, Inc. General Permit No: NCG030000; COC No: R OGC 3b5437 Buncombe County Dear Mr. Bowman: In response to your request for Regulatory Relief, NCDENR-Land Quality Section staff conducted a site inspection on January 14, 2013. The primary goal of the inspection was to evaluate the drainage to outfall 006 and to insure that there are no illicit discharges at your facility. At the time of this inspection the facility was found to be in compliance with permit NCG030543 and no illicit discharges were discovered. Monthly monitoring has been triggered by two consecutive exceedances of the zinc and copper benchmarks at your facility. Please keep in mind that benchmark exceedances are NOT limit violations or violations of permit conditions; however, you are obligated to follow the tiered response actions outlined in your permit. Unison Engine Components, Inc. has been following the tiered response actions and therefore is in compliance with the permit, Based on your materials inventory and certification that industrial activities at Unison Engine Components pose little to no potential for release of copper and zinc into stormwater we are granting regulatory relief in the form of a collapsed Tier 2 — Tier 3 response. Upon receipt of this letter, Unison Engine Components, Inc. may resume the permit specified semiannual analytical monitoring for the remainder of your current permit. Your current permit is set to expire on October 31, 2017. This decision only applies to the copper and zinc benchmarks. A benchmark exceedance of any other parameter listed in your permit will trigger tiered response actions as described in the general permit. Asheville Regional Office, 2090 US Highway 70, Swannanoa, North Carolina, 28778-8211 Telephone 828-296-4500 Fax 828-299-7043 One http;llportal.ncdenr.org/web/ir/land-quality NorthCarolina An Equal Opportunity 1 Affirmative Action Employer Na&rally Mr. Jeff Bowman January 21, 2014 Page 2 of 2 You must notify this office in writing, within five business days, if you become aware of any significant source of copper or zinc at your facility that has the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at Unison Engine Components. If industrial practices change and copper or zinc does become a significant stormwater exposure risk then this office reserves the right to withdraw this decision and reinstate the permit specified tiered response or other actions that may be warranted by the new set of circumstances. Please retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or comments concerning this letter, please contact Darlene Kucken or me at (828) 296-4500. Sincerely, Laura Herbert, PE Regional Engineer Enclosure ec: Bethany Georgoulias, RCO Andrew Alexander - BLE A70101 NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy Davis, PE, CPM Director January 21, 2014 Mr. Jeff Bowman Unison Engine Components, Inc. 401 Sweeten Creek Industrial Park Asheville, North Carolina 28803 Pat McCrory, Governor John E. Skvarla, III, Secretary SUBJECT: NPDES Stormwater Permit: Request for Regulatory Relief Unison Engine Components, Inc. General Permit No: NCG030000; COC No: NCG030543 Buncombe County . Dear Mr. Bowman: In response to your request for Regulatory Relief, NCDENR-Land Quality Section staff conducted a site inspection on January 14, 2013. The primary goal of the inspection was to evaluate the drainage to outfall 006 and to insure that there are no illicit discharges at your facility. At the time of this inspection the facility was found to be in compliance with permit NCG030543 and no illicit discharges were discovered. Monthly monitoring has been triggered by two consecutive exceedances of the zinc and copper benchmarks at your facility. Please keep in mind that benchmark exceedances are NOT limit violations or violations of permit conditions; however, you are obligated to follow the tiered response actions outlined in your permit. Unison Engine Components, Inc. has been following the tiered response actions and therefore is in compliance with the permit.. Based on your materials inventory and certification that industrial activities at Unison Engine Components pose little to no potential for release of copper and zinc into stormwater we are granting regulatory relief in the form of a collapsed Tier 2 -- Tier 3 response. Upon receipt of this letter, Unison Engine Components, Inc. may resume the permit specified semiannual analytical monitoring for the remainder of your current permit. Your current permit is set to expire on October 31, 2017. This decision only applies to the copper and zinc benchmarks. A benchmark exceedance of any other parameter listed in your permit will trigger tiered response actions as described in the general permit. Asheville Regional Office, 2090 US Highway 70, Swannanoa, North Carolina, 28778-8211 Telephone 828-296-4500 Fax 828-299-7043 '�7 ne http://portal.ncdenr.org/web/Ir/land-Quality 1V cAhCarolina An Equal Opportunity / Affirmative Action Employer Natualllf X Mr. Jeff Bowman January21, 2014 Page 2 of 2 You must notify this office in writing, within five business days, if you become aware of any significant source of copper or zinc .at your facility that has the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at Unison Engine Components. If industrial practices change and copper or zinc does become a significant store water exposure risk then this office reserves the right to withdraw this decision and reinstate the permit specified tiered response or other actions that may be warranted by the new set of circumstances. Please retain and append this fetter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or comments concerning this letter, please contact Darlene Kucken or me at (828) 296-4500. Sincerely, Laura Herbert, PE Regional Engineer Enclosure ec: Bethany Georgoulias, RCO Andrew Alexander - BLE Compliance Inspection Report Permit: NCG030543 Effective: 11/01/12 Expiration: 10/31/17 Owner: Unison Engine Components Inc SOC: Effective: Expiration: Facility: Unison Engine Components Inc County: Buncombe 401 Sweeten Creek Industrial park Region: Asheville Asheville NC 28803 Contact Person: Z W Michaely Title: Phone: 828-274-4540 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 01114f2014 Entry Time: 01:00 PM Exit Time: 01:30 PM Primary Inspector: ,Jonathan Stapp Phone: Secondary Inspector(s): Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ® Compliant ❑ Not Compliant Question Areas: Storm Water , (See attachment summary) Page: 1 Permit: NCG030543 Owner - Facility: Unison Engine Components Inc Inspection Date: 01/14/2014 Inspection Typo: Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: This inspection was in follow up to a compliance assistance inspection in 2013. The primary purpose of this inspection was to confirm that the facility has evaluated all internal drains to ensure that there are no illicit discharges. Land Quality staff did not see any evidence to suggest that there is an illicit discharge at the time of this inspection. Chrlstine Ingel, of Unison Engine Components, Inc., was asked if there were any illicit discharges associated with the facility and she stated that there were none. Ms. Ingle toured the facility with Land Quality staff and provided a packet for review. Brun nell-Lammons Engineering, Inc. prepared the packet for Unison. Unison is requesting relief from monthly monitoring related to copper and zinc benchmark exceedances. The packet contains the request letter, analytical monitoring results and a materials inventory. The packet is currently being reviewed. Page: 2 SDqA d'."..'r1(�� NGDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Jeff Bowman Unison Engine Components Inc 401 Sweeten Creek Indus Park Asheville, NC 28803 Dear Permittee: Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Unison Engine Components Inc CDC Number NCG030543 Buncombe County In response to your renewal application for continued coverage under stormwater General Permit NCG0300DO the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E), Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wg/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the stormwater Permitting Unit's website with the new General Permit. Please visit htti)://portal-ncdenr.o[g/web/wg/ws/su/nodessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N_ Salisbury St. Raleigh, North Carolina 27604 P',one: 91M07-63001FAX 91M07-6492 1^Iennok www.ncwatergual ty ury A EqualOpilorlunirylAffrmatw--Ac.-on Employer Nne °rthCarolina ,Xatwc al l� Jeff Bowman December d, 2012 Page 2 of 2 Some of the changes Include: • Part IL • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections B, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C: The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections B, C: The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely,/ for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030543 STORM WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Unison Engine Components Inc is hereby authorized to discharge stormwater from a facility located at: Unison Engine Components Inc 401 Sweeten Creek Industrial Park Asheville Buncombe County to receiving waters designated as Sweeten Creek (Busbee Reservoir), a class C waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, I11, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 41h day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission 10/18/2010 moN 13:22 FXX (2002/003 Michael F. Gastey, Covemor e4 Witliarn G- Ross Jr., Sccromq• North Carolina Deptnment of FnvirOnment and Natural Resources Alan W. Klimek, P.E. Director Division or Water Quality SURFACE WATER PROTECTION SECTION PERMIT NAMEIOWNERSHIP CHANGE FORM I. Please enter the permit number for which the change is requested. NPDES Pet'tnit (or) Certificate of Covcrage C c) fs Nn C G [I. Permit status prier to status change. a. Pennit issued to (company name): (P Y P flYY�Y1fNtP VA S b. Person Jegaily responsible for pemiit: Willi P_ �Y11P h Q e Fist ! Nif r Last 7 $� Y\ CT4 � 4t, .\flt, Permit Horde; �s�e. » Ciry 5 shone ^ c. Facility name (discharge): 7 Ad. � lf, AS /0 /0 2 I �Q, e. Facility contact p plea 0( III. Please provide the b a. Request for chary, nod7 y ,City State Zip 1 n: l i SCE 0 First i MI r Last Phone !'stowing r rite requested change (revised permit), is a res t of: 5 Change in ownership of the facility efacility or o+vner ifOther a e explain: h i�+ r ermi, tss d to (comps ' rttrnc) C. Person lega y responsibl for pert First I Ott r W {� c. ,_ fide Q� I S-L ']. D y Penrtit Horde: Mailing Address ... r achy ,/ State �'P'xFf�r-ey.�7Uwr5Y..z�e.U.t`1156s-ec,.� r'hon G e E-mail Addrew �d. Facility name (dischar �1I e. Facility address: Mcitcss cry - state zip t I l f. Facility contact pea'son, �( 1 First MI- '/ Last Phwie E-mail Address ��-�r-e.� . �c�v�►�x�� L�1'��ts�,� c . care-1 Revised 712001 © AD 111 10/18/2010 MON 13: 23 FAX am 0003/003 AIT NANIE/UWNLRSHIP CBAA1(xl FO M Zof2 V. Permit contact information: (ifdifferent from the person legally responsible for the permit) Permit contact: SQr First r Nil l Lasi Mailing Address City State Zip ( ) Phone J E-mail Addt= V. Will the permitted facility continue to conduct the same Industrial activities conducted prior to this ownership or name change? G/ Yes No (p)ease explain) V1. Hcquired Items: THIS APPLICATION WILL BE RETURNED UNPROCESSF,D IFITEMSARE XOMPLETE OR MISSING. his completed application is required for both name change and/or ownership change requests. 'regal documentation ot'the transfer of ownership (such as relevant pages of a contract deed, or a bill ...................................................................................................... The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request, For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to omw nvhip change): 1, LQ kVv 0. attest that this application for a narne/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will b • turned as 'sncompi te. Sibma[wc w APJ'I. 'I�Tf ICATIUN: - '1, �l i My, I AU —, attest that this application for a namelownership change has been reviewed and s accurate and complete to the best of my knowledge. I understand that if all required pans of this application are not completed and that if all required supporting information is not included, this application packag will be returned as incomplete, �oC b J gnahus are Re.ised 7r2005 THE COMPLETT A1'PI,ICATIO\ PACKAGE TO: Division of Water Quality Surface Water Protection Section 1617 Mail Service Center Raleigh, North Carolina 27699.1617 Stag of De1awaro - �ctaxy of State Division of CozWrations :..._._..... r_._ -D453i7ered-.09.26 PM I0'1221=07� FLEA 09:26 PM 1012212007 SRV 071141710 - 0913366 FILE STATE OF DEL.AWARE CERTIFICATE OF AMENDMENT OF CERTIFICATE OF INCORPORATION Smiths Aerospace Components, Inc. The corporation organized and existing under and by the virtue of the General Corporat cn Low of the State of Detawore does hereby certify. FIRST; That the Board of Directors of SMITHS AEROSPACE COMPONENTS, fNC., executed a unanimous board consent to change the company name, and therefore wish to amend the Ceriffcate of Incorporation in accordance with Section 242 of the General Corporation Low of the State of Delaware. SECOND: That�he sole shareholder, Smiths Aerospace Group Ltd., duly executed a shareholder consent to approve the change to the company name. RESOLVED, that the Amended and Restated CertTcote of Incorporation filed July 27, 2004. be amendedjp change the company name to. Unison Engine Components Inc, i RESOLVED, that the effective date of the name change is to be November 4, 2007 at 12.01 a.m. IN WITNESS WHEREOF, said corporation has caused this certificate to be signed this 22nd day of October. 2007. Au facer Title;—Secretury Name:.Mark Nogueira Print or Type i f _ , Delaware ?he first State PAGE I I, HARRIET SMITH WINDSOR, SECRETARY OF STATE OF THE STATE OF DELAWARE, DO HEREBY CERTIFY THE ATTACHED IS A TRUE AND CORRECT COPY OF THE CERTIFICATE OF AMENDMENT OF ''SMITHS AEROSPACE COMPONENTS, INC_", CHANGING ITS NAME FROM "SMITHS AEROSPACE COWONENTS, INC." TO "UNISON ENGINE COMPONENTS INC.", FILED IN THIS OFFICE ON THE TWENTY-SECOND DAY OF OCTOBER, A-D_ 2007, AT 9:26 O'CLOCK P.M. A FILED COPY OF THIS CERTIFICATE HAS BEEN FORWARDED TO THE NEW CASTLE COUNTY RECORDER OF DEEDS. AND I DO HEREBY FURTHER CERTIFY THAT THE EFFECTIVE DATE OF THE AFORESAID CERTIFICATE OF AMENDMENT IS THE FOURTH DAY OF NOVEMBER, A.D. 2007, AT 12:01 O'CLOCK A.M. 0913388 8100 071141710 Harriet Smith wndsor, Secretary of State AUTHENTICATION: 6095732 DATE: 10-23-07 Mr. Z.W. Michaely Smiths Aerospace Components 401 Sweeten Creek Industrial Park Asheville, NC 28803 Dear Mr. Michaely: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alari w.�Klime �P-E. Director LDivisionlgf 1yJ8ter Quality FR 1 November 10, 2005OV 20�5 IIJJ WATER UAI � Cy SECTION AFuE�'IL LE f3EGlONAt- O+-FiC Subject: General Permit No. NCG030000 Smiths Aerospace Components COC No. NCG030543 Buncombe County In accordance with your application for a discharge permit received on September 15, 2005, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required If you have any questions concerning this permit, please contact Bethany Georgoulias at telephone number (919) 733-5083 ext. 529. Sincerely, ORIGINAL SIGNED BY BRADLEY SENNETT Alan W. Klimek, P.E. cc: Asheville Regional Office Central Files Stormwater Permitting Unit Files NoiihCarohna �Natrrrally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N. Salisbury St, Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal OpportuniYAffirmalive Action Employer — 50% Recycledl10% Posi Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030543 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Smiths Aerospace Components is hereby authorized to discharge storrnwater from a facility located at Smiths Aerospace Components —Asheville 401 Sweeten Creek Industrial Park Asheville, NC Buncombe County to receiving waters designated as Sweeten Creek, a class C water in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, H, III, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective November 10, 2005. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day November 10, 2005. ORIGINAL S;GfVED 8Y BRADI.Ey BENNE7T for Alan W. Klimek, P.E., Director Division of Water Quality By the Authority of the Environmental Management Commission LOCATION MAP: - 7 "A Fi 'itir r P k i J,"o 0 • Skil x: -1 psw U Ell Smiths Aerospace Components --Asheville id 11 3!� A U 4 7 f Latitude. 353252" Longitude: 82'31'7" NCG030543 Facility Ae rospace erospace County: Buncombe-, NC SmithsLocation Stream Class: C Components —Asheville Receiving Stream: Sweeten Creek Subbasin: 04-03-02 (French Broad River Basin) avott/i TeAtfulovi NCG030543 October 24, 2005 B. Georgoulias Smiths Aerospace Components rev. 11 / 10/05 Summary This facility submitted a Notice of Intent to be covered under General Permit NCCT030000 (Metal Fabrication). The stormwater discharge drains to Sweeten Creek, a C stream in the French Broad River Basin. This facility is located. in Buncombe County, handled by the Asheville Regional Office. Application review a) The permit application has been signed and sufficiently completed. Yes. b) The SIC code accurately describes this facility's activities and is covered by this general permit. Yes. SIC: 3724 (Aircraft Engines and Engine Parts). Facility machines aero- engine components. c) Does this facility have other permits? No. d) Hazardous Waste Activities? Yes. Applicant indicated this is a large quantity generator of hazardous waste. Per company contact (Z. W. Michaely) on 10/25/05: Store used coolants in a 3,000 gallon capacity liquid storage tank which is covered and has secondary containment (concrete barrier). Disposal shipments are monthly. e) Regional Office input requested: 10/24/2005 (via e-mail to J. Reid) RO Approval received: I 1 / 10/05 (attached) g) Application approved? Yes. Phone Logs Phoned company contact (Z_W. Michaely, 828.274.4540) on 10/24/05 re: haz waste. See attached e-mail correspondence. Re: NO! from Smiths Aerospace Components - NCG030543 Subject: Re: NOI from Smiths Aerospace Components - NCG030543 From: Jim Reid <Jim.Reid@ ncmail.net> Date: Wed, 09 Nov 2005 13:03.19 -0500 To: Bethany Georgoulias<bethany.georgoulias@ncmail.net>, Jim Reid <Jim.Reid@ncmail.net> Bethany, ARO staff have no knowledge of the facility. At the company's location, staff anticipate that if problems existed, someone would have contacted this office. Absent complaints, ARO does not suspect any adverse impacts to WQ from the operation. Therefore, this office's recommendation is; ISSUE C-O-C. Jim Reid Bethany Georgoulias wrote: Hi, Jim, I just wanted to check on the status of this General Permit NOI request... I'll be out much of tomorrow, and after conducting the Stormwater Training next week I'll be out the rest of that week as well. If it's okay to proceed, I can issue the COC before I leave this week. If we should hold it for any reason, let me know. I've also attached company contact Willie Michaely's response to my questions at the end of this message. I might have neglected to forward you that earlier. Thanks, BG Bethany Georgoulias Environmental -Engineer NC DENR DWQ Stormwater Permitting Unit (919) 733-5083, ext. 529 bethany.Eorgouhas @ncmai I .net Bethany Georgoulias wrote: Hi Jim, We received an NOI from Smiths Aerospace Components in Asheville for coverage under the Stormwater General Permit for Metal Fabrication (NOI No. NCG030543). A copy of the NOI is attached. This facility machines aero-engine parts and is a large quantity generator of hazardous waste. The application indicates used machining coolants and oils are stored in a containment tank on 1 of 3 11/9/2005 4:27 PM Re: N01 from Smiths Aerospace Components - NCG030543 site, and that disposal shipments occur monthly. I've left a message with the company contact to follow up on the site's haz. waste storage arrangement & capacity and will let you know if there is additional information, but it doesn't appear to be a problem. Discharge is to Sweeten Creek, class C waters. Does the Asheville Regional Office have any concerns about issuing a COC for this facility? Thanks, BG Willie Michaely wrote: 1) the tank in question has a 3,000 gal capacity and it is the only one we have for liquid waste disposal accumulation. 2) the tank is covered and has a secondary containment (concrete barrier) enclosure. 3) no spills, releases or NOV recorded during the last 3 years. I trust this clarifies the issues at hand. please feel free to contact me should any additional info be required. Z. W. Michaely Technical Director, SAC - Asheville Park Asheville, NC 28803 tel. 828 274.4540 x.2237 fax 828 274.9387 401 Sweeten Creek Industrial -----Original Message ----- From: Bethany Georgoulias maiIto: bethan .geor oulias@ncmail.net] Sent: Tuesday, October 25, 2005 8.00 AM To: Willie Michaely Subject: Stormwater Permit Application - NOI No. NCG030543 Mr. Michaely: Thank you for your telephone message. As part of the review for the stormwater general permit application, I just wanted to follow up with you on some details of the hazardous waste storage at this facility: The application indicated that used coolants and oils are stored in a containment tank on the back lot. What is the capacity of this tank, and is this the only storage tank for hazardous waste on site? Is there secondary containment provided for this tank, and/or is it covered or enclosed in a building? 2 of 3 1119/2005 4:27 PM Re: NOl from Smiths Aerospace Components - NCG030543 Also, have there been any spills or releases of hazardous waste al this site in the past three years, or any Notices of Violation (NOVs)? Thanks, Jim Reid - Jim.Reid@ncmail.net North Carolina Dept_ of Environment and Natural Resources Asheville Regional office Division of Water Quality - Water Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Jim Reid <Jim.Reid@ncmail.neta NC DENR - Asheville Regional Office Division of Water Quality - Water Quality Section 3 of 3 11/9/2005 4:271 Kucken, Darlene From: Stepp, Jonathan Sent: Tuesday, November 05, 2013 8:00 AM To: andy@blecop.com Cc: Herbert, Laura C; Kucken, Darlene Subject: FW: Unison Tiered Response Attachments: NCG030000.pdf, 08292013101929-D00082913.pdf Good Morning Andy, Please see the correspondence between Jennifer Rendon and I below. I spoke with Jennifer after receiving the results from your investigation and summarized our conversation in the e-mail. I will call before I head out this morning. Best Regards, Jonathan Jonathan Stepp—Jonathan.Stepp@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. From: Stepp, Jonathan Sent: Thursday, August 29, 2013 2:41 PM To: 'Jennifer. Rendon@UnisonEC.com'; 'Jeffrey. Bowman@UnisonEC.com' Subject: FW: Unison Tiered Response Sorry forgot the attachments. Jonathan Stepp—Jonathan.Stepp@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties, .• From: Stepp, Jonathan Sent: Thursday, August 29, 2013 2:39 PM To: 'Jennifer.Rendon@UnisonEC.com'; 'Jeffrey.Bowman@UnisonEC.com' Subject: Unison Tiered Response Ms. Rendon, As requested, I am sending this e-mail to summarize the details of our phone conversation on 8-27-2013. I called your office in response to e-mail correspondence between Tim Fox and Andy Alexander of Brunnell- Lammons Engineering, Inc. (As a reminder I am the new stormwater contact for the NCDENR Asheville Regional Office). Mr. Alexander has requested a temporary suspension from the tiered response actions detailed in your general permit, NCG030000, based on an investigation Brunnell-Lammons Engineering, Inc. conducted this past spring (see attached discussion and results). I have advised Unison to continue the tiered response as detailed in the permit (our Central Office is working on a modification to how we implement the permit conditions). It would help us with that task if you would call the Central Office, (919) 807-6376, and make your comments to them as well. I want to stress that as long as Unison follows the permit specified tiered response they will remain in compliance with the permit even if Unison continues to exceed benchmark values for copper and zinc. A benchmark exceedance alone does not trigger a violation or enforcement action. Permit text: The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are notpermit limits but should be used as guidelines for the implementation of the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install storm water Best Management Practices (BMPs) in a tiered program. See below the descriptions of Tier One, Tier Two, and Tier Three response actions. In the event that DWQ releases the permittee from continued monthly monitoring under Tier Three, DWQ's release letter remains in effect through the subsequent reissuance of this permit, unless the release letter provides for other conditions or duration. Unison should include the investigation referenced above as part of their tiered response actions. Additionally, Unison should document any other actions they have taken to address zinc and copper benchmark exceedances and document these actions in their Stormwater Pollution Prevention Plan (SPPP). We are aware that copper and zinc benchmark values are an issue of concern within the metal fabrication industry. We remain in contact with our Central Office to communicate the efforts and difficulties the industry is having trying to meet these benchmarks. We will communicate any guidance or changes that address these benchmarks as it becomes available. I want to thank Jeff Bowman, Jennifer Rendon, Brunnell-Lammons Engineering, inc. and Unison for their proactive approach and diligence in trying to address benchmark exceedances at the Unison facility in Asheville, NC. Don't hesitate to contact me directly at 828-296-4616 if I can be of further assistance. Sincerely, Jonathan Jonathan Stepp—Jonathan.Stepp@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. Stepp, Jonathan From: Stepp, Jonathan Sent: Thursday, August 29, 2013 10:57 AM To: Jennifer. rendon@unisonec.com'; jeffrey.bowman@unisonec.com' Cc: 'andy@blecop.com'; Herbert, Laura C; Fox, Tim; Georgoulias, Bethany; Pickle, Ken Subject: RE: Unison Tiered Response Attachments: 08292013101929-00C082913.pdf Sorry forgot an attachment. Jonathan Stepp—Jonathan.Stepp@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. From: Stepp, Jonathan Sent: Thursday, August 29, 2013 10:55 AM To: 'jennifer.rendon@unisonec.com'; 'jeffrey.bowman@unisonec.com' Cc: 'andy@blecop.com'; Herbert, Laura C; Fox, Tim; Georgoulias, Bethany; Pickle, Ken Subject: Unison Tiered Response Ms. Rendon, As requested, I am sending this e-mail to summarize the details of our phone conversation on 8-27-2013. I called your office in response to e-mail correspondence between Tim Fox and Andy Alexander of Brunnell- Lammons Engineering, Inc. (As a reminder I am the new stormwater contact for the NCDENR Asheville Regional Office). Mr. Alexander has requested a temporary suspension from the tiered response actions detailed in your general permit, NCG030000, based on an investigation Brunnell-Lammons Engineering, Inc. conducted this past spring (see attached discussion and results). I have advised Unison to continue the tiered response as detailed in the permit (our Central Office is working on a modification to how we implement the permit conditions). It would help us with that task if you would call the Central Office, (919) 807-6376, and make your comments to them as well. I want to stress that as long as Unison follows the permit specified tiered response they will remain in compliance with the permit even if Unison continues to exceed benchmark values for copper and zinc. A benchmark exceedance alone does not trigger a violation or enforcement action. Permit text: The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark i values in Table 3 are not permit limits but should be used as guidelines for the implementation of the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Monagement Practices (BMPs) in a tiered program. See below the descriptions of Tier One, Tier Two, and Tier Three response actions. In the event that DWQ releases the permittee from continued monthly monitoring under Tier Three, DWQ's release letter remains in effect through the subsequent reissuance of this permit, unless the release letter provides for other conditions or duration. Unison should include the investigation referenced above as part of their tiered response actions. Additionally, Unison should document any other actions they have taken to address zinc and copper benchmark exceedances and document these actions in their Stormwater Pollution Prevention Plan (SPPP). We are aware that copper and zinc benchmark values are an issue of concern within the metal fabrication industry. We remain in contact with our Central Office to communicate the efforts and difficulties the industry is having trying to meet these benchmarks. We will communicate any guidance or changes that address these benchmarks as it becomes available. I want to thank Jeff Bowman, Jennifer Rendon, Brun nell-Lammons Engineering, inc. and Unison for their proactive approach and diligence in trying to address benchmark exceedances at the Unison facility in Asheville, NC. Don't hesitate to contact me directly at 828-296-4616 if I can be of further assistance. Sincerely, Jonathan Jonathan Stepp — Jonathan.Stepp@ncdenr.Rov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. Phone conversation with Jennifer Rendon of Unison 08/27/2013 I spoke with Ms. Rendon of Unison about their ongoing efforts to address benchmark exceedances for zinc and copper at the facility. Ms. Rendon explained that they have continued to work with Andy Alexander of Brunnell-Lammons Engineering, Inc. to address the exceedances. Mr. Alexander has submitted a study to try and explain the source of the zinc and copper at the facility. I advised Ms. Rendon to include the study as part of their tier one response. The plan form Mr. Alexander also asks the state to relieve Unison from their tiered response actions; I advised Ms. Rendon that they should continue with the tiered response for the time being. I went on to explain that as long as Unison continues to follow the tiered response as defined in the permit that they would remain in compliance even if they continue to have benchmark exceedances. Ms. Rendon explained that they would; however, she requested that I send her an email explaining our phone conversation so that she could pass it along to their corporate leadership at General Electric. The e-mail was drafted and sent on 8/29/2013. f`. Pat McCrory Governor June 10, 2013 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Tom Reeder Director Mr. Jeff Bowan EH & S and Facilities Manager Unison Engine Components 401 Sweeten Creek Industrial Park Asheville, NC 28803 SUBJECT: Industrial Stormwater Response Unison Engine Components Inc. Permit # NCG030543 Buncombe County Dear Mr. Bowan, John E. Skvarta,lll Secretary I would like to thank Unison Engine Components (Unison) and Bunnell-Lammons Engineering, Inc. (BLE) for being pro -active in their efforts toward meeting NPDES Stormwater General Permit NCG030000 requirements. Additionally, I wanted to clarify any questions or concerns related to the tiered response as described in your permit. The approach we feel is appropriate for your situation would include: I. The permittee must report the results from each sample taken within the monitoring period. However, for purposes of benchmark comparison and Tiered response actions, the permittee shall use the analytical results from the first sample with valid results within the monitoring period. Your first analytical results from the sampling period (January 1, 2013 through June 30, 2013) would be considered for tiered response action and permit requirements. The Unison Facility does not need to prepare a Tier II response for the April 2013 sampling event results. Please prepare a Tier I response for those data. Additional sampling in the same sampling period will not influence tiered response. If the permitee monitors any pollutant more frequently than required by the general permit using test procedures approved under 40 CFR Part 136 and at a sampling location specified in this general permit or other appropriate instrument governing the discharge, the results of such monitoring shall be included in the data submitted on the DMR. SURFACE WATER PROTECTION SECTION — ASHEVILLE REGIONAL OFFICE One Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 North Carolina Phone: 828-296A5001 FAX: 828-299-7043 Internet: www.ncwaterquality.org naturally An Equal Opportunity 1 Aff+rmaF ve Arbon Employer Unison Engine Components June 10, 2013 Page 2 of 2 1 Continue to send all analytical results to our Central office as per your permit requirements. You may continue to send a copy of your additional sampling results to the regional office for evaluation. We appreciate the chance to review and evaluate your past analytical sampling results. As discussed we are still gathering data from other facilities that are also exceeding zinc and copper benchmarks. I hope this letter will clear up any concerns regarding tiered response at this time. Should you have any additional questions regarding these matters, please contact Tim Fox at (828) 296-4664 or tim.fox na ncderingov Sincere y, , Tim Fox, Environmental Specialist Surface Water Protection Asheville Regional Office cc: Andrew W. Alexander, A.G. Bunnell-Lammons Engineering, Inc. ARO pile Copy S:ISWPIBuncombe\Stormwater\NCG03 Metal Fabrication\Unison\LTR.Unison6-07-13.doc C,F WA7-ER Michael F. Easley, Governor •O� QG "� / William G. Ross Jr., Secretary , North Carolina Department of Environment and Natural Resources =� Alan W. Klimek, P.E. Director 0 C Division of Water Quality Asheville Regional Office SURFACE WATER PROTECTION IFIL- March 21, 2007 Mr. Willie Michaely Smiths Aerospace Components 401 Sweeten Creek Industrial Park Asheville, NC 28803 SUBJECT: Compliance Evaluation Inspection Smiths Aerospace Components Permit Number NCG030543 Buncombe County Dear Mr. Michaely: Enclosed please find a copy of the Compliance Evaluation Inspection report from the inspection conducted on March 20, 2007. The facility at 401 Sweeten Creek Industrial Park is Compliant with all terms and conditions of its general stormwater permit NCG030543. Enclosed is also a name/ownership change form for your use once the acquisition by GE is complete. Our stormwater permits are related to geographic locations; thus this form is required to simply transfer permit conditions and responsibility to the appropriate party. I appreciate your time and assistance during the site inspection and file review. If you should have any questions regarding your permit or compliance with its requirements, please feet free to contact me at 828/296-4664. . Sincerely, Laurie L. Mooread Enclosures Environmental Specialist cc: Jennifer Rendon, Jeff Bowman — Smiths Aerospace Components Danny Smith — NPS ACO Unit ARO Files - Central Files One No hCarolina ;Vaturully 2090 US Hwy 70, Swannanoa, NC 28778 828-296-4500 Fax 828-299-7043 Customer Service 877-623-6748 Permit: NCG030543 SOC: County: Buncombe Region: Asheville Compliance Inspection Report Effective: 11/10/05 Expiration: 08/31/07 Owner: Smiths Aerospace Components -Asheville Effective: Expiration: Facility: Smiths Aerospace Components -Asheville 401 Sweeten Creek Industrial Park Contact Person: Z W Michaely Directions to Facility: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Asheville NC 28803 Phone: 828-274-4540 Certification: Phone: Inspection Date: 03/20/2007 Entry Time: 10:30 AM Exit Time: 11:50 AM Primary Inspector: Laurie L Moorhead /0-7 Phone: 828-295-4500 Ext.4664 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Stormwater Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: 0 Compliant Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG030543 Owner • Facility: Smiths Aerospace Components -Asheville Inspection Date: 03/20/2007 Inspection Type: Stormwaler Reason for Visit: Routine Inspection summary: Review of the facility's stormwater pollution prevention plan and other supporting documents as well as a site inspection were aided by Jennifer Rendon, Jeff Bowman, and Willie Michaely of Smiths Aerospace. All documents were in order and the stormwater pollution prevention plan is well created. The plan does need update to reflect recent addition of secondary containment and other planned best management practices such as mobile caps on stormdrains located in the loading dock area. It is also suggested that employee training records and monitoring records be kept with the plan to facilitate ease of review for future inspections. Monitoring records were available and recent training by the consultant hired to prepare the stormwater pollution prevention plan appears to have prepared responsible staff for visual monitoring requirements. !Vote that visual monitoring may be conducted during any rainfall event, but that analytical monitoring must be conducted during a representative event as defined in the permit (0.9 inches). Also note that Smiths Aerospace is about to be purchased by GE. A name/ownership change form will be required to be submitted for this site (attached). The facility is well -managed and staff have a proactive approach to eliminating stormwater contamination. Good team work. Page: 2 Permit: NCG030543 owner - Facility: Smiths Aerospace Components -Asheville Inspection Date: 0312012007 Inspection Type: Stofmwatef Reason for Visit: Routine Stormwater Pailutiont Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? IN n Q C3 # Does the Plan include a General Location (USGS) map? a ❑ 0 n # Does the Plan include a "Narrative Description of Practices"? ® n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ®� ❑ n # Does the Plan include a list of significant spills occurring during the past 3 years? ® ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® Cl n ❑ # Does the facility provide all necessary secondary containment? — ®❑ ❑ n # Does the Plan include a BMP summary? 0 0 Q ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)7 M Q ❑ Cl # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? m n n n # Does the Plan include a list of Responsible Party(s)? ® n n n # Is the Plan reviewed and updated annually? n ® ❑ Q # Does the Plan include a Stormwater Facility Inspection Program? ®❑ ❑ Cl Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: Note that the plan should be revised to reflect new secondary containment of oils. Once storm drain caps are installed, the procedure for use should also be added to the plan. Otherwise the plan documents activities exactly as required in the permit. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Ir9 ❑ ❑ ❑ Comment: The facility has only recently initiated monitoring as it hired an environmental consultant to assist with the writing of the site's stormwater pollution prevention plan and implementation. However, staff are in place to implement all future monitoring, and procedures were reviewed at the time of inspection. Note that visual samples may be observed during any rainfall event during the spring and fall as defined in the permit. Analytical Monitoring TBS NO NA ryr- Has the facility conducted its Analytical monitoring? ■ ❑ n 0 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ® n Comment: No vehicle maintenance occurs at this site. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ Page: 3 — -, Permit: NCG030543 Owner - Facility: Smiths Aerospace Components -Asheville Inspection Date: 03/20/2007 Inspection Type: Stormwater Reason for Visit: Routine # Were all outfalls observed during the inspection? No 00 # If the facility has representative outfali status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Page: 4 F WA7TF 0 9QG Michael F. Easley, Governor y William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 'C Alan W. Klimek, P.E. Director qo Division of Water Quality March 31, 2006 Smiths Aerospace Components -Asheville 401 Sweeten Creek Industrial Park Asheville, NC 28803 Subject: General Stormwater Permit Inspections Smiths Aerospace Components -Asheville Permit No. NCG030543 Buncombe County Dear Sir or Madam: Your facility holds a general permit from the North Carolina Division of Water Quality to discharge stormwater associated with industrial activities performed at your facility. Please be advised that the Asheville Regional Office will be performing NPDES stormwater inspections sometime in the near firture. If this office has not previously inspected your facility, you should be prepared to demonstrate compliance with all terms and conditions included in the permit. Specifically, we will be evaluating the following: your stormwater pollution prevention plan, stormwater outfall locations, qualitative and analytical monitoring data and any other activities required by your permit. Please note that any data reported to the State must be analyzed by a facility that has a North Carolina laboratory certification, either as a full laboratory or as a facility certified to perform on -site field testing. If you have any questions regarding the generation of your facility's data, please feel free to call Gary Francies at (828) 296-4677. Copies of the general permits and accompanying documents can be accessed from the following webpage: http://ii lviv.nctit,atergasality.vrg/su/Form.v_Doeuments.htm#storn?ii aterGP. If you have any questions, please contact me in the Asheville Regional Office at (828) 296-4500. Sincerely, Roy Davis Environmental Engineer cc: NPS Compliance & Assistance Oversight Unit SWP-Central Files ARO Files No thCarolina , VaturallIf North Carolina Division of Water Quality 2090 U.S. Hwy 70 Swannanoa, NC 28778 Phone (828) 2964500 Fax (828) 299-7043 Internet: hftp:/wm.ncwaterquality.org/ An Equal Opportunity/Affirmative Action Employer Herbert, Laura C From: Andrew W. Alexander <andya7a blecorp.com> Sent: Monday, August 26, 2013 1:38 PM To: Fox, Tim Cc: Herbert, Laura C, Stepp, Jonathan Subject: RE: General Permit NCGO30000 Benchmarks? . Tim, Thanks so much for the quick reply and explanation. I know that the corporate GE folks will be asking about this soon. As we discussed, we are pushing the 2"d semi-annual sampling as far back in the year as possible in hopes that the benchmark issues get resolved by the NCDENR. Thanks again, --Andy From: Fox, Tim [mailto:tim.fox@ncdenr.gov] Sent: Monday, August 26, 2013 11:28 AM To: Andrew W. Alexander Cc: Herbert, Laura C; Stepp; Jonathan Subject: RE: General Permit NCG030000 Benchmarks? Andy, Good to hear from you. We had some big changes here and as of August Is'The Division of Water Quality merged with The Division of Water Resources. One other change is that the industrial storm water program is now being administered by The Division of Energy, Mineral, and Land Resources (DEMLR). have communicated information regarding the Unison facility to DEMLR. I have included Laura Herbert's contact information below. Also, Jonathan Stepp, who was at the site inspection at Unison was transferred to DEMLR and is familiar with the site. His contact information is below. Laura, Jonathan, and I spoke with our Central office last week concerning facilities exceeding the copper and zinc benchmarks. We have all been working together during this transition period. We understand that the Unison facility would like some guidance on how to proceed and to answer questions regarding potential regulatory relief. I will speak again with Laura and Jonathan and help get your questions answered. Thanks for your understanding during this transition period. One of us will get ahold of you in the near future. 1 .01 ,i Thanks, Tim Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel:828-296-4500 Fax:828-299-7043 http://portal.ncdenr.org/web/Ir Jonathan Stepp—Jonathan.Stepp@ncdenr.Rov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Energy, Mineral, and Land Resources - Land Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Tim Fox - tim.fox@ncdenr.Rov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources — Water Quality Programs 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records law and may be disclosed to third parties. From: Andrew W. Alexander [mailto:and blecor ,com] Sent: Monday, August 26, 2013 10:55 AM To: Fox, Tim Cc: Rendon, Jennifer (UnisonEC); Bowman, Jeffrey (UnisonEC) Subject: General Permit NCG030000 Benchmarks? Hello Tim, Hope you are doing well. We (BLE and Unison) were curious about the status of the NCDENR review of the benchmarks for the subject permit. Would you please let us know where the documents we submitted currently reside, who and NCDENR is reviewing them, and the status of our request for regulatory relief from the current benchmarks? --Andy F] 0 - '1) Andrew W. Alexander, P-G., RSM Bunnell-Lammons Engineering, Inc. (BLE1. 6004 Ponders Court Greenville, South Carolina 29615 (864) 288-1265 (voice)'m (864) 288-4430 (fax) (864) 201-5530 (cell) andy(o-)blecorp.com www,blecorp.com SO, This electronic transmission contains information from the consulting firm of Bunnell-Lammons Engineering, Inc., that may be confidential or privileged. The information is intended solely for the recipient. Use by a hy.other party is not authorized. If you are not the intended recipient, be aware that any disclosure, copying, distribution, or use of the contents of this information is prohibited, if you received this transmission in error, please notify us immediately by telephone (864-288-1265) or by email (info@blecorp.com). Thank you for your cooperation. 3 0 1 �m-z1(-02)5 -orw .~-3 ID -�17 s m S-�t Permit: NCGO30543 Owner - Facility: Unison Engine components Inc Inspection Date: 02/14/2013 Inspection Type: Technical Assistance Stormwater Pollution Prevention Plan Reason for Visit: Routine Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? n n n ■ # Does the Plan include a General Location (USGS) map? Q Q ❑ ■ # Does the Plan include a "Narrative Description of Practices"? n n n ■ # Does the Plan include a detailed site map including outfall locations and drainage areas? El 0 0 ■ # Does the Plan include a list of significant spills occurring during the past 3 years? n n n ■ # Has the facility evaluated feasible alternatives to current practices? n n n ■ # Does the facility provide all necessary secondary containment? n n n ■ # Does the Plan include a BMP summary? 0 0 Q ■ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n in ■ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 0 ■ # Does the facility provide and document Employee Training? n n n ■ # Does the Flan include a list of Responsible Party(s)? n n n p # Is the Plan reviewed and updated annually? ❑ ❑ ❑ ■ # Does the Plan include a Stormwater Facility Inspection Program? n n n ■ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ 0 ■ Comment: This inspection was to help determine and evaluate cause of zinc and copper bench mark exceedance. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ D Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Outfalls 001, 003, 004, 005 and 006 (Exceedance of Zinc and Copper). Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Yes No NA NE ■nnn nn■n Yes No NA NE nnn■ ■nnn wn0D 0D mD Page: 3 Permit: NCG030543 Owner • Facility: Unison Engine Components Inc Inspection Date: 0211412013 Inspection Type: Technical Assistance Reason for Visit: Routine Comment: We toured the facility and the site is being maintainer) well. The only comment would include continuing to monitor and maintain the gravel pad appropriately at the back of the facility which receives high truck volume. Page: 4 Compliance Inspection Report Permit: NCGO30543 Effective: 11/01112 Expiration: 10/31/17 SOC: Effective: Expiration: County: Buncombe Region: Asheville Contact Person: Z W Michaely Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): On -site representative Related Permits: Andy Alexander Title: Certification: Owner: Unison Engine Components Inc Facility: Unison Engine Components Inc 401 Sweeten Creek Industrial Park Asheville NC 28803 Phone: 828-274-4540 Phone: Phone: 864-288-1265 Inspection Date: 02/14/2013 EntryTime: 10:00 AM Exit Time: 11:30 AM Primary Inspector: Timothy R Fox Phone: 828-296-4500 Secondary Inspector(s): Jonathan Stepp Phone: Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Q Compliant 0 Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NCGO30543 Owner - Facility: Unison Engine Components Inc Inspection Date: 0211412013 Inspection Type: Technical Assistance Reason for Visit: Routine Inspection Summary: Tim Fox and Jonathan Stepp with DENR DWO met with Andy Alexander P.G. and Ben Nisbeth with Bunnell-Lammons Engineering, Inc. (BLE) and Jeff Bowman (Unison EH&S and Facilities Manager) and Jennifer Rendon (Unison Environmental Health & Safety Coordinator). The purpose of this site meeting was to discuss, em solve, and evaluate recent bench mark exceedance of.copper and zinc at the facility. We toured the facility and looked at all outfalls. Important points to note: Outfalls 1,3,4,5,and 6 had exceedance of Zinc and Copper. One could speculate that if bench mark exceedance occurred it would most likely occur at outfalls 1 & 4 due to the location of the material stored ors -site. The site is being well maintained and the facility has begun evaluating any possible sources of copper and zinc_ Appropriate paperwork was provided to regional office. Since drainage areas contain large amounts of pavement it could be assumed that a potential non -point source of zinc and copper contamination could be coming from parking lot sediments. There are also galvanized culverts at outfalls. Items that were discussed during the visit included, Re -testing for Copper and Zinc. Seperating coloidal material or filtering samples. Split sampling Sampling other parking lots (nearby or other locations to compare values). Unison and Environmental Representatives are dedicated to being pro -active in problem solving and addressing any concerns at their facility. The Asheville Regional Office will review materials, continue to assist and re -visit the site as needed. Page: 2 Fox, Tim From: Andrew W_ Alexander (andy@blecorp_coml Sent: Friday, January 18, 2013 9:42 AM To: Fox, Tire cc: Davidson, Landon Subject: FW: General stormwater permit Hello Tim, talked to my client about this and we would like to get your help with this issue. Do you think you would be able to conduct a site visit somewhere around the first week of February? Please email or call me to discuss. Thanks, --Andy Andrew W. Alexander, P.G., RSM Bunnell-Lammons Engineering, Inc. (BLE) 6004 Ponders Court Greenville, South Carolina 29615 (864) 288-1265 (voice) (864) 288-4430 (fax) (864) 201-5530 (cell) andy cx_blecorp.com www.blecorp.com �- . . . . . . . ..... ....... ....... ......... ....... .......... ........ ....... .......... This electronic transmission contains information from the consulting firm of Bunnell-Lammons Engineering, Inc., that may be confidential or privileged. The information is intended solely for the recipient. Use by any other party is not authorized. If you are not the intended recipient, be aware that any disclosure, copying, distribution, or use of the contents of this information is prohibited. If you received this transmission in error, please notify us immediately by telephone (864-288-1265) or by email (infoco),blecoro.cum ). Thank you for your cooperation. From: Davidson, Landon [maiIto: landon.davidson (�i ncdenr.gov] Sent: Monday, January 14, 2013 4:17 PM To: Andrew W. Alexander Subject: General stormwater permit Andy - I've checked around and the only response has been that they'd (Surface Water Protection SWP) would be happy to do a site visit to assist with the issue of exceeding benchmarks. Your contact in SWP would be Tim Fox (828.296.4664). If you approach him with the issue, I think you'll find him helpful and interesting in resolving the issue. You can really gain a lot for your client by addressing this topic early and directly with local staff person. Hope this helps. Landon G. Landon Davidson, P.G. NODE€dR.-Rivisiono€Water Quatity �{ Aquifer Protection Section.. - RegionaJAPS Supervisor Asheville Regional O ite 3D90 US. q": e0 Swart n 2no ;k F C. 2877 ph.: 029-- Z9�4SM Faxi FOP, web page: http:Uportal.ncdenr.org/web/wqZaps Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality September 7, 2005 Mr. Z. W. Michaely Smiths Aeropace Components -Asheville 401 Sweeten Creek Industrial Park Asheville, NC 28803 Subject: New Permit Request Permit NCG030000 Your request for a new NPDES General Permit received on 0205, is being returned due - to: Check for $80.00 made payable to NCDENR is missing. ❑ Application is incomplete. ❑ Application package is missing the supporting documents. ❑ Missing copy of county map or USGS quad sheet with facility clearly marked. ❑ Other `;l o k_ Sty,-h a �t "na ,— cLC'Irr �t a ; 1r Please return the information so we can continue processing your request. If you have any additional questions, please contact Bradley Bennett at (919) 733-5083 extension 525, or Sarah Young at (919) 733-5083 extension 502. DWQ Stormwater Permitting Uni North Carolina �/VClfTlt'fl��lf North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1017 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27004 FAX (919) 733-2496 1-877-623-6748 An Equal opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper p�pF W ATFyQG Michael F. Easley, Govemor William G. Ross Jr., Secretary 7 North Carolina Department of Environment and Natural Resources jib, a a Alan W. Klimek, P.E. Director Division of Water Quality August 23, 2005 Smiths Aerospace Components -Asheville 401 Sweeten Creek Industrial Park Asheville, NC 28803 Subject: New Permit Request Permit NCG030000 Your request for a new NPDES General Permit received on �� is being returned due to: ❑ Check for $80.00 made payable to NCDENR is missing. Application is incomplete. Application package is missing the supporting documents. Missing copy of county map or USGS quad sheet with facility clearly marked. ❑ Other Please return the information so we can continue processing your request. If you have any additional questions, please contact Bradley Bennett at (919) 7S3`-5083 extension 525, or Sarah Young at (919) 733-5083 extension 502. J,t,a , *%-- DWQ Stormwater Permitting Unit I\PowrthCarolina Alaturaltif Worth Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Inlemet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-977-623-6748 An Equal opportunity/Affirmative Action Employer— 500% Recycled/10% Post Consumer Paper 's 661'Y au L rG'GI,d t2. `fiw 4 U Q� L �Z�L �-,� to u� e� s TABLI? 11 INSPECTION FORM Date; December 28 2012 Time: 09OD-1300 Inspector: Lien Nisbeth, PO Weather Conditions: Ckar/28°F-45911 Purpose, Housekeeping Waste Storage AST Storm Water Struclures Contairauent Structure Fire Prevention Equipment Spill Response Rquipment Tier One Inspection after the December 10, 2012 Sampling Event [tent Observation and/or Problems Noted CorrucOvc Action Needed PrO ud Coon dctiou Date Survey of Outfalls 001, 003, 004, 005 and 006 BLE representative performed observations described below. Refer to the attached Sf )O including the drainage areas ofeach outfall area. Monitoring Rcpoil for values of benchmark exceedence an December 10, 2012, {hrtfall 004 is lucaled Ia the southeast of Unison -Asheville and also receives discharge from rwo adjacent properties (Sunrise Sawmill, lac. & Plaslicard-Lochtech International). The discharge pipe appears to he located on the boundary hetween the sawmill and a parcel deeded to the Department of Transportation. It appears that the outfall pipe was The suspended solids are not 11,e result of scdialents released 1'mnl the Unison Duifafl 004 {F:xceedenco nfT55) reccinly cxlendcd appruxintately 15 to 20 feet and that grading had been performed As property. tJnlson to Contact Sunrise Sawmill to inform them of nur Fchniary 1, 2013 pant of the activity. It is unknown if the sail mound the pipe had been compacted. observations and lu delermime if the recent construction activity was Additionally it was noted (flat the new slope had not hccn sown with grass or vegetation performed by the Department afTJansportation or other entity, +t.* Pt z t l,•„ , �{o-Jr of any kind at the time of the inspection. The new construction is presumed to be the �� ,, ar JLYf d t , ; fr C"), source Gfthe sus nded solids. Disturbance of soils and/or a source ofsediment on Unison -Asheville property was not nbscrved during site inspection. / /"¢Y j.ag • Zadz BLE represeraative observed the drainage areas and a point source l'mr 'Zinc or Copper The detected concentrations of 7.inc and Copper are presumed to be naturally utfalls 001, D03, 004, 005, and D06 (Exccedence Could not be located. Each drainage area includes sigpilicam areas ofpaved parking. We uccurring and derived from sediments present in the parking lots. Unison to of/.inc and Copper) have assumed that these parking lots may contain de minimis amounts of sedimemts that review raw materials exposed to slornwater to determine if (hc materials February I, 20 i 3 might be et non -point sources for Zinc and Cupper. No indications of 7.inc or Capper contain Zinc or Copper and to make changes to materials storage if sources related In industrial operations were observed. warranted. UNISON R[i'FIESEN7'ATIVE5S1CiNATURti rt��+". ➢ate: __ BJ.ti Rli['R&SL'M"A't'IVE:tiS10NA'i'UR£ A7 Date: Ta61a i I of t009-62 Tier One Survey 12-29-2012.xis e