HomeMy WebLinkAbout20191578 Ver 1_BR-0011_PermitDrawings_20191107_20191115FIighway North Carolina Department of Transportation
Stormwater.
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 67011.1.1 TIP No.: BR-0011 County(ies): Cherokee Page 1 of 1
General Project Information
WBS Element:
67011.1.1 ITIP Number: BR-0011 Project Type: Bridge Replacement Date: 10/14/2019
NCDOT Contact:
Dan Duffield
Contractor I Desi ner:
Reid B. Robol - VHB
Address:
1020 Birch Ridge Drive
Room #16
Raleigh, NC 27610
Address:
940 Main Campus Drive
Suite 500
Raleigh, NC 27606
Phone:
919-707-6611
Phone:
919-754-5005
Email:
dcduffield ncdot. ov
Email:
rrobol vhb.com
City/Town:
Murphy
Count ies :
Cherokee
River Basins :
Hiwassee
CAMA County?
I No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
0.152 Miles Surrounding Land Use: I Forest, rural residential
Proposed Project
Existing Site
Project Built -Upon Area ac.
0.6 ac.
0.5 ac.
Typical Cross Section Description:
2 @ 12' lanes with 7'-11" paved shoulders (bridge) and 2 @ 12' lanes with 2' paved
shoulders and 6' grass shoulders (road).
2 @ 11' lanes with 1' paved shoulders.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 4800 Year: 2040
Existing: 4200 Year: 2018
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
TIP project BR-0011 involves the replacement of the existing NCDOT Bridge #190002 on NC 141 over Slow Creek in Cherokee County. Bridge #190002 consists of 1 @ 40'-6"
steel plank floor on I -beams with timber caps and piles. The proposed bridge consists of 1 @ 70'-24" cored slab with 4'-0" end caps with sloping spill through abutments. A
1 @60' Detour bridge will be constructed to maintain traffic during construction on the proposed bridge. Rip -rap pads will be utilized to dissipate energy and to reduce velocity at
all proposed outfalls. Runoff from the roads will be directed to vegetated roadside ditches. No deck drains are required for the proposed bridge.
Waterbody Information
Surface Water Body (1): Slow Creek
NCDWR Stream Index No.:
1-44-9
NCDWR Surface Water Classification for Water Body
Pr mary Classification:
Class C
Supplemental Classification:
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
1yes
I Deck Drains Discharge Over Buffer? N/A
Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body?
IN2
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative) I
3
E
L
T
0
m
3
0
L
0
i
0
c
E
c
0
L
c
w
U)
CL
Lu
d
U
:2 D
aL
000
M T�
N j 0
L
-Q� L
00
O
V
See Sheet t-A For Index of Sheets
See Sheet t-B For Conventional Symbols
ROW PLANS
Np.D
BEGIN TIP
PROJECT BR-0011
-L- STA.10 + 00.00
TO
BRASSTOWN
BEGIN
CONSTRUCTION
-L- STA.12 + 00.00
STATIC OF NORTH CAROI ILA
DIVISION OF HIGHWAYS
CHEROKEE COUNTY
LOCATION: BRIDGE 190002 ON NC141 OVER SLOW CREEK
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 2
BEGIN BRIDGE
—L— STA.15 + 08.70
L-
L_
7ry
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
END BRIDGE
—L— STA 15 + 81.30
c�
C \
-L-
4/5
srwra
area PNo,ecr a�anaNcs Na
seaeTrarw�
NO.
9N86T3
BR-0011
1
61'AY8 PROLN0.
P-M-NO.
DB&,W@I90N
WBS 67011.1.1
PE
WBS 67011.2.1
ROW, UTL.
END TIP
PROJECT BR-0011
-L- STA. 21 + 82.40
TO
MARBLE
END
CONSTRUCTION
-L- STA. 20 + 00.00
PERMIT DRAWING
SHEET 1 OF 7
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SURFACE WATER
®DENOTES
TEMPORARY
IMPACTS IN SURFACE WATER
®
DENOTES FILL IN
WETLAND
50' 0' 50'
GRAPHIC SCALE
25' 0' 25'
INSET GRAPHIC SCALE
Ming 9� P61V��
�1����
FARRO
SITE 2
SHEET NO.
:INEER
D FINAL
YIPLETED
RETAIN
B
SALT CURB—,
1�
N� DETAIL 1 DETAIL 3
SPECIAL LATERAL 'V' DITCH LATERAL BASE DITCH
( N.i Scale) IN— to Smle)
9 b
_ _
Narurcl F1 a• Fill Ground Z.y D ,�� 1 ht. Fill
Ground 7/ ob Slope Slope
D I o Min. D=1.0 Ff.
9 B B=2.0 N.
Min. D=1.5 Ft. b=5.0 Ft.
F— IFROM STA 15+50 TO STA 19+50 —L— LT FROM STA 12+50 TO STA 13+60 —L
s� DETAIL 2
RIP RAP AT EMBANKMENT
( Nor ro Scale)
10'mi
Ditch
Grade
GEOTEXTILE BEGIN BRIDGE
Type o1 Liner=18 TONS CL I N,Rap
FROM STA 15+35 TOi1eSTA 15+50 -L- LT _L_ STA• 1 + OS • 70
MOOG COMPONENTS GROUP INC. ETT 3 TONS RAP
CONSTR C ;�' s�
\ SY
1 GeEST TE TI
GEpTEXTILE e
� I
. 12 + 00. 0
CLAASSi RIP RAP
N DO NOT DISTURB SEWER PUMP STATION EST 2 TONS,
EST 7 SY
\GEOTEXTILE 1
SLIPLINE EXISTING 48" CMP ,
WITH 42" STEEL CASING W/ �1
BEVELEVED RING AN
I�
HEADWALL m WER P P 1 RIP RAP AT
(I1_\ )\/ S AII N
1 _ \n� _ PUE—i PUE ENP,JNDT 1 DETAIL 2T
1 CHL PUE PUE RETAIN `.
CONIC
PAVED �R
PIPES
BEGIN TIP
PRO�R—OQ11
0�� 1
ENOTES 1(.APAZ7�S
SURFACE WATER
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
® DENOTES FILL IN
WETLAND
50' 0' 50'
GRAPHIC SCALE
25' 0' 25'
INSET GRAPHIC SCALE
\ \e/CL45S.,6 RIP R� C
E T 2 TON \
91 £9t EST Y GEQTEXTILE
P?
IAARvu+ GARRETT
DB T545 PIG' 1193 I DB
B SLIDE 76
CLAUDE eb91 I
079/
o w�
�O�lr10 c��1i1 C 6Bh0 ��
•,••
{1I IIIEA
�.
d III
PE.I TT
ItfPACTS.♦:
II V I
4 nOD 1�•,
• •s
y�
I '
IA
4
Nu vrALPt r
Y_ CTA 1
R=20'
e\�� owo F GREU TLC -- \ 2 1 „W/
\ 40
-L- FILL LIFT \ 1_
D �C"
-L- FILL LIN ,� WALTER CADDIS
J
\ m
� E 3' ESCAPE TIMBE D UBL
r
MTL
N C OPY
- CLASS�N IP_ RAP ( P)
TO ELEV.623.0' m� G
ITE - C B RIP RAP
ST , T6N5--
ST 5(SY GEOTEXTIL —X-
� X X
RIDGE
/ —L— STA.I 1 + 81. `
PROJECT REFERENCE NO.
SHEET NO.
BR-00/l
4
RAN SHEET NO.
CADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
Raleigh, INC 27606
$ 20„
NA
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING
SHEET 3 OF 7
END CONSTRUCTION
—L— STA. 20 + 00.00
2S 7 B 1 ASSOCIATIONI03F PGP6 51
F F DO NOT 'DISTURB
EXISTING FENCE
v
CHARLES WHITE• ET UX L E
X
SEPTIC }E
ADO OT DISTURBI
SEPT I LINES L,i v oil/
_ TIP " PROJ. BR-0011
L STA. 21 + 82.40
e�9t
TEMPORARY IMPACTS C-' IMPACTS IN
-IN SURFACE WATER
I�� FSURFACE WATER
"ol -_
7nzz
SITE 2
z
w
SALT
DETOUR
DETAIL 1 DETAIL 4
SPECIAL LATERAL 'V' DITCH TOE PROTECTION
(Notto Scale) (Not to Sale)
OQ'
F
NSLOPEaNra � \pl Fill �� F�� SLOPE
Ground ?/ D FAO M� Slope d
—T-ILE
d=1.5 H.
Min. D=1.5 Ft.
FROM STA 50+50 TO STA 51+78 -L-DET- RT = Type of Liner= CLASS BRip-Rap
STA 12+84 - STA 14+02 -L- RT FROM STA 51+90 TO STA 52+78 -L DET- RT
FROM STA 54+40 TO STA 55+00-L_DET- RT
MOOG COMPONENTS GRF N 11* 52' 01,8' E-
S 33p 22' 45.3' W
SITE 1 \
STA
END Nu
SE' BUS FOUND
72' CHL PUE —1 PUE PUE 96 D�---Z4PLI,fP
�CONC MTL CONC r PUE 96' CHLPR�O 96
PAVED 72- CHL w X XXX__ 19' HDPE ' HDPE 16' N V �1626P66�% ' HD
s5 4s 12' STONE H
DAVID W. PIPES
®DENOTES
IMPACTS IN
SURFACE WATER
®
DENOTES HAND
CLEARING
®
DENOTES FILL IN
WETLAND
50, 0' 50'
GRAPHIC SCALE
25' 0' 25'
INSET GRAPHIC SCALE
I 15'CMP�/�EEDETAII
` CONFIPR' D'/ LIE
-L-DET- PC Sta 50+0000 1 -\\
V-DITC
-L- PT Sta. 12+38.40 1
-L-DET- PRC Stt& �38.00
REMOVE IS HOWL
TEMPO COL (�N
EXTEND WITH I
42" RCP -III \
CLAUDE E.MCDONALD
J
\\\ �
FILL IN
FILL IN 0^ EAD�----�
_ WETLAND --_
WETLAND E
F
PERM. SW
\
IMPACTS
\�
HAND
CLEARING
SITE 1
&N\
8 �\
Z '
;�\� \ O JAMES L. CARROLL
r \ —r.
E
��/ sy�o�-Tfl
vTO
SEE DETAIL 4 -L DET- FILL LINE
^o
STANK
-L-DET- PT Sta.52+78.8/
VHB Engineering NC, P.C. (C-3705)
940 Main Cal US Drive, Suite 500
Raleigh, NC 27606
PROJECT REFERENCE NO.
SHEET NO.
BR-00/l
4
RN✓ SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING
SHEET 4 OF 7
�- POT Sta, 6+50.00
]2S BR BUS
-DET- PT Sta.5+30.77
-Y-DET- PC Sta 5+/2.58
_ PAVED ORNEWAY
*LP DI
LP\� 15'CMP_
:MP F EXISTMC P/w Ir '-
IFc%ISTING R/W 6 ( X�X j
HEM-- ELVTRI�WIf�_ <
-L-DET- POT Sta.57+7508 = /
-L- POC STA20+00,00
CHARLES WHITE, ETU — , ET7 ,I 56,/.87.%.�\ /
�\
_-3' LANDSCAPE TIMBE WIDE 7R �I X
-L DET- FILL LINE —SEPTIC
CANOPY T — PRC f
TEMPORARY
CLASS II RIP RAP N 78- 0 ' 556 9- W
-Y-DET- ta.5+OODO = _
-L-DET- a.54+/9,3/
1 VE E (E \
L, ---BIM— — ——
�L------eaL
`WALIM
DETOUR
1�
DETAIL 1 DETAIL 4
SPECIAL LATERAL 'V' DITCH TOE PROTECTION
(Not. Sale) (Not to 5<ala)
\ ` TILL OR 1 TIF
SLOPE
Fill NaNra � \e SLLLOPE
Ground ?� D FAO 0� Slope d
GEOTE%TILE
M d=1.5
Min. D=1.5 F1.
\ FROM STA 50+50 TO STA 51+78 -L DET- RT = Type of Liner= CLASS BRip-Rap
STA 12+84 -STA 14+02 -L- RT FROM STA 54+40 TO STA 55+00 -CDET- RT
SALT CURB-.
�Ill1!/d TE
DENOTES 9MPACTS IN
SURFACE WATER
® DENOTES HAND
CLEARING
® DENOTES FILL IN
WETLAND
50, 0' 50,
GRAPHIC SCALE
25' 0' 25'
INSET GRAPHIC SCALE
- -- - unrun• iiin1
�. H A.
►�I _ _ —
L
1 1E IE IE \ a! � IE IE �
!_j
PROJECT REFERENCE NO.
SHEET NO.
BR-0011
4
RN✓ SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
Raleigh, NC 27606
8 20A1
NA
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
WETLAND AND SURACE WATER IMPACTS SUMMARY
VVETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
51+55 to 52+63 -L DET- RT
42" RCP cross -pipe & Detour
0.02
< 0.01*
< 0.01*****
45
1
13+57 to 14+33 -L- RT
42" RCP cross -pipe
0.02
< 0.01****
25
2
15+29 to 15+35 -L- LT
Bank Stabilization
< 0.01**
< 0.01***
8
10
TOTALS*:
0.04
< 0.01
< 0.01
< 0.01
78
10
0
*Rounded totals are sum of actual impacts
NOTES:
*42" RCP cross -pipe & Detour = 152.2 sf
**Bank Stabilization = 41.9 sf
***Bank Stabilization = 90.0 sf
****42" RCP cross -pipe = 99.1 sf
******42" RCP cross -pipe & Detour = 173.2 sf
2018 Feb