Loading...
HomeMy WebLinkAboutNCG030440_COMPLETE FILE - HISTORICAL_20180710STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. w U& 4--D DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ U� O YYYYM M D D Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY July 10, 2018 TimkenSteel Corporation — Tryon Peak Plant Attn: Robert Morrow, Plant Manager 205 Industrial Park Drive Columbus, NC 28722 Subject: Relief from Monthly Stormwater Sampling Stormwater Permit # NCG030440 TimkenSteel — Tryon Peak Polk County Dear Mr. Morrow: E ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. VINSON, JR Interim Director The Division has reviewed your request for regulatory relief from monthly stormwater sampling. The facility was inspected on March 15, 2018, and was found to be in compliance with the tiered response actions. -and other conditions of the NCG030000 General Permit. ;. As observed during. the inspection and due to facility actions taken regarding investigating and correcting exceedances, the Division is granting the facility regulatory relief from the tier responses for copper and zinc. Upon receipt of this letter, the subject facility may resume the permit specified semi-annual analytical monitoring. This relief letter remains in effect through the subsequent reissuance of the NCG030440 permit. This decision applies only to copper and zinc benchmarks. A benchmark exceedance of any other parameter listed in your permit will trigger the tiered response actions as described in the general permit. You must notify this office, in writing, within five business days if you become aware of any significant source of copper and zinc at your facility that has the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at TinikenSteel Corporation. If industrial practices change and copper or zinc does become a significant stormwater exposure risk or significant copper or zinc values have been recorded during a regular sampling event, then this office reserves the right to withdraw this decision and reinstate the permit specified tiered response or other actions that may be warranted by the new set of circumstances. Please retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or need further information, please contact Shawna Riddle at (828) 296- 4500. State of North Carolina I Environmental Quality I Energy, Mineral and land Resources 2090 Us 70 Highway I Swannaaoa, NC 28778-8211 828 296 4500 T Monthly Monitoring TimkenSteel Corporation July 10, 2018 Page 2 of 2 C1 Sincerely, J Stanley E. Aike ; PEGA Regional Engineer Land Quality Section Enclosure: Inspection Report ec: `Bethany Georgoulias, Environmental Engineer, (bethany.georgoulias@ncdenr.gov) Robert Teter, Environmental Program Manager, robert.teter a,tir kensteel.com Jody Splawn, Facility Support Representative, iody.splawn&timkentsteel.com State of North Carolina I Environmeatal Quality J Energy, Mineral and Land Resources 2090 US 70 Highway } Swanaanoa, NC 28778-8211 828 296 4500 T a Permit: NGG030440 SOC: County: Polk Region: Asheville Compliance Inspection Repo Effective: 11/16/17 Expiration: 10/31/18 Owner: Timkensteel Corporation Effective: Expiration: Facility: TimkenSteel Corporation -Tryon Peak 205 Industrial Park Dr Contact Person: Andrew R Farber Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representat€ve(s): On -site representative Related Permits: Inspection Date: 03/15/2018 Primary Inspector: Shawna Riddle Secondary Inspector(s): Columbus NC 28722 Title: Phone: 330-471-3643 Certification: Phone: Robert Morrow 330-471-6312 EntryTime: 10:OOAM Exlt Time: 12:30PM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ® Compliant [] Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 r . 0 Permit: NCG030440 Owner - Facility: Timkensteel Corporation Inspection Date: 0311512018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Follow-up inspection to determine regulatory relief from Zinc and Copper monthly sampling. The SPPP is current and monitoring is being conducted as required. Since my last inspection the facility has continued good housekeeping practices and investigating potential sources for copper and zinc. As discussed on site sampling for outfall 001 will be taken from the metal grate (pipe inlet) on the site property. Sample collection from the original outfall 001 location will no longer be used. This outlet pipe is not currently on property owned by TimkenSteel. Outfall 002 sample collection will now be taken at the Northwest corner of the lay down yard. Sample collection from the original 002 location will no longer be used. The lower building on the property has been sold and the sampling point needed to be moved to capture current stormwater conditions. The request for regulatory relief from monthly sampling has been granted and the facility can return to the permit specified semi-annual monitoring. Page: 2 r _ i 0 Permit: NCG030440 Owner • Facility: Timkensteel Corporation Inspection Hate: 03/15/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ®❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ®❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ®❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ®❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ®❑ ❑ ❑ # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ®❑ ❑ ❑ # Does the facility provide and document Employee Training? ®❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ®❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ®❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ® ❑ Comment: Page: 3 • i yy11�� Compliance Inspection Report ;r Permit: NCG030440 Effective: 11/16/17 Expiration: 10/31/18 Owner: Timkensteei Corporation SOC: Effective: Expiration: Facility: TimkenSteel Corporation- Tryon Peak County: Polk 205 Industrial Park Dr Region: Asheville Columbus NC 28722 Contact Person: Andrew R Farber Title: Phone: 330-471-3643 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Robert Morrow 330-471-6312 Related Permits: Inspection Date: 0311512018 Entry Time: 10:00AM Exit Time: 12:30PM Primary Inspector: Shawna Riddle Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: S Compliant Not Compliant Question Areas: ■ Storm Water (See attachment summary) Page: I Perrnit: NCG030440 Owner - Facility: Timkensteel Corporation Inspection Date: 03/15/2018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Follow-up inspection to determine regulatory relief from Zinc and Copper monthly sampling. The SPPP is current and monitoring is being conducted as required. Since my last inspection the facility has continued good housekeeping practices and investigating potential sources for copper and zinc. As discussed on site sampling for outfall 001 will be taken from the metal grate (pipe inlet) on the site property. Sample collection from the original outfall 001 location will no longer be used. This outlet pipe is not currently on property owned by TimkenSteel. Outfall 002 sample collection will now be taken at the Northwest corner of the lay down yard. Sample collection from the original 002 location will no longer be used. The lower building on the property has been sold and the sampling point needed to be moved to capture current stormwater conditions. The request for regulatory relief from monthly sampling has been granted and the facility can return to the permit specified semi-annual monitoring. 5� Y Page: 2 4 0 0 Permit NCGO30440 Owner - Facility:TimkensteelCorporation Inspection Date: 03/15/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? W ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ! ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? e ❑ ❑ ❑ # Is the Plan reviewed and updated annually? E ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ W ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Comment: Page: 3 N. Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY JBFILE eoPr March 28, 2016 TimkenSteel Corporation — Tryon Peak Plant Attn: Jody Splawn, Facility Support Representative 205 Industrial Park Drive Columbus, NC 28722 SUBJECT: NPDES Stormwater Permit Compliance Inspection TimkenSteel — Tryon Peak Permit No: NCG030440 Polk'County Dear Mr. Splawn: • PAT MCCRORY 6overnnr DONALD R. VAN DER VAART 1ec•rerary TRACY DAVIS 0) reccnr This letter is in follow-up to the NPDES Stormwater Permit Compliance Inspection conducted on February 10, 2016 The facility was found to be in non-compliance with permit NCG030440. Enclosed is a copy of the Compliance Inspection Report, which contains additional observations and comments for your reference. If 1 can be of any further assistance, please contact me at (828) 296-4500, Sincerely, Shawna Riddle Environmental Senior Specialist Land Quality Section Enclosure: Compliance Inspection Report ec: robe rt. morrow@tiinkensteel ;com, iod.splawn a,timkensteel.eom, robe rt.teter(cr�,timkensteel•eom, State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources 2090 US 70 Highway I Swannanoa, NC 28778-8211 828 296 4500 T :7 Com liance Inection 0e s rt • PFILE COPY M & po Permit: NCG030440 Effective: 11/01/12 Expiration: 10/31/17 Owner : Timkensteel Corporation SOC: Effective: Expiration: Facility: TimkenSteei Corporation- Tryon Peak County: Polk 205 Industrial Park Or Region: Asheville Columbus NC 28722 MV YD u) Contact Person: AWTUWF��art3er Tide: 4&�M Nw-MAy4rw Phone:-336-474-3643 gQqb?-2-q— Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/10/2016 Entry Time: 01:00PM Primary Inspector: Shawna Riddle Secondary Inspector(s): Certification: Phone: Exit Time: 03:30PM Phone:'± Reason for Inspection: Other Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 V9001 JAH permit; NGG030440 Owner - Facility: Timkensteel Corporation Inspection Date: 0211012016 Inspection Type : Compliance Evaluation Reason for Visit: Other Inspection Summary: While on site I, Shawna Riddle', inet'with Bob Morrow, Jody Splawn, Robert Teter, and Phillip Rhodes. In 2012 the facility was issued a new stormwater permit. The permit package was not delivered to the Polk County plant from Corporate and the nevr`monitoring form for Zn and Cu was not implemented. The company split in 2014 and a new company was formed. In 2015 the company realized that they were not using the correct sampling form including Zn and Cu. The facility has been sampling for Zn and Cu since April 2015. However, they requested an inspectionlmeeting at the facility to discuss exceedances. The facility is now in Tier 1111 for Outfall 001 and 002 for Zinc. We discussed the potential sources for Zinc and Copper and did a walk-thru of the facility and of the property including observations of outfails (001 '&'002). ` Inside the plant 1 noted grit/dust on the floors. Fork lifts are used inside/outside the plant. I recommended regular floor cleaning (floor scrubber) to adaress'this issue. It is essential that the floor cleaning water be disposed of properly, since this water could have a heavy"metal load. The facility has 2 buildings. The lower building in not in operation (roof has galvanized finished). Upper expansion of the main building has a galvanized roof finish as well. The facility has raw material composed of solid steel bar and tube stored outside on racks around the footprint of the building. The facility has no outside manufacturing or processing activities. Diesel fuel is stored in two above storage tanks equipped with steel secondary containment. All finished products are stored inside and no waste is disposed of at the site. We discussed housekeeping practices and other sources for zinc and copper. The facility has a spreadsheet of potential sources for further investigation of zinc and copper at the site. They have recently moved raw materials 17-4PH inside. These materials had a concentration of 3.2% copper. They have also revaluated their HVAC unit cleaning procedures. Other suggestions are to further investigate the impact of roof runoff, scrubbing floors (forklift trafficibrake wear/tires), cleaning the parking lot in the front of the building (brake wear), establishing a groundcover on the area leading to outfall 001 (where rocks are present). Outfall 001 pipe is galvanized - as discussed onsite - start sampling outfall 001 at the inlet of the pipe and at the outlet of the pipe. Take the samples at the same time to see if the pipe is contributing to the high copper/zinc numbers. The drainage leading to Outlet 001 is from the employee/visitor parking lot, the paved side/back lot area and some downspout lines. Outfall 002 there is no galvanized piping used. However, the drainage leading to 002 encompasses both buildings, alloy steel bar tubing, dumpsters, metal storage luger, pallets, and traffic from materials being received and shipped, and forklift traffic. This area is too large to put under cover. The facility will continue work with the Region during its sampling and investigating of potential sources for copper and zinc. Note: The facility is required to perform monthly monitoring until 3 consecutive sampling event fall below the benchmark values. Page: 2 • • Permit: NCG030440 Owner - Facility: Timkensteel Corporation Inspection Date: 02110/2016 Inspection Type : Compliance Evaluation Reason for Visit: Other Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ Cl ❑ # Does the Plan include a "Narrative description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? r;,, ;, . ,f _ . ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The SWPP is up-to-date and monitoring is currently being performed according to the permit. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: �..._._M . . Page: 3 f ). q!t'i , ,1, i r; 0 Storrusewer I()[;,itii:)riy anrf w<'itts�r"flerI i a k A � 6 } �I �€ E EnviroScience 1piii �w rn re IAIIM fM4t0 �f�r, �tl r4AM rKh alo9Alrm rlfrc4s Ms\��fi I �� '�fir+R�w µK rn rwdny ... -own Mi �7 �} Plan TimkenSteet Tryon Peak October 22, 201 Figure 4: Stormsewer locations and watershed E T 7a � III ;il J --}- --� rl j i i fl I I 1 ' rare VeuuRM n I I � II �• J ]I I II I ; I I —J j I I ---- U --; Ilil�lllllllllililll U 1--------- I II i II II II m i 2 ((((+j Y eD .rw AMw Y:4 s ��1 s,a �• ya,ew r.. +wr r.rr O ,1 ,0 R wV V.e! Nqw M Scole 1'-60' - - U - -� 5l3-. mill a as cy `°""° 1 1I 7-mWENA- 37fi853 EnviroScience Excellence In Any Environment 5070 Stow Road, Stow, Ohio 44224 / 800-940-4025 0 Herbert, Laura C From: Wiggs, Linda Sent: Thursday, February 26, 2015 2:59 PM To: Splawn, Jody T. (Mr.) Cc: Herbert, Laura C. Subject: RE: Stormwater permit HI Jody, Good to hear from you. Unfortunately, the stormwater program was moved from my Division in August of 2013 and given to the Land Resources folks. I have cc'd Laura Herbert here as she is the Asheville Supervisor for that group. She can be reached at the same phone number as I am if you need future assistance. However, I don't mind assisting you with your question. Go to Part II Page 5 of 10 Table I Footnote #4. (Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes.) This sentence states "only„ for those facilities performing....(}. If you are not performing those operation at your facility then you do not have to do TTO. You do not need to do anything to request removal of the requirement, as it is not required if you are not performing those operations. If you are performing those operations and want to get out from under the TTO requirement, then see the next page up (page 4 of 10) #10 Solvent Management Plan. Hope this helps, Linda.Wiggs@ncdenr.gov Environmental Senior Specialist North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources - Water Quality Regional Operations 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Link to Division of Water Resources Home Page httpJ/Portal.ncdenr.orp/web/wq Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. From: Splawn, Jody T. (Mr.)[mailto:jody.splawn(-Otimkensteel.com] Sent: Thursday, February 26, 2015 2:20 PM To: Wiggs, Linda Subject: Stormwater permit Hi Linda You visited our facility several years ago and I remember discussing the possibility of removing our TTO sampling requirement as we do not perform any metal finishing operations. Could you tell me what I would need to do in order to remove this requirement? I have attached a copy of our permit. Thanks Jody T. Splawn, Facility Support ReprAr, tative o : +1 828 894 6259 205 Industrial PTRY-oi Columbus, North Carolina 2870758 MMKENSTEELIv This message and any attachments are intended for the individual or entity named above. if you are not the intended recipient, please do not forward, copy, print or disclose this communication to others; also please notify the sender by replying to this message, and then delete it from your system. TimkenSteel Corporation 01 A VA .� NCDENR •North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. James Liggett TimkenSteel Corporation 205 Industrial Park Dr Columbus, NC 28722-9758 Dear Mr. Liggett: John E. Skvarla, III Secretary April 17, 2014 Subject: NPDES General Permit NCG030000 TimkenSteel Corporation Formerly The Timken Company Certificate of Coverage NCG030440 Polk County Division personnel received your request to revise your stormwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 807-6300. cc: Asheville Regional Office, L. Herbert Stormwater Permitting Program Files Central Files Sincerely, ORIGINAL SIGNED S1 KEN PICKLE for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources APR 2 9 2014 Land Quality Section Division of Energy, Mineral, and Land Resources f.411(--�r7ilit Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: 00 ortal.ncdenr.or /web/Irl An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030440 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, TimkenSteel Corporation is hereby authorized to discharge stormwater from a facility located at TimkenSteel Corporation — Tryon Peak 205 Industrial Park Dr Columbus Polk County to receiving waters designated as unnamed tributary to Whiteoak Creek, a class C water in the Broad River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, II1, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective April 17, 2014. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 17, 2014 ORIGINAL SIGNED M KEN PICKLE for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission rh 1 Division of Water Quality / Surface Wager Protection Nationatl Pollutant Dischtu•ge Elimination System NCDENR " " C—�PERMIT NAME/OWNERSHIP CHANGE FORM FOR AGENCY USE ONLY Date Recervea Yaw Mom I Da 1. Please enter the perttut nurtber for which the change is reque-4ed. NPDE5 Pen -nit ior) Certificate of Coverage N I C I s 10 1 1 1 1 1 N I C I a 10 13 1 6T4-1 4 10 H. Permit status prlor to requested change. a. Pennit issued to (company name): The Timken Company b. Person legally responsible for permit: James_ _ _ _ Liggett Ft rat NIT Las[ Plant Manager Title 205 Industrial Park Dr Permit Holder Mailing Address Columbus NC 28722-9758 City State %p { 828 ) 894-3811 (828 ) 894-8123 Ptumc Fax c. Facility name (discharge): The Timken Company - Tryon Peak d. Facility address: 205 Industrial Park Dr Address Columbus NC 28722-9758 City State %itl e. Facility contact person: Mr. Jody T Solawn (828 ) 894-6259 First / MI / Last M)nc Ill. Please provide the following for the requested change [revised permit). a. Request for change is a result of: ❑ Change in ownership of the facility 0 Name change of the facility or owner(see below) If wher 171ru.se a Alain: The Timken Company spinning off steel business into TimkenSteel Corporation b. Permit issued to (company name): TimkenSteel Corporation - c. Person legally responsible for permit: James _ _ Liggett First M1 last Plant Manager Title 205 Industrial Park Dr Pcrrnit I-144hlcr Mailing Address Rmsed 2812Apr23 d. Facility name (discharge) e. Facility address: f. Facility contact person: MAR 2 8 2014 Columbus NQ 28722-9758 a tty State 7.111 i 828 ) 894-381_1 jim.liggettCo�timken.com Ptuxtc E-mail Address TimkenSteel Corporation - Tryon Peak 205 Industrial Park Or Address Columbus NC 28722-9758 City State Mr_ Jody T splawn First Nil Irst ( 828 ) 894-6259 jody.splawn@timken.com Plxuic E ntul AJdresa t_-1 ,rtality Section NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 IV. Permit contact Information (if different from the person legally responsible for the permit) Permit contact: Andrew R Farber First Nit Lw Sr. EH&S Analvst - Steel Tirlc 1835 DueberAve SW (Mailcode HSO-11l__ NN frog MjrV%s Canton OH 44706 City Shut: Zip r 330 1 471-3643 farbera timken.com f'txmc N rrL i t Address V. WHI the permitted facility continue to conduct the same Industrial activities conducted prior to this ownership or name change" ❑X Yes ❑ No (please explain) VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ® This completed application is required for both name change and/or ownership change requests. ❑ Legal documentation of the transfer of ownership (such as relevant page., of a contract deed, or a bill of ,ale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. ..................................................................................................................... The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request. the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Pernut holder prior to ownership change): L.7ames Li est that this application for a name/ownership change has been reviewed and is accurate and complete itlo the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included. this application package will be returned as i 1plete. 03/24/2014 tp-nature Date APPLICANT CERTIFICATION I JamesLiggeJ�nest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included. this application package will be returned as incomplete. 03/24/2014 Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Quality Surface Water Protection Section 1617 Mail Service Center Raleigh. North Carolina 27699-1617 RevmW 712008 TIMKEN IA►I,--- you Turn M a Ir co 0 0 M n 0 0 0 ry a 0 Canton, Ohio 44706 USA - - Sib+. e� cr)l , 1- lcr��fr� L AIJ 049J8204647 $ 09.030. Mailed From 44706 US POSTAGE NWWO0tl Ntlfll3tl 3Ol ltl tl3)17LL5 30tlld > ■ r Herbert, Laura C From: Georgoulias, Bethany Sent: Monday, March 24, 2014 1:30 PM To: andrew.farber@timken.com Cc: Pickle, Ken; Herbert, Laura C Subject: RE: Name/Ownership Change Form NCG 030440 Hi Andrew, That's correct —you don't need legal documentation of transfer for a Name Change only. Also, the legally responsible person can sign the Permittee Certification, rather than the Applicant Certification (since this is not a transfer, but the Permittee is the same). Yes, a plant manager or someone delegated by the company to sign documents in accordance with NPDES permit requirements should sign. See signatory requirements in the back of your stormwater permit. Most say something like this: Signatory Requirements All applications, reports, or information submitted to the Permitting Issuing Authority shall be signed and certified [40 CFR 122.41(k)], a. All [Notices of Intent to be covered under this general permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official [40 CFR 122.221. b. All reports required by the general permit and other information Regards, Bethany Georgoulias, Environmental f'ngineer NCDENR / Division of Energy, Mineral, and band Resources Storrnwater Permitting Program 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury Street, Raleigh, NC 27604 919 / 807-6372 (phone); 919 / 807-6494 (fax) Website: http:Lportal.ncdenr.or--/web/]r/stormwater E-mail correspondence to and from this address may he subject to the North Carolina Public Records lair and may be disclosed to third parries. From: Herbert, Laura C Sent: Monday, March 24, 2014 1:18 PM To: Georgoulias, Bethany; Pickle, Ken Subject: FW: Name/Ownership Change Form NCG 030440 Can one of you answer Andrew's question? Please copy me on the response, so I can answer similar questions next time. Thanks! Laura Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel:828-296-4500 Fax:828-299-7043 http://Portal.ncdenr.org/web/ir Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Farber, Andrew [mailto:andrew.farber(&timken.com] Sent: Monday, March 24, 2014 1:12 PM To: Herbert, Laura C Subject: RE: Name/Ownership Change Form NCG 030440 A couple quick questions about the form you sent: 1) Considering our situation is a name change only, am I correct that accompanying legal documentation is not necessary ? 2) Can I sign the Applicant Certification or does the person legally responsible for the permit have to sign (in this case, our plant manager)? Thanks in advance, Andrew Farber From: Herbert, Laura C [mailto:laura.herbert@ncdenr.gov] Sent: Monday, March 24, 2014 11:17 AM To: Farber, Andrew Subject: FW: Name/Ownership Change Form NCG 030440 Andrew, Thanks for your call today. You indicated that the parent company is changing, as is the name of the company (to Timken Steel). See attached form. Please complete and submit to the address on the form. If you would, please send us a copy at the below address. Thanks, 1 00 La ura ft Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel:828-296-4500 Fax:828-299-7043 http://Portal.ncdenr.org/web/i Notice; E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may he disclosed to third parties unless the content is exempt by statute or other regulation. This message and any attachments are intended for the individual or entity named above. If you are not the intended recipient, please do not forward, copy, print, use or disclose this communication to others: also please notify the sender by replying to this message, and then delete it from your system. The Timken Company / The Timken Corporation 0 . Wiggs, Linda From: Wiggs, Linda Sent: Tuesday, November 02, 2010 2:59 PM To: 'Splawn, Jody T.' Cc: Birge, Chad; Hendrix, Jill L. Subject: RE: Timken Tryon Peak plant storm water results (Columbus, NC) Thanks Jody, I will take note of the outfall numbers. I had a chance to go through your data. One parameter (bis(2- Ethylhexyl)phthalate 9.8 ug/L) was over the E.P.A. National Criteria, but is not likely an issue at your facility, it could be related to the lab or plastics in general. I was in the area awhile back and drove by your facility and saw the improvements associated with the erosion issue. I also saw the access path created for sampling at the other outfall. I noticed there is another stormwater discharge outfall pipe next to your outfall pipe. Remember when sampling at that location to sample what comes out of your pipe only. Do not sample in the stream channel or pooling area, that would incorporate someone else's discharge (possibly a D.O.T. culvert) and you only need to account for your stormwater discharge. Linda Linda Wiggs - Linda.Wiggs@_ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Quality - Water Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Link to Division of water Quality Home Page http://Po rta I. ncde n r. o rg/we b/w R Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. From: Splawn, Jody T. rmailtoJody.splawnPtkmken.com1 Sent: Thursday, October 21, 2010 1:21 PM To: Wiggs, Linda Cc: Birge, Chad; Hendrix, Jill L. Subject: Timken Tryon Peak plant storm water results (Columbus, NC) Linda, have attached stormwater sampling results conducted at our facility on 9/27/2010. We conducted testing on both outfalls per your request. On your correspondence dated Feb.18 2010 your noted outfall 2 as the discharge that we had not previously taken a sample from. The outfall you are referring to is labeled outfall 1 on our site map. It is also referenced as outfall 1 in the Analytical monitoring report. We repaired all erosion issues leading to an inlet drain associated with outfall 1 well in advance of collecting the stormwater sample. We also now have pH calibration solutions onsite to ensure that our pH meter is working properly. is Please let me know if you need anything further from this sampling event. I will forward you the results from our next event when collected. 'nie 'rimken Company Office: (828)-894-6209 Mobile: (828)-289-6403 Email: Jodv.Spiawn @timken.com This message and any attachments are intended for the individual or entity named above. if you are not the intended recipient, please do not forward, copy, print, use or disclose this communication to others; also please notify the sender by replying to this message, and then delete it from your system. The Timken Company / The Timken Corporation 0 E.\l1(11iT6-? STOR.'sINV: ITCR 1).kTA NVORKSIiEET S,impliog Lnc;:aticut No,: d NIeUsur'crttcnts. S.antplus CullcUCd q Sp lA,Vj� Initial Dcp1h in Rain Gagc: Date u#'Storm Event: C�- �O -)a — 4 -;g -/o -SY- Time RttinS;all 13epri: Depth in Rain Gagc t:pt?n C��n�plCtiat�; Sampling r 1t dumber ofhours hetween beginning of Final Depth in Rain Gage (after storm storm measurement and end of previous event): measurable (greater than 0.1 inch) stor-rn � �1 event fat least 72 hours): LAJCe- � Time Runoff Began: Total Amount of Rainfall during Storm / Event (in inches): 9 — 11 Runoff Volumc (in Gallons): Time Grab Sample was Collected: pH of'Grab Sample: QQ U� Time Rainfall Ended: )- 1 Uv Ar►-,� a, o)b Duration of' Rainfall (in Hours): rJ}e.r ryo MC.,.4) h01) f5 . !,` l tiiri:Cn Cutup arl -- VI -) t Peak l iant 5? Columbus, Coal-Ohnca StarnttiVL11CJ P01416011 PrCVC11tion Plan E xulior 6-2 SToR.Ni1N,,.%, F, R in"r,% NVORKSlIFET Smipling Loca1101) NO.: �fc ssisrem4nts. S srsi}ales C ACCN Al hy: �vfl � IAw Initial Depth in Rain Gisge: Mic of Stowe Event: 1 ) C) - 9b "rinse Raintafl Began: Depth in Rain Gate 1_.,'pon Completing Sampling Oo Number of hours between beginning of Final Depth In Rain Gage (after stone storm sneasurement and end of'previous event): measurable (greater than 0.1 inch) storm �! fa event (at least ?2 hours): ) C j Time Runoff Began: Total Amount of Rainfall during Storm 2 Event (in inches): Time Grab S impie was Collectc;d: Runoff VOIUn3e (in G,1.11011S): pH of Grab Sample: 7.� Time Rainfall Ended: A-111 < .-9 9 -C�jp O, a4 Duration of Rainfall (in HOUrs): rj 4"'r.S ;s: i Mrkk:n i iyo Pcak 6'l int ; Columbus. North Carotina StorniccM r f ollunon Pri2vcntlon Plan s Pace Analytical Services, Inc. Pace Analytical Services, Inc. aceAnalXical 2225 Riverside Dr. 9800 Kincey Ave. Suite 100 www.pecelabs corn Asheville, NC 28804 Huntersviile, NC 28078 (828►254-7176 (7041875.9092 ANALYTICAL RESULTS Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 Sample: Outfall 1 Parameters LabID: 9278480001 Collected: 09/27/10 12:30 Results Units Report Limit DF Received: 09/28/10 09:30 Matrix: Water Prepared Analyzed CAS No, Qual HEM, Oil and Grease Analytical Method: EPA 1664A Oil and Grease ND mg1L 5.0 1 10/05/10 10:11 608SF GCS Pesticides and PCBs Analytical Method: EPA 608 Aldrin ND ug/L 0.011 1 10/03/10 15:28 10/15/10 02:23 309-00-2 alpha-BHC ND uglL 0.011 1 10/03/10 15:28 10/15/10 02:23 319-84-6 beta-BHC ND uglL 0.011 1 10/03/10 15:28 10/15/10 02:23 319-85-7 delta-BHC ND ug1L 0.011 1 10/03/10 15:28 10/15/10 02:23 319-86-8 gamma-BHC (Lindane) ND ug1L 0.011 1 10/03/10 15:28 10/15/10 02:23 58-89-9 Chlordane (Technical) NO uglL 0,55 1 10/03/10 15:28 10/15/10 02:23 57-74-9 4,4'-DDD ND ug1L 0.011 1 10/03/10 15:28 10/15/10 02:23 72-54-8 4,4'-DDE ND ug1L 0,011 1 10/03/10 15:28 10/15/10 02:23 72-55-9 4,4'-DDT ND ug1L 0.011 1 10/03/10 15:28 10/15/10 02:23 50-29-3 Dieldrin ND uglL 0.011 1 10/03/10 15:28 10/15/10 02:23 60-57-1 Endosulfan 1 0.025 ug/L 0.011 1 10/03/10 15:28 10/15/10 02:23 959-98-8 Endosulfan 11 ND ug1L 0.011 1 10/03/10 15:28 10/15/10 02:23 33213-65-9 Endosulfan sulfate ND ug/L 0.011 1 10/03/10 15:28 10/15/10 02:23 1031-07-8 Endrin ND uglL 0,011 1 10/03/10 15:28 10/15/10 02:23 72-20-8 Endrin aldehyde ND ug/L 0.0055 1 10/03/10 15:28 10/15/10 02;23 7421-93-4 Heptachlor ND uglL 0.011 1 10/03/10 15 26 10/15/10 02:23 76-44-8 Heptachlor epoxide ND uglL 0.011 1 10/03/10 15:28 10/15/10 02:23 1024-57-3 PCB-1016 (Aroclor 1016) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 12674-11-2 L3 PCB-1221 (Aroclor 1221) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 11104-28-2 PCB-1232 (Aroclor 1232) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 11141-16-5 PCB-1242 (Aroclor 1242) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 53469-21-9 PCB-1248 (Aroclor 1248) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 12672-29-6 PCB-1254 (Aroclor 1254) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 11097-69-1 PCB-1260 (Aroclor 1260) ND ug/L 0.55 1 10/03/10 15:28 10/15/10 02:23 11096-82-5 Toxaphene ND ug/L 0.55 1 10/03/10 15:28 10/15110 02:23 8001-35-2 Tetrachloro-m-xylene (S) 73 % 53-110 1 10/03/10 15:28 10/15/10 02:23 877-09-8 Decachlorobiphenyl (S) 37 % 61-121 1 10/03/10 15:28 10/15/10 02:23 2051-24-3 1g,S5 200.7 MET ICP Analytical Method: EPA 200.7 Preparation Method: EPA 200.7 Lead ND ug/L 5.0 1 10/01110 11:50 10/04110 21:58 7439-92-1 625 MSSV Analytical Method: EPA 625 Preparation Methods EPA 625 Acenaphthene ND ug/L 5.6 1 09/28/10 13:30 09/29/10 22:03 83-32-9 Acenaphthyleno NO ug/L 5.6 1 09/28/10 13:30 09/29/10 22:03 208-96-8 Anthracene ND ug/L 5.0 1 09/28/10 13:30 09/29/10 22:03 120-12-7 Benzidine ND ug1L 55.6 1 09/28/10 13:30 09129/10 22:03 92-87-5 Benzo(a)anthracene ND ug1L 5.6 1 09128/10 13:30 09/29/10 22:03 56-55-3 Benzo(a)pyrene ND uglL 5.6 1 09/28/10 13:30 09129/10 22:03 50-32-8 Benzo(b)fluoranthene ND uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 205-99-2 Benzo(g,h,i)perylene ND ug1L 5.6 1 09128/10 13:30 09129/10 22:03 191-24-2 Benzo(k)fluoranthene ND ug1L 5.6 1 09128/10 13:30 09129/10 22:03 207-08-9 4-Bromophenylphenyl ether ND ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 101-55-3 Butylbenzylphthalate ND ug1L 5.6 1 09/28/10 1130 09/29/10 22:03 85-68-7 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS Page 4 of 27 This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. �`nelc- • Pace Analytical Services, Inc. Pace Analytical Services, Inc. "ClAnalytical 2225 Riverside Dr, 9800 Kincey Ave, Suite 100 wrrwpecewscom Asheville, NC 28804 Hunlersville, NC 28078 (828)254-7176 (704)875-9092 ANALYTICAL RESULTS Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 Sample: Outfall 1 Parameters Lab Ii): 9278480001 Results Units Collected: 09/27/10 12:30 Report Limit OF Received: 09/28/10 09:30 Matrix: Water Prepared Analyzed CAS No. Qual 625 MSSV Analytical Method: EPA 625 Preparation Method: EPA 625 4-Chloro-3-methyl phenol NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 59-50-7 bis(2 -Ch loroethoxy)m ethane NO uglL 11.1 1 09/28/10 13:30 09/29/10 22:03 111-91-1 bis(2-Chloroethyi) ether NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 111-44-4 bis(2-Chloroisopropyl) ether NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 108-60-1 2-Chloronaphthalene NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 91-58-7 2-Chlorophenol NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 95-57-8 4-Chlorophenylphenyl ether NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 7005-72-3 Chrysene NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 218-01-9 Dibenz(a,h)anth racene NO uglL 5.6 1 09/28/10 13:30 09/29110 22:03 53-70-3 3,3'-Dichlorobenzidine NO uglL 27.8 1 09/28/10 13:30 09/29/10 22:03 91-94-1 2,4-Dichlorophenol NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 120-83-2 Diethylphthalate NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 84-66-2 2,4-Dimethylphenol NO uglL 11.1 1 09/28/10 13:30 09/29/10 22:03 105-67-9 Dimethylphthalate NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 131-11-3 Di-n-butylphihalate NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 84-74-2 4,6-Dinitro-2-methylphenol NO uglL 22.2 1 09/28/10 13:30 09/29/10 22:03 534-52-1 2,4-Dinitrophenol NO uglL 55.6 1 09/28/10 13:30 09129/10 22:03 51-28-5 2,4-Dinitrotoluene NO uglL 5.6 1 09/28/10 13:30 09129/10 22:03 121-14-2 2,6-Dinitrotoluene NO uglL 5.6 1 09/28/10 13:30 09129/10 22:03 606-20-2 Di-n-octylphthalate NO uglL 5.6 1 09/28/10 13:30 09129/10 22:03 117-84-0 1,2-Diphenylhydrazine NO uglL 5.6 1 09/28110 13:30 09/29/10 22:03 122-66-7 bis(2-Ethylhexyl)phthalate NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 117-81-7 Fluoranthene NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 20644-0 Fluorene NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 86-73-7 Hexachloro-1,3-butadiene NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 87-68-3 Hexachloro benzene NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 118-74-1 Hexachlorocyclopentadiene NO ug1L 11.1 1 09/28/10 13:30 09129/10 22:03 77-47-4 Hexachloroethane NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 67-72-1 Indeno(1,2,3-cd)pyre ne NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 193-39-5 Isophorone NO ug/L 11.1 1 09/28/10 13:30 09/29/10 22:03 78-59-1 Naphthalene NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 91-20-3 Nitrobenzene NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 98-95-3 2-Nitrophenol NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 88-75-5 4-Nitrophenol ND ug1L 55.6 1 09/28/10 13:30 09/29/10 22:03 100-02-7 N-Nitrosodimethylamine ND uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 62-75-9 N-Nitroso-di-n-propylamine ND uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 621-64-7 N-Nitrosodiphenylamine ND ug1L 11.1 1 09/28/10 13:30 09/29/10 22:03 86-30-6 Pentachlorophenol NO ug1L 27.8 1 09/28/10 13:30 09/29/10 22:03 87-86-5 Phenanthrene NO uglL 5.6 1 09/28/10 13:30 09/29/10 22:03 85-01-8 Phenol NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 108-95-2 Pyrene NO ug1L 5.6 1 09/28/10 13:30 09/29/10 22:03 129-00-0 1,2,4-Trichlorobenzene NO ug1L 5.6 1 09/28/10 13 30 09/29/10 22:03 120-82-1 2,4,6-Trichlorophenol NO uglL 11.1 1 09/28/10 13:30 09/29/10 22:03 88-06-2 Nitrobenzene-d5 (S) 38 % 10-120 1 09128/10 13:30 09/29/10 22:03 4165-60-0 2-Fluorobiphenyl (S) 45 % 15-120 1 09/28/10 13:30 09/29/10 22:03 321-60-8 Terphenyl-d14(S) 63 % 11-131 1 09/2811013:30 09/20/1022:03 1718-51-0 Phenol-d6 (S) 17 % 10-120 1 09/28/10 13:30 09/29/10 22:03 13127-88-3 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS Page 5 of 27 This report shad not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc._ .� n'efac i • ® Pace Analytical Services, Inc. Pace Analytical Services, Inc. /55'ceAnalytical 2225 Riverside Dr. 9800 Kincey Ave. Suite 100 ! www.pacelabs.com Asheville, NC 28804 Huntersville, NC 28078 ff! (828)254-7176 (704)875-9092 ANALYTICAL RESULTS Project: Slormwater Sampling Sept. 2010 Pace Project No.: 9278490 Sample: Outfall 1 Lab ID: 9278480001 Collected: 09/27/10 12:30 Received: 09/28110 09:30 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 625 MSSV Analytical Method: EPA625 Preparation Method: EPA 625 2-Fluorophenol (S) 23 % 10-120 1 09/28/10 13:30 09/29/10 22:03 367-12-4 2,4,6-Tribromophenol (S) 66 % 10-137 1 09/28/10 13:30 09/29/10 22:03 118-79-6 624 Volatile Organics Analytical Method: EPA 624 Acrolein ND ug/L 100 1 10/05/10 16:23 107-02-8 Acrylonitrile ND ug/L 100 1 10/05110 16:23 107-13-1 Benzene ND ug/L 5.0 1 10/05/10 16:23 71-43-2 Bromodichloromethane ND ug1L 5.0 1 10/05/10 16:23 75-27-4 Bromoform ND ug/L 5.0 1 10/05/10 16:23 75-25-2 Bromomethane ND ug/L 10.0 1 10/05/10 16:23 74-63-9 Carbon tetrachloride ND ug/L 5.0 1 10/05/10 16:23 56-23-5 Chlorobenzene ND ug/L 5.0 1 10/05/10 16:23 108-90-7 Chloroethane ND ug/L 10.0 1 10/05/10 16:23 75-00-3 2-Chloroethylvinyl ether ND ug/L 10.0 1 10/05/10 16:23 110-75-8 Chloroform ND ug1L 5.0 1 10/05/10 16:23 67-66-3 Chloromethane ND ug/L 5.0 1 10/05/10 16:23 74-87-3 Dibromochloromethane ND ug1L 5.0 1 10/05/10 16:23 124-48-1 1,2-Dichlorobenzene ND ug1L 5.0 1 10/05/10 16:23 95-50-1 1,3-Dichlorobenzene ND ug1L 5.0 1 10/05/10 16:23 541-73-1 1,4-Dichlorobenzene ND ug/L 5.0 1 10/05/10 16:23 106-46-7 1,1-Dichloroethane ND ug1L 5.0 1 10/05/10 16:23 75-34-3 1,2-Dichloroethane ND ug/L 5.0 1 10/05/10 16:23 107-06-2 1,1-Dichloroethene ND ug/L 5.0 1 10/05/10 16:23 75-35-4 trans-1,2-Dichloroethene ND ug1L 5.0 1 10/05/10 16:23 156-60-5 1,2-Dichloropropane ND ug/L 5.0 1 10/05/10 16:23 78-87-5 cis-1,3-Dichloropropene ND ug1L 5.0 1 10/05110 16:23 10061-01-5 trans-1,3-Dichloropropene ND ug1L 5.0 1 10/05/10 16:23 10061-02-6 Ethylbenzene ND ug/L 5.0 1 10/05/10 16:23 100-41-4 Hexachloro-1,3-butadiene ND ug1L 5.0 1 10105/10 16:23 87-68-3 Methylene Chloride ND ug/L 5.0 1 10/05/10 16:23 75-09-2 Naphthalene ND uglL 5.0 1 1010511016:23 91-20-3 1,1,2,2-Tetrachloroethane ND uglL 5.0 1 1010511016:23 79-34-5 Tetrachloroethene ND uglL 5.0 1 10/05110 16:23 127-18-4 Toluene ND uglL 5.0 1 10/05/10 16:23 108-88-3 1, 1, 1 -Trichloroethane ND uglL 5.0 1 10/05/10 16:23 71-55-6 1,1,2-Trichloroethane ND ug/L 5.0 1 10/05110 16:23 79-00-5 Trichloroethene ND ug/L 5.0 1 10/05110 16:23 79-01-6 Vinyl chloride ND ug/L 5.0 1 10105/10 16:23 75-01-4 Dibromofluoromethane (S) 99 % 70-130 1 10105/10 16:23 1868-53-7 4-Bromofluorobenzene (S) 94 % 70-130 1 10105/10 16:23 460-00-4 Toluene-d8 (S) 98 % 70-130 1 10/05/10 16:23 2037-26-5 1,2-Dichloroethane-d4 (5) 106 % 70-130 1 10/05/10 16:23 17060-07-0 2540D Total Suspended Solids Analytical Method: SM 2540D Total Suspended Solids 6.1 mg/L 2.8 1 09/29/10 23:02 Date: 10/1812010 09:18 AM REPORT OF LABORATORY ANALYSIS Page 6 of 27 This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Lnelac•. Pace Analytical Services, Inc. Pace Analytical Services, Inc. /�?ceAnalytical* 2225 Riverside Dr 9800 KlnceyAve. Suite 100 wwwpacwabsxom Asheville, NC 28804 Hurtersville, NC 28078 f (828)254-7176 (704)875-9092 ANALYTICAL RESULTS Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 Sample: Outfall 1 Lab ID: 9278480001 Collected: 09/27/10 12:30 Received: 09/28/10 09:30 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. flual 9040 pH Analytical Method: EPA 9040 pH 7.2 Std. Units 0.10 1 09/30/10 17:35 H6 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. a C4p„o Page 7 of 27 Pace Analytical Services, Inc. Pace Analytical Services, Inc. ;ace,Analytical 2225 Riverside Dr. 9800 KinceyAve. Suite 100 I wwwpeCefabs.Com Asheville. NO 28804 Huniersville, NC 28078 1f (828)254-7176 (704)875-9092 ANALYTICAL RESULTS Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 Sample: Outfall 2 Lab ID: 9278480002 Collected: 09/27/10 13:00 Received: 09/28110 09:30 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual HEM, Oil and Grease Analytical Method: EPA 1664A Oil and Grease ND mg1L 5.0 1 10/05110 10:11 608SF GCS Pesticides and PCBs Analytical Method: EPA 608 Aldrin ND ug1L 0,012 1 10/03110 15:28 10/15/10 02:40 309-00-2 alpha-BHC ND ug1L 0.012 1 10/03/10 15:28 10/15/10 02:40 319-84-6 beta-BHC ND uglL 0.012 1 10/03/10 15:28 10/15/10 02:40 319-85-7 delta-BHC ND ug1L 0.012 1 10/03/10 15:28 10/15/10 02:40 319-86-8 gamma-BHC (Lindane) ND uglL 0.012 1 10/03/10 15:28 10/15/10 02:40 58-89-9 Chlordane (Technical) ND ug1L 0.58 1 10/03/10 15:28 10/15/10 02:40 57-74-9 4,4'-DDD ND ug111- 0.012 1 10/03/10 15:28 10/15/10 02A0 72-54-8 4,4'-DDE ND ug1L 0.012 1 10/03/10 15:28 10/15/10 02:40 72-55-9 4,4'-DDT ND ug1L 0.012 1 10/03/10 15:28 10/15/10 02A0 50-29-3 Dieldrin ND ug1L 0.012 1 10/03/10 15;28 10/15/10 02:40 60-57-1 Endosulfan I ND ug1L 0,012 1 10/03/10 15:28 10/15/10 02:40 959-98-8 Endosulfan II ND ug1L 0.012 1 10/03/10 15:28 10/15/10 02A0 33213-65-9 Endosulfan sulfate ND uglL 0.012 1 10/03/10 15:28 10/15/10 02:40 1031-07-8 Endrin ND uglL 0.012 1 10/03/10 15:28 10/15/10 02:40 72-20-8 Endrin aldehyde ND uglL 0.0058 1 10/03/10 15:28 10/15/10 02:40 7421-93-4 Heptachlor ND uglL 0.012 1 10/03110 15:28 10/15/10 02:40 76-44-8 Heptachlor epoxide ND ug1L 0,012 1 10/03/10 15:28 10/15/10 02:40 1024-57-3 PCB-1016 (Aroclor 1016) ND uglL 0.58 1 10/03/10 15:28 10/15/10 02:40 12674-11-2 PCB-1221 (Aroclor 1221) ND ug1L 0.58 1 10/03/10 15:28 10/15/10 02:40 11104-28-2 PCB-1232 (Aroclor 1232) ND ug1L 0.58 1 10/03/10 15:28 10/15/10 02:40 11141-16-5 PCB-1242 (Aroclor 1242) ND uglL 0.58 1 10/03/10 15:28 10/15/10 02:40 53469-21-9 PCB-1248 (Aroclor 1248) ND ug1L 0.58 1 10/03/10 15:28 10/15/10 02A0 12672-29-6 PCB-1254 (Aroclor 1254) ND ug1L 0.58 1 10/03/10 15:28 10/15/10 02:40 11097-69-1 PCB-1260 (Aroclor 1260) ND ug1L 0.58 1 10/03/10 15:28 10/15110 02A0 11096-82-5 Toxaphene ND ug1L 0.58 1 10/03/10 15:28 10/15/10 02:40 8001-35-2 Tetrachloro-m-xylene (S) 85 % 53-110 1 10/03/10 15:28 10/15/10 02:40 877-09.8 Decachlorobiphenyl (S) 56 % 61-121 1 10/03/10 15:28 10/15/10 02:40 2051-24-3 200.7 MET ICP Analytical Method: EPA 200.7 Preparation Method: EPA 200.7 Lead ND ug1L 5.0 1 10/01/10 11:50 10/04/10 22A1 7439-92-1 625 MSSV Analytical Method: EPA 625 Preparation Method: EPA 625 Acenaphthene ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 83-32-9 Acenaphthylene ND uglL 5.9 1 09/28110 13:30 09/29/10 22:30 208-96-8 Anthracene ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 120-12-7 Benzidine ND uglL 58.8 1 09/28/10 13:30 09/29/10 22:30 92-87-5 Benzo(a)anth race ne ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 56-55-3 Benzo(a)pyrene ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 50-32-8 Benzo(b)ftuoranthene ND ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 205-99-2 Benzo(g,h,i)perylene ND uglL 5.9 1 09128/10 13:30 09/29/10 22:30 191-24-2 Benzo(k)fluoranthene ND uglL 5.9 1 09128/10 13:30 09/29/10 22:30 207-08-9 4-Bromophenylphenyl ether ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 101-55-3 Butylbenzylphthalate ND ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 85-68-7 L3 1g,S5 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS Page 8 of 27 This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc_ relac i _ aceAnalytical jwww,p&celabs.com I Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 i Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)8759092 Sample: Outtall 2 Parameters Lab ID: 9278480002 Results Units Collected: 09127/10 13:00 Report Limit OF Received: 09/28/10 09:30 Matrix: Water Prepared Analyzed CAS No. Qual 626 MSSV Analytical Method: EPA 625 Preparation Method: EPA 625 4-Chloro-3-methylphenol ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 59-50-7 bis(2-C h loroethoxy)m ethane ND uglL 11.8 1 09/28/10 13:30 09129110 22:30 111.91-1 bis(2-Chloroethyl) ether ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 111-44-4 bis(2-Chloroisopropyl) ether ND uglL 5.9 1 09128/10 13:30 09/29/10 22:30 108-60-1 2-Chloronaphthalene NO uglL 5.9 1 09/28/10 13:30 09/29110 22:30 91-58-7 2-Chlorophenol NO uglL 5.9 1 09/28/10 13:30 09/29110 22:30 95-57-8 4-Chlorophenylphenyl ether NO uglL 5.9 1 09/28/10 13:30 09/29110 22:30 7005-72-3 Chrysene ND ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 218-01-9 Dibenz(a,h)anthracene ND ug1L 5.9 1 09/28/10 13:30 09129/10 22:30 53-70-3 3,3'-Dichlorobenzidine NO uglL 29.4 1 09/28/10 13:30 09/29/10 22:30 91-94-1 2,4-Dichlorophenol NO uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 120-83-2 Diethylphtha late NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 84-66-2 2,4-Dimethylphenol NO ug1L 11.8 1 09/28/10 13:30 09/29/10 22:30 105-67-9 Dimethylphthalate NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 131-11-3 Di-n-butylphthalate NO uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 84-74-2 4,6-Dinitro-2-methylphenol NO ug1L 23.5 1 09/28/10 13:30 09/29/10 22:30 534-52-1 2,4-Dinitrophenol NO u911- 58.8 1 09/28/10 13:30 09/29/10 22:30 51-28-5 2,4-Dinitrotoluene NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 121-14-2 2,6-Dinitrotoluene NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 606-20-2 Di-n-octylphthalate NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 117-84-0 1,2-Diphenylhydrazine ND ug/L 5.9 1 09/28/10 13:30 09/29110 22:30 122-66.7 bis(2-Ethylhexyl)phthalate 9.8 uglL 5.9 1 09/28/10 13:30 09/29110 22:30 117-81-7 Fluoranthene NO ug1L 5.9 1 09/28/10 13:30 09/29110 22:30 206-44-0 Fluorene NO uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 86-73-7 Hexachloro-1,3-butadiene NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 87-68-3 Hexachlorobenzene ND ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 118-74-1 Hexachlorocyclopentadiene ND ug1L 11.8 1 09/28/10 13:30 09/29110 22:30 77A7-4 Hexachloroethane NO uglL 5.9 1 09/28/10 13:30 09/29110 22:30 67-72.1 tndeno(1,2,3-cd)pyrene NO ug1L 5.9 1 09/28/10 13:30 09/29110 22:30 193-39-5 Isophorone NO ug1L 11.8 1 09/28/10 13:30 09/29/10 22:30 78-59-1 Naphthalene NO ug1L 5.9 1 09/28/10 13:30 09129/10 22:30 91-20-3 Nitrobenzene NO uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 98-95-3 2-Nitrophenol NO uglL 5.9 1 09/28/10 13:30 09129/10 22:30 88-75-5 4-Nitrophenol NO ug/L 58.8 1 09/28/10 13:30 09129110 22:30 100-02-7 N-N itrosodi methyla mine NO ug1L 5.9 1 09/28/10 13:30 09129/10 22:30 62-75-9 N-N itroso-d i-n-propyla mine NO uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 621-64-7 N-Nitrosodiphenylamine NO ug1L 11.8 1 09/28110 13:30 09129110 22:30 86-30-6 Pentachlorophenol NO ug1L 29.4 1 09/28/10 13:30 00129/10 22:30 87-86-5 Phenanthrene NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 85-01-8 Phenol ND uglL 5.9 1 09/28/10 13:30 09/29/10 22:30 108-95-2 Pyrene ND ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 129-00-0 1,2,4-Trichlorobenzene NO ug1L 5.9 1 09/28/10 13:30 09/29/10 22:30 120-82-1 2,4,6-Trichlorophenol NO ug1L 11.8 1 09/28/10 13:30 09/29/10 22:30 88-06-2 Nitrobenzene-d5 (S) 62 % 10-120 1 09/28/10 13:30 09/29/10 22:30 4165-60-0 2-Fluorobiphenyl (S) 62 % 15-120 1 09/28/10 13:30 09/29/10 22:30 321-60-8 Terphenyl-dl4 (S) 64 % 11-131 1 09/28/10 13:30 09/29/10 22:30 1718-51-0 Phenol-d6 (S) 30 % 10-120 1 09/2all 0 13:30 00/29/10 22:30 13127-88-3 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS Page 9 of 27 This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. 4n& ® Pace Analytical Services, Inc. Pace Analytical Services, Inc. 11e Analytical 2225 Riverside Dr. 9800 Kincey Ave. Suite 100 r www.pacelabs.com Asheville, NC 28804 Huntersv ile, NC 28D78 1f (828)254-7176 (704)875-9092 ANALYTICAL RESULTS Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 Sample: Outfall 2 Lab ID: 9278480002 Collected: 09/27/10 13:00 Received: 09/28/10 09:30 Matrix: Water Parameters Results Units Report Limit OF Prepared Analyzed CAS No. Qual 625 MSSV Analytical Method: EPA 625 Preparation Method: EPA 625 2-Fluorophenol (S) 42 % 10-120 1 09128/10 13:30 09/29/10 22:30 367-12-4 2,4,6-Tribromophenol (S) 77 % 10-137 1 09/28/10 13:30 09/29/10 22:30 118-79-6 624 Volatile Organics Analytical Method: EPA624 Acrolein NO ug/L 100 1 10105M0 16:41 107-02-8 Acrylonitrile NO ug/L 100 1 10/05/10 16:41 107-13-1 Benzene NO ug1L 5.0 1 10/05/10 16:41 71-43-2 Bromodichloromethane NO ug/L 5.0 1 10105110 16:41 75-27-4 Bromoform NO ug/L 5.0 1 10105/1016:41 75-25-2 Bromomethane NO ug1L 10.0 1 10105/1016:41 74-83-9 Carbon tetrachloride NO ug/L 5.0 1 10/05/10 16:41 56-23-5 Chlorobenzene NO ug1L 5.0 1 10/05/10 16:41 108-90-7 Chloroethane NO ug/L 10.0 1 10/05/10 16:41 75.00.3 2-Chloroethylvinyl ether NO ug1L 10.0 1 10/05/10 16:41 110-75-8 Chloroform NO ug/L 5.0 1 10/05/10 16:41 67-66-3 Chloromethane NO ug1L 5.0 1 10/05/10 16:41 74-87-3 HS Dibromochloromethane NO ug1L 5.0 1 10/05/10 16:41 124-48-1 1,2-Dichlorobenzene NO ug1L 5.0 1 10/05/10 16:41 95-50-1 1,3-Dichlorobenzene ND ug1L 5.0 1 10/05/10 16:41 541-73-1 1,4-Dichlorobenzene NO ug1L 5.0 1 10/05/10 16:41 106-46-7 1,1-Dichloroethane NO ug1L 5.0 1 10/05/10 16:41 75.34-3 1,2-Dichloroethane NO ug1L 5.0 1 10/05/10 16:41 107-06-2 1,1-Dichloroethene NO ug1L 5.0 1 10/05/10 16:41 75-35-4 trans- l,2-Dichloroethene NO ug1L 5.0 1 10/05/10 16:41 156-60-5 1,2-Dichloropropene NO ug1L 5.0 1 10/05/10 16:41 78-87-5 cis-1,3-Dichloropropene NO ug1L 5.0 1 10/05/10 16:41 10061-01-5 trans- l,3-Dichloropropene NO uglL 5.0 1 10/05/10 16:41 10061-02-6 Ethylbenzene NO uglL 5.0 1 10/05/10 16:41 100-41-4 Hexachloro-1,3-butadiene NO ug/L 5.0 1 10/05/10 16:41 87-68-3 Methylene Chloride NO ug/L 5.0 1 10/05/10 16:41 75-09-2 Naphthalene NO uglL 5.0 1 10/05/10 16:41 91-20-3 1,1,2,2-Tetrachloroethane NO ug/L 5.0 1 10/05/10 16:41 79-34-5 Tetrachloroethene NO ug/L 5.0 1 10/05/10 16:41 127-18-4 Toluene NO ug/L 5.0 1 10/05/10 16:41 108-88-3 1,1,1-Trichloroethane NO ug1L 5.0 1 10/05/10 16:41 71-55-6 1,1,2-Thchloroethane NO ug/L 5.0 1 10/05/10 16:41 79-00-5 Trichloroethene NO uglL 5.0 1 10/05/10 16:41 79-01-6 Vinyl chloride NO ug/L 5.0 1 10/05/10 16:41 75-01-4 Dibromochoromethane (S) 104 % 70-130 1 10/05/10 16:41 1868-53-7 4-Bromofluorobenzene (S) 95 % 70-130 1 10/05/10 16:41 460-00-4 Toluene-d8 (S) 98 % 70-130 1 10/05/10 16:41 2037-26-5 1,2-Dichloroothane-d4 (S) 108 % 70-130 1 10/05/10 16:41 17060-07-0 2540D Total Suspended Solids Analytical Method: SM 2540D Total Suspended Solids NO mg/L 2.6 1 09/29/10 23:02 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc„ : , n'efac Page 10 of 27 Pace Analytical Services, Inc. 2225 Riverside Dr. /5a'ceAnalyfical' ww Pacelab9 can Asheville, NC 28804 (828)254-7176 1 ANALYTICAL RESULTS Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 HunterWIle, NC 28078 (704)875-9092 Sample: Outfall 2 Lab ID: 9278480002 Collected: 09/27/10 13:00 Received: 09/28/10 09:30 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. 4ual 9040 pH Analytical Method: EPA 9040 pH 6.6 Std, Units 0.10 1 09/29/10 21:35 H6 Date: 10/1812010 09:18 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. _nle Page 11 of 27 r • ® Pace Analytical Services, Inc. aceAnalytical 2225 Riverside Dr. wwwpacelabscorn Asheville, NC 2BB04 (828)254-7176 QUALITY CONTROL DATA Project: Stormwater Sampling Sept. 2010 Pace Project No.: 9278480 QC Batch: GCSVl8483 Analysis Method: EPA 1664A OC Batch Method: EPA 1664A Analysis Description: 1664 HEM, Oil and Grease Associated Lab Samples. 9278480001, 9278480002 METHOD BLANK: 507002 Associated Lab Samples: 9278480001, 9278480002 Parameter Units Oil and Grease mg/L LABORATORY CONTROL SAMPLE: 507003 Parameter Units Oil and Grease mg/L MATRIX SPIKE SAMPLE: 507004 Parameter Units Oil and Grease mg1L Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Huntersville, NC 2807E (704)875.9092 Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 5.0 10/0511010:07 Spike LCS LCS % Rec Conc. Result % Rec Limits Qualifiers 40 38.8 97 78-114 9278808001 Spike M5 Result Conc. Result ND 43.5 41.6 MS % Rec % Rec Limits Qualifiers 87 78-114 Date: 10/18/2010 09:18 AM REPORT OF LABORATORY ANALYSIS Page 12 of 27 This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. ��rielac: r AINAA NCDENR North Carolina Department of Environment and Natura Division of Water Quality Beverly Eaves Perdue Coieen H. Sullins Governor Director February 18, 2010 `Timken Company Dan Lake, Environmental Permitting Mgr, 1835 Dueber Ave SW Canton, OH 44706 SUBJECT: NPDES Stormwater Permit Compliance Inspection Timken Company Permit No: NCG030440 Polk County Dear Mr. Lake: JF I LEI Resources A Stormwater Permit Compliance Inspection was conducted at the Timken facility in Polk County, NC on February 11, 2010. Present during the inspection was Linda'Wiggs and Jody Splawn. The facility was found to be in compliance with permit NCG030440. The following observations and recommendations were noted during the Division of Water Quality (DWQ) inspection: Dee Freeman Secretary Stormwater Discharge Outfall 2 A second Stormwater Discharge Outfall monitoring point needs to be monitored. Please add the second Stormwater Discharge Outfall (SDO 2), which receives stormwater from the storage area to the right of the building, to your site plan and monitoring schedule. An inlet drain that is associated with this SDO 2 is located in a grassy area and has an erosion gully preceding it that needs to be fixed prior to your sampling event in order to avoid elevated Total Suspended Solid (TSS) results. Along with SDO 1, SDO 2 will require all Analytical and Qualitative monitoring, including Total Toxic Monitoring. H Monitoring A pH meter is located onsite for pH analysis. However, calibration and probe storage solutions necessary for accurate meter analysis are not onsite. Refer to the manufacturer instructions for proper calibration and storage requirements. Analytical Stormwater Monitoring Submittal Please submit the next two sampling events analytical monitoring results from both of the Stormwater Discharge Outfalls to the Asheville Regional Office (ARO) at the following address: Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-450M FAX: 828-299-70431 Customer Service: 1-877.623-6748 One Internet: www.nprraterquaiity.org ' NorthCarolina�lltlll"lr��� An Equal Oppp tunny 4 Affirmative Action Employer Yi Page Two Timken Company February IS, 2010 Division of Water Quality -Linda Wiggs, 2090 US HWY 70, Swannanoa, NC 28778, Submittal of these results to the Central Office as directed in permit is also required. Attached is a copy of the inspection report. Please contact me at (828) 296-4653 or linda.wiggsnncdenr.gov, if I can be of any further assistance. Sincerely, f Linda Wiggs Environmental Specialist Surface Water Protection Enclosure cc: Central Files Asheville Files Timken Company -Jody Splawn 205 Industrial Park Drive Columbus NC 28722. SASWPToIkls1ormvater\NCG03 Metal Fabticationl'FIMKEN-NC00304401timkcn-Inspect IV Feb-2010.doc 0 0 Permit: NCG030440 SOC: County: Polk Region: Asheville Compliance Inspection Report Effective: 11/01/07 Expiration: 10/31/12 Owner: The Timken Company Effective: Expiration: Facility: The Timken Company -Tryon Peak 205 Industrial Park Dr Contact Person: Daniel P Lake Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/11/2010 Primary Inspector: Linda S Wiggs Secondary Inspector(s): Title: Entry Time: 12:20 PM Columbus NC 28722 Phone: 330-471-3716 Certification Exit Time: 02:10 PM Phone: Phone: 828-296-4500 Ext.4653 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCGO30440 Owner - Facility: The Timken Company Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Most of the site drains via conveyances to a basin at bottom of hill. This basinthardwood weltand is very large and will treat the stormwater. The area to the right of the building does have a storage area that drains to a stormdrain via overland flow which is considered SDO 2 and needs to be monitored. There is an erosion gully leading to SDO 2 stormdrain. Prior to sampling this outfall the erosion gully needs to be fixed to avoid exceeding TSS benchmark. During the inspection no chemicals were stored outside, however alot of raw material is stored outside. It needs to be determined if pH meter is working properly. The facility needs to buy pH calibration solutions for meter to determine if readings are accurate. Page: 2 0 0 Permit: NCGO30440 Owner - Facility: The Timken Company Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwaler Pollution Prevention Plan? ■ ❑ Cl ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ■ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ■ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ■ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ■ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ 0 # Does the facility provide and document Employee Training? A ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ . ❑ Cl ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: A second SDO was located and needs to be added to site plan. No spills have occurred in the last 3 years. Alternative to practices has not recently been needed. However, depending on analytical resluts from SDO 2 a feasiblity study may be needed if benchmarks are exceeded. There were no chemicals stored outside at time of inspection. Qualitative MonitOring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? e ❑ ❑ Cl # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: Will need to add SDO 2 to monitoring schedule. All parameters at this time are to be monitored. This inpsection did not reveal any concerns with chemicals being stored outside, so after several monitoring results below benchmark are achieved at both SDOs, the facility should consider developing a Solvent Mangement Plan to avoid . TTO sampling. Permit and Outfalls Page: 3 • • Permit: NCG030440 Owner - Facility. The Timken Company inspection Date: 02/1112010 Inspection Type: Compliance Evaluation Reason for Visit: Routine # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ Q ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ■ 11 # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ 01 Comment: A second SDO was located. Onsite rep and Canton Ohio rep thought this area had representative outfall status. There are no records of Representative Outfall status in the Asheville Office, This SDO needs to be added to site plan and monitored. Unlike SDO 1, this SDO has no treatment and has the potential of delivering pollutants to the adjacent waters. Monitoring will determine if this is a concern. Facility has been told to send analytical results to the Region office for the next 2 sampling event. Page: 4 Michaet F. Easley. Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins,-Directm Division of Water Quality November 1, 2007 Dan Lake, Mgr Permitting The Timken Company 1835 Duebor Ave Sw Canton, OH 44706 Subject: NPDES Stormwater Permit Coverage Renewal The Timken Company - Tryon Peak COC Number NCG030440 Polk County Dear Permittee: In response to your renewal application for continued coverage under stormwater General Permit NCG030000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of stormwater General Permit NCG030000 • A copy of a Technical Bulletin for the General Permit • Five copies of the Discharge Monitoring Report (DMR) Form • Five copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater only, and it specifies your obligations with respect to stormwater discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. The more significant changes in the General Permit since your last Certificate of Coverage include the following: • Part I Section A - A new notation that the No Exposure Exclusion from permitting option may be available to the permittee. • Part I Section A - A new provision that facilities draining to 303(d) listed waters, or in watersheds with an approved TMDL, may not be eligible for renewed coverage under the General Permit., • Part II Section B Table 1 - An increased sampling frequency from once per year to twice per year. • Part 11 Section B Table 3 - Benchmark concentrations now replace cutoff concentrations; the elimination of the option to avoid sampling based on cutoff concentrations. • Part 11 Section B - New provisions requiring the permittee to execute Tier One and Tier Two response actions, based on the first benchmark exceedence (Tier One) and the second consecutive benchmark excoodence (Tier Two). Tier Two requires that the permittee institute monthly monitoring instead of twice -per -year monitoring, until three consecutive monitoring events show no benchmark exceedences. • Part II Section B - A new provision that four exceedences of any particular benchmark will trigger increased DWQ involvement in the permittee's stormwater management and control actions. DWQ may direct the permittee to apply for an individual permit, or may direct the implementation or installation of specific stormwater control measures. DWQ received a number of comments on a series of general permits similar to this one. A full response to comments can be found at http://ncwaterquality.org/su/industrialgpinfo.htm. Some comments resulted in permit modifications, others are addressed in the response document or Fact Sheet. A few specific requests for clarification are addressed below. 1. What is the deadline for having a revised SPPP that reflects the provisions of the new General Permit? DW O will require that the permittee have a revised, complete SPPP no later than six months after the date of issue of that permittee's new Certificate of Coverage. 2. Must analytical results be by a certified lab? What about pH measurements? All analytical results obtained to satisfy NPDES permit requirements must be certified, as directed in North Carolina regulations at 15A NCAC 2H .0800, and as administered by DWO's Laboratory Section Certification Branch. This includes field pH measurements. `t� tC'.'trts inu ��uWCan) North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.uslsuistormwater.himl 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9012 1-877-623-6748 An Equal OpporturtltylAt6rmaLve Action Employer - 50% Recycled110% Post Consumer Paper Permit Reissuance Letter -- Permit NCG030440 Page 2 Your coverage under the General Permit is transferable only through the specific action of DWQ. The Division may require modification and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Ken Pickle of the Central Office Stormwater Permitting Unit at (919) 733-5083, ext. 584. Sincerely, for Coleen H. Sullins cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office 9 0 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCGO30000 CERTIFICATE OF COVERAGE No. NCG030440 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina_ Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Timken Company is hereby authorized to discharge stormwater from a facility located at The Timken Company - Tryon Peak 205 Industrial Park Dr Columbus Polk County to receiving waters designated as a UT to White Oak Creek, a Class c water in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective November 1, 2007. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day November 1, 2007. for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission ►h''"`.�-'� �'"i-"-ram°-"'ti -�r'p� �}'"� f -�'�n—C�J ITE. TIMKENSTEELV Jody T. Splawn Facility Support Representative Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 To whom it may concern: Please find attached revised TimkenSteel-Tryon Peak Semi -Annual Stormwater Discharge Monitoring Reports for the North Carolina Division of Water Quality General Permit No. NCG030000. Our General Permit No. is NCG030440. The reports were generated from data dating back from June 2013. The issue of concern here is for the listed values for pH. During a corporate review of the sampling and reporting procedures in place here at the plant, we discovered that the pH values were incorrectly reported. For each sample event a field pH sample was done on each sample using a properly calibrated pH meter and the sample results recorded. We then mistakenly requested that the laboratory measure pH. The laboratory value was then reported in each instance on our Monitoring Reports. As you may know, pH is to be recorded in the field due to the lag time in the laboratory receiving the sample for analysis. In each case the pH values measured in the field or at the plant was higher than the pH values recorded at the lab. The laboratory pH values were outside the holding time and were inappropriately reported. Fortunately, the pH values measured using the meter here at the plant were recorded and available for review. We wish to correct the record by revising each report where the laboratory value was used with the appropriate plant or "field" measurement. Our Regional representative, Shawna Riddle, Environmental Senior Specialist, North Carolina Dept. Environmental Quality Asheville Regional Office, Energy Mineral and Land Resources has also been advised and is in receipt of corrected copies. Sincerely Jody T. Splawn TimkenSteel Corporation -Tryon Peak Plant 205 Industrial Park Drive, Columbus, NC 28722 • Enc. TIMKENSTEE Jody T. Splawn Facility Support Representative Timken5teei Corporation - Tryon Peak Plant 205 Industrial Park Drive, Columbus, NC 28722 LV I STORMWATER DISChti,1RGE OUTFALL (SDO) MONITORING RE,EPORT . GENERAL PERMIT NO, NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: :� O/3 CERTIFICATE OF COVERAGE NO. NCG03 ��%�� (This monitoring report is due at the Division no'later than 30 days from the date the facility receives the sani ling results from the laboratory.) FACILITY NAME 7 �n�ktu —7`r ,art pe-+v COUNTY _ PERSON COLLECTING SAMPLES PHONE NO. u—T T) ('�TT5P� CERTIFIED LABORATORY Lab # Lab # —72) -(M'% PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements �8{, Fx1!' nU,!k� ,t;�5�"-�!c�r fV. .ZAt� ,"I'... ;rlPr .•4 �QIZY 1 K..! _ Ho ' Satt 1ebllectC .{� S �3 nts , I`(")dal Siis'" ed 5'ald s•'Y- p`?r� t ,, t) ,,. "p Lp,rti ll�i ,,, Oi and"Gres°�� . r Ppt ,'14"oxllCClr antes,.`,•` _ :i 5, 7.r� qq ;�1.: I� Il � 11� r. i:'. 1 Rr" I 4 1 I �r fi 'Zf I rf �Irk� ��.. ,trt` � rl -f /l';, s �;•�` -�!.'rr l3enclima'rk r$: .,i s..r:, ;ry - f u!r'Y,k a f',S4 t c. c . iOQU F , i' `-!.� A - I I' Q Q,�F ?l` '};' !•w' A9ih;Fc _ K t cr, .c• �. .,r,"�f . :a,..;s'":=k : t: t^ >a l�',;� 1 , rtaWi'Iiii1k8i0 t,. a 0.f.0F r;F_'�,. h':x;,yr .',�r,I304;,sarr'; 3?�'!1, r c7) / r� I V) n) N N 0o / OIL N� Note: If you report a sampled value, in excess of the benchmark value, or outside the benchmark range for p1l, you must implement Tier 1 or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maitttenance Activities using more than 55 gallons of new motor oil per month?_ yes 1-50 (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements O '5Nutofal �N�: e t a 1atgJ , G„'tiN,i3t A�O a rt tOhr l I 2.,_il 1Je a - - rBenettm�s�k ,:t v; _,�If '.) �p�•,)Yft! :, " +l:f1t; ,,, �f h r: k:��- r'i. -}'J f t o?. °syfS+,.DEy�? $ V'�•ii4 }�W!' , i r r }rat•;. "1 : a?,: ��tt Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses. See General Permit text. STORM EVENT' CHARACTERISTICS: Date Lr.,i3 (first event sampled) ,t Total Event Precipitation (inches): . r Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 S W U-245-102107 Page I of 2 • Total Toxic Organics sampling is applicable only for those facifities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for die facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the defmition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR,469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shalt include a list of the total toxic organic compounds used and the"other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: I "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement -for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into [he stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. 1 further certify that this facility is implementing the all the provisions of the solvent management plan included in the.Stormwater Pollution Prevention Plan." Name (Print name Title (Print title) {Signature) (Date) "I certify, under penalty of law, .that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. f am aware that there are significant penalties for submitting false information, including the possibility-o fines and imprisonment for knowing violations." re of (> Zi (D a ) E CWt 1_745. t n7I n7 V STORMWATER DIS�r,;iARGE OUTI;iALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE NO. NCG,03 FACILITY NAME yl-' -Siee i - Tr o.N Al/. 1 vJ (- PERSON COLLECTING SAMP U S wN CERTIFIED LABORATORY WA Lab # Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 161V (This monitoring report is due at the Division no later than 30 days from the date the facility receives the s mp ' results from the laboratory.) COUNTY PHONE NO. C_��Igjv - PLEASE SIGN ON TILE REVERSE 4 Oiitiall No. Date�� kY;? Sample..Caligctedv . ESY7 IIlvldd/ r- ,A0530;, : Oa40Q::z a .:r •, }."0105I . ':; r':OOS56 • ? . N781',4I °° ; xptal3$ seeadedtSollds,; ;�.a ,m 7 " " pH, ' , - y �1 �, rS,fauda_rd uaxfs i,.Ar',./L Lead, mgtL '' �t- Orl andtiGrease;', Total+Toz>{c Organics,; -Bene'limarli ...� 0 ;. tl i Wit6t S U�-_ 9 0 n. r; , . .0 U 3t� ; < < x ytC 1.. �*., . ::1 . 30." ;7::ti ; i? �e :ii ° , 61 —J o fl Note: If you report a sampled value. in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. Did'this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_ yes --fio (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitorine Reauiremcnts 0uifall: 4055t " ;^ U05, i <- O0a00 Sample Collected t!; �,t' Qi1,�and:G,rease} ",otl 5 spendall- �, , h, in L�, j 562`I SO), ❑ (aaj e17x3) ilGenpeO pea IGen1190 uo 1001100 El !!UN pea Note: 'If you report a sampled value in excess of the benchmark value, or outside the ben! es!puepiaw jot td!eoaa uanlo8 ❑ peaeas See General Permit text. ! ,,,ssaadx3 I1EN AVAOlad ❑ e!!eN pall edhl • 7012 2210 0000 75L2 1295 o u3; m m� rn , off, , �o) . a;V ac o m m .3. � m 0 m 9LT � � fl L. i z ti iv CD�' »ga a� P. Q•� 'n c� -n vim, ,. 444 m w 1D m m �a STORM EVENT CHARACTERISTICS: Date -/ % % (first event sampled) f, ! ; Total Event Precipitation (inches): ! ON ❑ :nno!eq sGaAppe fUan!iap Jetua 'S Date (list each additional event sampled this reporting period, ands seX ❑ LL wat! wol;}uaiag!p ssaapPe h�anll ' Total Event Precipitation (inches): IGan!!aa to 9WC1 '0 (awuN polupd) tq pants 4 1-4 + easseippV ❑ 1 1 aueov p Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. ; For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing' use the.d8u1ition as found in 46 CFR 433.11; .for semiconductor manufacture -use ti e'deftniti6n as found in 40 CFR 469.12; for electronic crystal manufacture use the'detwititin'as found in 40 CFR 469'.22; and'for cathode ray tube manufacture use the defuution'found in 40 CFR 46931). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic argarde compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing. compliance with the permit monitoring requirement for total toxic Organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." • �o}D w n/ Name (Print name Title (Print title) (Signa (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibib of fines and imprisonment for knowing violations." of Permittee) ate) • S WU-245-102107 J STORMWATER DISCHARGE OU'TFALL (SDO) MONrfOlUNG REPOW GENERAL PEWMIT NO. NCC030000 - L� CERTIFICATE OIL COVERAGE NO. NCG03 FACILITY NAME 7-i m KC J- l-r-cl - Tr-2DV A k PERSON COLLECTING SAMPLES CERTIFIED LABORATORY A rc Lab # Part A: Specific Munitoriltg Requirements SAMPLES COLLECTED DUIUNG CALENDAR YEAR: V�yJS (This moniturin; report is due at the Division no Iater than 30 days frolp the date the facility receives file s: 1plil4}g results from the laboratory.) COUNTYv 1 ll P11ONE NO. (S D 9" PLEASE SIGN ON TIE REVERSE -) Uutf:ill . 1Vu� 'I3tlte :• `k':•; Sanlplc Cullccted, my/dd/ r' k 1J0531), i ;:;:; 00�300.:: '°::.;� d3+ �fOlOSI' ` d ':-0055Cs'` ; „a :•: :='ig•I+ti l VS Sulids, 'r if' lu /L. ��s r pIi;, Stkiildiii'llill�li9f4Y.11 rj cad; iligIL ' ri 4' : Q.i and Crcase� !:'}`r , '`' Tiita�rToxl Org:ulics,; ' +t�I11 'Benaliinarli s `10i1•�°• 3 tV>thilir`r:0' _li1nIL/L d C7�S h! (1 N , Note: if you report a sampled value, in excess of the benchniark value, or outside the bcncllaaark range for pH, you must implement Tier i or Tier 2 respanscs. See General Permit text. Did this facility perform Vehicle Mainieuance Activities using more than 55 gallons of new motor oil per month? _ yes l no (if yes, complete fart B) I'art B; Vehicle 11'taintestance Activity Munil �blltfali:,:."tC-r�.'i� Sariiple wilectcli, ,I. r � my%dd/ $etichntal k `�. .. Note: If you report a sampled value in excess of tlic See General Permit text. llil"CIIICFItS F 1112111F7m a. vy�1 Sys) a i L k jy a ETET sad ❑ (9e_4 erax3) 44JOA11eO pal' IGanpap uo 1001100 p decry pair value, or outside die bei oa UAL STORM EVENT CHARACTERISTICS: Date �-/-Y-lS (first event sampled) Total Event Precipitation (inches): Date (list each additional event sampled this reporting period, and Total Event Precipitation (inches): Sm. � 0 :Moteq ssajppe 4 well wilauf I0an11ea la elefl .0 (ewaN pe7u1Jd) Aq eassaappv luo6v 0 • 7014 2870 0002 1482 1313 --- • D r " Sao o� � y. 4 r i 2�AS 'V y{ ?O ?7J W • o o m -on x, m l Total Toxic Organics sampling is applicable only for those facilities whicli perform metal luxishiug operations, manufacture senuconductors, manufacture electronic crystals, or manufacture catlfode ray tubes., For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the f7ciiity subject to the requirement to sample (formeidi f nislniing use ale .d iiiiiion as foklnd.in 40 (SR 433.11; .for semiconductor�iitaiIufacturc itsc (Iic'definition as foitild in 40 CFR 469.12; for .. electronic crystal manufacture use the'definitiott?as famed *ill 40 CFR 469.22; and'for ca(ho4c ray tube manufacture use the definition -found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention flan may request that DWQ waive monitoring of total toxic organics. The solvent management plait shall iuclude a list of the total toxic organic compotwds used and life other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for inanaging compliance with the pennit monitoring requirement Ior total toxic organics (T'1'O), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the storinwater or areas which are exposed to rainfall or s(orniwater runoff has occurred since filing the last discharge monitoring report. I further certify that (his facility is ifill) lementitng the all the provisions of tlrc solvent tnanagennent • plau included in the 5toniiwatcr Pollution Prevention Plan." V.J Name (Print name Title (Print title)'- 6 / 5^ (Siglp r - (Date) • "I certify, under penalty of law, that this document and all attachments were prepared under nay direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information subeeutted. Based on my inquiry of the person or persons who manage the systene,-or those persons directly responsible for gathering the information, the inforniation submitted is, to the best of my knowledge and belief, true, accurate, and complete. I ain aware that there itre significant penalties for submitting false infortn.etion, including the possibility Onies and imprisonment for knowing violations.." (Si . ure f Perinittee) , (Da e) SWU-245-102107 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM for establishments primarily engaged in the following activities: Metal Fabrication In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act, as amended, this permit is hereby issued to all owners or operators, hereinafter permittees, which are covered by this permit as evidenced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of stormwater to the surface waters of North Carolina or to a separate storm sewer system conveying discharges to surface waters in accordance with the terms and conditions set forth herein. Coverage under this General Permit is applicable to: • All owners or operators of stormwater point source discharges associated with activities classified as establishments primarily engaged in activities classified as establishments prirnarily engaged in: ■ Rolling, Drawing, and Extruding of Nonferrous Metals, standard industrial classification (SIC 335) ■ Heat Treating of Metal (SIC 3398) ■ Fabricating of Metal Products (SIC 34) ■ Manufacturing of Industrial and Commercial Machinery (SIC 35) ■ Manufacturing of Electronic Equipment (SIC 36) • Manufacturing of Transportation Equipment (SIC 37) • Manufacturing of Measuring and Analyzing Instruments (SIC 38)) ♦ Stormwater point source discharges from like industrial activities deemed by DWQ to be similar to these operations in the process, or the discharges, or the exposure of raw materials, intermediate products, by-products, products, or waste products. Except upon DWQ determination of similarity as provided immediately above, the following activities and associated discharges are excluded from coverage under this General Permit: Establishments primarily engaged in the ship and boat building and repairing'(SIC 373), which is covered by general stormwater permit NCG190000. The General Permit shall become effective on November 1, 2012. The General Permit shall expire at midnight on October 31, 2017. Signed this day October 2S, 2012, Original sLcIned by Matt Matthews for Charles Wakild, P.E., Director Division of Water Quality By the Authority of the Environmental Management Commission . Permit No. NCG030000 If TABLE OF CONTENTS PART I INTRODUCTION Section A: General Permit Coverage Section B: Permitted Activities PART If MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Analytical Monitoring Requirements Section C: On -Site Vehicle and Equipment Maintenance Monitoring Requirements Section D: Qualitative Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability S. Oil and -Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports 11. Onshore or Offshore Construction 12. Duty to Reapply Section B: General Conditions 1. General Permit Expiration 2, Transfers 3. When an Individual Permit May he Required 4. When an Individual Permit May be Requested S. Signatory Requirements 6. General Permit Modification, Revocation and Reissuance, or Termination i • Permit No. NCG030000 7. Certificate of Coverage Actions S. Annual Administering and Compliance Monitoring Fee Requirements Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce not a Defense 3. Bypassing of Stormwater Control Facilities Section D: Monitoring and Records I. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring Reports 2. Submitting Reports 3. Availability of Reports 4. Nan-Stormwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Spills 8. Bypass 9. Twenty-four Hour Reporting 10. Other Noncompliance 11. Other Information PART IV DEFINITIONS Permit No. NCG030000 PART I — INTRODUCTION SECTION A: GENERAL PERMIT COVERAGE All persons desiring to have facilities covered by this General Permit must register with the Division of Water Quality (DWQ) by the filing of a Notice of Intent (N01) and applicable fees. The NOI shall be submitted and a certificate of coverage issued prior to any point source discharge of stormwater associated with -industrial activity to the surface waters of the state. Any owner or,operato,r,not wishing to be covered or limited by this General Permit may make application for an individual NPDES permit in accordance with NPDES procedures in 15A NCAC 2H .0100, stating the reasons supporting the request. Any application for an individual permit should be made at least,,180 days prior to commencement of discharge. This General Permit does not cover activities or discharges covered by an individual NPDES permit until the individual permit has expired or has been revoked. Any person conducting an activity covered by an individual permit but which could be covered by this General Permit may request that the individual permit be revoked and coverage under this General Permit be provided. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CPR §122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Exclusion must submit a No Exposure Certification Notice of Intent (N01) form to the Division; must receive approval by the Division; must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit; and must recertify the No Exposure Exclusion annually. Any facility may apply for new or continued coverage under this permit until a Total Maximum Daily Load (TMDL) for pollutants for stormwater is established. A TMDL sets a pollutant -loading limit that affects a watershed, or portion of a watershed, draining to a specific impaired water. For discharges to watersheds affected by a TMDL, coverage under this permit may depend on the facility demonstrating it does not have reasonable potential to violate applicable water quality standards for those pollutants as a result of discharges. If DWQ determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 1.80 days prior to the expiration date of this General Permit. Once that individual permit is effective, the facility will no longer have coverage under this General Permit. Note that the permittee must identify impaired waters (scheduled for TMDL development) and waters already subject to a TMDL in the Site Overview, as outlined in the Stormwater Pollution Prevention Plan, Part II, Section A. During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. Part i Page 1 of 2 Permit No. NCG030000 SECTION B: PERMITTED ACTIVITIES Until coverage under this permit expires or is modified or revoked, the permittee is authorized to discharge stormwater to the surface waters of North Carolina, or to a separate storm sewer system, which has been adequately treated and managed in accordance with the terms and conditions of this General Permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. The discharges allowed by this General Permit shall not cause or contribute to violations of Water Quality Standards. Discharges authorized by this permit and site operations must meet applicable wetland standards, as recorded in 15A NCAC 213.0230 and .0231, and water quality certification requirements as outlined in 15A NCAC 2H .0500. This permit does not relieve the permittee's responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, or decree. Part E Page 2 of 2 Permit No. NCG030000 PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The permittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP). The SPPP shall be maintained on site unless exempted from this requirement by the Division. The SPPP is public information in accordance with Part 111, Standard Conditions, Section E, paragraph 3 of this permit. The SPPP shall include, at a minimum, the following items: 1. Site Overview. The Site Overview shall provide a description of the physical facility and the potential pollutant sources that may be expected to contribute to contamination of stormwater discharges. The Site Overview shall contain the following: (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters; the name of the receiving waters to which the stormwater outfalls discharge, or if the discharge is to a.municipal separate storm sewer system, the name of the municipality and the ultimate. receiving waters; and accurate latitude and longitude of the points of stormwater discharge associated with industrial activity. The general location map (or alternatively the site map) shall,identify whether any receiving waters are impaired (on the state's 303(d) list of impaired,waters) or if the site is located in a watershed for which a TMDL has been established, and what the parameters of concern are. (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants that could be expected to be present in the stormwater discharge from each outfall. (c) A site map drawn at a scale sufficient to clearly depict: the site property boundary; the stormwater discharge outfalls; all on -site and adjacent surface waters and wetlands; industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads); site topography and finished grade; all drainage features and structures; drainage area boundaries and total contributing area for each outfall; direction of now in each drainage area; industrial activities occurring in each drainage area; buildings; stormwater Best Management Practices (BMPs); and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious, and the site map must include a graphic scale indication and north arrow, (d) A list of significant spills or leaks of pollutants during the previous three (3) years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part III, Standard Conditions, Section B, Paragraph 3. Partit Page 1 of 10 E 0 Permit No. NCG030000 2. Stormwater Management Strategy. The Stormwater Management Strategy shall contain a narrative description of the materials management practices employed which control or minimize the Stormwater exposure of significant materials, including structural and nonstructural measures. The Stormwater Management Strategy, at a minimum, shall incorporate the following: (a) Feasibility Study. An annual review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to rainfall and run-on flows. Wherever practical, the permittee shall prevent exposure of all storage areas, material handling operations, and manufacturing or fueling operations. In areas where elimination of exposure is not practical, this review shall document the feasibility of diverting the stormwater run-on away from areas of potential contamination. (b) Secondary Containment Requirements and Records. Secondary containment is required for: bulk storage of liquid materials includingpQtroleum products: storage in any amount of Section 313 of Title I11 of the Superfund Amendments and Reauthorization Ac (SARA) water priority chemicals: and storage in any amount of hazardous substances, in order to prevent leaks and spills from contaminating stormwater runoff. A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices which shall be secured closed with a locking mechanism. Any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, outfall staining, visible sheens, and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by any material. Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five (5) years. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMPs) shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and on data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually. Spill Prevention and Response Procedures. The Spill Prevention and Response Procedures (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP. Part 11 Page 2 of 10 0 • Permit No. NCG030000 Preventative Maintenance and Good Housekeeping Program. A preventative maintenance and good housekeeping program shall be developed and implemented. The program shall address all stormwater control systems (if applicable), stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas, disposal areas, process areas, loading and unloading areas, and haul roads), all drainage features and structures, and existing structural BMPs. The program shall establish schedules of inspections, maintenance, and housekeeping activities of stormwater control systems, as well as facility equipment, facility areas, and facility systems that present a potential for stormwater exposure or stormwater pollution where not already addressed under another element of the SPPP. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Timely compliance with the established schedules for inspections, maintenance, and housekeeping shall be recorded and maintained in the SPPP: S. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi- annual schedule, once during the first half of the year (January to June), and once during the second half (July to December), with at least 60 days separating inspection dates (unless performed more frequently than semi-annually). These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring at the outfalls required in Part [I B, C, and D of this permit. Employee Training. Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. The facility personnel responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained. 7. Responsible Party. The SPPP shall identify a specific person(s) or position(s) responsible for the overall coordination, development, implementation, and revision of the SPPP. Responsibilities for all components of the SPPP shall be documented and position assignments provided. 8. SPPP Amendment and Annual Update. The permittee shall amend the SPPP whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features which may have a significant effect on the potential for the discharge of pollutants to surface waters. All aspects of the SPPP shall be reviewed and updated on an annual basis. The annual update shall include: (a) an updated list of significant spills or leaks of pollutants for the previous three (3) years, or the notation that no spills have occurred (element of the Site Overview); (h) a written re-certffication that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges (element of the Site Overview); (c) a documented re-evaluation of the effectiveness of the on -site stormwater BMPs (BMP Summary element of the Stormwater Management Strategy). (d) a statement that annual training requirements were met in the year past; (e) a review and comparison of sample analytical data to benchmark values (if applicable) over the past year, including a discussion about Tiered Response status. The permittee shall use the Division's Annual Summary Data Monitoring Report (I)MR) form, available from the Stormwater Permitting Unit's website (See 'Monitoring Forms' here: http://liortal.ncdenr.org/web/wqlws/su/npdessw). Part 11 Page 3 of 10 • • Permit No. NCG030000 The Director may notify the permittee when the SPPP does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SPPP to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part 111, Standard Conditions, Section B, Paragraph 3) to the Director that the changes have been made. SPPP Implementation. The permittee shall implement the Stormwater Pollution Prevention Plan and all appropriate BMPs to prevent contaminants from entering surface waters via Stormwater. Implementation of the SPPP shall include documentation of all monitoring, measurements, inspections, maintenance activities, and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on -site for a period of five (S) years and made available to the Director or the Director's authorized representative immediately upon request. 10. Solvent Management Plan. Facilities that implement a Solvent Management Plan may so certify, and the requirement for Total Toxic Organics (TTO) monitoring in Part 11, Section B. may be waived. The Solvent Management Plan shall include: (a) an annually updated and quantified inventory of the total toxic organic compounds present on site during the previous three years; (b) a narrative description of the in -plant locations and uses of the toxic organic compounds, the method of disposal including quantities disposed on- and off -site; (c) the management procedures and engineering measures for assuring that toxic organics do not spill or leak into stormwater. DWQ may at its discretion require submittal, review, and approval of the Solvent Management Plan as a condition of continuing the TTO sampling waiver. For those facilities electing to employ the TTO sampling waiver, the permittee shall include the following signed certification statement on each discharge monitoring report: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no leak, spill, or dumping of concentrated toxic organics into the stormwater or onto areas which are exposed to rainfall or storm water runoff has occurred since filing the last discharge monitoring report. 1 further certify that this facility is implementing all the provisions of the Solvent Management Plan included in the Stormwater Pollution Prevention Plan." Part 11 Page 4 of 10 Permit No. NCG030000 SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a measureable storm event at each stormwater discharge outfall (SDO). Only SDOs discharging stormwater associated with industrial activity must be sampled (See Definitions). A measurable storm event is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. See Definitions. Table 1 Analytical Monitoring Re uirements Discharge Characteristics Units Measurement Fre uenc 1 Sample T e2 Sample Location3 H standard semi-annual Grab SDO Total Suspended Solids m L semi-annual Grab SDO Ikon -Polar Oil'& Grease / TPH EPA Method 1664 SGT-HEM mg/L � semi-annual Grab SDO Copper, Total Recoverable rn L semi-annual I Grab SDO Lead, Total Recoverable m L semi-annual Grab SDO Zinc, Total Recoverable m L semi-annual Grab SDO Total Toxic'Organics (TTO)4 m L semi-annual Grab SDO Total Rainfalls inches semi-annual 1 Rain Gauge - Footnotes:. ' 1 Measurement Frequency: Twice per year during a measureable storm event. 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status (ROS) has been granted. A copy of the letter granting ROS shall be kept on site. 4 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 1, for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31.) 5 For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time, a- local rain gauge reading may be substituted for an on -site reading. The permittee shall complete the analytical samplings in accordance with the schedule specified below in Table 2, unless adverse weather conditions prevent sample collection (see Adverse Weather in Definitions). A minimum of 60 days must separate Period 1 and Period 2 sample dates, bnless monthly monitoring has been instituted as part of other requirements of this permit. Inability to sample because of adverse weather conditions must he documented in the SPPP and recorded on the DMR. The permittee must report the results from each sample taken within the monitoring period (see Part III, Section E). Part It Page 5 of 10 0 i Table 2 Monitor' Schedule Permit No. NCG030000 Monitoring periodl•2 Sample Number Start End Year 1 - Period 1 1 January 1, 2013 June 30, 2013 Year 1 - Period 2 2 July 1, 2013 December 31, 2013 Year 2 - Period 1 3 January 1, 2014 June 30, 2014 Year 2 - Period 2 4 July 1, 2014 December 31, 2014 Year 3 - Period 1 5 January 1, 2015 June 30, 2015 Year 3 - Period 2 6 July 1, 2015 December 31, 2015 Year 4 - Period 1 7 January 1, 2016 June 30, 2016 Year 4 - Period 2 8 July 1, 2016 December 31, 2016 Year S - Period 1 9 January 1, 2017 June 30, 2017 Year 5 - Period 2 10 July 1, 2017 October 31, 2017 Footnotes: 1 Maintain semi-annual analytical monitoring throughout the permit renewal process (unless other provisions of this permit prompt monthly sampling). 2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "Ne Flow" or "No Discharge" within 30 days of the end of the sampling period. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period. "No discharge" from an outfall or inability to collect a sampie because of adverse weather conditions during a monitoring period, for example does not constitute failure to monitor, as long as it is properly reported. The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the implementation of the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. See below the descriptions of Tier One, Tier Two, and Tier Three response actions. In the event that DWQ releases the permittee from continued monthly monitoring under Tier Three, DWQ's release letter remains in effect through the subsequent reissuance of this permit, unless the release letter provides for other conditions or duration. Table 3 Benchmark Values for Analytical Monitoring Discharge Characteristics Benchmark Values pHl 6 - 9 standard unitsl Total Suspended Solids TSS) 100 mg/L TSS ORW HWQ, Trout & PNA waters 50 mg/L Non -Polar Oil & Grease TPH by EPA Method 1664 SGT-NEM 15 mg/L Copper, Total Recoverable 0.007 mg/L Lead Total Recoverable 0.030 mg/L Zinc, Total Recoverable 0.067 mg/L Total Toxic Organics (TTO) 1 mg/L Footnotes: 1 If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pill of the precipitation instead of 6 S. U. Readings from an on -site or local rain gauge must be documented to demonstrate background concentrations were below the benchmark pH range. Part 11 Page 6 of 10 • • Tier One Permit No. NCGO30000 I If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any I parameter at anv outfall: Then: The permittee shall; 1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. 2. Identify and evaluate possible causes of the benchmark value exceedance. 3. Identify potential and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, and/or to bring concentrations within the benchmark range. 4. Implement the selected actions within two months of the inspection. S. Record each instance of a Tier One response in the SPPP. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected actions were implemented. Tier Two If: During the term of this permit, the first valid sampling results from two consecutive monitoring periods are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific discharge outfall; Then: The permittee shall: 1. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for ail parameters. Conduct monthly monitoring at every outfall where a sampling result exceeded the benchmark value For two consecutive samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values or within benchmark range. 3. Submit a monthly monitoring report indicating "No Plow" if no discharge occurs during the sampling period. 4. Benchmark exceedances for a different parameter separately trigger a tiered response. 5. Maintain a record of the Tier Two response and monitoring results in the SPPP. Tier Three During the term of this permit, if the first valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, For any specific parameter at any specific outfall on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may but is not limited to: Part 11 Page 7 of 10 0 Permit No. NCG030000 SECTION C: ON -SITE VEHICLE AND EQUIPMENT MAINTENANCE MONITORING REQUIREMENTS Facilities that have any vehicle maintenance activity occurring on -site which uses more than 55 gallons of new motor oil and/or hydraulic oil per month when averaged over the calendar year shall perform analytical monitoring as specified below in Table 4. All analytical monitoring shall be performed during a measureable storm event at all stormwater discharge outfalls (SDOs) that discharge stormwater runoff from vehicle and equipment maintenance areas, and in accordance with the schedule presented in Table 2 (Section B). Sampling is not required outside of the facility's normal operating hours. Table 4 Analytical Monitoring Requirements for On -Site Vehicle Maintenance Discharge Characteristics Units Measurement 1=re uenc 1 Sample Type2 Sample Location3 H standard semi-annual Grab SDO Non -Polar Oil & Grease / TPH [EPA Method 1664 SGT-HEM mg/L semi-annual Grab SDO Total Suspended Solids m L semi-annual Grab SDO Total Rainfal14 inches semi-annual Rain au e New Motor Oil Usage gallons/month semi-annual Estimate - Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event, until either another permit is issued for this facility or until this permit is revoked or rescinded. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur. 4 For each sampled measureable storm event the total precipitation must be recorded. An on -site or local rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period, as provided in Part II Section B. Monitoring results shall be compared to the benchmark values in Table 5. The benchmark values in Table 5 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs), as provided in Part 11 Section B. Table 5 Benchmark Values for On -Site Vehicle and E ui ment Maintenance Activities Discharge Characteristics Benchmark Values H 6 - 9 standard units Non -Polar Oil & Grease / TPH EPA Method 1664 SGT-HEM 15 mg/L Total suspended solids (TSS) 100 m L TSS ORW, HQW, Trout, and PNA waters 50 m L Part H Page 8 of 10 E C� J SECTION D: QUALITATIVE MONITORING REQUIREMENTS Permit No. NCG030000 The purpose of qualitative monitoring is to evaluate the effectiveness of the permittee's implementation of the SPPP and to assess new sources of stormwater pollution. Qualitative monitoring of stormwater outfalls must be performed during a measurable storm event. Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status. Qualitative monitoring shall be performed semi-annually as specified in Table 6 and concurrent with the required analytical monitoring events (unless the permittee is required to perform further qualitative sampling per the Qualitative Monitoring Response, below). Inability to sample because of adverse weather conditions must be documented in the SPPP. Only SDOs discharging stormwater associated with Industrial activity must be monitored (See Definitions). Table 6 Qualitative Monitoring Requirements Discharge Characteristics Frequencyl Monitoring Location2 Color semi-annual SDO Odor semi-annual SDO Clarity semi-annual SDO FloatingSolids semi-annual SDO Suspended Solids semi-annual SDO Foam semi-annual SDO Oil Sheen semi-annual SDO Erosion or deposition at the outfall semi-annual SDO Other obvious indicators of stormwater pollution semi-annual S D 0 Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. The permittee must continue qualitative monitoring throughout the permit renewal process. 2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status. A minimum of 60 days must separate monitoring dates, unless additional sampling has been Instituted as part of other analytical monitoring requirements in this permit. In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. This documentation shall be maintained with the SPPP. Part 11 Page 9 of 10 0 0 Permit No. NCG030000 If the permittee's qualitative monitoring indicates that existing stormwater BMPs are ineffective, or that significant stormwater contamination is present, the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those corrective actions within 60 days, per the Qualitative Monitoring Response, below. A written record of the permittee's investigation, evaluation, and response actions shall be kept in the SPPP. ve Monitorin Qualitative monitoring is for the purposes of evaluating the effectiveness of the perjittee's implenetaion of the SPPP, and for assessing new sources of stormwater pollution, and for prompting the permittee's response to pollution. If the permittee repeatedly fails to respond effectively to correct problems identified by qualitative monitoring, or if the discharge causes or contributes to a water quality standard violation, DWQ may but is not limited to: • require that the permittee revise, increase, or decrease monitoring frequency for some or all parameters (analytical or qualitative); • require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; • require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters; or • require the permittee implement site modifications to qualify for a No Exposure Exclusion. Part 11 Page 10 of 10 • P Permit No. NCG030000 PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS SECTION A: COMPLIANCE AND LIABILITY C�pmnliance Schedule The permittee shall comply with Limitations and Controls specified for Stormwater discharges in accordance with the following schedule: Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the Certificate of Coverage and updated thereafter on an annual basis. Secondary containment, as specified in Part 11, Section A, Paragraph 2(b) of this general permit, shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage. New Facilities applying for coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified in Part 11, Section A, Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. Existing facilities previously permitted and applying for renewal under this General Permit: All requirements, conditions, limitations, and controls contained in this permit (except new SPPP elements in this permit renewal) shall become effective immediately upon issuance of the Certificate of Coverage. New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this general permit and updated thereafter on an annual basis. Secondary containment, as specified in Part Ill, Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. Duty tG Comply The permittee must comply with all conditions of this general permit. Any permit noncompliance constitutes a violation of the Clean Water Act (CWA) and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit upon renewal application [40 CFR 122.411. a. The permittee shall comply with standards or prohibitions established under section 307(a) of the CWA for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the general permit has not yet been modified to incorporate the requirement. b. T66 CWA provides that any person who violates section[s] 301, 302, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any such sections in a permit issued under section 402, or any requirement imposed in a pretreatment program approved under sections 402(a)(3) or 402(b)(8) of the Act, is subject to a civil penalty not to exceed $37,500 per day for each violation. [33 USC 1319(d) and 40 CFR 122.41(a)(2)] c. The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308, 318, or 405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3) or 402(b)(8) of the Act, is subject to criminal Penalties of $2,500 to $25,000 per day of violation, or imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a negligent violation, a person shall be Part Ill Page 1 of 10 • Permit No. NCG030000 subject to criminal penalties of not more than $50,000 per day of violation, or by imprisonment of not more than 2 years, or both. [33 USC 1319(c)(1) and 40 CFR 122.41(a)(2)] d. Any person who knowingly violates such sections, or such conditions or limitations is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or both. [33 USC 1319(c)(2) and 40 CFR 122.41(a)(2)] e. Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, and who knows at that time that he thereby places another person in imminent danger of death or serious bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangerment violation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more than 30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon conviction of violating the imminent danger provision, be subject to a fine of nut more than $1,600,000 and can be fined up to $2,000,000 for second or subsequent convictions. 140 CFR 122.41(a)(2)] f. Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [North Carolina General Statutes § 143-215.6A] g. Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are not to exceed $16,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $37,500. Penalties for Class 11 violations are not to exceed $16,000 per day for each day during which the violation continues, with the maximum amount of any Class 11 penalty not to exceed $177,500. [33 USC 1319(g)(2) and 40 CFR 122.41(a)(3)] Duty to Mitigate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this general permit which has a reasonable likelihood of adversely affecting human health or the environment [40 CFR 122.41(d)]. 4. Civil and Criminal Liability Lxcept as provided in Part III, Section C of this general permit regarding bypassing of stormwater control facilities, nothing in this permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6, or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. S. _Oil and Hazardous Substance Liability Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. 6. PropeM Rights The issuance of this general permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any Part 111 Page 2 of 10 0 Permit No. NCG030000 invasion of personal rights, nor any infringement of Federal, State or local laws or regulations 140 CPR 122.41(g)]. Severabilit_v The provisions of this general permit are severable, and if any provision of this general permit, or the application of any provision of this general permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this general permit, shall not be affected thereby [NCGS 15013-23]. 8. Duty to Provide Information The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the general permit issued pursuant to this general permit or to determine compliance with this general permit. The permittee shall also furnish to the Permit Issuing Authority upon request, copies of records required to be kept by this general permit [40 CPR 122.41(h)]. 9. Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this general permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both [40 CPR 122.411. 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this general permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both [40 CPR 122.411. 11. Onshore or Offshore Construction This general permit does not authorize or approve the construction of any onshore or offshore physical structures or facilities or the undertaking of any work in any navigable waters. 12. Duty to Reapply Dischargers covered by this general permit need not submit a new Notice of Intent (NO[) or renewal request unless so directed by the Division. If the Division chooses not to renew this general permit, the permittee will be notified to submit an application for an individual permit [15A NCAC 02H .0127(e)]. SECTION B: GENERAL CONDITIONS General Permit Expiration General permits will be effective for a term not to exceed five years, at the end of which the Division may renew them after all public notice requirements have been satisfied. If a general permit is renewed, existing permittees do not need to submit a renewal request or pay a renewal fee unless directed by the Division. New applicants seeking coverage under a renewed general permit must submit a Notice of Intent to be covered and obtain a Certificate of Coverage under the renewed general permit [15A NCAC 02H .0127(e)]. Part III Page 3 of 10 e a Permit No. NCG030000 2. Transfers This general permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122.61. The Director may condition approval in accordance with NCGS 143-215.1, in particular NCGS 143-215.1(b)(4)b.2., and may require modification or revocation and reissuance of the Certificate of Coverage, or a minor modification, to identify the new permittee and incorporate such other requirements as may be necessary under the CWA [40 UR 122.41(1)(3), 122.61] or state statute. The Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. When an Individual Permit May bg ReQuired The Director may require any owner/operator authorized to discharge under a certificate of coverage issued pursuant to this general permit to apply for and obtain an individual permit or an alternative general permit. Any interested person may petition the Director to take action under this paragraph. Cases where an individual permit may be required include, but are not limited to, the following: a. The discharger is a significant contributor of pollutants; b. Conditions at the permitted site change, altering the constituents and/or characteristics of the discharge such that the discharge no longer qualifies for a general permit; C. The discharge violates the terms or conditions of this general permit; d. A change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source; e. Effluent limitations are promulgated for the point sources covered by this general permit; f. A water quality management plan containing requirements applicable to such point sources is approved after the issuance of this general permit; g. The Director determines at his or her own discretion that an individual permit is required. When an Individual Permit May bg Requested Any permittee operating under this general permit may request to be excluded from the coverage of this general permit by applying for an individual permit. When an individual permit is issued to an owner/operator the applicability of this general permit is automatically terminated on the effective date of the individual permit. Signatory Requirgmgnts All applications, reports, or information submitted to the Permitting Issuing Authority shall be signed and certified 140 CFR 122.41(k)]. a. All Notices of Intent to be covered under this general permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. PartIll Page 4 of 10 i • Permit No. NCG030000 (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official [40 CFR 122.22]. b. All reports required by the general permit and other information requested by the Permit Issuing Authority shall be signed by a person described in paragraph a. above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.22] c. Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative [40 CFR 122.22] d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the following certification [40 CFR 122.221. NO OTHER STATF..MFNTS OF CERTIFICATION WILL BE ACCEPTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction orsupervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonmentfor knowing violations." 6. General Permit Mifi tin. E-Qvocationi unc r'I miain The issuance of this general permit does not prohibit the Permit Issuing Authority from reopening and modifying the general permit, revoking and reissuing the general permit, or terminating the general permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123, Title 15A of the North Carolina Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et al. After public notice and opportunity for a hearing, the general permit may be terminated for cause. The filing of a request for a general permit modification, revocation and reissuance, or termination does not stay any general permit condition. The Certificate of Coverage shall expire when the general permit is terminated. Certificate of Coverage AQtions The general permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any general permit condition [40 CFR 122.41(o]. Part H1 Page 5 of 10 �J 0 Permit No. NCG030000 S. Annual Administering and Compliance, Monitoring Fee Requirements The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division, failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(2) may cause this Division to initiate action to revoke coverage under the general permit SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of this permit [40 CFR 122.41(e]]. Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this general permit [40 CFR 122.41(c)]. Bypassing of Stormwater Control Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. The permittee submitted notices as required under, Part HI, Section E of this general permit. If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after considering its adverse effects. SECTION D: MONITORING AND RECORDS Representative Sam_plin Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge. Analytical sampling shall be performed during a measureable storm event. Samples shall be taken on a day and time that is characteristic of the discharge. All samples shall be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance. Monitoring points as specified in this general permit shall not be changed without notification to and approval of the Permit Issuing Authority [40 CFR 122.41(j)]. 2. Recording Results For each measurement or sample taken pursuant to the requirements of this general permit, the permittee shall record the following information [40 CFR 122.41]: a. The date, exact place, and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; Part ill Page 6 of 10 Permit No. NCG030000 c. The date(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 3. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. 4. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. To meet the intent of the monitoring required by this general permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are determined capable of achieving minimum detection and reporting levels below general permit discharge requirements, then the most sensitive (method with the lowest possible detection and reporting level) approved method must be used. S. Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. 6. Records Retention Qualitative monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan (SPPP). Copies of analytical monitoring results shall also be maintained on -site. The permittee shall retain records of all monitoring information, including o all calibration and maintenance records, o all original strip chart recordings for continuous monitoring instrumentation, o copies of all reports required by this general permit, o copies of all data used to complete the Notice of Intent to be covered by this general permit. These records or copies shall be maintained for a period of at least 5 years from the date of the sample, measurement, report or Notice of Intent application. This period maybe extended by request of the Director at any time [40 CFR 122.41]. If this volume of records cannot be maintained on -site, the documents must be made available to an inspector upon request as immediately as possible. 7. Inspection and Entry ' The permittee shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), or in the case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: Part Ill Page 7 of 10 Permit No. NCG030000 a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit; b. have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit; c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location [40 CFR 122.41(i)]. SECTION E. REPORTING REQUIREMENTS Discharge Monitoring Reports Samples analyzed in accordance with the terms of this general permit shall be submitted to the Division on Discharge Monitoring Report (DMR) forms provided by the Director. DMR forms are available on the Division's website (http:I/portal.ncdonr.org/web/`wq/ws/su/npdessw). Submittals shall be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. When no discharge has occurred from the facility during the report period, the permittee is required to submit a discharge monitoring report, within 30 days of the end of the specified sampling period, giving all required information and indicating "NO FLOW" as per NCAC T15A 0213 .0506. If the permittee monitors any pollutant more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 and at a sampling location specified in this general permit or other appropriate instrument governing the discharge, the results of such monitoring shall be included in the data submitted on the DMR. The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division and shall retain the completed forms on site. Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific requirement to do so. Qualitative Monitoring Report forms are available at the website above. 2. Submitting Reports Two signed copies of Discharge Monitoring Reports (DMRs) shall be submitted to: Central Files Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division. As required by the Act, analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.613 or in Section 309 of the Federal Act. 4. Non-Stormwater Discharges If the storm event monitored in accordance with this general permit coincides with a non- stormwater discharge, the permittee shall separately monitor all parameters as required under all Part 111 Page 8 of 10 • Permit No. NCG030000 other applicable discharge permits and provide this information with the stormwater discharge monitoring report. S. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged [40 CFR 122.41(1)]. This notification requirement includes pollutants which are not specifically listed in the general permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6.-ntiLWatedNoncompliance The permittee shall give advance notice to the Director of any planned changes at the permitted facility which may result in noncompliance with the general permit [40 CFR 122.41(l)(2)]. 7. Spills The permittee shall report to the local DWQ Regional Office, within 24 hours, all significant spills as defined in Part IV of this general permit. Additionally, the permittee shall report spills including: any oil spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters, any oil spill regardless of amount occurring within 100 feet of surface waters, and any oil spill less than 25 gallons that cannot be cleaned up within 24 hours. 8. Bypass Notice [40 CFR 122.41(m)(3)]: a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. Twenty-four Hour Reporting a. The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes, the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance [40 CFR 122.41(I)(6)]. b. The Director may waive the written report on a case -by -case basis for reports under this section if the oral report has been received within 24 hours. c. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. 10. Other Noncompliance The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted [40 CFR 122.41(l)(7)]. Part III Page 9 of 10 Permit No. NCG030000 11. Other Information Where the Permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent to be covered under this general permit, or submitted incorrect information in that Notice of Intent application or in any report to the Director, it shall promptly submit such facts or information [40 CPR 122,41(1)(8)1. Part III Page 10 of 10 • 0 PART IV DEFINITIONS Act See Clean Water Act. Permit No. NCG030000 Adverse Weather Adverse conditions are those that are dangerous or create inaccessibility for personnel, such as local Flooding, high winds, or electrical storms, or situations that otherwise make sampling impractical. When adverse weather conditions prevent the collection of samples during the sample period, the permittee must take a substitute sample or perform a visual assessment during the next qualifying storm event Documentation of an adverse event (with date, time and written narrative) and the rationale must be included with your SPPP records. Adverse weather does not exempt the permittee from having to file a monitoring report in accordance with the sampling schedule. Adverse events and failures to monitor must also be explained and reported on the relevant DMR. 3. t111owable Non-Stormwater Discharges This general permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: a. All other discharges that are authorized by a non-stormwater NPDFS permit. b. Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, irrigation waters, flows from riparian habitats and wetlands. c. Discharges resulting from fire -fighting or Fire -fighting training, or emergency shower or eye wash as a result of use in the event of an emergency. 4. Best Management Practices (BMP�) Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the form of a process, activity, or physical structure. More information on BMPs can be found at: http;//cfpub.epa.gov/npdes/stormwater/mnuQflimps/indeN.cfm. 5. Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 6. Bulk-Storqge of liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 7. Certificate of Coverage The Certificate of Coverage (CDC) is the cover sheet which accompanies a general permit upon issuance and lists the facility name, location, receiving stream, river basin, effective date of coverage under the general permit and is signed by the Director. 8. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean.Water Act (CWA), as amended, 33 USC 1251, et. seq. 9. - Qizisian or D_WQ The Division of Water Quality, Department of Environment and Natural Resources. Part IV Page 1 of 4 0 • Permit No. NCG030000 10. Director The Director of the Division of Water Quality, the permit issuing authority. 11. EMC The North Carolina Environmental Management Commission. 12. Grab Sample An individual sample collected instantaneously. Grab samples that will be analyzed (quantitatively or qualitatively) must be taken within the first 30 minutes of discharge. 13. - Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 14. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility. 15. Measureable Storm Event A storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval may not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and obtains approval from the local DWQ Regional Office. Two copies of this information and a written request letter shall be sent to the local DWQ Regional Office. After authorization by the DWQ Regional Office, a written approval letter must be kept on site in the permittee's SPPP. 16. Municipal 5eparate Storm Sewer S stem M 4 A stormwater collection system within an incorporated area of local self-government such as a city or town. 17. No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. DWQ may grant a No Exposure Exclusion from NPDES stormwater permitting requirements only if a facility complies with the terms and conditions described in 40 CFR §122.26(g). 18. Notice of Intent The state application form which, when submitted to the Division, officially indicates the facility's notice of intent to seek coverage under a general permit 19. Permit Issuing Autharily The Director of the Division of Water Quality (see "Director" above). 20. PermitteQ The owner oroperator issued a Certificate of Coverage pursuant to this general permit. 21. Point Source Discharge of Stormwater Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or inay be discharged to waters of the state. Part IV Page 2 of 4 0 Permit No. NCG030000 22. Rppre5el3talive-jautfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. 23. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event. 24. 5eaion 313 Water Priority Chemical A chemical or chemical category which: b. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; c. Is present at or above threshold levels at a facility subject to SARA title III, Section 313-reporting requirements; and d. Meets at least one of the following criteria: i. Is listed in appendix D of 40 CFR part 122 on Table 11 (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); ii. Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR 116.4; or iii. Is a pollutant for which EPA has published acute or chronic water quality criteria. 25. Severe Propt:rly Damage Substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 26. 2i gnifi n LM aterials Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under section 101(14) of CFRCLA; any chemical the facility is required to report pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. , 27. "1 rtiFicantSpills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Act (Ref: 40 CFR 110,3and 40 CFR 117.3) or section 102 of CFRCLA (Ref: 40 CFR 302.4). 28. Sturnwatu Discharge Outfall (SDO) The point of departure of stormwater from a discernible, confined, or discrete conveyance, including but not limited to, storm sewer pipes, drainage ditches, channels, spillways, or channelized collection areas, from which stormwater flows directly or indirectly into waters of the State of North Carolina. 29. 5to rm wate r_ Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. Part 1V Page 3 of 4 0 • Permit No. NCGO30000 30, �tQrmwater Associated with Industrial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 31. 5[Qrrnwaj_Qr.PQllutionPrevention Plan PPP A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site. 32. Total Maximum Daily Load (TMDQ TMDLs are written plans for attaining and maintaining water quality standards, in all seasons, for a specific water body and pollutant. A list of approved TMDLs for the state of North Carolina can be found at http://portal.ncdenr.orglweb/wa/os/mtu Itmdl. 33. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. 34. Vehicle Maintenance Activity Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport deicing operations. 35. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye. 36. 25-year. 24 hour Storm Event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. PartlV Page 4 of 4 North Carolina Department of Environment and Natural Resources oaCsF W ATEROG Technical Bulletin for N.C. General Stormwater Y Permits NCG030000 and NCG090000 Technical Bulletin for NCG030000 and NCG090000 Last Revised 10/25/2012 What is regulated by these two General Permits? These two General Permits regulate stormwater discharges from two groups of industrial manufacturing ac- tivities: -NCG030000 (NCG03) for metal fabrication and metal finishing businesses ✓NCG090000 (NCG09) for the manufacture of paints, varnishes, and allied products What does my permit require me to do? ✓ Develop and implement a written Stormwater Pollution Prevention Plan (SPPP) (Part 11, Section A). ✓Provide secondary containment for bulk storage of liquid materials (Part 1l, Section A). ✓Conduct semi-annual self -monitoring of the pollutant content in stormwater discharges, and report the results to DWQ (Part 11, Sections B and Q. -Conduct semi-annual visual inspections of stormwater pollutant sources, control measures, conveyances, and out - falls (Part it, Sections A and D). -"Respond to monitoring results that exceed the numerical benchmarks with management actions to reduce the level of pollutants in the stormwater discharges. The numerical benchmarks are considered as 'action levels.' Why? 1 /The two General Permits seek to reduce industrial pollution in rainfall runoff from manufacturing businesses by requiring site managers to be aware of, and control, the potential for polluted runoff. ✓Federal and state laws and regulations require the control of industrial pollution in stormwater runoff. ✓Those laws and regulations reflect the public's support for providing for clean natural waters in our state and nation. What has changed since the last renewals in 2007? Common changes to both General Permits: . The required content of the SPPP has been expanded slightly and clarified in minor ways in several paragraphs. i. The permittee may now sample discharges from any measureable storm event, rather than from a representative event. This change should make it easier to obtain a sample from a qualifying rain event. . The permit text now clarifies that failure to sample due to adverse weather, or due to no discharge during the nor- mal monitoring period, may be excused. However, the permits now require additional monthly monitoring for un- excused failures to monitor. �. Vehicle Maintenance Areas (VMA) shall be monitored for Total Petroleum Hydrocarbons (TPH) rather than Oil & Grease (O&G). • VMA monitoring is now triggered by the total oil usage for motor oil plus hydraulic oil. The trigger remains at a total of 55 gallons per month, average. • A lower TSS benchmark of 50 mg/L applies for discharges to especially protected water classifications. Significant changes specific to the different General Permits • For NCG03: Analytical monitoring for copper and zinc have been added to allow more facilities to qualify for cover- age under this General Permit. . For NCG09: Monitoring results must be reported in mg/L rather than ug/L; monitoring results may not be reported as 'non -detect', or 'below detection limit', or other similar notations, but instead must indicate the numerical value i of the reporting or detection limit of the test procedure employed. PAGE TECHNICAL BULLETIN FOR N.C. GENERAL STORMWATER PERMITS NCG030000 AND NCG090000 LAST REV, 1012512012 ' Frequently Asked Questions Do I have to monitor all outfalls? Yes. However, you may request ROS (Representative Outfall Status). If ROS is approved, this status allows analytical monitoring at fewer outfalls. To request ROS, submit a ROS Request Form SWU- ROS (from our website) to the DWQ Regional Office. What if I can't collect a storm - water discharge in 30 minutes? When distances separate multiple out - falls and preclude collection within 30 minutes of each discharge event, begin collection within 30 minutes and then continue until all outfalls are sampled. Documentation must be kept in the SPPP. Can I take more samples than is required by my permit? Yes. The permittee may take multiple samples at any time while under permit coverage. The permittee may find the extra sampling useful to quickly identify causes of benchmark exceedances. All sampling for the permit parameters must be reported to DWQ on the DMR forms. What if I can't sample because of bad weather? Adverse weather is dangerous or it may limit access for sampling personnel. Your documentation of adverse weather and the reasons for not sampling must be included in your SPPP. A substitute sample may be taken during the next qualifying storm event. What if I don't address visual monitoring problems? If you do not respond to problems seen in visual monitoring, DWQ may require that you increase the visual monitoring frequency, apply for an individual per- mit, implement in -stream monitoring, install or modify structural stormwater controls, or implement other controls. Why did you replace Oil & Grease with TPH in VM areas? The TPH test only targets chemicals de- rived from crude oil. The Oil & Grease (O&G) test recovers fats from animal & vegetable sources and chemicals from crude oil. Because TPH is more specific, it is a better parameter for vehicle main- tenance areas. The TPH method we are specifying is EPA 1664A (SGT-HEM). It is important to note that DWQ is not speci- fying the more expensive Gas Chromoto- graph (GQ TPH method. DWQ found lab costs for EPA 1664A (SGT-HEM) to be comparable to O&G test costs, To test these parameters in stormwoter, labs must perform this test in accordance with EPA procedures, but do not need to be certified. Note: A lower benchmark applies for TPH: 15 mg/I (not 30 mg/1). Why are there two benchmark values for TSS? The 100 mg/L benchmark applies to most rivers, lakes, and creeks in North Carolina. However, some other waters must receive special protection under North Carolina water quality rules, and in these two permits discharges to them are subject to the more protective benchmark of 50 mg/L. Those waters classified as Trout Waters, High Quality Waters, Outstanding Resource Waters, and Primary Nursery Areas receive this extra protection in these permits. Where and when do I send the monitoring reports? See your permit text, Part 1/1, Section E. Who can help me? Division of Water Quality (DWQ) Offices: Must I use a North Carolina certified laboratory? No. North Carolina water quality rules do not require that analyses of storm - water be accomplished by a certified facility. Please note however, federal rules at 40CFR136 do require that test- ing for these two permits be by EPA - approved lab methods, Analysis by a North Carolina certified lab is often the easiest way to insure compliance with federal rules. Note that pH is a special case, and must be measured within 15 minutes of the sample recovery. You must ei- ther train on -site staff to conduct pH testing, or contract with commercial services to test pH in accordance with EPA field testing methods. Must a P. E. sign and stamp my SPPP? No. North Carolina water quality rules do not require that the SPPP be the work product of a North Carolina P.E. Who inspects me, and for what? Staff from the DWQ Regional Offices shown below will inspect your facility. They will typically ask to see your SPPP and will check to see if it is complete and up to date. They will typically ask to see your recent monitoring results. They will typically tour the facility with a focus on the stormwater discharge outfalls and on your general housekeeping as a way to assess the potential for polluted storm - water discharges. Our staff will always follow up their Compliance Evaluation Inspection with a summary letter to you, restating their findings and, if necessary indicating whether enforcement action will be considered in response to those findings. Asheville Office .......... _ (828) 296-4500 Washington Office.-........ (252) 946-6481 Fayetteville Office.......... (910) 433-3300 Wilmington Office ...... .... (910) 796-7215 What it I forget to monitor? Mooresville Office...... (704) 663-1699 Winston-Salem Office...... (336) 771-5000 Raleigh Office ............... (919) 791-4200. Central Otftce..._. rf�.... (99) 807-6300 DWQ may require monthly monitoring for a specified time period. L WQ Stormwater Permitting Unit: http;llporial.ncdenr.org/web/wq/ws/su • TimkenSteei —Tryon Peak, NC Benchmark Monitoring — Stormwater General Permit NO. NCG030000 Certificate of Coverage: No. NCG030440 Effective : December 4, 2012 (5yrs) WELCOME: SHAWNA RIDDLE, Environmental Senior Specialist Agenda: ❖ Introductions: Bob Morrow, Operations Manager Tryon Peak 1828 894 6227 robert.morrow@timkensteel.com Jody Splawn, Facility Support Representative 1828 894 6259 Aody.splawn@timkensteel.com Robert Teter, Environmental Specialist -Corporate 330-471-3396 robert.teterL@timkensteel.com Philip Rhodes, Sr. Environmental Engineer 330-631-1156 prhodes4enviroscienceinc.com I ❖ Company History • NPDES Stormwater Permit Coverage Renewal —December 4, 2012 • The Timken Company —Tryon Peak • COC —Sent to Dan Lake, The Timken Company— Canton, Ohio • The Pemit Package was not filtered down to the plant New Form not received which identified additional metals ( Cu and Zn) • The NEW Discharge Monitoring Report (DMR) Form would have had Cu and Zn The TimkenSteel Company • July 1, 2014 —The Timken Company split - Bearing and Steel • Tryon Peak Facility - Now -The TimkenSteel Company • March 2015 - CEC advised the Plant to forward their SW permit to Pace Analytical • April 2015 -Pace Analytical —Lab began running Cu and Zn (per our permit) Stop and Tour the Facility before Proceeding........ ❖ Discussion(s) with Ken Pickle (*as recently as 2/9/2016) • NC Department of Environmental Quality (DEMLR-SW Permitting Program NCDEQ) CEC request a records inspection to acquire current permit information. New Water Quality Standards were developed (circa 2013) which are then used to establish the Benchmark Values for Stormwater discharges. ➢ Triennial Standards are reviewed every 3 years and 2017 values for Cu, Pb and Zn will be changed. ❖ Current Analysis and Possible Relief — Off Ramps? (Plant Analysis Spreadsheet) • Review of Data Spreadsheet to date* ➢ Slight exceedance of Cu (10.7 ppb v. 10 ppb and Zn (82.1 ppb v. 67.0 ppb) Very Low TSS 10.2 mg/L v. 100 mg/L (limit) Site exhibits very low possibility for the contribution of Cu or Zn Corrections to Prior Reports for pH (provide updated reports and memo)* *attach 1 & 2 (Storm water sampling data —Tryon Peak) & (Updated Semi -Ann reports) • • •t• Tier ONE — If sampling results are above benchmark value: • Conduct a stormwater management inspection within 2 weeks of elevated sampling results - Missed in April 2015 —15t experience with Zn as a limit (slightly elevated) - Inspection was conducted for 2"d Half 2015 - January 2016— Plant informed CEC that Zn and Cu exceeded —Jul-Dec 2015 - CEC — requested spreadsheet and conference call - Identified potential Select the Specific : source controls, operational controls, physical improvements - Implement the selected actions within Two Months of the Inspection - Record each instance of a Tier One response in the SPPP* (*attach 3) 0 ❖ Tier TWO - If sampling results are above benchmark value for two consecutive monitoring periods: • Repeat all required actions outlined in Tier One - Immediately institute monthly monitoring for all parameters. - Conduct Monthly monitoring at every outfall that exceeded the benchmark value for two consecutive samples - Monthly monitoring shall continue until three (3) consecutive samples are below the benchmark values or within benchmark range. - Submit a monthly monitoring report indicating "No Flow" if no discharge occurs during the sampling period. - Benchmark exceedances for a different parameter separately trigger a tiered response. - Maintain a record of the Tier II response and monitoring results in the SPPP. ❖ Tier THREE- Notify the Shawna Riddle...... let's discuss plans to move forward! • Facility: Date: Location Address: COC#: Contact Name: Phone #: Contact Mailing Address: County: Directions: Routine Compliance Inspection Rescission Request Complaint Investigation Other- Explain: A Storm Water Pollution Prevention Plan Yes No N/A Comments 1 Is a copy of the permit and the Certificate of Coverage available at the site? ti C Cud '►�� �Ielf of l}� VV�� l�Ui1i (ln �4 4�LGr} 2 Is a copy of the signed and certified SWPPP at the facility? 3 Does the Plan include a "Narrative Description of Practices"? 4 Does the plan include a general location (USGS) map? 5 Does the plan include a detailed site map including outfall locations and drainage areas? 6 Does the plan include a Spill Prevention and Response Plan? (SPRP) 7 Does the plan include a Preventative Maintenance and Good Housekeeping Plan? 8 Does the plan include a Stormwater Facility Inspection Program? 9 Does the Plan include a BMP Summary? 10 Does the plan include a list of Responsible Party(s)? 11 Has the SWPPP been implemented? B Monitoring and Records Yes No N/A 1 Does the plan include a list of significant spills occurring during the past 3 ears? 2 Does the facility provide and document employee training? 3 Has the facility conducted its qualitative Monitoring? (semi- annual) 4 Has the facility conducted its Analytical Monitoring? (s-a) 5 is the facility meeting all permit specified benchmark goals? 6 Is the facility following the tiered response? 7 Has the facility conducted its Analytical Monitoring from vehicle Maintenance areas?� C lWaste Management Yes No N/A 1 Does the facility provide all necessary secondary containment? 2 Are current BMPs in material storage areas adequate. 3 Are appropriate spill containment and cleanup materials kept on - site and in convenient locations? D Outfalis Yes No N/A 1 Were all outfalls observed during the inspection? If the facility has representative outfall status, is it properly 2 documented by the Division? 3 Has the facility evaluated all illicit (non stormwater) discharges? E Sector specific questions Yes No N/A 1 Have zinc or copper benchmarks been exceeded in the past 3 sampling periods? 2 Have potential sources for copper and zinc been evaluated at your facility? 3 4 Comments E7— 1 P4 ,-7 AJ, 1°kl J U u •.5`Y•'7,� ,� Mid %lpr R . 1 {' I _,ter•--� �\ �� ! � rc 1 � -! f• � � tt �J •�� � 'wti ,� fj `�Gz311,�~ �ti`h.. 'i TIMKEN • , j. 71 �.. .,._ � .«�� _ _.•.^�� �f .� � � - ,��f� � '' � �' a,F ' �' •`fit f !� Map of 205 Industrial Rd Colbus, North Carolina by MapQuest Page 1 of 1 �� ��� Sorry? When printing directly from the browser your directions or map may not print correctly. For best results, try clicking the Printer -Friendly button. 205 Industrial Rd Columbus, NC 28722-7740 MA9QYE5T. t o� soo m eoo tt a 1 , OdIL 47 020091.tapQuestInc. htapData 02009NAVIE0 a TeleAVas All rights reserved. Use subject to License/Copyright Directions and maps are informational only. We make no warranties on the accuracy of their content, road Conditions or route usability or expeditiousness. You assume all risk of use. MapQuest and its suppliers shall not be liable to you for any loss or delay resulting from your use Of MapQuest. Your use of MapQuest means you agree to our Terms of Use http://www.mapduest.com/maps?city=Columbus&state=NC&address=205+Industrial+Rd&... 2/9/2010