Loading...
HomeMy WebLinkAboutNCG030329_COMPLETE FILE - HISTORICAL_20111025STORMWATER DIVISION CODING SHEET NCG PERMITS . PERMIT NO. /V Uc v3 C) �a 9 DOC TYPE 9!� HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ 10 YYYYMMDD h i NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 25, 2011 Mr. Brendan Conway Honda Power Equipment Mfg -Inc. Post Office Box 37 Swepsonville, North Carolina 27359 Subject: General Stormwater Inspection - NPDES General Permit No. NCG030329 Honda Power Equipment — Alamance County Dear Mr. Conway: On October 13, 2011, Jenny Graznak of this office performed a General Stormwater Permit Inspection at Honda Power Equipment located in Alamance County, North Carolina. This facility holds General Stormwater Permit No. NCG030329 under the National Pollutant Discharge Elimination System (NPDES) to discharge Stormwater from metal fabrication activities. You were present for the inspection. This type of inspection consists of two basic parts: a review of facility files and self-monitoring'data, and an on -site inspection of the facility and its outfalls. This particular inspection evaluated five (5) areas and observations from each area are addressed below: 1. Permit The permit became effective November 1, 2007 and expires October 31, 2012. 2. Records/Reports As required by the Permit, the facility has a complete Stormwater Pollution Prevention Plan (SPPP) that was available for review during the inspection. A site plan lists all potential stormwater pollutants and best management practices used at the site. The SPPP also includes a location map of the facility. The SPPP was last updated on March 31, 2009. Employee training occurs on a monthly basis. 3. Facility Site Review Honda Power Equipment manufactures lawnmowers. During the inspection, no major issues were noted with respect to housekeeping. All materials (diesel, oil, etc.) are stored in double -walled tanks with additional secondary containment structures. Waste oil is removed from the site as necessary. Pallets and scrap metal containers are stored under awnings. 4. Effluent/Receiving Waters Stormwater discharges from this site drain to an unnamed tributary to Haw River (Class C; NSW) in the Cape Fear River Basin. The site has three Stormwater discharge outfalls. Outfall 1 discharges from a stormwater detention pond. Outfall 2 discharges from a small pond and check dam. Outfall 3 discharges from a large pond behind the R & D Building. No problems were noted with respect to discharge from the outfalls. North Carolina Division of water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Caroilna 27107 Phone: 336-771-5000 L FAX: 336-771-46301 Customer Service: 1-877-623-6748 Internet: www.navaterquality.org An Equal Opportunity k Affirmative Action Employer Nne orthCarolina Naturally, 5. Self -Monitoring Program The stormwater permit requires semi-annual qualitative and analytical monitoring at each stormwater outfall. On -site vehicle maintenance monitoring requirements at the site are waived, since these activities are not performed at the site. An on -site review of the monitoring data during the inspection showed that all parameters were evaluated per the specifications of the permit. Sampling is performed by Carl Hewitt of Enviro-Pro PC. The last monitoring event occurred on September 6, 2011, and the results were under the benchmark values described in the storm water permit. You are found to be in compliance with General Permit No. NCG030329. Please refer to the attached report for further details from the inspection. If you have any questions concerning this report, please contact Ms. Graznak or me at (336) 771-5000. Sincerely, W. Corey Basinger Regional Supervisor Surface Water Protection Section '8 k cc: WSRO — SWP Central Files — SWP e Compliance Inspection Report Permit: NCG030329 Effective: 11/01/07 Expiration: 10/31/12 Owner: Honda Power Equipment Mfg SOC: Effective: Expiration: Facility: Honda Power Equipment Mfg County: Alamance NC Hwy 119 Honda Dr Region: Winston-Salem Swepsonville NC 27359 Contact Person: Brendan Conway Title: Phone: 336-578-6307 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Re prose ntative (s): On -site representative Related Permits: Brendan Conway Certification Inspection Date: 10/1312011 Entry Time: 11:00 AM Exit Time: 12:30 PM Primary Inspector: Jennifer F Graznak Secondary Inspector(s): Phone: Phone: 336-578-6307 Phone: 336-771-5000 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: m Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NGG030329 Owner - Facility: Honda Power Equipment Mfg Inspection Date: 1011312011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ® n Cl n # Has the facility evaluated feasible alternatives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? e n n n # Does the Plan include a BMP summary? ■ n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? e n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee Training? ■ ❑ n n # Does the Plan include a list of Responsible Party(s)? ■ n In n # Is the Plan reviewed and updated annually? e n n n # Does the Plan include a Stormwater Facility inspection Program? ® n Cl n Has the Stormwater Pollution Prevention Plan been implemented? ■ n In n Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annuaily? ■ n n n Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ■ n Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage avai€able at the site? ■ n n n # Were all outfalls observed during the inspection? ® n n n # If the facility has representative outfall status, is it properly documented by the Division? n n 00 # Has the facility evaluated all illicit (non stormwater) discharges? ® n 110 Comment: Page: 3