HomeMy WebLinkAboutNC0021181_Authorization to Construct_19920212State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James C_ Martin, Govemor
William W. Cobey, Jr., Secretary
Honorable Billy W. Joye,
City of Belmont
P. 0. Box 431
Belmont, North Carolina
Dear Mavor Joye:
February 12, 1992
Jr., Mayor
28012
George T. Everett, Ph.D.
Director
SUBJECT: City of Belmont
Permit No. N00021181
Authorization to Construct
Wastewater Treatment Facilities
Clarifier Rehabilitation
Project No. CS370702-04
Gaston County
The final plans and specifications for the subject project have been
reviewed and found to be satisfactory.
Authorization is hereby granted for the construction and operation of
modifications to the existing wastewater treatment facilities to consist of
the rehabilitation of the west secondary clarifier.
Do not proceed with construction until the Authorization -to -Award
package, EEO, and MBE documentation/certification have been reviewed, and
you are in receipt of our approval, if funding is desired for project
construction.
The Authorization-tO-Construct is issued in accordance with Part III,
Paragraph D of NPDES Permit No. NC0021181, issued August 29, 1988 and
shall be subject to revocation unless the wastewater treatment facilities
are constructed in accordance with the approved plans, specifications, and
supporting documents; and are in compliance with the conditions and
limitations specified in Permit No. NC0021181.
The disposing, selling or free distribution of wet, dried, composted
sludge or sludge -like materials from wastewater facilities without prior
review and approval by this Division is illegal.
Pollution Prevvendon Pays
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015
Page 2
The Division of Environmental Management's Mooresville Regional Office
must be notified at least 48 hours prior to taking the clarifier out of
service.
Supernatent from the clarifier must be returned to the aeration
basins. Any solids removed, must be disposed of in accordance with the
conditions of the existing land application non -discharge Permit No.
WQ0003281, dated March 22, 1991.
During the construction of the proposed additions/modifications, the
permittee shall continue to properly maintain and operate the existing
wastewater treatment facilities at all times, and in such a manner, as
necessary to comply with the effluent limits specified in the NPDES Permit.
One (1) set of final approved plans and specifications is to be
forwarded to you for your files. The copy of the approved plans and
specifications shall be maintained on file by the Owner for the life of the
project.
Upon completion of construction and prior to operation of this
permitted facility, a certification must be received from a Professional
Engineer certifying that the permitted facility has been installed in
accordance with the approved plans and specifications. Mail the Certifica-
tion to the Permits and Engineering Unit, P. 0. Box 29535, Raleigh, North
Carolina 27626-0535. (Engineer's Certification Form is attached.)
If you have any questions or need additional information, please
contact Mr. Bill Hoffman, at (919) 733-6900, extension 615.
Attachment
BG:vk
cc: Professional Services, Inc.
Mr.
Don Safrit
Mooresville Regional Office
Mr.
Tom Fahnestock
Mr.
Don Evans
Ms.
Valerie Lancaster
Mr.
Bennie Goetze, Jr.
Ms.
Cindy Finan
DMU
SRF
I
DIVISION OF ENVIRONMENTAL MANAGEMENT
January 14, 1992
Memo To:
Bill Hoffmann C/
From:
Rex Gleason
Prepared By:
Michael Parker/0
Subject:
City of Belmont
Clarifier Rehabilitation
Project No. CS370702-04
Gaston County
4RI"AL CENT
" W
MNSTRUCON.- NAN!TS SECTION
ENGINE RING. ht"EMENT UN11`
Per your request, this Office has reviewed the documents
submitted for the subject WWTP project and offers the
following comments:
1. The Belmont WWTP;was under an SOC which expired on
December 1, 1991.! Completion, of the construction
activities requited by the SOC was achieved on
August 24, 1991.,The WWT facility, however,
continues to experience periods of noncompliance.
2. With regards to the proposed method and sequence
for construction,. this Office has no objections
provided the effects on day-to-day treatment plant
operation are minimized by the proposed repairs/
rehabilitation work. The City's engineer has
requested that a temporary NPDES Permit TSS limit
of 60 mg/1 be established during the rehabilitation
period. Due the short time frame involved (approx.
2 months), modifying the Permit for this purpose is
not practical. It is suggested that the Division
notify the City that if noncompliance occurs as a
result of repairs to the existing WWT facility,
enforcement may beheld in abeyance provided
compliance is achieved upon completion of the
repairs. An evaluation should also be made by
Technical Support to determine whether 60 mg/1
would cause WQ impacts in the receiving stream.
If you have any questions regarding this matter, please
advise.
MLP