Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030238_COMPLETE FILE - HISTORICAL_20160607
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. IV� U3�a3t� DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ ,1, n) (P D WYYMMDD lk4 o3o23s SIEMENS June 17, 2016 3050 Westinghouse Road Rural Hall, NC 27045 Tel. (336) 969-1220 Fax (336) 969-1398 FcdEx 5-10 3 1.7,// ?'IS 6 Signature Required NC Department of North Carolina Department of Environmental Equality Environmental Quality Division of Energy, Mineral and Land Resources Received 585 Waughtown St JUN 2 0 2016 Winston-Salem, NC 27107 Winston-Salem Regional Of`sce Subject: Siemens Energy, Inc. 2016 Updated Emergency Action Plan Rev6 Rural Hall Facility; 3050 Westinghouse Road, Rural Hall_ NC 27045 To Whom It May Concern: Enclosed is an updated copy of our Integrated Emergency Action Plan (EAP) and Contingency Plan for your records. lblost recently updated: • Page 1-5, Appendix A Changed IYR Manager to Chris Graham; added cell number • Page 15, Appendix A — Removed Operations Afanager • Page 15. Appendix A — Updated 3T`t shift Manager to Lewis jVoran; added cell number • Pages 25 & 26. Appendix D — Updated Spill Kit Inventory list If you have any questions or require further information on this hatter, please contact me at (336) 969- 1265, or the facility QEHS Manager, Mr. Srikanth Parvathaneni; at (336) 969-1232. Sincerek" James Whiticar EI-1S Officer Siemens Energy_ Inc. Cc: Srikanth Parvathaneni, Siemens Energy, Inc. Siemens Energy, Inc. 3050 Westinghouse Rd Rural Nall, NC 27046 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Document type No.: SIEMENS QEHS Procedures Manual Revision/Date: 6 2016-06-03 Winston Service Center Issued by: EHS Department Title Integrated EAP and Contingency Plan Handling: For Internal Use Only ISO-9001 ISO-14001 OHSAS-1 &001 Table of Contents Revision Sheet 1.0 Purpose 2.0 Scope 3.0 Authority 4.0 Organization 5.0 Emergency Action Plan 6,0 Contingency Plan Released by: Reviewed by, Reviewed by: Srikanth Parvathaneni QEHS Manager ReviewerlStakeholder a-QMS Reviewer/Stakeholder a-QMS Page: 1 of 26 Appendices: 4 NC Department of Environmental Quality Received .SUN 2 0 2016 Winston-Salem Regional Office e-QMS 7/25/2013 e-QMS a-QMS e-GEMS e-QMS Reviewed by: Reviewer/Stakeholder a-QMS a-QMS a-QMS Prepared by: James Whiticar EHS Department e-QMS 7/25/2013 Name Org. Unit Signature Date Siemens Energy, Inc. ®Siemens Energy, Inc. 2011 All Rights Reserved. n: Integrated Emergency Action Plan and Contingency Plan Kev. b rage NO.: Date: 06-03-16 1 1 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Revision Sheet SIEMENS Revision Reissue Date Section Description Of Change 1 7-25-13 Appendix A Change name of coordinators and 2" i3` Shift Supervisors 2 8-21-13 5.3 Modified evacuation process. 3 4-21-14 Appendix A Change alternative E.0 Sam Myers to Michael Cox 4 8-10-15 5.6.3 Add AED locations 4 8-10-15 Appendix A Third Shift contact information 4 8-10-15 Appendix A Security Phone number 4 8-10-15 Appendix A Siemens Corporate ENS Director 5 11-24-15 Appendix A Plant Manager Changed to Cory Phillips 5 11-24-15 Appendix A Plant Manager cell phone updated 5 11-24-15 A2pendix A 2" shift Su v. Ed Majersk — updated cell phone number 6 06-03-16 Appendix A Changed HR Manager to Chris Graham; added cell number 6 06-03-16 Appendix A Removed Operations Manager 6 06-03-16 Appendix A Added 3` shift Manager, Lewis Moran; added cell number 6 06-03-16 Appendix A Added 3` shift Mana er, Lewis Moran, added cell number 6 06-16-16 Appendix D Updated Spill Kit Inventory List 2 pages) me Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 2 of 26 Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY INTEGREGRATED EAP AND CONTINGENCY PLAN 1.0 PURPOSE: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) describes a course of action to follow in order to assure the safety of personnel (employees, contractor personnel, visitors, and the general public) who are present on the site, the environment, and equipment when an emergency occurs. This plan also details communication requirements with the sublet EAP emergency and management personnel. External reporting requirements are also detailed in this plan. The plan provides the guidelines and procedures to meet these needs at the Siemens facility in Rural Hall, N.C. 2.0 SCOPE: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) provides information such as examples of the types of emergencies that could occur at the Rural Hall site, procedures to follow in the event of an emergency, and responsibilities of personnel during an emergency. Our plans describe actions facility personnel will take, what emergency response equipment is available, what procedures will be followed, and arrangements made with local emergency response authorities in order to minimize hazards to human health or to the environment in the event of an accident involving hazardous materials. 3.0 AUTHORITY: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) was developed and implemented to comply with OSHA 29CFR 1910.38 and 40 CFR 264.50 thru 56 and to assure for the safety of personnel, protection of the environment and the protection of physical assets at the Siemens Winston Service Center has documented and issued this Integrated Emergency Action Plan and Contingency Plan. The emergency coordinator has the full authority to commit resources needed to respond to emergencies at this facility. The emergency coordinators can deputize other employees to assist them in the event of an emergency. The authority to review, revise and approve this procedure is defined within our document control procedures. Only the owners and approvers of this document are authorized to approve revisions made to this document. The Emergency Action Plan and Contingency Plan must be reviewed, and immediately amended as necessary, whenever the following situations apply; • Applicable regulations are revised; • The plan fails in an emergency; • The facility changes in its design, construction, operation, maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or releases; • The list of emergency coordinators changes; • Or the list of emergency equipment changes. When changes are made that impact the Fire, Explosion or Spill Sections of this plan, revised copies of this plan are to be sent to the following personnel or agencies: 1) Rural Hall Fire Department Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 3 of 26 Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY 2) Forsyth County Fire Department 3) Forsyth County Sheriffs Office 4) Wake Forest Baptist Medical Center 5) Spill Response Contractor 6) Security 7) Tenant(s) Human Resource Manager 8) Emergency Coordinators 9) Plant Manager 4.0 Organization 4.1 Emergency Coordinator Facilities and Maintenance Manager The Facilities and Maintenance Manager shall be the primary Emergency Coordinator and have primary responsibility for emergency responses to include the local fire department, training, equipment, and evacuation. He/she shall consult with the Plant/General Manager, Operations Management, and the Human Resources Manager. He/she will also communicate with the tenant(s) HR Manager in order to ensure plant -wide coordination when required. The Emergency Coordinator will be responsible for recording events, coordinating internal and external resources, consulting with Siemens EHS personnel as appropriate and reporting status and creating incident reports.. Security, although contracted by the Siemens Real Estate Facility Manager (SREFM)„ will be given directions by the Emergency Coordinator, since our primary objective in an emergency is the safety of all personnel. Alternate Emergency Coordinator The alternate emergency coordinator has been designated to identify in Appendix A. In the event that the Primary Emergency Coordinator is unavailable, the Alternate Emergency Coordinator shall assume emergency response responsibilities. At all times there must be at least one Emergency Coordinator on site or on call, with the ability to reach the facility in a short amount of time, with the responsibility for coordinating all emergency response measures. Continuity of Emergency Coordination The emergency coordinator first arriving at the scene shall have the responsibility as the emergency coordinator for the duration of the emergency, unless properly relieved by the Facilities and Maintenance/QEHS manager. The emergency coordinator will be responsible for recording events, coordinating internal and external resources, consulting with Siemens and Siemens Corporate EHS personnel as appropriate and reporting status and creating incident reports. The oncoming emergency coordinator assumes all responsibilities including record keeping and notifications from the point of assuming emergency coordinator responsibilities. 4.2 Personnel Responsibilities Outside of Emergency Team Management Personnel The management personnel snail be responsible for maintaining organization within their area as well as other measures that are called for to protect personnel and company property in their assigned areas of responsibility. Management is responsible for maintaining posted sketches in the area outlining emergency routes for employees in their area. They shall advise all new, incoming employees of these routes during their orientation. a.: i Kev ti i rase NO.: Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 4 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Security Security shall be responsible for evaluating the type of emergency to determine whether the emergency coordinator should be contacted in accordance with Section B. Security shall communicate and coordinate a plant wide evacuation with the tenant(s) in the event that an evacuation is ordered. Security shall call 911 in the event of a fire alarm or upon observation or notification of emergencies as defined in this plan. Second Shift, Third Shift and Weekend Shift The primary role of the second, third and weekend shift supervisors is to coordinate the initial response (contain, assist and notify) according to the specific emergency procedure contained in Section 5.1, and contact Security as quickly as possible. Personnel Outside of Emergency Team All Siemens WSC staff is part of the Emergency Response Organization and is the organization established to help in an emergency. The Siemens WSC staff will be responsible for the communications systems, record keeping, and facilities status during the emergency_ Liaison with External Organizations and the Press The Emergency Coordinator will maintain liaison with Siemens and the tenant(s) management, emergency organizations, Siemens and government officials. The Siemens WSC HR Manager is the only person authorized to talk with reporters or the press. All inquiries by the press are to be answered with "no comment" and forwarded to the Siemens WSC HR Manager. Emergency Support Immediately following either decision, evacuate and search or search without evacuating, the Emergency Coordinator shall notify the appropriate emergency organizations (Fire, Police, Sheriff, Regulatory Agencies) giving them information that is available, outlining the plan for action within the plant, and requesting advice and assistance as necessary. Recorder The Emergency Coordinator shall be responsible for recording the chronology of events, to document changes that take place and to provide a record for the future. It is recommended that the emergency coordinator assign record keeping responsibilities to a designated employee. 4.3 Arrangements with Local Authorities Arrangements have been made with local authorities such as police, fire and local hospitals to familiarize the local authorities with our facility layout, waste handling and generating activities, and the types of injuries or illness that could result from fires, explosions, or releases. The local emergency response agencies, identified in Appendix A, and various state agencies have been requested to respond to this Hazardous Waste Contingency Plan. Also, their Chief Administrators are invited to visit the facility in order to better coordinate potential hazardous waste related emergency response procedures_ If more than one law enforcement agency or fire department responds to an emergency at our facility, The Emergency Coordinator will hand over control of the incident to the agency that best addresses the mitigation needs. o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 5 of 26 Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY 5.0 Emergency Action Plan 5.1 General Guidelines for Specific Emergencies Whenever there is a release, fire, explosion, the Emergency Coordinator must be notified in order to immediately identify the character, exact source, amount, and areal extent of any release material. The Emergency Coordinator may do this by observation or review of facility records or manifests and, if necessary, by chemical analysis. Concurrently, the emergency coordinator must assess possible hazards to human health or the environment that may result from the release, fire, or explosion. This assessment must consider both direct and indirect effects of the release, fire, or explosion (e.g. the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any hazardous surface water run-offs from water or chemical agents used to control fire and heat -induced explosions.) If the emergency coordinator determines that the facility has had a spill, release, fire, or explosion which could threaten human health, or the environment, outside the facility, he must report his findings in accordance under Section 5.0 of this plan. During an emergency, the emergency coordinator must take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous materials at the facility. These measures must include, where applicable, stopping processes and operations, collecting and containing released waste, and removing or isolating containers. If the facility stops operations in response to a fire, explosion, or release, the emergency coordinator must monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate. Immediately after an emergency, the emergency coordinator must provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results form a release, fire, or explosion at the facility. The emergency coordinator must ensure that, in the affected areas of the facility: • No materials that may be incompatible with the released material is treated, stored, or disposed of until cleanup procedures are completed; and • All emergency equipment listed in the Emergency Action Plan and Contingency Plan is cleaned in the designated decontamination area and fit for its intended use before operations are resumed. 5.2 FIRE AND EXPOLOSION 5.2.1 Small (incipient) Fire: • An incipient fire is a small isolated fire that has not spread to the structure of the building or to other equipment. • If a member of the Incipient Fire Brigade is present then that member must initially evaluate the situation and determine what type of fire extinguisher to use. • If the incipient fire is located in chemical stripping, FIC, or where aluminum powder is present then the fire department is to handle the situation. • Security shall contact the Emergency Coordinator from the list in Appendix A. o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 6 of 26 Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY • If the Emergency Coordinator is on site he/she shall conduct an initial evaluation of the situation. If the Emergency Coordinator is off site, Security shall conduct the initial evaluation and advise the Emergency Coordinator immediately. The initial evaluation consists of the following: • The fire could cause the release of toxic fumes; • If the fire spreads, it could ignite material at other locations at the site or cause heat -induced explosions; • The fire could spread to off -site areas; • Use of water or water and chemical fire suppressant could result in contaminated run-off and/or a violent chemical reaction, • If any of these conditions exist or could exist, appropriate actions should be taken. 5.2.2 Structural Fire or Explosion: • A structural fire is a fire that has spread to other equipment or the structure of the building. • Personnel, who discover major fire or explosion should leave the immediate area, pull the nearest fire alarm pull box and call Emergency Coordinator and/or security at extension 1359. • Security shall contact the Emergency Coordinator from the list in Appendix A. • If the Emergency Coordinator is on site he/she shall conduct an initial evaluation of the situation. If the Emergency Coordinator is off site, Security shall conduct the initial evaluation and advise the Emergency Coordinator immediately (if feasible). The initial evaluation consists of the following: • The Emergency Coordinator will ensure that evacuation procedures have been initiated. He/she will also communicate with the Tenant(s) HR Manager in order to ensure plant wide coordination. • Contact the appropriate local, state, or federal agencies as warranted. 5.3 Evacuation Alert System The facility is equipped with audible work area alarms and visual strobes. The annunciation is monitored by Security and the alarm monitoring service. The annunciation panel is located in the lobby next to Security. • The fire alarm can be initiated by any of the following: 1. Automatic initiation of water flow system and heat sensors. 2. Notifying Security by phone or other means. 3. Activating a fire alarm pull box. If the evacuation alarm fails to operate when activated, security shall be notified and will take the following steps: 1. Phones and radios can be used to announce the evacuation or; Security and/or supervisors will physically go through the facility, announcing the evacuation. 5.3.1 Evacuation Process Step 1 Once the fire alarm is activated, all employees are required to evacuate the building. e No.: Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 7 of 26 Winston Service Center EFTS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Evacuation Routes and Assembling Area • When the evacuation signal sounds, all employees, contractors, salesmen and visitors shall proceed via the nearest exit identified on the attached plans and proceed to their assembly area as designated on attached plans located in Appendix B. • The escort (Siemens WSC employee) is responsible for ensuring that the visitor and/or contractor are accounted for and they know where the assembly area is located. • After evacuating and walking to the assembly area, employees will remain in the assembly area until notified that it is safe to re-enter the building. • Employees are not authorized to leave the evacuation area or facility grounds unless directed to do so by the Emergency Coordinator, Plant Management or emergency personnel (e.g. Fire Department) Step 2: Make Sure Everyone Gets Out The following steps will be initiated to ensure that everyone gets out: • Once the evacuation signal has sounded, all employees are required to evacuate the building. Employees are to follow the evacuation routes identified in the evacuation maps posted throughout the facility. If a route is blocked by the release of hazardous materials or fire, and alternate route should be found using the evacuation maps located in Appendix B. Department managers or designee should report to their assigned assembly areas and see that personnel remain at proper distances from the building until the all clear signal is received. Employees are not authorized to leave the evacuation area or facility grounds unless directed to do so by the Emergency Coordinator, Plant Management or emergency personnel (i.e. Fire Department) Step 3: Roll Call In the event of an evacuation, each department manager or designee will perform a roll call to ensure that every employee in their department is accounted. At the assembly area, each department manager will verbally inform the EHS Officer if every employee has been accounted for. Once inside, each department manager or designee will send the EHS Officer an e-mail to verify that all employees have been accounted for (present or not present at the facility). Step 4: Decision After Evacuation: After evacuation of an actual emergency, the Emergency Coordinator in consultation with Siemens Real Estate, the County Emergency Personnel, and the Plant Manager shall make a decision regarding: • Waiting period before employees may re-enter the building; • Shutting off or turning back on utilities (electricity, gas, steam, etc.); • Evacuation times in relation to end of shift, deciding whether to send employees home or hold in assembly area; Whether next shift should be notified not to report to work; Returning to the building for additional searching. Once decision has been made to allow employees to re-enter the building, the Emergency Coordinator will be instructed to communicate to all Siemens Management, HR Manager or the tenant(s) Plant Manager, Siemens Real Estate, and any contractors on site that all is clear - Integrated Emergency Action Plan and Contingency Plan Rev. 6 Page No.: Date: 06-03-16 8 of 26 Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY After evacuation a non emergency situation, the Emergency Coordinator or designee will communicate the message to re-enter the building to the employees in the assembly area once the cause of the evacuation has been discussed and determined. 5.3.2 Second Shift, Third Shift or Weekend After evacuation of a non emergency during second shift, third shift or the weekend, the shift supervisor(s) will take the role of the Emergency Coordinator and communicate the message to re-enter the building to the employees in the assembly area once the cause of the evacuation has been discussed and determined with maintenance and security. The supervisor will provide the EHS Officer a report that ensures that all employees have been accounted for and a detailed description of the situation. After evacuation of an emergency situation, the shift supervisor will contact the Emergency Coordinator or designee of the situation. During the emergency situation, the Emergency Coordinator or designee will come to the facility to initiate the Contingency Plan_ Also, the supervisor will provide a report that ensures that all employees have been accounted for and a detailed description of the situation. 5.4 Chemical Spill — Liquid or Solid Facilities and Maintenance employees will respond to any reported chemical spill. These employees have been properly trained in basic spill response. These employees can be notified in person or by calling extension 1359. If maintenance cannot be reached then security is to be notified (extension 1359). 5.4.1 Spill Evaluation Answer the following questions when responding to a spill: • What is the chemical? • What is the PPE requirement? • Do I have the necessary spill clean up and containment material present? • What are the potential physical and toxic risks? • If the spill occurs outside, am I aware of the requirements listed in the Stormwater Pollution Prevention Plan (SWPPP) and the Spill Prevention, Control, and Countermeasures Plan (SPCC)? • If the spill reaches a certain level, do I know the Emergency Coordinator? 1. The Emergency Coordinator must determine when to contact the list of contacts in Appendix A, which is dependent upon the nature of the spill. 5.4.2 Gas Release If chlorine or fluorine gas was released into the facility then the evacuation order would be given, However, to confirm a chlorine gas release has occurred, a chlorine gas meter would be used to determine the amount of gas released. If fluorine gas released in the fluorine ion cleaning (FIC) area then ammonia would be released to suppress the fluorine gas_ 5.5 Emergency Procedures for Severe Weather 5.5.1 Tornadoes The facility utilizes a NOAA weather radio to be alerted to any tornado warnings. If a tornado warning is issued by the National Weather Service for the Rural Hall area then all employees are Integrated Emergency Action Plan and Contingency Plan I I bate: 06-03-16 1 9 of 26 Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH $ SAFETY to report to the designated tornado shelter_ While in the tornado shelter, the HR Specialist will take a roll call to ensure that all employees are accounted for_ Once the tornado warning is lifted then employee will resume normal operations. 5.5.2 Winter storm If a winter storm occurs that has been determined to make roads impassable or has a utility outage for the facility then the employees will call 866-367-7972 or on-line at www.siemens.com/energy/darkwebsite for information about the plant closing. If the storm occurs during the shift then the supervisors will notify the employees that the plant is closing. 5.5.3 Flood If the facility is being flooded then the facility will follow the evacuation procedure listed in Section 5.3. 6.6 Medical Emergency: 6.6.1 General Guidelines A medical emergency includes injuries and/or illnesses that will require more than the routine first aid treatment. 5.6.2 Person Discovering the Emergency The person discovering an employee in need of emergency medical assistance should follow these steps: 1. Do not activate the fire alarm. 2. Call the radio access channel (extension 1359) from the nearest phone. 3. Stay with the employee needing medical assistance until trained emergency personnel arrives, but do not attempt to move therm unless they are in imminent danger. 4_ Always be sure to follow blood borne pathogen protocols_ 5.6.3 On -Site Emergency Medical Technician (Siemens EMT or Security) 1. Provide initial or stabilizing assistance and determine if additional medical treatment is required. 2. If the EMT goes to the scene of an incident then they must take the AED and first aid bag. There are five AEDs in the building — Security office, Outside of the front office, Outside of the Manufacturing offices, Across from David Cox's office, and on the wall at the restroom near Forged Blade Machining and New Parts. 3. Call 911 if a life threatening condition exists. 4. Call an ambulance, if necessary. Notify doctor and hospital of the emergency. 5. Notify the EHS Officer or QEHS Manager immediately of the emergency situation. 6. The On -site Emergency Medical Technician or EHS Officer may also contact WorkCare for assistance (24-hr Triage Assistance). 5.6.4 HR Manager Notify the employee's designated emergency contact of the injury or illness and of the action that has been taken. Notify the employee's supervisor of the emergency. Ensure that all necessary accident reports are completed. Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 10 of 26 Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY 5.7 Threats Against the Facility 5.7.1 General Guidelines for Bomb Threat If an employee receives a call concerning a bomb threat then the employee should try to get as much information as possible from the caller. Afterwards, the employee should notify the Emergency Coordinator and/or the HR Manager immediately, so they can contact the proper authorities in order to determine the best course of action. If the authorities authorize the evacuation of the facility then the evacuation protocol will be followed as in Section 5.3.1. Also, the HR Manager will notify the Plant/General Manager and the tenant(s) Manager in order to ensure plant -wide coordination when required. If the call occurs during night shift working hours then the employee or Security would take the call. if an employee answers the phone then he/she will contact Security and then Security would contact the Emergency Coordinator to alert he/she of the situation. 5.7.2 Procedures to follow if taking the call of a bomb threat 1. Record the time and exact words of the message; 2. Have the caller repeat the message and keep the caller on the line as long as possible; 3. Have someone nearby notify the Emergency Coordinator 4. Ask the caller the reason for making the threat; 5. Note the caller's sex, speech, mannerisms, signs of intoxication, phrases, etc.; and 6. Determine if the caller is using an internal or external line (look at caller ID). 5.7.3 Written Threats: Threats received in writing should be preserved for investigation for possible fingerprints and if possible should not be handled once the letter has been opened. When the threat is received, the person receiving the letter shall personally contact the Emergency Coordinator. 5.8 Emergency Procedures for Civil Disturbance 5.8.1 General Guidelines The purpose of this procedure is to detail action to be taken in order to protect personnel and property from any negative effects as a result of civil disturbance. These actions include notification of the proper authorities for resolving the disturbance, providing a protective separation between the disturbance and our personnel, and taking necessary steps to protect our property from destruction as a result of the disturbance. 5.8.2 Responsibilities Security Secure Guard Station --Call 911 (if necessary), the Human Resources Manager and the Emergency Coordinator Human Resources Manager Notify local authorities. Notify the tenant(s) HR Manager to determine need for coordination. Have plant management personnel give direction to their employees. Provide liaison with the police. me Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 11 of 26 Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY Management Personnel Keep employees and other individuals away from the disturbance. 6.0 Contingency Plan 6.1 Reporting of Significant Event Requirements to initiate the Contingency Plan A Significant event is defined as: • Serious accident, life threatening illness, risk of epidemic • Definition of a "serious accident" — fatal accident, life endangering injuries, poisoning • Large-scale damage to plant or equipment, Fires (extinguished by external fire fighters, and/ or having influence on the production), explosion Crises (e.g. terror attacks, criminal threats, kidnapping, bomb scare, putsch), civil unrest, natural catastrophes (e.g. flood, earthquake, hurricane, tornado), • Loss of radio -active sources or contamination by radio -active material, • Technical emergency (Impacts from outside: Fire, implosions, plane crash, gas release, power supply interruptions) • Imminent or actual (unplanned sudden or non -sudden) release of hazardous materials to the air, soil or water of the environment, and release of hazardous substances of which the reportable quantity require reporting to regulatory agency. + Failure to follow permit requirements which result in self reporting or notice of violation or citation by a regulatory agency. • Accident during the transport of dangerous goods in conjunction with release of dangerous goods • Indications 1 suspected cases 1. that are capable of becoming events with negative results to the Image of Siemens Energy Sector 2. respectively unplanned contact to authorities as a result of these events 3. for the occurrence of one of the events described above_ • >_ 3 persons injured respectively affected by a single event • Loss of limb(s) • Any Electric shock accident • Motor vehicle accident resulting in hospitalization of two or more persons + The Emergency Coordinator is responsible to ensure events are reported to Siemens. • All significant events must be reported within 2 hours by phone to the Siemens Corporate Contacts listed in Appendix A of this document. The purpose of this contact is to notify and gain guidance on what we are to communicate to external entities. • After notification to Siemens Corporate, the facility Siemens representative identified in Siemens Procedure P00-057-A01 shall notify the appropriate external entities based on event being reported. 6.2 Incident Reporting Requirements The Emergency Coordinator must document the incident by recording the time, date, and details of any incident which requires implementing the contingency plan. Within 15 days after the incident, the EHS Manager must submit a written report on the Environmental incident to the Regional Administrator identified in Appendix A. The report must include: (1) Name, address, and telephone number of the owner or operator; (2) Name, address, and telephone number of the facility; Integrated Emergency Action Plan and Contingency Plan I I bate: 06-03-16 1 12 of 26 Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY (3) Date, time, and type of incident (e.g., fire, explosion); (4) Name and quantity of material(s) involved; (5) The extent of injuries, if any; (6) An assessment of actual or potential hazards to human health or the environment, where this is applicable; and (7) Estimated quantity and disposition of recovered material that resulted from the incident. 6.3 Evacuation of Local Areas (Evaluation, Action and Notification) If the Emergency Coordinator in conjunction as applicable with the Emergency Responding Agency (e.g. Fire Department) assessment indicates that evacuation of local areas may be advisable, the emergency coordinator must immediately notify the appropriate local authorities identified and either the government official designated as the on -scene coordinator for that geographical area, or the National Response Center using their 24-hour toll free number listed in Appendix A. The emergency coordinator must be available to help appropriate officials decide whether local areas should be evacuated. 6.4 Contingency Plan Resources Siemens Real Estate Facilities Management The Siemens Real Estate Response Center should be notified during any emergency situation concerning the building and/or property. They will assign personnel from Siemens Real Estate Facilities Management and/or their contractors accordingly to remove/restore utility services and assess/repair damages. Maintenance Support The Siemens Facility Maintenance group will be directed, as needed, by the emergency personnel to assist in removal of services (power, water, etc.) during such emergencies. Security Plant Security will assist in controlling access to emergency locations and to direct outside emergency response services to proper locations on the plant property. 6.5 Command Post (if needed) Purpose The Command Post provides a location for responsible personnel to collect data, make decisions, and resolve immediate problems at the scene of the emergency. Location and Function The command post will be established at the Security Control Office ('B' Building). The Plant Security will man it with other personnel designated by the Emergency Coordinator. Alternate Command Post An alternate command post will be designated by Security and/or the Emergency Coordinator, as needed. Integrated Emergency Action Plan and Contingency Plan I I Bate: 06-03-16 1 13 of 26 Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Staff All Siemens WSC staff is part of the Emergency Response Organization and is the organization established to help in an emergency. The Siemens WSC staff will be responsible for the communications systems, record keeping, and facilities status during the emergency. Liaison with External Organizations and the Press The Emergency Coordinator will maintain liaison with Siemens and the tenant(s) management, emergency organizations, Siemens and government officials. The Siemens HR Manager is the only person authorized to talk with reporters or the press. All inquiries by the press are to be answered with "no comment" and forwarded to the Siemens HR Manager. Emergency Support Immediately following either decision, evacuate and search or search without evacuating, the Emergency Coordinator shall notify the appropriate emergency organizations (Fire, Police, Sheriff, Regulatory Agencies) giving them information that is available, outlining the plan for action within the plant, and requesting advice and assistance as necessary. Arrangements made with Local Authorities Arrangements have been made with local authorities such as police, fire and local hospitals to familiarize the local authorities with our facility layout, waste handling and generating activities, and the types of injuries or illness that could result from fires, explosions, spills, or releases. The local emergency response agencies, identified in Appendix A, and various state agencies have been requested to respond to this Hazardous Waste Contingency Plan. Also, their Chief Administrators are invited to visit the facility in order to better coordinate potential hazardous materials and/or waste related emergency response procedures. If more than one law enforcement agency or fire department responds to an emergency at our facility, The Emergency Coordinator will hand over control of the incident to the agency that best addresses the mitigation needs. Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 14 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Appendix A Emergency Contact Information EMERGENCY COORDINATORS • Primary Emergency Coordinator - Gary Gingras — Facilities Manager 1500 Oscar Frye Road Pinnacle, NC 27043 (336) 969-1285 (Work) (413) 717-7450 (Cell) SIEMENS Alternate Emergency Coordinator — Michael Cox - Support Services Supervisor 125 Prestwick, Rural Hall, NC 27045 (336) 969-1362 (Work) (336) 391-3257 (Cell) • Alternate Emergency Coordinator — James Whiticar — EHS Officer 6504 Dornoch Drive Greensboro, NC 27410 (336) 969-1265 (336)602-3043 ■ Alternate Emergency Coordinator — Srikanth Parvathaneni — QEHS Manager 4702 Jefferson Wood Court, Greensboro, NC 27410 (336) 969-1232 (Work) (407) 516-6806 (Cell) Siemens Winston Service Center Management/Supervision Plant/General Manager Controller Human Resources Mgr Second Shift (3:30pm — 11:30pm) Third Shift (11:30pm-7:30am) Security Cory Phillips James Rochester Chris Graham Ed Majersky Lewis Moran Security (704) 806-3714 (Cell) (704) 264-5447 (Cell) (980) 322-4977 (Cell) (336) 816-9185 (Cell) (336) 406-2687 (Cell) (336) 969-1359 (Radio) (336) 969-1220 (Security Office) ment Integrated Emergency Action Plan and Contingency Plan I I Hate: 06-03-16 1 15 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Tennant(s) Management/Supervision Security maintains a current list of contacts and their phone numbers. SIEMENS CORPORATE CONTACTS Siemens Energy EHS Director Janaina Gameiro (407) 736-2304 (Work) Siemens Real Estate Response Center (866) 311-9290 WorkCare (24-hr Triage Assistance) (888) 449-7787 SIEMENS WINSTON-SALEMIFORSYTH COUNTY EMERGENCY ORGANIZATIONS Rural Hall Fire Department (336) 969-9368 or 911 Winston Salem City Muddy Creek Water Treatment Plant 6am-6pm (336) 765-0130 6pm-6am (336) 784-4710 Forsyth County Fire Department (336) 727-2222 or 911 Forsyth County Sheriff's Office (336) 727-2112 or 911 Forsyth County Ambulance Service (336) 727-2222 or 911 N.C. State Highway Patrol (336) 761-2441 or 911 Wake Forest Baptist Medical Center (336) 716-2255 or 911 Regional Coordinator: Winston-Salem/Forsyth County Office of Emergency Management Smith Reynolds Airport, Room 104 (336) 767-6161 Winston-Salem, NC 27105 (336) 727-8000 - secondary number Forsyth County Environmental Affairs (336) 703-2440 Forsyth County Government Center 201 N, Chestnut St. Winston Salem, NC 27101-4120 N.C. Department of Environmental Quality (NCDEQ) Division of Energy, Mineral and Land Resources (336) 858-0368 Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, NC 27107-2241 o. Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 16 of 26 . Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EMERGENCY ORGANIZATIONS - CONTRACTORS Shamrock Environmental Corporation 503 Patton Avenue Greensboro, NC 27406 24 Hour Emergency Response 800-881-1098 Non -Emergency (336) 375-1989 In the event of an emergency, Shamrock Environmental is contracted by Siemens to provide comprehensive environmental services to include emergency response, wastewater treatment, industrial services, waste management, remedial and stream and wetland restoration. NORTH CAROLINA EMERGENCY ORGANIZATION N.C. Emeraencv Response Commission Hotline (8001451-1403 or (9191 733-1361 NC EPCRA 4714 Mail Service Center Raleigh, NC 27699-4714 FEDERAL ORGANIZATIONS NATIONAL RESPONSE CENTER_(NRC) (800) 424-8802 United States Environmental Protection Agency Region 4 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Atlanta, GA 30303-8960 FEDERAL BUREAU OF INVESTIGATION Charlotte (704) 529-1030 Raleigh (919) 856-4620 Greensboro (336) 855-7770 US EPA HOTLINE (800) 535-0202 Integrated Emergency Action Plan and Contingency Plan o.: Rev. 6 Page No.: Date: 06-03-16 17 of 26 Winston Service Center EHS Programs ENVIRONMENTAL., HEALTH & SAFETY Appendix B Site Maps SIEMENS Description: _ Document No.: Rev. 6 Page No.. Integrated Emergency Action Plan and Contingency Plan Date 06-03.16 18 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EXIT GS R �III]IOCAp�jVAC31R. IIVi PL-S\ml tMN \C-Ao-v-" n: SIEMENS EXIT G6 EXIT G7 EXIT G4 EXIT G3 EXIT G2 EVACUATION PLAN BUILDING G ;L—) EXIT G1 REV. 7-21-11 Integrated Emergency Action Plan and Contingency Plan I I Date: 06-03-16 1 19 or 26 Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY R I LOIaS N,} Tlip A A ►ipa�7wc_a MOW can _.._ o IRmrioac e U .,,.e., d._..� C� uescnpuon: Integrated Emergency Action Plan and Contingency Plan m7 e :'Hazardous Waste � � Storage � Saar m f ! Area 1 'car a CM 1' 1 , tl r� n i' t: Q 4 I 4rf :y P97 r I par i oR e ' dult,tr►.G f = 1 1 z• Cffr ad ; �, ocx aa__ wro.w Cu 3?• 1 oer 1 Q *CWA'= Mr War ^FXA ar MMMC � EVACUATION PLAN STAGING AREAS SIEMENS WINSTON SERVICE CENTER ment No.: Rev. 6 Page No.: Date: 06-03-16 20 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY jai o I t i*> EMT 7 Y A t Gt�1Ei7kw t EMT 5_---�- A @ZLQtNG B ' V h e r00T 8 EMT 4 t At it EMT 7 SIEMENS iption: Document No.: Rev. 6 Page No. Integrated Emergency Action Plan and Contingency Plan Date: 06-03-16 21 of 26 EVACUATION PLAN BUIL131NGS A AND 8 SIEMENS WINSTON SERVICE CENTER yen .-i+-ss Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS eW 2M EVACUATION PLAN MANUFACTURING BUILDING C Dar za 'ti SIEMENSWINSTON SERVICE CENTER i r I } } ears {� INDICATES oar wsTx AREA of RESCUE ❑ ear sz I Dar I ' „ Dar 13 Eur , PCEPAN +� I� -------, �_ WCIi'JGf� � �, iJa; 12 E,aa: �S L14 f Is 1 P/p( -TJI •I �. � I III I _ I 1 ..I,L�"` 1. I� I I � i �••� i' � rds a,rma,e:SLAM .k&%CKDCWli I i i �- I' '� ilk •---� �! T t I� � r Dar ,v , 1 C= a TO oar s cat Ia M oar x TO oar as ■o Dar la 2nd FL- OFnCE AREA 4�Y,ds105�t.tl�.yn� .crCWln �W+�e [.w6 wary Integrated Emergency Action Plan and Contingency Plan I Date: 06-03-16 22 of 26 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EXI T 21 �1 A I A, 11 1-------F—__,rrr=T SIEMENS v I l I t k f F I 1 [ I f [ 1 [ r I I I f I I I I EXIT20'<--- EVACUATION PLAN BUILDING F FORGE SHOP EXIT 22 --> EXIT 23 a: v. 7-20 -t 1 Integrated Emergency Action Plan and Contingency Plan Date: 06-03-16 23 of 26 Procedure No.: Page: 24 of 26 Appendix C The DOT identification of hazardous materials located at the Rural Hall Facility The following are examples of hazardous materials located at the facility: ➢ 2.1 — Flammable Gases — Acetylene, Hydrogen, Propane ➢ 2.2 — Non Flammable Gases — Argon, Nitrogen ➢ 3 — Flammable Liquid — Acetone ➢ 4.3 — Water Reactive — Aluminum Powder ➢ 5.1 — Oxidizer — Oxygen gas ➢ 6.1 — Toxic — Chromium metal powder 8 - Corrosive — Hydrochloric Acid, Hydrofluoric Acid, Sulfuric Acid, Potassium Hydroxide Siemens Energy, Inc. OOSiemens Energy, Mr. 2011 All Rights Reserved. TO! INTEGRATED EAP AND CONTINGENCY PLAN REV6_06-56,DOC Hard Copies of this procedure are uncontrolled. Procedure No.: Page: 25 of 26 Appendix D. Siemens Energy, Rural Hall: SPILL KIT INVENTORY LIST EDM AISLE QTY ITEM 30 Absorbent Pigs 1 Spark Arresting Shovel 1 Broom 3 50 lb Absorbent 1 Nitrile Gloves 1 T ek Suit 1 Faceshield SHIPPING QTY ITEM 6 Chemical Pigs 2 Chemical Boom 11 2 x 2 White Absorbent Pads 6 2 x 2 Green Pads 7 2 x 2 Chemical Pads 4 Special Snakes soft, unsure of use 1 Large Drain Cover (Dirty, in tube 2 Drain Covers 3 50 lb Absorbent 2 Hazardous Material Clean-up Bags, Lar e 23 Hazardous Material Clean-up Bags, Small 1 Clear Plastic Bag 1 Labels, Misc Pack 2 Overboots 2 Yellow Suits 1 Black Gloves 1 Silver Gloves 2 Nitrile Gloves 19 Wipes i Tyvek Suit 2 Goggles 1 Drum Lifter 1 Drum Tourniquet 1 Spark Arresting Shovel E-BLDG (CLOSE TO TOWER) QTY ITEM 8 Petroleum Booms 1,5 50 lb Absorbent 1 Yellow Rope 1 T ek Suit 1 Faceshield 1 Nitrile Gloves 4 Pi s E-BLDG (CLOSE TO DOOR) QTY IT EM 7 Chemical Suckers, Pink 10 2 x 2 White Absorbent Pads 16 White Snakes 3 Long Blue Snakes 6 Pink Snake 1 Large Pink Snake 1 Boom 1 Bag of Acid Neutralizer hard 1 1 Broom 1 Spark Arresting Shovel 3 50 lb Absorbent 1 Drum Lifter 1 Faceshield 1 Labels, Misc Pack 24 Hazardous Material Clean-up Bags, Small 3 Yellow Suits 3 Nitrile Gloves 2 Overboots 19 Wipes 1 Drum Tourniquet 2 ]Goggles CHEM STRIP LINE #1 QTY IT EM 1 Acid Neutralizer 1 Base Neutralizer 27 Gra Absorbent Pads 2 1 Silver Gloves 2 Nitrile Gloves 4 Hazardous Material Clean-up Bags, Large 1 Emergency Response Guidebook & Labels 1 Overboots 2 Goggles 6 IYellow Snakes, Lon 7 White Snakes, Short 19 2 x 2 White Pillows 1 Spill Area Sign I ! FORGED BLADE MACHINING (FBM) QTY ITEM 30 Absorbent Pigs 1 Spark Arresting Shovel 1 Broom 3 50 lb Absorbent i 1 Nitrile Gloves 1 Tyvek Suit 1 IFaceshield Appendix D Siemens Energy, Inc. ©Siemens Energy, Inc 2011 All Rights Reserved TQ:INIEGRATE❑ EAP AND CONTINGENCY PLAN REVfi_ 06-16.DOC Hard Copies of this ProCedure are uncontrolled. ' Procedure No.: Page: 26 of 26 Siemens Energy, Rural Hall: SPILL KIT INVENTORY LIST(2) CHEM STRIP LINE #2 QTY ITEM 1 Acid Neutralizer 1 Base Neutralizer 4 Hazardous Material Clean-up Bags, Large 2 Silver Gloves 2 Nitrile Gloves 2 Goiciciles 1 Emergency Response Guidebook & Labels 20 2 x 2 White Pillows 14 White Snakes, Short . 3 White Snakes, Lon 1 Spill Area Sign IF IC QTY ITEM 42 Gray Absorbent Pads 2 Silver Gloves 2 Nitrile Gloves 4 Hazardous Material Clean-up Bags, Large 1 Emergency Response Guidebook & Labels 2 Goaales 6 Yellow Snakes, Lon 12 White Snakes, Short 21 2 x 2 White Pillows 1 Spill Area Sign 1 Yellow Suit 1 Base Neutralizer HAZARDOUS WASTE STORAGE AREA QTY ITEM 2 Silver Gloves 1 Nitrile Gloves 4 Hazardous Material Clean-up Bags, Large 1 Emergency Response Guidebook & Labels 2 Goggles 2 White Snakes, Lon 15 White Snakes, Short 20 2 x 2 White Pillows 1 Spill Area Sign 2 Yellow Suit Siemens Energy, Inc. 05iemens Energy, Inc. 2011 All Rights Reserved. TQ:INTEGRATED EAP AND CONTINGENCY PLAN REV6_ 06-16.DOC Hard Copies of this procedure are uncontrolled. r� NC Department of Environmental Quality Received REQUESTED BY: DATE: 06-17-16 15 Leigh Frazier Winston -sal ^r. rr Regior,a3 SHIP TO: NCDEQ (North Carolina Division of Energy, Mineral & Land Resources) NCDEQ 585 Waughtown St Winston Salem, NC 27107 - 2241 ATTN : TELE#i: (336) 858-0368 J-g pj /"?, //'yY-5rV Fed -Ex Standard Signature Required DESCRIPTION: DESCRIPTION: Updated Emergency Action Plan Rev6, Siemens Energy From: Lei h Frazier Siemens, Inc. 3050 Westinghouse Rd. Rural Hall NC 27045 Phone 336 -969-1350 Email: lei h.frazier siemens.com VALUE: qTtankyou, Leigh TrazierforJames Whiticar MS Support ,Siemens 3050 Westinghouse Rd. RurafYfaff, -VC 2 704 5 336-969-1350 fetah.{razier@siemens. com /�IG'C�434Z�o° t'14� RECE WED f N.C. Deft. of ENR SIEMENS DEC 0 k 2015 �f 3050 Westinghouse Road Rural Hall, NC 27045 Winston-salern Tel. (336)969-1220 Regional Oftce f, Fax (336) 969-1398 November 30, 2015 9,rrs Signature Required North Carolina Department of Environmental and Natural Resources 585 Waughtown St Winston-Salem, NC 27107 Subject: Siemens Energy, Inc. 2015 Updated Emergency Action Plan Revs Rural Hall Facility, 3050 Westinghouse Road; Rural Hall, NC 27045 To Whom It May Concern: Enclosed is an updated copy of our Integrated Emergency Action Plan (EAP) and Contingency Plan for your records. Most recently revised: • Page 15, Appendix A — New Plant Manager, Cory Phillips • Page 15, .Appendix A —Added Cory Phillips ' cell phone number under Plant Manager • Page 151, Appendix A — 2"d shift Supervisor, Ed Majersky, updated cell phone number If you have any questions or require further information on this matter, please contact me at (336) 969- 1265, or the facility QEHS Manager, Mr. Srikanth Panrathaneni, at (336) 969-1232. Sincerely, James Whiticar EI-IS Officer Siemens Energy, Inc. Cc: Srikanth Parvathaneni, Siemens Energy, Inc. Siemens Energy, Inc. 3050 Westinghouse Rd Rural Nall, NC 27045 REQUESTED BY: DATE: 12-2-2015 Leigh Frazier SHIP TO: North Carolina Department of Environment and Natural Resources (NCDENR) 585 Waughtown St Winston Salem, NC 27107 - 2241 ATTN : TELE# (336) 858-0368 sqa 3 Id/0 9s-r-r' Fed -Ex Standard, Signature Required DESCRIPTION: DESCRIPTION: Updated Emergency Action Plan RevS, Siemens Energy From: Leigh Frazier Siemens, Inc. 3050 Westinghouse Rd. Rural Hall, NC 27045 Phone 336 -969-1350 Email: lei h.frazier siemens.com VALUE: Zhankyou, Leigh 'Frazierfor James `iNhiticar E9TS Support Siemens 3050 Westinghouse 1R R,urafYfaCC, XC 27045 33 6-969-1350 Ceigh. {razier@siemens. cam Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY RECEIVED N.C. Dept. of ENR DEC 0 4 2015 . Winston-Salem ; x Regional Office. SIEMENS Document type No.: SIEMENS QEHS Procedures Manual Revision/Date: 5 2015-08-10 Winston Service Center Issued by: EHS Department Title Integrated EAP and Contingency Plan Handling: For Internal Use Only I S O-9001 I I S O-14001 I O H SA S-18001 Table of Contents Revision Sheet 1.0 Purpose 2.0 Scope 3.0 Authority 4.0 Organization 5.0 Emergency Action Plan 6.0 Contingency Plan Page: 1 of 25 Appendices: 4 Released by: Srikanth Parvathaneni QEHS Manager a-QMS 7/25/2013 Reviewed by: Reviewer/Stakeholder a-QMS a-QMS a-QMS Reviewed by: ReviewerlStakeholder a-QMS a-QMS a-QMS Reviewed by: Reviewer/Stakeholder a-QMS a-QMS a-QMS Prepared by: James Whiticar EHS Department a-QMS 7/25/2013 Name Org. Unit Signature Date Siemens Energy, Inc. ©Siemens Energy, Inc. 2011 All Rights Reserved. Description: Document No.: Rev, 5 Page No.: Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 1 of 25 E103. DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Revision Sheet SIEMENS Revision Reissue Date Section Description Of Change 1 7-25-13 Appendix A _Change name of coordinators and 2" 13 Shift Supervisors 2 8-21-13 5.3 Modified evacuation process 3 4-21-14 Appendix A Change alternative E.0 Sam Myers to Michael Cox 4 8-10-15 5.6.3 Add AED locations 4 8-10-15 Appendix A Third Shift contact information 4 8-10-15 Appendix A Security Phone number 4 8-10-15 Appendix A Siemens Corporate EHS Director 5 11-24-15 Appendix A Plant Manager Changed to Cory Phillips 5 11-24-15 Appendix A Plant Manager cell phone updated 5 11-24-15 Appendix A 2" shift Su v. Ed Majersk — updated cell phone number Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 2 of25 E103.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY INTEGREGRATED EAP AND CONTINGENCY PLAN 1.0 PURPOSE: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) describes a course of action to follow in order to assure the safety of personnel (employees, contractor personnel, visitors, and the general public) who are present on the site, the environment, and equipment when an emergency occurs. This plan also details communication requirements with the sublet EAP emergency and management personnel. External reporting requirements are also detailed in this plan. The plan provides the guidelines and procedures to meet these needs at the Siemens facility in Rural Hall, N.C. 2.0 SCOPE: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) provides information such as examples of the types of emergencies that could occur at the Rural Hall site, procedures to follow in the event of an emergency, and responsibilities of personnel during an emergency. Our plans describe actions facility personnel will take, what emergency response equipment is available, what procedures will be followed, and arrangements made with local emergency response authorities in order to minimize hazards to human health or to the environment in the event of an accident involving hazardous materials. 3.0 AUTHORITY: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) was developed and implemented to comply with OSHA 29CFR 1910.38 and 40 CFR 264.50 thru 56 and to assure for the safety of personnel, protection of the environment and the protection of physical assets at the Siemens Winston Service Center has documented and issued this Integrated Emergency Action Plan and Contingency Plan. The emergency coordinator has the full authority to commit resources needed to respond to emergencies at this facility. The emergency coordinators can deputize other employees to assist them in the event of an emergency. The authority to review, revise and approve this procedure is defined within our document control procedures. Only the owners and approvers of this document are authorized to approve revisions made to this document. The Emergency Action Plan and Contingency Plan must be reviewed, and immediately amended as necessary, whenever the following situations apply; • Applicable regulations are revised; • The plan fails in an emergency; • The facility changes in its design, construction, operation, maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or releases; • The list of emergency coordinators changes; • Or the list of emergency equipment changes. When changes are made that impact the Fire, Explosion or Spill Sections of this plan, revised copies of this plan are to be sent to the following personnel or agencies: 1) Rural Hall Fire Department me Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 3 of 25 E103. DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY 2) Forsyth County Fire Department 3) Forsyth County Sheriff's Office 4) Wake Forest Baptist Medical Center 5) Spill Response Contractor 6) Security 7) Tenant(s) Human Resource Manager 8) Emergency Coordinators 9) Plant Manager 4.0 Organization 4.1 Emergency Coordinator Facilities and Maintenance Manager The Facilities and Maintenance Manager shall be the primary Emergency Coordinator and have primary responsibility for emergency responses to include the local fire department, training, equipment, and evacuation. He/she shall consult with the Plant/General Manager, Operations Management, and the Human Resources Manager. He/she will also communicate with the tenant(s) HR Manager in order to ensure plant -wide coordination when required. The Emergency Coordinator will be responsible for recording events, coordinating internal and external resources, consulting with Siemens EHS personnel as appropriate and reporting status and creating incident reports.. Security, although contracted by the Siemens Real Estate Facility Manager (SREFM)„ will be given directions by the Emergency Coordinator, since our primary objective in an emergency is the safety of all personnel. Alternate Emergency Coordinator The alternate emergency coordinator has been designated to identify in Appendix A. In the event that the Primary Emergency Coordinator is unavailable, the Alternate Emergency Coordinator shall assume emergency response responsibilities. At all times there must be at least one Emergency Coordinator on site or on call, with the ability to reach the facility in a short amount of time, with the responsibility for coordinating all emergency response measures. Continuity of Emergency Coordination The emergency coordinator first arriving at the scene shall have the responsibility as the emergency coordinator for the duration of the emergency, unless properly relieved by the Facilities and Maintenance/QEHS manager. The emergency coordinator will be responsible for recording events, coordinating internal and external resources, consulting with Siemens and Siemens Corporate EHS personnel as appropriate and reporting status and creating incident reports. The oncoming emergency coordinator assumes all responsibilities including record keeping and notifications from the point of assuming emergency coordinator responsibilities. 4.2 Personnel Responsibilities Outside of Emergency Team Management Personnel The management personnel shall be responsible for maintaining organization within their area as well as other measures that are called for to protect personnel and company property in their assigned areas of responsibility. Management is responsible for maintaining posted sketches in the area outlining emergency routes for employees in their area. They shall advise all new, incoming employees of these routes during their orientation. iption: Document No.: Rev. 5 Page No Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 4 of 25 E103. DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Security Security shall be responsible for evaluating the type of emergency to determine whether the emergency coordinator should be contacted in accordance with Section 8. Security shall communicate and coordinate a plant wide evacuation with the tenant(s) in the event that an evacuation is ordered. Security shall call 911 in the event of a fire alarm or upon observation or notification of emergencies as defined in this plan. Second Shift, Third Shift and Weekend Shift The primary role of the second, third and weekend shift supervisors is to coordinate the initial response (contain, assist and notify) according to the specific emergency procedure contained in Section 5.1, and contact Security as quickly as possible. Personnel Outside of Emergency Team All Siemens WSC staff is part of the Emergency Response Organization and is the organization established to help in an emergency. The Siemens WSC staff will be responsible for the communications systems, record keeping, and facilities status during the emergency. Liaison with External Organizations and the Press The Emergency Coordinator will maintain liaison with Siemens and the tenant(s) management, emergency organizations, Siemens and government officials. The Siemens WSC HR Manager is the only person authorized to talk with reporters or the press. All inquiries by the press are to be answered with "no comment" and forwarded to the Siemens WSC HR Manager. Emergency Support Immediately following either decision, evacuate and search or search without evacuating, the Emergency Coordinator shall notify the appropriate emergency organizations (Fire, Police, Sheriff, Regulatory Agencies) giving them information that is available, outlining the plan for action within the plant, and requesting advice and assistance as necessary. Recorder The Emergency Coordinator shall be responsible for recording the chronology of events, to document changes that take place and to provide a record for the future. It is recommended that the emergency coordinator assign record keeping responsibilities to a designated employee. 4.3 Arrangements with Local Authorities Arrangements have been made with local authorities such as police, fire and local hospitals to familiarize the local authorities with our facility layout, waste handling and generating activities, and the types of injuries or illness that could result from fires, explosions, or releases. The local emergency response agencies, identified in Appendix A, and various state agencies have been requested to respond to this Hazardous Waste Contingency Plan. Also, their Chief Administrators are invited to visit the facility in order to better coordinate potential hazardous waste related emergency response procedures. If more than one law enforcement agency or fire department responds to an emergency at our facility, The Emergency Coordinator will hand over control of the incident to the agency that best addresses the mitigation needs. on: ment No.: I Rev. 5 I Wage NO.: Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 5 of25 E143.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY 5.0 Emergency Action Plan 5.1 General Guidelines for Specific Emergencies Whenever there is a release, fire, explosion, the Emergency Coordinator must be notified in order to immediately identify the character, exact source, amount, and areal extent of any release material. The Emergency Coordinator may do this by observation or review of facility records or manifests and, if necessary, by chemical analysis. Concurrently, the emergency coordinator must assess possible hazards to human health or the environment that may result from the release, fire, or explosion. This assessment must consider both direct and indirect effects of the release, fire, or explosion (e.g. the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any hazardous surface water run-offs from water or chemical agents used to control fire and heat -induced explosions.) If the emergency coordinator determines that the facility has had a spill, release, fire, or explosion which could threaten human health, or the environment, outside the facility, he must report his findings in accordance under Section 5.0 of this plan. During an emergency, the emergency coordinator must take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous materials at the facility. These measures must include, where applicable, stopping processes and operations, collecting and containing released waste, and removing or isolating containers. If the facility stops operations in response to a fire, explosion, or release, the emergency coordinator must monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate. Immediately after an emergency, the emergency coordinator must provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results form a release, fire, or explosion at the facility_ The emergency coordinator must ensure that, in the affected areas of the facility: No materials that may be incompatible with the released material is treated, stored, or disposed of until cleanup procedures are completed; and All emergency equipment listed in the Emergency Action Plan and Contingency Plan is cleaned in the designated decontamination area and fit for its intended use before operations are resumed. 5.2 FIRE AND EXPOLOSION 5.2.1 Small (incipient) Fire: • An incipient fire is a small isolated fire that has not spread to the structure of the building or to other equipment. • If a member of the Incipient Fire Brigade is present then that member must initially evaluate the situation and determine what type of fire extinguisher to use. • If the incipient fire is located in chemical stripping, FIC, or where aluminum powder is present then the fire department is to handle the situation. Security shall contact the Emergency Coordinator from the list in Appendix A. o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I s of 25 E103.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY • If the Emergency Coordinator is on site he/she shall conduct an initial evaluation of the situation. If the Emergency Coordinator is off site, Security shall conduct the initial evaluation and advise the Emergency Coordinator immediately. The initial evaluation consists of the following: • The fire could cause the release of toxic fumes; • If the fire spreads, it could ignite material at other locations at the site or cause heat -induced explosions; • The fire could spread to off -site areas; • Use of water or water and chemical fire suppressant could result in contaminated run-off and/or a violent chemical reaction. • If any of these conditions exist or could exist, appropriate actions should be taken. 5.2.2 Structural Fire or Explosion: • A structural fire is a fire that has spread to other equipment or the structure of the building. • Personnel, who discover major fire or explosion should leave the immediate area, pull the nearest fire alarm pull box and call Emergency Coordinator and/or security at extension 1359. • Security shall contact the Emergency Coordinator from the list in Appendix A. • If the Emergency Coordinator is on site he/she shall conduct an initial evaluation of the situation. If the Emergency Coordinator is off site, Security shall conduct the initial evaluation and advise the Emergency Coordinator immediately (if feasible). The initial evaluation consists of the following: » The Emergency Coordinator will ensure that evacuation procedures have been initiated. He/she will also communicate with the Tenant(s) FIR Manager in order to ensure plant wide .coordination. • Contact the appropriate local, state, or federal agencies as warranted. 5.3 Evacuation Alert System The facility is equipped with audible work area alarms and visual strobes. The annunciation is monitored by Security and the alarm monitoring service. The annunciation panel is located in the lobby next to Security. • The fire alarm can be initiated by any of the following: 1. Automatic initiation of water flow system and heat sensors. 2. Notifying Security by phone or other means. 3. Activating a fire alarm pull box. • If the evacuation alarm fails to operate when activated, security shall be notified and will take the following steps: 1. Phones and radios can be used to announce the evacuation or; Security and/or supervisors will physically go through the facility, announcing the evacuation. 5.3.1 Evacuation Process Step I Once the fire alarm is activated, all employees are required to evacuate the building_ Integrated Emergency Action Plan and Contingency Plan I I Gate: 11-24-15 I 7 of 25 E 103. DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Evacuation Routes and Assembling Area • When the evacuation signal sounds, all employees, contractors, salesmen and visitors shall proceed via the nearest exit identified on the attached plans and proceed to their assembly area as designated on attached plans located in Appendix B. • The escort (Siemens WSC employee) is responsible for ensuring that the visitor and/or contractor are accounted for and they know where the assembly area is located. • After evacuating and walking to the assembly area, employees will remain in the assembly area until notified that it is safe to re-enter the building. • Employees are not authorized to leave the evacuation area or facility grounds unless directed to do so by the Emergency Coordinator, Plant Management or emergency personnel (e.g. Fire Department) Step 2: Make Sure Everyone Gets Out The following steps will be initiated to ensure that everyone gets out: • Once the evacuation signal has sounded, all employees are required to evacuate the building. • Employees are to follow the evacuation routes identified in the evacuation maps posted throughout the facility. If a route is blocked by the release of hazardous materials or fire, and alternate route should be found using the evacuation maps located in Appendix B. • Department managers or designee should report to their assigned assembly areas and see that personnel remain at proper distances from the building until the all clear signal is received. Employees are not authorized to leave the evacuation area or facility grounds unless directed to do so by the Emergency Coordinator, Plant Management or emergency personnel (i.e. Fire Department) Step 3: Roll Call In the event of an evacuation, each department manager or designee will perform a roll call to ensure that every employee in their department is accounted. At the assembly area, each department manager will verbally inform the EHS Officer if every employee has been accounted for. Once inside, each department manager or designee will send the EHS Officer an e-mail to verify that all employees have been accounted for (present or not present at the facility). Step 4: Decision After Evacuation: After evacuation of an actual emergency, the Emergency Coordinator in consultation with Siemens Real Estate, the County Emergency Personnel, and the Plant Manager shall make a decision regarding: • Waiting period before employees may re-enter the building; • Shutting off or turning back on utilities (electricity, gas, steam, etc.); • Evacuation times in relation to end of shift, deciding whether to send • employees home or hold in assembly area; • Whether next shift should be notified not to report to work; • Returning to the building for additional searching. Once decision has been made to allow employees to re-enter the building, the Emergency Coordinator will be instructed to communicate to all Siemens Management, HR Manager or the tenant(s) Plant Manager, Siemens Real Estate, and any contractors on site that all is clear. o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I B of 25 E ]03. DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY After evacuation a non emergency situation, the Emergency Coordinator or designee will communicate the message to re-enter the building to the employees in the assembly area once the cause of the evacuation has been discussed and determined. 5.3.2 Second Shift, Third Shift or Weekend After evacuation of a non emergency during second shift, third shift or the weekend, the shift supervisor(s) will take the role of the Emergency Coordinator and communicate the message to re-enter the building to the employees in the assembly area once the cause of the evacuation has been discussed and determined with maintenance and security. The supervisor will provide the EHS Officer a report that ensures that all employees have been accounted for and a detailed description of the situation. After evacuation of an emergency situation, the shift supervisor will contact the Emergency Coordinator or designee of the situation. During the emergency situation, the Emergency Coordinator or designee will come to the facility to initiate the Contingency Plan. Also, the supervisor will provide a report that ensures that all employees have been accounted for and a detailed description of the situation. 5.4 Chemical Spill — Liquid or Solid Facilities and Maintenance employees will respond to any reported chemical spill. These employees have been properly trained in basic spill response. These employees can be notified in person or by calling extension 1359. If maintenance cannot be reached then security is to be notified (extension 1359). 5.4.1 Spill Evaluation Answer the following questions when responding to a spill: • What is the chemical? • What is the PPE requirement? • Do I have the necessary spill clean up and containment material present? • What are the potential physical and toxic risks? • If the spill occurs outside, am I aware of the requirements listed in the Stormwater Pollution Prevention Plan (SWPPP) and the Spill Prevention, Control, and Countermeasures Plan (SPCC)? • If the spill reaches a certain level, do I know the Emergency Coordinator? 1. The Emergency Coordinator must determine when to contact the list of contacts in Appendix A, which is dependent upon the nature of the spill. 5.4.2 Gas Release If chlorine or fluorine gas was released into the facility then the evacuation order would be given. However, to confirm a chlorine gas release has occurred, a chlorine gas meter would be used to determine the amount of gas released. If fluorine gas released in the fluorine ion cleaning (FIC) area then ammonia would be released to suppress the fluorine gas. 5.5 Emergency Procedures for Severe Weather 5.5.1 Tornadoes The facility utilizes a NOAA weather radio to be alerted to any tornado warnings. If a tornado warning is issued by the National Weather Service for the Rural Hall area then all employees are Integrated Emergency Action Plan and Contingency Plan I I Hate: 11-24-15 I 9 of 25 E 1 a3. ooT Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY to report to the designated tornado shelter. While in the tornado shelter, the HR Specialist will take a roll call to ensure that all employees are accounted for_ Once the tornado warning is lifted then employee will resume normal operations. 5.5.2 Winter storm If a winter storm occurs that has been determined to make roads impassable or has a utility outage for the facility then the employees will call 866-367-7972 or on-line at www.siemens.com/energy/darkwebsite for information about the plant closing. If the storm occurs during the shift then the supervisors will notify the employees that the plant is closing. 6.5.3 Flood If the facility is being flooded then the facility will follow the evacuation procedure listed in Section 5.3. 5.6 Medical Emergency: 5.6.1 General Guidelines A medical emergency includes injuries and/or illnesses that will require more than the routine first aid treatment. 5.6.2 Person Discovering the Emergency The person discovering an employee in need of emergency medical assistance should follow these steps: 1. Do not activate the fire alarm. 2_ Call the radio access channel (extension 1359) from the nearest phone. 3_ Stay with the employee needing medical assistance until trained emergency personnel arrives, but do not attempt to move them unless they are in imminent danger. 4_ Always be sure to follow blood borne pathogen protocols_ 5.6.3 On -Site Emergency Medical Technician (Siemens EMT or Security) 1. Provide initial or stabilizing assistance and determine if additional medical treatment is required. 2. If the EMT goes to the scene of an incident then they must take the AED and first aid bag. There are five AEDs in the building — Security office, Outside of the front office; Outside of the Manufacturing offices, Across from David Cox's office, and on the wall at the restroom near Forged Blade Machining and New Parts. 3. Call 911 if a life threatening condition exists. 4. Call an ambulance, if necessary. Notify doctor and hospital of the emergency. 5. Notify the EHS Officer or QEHS Manager immediately of the emergency situation. B. The On -site Emergency Medical Technician or EHS Officer may also contact WorkCare for assistance (24-hr Triage Assistance). 5.6.4 HR Manager Notify the employee's designated emergency contact of the injury or illness and of the action that has been taken. Notify the employee's supervisor of the emergency. Ensure that all necessary accident reports are completed. No.: Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 10 of 25 E 103. DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY 5.7 Threats Against the Facility 5.7.1 General Guidelines for Bomb Threat If an employee receives a call concerning a bomb threat then the employee should try to get as much information as possible from the caller. Afterwards, the employee should notify the Emergency Coordinator and/or the HR Manager immediately, so they can contact the proper authorities in order to determine the best course of action. If the authorities authorize the evacuation of the facility then the evacuation protocol will be followed as in Section 5.3.1. Also, the HR Manager will notify the Plant/General Manager and the tenant(s) Manager in order to ensure plant -wide coordination when required. If the call occurs during night shift working hours then the employee or Security would take the call. If an employee answers the phone then he/she will contact Security and then Security would contact the Emergency Coordinator to alert he/she of the situation. 5.7.2 Procedures to follow if taking the call of a bomb threat 1. Record the time and exact words of the message; 2. Have the caller repeat the message and keep the caller on the line as long as possible; 3. Have someone nearby notify the Emergency Coordinator 4. Ask the caller the reason for making the threat; 5. Note the caller's sex, speech, mannerisms, signs of intoxication, phrases, etc.; and 6. Determine if the caller is using an internal or external line (look at caller ID). 5.7.3 Written Threats: Threats received in writing should be preserved for investigation for possible fingerprints and if possible should not be handled once the letter has been opened. When the threat is received, the person receiving the letter shall personally contact the Emergency Coordinator. 5.8 Emergency Procedures for Civil Disturbance 5.8.1 General Guidelines The purpose of this procedure is to detail action to be taken in order to protect personnel and property from any negative effects as a result of civil disturbance. These actions include notification of the proper authorities for resolving the disturbance, providing a protective separation between the disturbance and our personnel, and taking necessary steps to protect our property from destruction as a result of the disturbance. 5.8.2 Responsibilities Security Secure Guard Station --Call 911 (if necessary), the Human Resources Manager and the Emergency Coordinator Human Resources Manager Notify local authorities. Notify the tenant(s) HR Manager to determine need for coordination. Have plant management personnel give direction to their employees. Provide liaison with the police. n: o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 11 of25 E 103. DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Management Personnel Keep employees and other individuals away from the disturbance_ 6.0 Contingency Plan 6.1 Reporting of Significant Event Requirements to initiate the Contingency Plan A Significant event is defined as: • Serious accident, life threatening illness, risk of epidemic * Definition of a "serious accident" -- fatal accident, life endangering injuries, poisoning • Large-scale damage to plant or equipment, Fires (extinguished by external fire fighters, and/ or having influence on the production), explosion • Crises (e.g. terror attacks, criminal threats, kidnapping, bomb scare, putsch), civil unrest, natural catastrophes (e.g. flood, earthquake, hurricane, tornado), • Loss of radio -active sources or contamination by radio -active material, • Technical emergency (Impacts from outside: Fire, implosions, plane crash, gas release, power supply interruptions) • Imminent or actual (unplanned sudden or non -sudden) release of hazardous materials to the air, soil or water of the environment, and release of hazardous substances of which the reportable quantity require reporting to regulatory agency. • Failure to follow permit requirements which result in self reporting or notice of violation or citation by a regulatory agency. • Accident during the transport of dangerous goods in conjunction with release of dangerous goods • Indications 1 suspected cases 1. that are capable of becoming events with negative results to the Image of Siemens Energy Sector 2. respectively unplanned contact to authorities as a result of these events 3. for the occurrence of one of the events described above. • > 3 persons injured respectively affected by a single event • Loss of limb(s) • Any Electric shock accident • Motor vehicle accident resulting in hospitalization of two or more persons • The Emergency Coordinator is responsible to ensure events are reported to Siemens. • All significant events must be reported within 2 hours by phone to the Siemens Corporate Contacts listed in Appendix A of this document. The purpose of this contact is to notify and gain guidance on what we are to communicate to external entities. • After notification to Siemens Corporate, the facility Siemens representative identified in Siemens Procedure P00-057-A01 shall notify the appropriate external entities based on event being reported. 6.2 Incident Reporting Requirements The Emergency Coordinator must document the incident by recording the time, date, and details of any incident which requires implementing the contingency plan_ Within 15 days after the incident, the EHS Manager must submit a written report on the Environmental incident to the Regional Administrator identified in Appendix A. The report must include: (1) Name, address, and telephone number of the owner or operator; (2) Name, address, and telephone number of the facility; ment No.: s Kev. 5 I i aae No.: Integrated Emergency Action Plan and Contingency Plan I I date: 11-24-15 I 12 of 25 rX01191 z.>rr Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY (3) Date, time, and type of incident (e.g., fire, explosion); (4) Name and quantity of material(s) involved, (5) The extent of injuries, if any; (6) An assessment of actual or potential hazards to human health or the environment, where this is applicable; and (7) Estimated quantity and disposition of recovered material that resulted from the incident. 6.3 Evacuation of Local Areas (Evaluation, Action and Notification) If the Emergency Coordinator in conjunction as applicable with the Emergency Responding Agency (e.g. Fire Department) assessment indicates that evacuation of local areas may be advisable, the emergency coordinator must immediately notify the appropriate local authorities identified and either the government official designated as the on -scene coordinator for that geographical area, or the National Response Center using their 24-hour toll free number listed in Appendix A. The emergency coordinator must be available to help appropriate officials decide whether local areas should be evacuated. 6.4 Contingency Plan Resources Siemens Real Estate Facilities Management The Siemens Real Estate Response Center should be notified during any emergency situation concerning the building and/or property. They will assign personnel from Siemens Real Estate Facilities Management and/or their contractors accordingly to remove/restore utility services and assess/repair damages. Maintenance Support The Siemens Facility Maintenance group will be directed, as needed, by the emergency personnel to assist in removal of services (power, water, etc_) during such emergencies. Security Plant Security will assist in controlling access to emergency locations and to direct outside emergency response services to proper locations on the plant property. 6.5 Command Post (if needed) Purpose The Command Post provides a location for responsible personnel to collect data, make decisions, and resolve immediate problems at the scene of the emergency. Location and Function The command post will be established at the Security Control Office ('B' Building). The Plant Security will man it with other personnel designated by the Emergency Coordinator_ Alternate Command Post An alternate command post will be designated by Security and/or the Emergency Coordinator, as needed. o. Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 13 of 25 E103.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Staff All Siemens WSC staff is part of the Emergency Response Organization and is the organization established to help in an emergency. The Siemens WSC staff will be responsible for the communications systems, record keeping, and facilities status during the emergency. Liaison with External Organizations and the Press The Emergency Coordinator will maintain liaison with Siemens and the tenant(s) management, emergency organizations, Siemens and government officials. The Siemens HR Manager is the only person authorized to talk with reporters or the press. All inquiries by the press are to be answered with "no comment" and forwarded to the Siemens HR Manager. Emergency Support Immediately following either decision, evacuate and search or search without evacuating, the Emergency Coordinator shall notify the appropriate emergency organizations (Fire, Police, Sheriff, Regulatory Agencies) giving them information that is available, outlining the plan for action within the plant, and requesting advice and assistance as necessary. Arrangements made with Local Authorities Arrangements have been made with local authorities such as police, fire and local hospitals to familiarize the local authorities with our facility layout, waste handling and generating activities, and the types of injuries or illness that could result from fires, explosions, spills, or releases. The local emergency response agencies, identified in Appendix A, and various state agencies have been requested to respond to this Hazardous Waste Contingency Plan. Also, their Chief Administrators are invited to visit the facility in order to better coordinate potential hazardous materials and/or waste related emergency response procedures. If more than one law enforcement agency or fire department responds to an emergency at our facility, The Emergency Coordinator will hand over control of the incident to the agency that best addresses the mitigation needs. iption: I Document No.: Rev. b Nage No.: Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 14 of 25 E 103. DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Appendix A Emergency Contact Information_ EMERGENCY COORDINATORS ■ Primary Emergency Coordinator - Gary Gingras — Facilities Manager 1500 Oscar Frye Road Pinnacle, NC 27043 (336) 969-1285 (Work) (413) 717-7450 (Cell) SIEMENS ■ Alternate Emergency Coordinator — Michael Cox - Support Services Supervisor 125 Prestwick, Rural Hall, NC 27045 (336) 969-1362 (Work) (336) 391-3257 (Cell) • Alternate Emergency Coordinator — James Whiticar — EHS Officer 6504 Dornoch Drive Greensboro, NC 27410 (336) 969-1265 (336) 602-3043 ■ Alternate Emergency Coordinator — Srikanth Parvathaneni — QEHS Manager 4702 Jefferson Wood Court, Greensboro, NC 27410 (336) 969-1232 (Work) (407) 516-6806 (Cell) Siemens Winston Service Center Management/Supervision Plant/General Manager Operations Controller Human Resources Mgr Second Shift (3:30pm — 11:30pm) Third Shift (11:30pm-7:30am) Security Cory Phillips Cory Phillips James Rochester Samara Satterfield Ed Majersky Security Security (704) 806-3714 (Cell) (704) 806-3714 (Cell) (704) 264-5447 (Cell) (336) 655-8716 (Cell) (336) 816-9185'(Cell) (336) 969-1359 (Radio) (336) 969-1359 (Radio) (336) 969-1220 (Security Office) Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 1 15 of 25 E103.DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Tennant(s) Management/Supervision Security maintains a current list of contacts and their phone numbers. SIEMENS CORPORATE CONTACTS Siemens Energy EHS Director Janaina Gameiro (407) 736-2304 (Work) Siemens Real Estate Response Center (866) 311-9290 Workfare (24-hr Triage Assistance) (888) 449-7787 SIEMENS WINSTON-SALEM/FORSYTH COUNTY EMERGENCY ORGANIZATIONS Rural Hall Fire Department 969-9368 or 911 Winston Salem City Muddy Creek Water Treatment Plant 6am-6pm 765-0130 6pm-6am 784-4710 Forsyth County Fire Department 727-2222 or 911 Forsyth County Sheriffs Office 727-2112 or 911 Forsyth County Ambulance Service 727-2222 or 911 N.C. State Highway Patrol 761-2441 or 911 Wake Forest Baptist Medical Center 716-2255 or 911 Regional Coordinator: Winston-Salem/Forsyth County Office of Emergency Management Smith Reynolds Airport, Room 104 (336) 767-6161 Winston-Salem, NC 27105 (336) 727-8000 - secondary number Forsyth County Environmental Affairs (336) 703-2440 Forsyth County Government Center 201 N. Chestnut St. Winston Salem, NC 27101-4120 N,C. Department of Environmental and Natural Resources (NCDENR) (336) 858-0368 Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, NC 27107-2241 n: Integrated Emergency Action Plan and Contingency Plan Date: 1 1-24-15 1 16 of 25 E9 03. DOT Winston Service Center EHS Programs SIEMENS ENVIRONMENTAL, HEALTH & SAFETY EMERGENCY ORGANIZATIONS - CONTRACTORS Shamrock Environmental Corporation 503 Patton Avenue Greensboro, NC 27406 24 Hour Emergency Response 800-881-1098 Non -Emergency (336) 375-1989 In the event of an emergency, Shamrock Environmental is contracted by Siemens to provide comprehensive environmental services to include emergency response, wastewater treatment, industrial services, waste management, remedial and stream and wetland restoration. NORTH CAROLINA EMERGENCY ORGANIZATION N.C. Emeraencv Response Commission Hotline 1800) 451-1403 or (919) 733-1361 NC EPCRA 4714 Mail Service Center Raleigh, NC 27699-4714 FEDERAL ORGANIZATIONS NATIONAL RESPONSE CENTER (NRC) (800) 424-8802 United States Environmental Protection Agency Region 4 Sam Nunn Atlanta Federal Center fit Forsyth Street, SW Atlanta, GA 30303-8960 FEDERAL BUREAU OF INVESTIGATION Charlotte Raleigh Greensboro US EPA HOTLINE (704) 529-1030 (919) 856-4620 (336) 855-7770 (800) 535-0202 Description: Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 1 17 of 25 E103-DOT Winston Service Center E;HS Programs ENVIRONMENTAL, HEALTH & SAFETY Site Maps SIEMENS o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 11-24-15 I 18 or 25 E 103. DOT �, .r. !. �•.. r �.:�= ... .,��' .�,a�� c .,». ,; K��i.w `� Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EXIT GS SIEMENS EXIT G5 EXIT G7 EXIT G4 EXIT G3 EXIT G2 Integrated Emergency Action Plan and Contingency Plan EVACUATION PLAN BUILDING G xev. 5 rage NO.: Date: 11-24-15 I 19 of 25 ;L—] EXIT 01 RLv. 7_2,-11 E1a3.D Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY �=6 � — �'r--------�— k Hsu 1 h u r 1 ' ^ X 1 r • aer 1 fan am a I � � � 1 I I I y 1 + i Orr 1 . J t 1 ` � 1 S i s i m ro jam r In 1 anon a nc a �" �j'tlal L E O •.37� ; IV SIEMENS to 1 par • pPr la i � Hazardous cc j Storage i�aar m L-• ar „ • ao " ' Area ' i a. cm ,. ca prt n � ouac wl�r ii t-4 1 a urt car Qi n t Ar4Ld1Ti t/J7.+�IC Ld: ption: Integrated Emergency Action Plan and Contingency Plan Orr Rev 5 Page No. Date: 11-24-15 20 of 25 2A altUrr f QD ocmu 7 ewr w7k ^V,& Or ACULK EVACUATION PLAN STAGING AREAS SIEMENS WINSTON SERVICE CENTER Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY - _ ► ---- - EVACUATION PLAN BUILDINGS A AND B • I SIEMENS WINSTON SERVICE CENTER e , 1 i E)aT 7 �Y 6 y 1 1 B 1 1 A 1 Gofers*. 1 DaT 5 E --f— -- t J a �UILC1tNC S ' eMJ- <4 �D4T 6 EiaT 4- I 0 2 iption: Document No.: Rev 5 Page No. Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 21 of 25 ftht a 1-u E103.0 Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS 9wam EW30 EVACUATION PLAN MANUFACTURING BUILDING C oar za SIEMENS WINSTON SERVICE CENTER 1 F } } par , I j INDICATES EXR wf7}1 AREA DE RESCUE ■ .._._i__ [jar 32 I � � !4t' s -++f Oaf 11 OQi 1S Oaf 1 k MOO � I t O4T 3+ 9N 9PNG 4% �« FEl'aYM 1 Oa t , 1 � Cn 12 on 13 cwa 14 iYCFAl4NG � 1 1 � 111 1 � Q1r-OiF � oar , +>T I r.,� iIR, T—.- T-1°' 1 1. Al T T '1 i I I F7ar ,s r I I oa'r a In oars oa# , e to oar as ro oar x ro oar to i l 2nd FL OFE1C£ AREA �r+t�tlre+wwai r�w.nlw� i.w.�c awe ma..y Integrated Emergency Action Plan and Contingency Plan I Date: 11-24-15 22 of 25 E 103. D Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EXI T 21 I A J,. EXIT 20'<-- SIEMENS EVACUATION PLAN BUILDING F FORGE SHOP > EXIT 22 ---> EXIT 23 REV. 7-2N-31 Integrated Emergency Action Plan and Contingency Plan Date: 11-24-15 1 23 of 25 E103. D Procedure No.: Page: 24 of 25 Appendix C. The DOT identification of hazardous materials located at the Rural Hall Facility The following are examples of hazardous materials located at the facility: > 2.1 — Flammable Gases — Acetylene, Hydrogen, Propane > 2.2 — Non Flammable Gases — Argon, Nitrogen ➢ 3 — Flammable Liquid — Acetone ➢ 4.3 — Water Reactive — Aluminum Powder > 5.1 — Oxidizer — Oxygen gas ➢ 6.1 — Toxic — Chromium metal powder ➢ 8 - Corrosive — Hydrochloric Acid, Hydrofluoric Acid, Sulfuric Acid, Potassium Hydroxide Siemens Energy, Inc. Merren$ Energy, Inc 2011 All Rights Reserved TO INTEGRATED EAP AND CONTINGENCY PLAN REVS11-25- _ 15.DOC Hard Copies of this procedure are uncontrolled. Procedure No.: Page: 25 of 25 Appendix D List of Emergency Spill Response Equipment Aisle/Area Column C12 Column C12 Column F11 Column F11 Column F11 Shipping/Receiving Shipping/Receiving Column B11 Column B11 Waste Storage & Shipping Area Waste Storage & Shipping Area Throughout the plant Emergency Spill Response Equipment Oil Spill Kit (95 gal over pack with oil socks) Spill Control Kit with Shovel & Broom Wash Station (1) Vacuum Tank (250 gallon) (1) Vacuum Tank (175 gallon) Multi Chemical Spill Kit (65 gal over pack) Spill Control Kit with Shovel & Broom Oil Spill Kit (95 gal over pack with oil socks) Spill Control Kit with Shovel & Broom Multi Chemical Spill Kit (65 gal over pack) Spill Control Kit with Shovel & Broom Emergency Eye Wash/Shower Stations Siemens Energy, Inc. ®Siemens Energy, Inc 2011 All Rights Reserved. TO: INTEGRATED EAP AN❑ CONTINGENCY PLAN REVS 11-25- 15_DOC Hard Copies of this procedure are uncontrolled. SIEMENS May 19, 2014 RECEIVED 7 N.C, Dept. of ENR z MAY 2 0 2014 WINSTON-SALEM ' REGIONAL OFFICE '= 3050 Westinghouse Road Rural Hall, NC 27045 Tel. (336) 969-1211 Fax (336) 969-1399 FedEx 5c1C>3 I;j95 rqt Signature Required North Carolina Department of Environmental and Natural Resources 585 Waughtown St Winston-Salem, NC 27107 Subject: Siemens Energy, Inc. 2014 Updated Emergency Action Plan Appendix A Rural Hall Facility, 3050 Westinghouse Road, Rural Hall, NC 27045 To Whore It May Concern: Enclosed is an updated copy of our Integrated Emergency Action Plan (EAP) and Contingency Plan for your records. Most recently revised is Appendix A: Changed Alternate Emergency Coordinator from Sam Myers to Michael Cox. If you have any questions or require further information on this matter, please contact me at (336) 969- 1265, or the facility QHSE Manager, Mr. Srikanth Parvathaneni, at (336) 969-1232. Sincerely, /.4�;'� 4--- James Whiticar EHS Officer Siemens Energy, Inc. Cc: Srikanth Parvathaneni, Siemens Energy, Inc. Siemens Energy, Inc. 3050 Westinghouse Rd Rural Hall, NC 27045 RECEIVED N.C. Dept. of ENR MAY 2 0 2014 REQUESTED BY: DATE: 5/ 19/2014 gEdre; AL C Leigh Frazier SHIP TO: North Carolina Department of Environment and Natural Resources NCDENR) 585 Wau htown St Winston Salem, NC 27107 - 2241 ATTN : TELE# (336) 858-0368 Fed -Ex Standard, Signature Required DESCRIPTION: DESCRIPTION: Updated Emergency Action Plan, Siemens Energy (Appendix A) From: Leigh Frazier Siemens Inc. 3050 Westinghouse Rd. Rural Half NC 27045 Phone 336 -969-1350 Email: leicih.fraziLer@siemens.com VALUE: Thankyou, Leigh Frazier E3fS Support Siemens 3050 Westinghouse R Rura(Yfaff, XC 27045 33 6-969-1350 Leigh' frazier@siemens. coma #LEM =FICE Winston Service Center EHS Programs s ENVIRONMENTAL, HEALTH & SAFETY - RECEIVED N.C. Dept. of ENR MAY 2 0 2014 WINSTON-SALEM RF-r,InNAI OFF12P SIEMENS Document type No.: SIEMENS QEHS Procedures Manual Revision/Date: 0 2013-08-22 Winston Service Center Issued by: EHS Department Title Integrated EAP and Contingency Plan Handling: For Internal Use Only ISO-9001 ISO-14001 OHSAS-18001 Table of Contents Revision Sheet 1.0 Purpose 2.0 Scope 3.0 Authority 4.0 Organization 5.0 Emergency Action Plan 6.0 Contingency Plan Page: 1 of 4 Appendices: 4 Released by: Srikanth Parvathaneni QEHS Manager a-QMS 7/2512013 Reviewed by: Reviewer/Stakeholder a-QMS a-QMS a-QMS Reviewed by. Reviewer/Stakeholder a-QMS a-QMS a-QMS Reviewed by: Reviewer/Stakeholder e•QMS a-QMS a-QMS Prepared by: James Whiticar EHS Department a-QMS 7/25/2013 Name Org. Unit Signature Date Siemens Energy, Inc. CGiamens Energy. Inc. 2011 All Rights Reserved iption: I Document No.: Rev. 8 Page No.: Integrated Emergency Action Plan and Contingency Plan Date: 41ni3 1 of 25 E 103. DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Revision Sheet SIEMENS Revision Reissue Date Section Description Of Change 1 7-25-13 Appendix A Change name of coordinators and 2r"/3ra Shift Supervisors 2 8-21-13 5.3 Modified evacuation process 3 4-21-14 Appendix A Change alternative E.0 Sam Myers to Michael Cox n: o.: Integrated Emergency Action Plan and Contingency Plan , I Date: 4rm13 I 2 of 25 E103.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH S SAFETY INTEGREGRATED EAP AND CONTINGENCY PLAN 1.0 PURPOSE: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) describes a course of action to follow in order to assure the safety of personnel (employees, contractor personnel, visitors, and the general public) who are present on the site, the environment, and equipment when an emergency occurs. This plan also details communication requirements with the sublet EAP emergency and management personnel. External reporting requirements are also detailed in this plan. The plan provides the guidelines and procedures to meet these needs at the Siemens facility in Rural Hall, N.C. 2.0 SCOPE: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) provides information such as examples of the types of emergencies that could occur at the Rural Hall site, procedures to follow in the event of an emergency, and responsibilities of personnel during an emergency. Our plans describe actions facility personnel will take, what emergency response equipment is available, what procedures will be followed, and arrangements made with local emergency response authorities in order to minimize hazards to human health or to the environment in the event of an accident involving hazardous materials. 3.0 AUTHORITY: The Integrated Emergency Action Plan (EAP) and Contingency Plan (CP) was developed and implemented to comply with OSHA 29CFR 1910.38 and 40 CFR 264.50 thru 56 and to assure for the safety of personnel, protection of the environment and the protection of physical assets at the Siemens Winston Service Center has documented and issued this Integrated Emergency Action Plan and Contingency Plan. The emergency coordinator has the full authority to commit resources needed to respond to emergencies at this facility. The emergency coordinators can deputize other employees to assist them in the event of an emergency. The authority to review, revise and approve this procedure is defined within our document control procedures. Only the owners and approvers of this document are authorized to approve revisions made to this document. The Emergency Action Plan and Contingency Plan must be reviewed, and immediately amended as necessary, whenever the following situations apply; • Applicable regulations are revised; • The plan fails in an emergency; • The facility changes in its design, construction, operation, maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or releases; • The list of emergency coordinators changes; • Or the list of emergency equipment changes. When changes are made that impact the Fire, Explosion or Spill Sections of this plan, revised copies of this plan are to be sent to the following personnel or agencies: 1) Rural Hall Fire Department o.: Integrated Emergency Action Plan and Contingency Plan j 1 Date: 4122m ! 3 of 25 E 103. DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH R SAFETY 2) Forsyth County Fire Department 3) Forsyth County Sheriffs Office 4) Wake Forest Baptist Medical Center 5) Spill Response Contractor 6) Security 7) Tenant(s) Human Resource Manager 8) Emergency Coordinators 9) Plant Manager 4.0 Organization 4.1 Emergency Coordinator Facilities and Maintenance Manager The Facilities and Maintenance Manager shall be the primary Emergency Coordinator and have primary responsibility for emergency responses to include the local fire department, training, equipment, and evacuation. He/she shall consult with the Plant/General Manager, Operations Management, and the Human Resources Manager. He/she will also communicate with the tenant(s) HR Manager in order to ensure plant -wide coordination when required. The Emergency Coordinator will be responsible for recording events, coordinating internal and external resources, consulting with Siemens EHS personnel as appropriate, reporting status of emergency response, and creating incident reports. Security, although contracted by the Siemens Real Estate Facility Manager (SREFM), will be given directions by the Emergency Coordinator, since our primary objective in an emergency is the safety of all personnel. Alternate Emergency Coordinator The alternate emergency coordinator has been designated to identify in Appendix A. In the event that the Primary Emergency Coordinator is unavailable, the Alternate Emergency Coordinator shall assume emergency response responsibilities. At all times there must be at least one Emergency Coordinator on site or on call, with the ability to reach the facility in a short amount of time, with the responsibility for coordinating all emergency response measures. Continuity of Emergency Coordination The emergency coordinator first arriving at the scene shall have the responsibility as the emergency coordinator for the duration of the emergency, unless properly relieved by the Facilities and Maintenance/QEHS manager. The emergency coordinator will be responsible for recording events, coordinating internal and external resources, consulting with Siemens and Siemens Corporate EHS personnel as appropriate and reporting status and creating incident reports. The oncoming emergency coordinator assumes all responsibilities including record keeping and notifications from the point of assuming emergency coordinator responsibilities. 4.2 Personnel Responsibilities Outside of Emergency Team Management Personnel The management personnel shall be responsible for maintaining organization within their area as well as other measures that are called for to protect personnel and company property in their assigned areas of responsibility. Management is responsible for maintaining posted sketches in the area outlining emergency routes for employees in their area. They shall advise all new, incoming employees of these routes during their orientation. o.: Integrated Emergency Action Plan and Contingency Plan Date: 4rni13 1 4 of 25 E103.DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Security Security shall be responsible for evaluating the type of emergency to determine whether the emergency coordinator should be contacted in accordance with Section 8. Security shall communicate and coordinate a plant wide evacuation with the tenant(s) in the event that an evacuation is ordered. Security shall call 911 in the event of a fire alarm or upon observation or notification of emergencies as defined in this plan. Second Shift, Third Shift and Weekend Shift The primary role of the second, third and weekend shift supervisors is to coordinate the initial response (contain, assist and notify) according to the specific emergency procedure contained in Section 5.1, and contact Security as quickly as possible. Personnel Outside of Emergency Team All Siemens WSC staff is part of the Emergency Response Organization and is the organization established to help in an emergency. The Siemens WSC staff will be responsible for the communications systems, record keeping, and facilities status during the emergency. Liaison with External Organizations and the Press The Emergency Coordinator will maintain liaison with Siemens and the tenant(s) management, emergency organizations, Siemens and government officials. The Siemens WSC HR Manager is the only person authorized to talk with reporters or the press. All inquiries by the press are to be answered with "no comment" and forwarded to the Siemens WSC HR Manager. Emergency Support Immediately following either decision, evacuate and search or search without evacuating, the Emergency Coordinator shall notify the appropriate emergency organizations (Fire, Police, Sheriff, Regulatory Agencies) giving them information that is available, outlining the plan for action within the plant, and requesting advice and assistance as necessary. Recorder The Emergency Coordinator shall be responsible for recording the chronology of events, to document changes that take place and to provide a record for the future. It is recommended that the emergency coordinator assign record keeping responsibilities to a designated employee. 4.3 Arrangements with Local Authorities Arrangements have been made with local authorities such as police, fire and local hospitals to familiarize the local authorities with our facility layout, waste handling and generating activities, and the types of injuries or illness that could result from fires, explosions, or releases. The local emergency response agencies, identified in Appendix A, and various state agencies have been requested to respond to this Hazardous Waste Contingency Plan. Also, their Chief Administrators are invited to visit the facility in order to better coordinate potential hazardous waste related emergency response procedures. If more than one law enforcement agency or fire department responds to an emergency at our facility, The Emergency Coordinator will hand over control of the incident to the agency that best addresses the mitigation needs. Integrated Emergency Action Plan and Contingency Plan Date: 4n2w 1 5 of 25 Ei03.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY 5.0 Emergency Action Plan 5.1 General Guidelines for Specific Emergencies Whenever there is a release, fire, explosion, the Emergency Coordinator must be notified in order to immediately identify the character, exact source, amount, and areal extent of any release material. The Emergency Coordinator may do this by observation or review of facility records or manifests and, if necessary, by chemical analysis. Concurrently, the emergency coordinator must assess possible hazards to human health or the environment that may result from the release, fire, or explosion. This assessment must consider both direct and indirect effects of the release, fire, or explosion (e.g. the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any hazardous surface water run-offs from water or chemical agents used to control fire and heat -induced explosions.) If the emergency coordinator determines that the facility has had a spill, release, fire, or explosion which could threaten human health, or the environment, outside the facility, he must report his findings in accordance under Section 5.0 of this plan. During an emergency, the emergency coordinator must take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous materials at the facility. These measures must include, where applicable, stopping processes and operations, collecting and containing released waste, and removing or isolating containers. If the facility stops operations in response to a fire, explosion, or release, the emergency coordinator must monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate. Immediately after an emergency, the emergency coordinator must provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results form a release, fire, or explosion at the facility. The emergency coordinator must ensure that, in the affected areas of the facility: • No materials that may be incompatible with the released material is treated, stored, or disposed of until cleanup procedures are completed; and • All emergency equipment listed in the Emergency Action Plan and Contingency Plan is cleaned in the designated decontamination area and fit for its intended use before operations are resumed. 5.2 FIRE AND EXPOLOSION 5.2.1 Small (incipient) Fire; • An incipient fire is a small isolated fire that has not spread to the structure of the building or to other equipment. • If a member of the Incipient Fire Brigade is present then that member must initially evaluate the situation and determine what type of fire extinguisher to use. • If the incipient fire is located in chemical stripping, FIC, or where aluminum powder is present then the fire department is to handle the situation. • Security shall contact the Emergency Coordinator from the list in Appendix A. iption; Document No.: Rev. 8 Page No Integrated Emergency Action Plan and Contingency Plan Date. 412213 s of 25 E103.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY • If the Emergency Coordinator is on site he/she shall conduct an initial evaluation of the situation. If the Emergency Coordinator is off site, Security shall conduct the initial evaluation and advise the Emergency Coordinator immediately. The initial evaluation consists of the following: • The fire could cause the release of toxic fumes; • If the fire spreads, it could ignite material at other locations at the site or cause heat -induced explosions; • The fire could spread to off -site areas; • Use of water or water and chemical fire suppressant could result in contaminated run-off and/or a violent chemical reaction. • If any of these conditions exist or could exist, appropriate actions should be taken. 5.2.2 Structural Fire or Explosion: • A structural fire is a fire that has spread to other equipment or the structure of the building. • Personnel, who discover major fire or explosion should leave the immediate area, pull the nearest fire alarm pull box and call Emergency Coordinator and/or security at extension 1359. • Security shall contact the Emergency Coordinator from the list in Appendix A. • if the Emergency Coordinator is on site he/she shall conduct an initial evaluation of the situation. If the Emergency Coordinator is off site, Security shall conduct the initial evaluation and advise the Emergency Coordinator immediately (if feasible). The initial evaluation consists of the following: • The Emergency Coordinator will ensure that evacuation procedures have been initiated. He/she will also communicate with the Tenant(s) HR Manager in order to ensure plant wide coordination. • Contact the appropriate local, state, or federal agencies as warranted. 5.3 Evacuation Alert System The facility is equipped with audible work area alarms and visual strobes. The annunciation is monitored by Security and the alarm monitoring service. The annunciation panel is located in the lobby next to Security. • The fire alarm can be initiated by any of the following: 1. Automatic initiation of water flow system and heat sensors. 2. Notifying Security by phone or other means. 3. Activating a fire alarm pull box. • If the evacuation alarm fails to operate when activated, security shall be notified and will take the following steps: 1. Phones and radios can be used to announce the evacuation or; Security and/or supervisors will physically go through the facility, announcing the evacuation. 5.3.1 Evacuation Process Step 1 Once the fire alarm is activated, all employees are required to evacuate the building. 0.: Integrated Emergency Action Plan and Contingency Plan I I Date: 4r2v13 I 7 of 25 E1D3.DOT Winston Service Center EMS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS Evacuation Routes and Assembling Area • When the evacuation signal sounds, all employees, contractors, salesmen and visitors shall proceed via the nearest exit identified on the attached plans and proceed to their assembly area as designated on attached plans located in Appendix B. • The escort (Siemens WSC employee) is responsible for ensuring that the visitor and/or contractor are accounted for and they know where the assembly area is located. • After evacuating and walking to the assembly area, employees will remain in the assembly area until notified that it is safe to re-enter the building. • Employees are not authorized to leave the evacuation area or facility grounds unless directed to do so by the Emergency Coordinator, Plant Management or emergency personnel (e.g. Fire Department) Step 2: Make Sure Everyone Gets Out The following steps will be initiated to ensure that everyone gets out: • Once the evacuation signal has sounded, all employees are required to evacuate the building. • Employees are to follow the evacuation routes identified in the evacuation maps posted throughout the facility. If a route is blocked by the release of hazardous materials or fire, and alternate route should be found using the evacuation maps located in Appendix B. • Department managers or designee should report to their assigned assembly areas and see that personnel remain at proper distances from the building until the all clear signal is received. Employees are not authorized to leave the evacuation area or facility grounds unless directed to do so by the Emergency Coordinator, Plant Management or emergency personnel (i.e. Fire Department) Step 3: Roll Call In the event of an evacuation, each department manager or designee will perform a roll call to ensure that every employee in their department is accounted. At the assembly area, each department manager will verbally inform the EHS Officer if every employee has been accounted for. Once inside, each department manager or designee will send the EHS Officer an e-mail to verify that all employees have been accounted for (present or not present at the facility). Step 4: Decision After Evacuation: After evacuation of an actual emergency, the Emergency Coordinator in consultation with Siemens Real Estate, the County Emergency Personnel, and the Plant Manager shall make a decision regarding: • Waiting period before employees may re-enter the building; • Shutting off or turning back on utilities (electricity, gas, steam, etc.); • Evacuation times in relation to end of shift, deciding whether to send employees home or hold in assembly area; Whether next shift should be notified not to report to work; Returning to the building for additional searching. Once decision has been made to allow employees to re-enter the building, the Emergency Coordinator will be instructed to communicate to all Siemens Management, HR Manager or the tenant(s) Plant Manager, Siemens Real Estate, and any contractors on site that all is clear. Integrated Emergency Action Plan and Contingency Plan Rev. 8 Page No.: Date: anzr,s 1 8 of 25 E903.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY After evacuation a non emergency situation, the Emergency Coordinator or designee will communicate the message to re-enter the building to the employees in the assembly area once the cause of the evacuation has been discussed and determined. 5.3.2 Second Shift, Third Shift or Weekend After evacuation of a non emergency during second shift, third shift or the weekend, the shift supervisor(s) will take the role of the Emergency Coordinator and communicate the message to re-enter the building to the employees in the assembly area once the cause of the evacuation has been discussed and determined with maintenance and security. The supervisor will provide the EHS Officer a report that ensures that all employees have been accounted for and a detailed description of the situation. After evacuation of an emergency situation, the shift supervisor will contact the Emergency Coordinator or designee of the situation. During the emergency situation, the Emergency Coordinator or designee will come to the facility to initiate the Contingency Plan. Also, the supervisor will provide a report that ensures that all employees have been accounted for and a detailed description of the situation. 5.4 Chemical Spill — Liquid or Solid Facilities and Maintenance employees will respond to any reported chemical spill. These employees have been properly trained in basic spill response. These employees can be notified in person or by calling extension 1359. If maintenance cannot be reached then security is to be notified (extension 1359). 5.4.1 Spill Evaluation Answer the following questions when responding to a spill: • What is the chemical? • What is the PPE requirement? • Do I have the necessary spill clean up and containment material present? • What are the potential physical and toxic risks? • If the spill occurs outside, am I aware of the requirements listed in the Stormwater Pollution Prevention Plan (SWPPP) and the Spill Prevention, Control, and Countermeasures Plan (SPCC)? • If the spill reaches a certain level, do I know the Emergency Coordinator? 1. The Emergency Coordinator must determine when to contact the list of contacts in Appendix A, which is dependent upon the nature of the spill. 5.4.2 Gas Release If chlorine or fluorine gas was released into the facility then the evacuation order would be given. However, to confirm a chlorine gas release has occurred, a chlorine gas meter would be used to determine the amount of gas released. if fluorine gas released in the fluorine ion cleaning (FIC) area then ammonia would be released to suppress the fluorine gas. 5.5 Emergency Procedures for Severe Weather 5.5.1 Tornadoes The facility utilizes a NOAA weather radio to be alerted to any tornado warnings. If a tornado warning is issued by the National Weather Service for the Rural Hall area then all employees are Integrated Emergency Action Plan and Contingency Plan I I Date: ar I3 I 9 of 25 E101DOT Winston service Center SIEMENS 'EHS Programs ENVIRONMENTAL, HEALTH & SAFETY to report to the designated tornado shelter. While in the tornado shelter, the HR Specialist will take a roll call to ensure that all employees are accounted for. Once the tornado warning is lifted then employee will resume normal operations. 5.5.2 Winter storm If a winter storm occurs that has been determined to make roads impassable or has a utility outage for the facility then the employees will call 866-367-7972 or on-line at www.siemens.com/energy/darkwebsite for information about the plant closing. If the storm occurs during the shift then the supervisors will notify the employees that the plant is closing. 5.5.3 Flood If the facility is being flooded then the facility will follow the evacuation procedure listed in Section 5.3. 6.6 Medical Emergency: 5.6.1 General Guidelines A medical emergency includes injuries and/or illnesses that will require more than the routine first aid treatment. 5.6.2 Person Discovering the Emergency The person discovering an employee in need of emergency medical assistance should follow these steps: 1. Do not activate the fire alarm. 2. Call the radio access channel (extension 1359) from the nearest phone. 3. Stay with the employee needing medical assistance until trained emergency personnel arrives, but do not attempt to move them unless they are in imminent danger_ 4. Always be sure to follow blood borne pathogen protocols. 5.6.3 On -Site Emergency Medical Technician (Siemens EMT or Security) 1. Provide initial or stabilizing assistance and determine if additional medical treatment is required. 2. Call 911 if a life threatening condition exists. 3. Call an ambulance, if necessary. Notify doctor and hospital of the emergency. 4. Notify the EHS Officer or QEHS Manager immediately of the emergency situation. 5. The On -site Emergency Medical Technician or EHS Officer may also contact WorkCare for assistance (24-hr Triage Assistance). 5.6.4 HR Manager Notify the employee's designated emergency contact of the injury or illness and of the action that has been taken. Notify the employee's supervisor of the emergency, Ensure that all necessary accident reports are completed. Integrated Emergency Action Plan and Contingency Plan I I Date, 4MI13 I 10 of 25 E ]03, DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY 5.7 Threats Against the Facility 5.7.1 General Guidelines for Bomb Threat If an employee receives a call concerning a bomb threat then the employee should try to get as much information as possible from the caller. Afterwards, the employee should notify the Emergency Coordinator and/or the HR Manager immediately, so they can contact the proper authorities in order to determine the best course of action. If the authorities authorize the evacuation of the facility then the evacuation protocol will be followed as in Section 5.3.1. Also, the HR Manager will notify the Plant/General Manager and the tenant(s) Manager in order to ensure plant -wide coordination when required. If the call occurs during night shift working hours then the employee or Security would take the call. If an employee answers the phone then he/she will contact Security and then Security would contact the Emergency Coordinator to alert him/her of the situation. 6.7.2 Procedures to follow if taking the call of a bomb threat 1. Record the time and exact words of the message; 2. Have the caller repeat the message and keep the caller on the line as long as possible; 3. Have someone nearby notify the Emergency Coordinator 4. Ask the caller the reason for making the threat; 5. Note the caller's sex, speech, mannerisms, signs of intoxication, phrases, etc.; and 6. Determine if the caller is using an internal or external line (look at caller ID). 5.7.3 Written Threats: Threats received in writing should be preserved for investigation for possible fingerprints and if possible should not be handled once the letter has been opened. When the threat is received, the person receiving the letter shall personally contact the Emergency Coordinator. 5.8 Emergency Procedures for Civil Disturbance 5.8.1 General Guidelines The purpose of this procedure is to detail action to be taken in order to protect personnel and property from any negative effects as a result of civil disturbance. These actions include notification of the proper authorities for resolving the disturbance, providing a protective separation between the disturbance and our personnel, and taking necessary steps to protect our property from destruction as a result of the disturbance. 5.8.2 Responsibilities Security Secure Guard Station --Call 911 (if necessary), the Human Resources Manager and the Emergency Coordinator Human Resources Manager Notify local authorities. Notify the tenant(s) HR Manager to determine need for coordination. Have plant management personnel give direction to their employees. Provide liaison with the police. Integrated Emergency Action Plan and Contingency Plan j I Date:4=13 I 11 of25 E103.DOT Winston Service Center SIEMENS EI-IS Programs ENVIRONMENTAL, HEALTH & SAFETY Management Personnel Keep employees and other individuals away from the disturbance. 6.0 Contingency Plan 6.1 Reporting of Significant Event Requirements to initiate the Contingency Plan A Significant event is defined as: • Serious accident, life threatening illness, risk of epidemic • Definition of a "serious accident" — fatal accident, life endangering injuries, poisoning • Large-scale damage to plant or equipment, Fires (extinguished by external fire fighters, and/ or having influence on the production), explosion Crises (e.g. terror attacks, criminal threats, kidnapping, bomb scare, putsch), civil unrest, natural catastrophes (e.g. flood, earthquake, hurricane, tornado), • Loss of radio -active sources or contamination by radio -active material, • Technical emergency (Impacts from outside: Fire, implosions, plane crash, gas release, power supply interruptions) • Imminent or actual (unplanned sudden or non -sudden) release of hazardous materials to the air, soil or water of the environment, and release of hazardous substances of which the reportable quantity require reporting to regulatory agency. • Failure to follow permit requirements which result in self reporting or notice of violation or citation by a regulatory agency. • Accident during the transport of dangerous goods in conjunction with release of dangerous goods • Indications 1 suspected cases 1. that are capable of becoming events with negative results to the Image of Siemens Energy Sector 2. respectively unplanned contact to authorities as a result of these events 3. for the occurrence of one of the events described above. • a 3 persons injured respectively affected by a single event • Loss of limb(s) • Any Electric shock accident • Motor vehicle accident resulting in hospitalization of two or more persons • The Emergency Coordinator is responsible to ensure events are reported to Siemens. • All significant events must be reported within 2 hours by phone to the Siemens Corporate Contacts listed in Appendix A of this document. The purpose of this contact is to notify and gain guidance on what we are to communicate to external entities. • After notification to Siemens Corporate, the facility Siemens representative identified in Siemens Procedure P00-057-A01 shall notify the appropriate external entities based on event being reported. 6.2 Incident Reporting Requirements The Emergency Coordinator must document the incident by recording the time, date, and details of any incident which requires implementing the contingency plan. Within 15 days after the incident, the EHS Manager must submit a written report on the Environmental incident to the Regional Administrator identified in Appendix A. The report must include: (1) Name, address, and telephone number of the owner or operator; (2) Name, address, and telephone number of the facility; iption: Document No.: Rev. 8 I Page No. Integrated Emergency Action Plan and Contingency Plan I Date: 412V13 12 ot25 E103.DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY (3) Date, time, and type of incident (e.g., fire, explosion); (4) Name and quantity of material(s) involved; (5) The extent of injuries, if any; (6) An assessment of actual or potential hazards to human health or the environment, where this is applicable; and (7) Estimated quantity and disposition of recovered material that resulted from the incident. 6.3 Evacuation of Local Areas (Evaluation, Action and Notification) If the Emergency Coordinator in conjunction as applicable with the Emergency Responding Agency (e.g. Fire Department) assessment indicates that evacuation of local areas may be advisable, the emergency coordinator must immediately notify the appropriate local authorities identified and either the government official designated as the on -scene coordinator for that geographical area, or the National Response Center using their 24-hour toll free number listed in Appendix A. The emergency coordinator must be available to help appropriate officials decide whether local areas should be evacuated. 6.4 Contingency Plan Resources Siemens Real Estate Facilities Management The Siemens Real Estate Response Center should be notified during any emergency situation concerning the building and/or property. They will assign personnel from Siemens Real Estate Facilities Management and/or their contractors accordingly to remove/restore utility services and assess/repair damages. Maintenance Support The Siemens Facility Maintenance group will be directed, as needed, by the emergency personnel to assist in removal of services (power, water, etc.) during such emergencies. Security Plant Security will assist in controlling access to emergency locations and to direct outside emergency response services to proper locations on the plant property. 6.5 Command Post (if needed) Purpose The Command Post provides a location for responsible personnel to collect data, make decisions, and resolve immediate problems at the scene of the emergency. Location and Function The command post will be established at the Security Control Office (`B' Building). The Plant Security will man it with other personnel designated by the Emergency Coordinator, Alternate Command Post An alternate command post will be designated by Security and/or the Emergency Coordinator, as needed. iption: I Document No.: Rev, 8 I Page No. Integrated Emergency Action Plan and Contingency Plan I Date: 4122Y13 13 of 25 E103. DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Staff All Siemens WSC staff is part of the Emergency Response Organization and is the organization established to help in an emergency. The Siemens WSC staff will be responsible for the communications systems, record keeping, and facilities status during the emergency. Liaison with External Organizations and the Press The Emergency Coordinator will maintain liaison with Siemens and the tenant(s) management, emergency organizations, Siemens and government officials. The Siemens HR Manager is the only person authorized to talk with reporters or the press. All inquiries by the press are to be answered with "no comment" and forwarded to the Siemens HR Manager. Emergency Support Immediately following either decision, evacuate and search or search without evacuating, the Emergency Coordinator shall notify the appropriate emergency organizations (Fire, Police, Sheriff, Regulatory Agencies) giving them information that is available, outlining the plan for action within the plant, and requesting advice and assistance as necessary. Arrangements made with Local Authorities Arrangements have been made with local authorities such as police, fire and local hospitals to familiarize the local authorities with our facility layout, waste handling and generating activities, and the types of injuries or illness that could result from fires, explosions, spills, or releases. The local emergency response agencies, identified in Appendix A, and various state agencies have been requested to respond to this Hazardous Waste Contingency Plan. Also, their Chief Administrators are invited to visit the facility in order to better coordinate potential hazardous materials and/or waste related emergency response procedures. If more than one law enforcement agency or fire department responds to an emergency at our facility, The Emergency Coordinator will hand over control of the incident to the agency that best addresses the mitigation needs. Iptlon: Document No.: Rev. 6 Page No.: Integrated Emergency Action Plan and Contingency Plan Date: 4rM13 14 of 25 E103.DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Appendix A Emergency Contact Information EMERGENCY COORDINATORS • Primary Emergency Coordinator - Gary Gingras — Facilities Manager 1500 Oscar Frye Road Pinnacle, NC 27043 (336) 969-1285 (Work) (413) 717-7450 (Cell) SIEMENS ■ Alternate Emergency Coordinator — Michael Cox - Support Services Supervisor 125 Prestwick, Rural Hall, NC 27045 (336) 969-1362 (Work) (336) 391-3257 (Cell) • Alternate Emergency Coordinator — James Whiticar — EHS Officer 6504 Dornoch Drive Greensboro, NC 27410 (336) 969-1265 (336) 602-3043 ■ Alternate Emergency Coordinator — Srikanth Parvathaneni — QEHS Manager 4702 Jefferson Wood Court, Greensboro, NC 27410 (336) 969-1232 (Work) (407) 516-6806 (Cell) Siemens Winston Service Center Management/Supervision Plant/General Manager Operations Controller Human Resources Mgr Second Shift (3:30pm -- 11:30pm) Third Shift (11:30pm-7:30am) Security Amogh Bhonde Cory Phillips James Rochester Samara Satterfield Ed Majersky Christopher Lynch (407) 928-1309 (Cell) (704) 806-3714 (Cell) (704) 264-5447 (Cell) (336) 655-8716 (Cell) (336) 969-1429 (336) 969-1583 (336) 969-1351 n; Integrated Emergency Action Plan and Contingency Plan Date: 4wjl3 1 15 of 25 E103.AOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Tenant(s) Management/Supervision Security maintains a current list of contacts and their phone numbers. SIEMENS CORPORATE CONTACTS Siemens Energy EHS Director Jack Bynum (407) 736-2304 (Work) (407) 406-0343 (Cell) Siemens Real Estate Response Center (866) 311-9290 WorkCare (24-hr Triage Assistance) (888) 449-7787 SIEMENS WINSTON-SALEM/FORSYTH COUNTY EMERGENCY ORGANIZATIONS Rural Hall Fire Department 969-9368 or 911 Winston Salem City Muddy Creek Water Treatment Plant 6am-6pm 765-0130 6pm-6am 784-4710 Forsyth County Fire Department 727-2222 or 911 Forsyth County Sheriffs Office 727-2112 or 911 Forsyth County Ambulance Service 727-2222 or 911 N.C. State Highway Patrol 761-2441 or 911 Wake Forest Baptist Medical Center 716-2255 or 911 Regional coordinator: Winston-Salem/Forsyth County Office of Emergency Management Smith Reynolds Airport, Room 104 (336) 661-6440 Winston-Salem, NC 27105 Forsyth County Environmental Affairs (336) 703-2440 Forsyth County Government Center 201 N. Chestnut St. Winston Salem, NC 27101-4120 N.C. Department of Environmental and Natural Resources (NCDENR) (336) 858-0368 Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, NC 27107-2241 n: Integrated Emergency Action Plan and Contingency Plan Dates 4r22M 1 16 of 25 E103_ DOT Winston Service Center SIEMENS EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EMERGENCY ORGANIZATIONS - CONTRACTORS Shamrock Environmental Corporation 503 Patton Avenue Greensboro, INC 27406 24 Hour Emergency Response 800-881-1098 Non -Emergency (336) 375-1989 In the event of an emergency, Shamrock Environmental is contracted by Siemens to provide comprehensive environmental services to include emergency response, wastewater treatment, industrial services, waste management, remedial and stream and wetland restoration. NORTH CAROLINA EMERGENCY ORGANIZATION N.C. Emeraencv Response Commission Hotline (8001451-1403 or (9191 733-1361 NC EPCRA 4714 Mail Service Center Raleigh, NC 27699-4714 FEDERAL ORGANIZATIONS NATIONAL RESPONSE CENTER (NRC) (800) 424-8802 United States Environmental Protection Agency Region 4 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Atlanta, GA 30303-8960 FEDERAL BUREAU OF INVESTIGATION Charlotte (704) 529-1030 Raleigh (919) 856-4620 Greensboro (336) 855-7770 US EPA HOTLINE (800) 535-0202 o.: Integrated Emergency Action Plan and Contingency Plan Date: 4122)13 1 17 of 25 E103. DOT Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY Site Maps SIEMENS o.: Integrated Emergency Action Plan and Contingency Plan I I Date: 4r22fia I 18 of 25 E103.DOT ,� 5 4t i i� i�'� �� > +� �w�; �l Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY �4- EXIT G5 SIEMENS EXIT G6 EXIT G7 T A EXIT G4 EXIT G3 EXIT G2 EVACUATION PLAN BUILDING G :> EXIT G1 REV. 7_21-11 Integrated Emergency Action Plan and Contingency Plan Date: 4r=13 1 19 of 25 E?03.D Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY SIEMENS =acui � C#f car 1 A ILL ! E+eT « GQr tP E 4... FJCr « ca wr L7 R j I V• I' 'SLAT I ie T-: 6 'J >f ' E i s fl�nIANG G i s�.asnvac se- ovT ei mr uaA�+F • mra esrT BtnpwG C {.�,� i i i s: 1 . ovr cs' I -- 17777771 _ ooT a i __J YrT ` ' oer xa I rw a IITI YJ crT T ® I I _ E]ST aL a snc n � e I ' f T9 Y cor SO i ,. .. O= M..... 06 22... .. 0 ,7YEE PMtA+4 69—T ®w'ans Oa'r WM uR[A or sew[ .. EVACUATION PLAN 25 STAGING AREAS SIEMENS 4�OG'O�PM1PRM4i012 IY.IKw�T/JO CrIG RM ]Oa1wi WINSTON SERVICE CENTER tlMi ipuon: Integrated Emergency Action Plan and Contingency Plan Hate: 4122n3 1 20 of 25 E103.D Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY DDT 7 , � A [ CAFEM11A EXIT 5 QUILDING D EXIT 6 EXIT 4< iphon: Integrated Emergency Action Plan and Contingency Plan SI EM ENS 1 MINEmoon Date: 4r22113 1 21 of 25 EVACUATION PLAN BUILDINGS A AND B SIEMENS WINSTON SERVICE CENTER 3 ft� -1-u E 103. D Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EVACUATION PLAN MANUFACTURING BUILDING C ■ SIEMENS WINSTON SERVICE CENTER INDICATES DQT WITH AREA OF RESCUE CaT , 1 Oar 10'-J R6PEGr P 1[)( a SIEMENS EXIT 21& OUT 30. Oar Y8 ! 4 1 1 paT 1 1 j 1 4 �-�•. �� OQr 32 1 ! II Var 1 b Em 7 FNY — + Oar I I *� Oar 3! AmavPa1B a I E IIpCs:YV�4Q T I f � 1 1 1 f2 Oar 13 pai 14 1 `1 1 I1 It � s 1 1 I - _ k3Nt '�UGTC i ! ! T I t7 CUr-OFF • � a i III I I PACK i1I. T I T+ + I I 1II E I i__i CAS TUP N- l �� REPAIR . 1 1 I T I 1 I I it T T If EnT :$a OFF7GE AREK 1 •. OR10E./JZEA Oar 19 T I To &T 5 car is To Ew 35 1Ti Oar as .0 par se .1 2rd FL OFFICE AREA Ipum Integrated Emergency Action Plan and Contingency Plan Date: 4n2113 1 22 of 25 E103.D Winston Service Center EHS Programs ENVIRONMENTAL, HEALTH & SAFETY EXI T 21 �1 I I I I I I I I I-___-_--E--- EXOT20 1 W EXIT 25 ik �AllTOCM�CVAd1�ix11 A.W6'�20�I Wdebw\RVA4fAYp I W EXIT 24 SIEMENS Y EVACUATION PLAN BUILDING F FORGE SHOP I -L- --> EXIT 22 -> EXIT 23 REV 7-20-7t Integrated Emergency Action Plan and Contingency Plan Date: 4122113 f 23 of 25 E103.D Procedure No.: Page: 24 of 25 Appendix C The DOT identification of hazardous materials located at the Rural Hall Facility The following are examples of hazardous materials located at the facility: ➢ 2.1 — Flammable Gases — Acetylene, Hydrogen, Propane ➢ 2.2 — Non Flammable Gases -- Argon, Nitrogen ➢ 3 — Flammable Liquid — Acetone ➢ 4.3 — Water Reactive — Aluminum Powder ➢ 5.1 — Oxidizer Oxygen gas ➢ 6.1 — Toxic — Chromium metal powder ➢ 8 - Corrosive — Hydrochloric Acid, Hydrofluoric Acid, Sulfuric Acid, Potassium Hydroxide Siemens Energy, Inc. O5iemens Energy, Inc 2011 All Rights Reserved T4:INTEGRATED EAP AND CONTINGENCY PLAN • 8-22-13.DOC Hard Copies of this procedure are uncontrolled. Procedure No.: Page: 25 of 25 Appendix D List of Emergency Spill Response Equipment Aisle/Area Column C12 Column C12 Column F11 Column F11 Column F11 Shipping/Receiving Shipping/Receiving Column B11 Column B11 Waste Storage & Shipping Area Waste Storage & Shipping Area Throughout the plant Emergency Spill Response Equipment Oil Spill Kit (95 gal over pack with oil socks) Spill Control Kit with Shovel & Broom Wash Station (1) Vacuum Tank (250 gallon) (1) Vacuum Tank (175 gallon) Multi Chemical Spill Kit (65 gal over pack) Spill Control Kit with Shovel & Broom Oil Spill Kit (95 gal over pack with oil socks) Spill Control Kit with Shovel & Broom Multi Chemical Spill Kit (65 gal over pack) Spill Control Kit with Shovel & Broom Emergency Eye Wash/Shower Stations Siemens Energy, Inc. ®Siemens Energy, Inc. 2011 All Rights Reserved. MINTEGRATED EAP AND CONTINGENCY PLAN - B-22-13.DOC Hard Copies of this procedure are uncontrolled. Taylor -Smith, Aana From: Frazier, Leigh A (E S SF RNA 4 3 2) <Ieigh.frazier@siemens.com> Sent: Monday, February 10, 2014 1:11 PM To: Taylor -Smith, Aana Subject: RE: Siemens Energy, Rural Hall: 2014 Annual Stormwater Fee Thank you, Aana. I have added your confirmation to our records, and notified James that he is the billing contact person in your data base. Stay safe this week, Leigh 336-969-1350 From: Taylor -Smith, Aana [maiIto: Aana.Taylor-Smith@ncdenr.gov] Sent: Monday, February 10, 2014 12:55 PM To: Frazier, Leigh A (E S SF RNA 4 3 2) Subject: RE: Siemens Energy, Rural Hall: 2014 Annual Stormwater Fee Hi Leigh, I enjoyed speaking with you as well! You are correct in that the invoice was sent to the wrong address and I have already had Raleigh re -send the invoice to the correct address. In addition, James Whiticar is our new billing contact. There will be no penalty for Siemens because the issue was due to an error in our database. Thank you so much for bringing this to our attention, and I look forward to working with you in the future! Aana Taylor -Smith Land Quality Section Division of Energy, Mineral, and Land Resources NC DENR Winston-Salem Regional Office Phone: (336) 771-5034 Fax (336) 771-4631 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties. From: Frazier, Leigh A (E S SF RNA 4 3 2) [ma iIto: leiq_h.frazier@siemens.com] Sent: Monday, February 10, 2014 12:53 PM To: Taylor -Smith, Aana Cc: Whiticar, James A (E S SF RNA 4 3 2) Subject: Siemens Energy, Rural Hall: 2014 Annual Stormwater Fee Importance: High Good Afternoon Aana, It was a pleasure speaking with you this morning. I appreciate your quick response to the inquiry I left you on your voice mail. Per our conversation, the invoice for our Annual Stormwater fee was mistakenly sent to the wrong address, but will be resent to us at 3050 Westinghouse Rd to the attention of James Whiticar; I understand from our conversation that Siemens will not be penalized. Please confirm for our records. I appreciate your assistance. Thank you, Leigh `Frazier EtfS Support Siemens `Mnston Service Center 3050 Westinghouse 12d R,uraf9faff, XC 27045 (336) 969-1350 fiigh.frazier@si'emet?s.com This message and any attachments are solely for the use of intended recipients. The information contained herein may include trade secrets, protected health or personal information. privileged or otherwise confidential information. Unauthorized review. forwarding, printing. copying, distributing. or using such information is strictly prohibited and may be unlawful. If you are not an intended recipient, you are hereby notified that you received this email in error, and that anv reviex. dissemination_ distribution or copying ofthis email and any attachment is strictly prohibited. If you have received this ernail in error, please contact the sender and delete the message and any attachment from your system. Thank you for your cooperation This message and any attachments are solely for the use of intended recipients. The information contained herein may include trade secrets. protected health or personal information, privileged or otherwise confidential information. Unauthorized review. forwarding. printing. copying, distributing. or using such information is strictly prohibited and may be unlawful. If you are not an intended recipient, you are hereby notified that you received this email in error, and that any review, dissemination, distribution or copying of this email and any attachment is strictly prohibited. If you have received this email in error, please contact the sender and delete the message and any attachment from your system. 'thank you for your cooperation NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Pat McCrory, Governor Director John E. Skvarla, III, Secretary 18 November 2013 Mr, James Whiticar Siemens Energy Inc. 3050 Westinghouse Road Rural Hall, NC 27045 Subject: Compliance Evaluation Inspection NPDES General Stormwater Permit NCG030000 Certificate of Coverage NC6030238 Siemens Energy Rural Hall Forsyth County Dear Mr. Whiticar: Aana Taylor -Smith of the Winston-Salem Regional Office of the NC Division of Energy, Mineral, and Land Resources (DEMLR) conducted a compliance evaluation inspection at the subject facility on 18 November 2013. This inspection was conducted as a response to the Request for Representative. Outfall Status letter from Siemens Energy Inc. dated 5 November 2013. Your assistance during the inspection was greatly appreciated. An inspection checklist is attached for your records and the inspection findings are summarized below. This facility is located at 3050 Westinghouse Road in Rural Hall, Forsyth County, North Carolina. Stormwater related to industrial activity is discharged from the site to Muddy Creek, this segment of which is currently classified as Class C waters, in the Yadkin -Pee Dee River Basin. Documentation & Monitoring Review The facility's Stormwater Pollution Prevention Plan (SPPP) is very thorough, up to date, and fully implemented. Analytical and qualitative monitoring has been completed as required. This site does not perform vehicle maintenance. Siemens Energy at Rural Hall is currently certified for the ISO 14001 standard for environmental management, among other standards, and all new v..isitorsyeceive basic spill response training. We appreciate your attention to good environmental practices. Site Review The facility is clean and well -maintained. Secondary containment is implemented as required. The facility currently monitors two Stormwater Discharge Outfalls (SDOs). The outfalls were inspected and found to be in good order. No evidence of erosion or instability at the SDOs was observed. The receiving stream was free of pollution indicators. Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, NC 27101 9 Phone: 336-771-50001 FAX: 336-771-4631 Siemens Energy Inc. 11/18/2013 Page 2 of 2 During the inspection, it was noted that while Representative Outfall Status does not apply to this site, Outfall 002 can be released from analytical and qualitative monitoring requirements because it does not discharge stormwater related to industrial activity. Siemens Energy Inc. is no longer required to perform either type of monitoring at Outfall 002. Please append this letter to your SPPP to document that your facility has been relieved of all monitoring requirements at Outfall 002. Please notify DEMLR immediately if conditions at this site should change such that Outfall 002 will discharge stormwater related to industrial activity. Thank you for your efforts to comply with the stormwater permit. No additional response to this letter is required. Should you have any questions regarding the NCG030000 permit or this inspection, please do not hesitate to contact Ms. Taylor -Smith or me at (336) 771-5000. Sincerely, Matthew E. Gantt, PE Regional Engineer Land Quality Section Enclosures: BIMS Inspection Checklist cc: Central Files WSRO/LQ Compliance Inspection Report Permit: NCG030238 Effective: 11/01/12 Expiration: 10/31/17 Owner: Siemens Energy Inc SOC: Effective: Expiration: Facility: Siemens Energy Rural Hall County: Forsyth 305D Westinghouse Rd Region: Winston-Salem - Rural Hall NG 270454699 Contact Person: Srikanth Parvathaneni Title: Phone: 336-969-1232 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 11/1812013 Entry Time: 09:30 AM Exit Time: 10:30 AM Primary Inspector: Aana Taylor -Smith Phone: 336-771-5000 Secondary Inspector(s): Reason for Inspection: Routine inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: 0 Compliant Not Compliant Question Areas: ®Storm Water (See attachment summary) Page: 1 Permit: NCG030238 Owner - Facility: Siemens Energy Inc Inspection Date: 11118/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Please refer to attached inspection letter. Page: 2 Permit: NCG03023B Owner - Facility: Siemens Energy Inc Inspection Date: 1111812013 Inspection Type: Compliance Evaluation Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? Reason for Visit: Routine # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: SPPP is complete and up-to-date. Please update SPPP when this report is received to show removal of sampling/monitoring requirements for Outfall 002. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Yes No NA NE ■❑Inn ■❑nn ■❑nn ■❑Q❑ ■❑on ■pnn ■❑nn ■❑00 ■n❑n ■❑n❑ ■Qnn ■Q❑❑ ■n❑0 ®rDnn ®npn Yes No NA NE Yes No NA NE ■❑nn DDMC) Yes No NA NE Page: 3 Permit: NCG030238 Owner - Facility: siemens Energy Inc Inspection Date: 11/18/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Representative Out -fall Status is not necessary for this site. Instead, Outfall 002 will be eliminated from all monitoring requirements because it does not discharge stormwater related to industrial activity. Page: 4 ('OKL INFEELOER Bright People, Right Solutions. November 6, 2013 File No. 132528 1 GS013LO398 Mr. W. Corey Basinger Water Quality Regional Supervisor NCDENR Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 RECEIVED N.C.Deot. of ENR NOV 0 8 2013 Winston-Salem Regional office Reference: Request for Representative Outfall Status NPDES Stolrmwater Permit Certificate of Coverage NCG030238 Siemens Energy, Inc. 3050 Westinghouse Road Rural Hall, North Carolina Dear Mr. Basinger: Kleinfelder Southeast, Inc. (Kleinfelder) is requesting representative outfall status (ROS) for stormwater discharge outfall (SDO) 002 at the Siemens Energy, Inc. (Siemens) facility in Rural Hall, North Carolina. The Siemens facility has two stormwater discharge outfalls, both discharging, to Muddy Creek. As noted on the attached drawing showing the stormwater drainage facilities at the site, SOO 001 collects stormwater from the entire industrial area of the property. The inlet locations for SOO 002 are located in grass covered and natural areas south of the manufacturing operations. These inlets are further separated from industrial activities by administrative buildings and asphalt paved driveways with separate stormwater collection systems. This information is depicted on the attached drawing showing the outfall locations, the associated collection systems, impervious facilities, and the latitude and longitude of each outfall. Siemens understands that if ROS is granted for SOO 002, Qualitative Monitoring will still be required. Further, Siemens understands that if changes in drainage areas, structures, processes, or.storage practices occur, the ROS may no longer be valid, Should you have any questions concerning this request, or require additional information, please feel free to contact the undersigned. Sincerely, KLEINFELDER SOUTHEAST, INC. t. 1 _ tk C rlstopher W,ay, El, RSM Environ entaClOrograrn Manager CWH:cas . Attachments: Drawing SWPPP-2005 Storm Water Drainage Plan and Industrial Areas KLEINFELDER 313 Gallimore Dairy Road, Greensboro, NC 27409 pi 336.668.0093 fi 336.668,3868 OC ` � N P 411 'Rill N z rn Z 0 ;r i�rii R S k 0 0 g rn rm 0 0 Ln -P. 7 Mk► il N 2 Z 0 0 z A � 0 r _ Ig oil �, . 0-6 Ncelo3g239 Taylor -Smith, Aana From: Gantt, Matt Sent: Monday, October 14, 2013 8:01 AM To: White, Sue; Taylor -Smith, Aana .0lW ood yv1.F t-" [�mjapvl��utS Subject: FW: Ellwood Advanced Components JJ Importance: High ( n-� ,+�P�X po r'i Sue and Aana, We probably need to discuss this e-mail before I respond. Thanks, Matt Matthew E. Gantt, P.E. NC DENR Winston-Salem Regional Office Division of Energy, Mineral, and Land Resources 585 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-5000 FAX: (336) 771-4631 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Aaron Hunter [mailto:ahunter@elwd.com] Sent: Friday, October 11, 2013 9:52 PM To: Gantt, Matt Subject: Ellwood Advanced Components Importance: High Need S- cAk Svc vex M �- cdist"e fio creek. -t tlVJood • rc�-r 11v�1ood i5 soa rc4c:. `) send S+t-L+e 5v. i �-� v 101 e may i --> Gp r-VA� W1c _ � I My name is Aaron Hunter and I am the Maintenance Manager at Ellwood. We rent building space from Siemens at 3050 Westinghouse Road in Rural Hall. Ellwood has been talking to Siemens about purchasing property and 2 buildings. Siemens currently has the Storm Water Permit for the entire complex. Ellwood is interested in possibly installing their own retention pond but during their discussions the question has been ask if it is possible. Is there any way I could come to your office Monday the 141h for a very short meeting so I can show you the complex layout and get your opinion? I am concerned that Ellwood may relocate these 150 jobs to another State if some of these questions cannot be resolved in a timely manner. Elwood and Siemens have been negotiating for 1 year and something new keeps coming up. Please keep this confidential and if I need to talk to someone else can you please direct me to the correct person. ,, 0 Thank You Aaron Hunter 336-473-0881 CPO ow 33�a-aidt-4n�3 ��c_e. 1 ffl;_1;WA. MDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, P.E. Dee Freeman Governor Director Secretary December 17, 2012 Siemens Energy Inc. Aitn: Srikanth Parvathaneni, Manager -- QEHS 3050 Westinghouse Road Rural Hall, NC 27045 Subject: Compliance Evaluation inspection and Notice of Violation NOV-2012-PC-0414 NPDES General Stormwater Permit NCG030000 Certificate of Coverage NCG030238 Siemens Energy Rural Hall, 3050 Westinghouse Road, Rural Hall, NC, 27045 Forsyth County Dear Mr. Parvathaneni: Ron Boone, of the Winston'Salem Regional Office (WSRO) of the NC Division of Water Quality (DWQ or the Division), conducted a compliance evaluation inspection (CEI) of Siemens Energy Rural Hall (Siemens) on December 12, 2012. Your assistance and cooperation during the inspection was greatly appreciated. An inspection checklist is attached for your records and the inspection findings are summarized below. The facility is located at 3050 Westinghouse Road, in Kernersville, Forsyth County, North Carolina, at approximate coordinates 36.2317870N,-80.3220130W. Stormwater related to industrial activity is discharged from stormwater discharge outfalls (SDO) 001 and 002 to Muddy Creek, -which is currently classified as a Class C water located in the Yadkin Pee -Dee River Basin. Documentation & Monitoring Review Siemens's Stormwater Pollution Prevention Plan (SP3), documentation, and monitoring activities were reviewed during the inspection. The following deficiencies were noted: • The SDOs were certified in accordance with (IAW) NCG030000, Part II, Section A, Paragraph 1(e) in 2009 and 2012. No other records were available. • SP3 annual reviews, as required by NCG030000, Part 11, Section A, Paragraph 8, were completed for 2009 and 2012. No other records were available. • Neither analytical nor qualitative monitoring (AM and QM, respectively) has been completed IAW NCG030000, Part II, Section B. Only one sampling event was completed in 2010, 2011, and 2012. Also, although Siemens completed two sampling events in 2009, there were no records for AM/QM previous to this. North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-7714630 4 Customer Service: 1-877-623-6748 tntemet: www.ncwaterquaiity.org An Equal Opportunity \ Affirmative Action Employer Nose Carolina ;atmmily Siemens Energy Inc. — Siemens Energy Rural Hall Attn: Sri Parvathaneni, Manager — OEHS Compliance Evaluation Inspection, NCG030238 NOV-2012-PC-0414 12/17/2012, Page 2 of 2 Q Please also bear in mind that Part III, Section D, Paragraph 6 of NCG030000 requires permittees to keep all records for a minimum of 5 years. Site Review The site was very clean and well maintained. Mr. Boone noted no issues, concerns, or violations. The Division requests that Siemens reply in writing to this Notice of Violation with. 30 business days of receiving it. Siemens's written response should address each deficiency/violation listed above and provide corrective actions with estimated implementation schedules for each. Siemens is reminded that violations of the NCG030000 general stormwater permit are subject to civil penalty assessments not to exceed $25,000 per day, per violation. Should you have any questions regarding the permit, this Notice of Violation, or the inspection, please coo not hesitate to contact Mr. Boone or me at (336) 771-5000. Attachments: 1. BIMS Inspection Checklist cc:SWP_— WSRO Central Files Stormwater Permitting Unit Sincerely, W. Corey Basinger Water Quality Regional Supervisor Winston-Salem Region Division of Water Quality Aaron Hunter Ma,ntenarxe Manager lily r � Ellwood Advanced Components, LLC 3050 Wastinghouse Road Rural Hall, North Carolina 27045 phone:1-336-969-4043 Cell: 1-336-473-OB81 Fax: 1.336-969-4058 Email: ahunter@elwd.com www.Ellwooddoseddiegroup.00rn! 1 Compliance Inspection Report Permit: NCG030238 Effective: 11/01/12 Expiration: 10/31/17 Owner: Siemens Energy Inc SOC: Effective: Expiration: Facility: Siemens Energy Rural Hall County: Forsyth 3050 Westinghouse Rd Region: Winston-Salem Rural Hall NC 270454699 Contact Person: Srikanth Parvathaneni Title: Phone: 336-969-1232 Directions to Facility: System Ciassifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/12/2012 Entry Time: 09:00 AM Exit Time: 12:30 PM Primary Inspector: Ron Boone ,/%� Phone: 336-7714967 Secondary Inspector(s): , Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant ■ Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NCG030238 Owner -Facility: Siemens Energy Inc Inspection date: 12/1212012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Please refer to the attached Notice of Violation. Page: 2 Permit: NCG030238 Owner - Facility: Siemens Energy Inc Inspection Date: 12/12/2012 Inspection Type: Compliance Evaluation Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Please refer to the attached Notice of Violation. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Please refer to the attached Notice of Violation. Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Please refer to the attached Notice of Violation. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Please refer to the attached Notice of Violation. Reason for Visit: Routine Yes No NA NE n■nn Yes No NA NE n®nn �r�®n Yes No NA NE Page: 3 SIEMENS RECEIVED N.C. Dept. of ENR JAN 17 2013 Winston-Salem Regional Office January 16, 2013 FedEx Overnight, Signature Required Mr. W. Corey Basinger, Water Quality Regional Supervisor Winston-Salem Region, Division of Water Quality North Carolina Department of Environment and Natural Resources 585 Waughtown Street Winston-Salem, NC 27107 Subject: NCDENR Letter Dated December 17th, 2012; NPDES General Stormwater Permit NCG030000; Certificate of Coverage NCG030238 Rural Hall Facility, 3050 Westinghouse Road, Rural Hall, NC 27045 Dear Mr. Basinger: The purpose of this letter is to provide the requested response to the referenced North Carolina Department of Environment and Natural Resources ("NCDENR") letter related to the referenced Siemens Energy, Inc. ("SEI") facility. The referenced letter was received by SEI on December 18, 2012, and requested a response within thirty days of receipt. First and foremost, thank you for allowing Siemens the opportunity to comment and respond. As you may have been previously advised, the referenced facility is owned by SEI, and had been operated by TurboCare, Inc., an affiliate of SEI. SEI became the operator of the facility effective October 1, 2012, which was communicated on September 25, 2012 to NCDENR via the NPDES Permit Name/Ownership Change Form for the site's Certificate of Coverage for stormwater. Provided below is a SEI's written response. The response follows the outline of the bulleted items under the "Documentation & Monitoring Review" in the referenced letter. Siemens has not located any additional SDOs in its records to date. The facility recently implemented an environmental compliance task management process and system. Along with key stormwater compliance dates, the annual SDOs review and certification is on the compliance calendar. Each week the facility EHS Department is to review pending compliance calendar entries for the month to ensure a completion plan is in place. The status of pending and future compliance tasks are to be reported monthly to the site management team. SEI plans to further enhance the compliance system to electronically monitor the tasks status and to send reminders and alerts to responsible team members and managers. These electronic reminders are expected to be implemented by mid year. The facility has designated a dedicated person with overall responsibility for input to and tracking compliance through this system. Siemens Energy, Inc. 3050 Westinghouse Rd Rural Hall, NC 27045 Mr. W. Corey Basinger Page 2 January 16, 2013 SEI also plans on scheduling additional training for those responsible for conducting the inspections and preparing the documentation, along with conducting a stormwater management training session with the site management team. This training session will be jointly delivered by the site Environmental Manager and by a Senior Engineer from SEI Corporate Environment Team. All training is expected to be completed by mid -February of this year. The annual SP3 annual review requirement has been incorporated into the compliance calendar system described above. The facility has established a service contract with an environmental consultant to conduct the required stormwater analytical and qualitative monitoring. The consultant is to monitor rain events, select a suitable time, preferably during the first rain event of the collection period, within the permit requirements for sampling, collect AM and QM samples, have the samples analyzed, compare the results to the Benchmark Values for Analytical Monitoring, review the results with SEI, and submit the Discharge Monitoring Reports (DMR) to SEI for review, certification, and submittal to NCDENR. These AM and QM events were implemented, and are monitored in the environmental compliance task management process and system. The environmental compliance calendar referred to above files all documentation (including DMR's certifications, inspections, analysis,) electronically. This electronic database will be backed up as part of the normal plant systems backup procedure. Further, hard copies will be printed and will be separately retained in the Stormwater Pollution Prevention Plan (SWPPP) files. The records will be retained for at least 5 years. While we at SEI appreciate the comments from the inspector regarding the overall condition of the facility, SEI nevertheless takes allegations of the kind made in the referenced correspondence very seriously. Siemens Energy is committed to protecting the environment and being a good corporate citizen by demonstrating environmental stewardship through direct monitoring, support, and oversight of the facility's regulatory requirements. If you have any questions or require further information on this matter, please contact me at (336) 969-1491 or the facility QHSE Manager, Mr. Sri Parvathaneni, at (336) 969-1232. Sincerely, Amogh Bhonde Plant Manager Siemens Energy, Inc. Cc: Sri Parvathaneni, Siemens Energy, Inc. a Me O �t4,�,4 r SIEMENS 3050 WESTINGHOUSE RD, RURAL HALL NC 27045 Tel. (336) 969-1211 Fax. (336) 969-1539 Packing Slip: 2783 Packing Slip- i RECEIVED Ship To: COREY l3ASiNGER N.C. Dept. of ENR DIVISION OF WATER QUALITY JAN 17 2013 N.C. DEPT OF ENVIRONMENT & NATURAL RESOURCES (NCDE 585 WAUGHTOWN ST. Winston-Salem WINSTON SALEM NC 27107 g Ship Date: 1/16/2013 Ship Via: FedX Priority Overnite Ppal FEDEX# 67171100 6640 Legal Number: Line Part Number Revision Quantity RESPONSE LETTER 1 FEDEX ENVELOPE @ 1 L8. Page: 1 of 1 REQUESTED BY: Srikanth Parvathaneni DATE: 1.16.2013 SHIP TO: Mr. Corey Basin er Division of Water Quality North Carolina Department of Environment and Natural Resources (NCDENR) 585 Waughtown St Winston Salem, NC 27107 ATTN: Corey Basinger TELE# (336) 771-5000 r Fed -Ex Overnight, 10a.m. Delive DESCRIPTION: Response Letter From: Lei h Frazier_ TurboCare Inc. 3050 Westinghouse Rd. Rural Hall NC 27045 F- Phone 336 -969-1350 Email: lei h.frazier siemens.com VALUE: Thankyou, Leigh Trazierfor,S'ri Tarvathaneni EffS Support. Dep i. aE�R Siemens .1AN f 7 2g13 3050 Westinghouse Rd. Winston-Salem RurafafafC, XC 27045 Regional Office 33 6-969-.1350 CeigFi. {razier@siemens. coma 4 NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director December 4, 2012 Steve Schneider TurboCare Inc 3050 Westinghouse Rd Rural Hall, NC 27045-4699 Natural Resources Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal TurboCare Inc COC Number NCG030238 Forsyth County Dear Permittee: In response to your renewal application for continued coverage under stormwater General Permit NCG030000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://`pprtal.ncdenr.orp-Zweb/wg/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://portal.ncdenr.org/web/wq/ws/sulnr)dessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 91 M07-63001 FAX: 91 M07-6492 Internet: www.nGwaterguality.ora An Equal Opportunity 1 Affirmative Action Employer i \ Nne orthCarolina Naturally Steve Schneider December 4, 2012 Page 2 of 2 Some of the changes include: • Part ll: • Section A- The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections B, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TSS benchmark of 50 mg/1 for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C: The monitoring parameter oil & Grease (0&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections B, C. The term "Representative Storm Event" has been replaced by "Measurable Storm _ Event-" A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, TZ�y` for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office J STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030238 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, TurboCarelnc is hereby authorized to discharge stormwater from a facility located at: TurboCarelnc 3050 Westinghouse Rd Rural Hall Forsyth County to receiving waters designated as Muddy Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Governor Director March 14, 2012 Steve Schneider TurboCare Inc 3050 Westinghouse Rd Rural Hall, NC 27045-4699 Subject: NPDES Stormwater Permit Coverage Renewal TurboCare Inc COC Number NCG030238 Forsyth County Dear Permiee: Dee Freeman Secretary Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on 10/31/2012. The Division staff is currently in the process of renewing this permit. When a draft is available for notice and public comment, it will be posted on our website at http://Portal.ncdenr.org/web/wq/ws/su/public-notices. Please continue to check this website to review and comment on proposed changes to the permit. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. To assure consideration for continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit. Enclosed you will find a Permit Coverage Renewal Application Form. The application must be completed and returned by May 4, 2012. Letters confirming our receipt of the completed application will not be sent. Failure to request renewal within the time period specified may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. Our records indicate that your facility has outstanding annual fees in the amount of $200. We cannot renew permit coverage until you have corrected this situation. We have enclosed copies of the unpaid invoice(s) that must be returned with payment. Failure to pay annual fees is a violation of your permit and may result in revocation of your permit coverage. "No exposure exclusion° is now available to industrial facilities in any of the categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facility industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater Permitting Unit Web Site at http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-5. If the subject Stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions can be found on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Bradley Bennett of the Central Office Stormwater Permitting Unit at (919) 807-6378. Sincerely, Bradley Bennett Supervisor, Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St, Ralegh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer N©rthCarolina Naturallrf �oFwnr� Permit Coverage Renewal Application Form National Pollutant Discharge Elimination System Certificate of Coverage Number Stormwater General Permit NCG030000 NCG030238 The following is the information currently in our database for your facility. Please review this information carefully and make all corrections/ additions as necessary in the space provided to the right of the current information. Owner Affiliation Information *Reissued Permit will be mailed to the owner address Owner / Organization Name: TurboCare Inc Owner Contact: Steve Schneider Mailing Address: 3050 Westinghouse Rd Rural Hall, NC 270454699 Phone Number: 336-969-1299 Ext. Fax Number: E-mail address: FacilitylPermit Contact Information Facility Name: TurboCare Inc Facility Physical Address: Facility Contact: Mailing Address: Phone Number: Fax Number: E-mail address: Discharne Information 3050 Westinghouse Rd Rural Hall, NC 270454699 Sam Myers 3050 Westinghouse Rd Rural Hall,NC 270454699 336-969-1362 Ext. 336-969-1560 Receiving Stream: Muddy Creek Stream Class: C Basin: Yadkin River Basin Sub -Basin: 03-07-04 Number of Outfalls: Impaired Waters/TMDL Does this facility discharge to waters listed as impaired or waters with a finalized TMDL? ❑ Yes ❑ No ❑ Don't Know forinfmmation on these waters refertc http.y/portal.ncoJenr.org/web/wq/ws/su#fah-3 CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and accurate. Signature Print or type name of person signing above Date Title Please return this completed renewal application form to: SW General Permit Coverage RenewalStormwater Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 . 1F ACF WATg1, P 15� Y Permit Rescission Request Form National Pollutant Discharge Elimination System General Permit NCG030000 Certificate of Coverage Number NCG030238 Please fill out and return this form only if you no longer need to maintain your NPDES stormwater permit. The following is the information currently in our database for your facility. Please review this information carefully and make all corrections as necessary in the space provided to the right of the current information. Owner Affiliation Information * Rescission Correspondence will be mailed to the owner address Owner / Organization Name: TurboCare Inc Owner Contact: Steve Schneider Mailing Address: 3050 Westinghouse Rd Rural Hall, NC 270454699 Phone Number: 336-969-1299 Ext. Fax Number: E-mail address: Facility/Permit Contact Information Facility Name: TurboCare Inc Facility Physical Address: Facility Contact: Mailing Address: Phone Number: Fax Number: E-mail address: 3050 Westinghouse Rd Rural Hall, NC 270454699 Sam Myers 3050 Westinghouse Rd Rural Hall,NC 270454699 336-969-1362 Ext. 336-969-1580 Reason for rescission request (This is required information. Attach separate sheet if necessary): REQUEST AND CERTIFICATION I, as an authorized representative, hereby request rescission of certificate of coverage NCG030238 under NPDES Stormwater General Permit NCG030000 for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Signature Print or type name of person signing above Date Title Please return this completed rescission request form to: SW General Permit Coverage Rescission Stormwater Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 M ID.,- September 22, 2009 Mr. Steve W. Tedder Water Quality Regional Supervisor, Winston-Salem Region North Carolina Division of Water Quality 585 Waughtown St. Winston-Salem, NC 27107 jg %ef__ TurboCare, Inc. 3050 Westinghouse Road Rural Ball, NC 27045 RECEIVED IV.C, Off0t of ENR SEP 2 3 2009 Wnslon-Salem Regional office Reference: NOV-2009-PC-0749, NPDES General Stormwater Permit NCG030000 Certificate of Coverage NCG030238, TurboCare, Rural Hall Plant, Forsyth County Dear Mr. Tedder: Subsequent to Mr. Ron Boone's visit to our facility on August 20, 2009, a Compliance Evaluation Inspection & Notice of Violation was issued to TurboCare. Below are the corrective actions that we have taken to address these issues. Plan Review and Implementation: The SWPPP has been fully reviewed for accuracy and completeness. We conducted a complete site review along with our environmental consultant, Trigon/Kleinfelder on September 151h. A few minor updates are being made. They will have the revised hardeopy completed by October 23rd. We are also performing inspections of all required areas on a weekly basis. These are being fully documented. We have set a reminder in our system to ensure that the annual review is accomplished on time going forward, and weekly inspections have been made a part of our standard practice. Training: All personnel listed in our SWPPP have now received training on procedures and best management practices as outlined in both the SWPPP and SPCC. Again, we have included this training requirement on our calendar of events to take place annually. Certification of Outfall: We have enclosed a Certification of the Storm Water Outfall, which will also be included in our revised SWPPP. Stormwater Monitoring Event: A purchase order had already been written on August 6, 2009 to perform the 2r,d Storm Water Monitoring requirement for 2009. This will be completed as soon as we have the required rain event. We have already been in contact with our vendor about conducting all sampling and monitoring for 2010, as well as marking the requirements on our calendar. Should you have any further questions, please feel free to reach me at the numbers below. Sincerely, w4I?'l " �� Sam Myers HSE Officer 336-969-1362 (work) 336-408-4123 (cell) Enclosures: Certification of Non-Stormwater Discharge and Plan PRESENCE OF NON-STORMWATER DISCHARGE AND PLAN CERTIFICATION I certify that the stormwater outfall has been inspected for the presence of non-stormwater discharges and that no such discharges are present at the facility. certify, under penalty of law, that this document and attachments were prepared under my direction or supervision in accordance with the systems designed for qualified personnel to properly gather and evaluate the information submitted. Based on my inquiries of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted, is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for known violations. This Plan is fully supported by the management of TurboCare. By signing below, the designated company official has authority to commit the necessary resources to perform the provisions described in this Plan. Name: IRsx�c�' _4L t r Signature: Title: VGE (Er=ot�v� �it� te: s/� REM ALIT NCDENR North Carolina Department of Environment and Natural Resources Division of water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary 27 August 2009 TurboCare Attn: Mr, Sam Myers, Supervisor, Support Services 3050 Westinghouse Road Rural Hall, NC 27045-9570 Subject: Compliance Evaluation Inspection & Notice of Violation NOV-2009-PC-0749 NPDES General Stormwater Permit NCG030000 Certificate of Coverage NCG030238 TurboCare, Rural Hall Plant Forsyth County Dear Mr. Myers: 1. Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Quality (DWQ) conducted a compliance evaluation Inspection (CEI) at the subject facility on 20 August 2009. Your assistance and cooperation during the inspection was greatly appreciated. An inspection checklist is attached for your records and the inspection findings are summarized below, 2. The facility is located at 3050 Westinghouse Road, in Rural Hail, Forsyth County, North Carolina- Stormwater related to industrial activity is discharged to Muddy Creek, which is currently classified as Class C waters in the Yadkin River basin. Documentation & Monitoring Review 3. The Stormwater Pollution Prevention Plan (SP3) is complete and current. However, it has not been fully implemented and is slightly outdated. It was last reviewed in March 2008 and there are no records of the required annual reviews. Furthermore, there is no record of annual training and no certification of the stormwater discharge outfalls (SDO). Finally, only one arlalyticallqualitative monitoring event has occurred since permit issuance; it was completed in February 2009. Site Review 4. The site was clean and well maintained. There is a large amount of industrial activity on the north and east sides of the facility ranging from raw product storage to waste disposal. It is believed that you have minimized exposure of industrial' activities to the maximum extent practical at this point. North Carolina Division of ~hater Quality, Winston-Salem Regbnai Q{4ce Location: 585 Waughtowr) 5t. Winston-Salem, North Carolina 27107 Phone: 336-771.50001 FAX: 336-771-46301 Customer Service: 1-877-623.6748 Internet: www.ncwatergtial!V.org 011C NorthCauohna Amllrallif An Equal Opportunity \Affirmative Action Employer TurboCare Inc- NCG060042 Attn: Mr. Sam Myers, Supervisor, Support Services Compliance Evaluation Inspection & NOV-2009-PG-0749 8/27/2009 Page 2 of 2 5. You are reminded that violations of the NCG030000 general permit are subject to civil penalty assessments not to exceed $25,000 per day, per violation. Please reply to this letter in writing within 30 days of receiving it. Your reply Should include a corrective action with implementation schedule for all deficiencies noted above in paragraph 3. 6. Thank you for your cooperation in this matter. Should you have any questions, please feel flee to contact Mr. Boone, Rose Pruitt, or me, at (336) 771-5000. Sincerely, Steve W. Tedder Water Qua€ity Regional Supervisor Winston-Salem Region Division of Water Quality Attachments: 1. BIMS Inspection Checklist cc �Sllll P�WSR�----� Central Files Stormwater Permitting Unit Compliance Inspection Report Permit: NCGO30238 Effective: 11/01/07 Expiration. 10131/12 Ommer: TurboCare Inc SOC: Effective: Expiration: Facility: TurboCare Inc County: Forsyth 3050 Westinghouse Rd Region: Winston-Salem Ru4 Hall NC 270454699 Contact Person: Sam Myers Title: Phone: 336-969-1362 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representatives): 24 hour contact name Sam Myers Related Permits: Phone: 336-969-1362 Inspection pate: 08120/2009 Entry Time: 10:00 AM Exit Time: 12:00 PM Primary Inspector: Ron Boone // Phone: 704-663-1699 Secondary InspectorExt.2202s}: Reason for Inspection: Routine Inspection Type: Compliance Evaluatbn Permit inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Q Compliant ® Not Compliant Question Areas: MI Storm Water (See.attachment summary) Page: 1 Permit: NCG030238 Owner - Facility; TurhoCare Inc Inspection Date: 08/20/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Refer to letter. Page: 2 Permit; NCG030238 Owner - Facility: TurboCare Inc Inspection Date: 08/20/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Storrnwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® n n n # Does the Plan include a General Location (USGS) map? ® n n n # Does the Plan include a "Narrative Description of Practices"? W fTi n n # Does the Plan include a detailed site map including outfall locations and drainage areas? m n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n n I] # Has the facility evaluated feasible alternatives to current practices? n n n # floes the facility provide all necessary secondary containment? ® n n n # Does the Plan include a BIVIP summary? 12 n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n n # Does the facility provide and document Employee Training? n m n n # Does the Plan include a list of Responsible Party(s)? ® n n n # Is the Plan reviewed and updated annually? n ® n n # Does the Plan include a Stormwater Facility Inspection Program? In n n n Has the Stormwater Pollution Prevention Plan been implemented? n ® n n Comment: Refer to letter. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n ® n n Comment' Refer to letter. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ®n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n U Comment: Refer to letter. Permit and Outfalls Yc5 No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® n n n # Were all oulfalls observed during the inspection? ® n n n # If the facility has representative outfall status, is it properly documented by the Division? n n ® n # Has the facility evaluated ail illicit (non Stormwater) discharges? n ® n n Comment: Refer to letter. Page: 3 )rmwater Pollution Prevention Plan )es the site have a Storn-rater Pollution Prevention Plan? Does the Plan include a General Location (USGS) map? Does the Plan include a sNarrative Description of Practices Does the Plan include a detailed site nap including outfail locations and drainage areas? Goes the Plan include a list of signifimnt spills occurring during the past 3 years? Has the facility evaluated feasible alternatives to current practices? Does the facility provide all necewary :secondary containment? Does the flan include a BMP sLmmary? Does the Plan include a Spill Prevention and Response Plan (SPRP)? Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? Does the facility provide and document Employee Training? Does the Plan include a list of Responsible ParMs)? Is the Plan reviey&d and updated annually? Does the Plan include a Storn-water Facility Inspection Program? as the Stornwater Pollution Prevention Plan been implemented? omment_ 66U new vi'sj7vrs r�espD;"Ls- -+- s � alitative Monitoring as the facility conducted its Qualitative Monitoring semi-annually} omment alytical Monitoring is the facility conducted its Analytical monitoring? Has the facility conducted its analytical monitoring from Vehicle Maintenanoe areas? omment: rmit and Outfalls AAA V\.� 0Ldt-OGU Is a copy of the Pemiit and the Certificate of Coverage available at the site? Were all outfalls observed during the inspection? If the facility ha; representative outfalI status, is it properly documented by the division? Has thie facility evaluated all illicrt (nvn stormpfiater) discharges? joy." s 1N vUfi Ca)( NCCII 0 3t)2% St1P-1WU1*1 s `(Z-L L rA Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Cl ❑ ❑ ❑ ❑ ❑ ❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ■ ■ NOW Yes No NA NE Yes No NA NE ® ❑ ❑ ❑ AK M Yes No NA NE tSD t�Opl