Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030034_MONITORING INFO_20180816
STORMWATER DIVISION CODING SHEET NCG PERMITS-.. PERMIT NO. DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ Du R bg I (Q YYYYM MDD Semi-annual Stormwater Dirge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted August 16, 2018 CERTIFICATE OF COVERAGE NO. NCG030034 FACILITY NAME Isometrics, Inc. COUNTY ROCKINGHAM PERSON COLLECTING SAMPLES J FREI/ SwSG LABORATORY Pace Analytical Lab Cert. ## 12L 40/ 633 Comments on sample collection or analysis: pH measured by Stormwater Services Group (Lab Cert No. 5054) Part A: Stormwater Benchmarks and. Monitoring Results f SAMPLE COLLECTION YEAR Year 6 Period 1 SAMPLE PERIOD ❑ Jan -June O July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply []SA 00ther C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No dischorge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 001 07/30/18 0.28" 14.6 7.72 < 0.0050 < 0.0050 0.011 < 5.0 n/a 002 07/30/18 0.28" 22.2 7.28 0.020 < 0.0050 < 0.010 < 5.0 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilitie Olt incorporate a solvent management plan into the Stormwater 1*tion Prevention Plan may so certify, and the requirement for TTC9nitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. Foss those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: .� "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed.to rainfall or stormwater runoff has occurred since fling the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Pri title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX m$/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. 'Note: if you report a sample value in excess of the benchmark, you must implement rer 1, Tier 2, or Tier 3 responses: See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. 1] No discharge this period?z ' . OutfaEl Na. Date Sample Collected, (mo/dd/yr) 24-hour rainfall . amount, . Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids = ' pH Benchmarks ===> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 -'9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if yolloort a sample value in excess of the benchmark, you must impleo Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text. 0 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES O NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 13 NO ❑ REGIONAL OFFICE CONTACT NAME: Glenn White Mail an original and one co,p V ot this DMR including all "No Discharge"" re orts within 30 days of receipt of the lab results or at end of monitoring period in the case of "No Discharge" reportsl to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permit Date: 11/1/2012-10/31/2017 0�Rwlf (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Daarge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted March 1, 2018 CERTIFICATE OF COVERAGE NO. NCG030034 FACILITY NAME Isometrics, Inc. COUNTY ROCKINGHAM PERSON COLLECTING SAMPLES J FREI/ SwSG LABORATORY Pace Analytical Lab Cert. # 12/ 40/ 633 Comments on sample collection or analysis: qH measured by Stormwater Services Group Lab Cert No. 5054 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Yr 5 Pd 2 SAMPLE PERIOD ❑ Jan -June [] July -Dec p or ❑ Monthly' (month) ,� REED fr_Di SC HARGING TO CLASS ❑ORW ❑HQW [-]Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA MAR 2 2 ®other C CENTRAL FILF.3 DIAIR SECTION, PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks - - 100 mg/L 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 001 02/11/18 0.43" 24.8 7.83 0.010 < 0.0050 1.9 < 5.0 n/a 002 02/11/18 0.43" 512 7.35 0.032 0.0080 2.3 < 5.0 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31), Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities Oncorporate a solvent management plan into the Stormwater Poon Prevention Plan may so certify, and the requirement for TTO reoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign'the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) ZtiV . '41, Title ( Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mgjL". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. !Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period?2 outfall No. Date Sample Collected 1 (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ===> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If yoport a sample value in excess of the benchmark, you must implOnt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. 0 FOR PART'A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES 0 NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 0 NO ❑ REGIONAL OFFICE CONTACT NAME: Glenn White Mail an original and, one cgpy of this DMR, intludina all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater D►l arge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted August 29, 2017 CERTIFICATE OF COVERAGE NO.'UCG030'034-7 FACILITY NAME Isometrics. Inc. COUNTY ROCKINGHAM PERSON COLLECTING SAMPLES 1 FREI SwSG LABORATORY Pace Analytical Lab Cert. # 12/ 401633 Comments on sample collection or analysis: __ pH measured by Stormwater Services Group ILab Cert No. 5054) Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly' month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA RFr. FIN/ ED 00ther C SEP 18 2017 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DVVP. of CMN IINFORRATlON PROCESSING UNIT ' ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 001 08/07/17 1.07" 52.0 6.81 1.6 < 0.0050 < 0.010 < 5.0 n/a 002 08/07/17 1.07" 64.7 6.97 2.6 <0.0050 0.026 <5.0 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in ,t0 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities 0ncorporate a solvent management plan into the Stormwater Poo Prevention Plan may so certify, and,the requirement for TTO Ooring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no'dumping of concentrated toxic organics into the stormwater or areas"which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." LU AAht fit Name (Print name) Title (Print title) J (Signa(re) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect,, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mrjL", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. (Vote: If you report a'somple value in excess of the benchmark, you must implement Ter 1, Ter 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?Z ' - Out#all No: ' Date Sample" Collected' (mo/dd/yr) 24-hour rainfall amount, a Inches, .• Non -polar O&G/TPH by . EPA 1664 (SGT-HEM) .. - - . , . Total Suspended Solids , pH Benchmarks =_> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if ysport a sample value in excess of the benchmark, you must impont Tier 1, rer 2, or Tier 3 responses. See General Permit text. 0 FOR PART AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES If NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: Glenn White Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." lill" (Signature of Permittee) 617 ( Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 • Semi-annual Stormwater 10harge Monitoring Report for North Carolina Division of. Water Quality General Permit No. NCG030000 t Date submitted December 13, 2016 CERTIFICATE OF COVERAGE NON CG030034 FACILITY NAME —Isometrics, Inc. COUNTY ROCKINGHAM PERSON COLLECTING SAMPLES J FREI/ SwSG LABORATORY Pace Analytical _ Lab Cert. # _ 12140/ 633 Comments on sample collection or analysis: _PH measured by Stormwater Services Group (Lab Cert No. 5054)_ Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June a July -Dec ���E{���c�ARGINor El monthly' _ (month) G S G TO.CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flaw ❑Water Supply []SA 00ther C HLES TION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount Inches3 Total Suspended Solids pH, Standard units ^Q Co pZ Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total To Or anics5 g Benchmarks --=> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 001 11/29/16 0.35" 195 8.48 0.023 0.0067 3.7 < 5.0 n/a 002 11/29/16 0.35" 238 8.01 0.035 0.014 4.3 < 5.0 n/a i Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a'waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31).' RECEIVED Permit Date: 11/1/2012-10/31/2017 DEC 1 A c,> tC. CENTRAL FILES DWR SECTION' SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities. incorporate a solvent management -plan into the Stormwater Pn.Prevention Plan may so certify, and the requirement for TTO toring may be waived. The solvent management plan shall include a list of the total OW organic compounds used and the other elements listed in the G I Permit. For those facilities electing to•employ the TTO monitoring waive, the discharger'•shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics r (TTO), I certify that to the best of.my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the,all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." " Name (Print name) Title (Print title) ,,,�ca 1 • (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format , Wheri results are below the applicable limits, they must be reported in the format, "<xX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: -if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal -of new oil per month. (� No discharge this period?Z+ Outfall No. Date Sample i Collected , , (mo/dd/y�) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM] Total Suspended Solids, ' pH Benchmarks =__> _ -, 15 mk/L 100 mg/L or 50 mg/L* 6.0 -- 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245; last,revised 10/25/2012 .r. . s Page 2 of 3 Note: If A&eport a sample value in excess of the benchmark, you must impant Tier 1, Tier Z, or Tier 3 responses. See General Permit text. A FOR PART'hAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑NOIZ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an on final and one cgey of this DMR including all "Na Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reportsl to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Vk�cHnci- -j3, Ler- Fe W ��-r � 11) (Signature of Permittee) (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Permit Date: 11/1/2012-10/31/2017 Semi-annual Stormwater D&ar a Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG0300.QO' D Date submitted December 17 2015 CERTIFICATE OF COVERAGE NO. N00030034 FACILITY NAME Isometrics Inc. COUNTY ROCKINGHAM PERSON COLLECTING SAMPLES J FREI/ SwSG LABORATORY Pace Analytical Lab Cert. # 12/ 401633 Comments on sample collection or analysis: pH measured by Stormwater Services Group (Lab Cert No. 5054) Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 201S SAMPLE PERIOD ❑ Jan -June 0 July -Dec or ❑ Monthly' _ _(month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply []SA RECEIVED 00ther C Jr-C 2 2 Z015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 .ENTRAL FILES 70R SECTION _ . ❑ No discharge this period? Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Tota! Total Petroleum Hydrocarbons Toxic Organics" Benchmarks - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 002 06/18/15 0.41" 52.4 6.90 0.0061 < 0.0050 0.018 < 5.0 n/a 002 11/30/15 1.06" 130 9.52 0.0082 0.0089 0.30 < 5.0 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. k See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date; 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities. incorporate a solvent management plan into the Stormwater Pd&n Prevention Plan may so certify, and the requirement for TTO r toring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the Gen Cal; Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Al ci4ALL,,. Name (Print name) Title (Print title) /L( d_lad 6 (Signature) 1�D6�rs (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 -- 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If *Port a sample value in excess of the benchmark, you must impont Tier 1, Tier 2, or Tier 3 responses. See General Permit text. . FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO 0 IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources ^ Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: - "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." t� � I`�1,viANC-V 'F . (�F (Signature of Permittee) Permit pate: 11/1/2012-10/31/2017 I i� m&C, 2© fs (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 , T .J Semi-annual Stormwater Discharge Monitoring Report / for North Carolina Division of Water Quality General Permit No. NCG030000� Date submitted 12/01/2015 CERTIFICATE OF COVERAGE NO. NCG030041 SAMPLE COLLECTION YEAR _2015 Kinston FACILITY NAME CROWN _nston SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY LENOIR or [ I'Monthlyl November PERSON COLLECTING SAMPLES JIMMY YELVERTON DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY ENVIRONMENTAL #1 Lab Cert. # 10 ❑Zero -flow []water Supply ❑SA Comments on sample collection or analysis: RECEIVED ❑Other_ C,SW,NSW DEC 0 4 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results DWR CENTRAL ECTION ❑ No discharge this period: Outfall No. Date Sample Collected' (mo/dd/yr) 24hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 11/09/15 .750 2.9 mg/I 6.56 <0.002 mg/I <0.005 mg/I 0.025 mg/I <5.0 mg/I SMP 2 11/09/15 .750 2.9 mg/I 6.50 <0.002 mg/I <0.005 mg/I 0.026 mg/I <5.0 mg/1 SMP 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilllties that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. Faf those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (Tf0), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Jimmy Yelverton Name (Print name) Safety & Environmental Engineer a, 'LL 4ign (Print title)ature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mR/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall Na. t Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ==_> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU I; i i Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 aw- � . Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OLITFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orlainal and one coov of this DMR, includina all "No Discharae" reports. within 30 dovs of receipt of the lab results for at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of P�r�nittee) Permit Date: 11/1/2012-10/31/2017 l.-7-of //S--- (Da e) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted July 20, 2015 CERTIFICATE OF COVERAGE NO. NCG030034 SAMPLE COLLECTION YEAR 2015 FACILITY NAME _ Isometrics, Inc. SAMPLE PERIOD 0 Jan -June ❑ July -Dec 4-V� COUNTY ROCKINGHAM or ❑ Monthly' (month) PERSON COLLECTING SAMPLES J FREI/ SwSG DISCHARGING TO CLASS ❑ORW ❑HIQW []Trout ❑PNA LABORATORY Pace Analytical Lab Cert. It12/ 40/ 67 R CE I W Mi ❑Zero -flow ❑Water Supply [:]SA r Comments on sample collection or analysis: pH measured by JUL 2 7 2 Bother C 5tormwater Services Group 'Lab Cert No. 50541 (CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ORR SFCTIC Part A: 5tormwater Benchmarks and Monitoring Results No discharge this period?Z outfall No. Rate Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic s Organics Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 002 06/18/15 0.41" 52.4 6.90 0.0061 < 0.0050 0.018 < 5.0 n/a �r V A- ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same pararneterVLAs�rrK ,outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark-here. ;The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the�rrai gauge', equirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 RECEIVED JUL 2 7 2015 CENTRAL FILES 5WU-245, last revised 10/25/2012 Page 1 of 3 Fadlities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Not Applicable — TTOs not used Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in -the format, "<)(X me/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 4.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this OMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." IM IC-H A-c--L- 'G, (Signature of Permittee) Permit Date: 11/1/2012-10/31/2017 �zik (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 is Semi-annual Stormwater Discharge_ Monitoring Report for North Carolina Division of Water Quality General Permit No. NC6030000 Date submitted Janua-N 22015 CERTIFICATE OF COVERAGE NO, NCG030034 FACILITY NAME Isometrics, Inc. COUNTY ROCKINGHAM PERSON COLLECTING SAMPLES _ J FREI/ SwSG _ LABORATORY Pace Analytical Lab Cert. # 12/ 40/ 67 Comments on sample collection or analysis: pH measured by Stormwater Services Group (Lab Cert No. 5054) Part A: Stormwater Benchmarks and Monitoring Results RECEIVED JAN 14 2015 CENTRAL FILES SAMPLE COLLECTION YEAR 2014 DWR SECILON SAMPLE PERIOD ❑ lan-June @July -Dec or [—]monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow []WaterSupply ❑SA 00ther C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?z I Outfall No. Date Sample Collected` (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organlcss Benchmarks ===> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 002 08/12/14 0.65" 274 7.04 0.019 < 0.005o < 0.010 < 5.0 n/a 002 12/24/14 0.67" 13.6 6.88 0.0055 < 0.0050 0.033 < 5.0 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date-.11/1/2012-10/31/2017 SWU-24S, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollutions Prevention Plan." Name (Print name) Title (Print title) 7 GIs (Signature) (Date) m� Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period:2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES I N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGE R TIER 2 REQUIREMENTS. SEE PERMIT PART R SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES [] NO fil IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an _original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Dischame" reports) to: Division of Water Quality Attm DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing; violations." (Signature of Permlttee) .A�' -Zorn (Date) Permit Date•.11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report_ for North Carolina Division of Water Quality General Permit No. NCG030000 do RECEIVED SEP 08 Z014 Date submitted September 5, 2014 CENTRAL FILES DWR SECTION CERTIFICATE OF COVERAGE.NO. NCG030034 SAMPLE COLLECTION YEAR 2014 FACILITY NAME Isometrics, Inc. _ SAMPLE PERIOD ❑ Jars -June Q July -Dec COUNTY ROCKINGHAM or ❑ Monthiy't (month) PERSON COLLECTING SAMPLES J FREI/ SwSG DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Pace Analytical_ _ Lab Cert. i# 12/ 40/ 67 ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis; pH measured by 00ther. C Stormwat_er_ Services Group (Lab Cert No. S05.4_) PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -i Part A: 5tormwater Benchmarks and Monitoring Results ❑ No discharge this period?z outfall No. Date Sample , Collected (mo/dd/yri 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc' Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L D.D67 mg/L 15 mg/L 1 mg/L 002 08/12/14 0.65" 274 7.04 0.019 < 0.0050 < 0.010 < 5.0 n/a . 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a'waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Facilities ihafincorporate a solvent management plan into the Stormwater Pollution Prevention Plan -may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total. toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: rt • "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since fling the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) � 1( t j -D(LATS,M A r Title,(Print title) r 0 S� Z�I� (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are.below the applicable limits, they must be reported in the format, "<XX mg/t where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. S ' Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.. ❑ No discharge this period?Z Outfall No.Date Sample Collected, (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (5GT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B " See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 • 0 0 Note: ICE you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW,FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an originol and one copy of this AMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No_Dischame" reports) to: Division of Water Quality T Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699.1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY'INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons,directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am -aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." jSignature of Permlttee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 ISOMETRICS, INC. P. O. Box 660 Reidsville, NC 27323 (I i Ifs Street Address: 1266 N. Scales St. Reidsville, NC 27323-0660 LJ www.isometrics-inc.com 04 September, 2014 Division of Water Quality ATTN- Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: SDO Monitoring Reports Dear Sir or Madam; } f Phone: 336-349-2329 1-800-567-7510 Fax: 336-349-4744 mi@isometrics-inc.com Enclosed please find Stormwater Discharge Outfall Monitoring Reports for Isometrics, Inc., in Reidsville NC (General Permit # NCG030000, Certificate of Coverage No.s NCG03-0033 and NCG03-0034). Sincerely, Michael B. Leffew Engineering Dept s•.._ rj'•tr..w .� �i��i� ,s'ri :mar Jti:�.C: _� a3. !JJ�.. .. �f• �.: r;oi{�.'S.i �.. if-}.. j 1.2 .:2