Loading...
HomeMy WebLinkAboutNCG020877_COMPLETE FILE - HISTORICAL_20150505STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. lv� va DOC TYPE CYHISTORICAL FILE 11 MONITORING REPORTS DOC DATE n v) S 0) OL YYYYM M D D Permit Number NCG020877 ` Central Files APS _ SWP 5/1/2015 Permit Tracking Slip Program Category Status Project Type NPOES SW E`Dn In review New Project Permit Type REcEi Yl Version Permit Classification Mining Activities Slormwater Discharge COC COC MAY 05 cQ4� Primary Reviewer Permit Contact Affiliation larry wade CENTRAL FILES DWR SECTION Coastal SWRule Permitted Flow Facility Facility Name Matorimirior Region Devan s Sand Pits Minor Wilmington Location Address County PO Box 67 Duplin Facility Contact Affiliation Warsaw NC 28398 Bryan Ray Kennedy PO Box 67 Owner Warsaw NC 28398 Owner Name Owner Type Tarheel Concrete ` Non-Govemment Owner Affiliation Bryan Ray Kennedy PO Box 67 DateslEvents Warsaw NC 28398 Scheduled Ong Issue App Received Draft Initiated Issuance Public Notice �Iss a1 Efectve Expir ion r��_ 1212312014 �CIIsI�a 7 Regulated Activities Requested /Received Events RO staff report received 511115 RO staff report requested 1116115 Outfall 1 Waterbody Name Streamindex Number Current Class Subbasin Caritons Mill Run 18-68-2-10-2 C Sw 03-06-19 ATNP*FA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Bryan Ray Kennedy Tarheel Concrete PO Box 67 Warsaw, NC 28398 Dear Mr Kennedy May 4, 2015 Donald R van der Vaart Secretary RECEIVED MAY 0 5 2U=ti CENTRAL FILES DWR SECTION Subject General Permit No NCG020000 Devan's Sand Pit COC NCG020877 Duplin County In accordance with your application for a discharge permit received on December 23, 2014, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit This permit is issued pursuant to the requirements of North Carolina General Statute 143- 215 1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended) Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral, and Land Resources The Division may require modification or revocation and reissuance of the certificate of coverage Please note that the attached General Permit expires on June 1, 2015 Your COC will be automatically renewed to cover the full 5 year term of the soon to be reissued permit In the interim you must abide by the terms of the expiring permit You can review the proposed general permit changes once they are posted at http Ilportal ncdenr org/web/wg/ws/su/current-notices Please note that mine dewatering wastewater includes wet pit overflows caused solely by irect rainfall and groundwater seepage for this type of mining operation Any discharge of this water (and any stormwater commingled with it) is subject to the effluent limitations in this permit Division of Energy, Mineral and Land Resources Energy Section • Geological Survey Section - Land Quality Section 1612 Mad Service Center, Raleigh, North Carolina 27699-1612 • Telephone 919-707-92001 FAX 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet http llportal ncdenr orglwebllrl An Equal Opportunity 1 Affirmative Acbon Employer — 50°% Recycled 110% Post Consumer Paper Mr Kennedy May 4, 2015 Page 2 of 2 This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mining, and Land Resources, or permits required by the Division of Water Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be required If you have any questions concerning this permit, please contact Richard Riddle at telephone number (919) 807-6375 Sincerely, for Tracy E Davis, P E , CPM cc Wilmington Regional Office Central Files Stormwater Permitting Program Files Division of Energy, Mineral and Land Resources 1612 Mail Service Center, Raleigh, NC 27699-1612 • Phone 919-707-9200 • Fax 919-807-6494 Location 512 N Salisbury Street, Raleigh, NC 27604 + http //portal ncdenr orglwebllrl An Equal Opportunity/Affirmative Action Employer STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERNUT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020877 STORMWATER AND MINE DEWATERING DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215 1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Bryan Ray Kennedy is hereby authorized to discharge stormwater and process wastewater and from a facility located at Devan's Sand Pit Boy Scout Lane Warsaw Duplin to receiving waters designated as Carlton's Mill Run, a class C, SW water in the Cape Fear River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1,1I, Ili, and 1V of General Permit No NCG020000 as attached This certificate of coverage shall become effective May 4, 2015 This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed tins day May 4, 2015 ,�-,j 142 for Tracy E Davis, P E , Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission W� Lam`' s �� •' °$' 8'iVll, 7'4&.19" N'`l (! >✓'J. It I, ,; � _ i Devan s Sand Pit i_� �•,, . .)�C h. .... : ,.T, `� '� r�' . � t .i \ � ���� � } � _,` ' `` `1 `� a4�•R �j-I/1�/, t � 1-'Y�- /�, . / _-, o� � S � , � � c=.- ��/ p # 7:1�' . ,7 _ l f t /\ � r '�� •. fi2f d � � �•�' NCGOZos77 N W E S. Map Scale 1:24,000 Tarheel Concrete Devan's Sand Pit Latitude: 340 57' 43.9" N Longitude: 7811 08' 58" W County: Duplin Receiving Stream: Cantons Mill Run Stream Class: C. Sw Index Number: 18-68-2-10-2 (Cape Fear River Basin) Facility Location jFj Division of Water Quality 1 Surface Water Protection NCDENRNational Pollutant Discharge Elimination System N C+no _ p�nn Nr pr E�wpw+• — Nu - R[yp,fnG[5 NCG020000 NOTICE OF INTENT FOR AGENCY USE ONLY Dare Received Year Mumh Day Certiflca[cofCovera e [7 2 Check Amount RECEIVE® National Pollutant Discharge Elimination System application for coverage under General PermiVAY 0 5 Z015 NCG020000: CENTRAL FILES STORMWATER DISCHARGES associated with activities classified as: Dkl'.!R SECTION SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) The following activities are also included: • Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater contaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; • Stormwater from vehicle maintenance activities at mining operations; R E C a�` "m e-1\1ED • Overflow from facilities that recycle process wastewater; and/or } • Mine dewatering(wastewater) DEC 23 20114 The following activities are specifically excluded from coverage under this General P t• F -LAND QUA! _ITY • Stormwater discharges associated with peat mining, coal mining, and metal rninincPTORMVVA,T ER P_ERrM T Td'4G • Stormwater discharges from mining operations which are intermixed on site with stormwater from asphalt operations and/or concrete operations; • Stormwater discharges associated with oil and gas extraction operations: and • Stormwater discharges associated with tourist gem mines • NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000- Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e.. sand dredging or dipping operations). Please contact the NPDES Wastewater Point -Source Group for more information on coverage under this perm it. Please print or tvpe all entries in this application form. t ) Mailing address of owner/operator official address to which all permit correspondence will be mailed : Legal Owner Name _612U cQ TZpy K�UNEO T�+2t*kr Cam? �l�►zG� (Attach the most recent Annual Report to the NC Secretary of State showing the current legal name of the corporation or entily Alternatively this permit can be given io an individual or government authority, This name must be the same name as appears on the Division of Land Resources' Mining Permit, ) Signee's Name (as signed for in permit signature at bottom) 'i4ry I�a� tinlric_ Street Address IUD fox Cv`i _ City 12 State NG ZIP Code Z 93q S Telephone No. I D Zq 3 — C,S$ Email Alternate Contact Name Email (if different) Alternate Contact Telephone (if different) Page 1 of 8 SWU-NCG02-NOI Last revised 3/15/2012 NCG020000 N.O.L 2) Location of facility producing discharge: Facility Name D6VP1N '5 :5 RND Pi T Facility Contact BiziA k+j _TZa `I I~C N NJZ� i)c Street Address Po Sox 67 City 1NArT"LS A-1-4 State N ,�— ZIP Cade 2 S 3 a County QQ P I.. t N Telephone No. q10 Zq 3 - 6 5 Fax: Contact E-mail 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). 5'(4 (71-' -T.T2. I108 , �'r2IJ)C i. Z {M�L-0', 60 Vr z or- MG k4­, k 4) Latitude s • 9 fo2Z Longitude - 7$ • 14qS (degrees, minutes, seconds) '78va8' Rrlmits: 5) This NPDES Permit Application applies to which of the following: U?-I ew or Proposed Facility Date operation is to begin: r 73 i 5 20 i5 ❑ Existing Date began mining: 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 1 1' 4 _. 7) Provide a narrative description of the types of minerals mined at this facility: �'flivlh �- To P5o t �- 8) Is this mine an inactive mine site? C9' 0 ❑ Yes If yes, do you posses an "Inactive Renewal" from DLR and notified the DWQ Regional Office or have you certified to the DWQ that the site has been stabilized? ❑ No ❑ Yes 9) Does this facility already have a valid Mining Permit from the Division of Land Resources (DLR)? QIN'o If No, please indicate the status of the Mining Permit application: PrPL1 DJ i Z --Z-2 _ ? `"I ❑ Yes If yes, please provide the Mining Permit number: Please also provide a copy of your DLR Mining Permit with this DWQ application. Note: DWQ cannot issue a COC for the NCGO20000 General Permit until a Mining Permit is issued or renewed by the Division of Land Resources (DLR). 10) Does this facility have any other NPDES permits? LI'No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: Page 2 of 8 5W U-NCG02-NOI Last revised 3/15/2012 NCG020000 N.O.I. 11) Are you applying for a mining permit in the same location as a previously permitted mine? ❑ Yes If yes, specify permit number and name if known: 12) Does this facility have any Non -Discharge permits (ex: recycle permits)? U11 11<a ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 13) Does total area of this mine site include ready -mix and asphalt areas? o ❑ Yes If yes, do they have DWQ stormwater permits (if owned by the same company)? ❑ No ❑ Yes (provide permit number ) If not owned by the same company, who is the owner? 14) Will this mining operation precede development activities at this site? Z ❑ Yes 15) Is this mine located within one of the 20 Coastal Counties and will it add more than 10,000 ft2 of impervious surface? alNo ❑ Yes If yes, you may be required to apply for an additional state stormwater permit. Check with your local Regional Office. See contact information and checklist below. 16) Is this mine located the Meuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan Water supply Watersheds? 91C ❑ Yes If yes, what size stream buffers are included on site? ft. Please show buffers in site plans. If yes, please include information and plans showing diffuse flow through buffers as required. Discharge Points, Receiving Waters & Wetlands: 17) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? v Nnf ArnJ If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Receiving water classification (if known): Note: Discharge of process wastewater to receiving waters classified as WS-11 to WS-V or SA must be approved by the N-C_ Dept. of Environmental Health. If DEH does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 18) If your facility has wastewater discharges and they are to HW©, PNA waters (Primary Nursery Areas) waters, what is the flow rate? NIA (See http:!/www.ncdmf.net/maps/FNA maps/index.html, for map) Page 3 of 8 5Wu-NCG02-N0I Last revised 3/15/2012 NCG020000 N.Q.I. 19) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onslte: Stormwater: Mine dewatering: 1 Process Wastewater Overflow: Offsite: Stormwater: Mine dewatering: Process Wastewater Overflow: Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges c_111 PIC'c C—TZ- W 11A1, CA L&1 ( 4 " E t_c A Gi`7ouu ouJ N r, -t— STORM_ N - W Pr , GiZ L,.l l l-Ir 6CX-:P, 5 t.b WA. LL-, -6r, PUMpv-'J QzAr'& 1 N 4 Ate, tall ib­;- w c I.tr PQa , S UCH l� �6 14 F-�e �C Gtc:�>n , ` rJ 1 ru o U�yJyairr�r� C1 �L tlt,P�- ��Tcrw-1. a) Is your mine dewatering and discharging? (Answer only if you are dewatering) ❑ No 9?' es If yes, where to? '-�urface Waters and/or Wetlands (on -site or off -site) Other (on -site or off -site) Describe: b) Are you dewatering but not discharging? (Answer only if you are dewatering) C;-No ❑ Yes If Yes, please explain how you are dewatering, and where that water will be directed: 20) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? ivo w ("C'! D5 IN V i&(Aj1 cq Odz_ mtN � Note: Wetlands must be CLEARLY DELINEATED on the site plari. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (O&M) Plan that has been approved by the Division. For sites that may drain wetlands — approval of a Pumping O&M plan may be required prior to coverage under this general permit. The Pumping O&M Plan should be submitted to the appropriate Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact your local Regional Office for questions specific to your mine. 21) It you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? V_NZ ❑ Yes If yes, what distance are they from the mine pit perimeter? 22) Have you been required to obtain a 404/401 Certification permits? Ca'eyNo ❑ Yes If yes, please briefly describe below (include information such a required mitigation, BMPs, setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: Page 4of8 SWU-NCG02-NOI Last revised 3/15/2012 NCG020000 N.O.I. 23) Haveyoubeen required to obtain a wetland delineation certified by the US Army Corps of Engineers? O No ❑ Yes If yes, please attach to application submission. Stormwater BMPs: 24) Does this facility employ any best management practices for stormwater control? ❑ No Cg'Ves If yes, please briefly describe: 25C!U,4fZG WET -(70 P*65 P;C'�S/V —L-5 r515�t� 15Gk �AfZC,. 25) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No W-Y'es If yes, when was it implemented? L-4(LU 1M�4 1r: � C,.1}: 1V�4►�1+ �4 �vtN s 26) Will vehicle maintenance activities occur at this facility? R"No ❑ Yes Wastewater Treatment Facilities: 27) Will mine dewateriing discharges occur? ❑ No 28) Will discharges of overflows from process wastewater treatment systems occur? 1p-IO ❑ Yes If yes, a_ Does this facility employ chemical additives to flocculate suspended solids? L7No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North Carolina: http://portal.ncdenr.org/web/wq/ws/su/npdessw b. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No El Yes QD wa i"a k-j 29) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? Er No ❑ Yes 30) Is your facility washing mined materials? 0 ❑ Yes If Yes, are you discharging this water? Page 5 of 8 SW U-NCG02-NOI Last revised 3/15/2012 NCG020000 N.O.I. Other: 31) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? 2 No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? M,60 ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? L�TV0 ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored:_ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit tent for secondary containment requirements. ❑ Yes 33) Does' r site have an active landfill within the mining permit boundary? L+7 No ❑ Yes If yes, specify type: ❑ LCID ❑ Other: Final Checklist: This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. Fee of $100 made payable to NCDENR. Completed application and all supporting documents. Copy of the valid approved mining permit (MP) for the facility or indication of MP application status. Copy of a county map or other general location map that shows the mining site and nearest major roads. Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. 2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated, and 100-year flood plain line if applicable. A copy of your DLR mining permit. A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 23 above. A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. If mine site is in one of the 20 Coastal Counties: • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: Page 6of8 SWU-NCG02-NOI Last revised 3/15/2012 NCG020000 N.O.I. • Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage areas and total drainage area. It the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping O&M Plan (see below for contact information). You may be required to provide an approved Pumping O&M plan priorto NCG02 issuance. 2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the plans and listing acreage (including: wetlands, ditches, well -placements, pits, borrow areas, overburden storage, stormwater controlslBMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state sw programs apply), applicable buffers, and access and/or haul roads). Pump dewatering size and information on its specifications. Well information (design, depths. maintenance). Physical monitoring for the wetlands areas. Settling pond sizing information. if applicable. Level spreader design, if applicable. Details about dewatering method. Cone of influence calculations. _Description of measures to prevent erosion and flooding. Description & information about 401/404 permits that have been obtained. Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable). I have contacted my local regional office about a Pumping O&M Plan, Regional Office Contact: Date contacted: -OR- I will not any impact nearby wetlands, surface waters or groundwater by dewatering. Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation. or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article: or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article: or who falsifies. tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($t0.000j. 33) Signatory Requirements (per 40 CFR 122.22) Ali applications. reports. or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit. a responsible corporate officer means: {a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), it authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor. respectively: or (3) For a municipality. state. federal, or other public agency: by either a principal executive officer or ranking elected offictal. I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1. 1 agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. Page 7 of 8 SW U-NCG02-NOI Last revised 3/15/2012 NCG020000 N.O.I. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit, I certify that I am familiar with the information contained in this application and that to the best of my knowledge and Belief such information is true, complete, and accurate. Printed Name of Person Signing: &(,ox Title: (Signature of %Z- '�?2 — / (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWO Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 8 of 8 SWU-NCC302-NOI Last revised 3/15/2012 WaIr Langth 2rt, Min. l 'p�Rrnn� � c7t 3 (s. Rock obutment SP!rlway l 4TL (Ain. Ij 1.Sft, MID. Mock Care No. Disturbed Area (Ac,) Drainage Area (Ac.) Volume Required (CF.)Heigth Weir Weir Length Excavated Basin Dimensions Depth Wdth (Ft.) (FQ Length (FQ Volume (CF) 3' 3' q 30` GO' 72DO WA-rM PU 06") AIN sc1laQ4ZE OF ROCK M CQN5!BVQTIQN QUAIL Not To float. Property of Carroll's Realty Partnership 3 ft. M;n. Flow 3 (or #taller) Direction Soil Bern, Berm Construction Specifications: I. Construct berm by placement Of top9Dil and ovefburden taken from initially disturbed areas. 2. Prior to placement of materials for berm formation, cut vegetation nearly flush with ground. 3. Compoet materials in 1ft. lifts by construction traffic, Not To Scale Property of Henry James Register 3 (of -Flutter) \� I Figure 17-3. Temporary Diversion Berra Detail dewatering basin l �a a I Property of Mary Sutton Harris m,,,,ng berms Mining Area perime�erbe�fi m;�Ing I' undisturbed buffer a�aa �4 n A' w d— yaw �O aneP 00 o o 6 ° �AOe'e n�pQ .a 00 6N v a° � Ao� Yo've�Qt ' e NCDOT #5 OR #57 Washed Stone a° Notes. 1, NCDOT #5 stone is preferred . Pod to be 100 ft. L x 20 ft. W x 6 in, thick (min). 2. Turning radius sufficient to occomodote large trucks. 3. Must be maintained in a condition which will prevent tracking or direct flow of mud onto streets. Periodic topdressing moy be necessary. Not To Scale Figure 12-5. Gravel Construction Entrance a� -Q m a,` � F i a� Stockpile Area 20 ft. Min, Property of Carroll's Realty Partnership i C J U 41 m 0dr 9raLe/c /0G/�. R o��f~4efio Oars e�t'a 7708 WAMW Site Location Map qF a lam 0`�` i ]]L? S •Y+ li �. ,.n . �. R.;Wd 'U'P.0 ,r IiZ4 A im Im Im W a v 1�1 KLkE .7 Mine Desc iption: This is a sir ple sand mine covering 10 acres. Maximum depth is expected to be 30 feet. A perimeter berm will be established around the Mining Area to contain all stormwater within the pit. Stormwatei and groundwater will be allowed to collect within the pit and will be occasionally pumped out as necessary. The pumped water will p iss through the 60 foot by 30 foot basin as shown. All final side slopes will be graded to a 3 to 1 slope (or flatter). Runoff from stockr 'le area will flow back into the mining area. Some material ge ierated offsite (such as crushed concrete) will be stored in th stockpile area. Reclamati n: The mining area will be left as a pond. All slopes will be graded to a 3 to 1 slope or flatter. All disturbed areas above water level will be seeded ccording to schedule. The dewatering basin will be removed a d the disturbed area seeded. The haul road is an existing farm path a d will remain as access to the property. Disturbed Acreag( Mining area: 10 acr Stockpiles: 1 acre Haul Road: 0.85 a Pond (basin) 0.04 a JAN 2 i 2015 Site Plan 1 Mine Plan Devan's Sand Pit Tarheel Concrete Duplin County, NC 1 "=100' December 19, 2014 s ( f ti