HomeMy WebLinkAboutI-95 July 10 field day I-5987.docxNotes for 1-5987 Field Day July 10, 2019
Sheet 2F—TAA on SB is a ditch for DWR (did find pipe on NB side, but it is offset from TAA).
Liz is going to check on old PJDs.
Looked at potential wetland feature (circled by TAA) on NB side — Liz said it was not wet
Sheet 2K — TM — Trib — due to adj to wetlands
TL- intermittent stream (LIDAR)
Sheet 2L — Wetland WF — was enlarged
(If TJ is included in the enlarged wetland area, it is just a part of the wetland)
Sheet 2M —TG — a UT to Mercer's Branch (intermittent) — Consultants LIDAR
Sheet 2N — Wetland adj to Brisson Branch & SI
SI — within wetland is part of the wetland — outside of wetland it is a ditch
Brisson Branch — SB OK
NB check with Liz
Sheet 2W —TA is a ditch (formed from when they built 1-95 and the side road)
WO — Liz was good with
TK— NB is a ditch
SB — sm WO — I think Liz was OK with this
Sheet 2T— WP is good (may have been old borrow pit)
Sheet 2S — Liz is good with WT
Label long Branch on SB side and include the wetland delineated but not shown on the aerials.
Sheet 20 — SK -OK
Wn-OK
TE — on SB is a ditch
TE - on NB is a ditch
Other Decisions to answer the May 3 e-mail list
Sheet 2C— SM on SB side OK to be intermittent
Sheet 2J - TN — Ditch and TO- ditch
Sheet 2V - TK on NB side ditch
Sheet 2D - TY is a ditch