Loading...
HomeMy WebLinkAboutI-95 July 10 field day I-5987.docxNotes for 1-5987 Field Day July 10, 2019 Sheet 2F—TAA on SB is a ditch for DWR (did find pipe on NB side, but it is offset from TAA). Liz is going to check on old PJDs. Looked at potential wetland feature (circled by TAA) on NB side — Liz said it was not wet Sheet 2K — TM — Trib — due to adj to wetlands TL- intermittent stream (LIDAR) Sheet 2L — Wetland WF — was enlarged (If TJ is included in the enlarged wetland area, it is just a part of the wetland) Sheet 2M —TG — a UT to Mercer's Branch (intermittent) — Consultants LIDAR Sheet 2N — Wetland adj to Brisson Branch & SI SI — within wetland is part of the wetland — outside of wetland it is a ditch Brisson Branch — SB OK NB check with Liz Sheet 2W —TA is a ditch (formed from when they built 1-95 and the side road) WO — Liz was good with TK— NB is a ditch SB — sm WO — I think Liz was OK with this Sheet 2T— WP is good (may have been old borrow pit) Sheet 2S — Liz is good with WT Label long Branch on SB side and include the wetland delineated but not shown on the aerials. Sheet 20 — SK -OK Wn-OK TE — on SB is a ditch TE - on NB is a ditch Other Decisions to answer the May 3 e-mail list Sheet 2C— SM on SB side OK to be intermittent Sheet 2J - TN — Ditch and TO- ditch Sheet 2V - TK on NB side ditch Sheet 2D - TY is a ditch