Loading...
HomeMy WebLinkAbout20081121 Ver 2_More Info Received_20091023Summey Engineering Associates, PLLC SEA Engineering • Land Planning • Consulting PLLC PO Box 968 - Asheboro, NC 27204 (336) 328-0902 / Fax: (336) 328-0922 / Mack@asheboro.com TRANSMITTAL Date: October 22, 2009 To NCDENR-Division of Water Quality 401 Oversight & Express Permits Unit Wetlands & Stormwater Branch 1650 Mail Service Center Raleigh, NC 27699-1650 ATTN: Ms. Laurie Dennison Re We are sending you attached the following items: ? Shop Drawings ? Samples ? Prints ? Specifications ® Plans ? Disk Diamonds Keep S/D DWQ Project #08-1121 V2 SEA Job No. E-1524 ? Copy of Letter ? Other # Copies __Drawing # Description Disposition 5 ea. Pg 5 Revised page 5 of PCN Form ( ?} OCT232U 9 DENR - WATER MKI WETLANDS AND STORMWATE BRANCH Remarks: Ms. Dennison, enclosed is the revised page 5 of the application. If you need anything else just let me know. Thanks! Mack By: H. Mack Summey, PE c: File o8-?i a.? ua C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T Fill Bottom of pond ? Yes ? Corps .254 removed ® No ? DWQ W2 ? P ®T Fill - Temporary Forrested ® Yes ? No ? Corps ? DWQ .001 W3 ®P ? T Fill Bottom of ? Yes ? Corps .140 removed pond ® No ? DWQ W4 ® P ? T Fill Forrested ® Yes ? No ? Corps ? DWQ .051 W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts .446 2h. Comments: * .001 Ac. included but is temporary impact. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ? T Culvert Caraway Creek ® PER ? INT ® Corps ® DWQ 15' 66' S2 ®P ? T Rip Rap Caraway Creek ® PER ? INT ® Corps ® DWQ 15' 72' S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 138' 3i. Comments: Involves crossin c Pg("9;1Q-'UVV Ur- fJ OCT2?2?09 Page 5 of 11 DENR WATER CIUALCTV WETLANDS AND STORMWATER BRANCH PCN Form - Version 1.3 December 10, 2008 Version