HomeMy WebLinkAbout20081121 Ver 2_More Info Received_20091023Summey Engineering Associates, PLLC
SEA Engineering • Land Planning • Consulting
PLLC PO Box 968 - Asheboro, NC 27204
(336) 328-0902 / Fax: (336) 328-0922 / Mack@asheboro.com
TRANSMITTAL
Date: October 22, 2009
To
NCDENR-Division of Water Quality
401 Oversight & Express Permits Unit
Wetlands & Stormwater Branch
1650 Mail Service Center
Raleigh, NC 27699-1650
ATTN: Ms. Laurie Dennison
Re
We are sending you attached the following items:
? Shop Drawings ? Samples
? Prints ? Specifications
® Plans ? Disk
Diamonds Keep S/D
DWQ Project #08-1121 V2
SEA Job No. E-1524
? Copy of Letter
? Other
# Copies __Drawing # Description Disposition
5 ea. Pg 5 Revised page 5 of PCN Form
( ?}
OCT232U 9
DENR - WATER MKI
WETLANDS AND STORMWATE
BRANCH
Remarks: Ms. Dennison, enclosed is the revised page 5 of the application. If you need anything
else just let me know.
Thanks!
Mack
By:
H. Mack Summey, PE
c: File
o8-?i a.? ua
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ®P ? T
Fill Bottom of pond ? Yes ? Corps
.254
removed ® No ? DWQ
W2 ? P ®T Fill - Temporary Forrested ® Yes
? No ? Corps
? DWQ .001
W3 ®P ? T Fill Bottom of ? Yes ? Corps .140
removed pond ® No ? DWQ
W4 ® P ? T Fill Forrested ® Yes
? No ? Corps
? DWQ .051
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts .446
2h. Comments: * .001 Ac. included but is temporary impact.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ®P ? T Culvert Caraway Creek ® PER
? INT ® Corps
® DWQ 15' 66'
S2 ®P ? T Rip Rap Caraway Creek ® PER
? INT ® Corps
® DWQ 15' 72'
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 138'
3i. Comments: Involves crossin c
Pg("9;1Q-'UVV
Ur-
fJ
OCT2?2?09
Page 5 of 11
DENR WATER CIUALCTV
WETLANDS AND STORMWATER BRANCH PCN Form - Version 1.3 December 10, 2008 Version