HomeMy WebLinkAbout20181446 Ver 1_More Info Requested_20191025 (2)Strickland, Bev
From: Price, Zan (George)
Sent: Friday, October 25, 2019 1:32 PM
To: Jon Swaim; Fuemmeler, Amanda J CIV (US)
Subject: RE: [External] N Fork Water Line update
Jon,
Since the permit was issued based on the description in the PCN (see below) and details on the plans provided, the
agencies will need additional information if the City wishes to keep the riprap in place.
PCN Description below the impact table:
Temporary impacts associated with water line installation as open cut trench excavation. River/Stream beds
and banks to be returned to original
contours and stabilized with coir matting, seeded with native seed mix impacted stream bank areas outside of
the permanent maintenance corridor will
be live staked.
As discussed at our site meeting, there are 2 options:
1). Remove the riprap and stabilize the banks per the description above or
2). Provide a justification for using the riprap including calculations demonstrating that the size rock used will remain
stable during over bank events. Additionally, please submit a revised stream impact table with a permanent impact for
this location and a typical cross-section detail.
Let us know if you have any questions or concerns.
Regards,
Zan Price_ PE
,4ssistamtRegional,S'Upervisar,AshevilleRegional 0ffice
__ Q3Mater Quality Regional Operations 3,ction
N rth arolma Department of En--ironmental Quality
is 8 8_296.4662. (Office)
8 9-231.9634 (Cell)
an.Price ncdenr_gov
{;9r4 9 #'try acords l.aw any
may be dL9GtzE'f fa pAR+sx
From: Jon Swaim[mailto:jon.swaim@mcgillassociates.com]
Sent: Monday, October 21, 2019 5:18 PM
To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Subject: RE: [External] N Fork Water Line update
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hey Guys, I found the project description that was attached to the PCN submittal that calls for rip rap in the N Fork
Swannanoa. Not sure if this will help their case, but figured I'd give it a shot.
Thanks,
Jon Swaim
Project Manager
McGill Associates, P.A.
1013 State Farm Road, Boone, NC 28607
T 828.386.1920
C 828.434.0951
ion.swaima-mcgillassociates.com
mcgillassociates.com
We launched a refreshed brand. Please note email / web address changes above.
From: Price, Zan (George) <Zan.Price@ncdenr.gov>
Sent: Wednesday, October 16, 2019 3:55 PM
To: Jon Swaim <Ion.swaim@mcgillassociates.com>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Subject: RE: [External] N Fork Water Line update
1pm work?
DEQ�
Zan Price_ PE
4ssistamt Regional Superviso7, Asheville Regional Office
Mater Quality Regional Operations S�,ction
North Carolina Department of Env ronmental uaht�,
829-296_4662 (Office)
829-231.9634 (Cell)
anTrice cdenr_goy-
En,w ca7esc open to and trcm u Ls Inc fp- j�, suL? uiv r'+kurr i c a FL"c fkcords Law arrx
maybe dL9Gb5ed to t+kdpales
From: Jon Swaim[mailto:ion.swaim@mcgillassociates.com
Sent: Wednesday, October 16, 2019 3:52 PM
To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Subject: Re: [External] N Fork Water Line update
a7mr.17
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ort.s am nc. ov
Works for me
Get Outlook for iOS
From: Price, Zan (George) <Zan.Price@ncdenr.gov>
Sent: Wednesday, October 16, 2019 2:50:38 PM
To: Jon Swaim <Ion.swaim@mcgillassociates.com>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Subject: RE: [External] N Fork Water Line update
Does Monday before 2pm work?
From: Jon Swaim[mailto:ion.swaim@mcgillassociates.com]
Sent: Tuesday, October 15, 2019 9:31 AM
To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Subject: RE: [External] N Fork Water Line update
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Will do, I'm out of town for the rest of this week, but next week is open.
Sent from Mail for Windows 10
From: Price, Zan (George) <Zan.Price@ncdenr.gov>
Sent: Tuesday, October 15, 2019 8:53:48 AM
To: Jon Swaim <Ion.swaim@mcgillassociates.com>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Subject: RE: [External] N Fork Water Line update
I would like to schedule a site visit. Let me know some dates that would work in the next week or so. Please also
remind the contractor and your construction manager of the following condition of the approved 401. To date, we have
not received any notifications of sediment impacts to waters.
6. The permittee shall report to the Asheville Regional Office any noncompliance with this certification,
any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to
sediment impacts. Information shall be provided orally within 24 hours (or the next business day if a
weekend or holiday) from the time the applicant became aware of the circumstances. A written
submission shall also be provided within 5 business days of the time the applicant becomes aware of
the circumstances. The written submission shall contain a description of the noncompliance, and its
causes; the period of noncompliance, including exact dates and times, if the noncompliance has not
been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to
reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the
written submission requirement on a case -by -case basis.
Zan Price _ PE
AssistaV Regional S'Upervis07, Ashe 'ille Regional Office
Mate- Oualrty Regional Operations 3`,ctaon
D
North Carolina Department ofEnvi-ronmental uaht�,
;.,...,.�..:.:_..,.a.r�
828.296_4662 (Office)
829-231.9634 (Cell)
Zan.Price cdenr_gov
Y?7c 4Y �' L101r1[ 9 iQ a�ldliC�7] df bti iJ[1[Ift--,S j�, s2JL1 xA i j ux jWuI Cau"FLbicacordsLawaw
n y be afsdais d to d pales
From: Jon Swaim<jon.swaim@mcgillassociates.com>
Sent: Monday, October 14, 2019 9:55 AM
To: Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Cc: Price, Zan (George) <Zan.Price@ncdenr.gov>
Subject: [External] N Fork Water Line update
0 rnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
o nc. ov
Hey Amanda, Please find the attached letter and photos detailing my site inspection last week. I've reached out to our
construction manager this morning for an update but haven't heard back from him yet.
I'll keep you posted. Thanks, let me know about a site visit if you feel one is needed.
Jon Swaim
Project Manager
McGill Associates, P.A.
1013 State Farm Road, Boone, NC 28607
T 828.386.1920
C 828.434.0951
ion.swaim0mcaillassociates.com
mcgillassociates.com
We launched a refreshed brand. Please note email / web address changes above.