Loading...
HomeMy WebLinkAboutNCC192812_ESC Approval Submitted_20191118JAW' TOWN of WAKE FOREST EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL Homes By Dickerson, Inc 7101 Creedmoor Rd Suite #115 Raleigh, NC 27613 301 S. Brooks Street Wake Forest, NC 27587 t 919.435.9400 www.Avakeforesinc.gov Date: November 15, 2019 RE: Project Name: Traditions Southeast Lots 1, 20, 40-47, 50, 51, 56-59, 64 Permit No: 2019-00002435 Acres Approved: 5.23 Location: Grande Water Way and Reservoir Lane Wake Forest, NC 27587 Submitted By: McKim & Creed Date Approved: November 14, 2019 Dear Sir/Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest, as well as, a digital copy at least one week prior to the preconstruction meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be renewed in one-year increments. Per the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the jobsite to insure compliance with the approved plan as outlined in the UDO. The Town of Wake Forest Erosion and Sediment Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Town of Wake Forest Erosion and Sediment Control Ordinance, this office may require revisions to the plan and implementation of the revisions to insure compliance with the UDO. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended form if there are any changes in the information. Please set up a preconstruction conference with all parties involved through the Planning Department. A preconstruction meeting must be held with the Town prior to starting any work, including installation of erosion control measures, demolition, any clearing and grubbing or earth moving activities. Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an electronic Notice of Intent with this approval letter. You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment control plan onsite. Sincerely, Carrie Mitchell, PE Environmental Engineer