HomeMy WebLinkAbout20071503 Ver 3_Initial Interest_20091021Gilleski, Lia
From: Coleman, Amber [amber.coleman@stantec.coml
Sent: Wednesday, October 21, 2009 2:27 PM
To: SVC_DENR.401 express
Cc: Gilleski, Lia
Subject: NC 55 Improvements (Parkside) - Revision
Attachments: Parkside_overall_sitemap_Oct2009a.pdf; Parkside_InitiallnterestFormV6_oct2009.pdf
A 401 certification was issued on April 30, 2009 and a 404 permit was issued on June 14, 2009 for Phase II of the Parkside project in
Cary, NC. Changes to the crossings were made based on NCDOT comments which resulted in an additional 11 feet of permanent
perennial stream impact. As per comments from DWQ and USACE we are resubmitting the permit application for revision. Please
contact me if you have any additional questions.
Thanks,
Amber
Amber L. Coleman, LSS, PWS
Scientist
Stantec
I Jones Franklin Road Suite 300
I R 1: ?: 27606
f 19) 865--7399
1 19) 851-7024
amber. coleman(-a)stantec.com
stantec.com
The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any
purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us
immediately.
Please consider the environment before printing this email.
NCDENR
Form Version 6.1
EX0 S Q.3 C? February 18, 2009
INITIAL INTEREST IN PARTICIPATION IN THE EXPRESS REVIEW PROGRAM
WITHIN THE 401 OVERSIGHT/EXPRESS PERMITTING UNIT
A. Applicant Information
1. Processing
® 401 Water Quality Certification (List NW(s) or GP# verified by Corps: 39)
? Non-404 Jurisdictional Permit
? Riparian Buffer Authorization
la. Type(s) of actions ? Riparian Buffer Minor Variance
requested: ? Coastal General "Major" Variance
(Check all that apply)
? Stream Determination: # Streams
? Non-404 Wetland Determination: # Wetlands
? Stormwater Management Plan Review (fee not additive if combined with 401):
# of Drainage Areas/Project Site
2. Project Information
2a. Name of project: NC 55 Roadway Improvements (Parkside) - revision
2b. County: Wake
2c. Latitude/Longitude: Lat: 35.844676 N Long: 78.893862 W
2d. River Basin: Cape Fear
2e. Tax PIN or Parcel ID: Impact is within NCDOT ROW for O'Kelley Chapel Road - adjacent to 0736128610
2f. Nearest Named Stream: Kit Creek
2g. Water Quality Classification of Nearest Named Stream: WS-IV NSW
2h. Total project acreage (Stream or wetland determinations may omit this item): 23.97 (acres)
2i. Total Built Out Imperviousness (Stream or wetland determinations may omit this item): 56.3 %
2j. Provide a brief description of this project (attach a site plan): The mixed use Parkside Town Commons Development is
proposed to be located in the NE quadrant of the NC540 and NC55 interchange in Cary. The Parkside Town Commons
Development has already been permitted with NCDWQ (#EXP 07-1503) and USACE (#2005-21328 and 2007-04171) and is
considered Phase I of this project. Phase II includes the roadway improvements required to the surrounding infrastructure as a result
of this development. NC55, O'Kelley Chapel Road, Morrisville Carpenter Road, Carpenter Fire Station Road, McKrimmon Parkway
will all be widened to facilitate new turn lanes. Three stream crossings occur within the roadway project area. A 401 certification was
issued on April 30, 2009 and a 404 permit was issued on June 14, 2009 for Phase II. Changes to the crossings were made based on
NCDOT comments which resulted in an additional 11 feet of permanent perennial stream impact. In the first iteration of this
application, one crossing (O'Kelley Stream Impact #1) had a permanent impact of 11 linear feet associated with a culvert extension.
This impact has now been shortened to 8 linear feet. Another crossing (O'Kelley Stream Impacts #2 & #3) had a temporary impact of
35 linear feet related to the installation of a new inlet structure and endwall on either end of the existing pipe. The headwall was not
approved by NCDOT so a culvert extension of 14 feet (permanent impact) is required at that location. Temporary impacts are no
longer present at Stream Impact Site #3. No other changes were made to the project. A site plan as well as detailed maps of the
impacts has been included.
2k. Provide directions from the nearest named town, including street names and/or highway numbers: From the
intersection of 1-540 and NC-55 in Cary turn right (North) on NC-55. Take the first left onto O'Kelley Chapel Road, the
stream impact site is located on the right side of the road before Alston Avenue. Additional roadway work is occurring
along NC 55 from Kit Creek to the south side of the intersection with O'Kelley Chapel Road as well as the intersections
with McCrimmon Parkway, Carpenter Fire Station Road, and Morrisville Carpenter Road.
Initial Interest Form v6.1 Cont.
3. Applicant Information
3a. Applicant is: ? Owner ® Agent ? Other:
3b. Name: David George
3c. Business name (if applicable): KRG/PRISA II Parkside, LLC (Kite Realty Group)
3d. Street address: 30 South Meridian Street, Suite 1100
3e. City, State, zip: Indianapolis, IN 46204
3f. Telephone no.: 314-713-5600 3g. Fax no.: 314-577-7879
3h. Email address: dgeorge@kiterealty.com
4. Agent/Consultant Information (if applicable)
4a. Contact Name: Amber Coleman, LSS, PWS
4b. Company Name: Stantec Consulting Services, Inc.
4c. Street address: 801 Jones Franklin Road
4d. City, State, zip: Raleigh, NC 27606
4e. Telephone no.: 919-865-7399 4f. Fax no.: 919-851-7024
4g. Email address: amber.coleman@stantec.com
5. Proposed Impacts (include both temporary and permanent) [Determination requests may omit this item]
5a. Total 404/401 wetland impacts: 0 (acres) 5b. Total non-404/401 wetland impacts: 0 (acres)
5c. Total 404 stream impacts: Intermittent: 0 (linear feet) Perennial: 22 (linear feet)
5d. Total non-404 stream impacts: Intermittent: 0 (linear feet) Perennial: 0 (linear feet)
5e. Total riparian buffer impacts: Zone 1: 0 (sq. feet) Zone 2: 0 (sq. feet)
6. Project History and Additional Information
6a. Has any DWQ staff visited the site? ® Yes (a portion of the site) ? No
If yes, provide staff name: Eric Kulz and date of visit: 8/29/2006
DWQ verified the stream calls on the east side of NC55 in 2006. USACE verified streams and wetlands in the two
parcels on either side of O'Kelley Chapel Road (west side of NC55) in 2008. Wetlands in the right of way on the west
side of NC55 near Kit Creek were delineated and are included in this permit application but have not been visited by
regulatory personnel during this proiect.
6b. Does this project require a Stormwater Management Plan (SMP)? ® Yes ? No ? Unknown
6c. Who will be responsible for the review of the SMP? ® Certified Local Gov't: Town of Cary
? DWQ Stormwater Program
? DWQ 401/Express Review Unit
6d. Does this project require approval under SEPA or NEPA? ? Yes ® No ? Unknown
6e. Is this project an after-the-fact application or has a DWQ notice of violation been issued? ? Yes ® No
6f. Does this project include buffer impacts that are "prohibited" in the DWQ "Red Rule Book"? ? Yes ® No
6g. If you are aware of any local controversy concerning this project, provide details in a cover letter. Describe the
controversy and any measures that have been taken with respect to public involvement.
This form must be submitted via email (c/o 401express e,ncmail.net), faxed (919-733-6893), or hand-delivered to: Parkview Building,
2321 Crabtree Blvd. Suite 250, Raleigh, NC 27604. Applicants who are selected to participate in the Express Review Program will be
notified via email or fax. Successful applicants will then be instructed regarding detailed procedures for full application (Note:
Submittals of the review packages on Friday after 12:00 pm will be stamped as received on the next business day). Please contact Lia
Myott Gilleski or Joseph Gyamfi at 919-733-1786 if you have any questions regarding this form.
a e$
a?
Ell
0o 3 0
?O o
ZU
\5' ? Z
?.?,.
8 `? W C t
YW W
o U O
W E Iii
W
~ I?
Q? Cl- ?
?zg p
I
QOW
OdON 73dVH,7 1773.V OW Z,?
o lu??
dv" 3 Q In W
w cc ZUW 1
a /
U-) W e
0 ? \
IoQ
(/) Jh ''?i?'?°byJ
Q Ln
? v
Z