Loading...
HomeMy WebLinkAboutWQCSD0288_Compliance Evaluation Inspection_20191115ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Greg Campbell Chicopee Inc. 1203 Chicopee Road Benson, NC 27504 NORTH CAROLINA Environmental Quality November 15, 2019 Subject: Compliance Evaluation Inspection Chicopee Deemed Collection System T15A NCAC 02T .0403 — PERMITTING BY REGULATION Deemed Collection System Permit WQCSD0288 Johnston County Dear Mr. Campbell: On November 7.2019, Vanessa Manuel from the Raleigh Regional Office conducted an inspection of the Chicopee's wastewater collection system to evaluate compliance with North Carolina Administrative Code Section 15A NCAC 02T .0403 (Permitting by Regulation). The cooperation and assistance of Christopher Soles and John Stanfield during the inspection were greatly appreciated. During the inspection, Mr. Stanfield indicated the wastewater collection system consists of approximately 500 feet of gravity sewer, no force mains. 2 duplex pump stations, and no high priority sewer lines. The subject collection system is deemed permitted by regulation (1]5A NCAC 02T .0403) and is subject to specific criteria in this Rule. The overall conditions of the pump stations inspected were compliant with the subject Rule. North Carolina Administrative Code Title I5A Subchapter 02T Section .0403 requires collection system owners to maintain records documenting compliance with subparagraphs (a)(1) through (a)(9) of the Rule for three years. except for the collection system map, which shall be maintained for the life of the system. Please ensure all required actions and records are documented and maintained as required by T15A NCAC 02T.0403. We appreciate Chicopee's efforts to maintain a compliant sewer collection system program. Please refer to the attached inspection report for full inspection details. ,- North Carolina Department of Environmental Quality I Division of Water Resources ZTRaleigh Regional Office 1 3800 Barrett Drive I Raleigh. North Carolina 27609 o�m...ien. .a.rry /�' 9197914200 Chicopee Inc., WQCSD0288 November i-5,•20d9 If you have questions or comments about this inspection or the requirements to take corrective action if applicable, please contact Vanessa Manuel at 919-791-4255. Sincerely, S. Ja' Zimmerman, P.G., Chief Water Quality Regional Operations Section Attacliment(s); Collection System Inspection Report Cc_ RRO:'SWP Files Laserfche 2 of Compliance Inspection Report Permit: WQCSD0288 Effective. DaWi0o Expiration: SOC: Effective: Expiration: County: Johnston Region: Raleigh Contact Person: Christopher Soles Title Owner: Chicopee Inc Facility: Chicopee Inc 1203 S Chirapee Rd Bensun NC 27504 Phone: 919-207-3292 Directions to Facility: South on 1-95 to exit 79. Right onto E. Main 0.1 left onto S. Dunn St. (0.1) Left onto E Harnett (0 2) Right onto Chicapee Road (0.8) Left into plant entrance. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11r07+2019 Entry Time: 10 16W Exit Time: 11 45AM Primary Inspector: Vanessa E Manuel Phone: 919-7914200 Secondary Inspector(s): Reason for Inspection; Rcubne Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type; Deemed permitted collection system management and operation Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellanect;s Questions General Spills.Response Plan Inspections Pump Stal:crls (See attachment summary) Page 1 of 5 permit: WOCS00288 Owner - Facility: Chtcapee Inc Inspection Date: 11/07/2019 Inspection Type,. Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary See attached inspection report. Page 2 of 5 Permit: WOCS00288 Owner - Facility: Chicopee Inc Inspection Date: 11/0712019 Inspection Type ; Collection System Inspect Non Sampling Reason for Visit: Routine General Yes No NA NE # Is this system a satellite system? 1:1 El # If Yes, what is system name or permit number? Is there a overall sewer system map? ■ Does the map include: Pipe sizes Pipe materials (PVC. DIP, etc) ❑ ❑ ❑ Pipe location ■ # Flow direction ■ # Approximate pipe age El El El # Pump station ID, location and capacity El El El # Force main air release valve location & type El ❑ El ❑ # Location of satellite connections 1:1 El ■ Are system maintenance records maintained? ❑ Comment: Spills and Response Action Plan Yes No NA NE # Is system free of known points of bypass? If No, describe type of bypass and location # Have there been any sewer spills in the past 3 years? M 1:1 El If Yes, were they reported to the Division if meeting the reportable criteria? ❑ If applicable, is there documentation of press releases and public notices issued? Are all spills or sewer related issueslcomplainls documented? a El # Are there repeated overflows/problems (2 or more in 12 months) at same ID anon? a # If Yes, is there a corrective action plan? El El . El Is a Spill Response Action Plan available? ■ Is a Spill Response Action Plan available fcr all personnel? ■ Does the plan include # 24-hour contact numbers ■ El El El # Response time # El ❑ ❑ # Equipment list and spare parts inventory . El ❑ # Access to cleaning equipment ■ ❑ ❑ ❑ # Access to construction crews contractors, and/or engineers ❑ ❑ D . # Source of emergency funds # Site sanitation and cleanup materials . ❑ # Past-overfiowlspill assessment . ❑ 1:1 El Page 3 of 5 permit: WOCS170200 Owner - Facility.ChtcopeeInc Inspection Date: 11/07/2019 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine Comment: Inspections Yes No NA NE Are adequate maintenance records maintained? M Cl ❑ ❑ Are pump stations being inspected at the required frequency? U ❑ ❑ ❑ Is at least one complete functionality test conducted weekly per pump station? ❑ ❑ ❑ ❑ 1s there a system or plan in place to observe the entire system annually? M ❑ ❑ ❑ Is the annual inspection documented? M ❑ ❑ ❑ # Does the system have any high -priority linesllocations? ❑ 0 ❑ ❑ Are inspections of HPL documented at least every 6 months? ❑ ❑ M ❑ Are new lines being added to the HPL list when found or created? ❑ ❑ M ❑ Comment: Pump Stations Yes No NA NE Please list the Pump Stations Inspected: AS Pump Station and EF Pump Station # Number of duplex or larger pump stations in system 2 # Number of vacuum stations in system a # Number of simplex pump stations in system a # Number of simplex pump stations in system serving more than one building o How many pumplvacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? o # A simple one-way telemetry/communication system (auto -dialer) installed? 2 For pump stations inspected: Are they secure with restricted access? ❑ ❑ ❑ Were they free of by-pass structures/pipes? E ❑ ❑ ❑ Were wel wells free of excessive greaseldebris? S ❑ ❑ ❑ # Do they all have telemetry installed? ❑ ❑ ❑ Is the telemetry system functional? M ❑ ❑ ❑ Is a 24-hour notification sign posted ? 0 ❑ El ❑ Does the sign include: ❑ ❑ ❑ Owner Name? ❑ ❑ Pump station identifier? ❑ ❑ ❑ # Address? 0 ❑ ❑ ❑ Instructions for notification? 24-hour emergency contact numbers? M ❑ ❑ ❑ Are audio and visual alarms present? ❑ Are audio and visual alarms operable? ❑ ❑ Page 4 of 5 Permit: WOCS0028EI Owner -Facility: Chicopee Inc Inspection Dale: 1110712019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine # Is there a backup generator or bypass pump connected? If tested during inspection, did it function property? Is the back-up system tested at least bi-annually under normal operating conditions? # Does it have a dedicated connection for a portable generator? Al Is the owner relying on portable units in the event of a power outage? # If Yes, is there a distribution plan? If Yes, what resources (UnitslSlaF(Nehiclesletc) are included in Plan? No backup generators on site. The facility has spare pumps if needed. # Does Permittee have the approved percentage of replacement simplex pumps? Is recordkeeping of pump station inspection and maintenance program adequate? Do pump station logs include at a minimum Inside and outside cleaning and debris removal? Inspecting and exercising all valves? Inspecting and lubricating pumps and other equipment? Inspecting alarms, telemetry and auxiliary equipment? Comment: ❑ m ❑ ❑ ❑❑ME] ❑❑■❑ ❑ ❑ ❑ 0 Elm ❑❑ ❑ ❑ ❑ m ❑❑■❑ M ❑ ❑ ❑ ❑ ❑ ❑ ■❑❑❑ 0❑❑❑ 110 ❑ Page 5 of 5