Loading...
HomeMy WebLinkAbout20081020 Ver 1_Information Letter_20091012Siot, NC®ENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 C L Natural Resources Division of Water Quality Coleen H. Sullins Director October 12, 2009 Subject: Inspection-NCSR 1102 Pearson Falls Road DWQ Project 08-1020 TIP No. B-4239 Polk County Dear Mr. Setzer: Dee Freeman Secretary On October 1, 2009, 1 inspected the construction work at the new bridge site on NCSR 1102, Pearson Falls Road in Polk County. Construction work appears to be going well. Both of the new MSE walls are almost complete. The erosion and sedimentation control structures, vegetative covering, and matting appear to be working properly. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Sincerely, Michael R. Parker l/ Environmental Senior Specialist Transportation Permitting Unit ? Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office (Setzer) NCSR 1102 Inspection Letter October 2009 SURFACE WATER PROTECTION SECTION - Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NO 28778-8211 Phone: 828-29645001 FAX: 828-299-7043 1??One 1 Customer Service: 1-877-623-6748 1 ? Orth Carolina Internet: ww,v.nmalemuattV.ora (U / An Equal Opportunity l Affirmative Action Employer Nat{I?(,{fir "" all DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: October I, 2009 County: Polk Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 08-1020 NW Permit 1P #: Project Name: Location of Project: NCSR 1102 Pearson Falls Road B-4239 From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately I mile to the new bridge site Project Complete: ?Yes X No I Bridge ] Culvert Bottomless Culvert Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Ncuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft? ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited D_WQ Site Visits for DOT Projects Background Info Name of Waterway(s): Basin/ Subbasin North Pacolet River Broad 030501 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-I[ ?WS-V ?SB X?ClassC ?ORW X?Trout ?WS-[[[ ?NSW ?HQW ?WS-I ?WS-[V ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert X?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts: Authorized Stream Impacts Additional comments: ?0 - 1/10th acre ? UP to 1.0 acre X?< 150 linear feet ?1/11`h to 1/3`d acre ?> 1.0 acre ?> 150 linear feet Reviewed project with DOT staff. Construction is underway on both end bents with both MSE walls almost complete. Sediment and erosion control structures appear to be working properly. Seeding and/or matting ' should be performed as needed. Maintain erosion control devices and continue with seeding and matting as required to protect State surface waters. Install rip rap at base of both MSE walls as soon as possible. NCSR 1102 Pearson Falls Road Inspection October 2009