HomeMy WebLinkAbout20081020 Ver 1_Information Letter_20091012Siot,
NC®ENR
North Carolina Department of Environment and
Beverly Eaves Perdue
Governor
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
C L
Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
October 12, 2009
Subject: Inspection-NCSR 1102
Pearson Falls Road
DWQ Project 08-1020
TIP No. B-4239
Polk County
Dear Mr. Setzer:
Dee Freeman
Secretary
On October 1, 2009, 1 inspected the construction work at the new bridge site on NCSR 1102, Pearson Falls
Road in Polk County. Construction work appears to be going well. Both of the new MSE walls are almost
complete. The erosion and sedimentation control structures, vegetative covering, and matting appear to be
working properly.
Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached
to this letter.
If you have questions, please call me at 828-296-4500.
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Sincerely,
Michael R. Parker l/
Environmental Senior Specialist
Transportation Permitting Unit ?
Niki Maher, NPS Assistance and Compliance Oversight Unit
Mike Parker, Asheville Regional Office
(Setzer) NCSR 1102 Inspection Letter October 2009
SURFACE WATER PROTECTION SECTION - Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NO 28778-8211
Phone: 828-29645001 FAX: 828-299-7043 1??One 1
Customer Service: 1-877-623-6748 1 ? Orth Carolina
Internet: ww,v.nmalemuattV.ora (U
/
An Equal Opportunity l Affirmative Action Employer Nat{I?(,{fir "" all
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: October I, 2009
County: Polk Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 08-1020 NW Permit 1P #:
Project Name:
Location of Project:
NCSR 1102 Pearson Falls Road B-4239
From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately
I mile to the new bridge site
Project Complete: ?Yes X No
I Bridge
] Culvert
Bottomless Culvert
Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
? Bank Stabilization
? Other
If no, estimated date of completion:
Water Quality Concerns (DWO):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone I Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Ncuse ?Tar-Pam ?Randleman ?Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft? ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
D_WQ Site Visits for DOT Projects
Background Info
Name of Waterway(s):
Basin/ Subbasin
North Pacolet River
Broad 030501
Wetland Type: ?Isolated ?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-I[ ?WS-V ?SB
X?ClassC ?ORW X?Trout ?WS-[[[ ?NSW
?HQW ?WS-I ?WS-[V ?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
X?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts:
Authorized Stream Impacts
Additional comments:
?0 - 1/10th acre
? UP to 1.0 acre
X?< 150 linear feet
?1/11`h to 1/3`d acre
?> 1.0 acre
?> 150 linear feet
Reviewed project with DOT staff. Construction is underway on both end bents with both MSE walls almost
complete. Sediment and erosion control structures appear to be working properly. Seeding and/or matting '
should be performed as needed.
Maintain erosion control devices and continue with seeding and matting as required to protect State surface
waters. Install rip rap at base of both MSE walls as soon as possible.
NCSR 1102 Pearson Falls Road Inspection October 2009