Loading...
HomeMy WebLinkAbout20160679 Ver 1_On-Site Determination_200910084 r NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Dee Freeman Governor Director Secretary October 8, 2009 Mr. Brett Feulner, Senior Environmental Specialist North Carolina Department of Transportation PDEA I Natural Environment Unit 1598 Mail Service Center Raleigh, NC 27699-1598 SUBJECT: On-Site Determination for Applicability to the Mitigation Rules [15A NCAC 2H .0506(h)], NC 273 Improvements from Tuckaseege Road to Highland Street at South Main Street, TIP U-3633, Gaston County Dear Mr. Feulner: Polly Lespinasse of the Division of Water Quality (DWQ) met with you and Mr. William Barrett of the North Carolina Department of Transportation (NCDOT), and Steve Lund with the U.S. Army Corps of Engineers on September 28, 2009, in order to provide verification of potential jurisdictional features previously identified by NCDOT for the above referenced project. These features were evaluated for applicability to the mitigation rules set forth in [15A NCAC 2H .0506(h)]. The maps containing the project corridor were provided in the jurisdictional verification package received electronically by this office on August 24, 2009. The jurisdictional features are approximated on these maps. Based on the site reviews of the jurisdictional determinations made by NCDOT, DWQ will consider all sites identified in the jurisdictional verification package, and revisions received electronically on October 1, 2009, as accurate. This letter only addresses the applicability to the mitigation rules and does not approve any activity within buffers, Waters of the United States, or Waters of the State. Any impacts to wetlands, streams and buffers must comply with 404/401 regulations, water supply regulations (15A NCAC 2B .0216), applicable buffer rules, and any other required federal, state and local regulations. Please be aware that even if no direct impacts are proposed to any protected buffers, sheet flow of all new stormwater runoff as per 15A NCAC 2B .0250 is required. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the mitigation rules may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Brian Wrenn, DWQ 401 Transportation Permitting Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the mitigation rules may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 1 Fax: (704) 663-60401 Customer Service: 1.877£23-6748 Internet: w .ncwateiqualiycrg An Equal OpportuniytAf'. naMAdbnErrplover-5044 RecycleC110% Post C=sumer paper NordiCarolina. J11aturally Mr. Brett Feulner Page Two Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected parties (including downstream and adjacent landowners) are notified of this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. If you have any additional questions or require additional information please contact Polly Lespinasse at (704) 663-1699. C/SirelY, Robert B. Krebs Surface Water Protection Regional Supervisor cc: Steve Lund, USACE Asheville Field Office Sonia Gregory, DWQ Transportation Permitting Unit File Copy