HomeMy WebLinkAbout20191252 Ver 1_Impact tables_20191113Wetland Impacts
Site #
Reason
Impact Type
Type of W
W Name
WB
Roadway Fill
P
Riverine Swamp Forest
WB
WA
Roadway Fill
P
Riverine Swamp Forest
WA
WE
Roadway Fill
P
Riverine Swamp Forest
WE
WF
Roadway Fill
P
Riverine Swamp Forest
WF
WE
Temp Fill/Detour
T
Riverine Swamp Forest
WE
WF
Temp Fill/Detour
T
Riverine Swamp Forest
WF
WE
Excavation
P
Riverine Swamp Forest
WE
WF
Excavation
P
Riverine Swamp Forest
WF
Total Permananent Wetland Impact O.S31
Total Temporary Wetland Impact 0.213
A total of 0.30 acre of handclearing will occur due to the bridge/road construction.
A total of 0.69 acre of handclearing will occur due to utility relocation.
Handclearing total
Open Water Impacts
E..
Site #
Impact Reason
Impact Type
Name of Waterbody
Activity Type
Site 1 (WB)
Impervious dike
T
South River Overflow
Dewatering
Site 1 (WA)
Impervious dike
T
South River Overflow
Dewatering
Total Permanent Open Water Impact 0
Total Temporary Open Water Impact 0.039
Forested
Type of Jurisdiction
Impact Area
Yes
USACE
0.099
Yes
USACE
0.083
No
USACE
0.205
No
USACE
0.025
No
USACE
0.139
No
USACE
0.074
No
USACE
0.024
No
USACE
0.095
Waterbody Type
Impact area
Tributary
0.023
Tributary
0.016