Loading...
HomeMy WebLinkAbout20191252 Ver 1_Impact tables_20191113Wetland Impacts Site # Reason Impact Type Type of W W Name WB Roadway Fill P Riverine Swamp Forest WB WA Roadway Fill P Riverine Swamp Forest WA WE Roadway Fill P Riverine Swamp Forest WE WF Roadway Fill P Riverine Swamp Forest WF WE Temp Fill/Detour T Riverine Swamp Forest WE WF Temp Fill/Detour T Riverine Swamp Forest WF WE Excavation P Riverine Swamp Forest WE WF Excavation P Riverine Swamp Forest WF Total Permananent Wetland Impact O.S31 Total Temporary Wetland Impact 0.213 A total of 0.30 acre of handclearing will occur due to the bridge/road construction. A total of 0.69 acre of handclearing will occur due to utility relocation. Handclearing total Open Water Impacts E.. Site # Impact Reason Impact Type Name of Waterbody Activity Type Site 1 (WB) Impervious dike T South River Overflow Dewatering Site 1 (WA) Impervious dike T South River Overflow Dewatering Total Permanent Open Water Impact 0 Total Temporary Open Water Impact 0.039 Forested Type of Jurisdiction Impact Area Yes USACE 0.099 Yes USACE 0.083 No USACE 0.205 No USACE 0.025 No USACE 0.139 No USACE 0.074 No USACE 0.024 No USACE 0.095 Waterbody Type Impact area Tributary 0.023 Tributary 0.016