See Sheet i-A For Index of Sleets
L
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CHEROKEE COUNTY
LOCATION. REPLACEMENT OF BRIDGE NO.36 ON WEBB
CREEK RD. (SR 1384) OVER WEBB CREEK
TYPE OF WORK: GRADING, TRAFFIC CONTROL,
DRAINAGE, & CULVERT
17BP.14.R.61
4
ey
NSRs
BEGIN CULVERT END CULVERT roc
U STA. ll+52.34 U STA.11+80.98
BEGIN TIP PROJECT 17BP.74.R.61
L— STA. I0+10.00 END TIP PROJECT 17BP.14.R.61
—L— STA. 12+85.00
'4015
NO Oo—T
,0
I� ero�r MPL�Ep E �LW pNNS
CONTACT. JOSHUA B. DEYTON, P.E. DoeuMExT xoT eoxsloEREo P1xnL
NCDOT HIGHWAY DIVISION 14 UNLESS ALL SIGN-RES COMPLETED
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Prepared !n ft.3 Offloe of:
HYDRAULICS ENGINEER
WSP I PARSONS BRINCKERHOFF
50 25 0 50 100
ADT 1996 = 130
ADT 2025 = XXX
=
DHV NA %
LENGTH OF ROADWAY PROJECT 176P.14.R.61 = 0.052 MILE
For T�
NORTH CAR -NA DEPARTMENT OF TRANSPORTATION
��aF NOR C,
ti
iii
PLANS
mn srARDARD sPacrFrcwrlays
D = NA %
LENGTH OF STRUCTURE PROJECT 17BP.14.R.61 = 0.000 MILE
F.
o'^
ROADWAY DESIGN
so 25 0 50 loo
T = 6 %
V = 15 MPH
TOTAL LENGTH PROJECT 17BP.14.R.61 = 0.052 MILE
RIGHT OF WAY DATE.
02-24-2016
ROWELL THIGPEN, PE
P
PRcmcr axcrxsea
PROFILE (HORIZONTAL)
TTST —NA DUAL NA
ENGINEER
fde�A cep
op
5 2.5 0 5 10
FUNC CLASS =
LOCAL
LETTING DATE.
HOLLY CHRISTENBURY, PE
pRo�cr nesrcx excrxe
rnL+eT
PROFILE (VERTICAL)
SUB REGIONAL TIER
Note: Not to Scale
STATE OF NORTH CARO INS
R BPJ4Rb/
nu
B
*S.U.E. = Subsurface Utility Engineering
DIVISION OF
HIGHWAYS
CONVENTIONAL
PLAN SHEET SYMBOLS
BOUNDARIES AND PROPERTY
WATER:
State Line
Water Manhole
OO
County Line
RAILROADS:
Water Meter
o
Township Line -----
Standard Gauge
Water Valve
Orchard
[i fl iZ
City Line
RR Signal Milepost ePon
*
Water Hydrant
�
Reservation Line
- -
Switch
O35
Vineyard
0
Recorded ILL+ Water Line
°
Property Line
RR Abandoned —
— —
EXISTING STRUCTURES:
Designated ILG Water Line (S.U.E.*)----"----
Existing Iron Pin
RR Dismantled -------
Above Ground Water Line
MAJOR.
Property Corner
RIGHT OF WAY-
Bridge, Tunnel or Box Culvert
0
Property Monument
Baseline Control Point
Wing Wall, Head Wall and End Wall -
1 cac w* f
J l
TV:
Parcel/Sequence Number
iz3
Existing Right of Way Marker
MINOR:
TVSatellite Dish
CC
Existing Fence Line -x
x x-
Existing Right of Way Line
-
Head and End Wall
/
N Pedestal
Proposed Woven Wire Fence
Proposed Right of Way Line
Pipe Culvert
TV Tower
Proposed Chain Link Fence
a
Proposed Right of Way Line with
A
Footbridge r--------<
UAG TV Cable Hand Hole
Proposed Barbed Wire Fence
A
Iron Pin and Cap Marker
Drainage Box: Catch Basin, DI or JB
Ica
Recorded lLG N Cable
,.
Existing Wetland Boundary ----"`°-
Proposed Right of Way Line with
Concrete or Granite RrW Marker
R
Paved Ditch Gutter
____—
Designated U/G TV Cable (S.U.E.*)--
--^- ---
Proposed Wetland Boundary
"`°
Proposed Control of Access Line with
m
Storm Sewer Manhole
OO
Recorded U/G Fiber Optic Cable
"° °°
Existing Endangered Animal Boundary
Concrete C/A Marker '�'
�^-1
Storm Sewer
s
Designated WG Fiber Optic Cable (S.U.E.*r----^°°---
Existing Endangered Plant Boundary
'^
Existing Control of Access —�—
Known Soil Contamination: Area or Site —�—
�
Proposed Control of Access
m
�
UTILITIES.•
GAS:
Potential Soil Contamination: Area or Site —�—
�%
Existing Easement Line
n
E
Gas Valve
0
BUILDINGS AND OTHER CULTURE.
Proposed Temporary Construction Easement-
E
POWER:
Existing Power Pole
y
Gas Meter
�
Gas Pump Vent or lLG Tank Cap
O
Proposed Temporary Drainage Easement—
TDE
Proposed Power Pole
b
Recorded U2o Gas Line
Sign
O
Proposed Permanent Drainage Easement—
PDE
Existing Joint Use Pole
+
Designated UG Gas Line S.U.E.*
gnate( )
°
Well
o
Proposed Permanent Drainage / Utility Easement —DUE—
Above Ground Gas Line
Proposed Permanent Utility Easement
PUE
Proposed Joint Use Pole
Small Mine
'SZ'
Power Manhole
O
Foundation
Proposed Temporary Utility Easement
TUE
Power Line Tower
SANITARY SEWER:
Proposed Aerial Utility Easement
puE
Sanitary Sewer Manhole
O
Area Outline
0
Power Transformer
0
n,
Cemetery
1
0
Proposed Permanent Easement with
ILG Power Cable Hand Hole
Sanitary Sewer Cleanout
0+
BuildingIron
Pin and Cap Marker
O
lLG Sanitary Sewer Line
s
ROADS AND RELATED FEATURES.
H-Frame Pole
*•
Above Ground Sanitary Sewer
School
Recorded ILG Power Line
Church
�
Existing Edge of Pavement
---°---
Recorded SS Forced Main Line
,x
Exis}in Curb
g
Designated WG Power Line ($.U.E.*)
Designated SS Forced Main Line
Dam
Proposed Slope Stakes Cut --
- � ---
TELEPHONE:
(S.U.E.*) -----n"--
HYDROLOGY.•
Proposed Slope Stakes Fill ---
F ---
MISCELLANEOUS:
Stream or Bodyof Water
Proposed Curb Ramp
cR
Existing Telephone Pole
�
Utility Pole
•
Hydra, Pool or Reservoir
Y
J
Existing Metal Guardrail
Proposed Telephone Pole
Utility Pole with Base
❑
Jurisdictional Stream —is
--
Proposed Guardrail
Telephone Manhole
O
Utility Located Object
O
Buffer Zone 1
az r
Existing Ca ble Guiderail
Telephone Booth
0
Utility Traffic Signal Box
Buffer Zone 2
az z
Proposed Cable Guiderail
Telephone Pedestal
IT]
Utility Unknown U•G Line
,N.
Flow Arrow �-
--
Equality Symbol
Q
Telephone Cell Tower
Disappearing Stream �������—
lYG Telephone Cable Hand Hole
p
U'G Tank; Water, Gas, Oil
O
Pavement Removal
®
Underground Storage Tank, Approx. Loc. —
ut=js.'
Spring O�-_
��^
VEGETATION:
Recorded U•G Telephone Cable
Wetland
�
Designated lLG Telephone Cable ($.U.E.*)-----*----
AG Tank; Water, Gas, Oil
O
Single Tree
Q
Geoenvironmental Boring
Proposed Lateral, Tail, Head Ditch
rw
Single Shrub
Recorded U•G Telephone Conduit
�_
False Sump
�f--
Designated WG Telephone Conduit S.U.E.*
g p
-
TestHole (S.U.E.*)
Hedge
9
��„
Abandoned According to Utility Records
AATUR
Woods Line
.,.
Recorded lLG Fiber Optics Cable
� °°
Designated lLG Fiber Optics Cable (S.U.E.*)- ----��-
°
End of Information
E.O.I.
BEGIN TIP PRO
—L— STA. 10+10.00
17BP
El
MKIM01,11 EM0,01
wopos
V / �
INC_OM_PL_E E PLANS
PRELIMIN RY PLANS
i�irrirrr i
TO LOWER BEAR PAW RD
D ETAI L A
DETAIL L B
ENVIRONMENTALLY SENSITIVE AREA
SEE PROJECT SPECIAL PROVISIONS
TOE PROTECTION
LATERAL 'V' DITCH
(Not to Scale)
(
\fie
( Not to Scale)
CLEARING AND GRUBBINGEROSION 'o
CONSTRUCT ONTR HLEET 4
DISNRBED AREA
16,000 SF
a( \a^6
b
PHASE I
NatUFOI
Natural f n,
Ground �•'% I%Ft.
Fill
PLACE TEMPORARY SILT CHECKS TYPE - A AT
Ground
D V'
Slope
DRAINAGE OUTLETS.
d
d
MATTING
BRIDGE
REgUIREM
--
NITS INTHENCDOTND T ESOTNMANAGEMENTSTRUCTION �PRACTICESR
d= 1 Ft.
Geotextile
FOR
CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL
Min. D=
1.0 Ft.
Max. d=
0.8 Ft.
Place Matting for Erosion Control
Type of Liner= EXCELSIOR MATTING Type of Liner= Enkamat 7003 (BFM)b= 1 Ft. on Slope as Work Allows.
FROM STA. 11 + 90 TO STA. 12 + 80 RT
FROM STA. 11+75 TO STA. 12+75 LT INSTALL IN THE
DI
PROPOSED DITCH LINE.
SCALE: HORIZONTAL 1" = 20'
BM-1: 8"SPIKE SET IN ROOT OF 10" MAPLE 12.97' RIGHT OF —L— STA. 13+01.93
ELEV: 2023.08'
TEMPORARY SHORING
STA. 11+65.00 -L-
EXISTING STRUCTURE NO.036
ite
ite 1
1&111 ��
��l,5ril�
MUM
-�siWi
TOTAL CULVERT LENGTH
1
10
O
CLASS I RIP RAP
(ROADWAY DETAIL &
PAY ITEM)(TYP.)
z
NO KNOWN UTILITY CONFLICTS.
LOCATION SKETCH
Impact Description Impact Length
Arch Culvert
A
NOTES
ASSUMED LIVE LOAD ................................ HL-93 OR ALTERNATE LOADING.
DESIGN FILL ............................................ 3.40'
FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SN.
FOR CULVERT DIVERSION DETAILS AND PAY ITEM,
SEE EROSION CONTROL PLANS.
THE EXISTING STRUCTURE CONSISTING OF 1SPAN C 20-6"TIMBER
FLOOR ON TIMBER JOISTS AND TIMBER CAP & POST AND SILL END
BENTS WITH ll'-4"CLEAR ROADWAY WIDTH SHALL BE REMOVED.
THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS
IS FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION IS
SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR, THE CONTRACTOR
SHALL HAVE NO CLAIM WHATSOEVER AGAINST THE DEPARTMENT OF
TRANSPORTATION FOR ANY DELAYS OR ADDITIONAL COST INCURRED
BASED ON DIFFERENCES BETWEEN THE EXISTING BRIDGE SUBSTRUCTURE
SHOWN ON THE PLANS AND THE ACTUAL CONDITIONS AT THE PROJECT
SITE.
REMOVAL OF THE EXISTING BRIDGE SHALL BE PERFORMED SO AS NOT TO
ALLOW DEBRIS TO FALL INTO THE WATER.THE CONTRACTOR SHALL
SUBMIT DEMOLITION PLANS FOR REVIEW AND REMOVE THE BRIDGE
IN ACCORDANCE WITH ARTICLE 402-2 OF THE STANDARD
SPECIFICATIONS.
FOR ALUMINUM BOX CULVERT, SEE SPECIAL PROVISIONS.
FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS.
FOR FALSEWORK AND FORMWORK, SEE SPECIAL PROVISIONS.
FOR CRANE SAFETY,SEE SPECIAL PROVISIONS.
FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS.
THE RESIDENT ENGINEER SHALL CHECK THE LENGTH OF THE CULVERT
BEFORE STAKING IT OUT TO MAKE CERTAIN THAT IT WILL
PROPERLY TAKE CARE OF THE FILL.
FOR TRAFFIC PHASING,SEE TRAFFIC CONTROL PLANS.
FOR LIMITS OF TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC,SEE
TRAFFIC CONTROL PLANS. FOR PAY ITEM FOR TEMPORARY SHORING FOR
MAINTENANCE OF TRAFFIC,SEE ROADWAY PLANS.
FOR BLASTING ADJACENT TO HIGHWAY STRUCTURES,SEE STANDARD
SPECIFICATIONS ARTICLE 410-9.
THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH "HEC 18
EVALUATING SCOUR AT BRIDGES."
TOTAL STRUCTURE QUANTITIES
ALUMINUM BOX CULVERT
LUMP SUM
CULVERT EXCAVATION
LUMP SUM
REINFORCING STEEL IN STRIP FOOTING
1535 LBS
CAST -IN -PLACE CLASS A
CONCRETE STRIP FOOTING
17.2 CY
REMOVAL OF EXISTING STRUCTURE
LUMP SUM
CLASS I RIP -RAP
25 TONS
GEOTEXTILE FABRIC
SY
25'-0" 25'-0" 25-0" 25'-0" 25'-0"
PROFILE ALONG C CULVERT
ALL MATERIALS SHALL MEET THE REQUIREMENTS OF THE NCDOT
STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES DATED JANUARY
2012.
CHECK FIELD CONDITIONS FOR THE REQUIRED RESISTANCE OF 10 TSF
JUST BEFORE PLACING CULVERT.
GUARDRAIL POST LOCATIONS SHALL BE DETERMINED IN THE FIELD BY
THE ENGINEER TO ENSURE ADEQUATE COVER FOR INSTALLATION.FOR
CULVERTS 24FT OR LESS, SEE ROADWAY STD. 862.01 SHEET 11 OF 12 AS
OPTIONAL GUARDRAIL PLACEMENT.
CARE SHALL BE TAKEN DURING BACKFILL AND COMPACTION OPERATION
TO MAINTAIN ALIGNMENT AND PREVENT DAMAGE TO THE UNITS. UNITS
WHICH BECOME MISALIGNED SHOW EXCESSIVE DEFLECTION OR HAVE
OTHERWISE BEEN DAMAGED BY THE CONTRACTOR'S OPERATION SHALL AT
THE DISCRETION OF THE ENGINEER BE REMOVED AND REPLACED BY
CONTRACTOR AT NO COST TO THE DEPARTMENT OF TRANSPORTATION.
THE DETAILS SHOWN HERE ARE FOR GENERAL LAYOUT ONLY.THE
SUPPLIER SHALL SUPPLY DESIGNS AND DETAILS FOR REVIEW AND
APPROVAL THAT MEET THE REQUIREMENTS OF AASHTO LRFD BRIDGE
DESIGN SPECIFICATIONS. SECTION 12, AND ARE SEALED BY A NORTH
CAROLINA REGISTERED PROFESSIONAL ENGINEER.
THE CONTRACTOR SHALL SUBMIT SEALED SHOP DRAWING PLANS FOR THE
ALUMINUM BOX CULVERT, ALUMINUM HEADWALL, ALUMINUM WINGS, AND
TEMPORARY CONCRETE COLLAR WITH GUARD RAIL TO NCD0T FOR
APPROVAL PRIOR TO CONSTRUCTION.
THE MANUFACTURER OF THE 24'-0"X 5'-9"ALUMINUM BOX CULVERT SHALL
PROVIDE LOAD RESISTANCE FACTOR RATINGS (LEER)SUMMARY PER NCDOT
REQUIREMENTS.
THE CORRUGATED ALUMINUM BOX CULVERT AT STATION 11+65.00 -L- IS
DESIGNED FOR A FACTORED RESISTANCE OF 4 TSF. CHECK FIELD
CONDITIONS FOR THE REQUIRED RESISTANCE OF 10 TSF JUST BEFORE
PLACING CULVERT.
KEY FOOTINGS FOR THE ALUMINUM BOX CULVERT AT STA. 11+65.00 -L-
AT LEAST 12 INCHES INTO WEATHERED ROCK, OR 6"INTO ROCK.
IF UNSUITABLE MATERIAL IS ENCOUNTERED,REMQVE THE MATERIAL AS
REOUIRED AND BACKFILL TO BOTTOM OF FOOTING ELEVATIONS WITH
LEAN CONCRETE (CLASS B)OR APPROVED FOUNDATION MATERIALS.
DOCUMENT NOT CONSIDERED
FINAL UNLESS ALL
SIGNATURES COMPLETED
@0�A i€SSi V"''
V
PROJE CT N0. 17.BP.14.R.61
sLnl
:. 1aa55 =
CHEROKEE COUNTY
1F0 °BpR?�`
-,
STATION: 11+65.00 —L-
DESIGN ENGINEER OF RECORD
DEPARTMENTEOFTRANSP0RTAT ION
DATE:
P s GENERAL DRAWING
II I \ SINGLE 2BOX C
ALUMINUM BOX CULVERT
60°SKEW
ALPHA & OMEGA GROUP
yak• sr,. REVISIONS SHEEI
m ,, m C
r..;ZO AOJECT NO. 2013.060 " n T.T
saaaocrvaassaraassa+aassaaaassa GD1
CONSTRUCTION SEQUENCE STAGE I
24'X 5'-9"BOTTOMLESS ALUMINUM
BOX CULVERT ON FOOTINGS -L-
T
\✓s
STILLING PDE I �,
24"TEMPORARY FLEXIBLE PIPE
� \ 1
v
� DE
PHASE I
].INSTALL TEMPORARY SHORING/BARRIERS AND DIRECT TRAFFIC ONTO WEST SIDE OF
ROAD OVER EXISTING BRIDGE.
2. UTILIZE SPECIAL STILLING BASIN(S) AS NECESSARY.
3.CONSTRUCI TEMP.IMPERVIOUS DIKES.
4.PLACE 24"TEMP.FLEXIBLE PIPE ALONG EXISTING CHANNEL AS SHOWN.
5.DEWATER CONSTRUCTION AREA AS NECESSARY INTO SPECIAL STILLING BASIN.
y✓o- w
PHASE II
1. INSTALL UPSTREAM PORTION OF CULVERT INCLUDING WING WALLS. RIP RAP ALONG
WING WALLS,AND INTERIOR HEADWALL.
2. CONSTRUCT SILLS AND BAFFLES IN UPSTREAM CULVERT.
3. BACKFILL INSIDE CULVERT WITH STOCKPILED NATIVE MATERIAL.
4. CONSTRUCT TEMPORARY DETOUR OVER NEWLY CONSTRUCTED CULVERT.
5. DEWATER CONSTRUCTION AREA AS NECESSARY INTO SPECIAL STILLING BASIN.
CONSTRUCTION SEQUENCE STAGE II
24'X 5'-9"BOTTOMLESS ALUMINUM
BOX CULVERT ON FOOTINGS -L-
-`i POE wr DIN
STILLING FOE F\
W
A
\ O
_ — E
/ 2
29"TEMPORARY FLEXIBLE PIPE � \
Fv v
/� p0 PDE wroa us �\ 1
PHASE I
].RELOCATE IMPERVIOUS DIKES IN ORDER TO REDIRECT WATER AROUND NEWLY
CONSTRUCTED CULVERT AND EXISTING BRIDGE.
2.INSTALL BARRIERS AND REDIRECT TRAFFIC TO TEMPORARY DETOUR.
3.REMOVE THE EXISTING BRIDGE.
4.DEWATER CONSTRUCTION AREA AS NECESSARY INTO SPECIAL STILLING BASIN.
aawECT REFERENCE nBP.14R.6/N� ec s6/cc
a Sxaaa 10
eE RE
INC_OM_PL_E E PLANS
PRELIMIN RY PLANS
Site Impact Description Impact Length
Site 2 Rip -Rap Upstream 251
Site 3 Rip -Rap Downstream 151
Site 4 Diversion Dike/Dewatering 1051
20
UYt =
TOP OF FOOTING
ELEVATION = 2004.65
STAGE II I STAGE I
STAGING CONST. JT.
-L-
t25'-0"PAVED ROADWAY
PROFILE ALONG CULVERT
STAGE I TEMP.CONC.
COLLAR & GUARDRAIL
(BY SUPPLIER)
ROADWAY FILL
SLOPE (VARIES)
TOP OF FOOTING
ELEVATION
= 2007.35
CONCRETE STRIP FOOTIN
SEE SECTION A -A
36'-0" (STAGE II)
'*' 31'-6" (STAGE II
29'-3" (STAGE III
38'-3" (STAGE I)
CONCRETE STRIP
A
FOOTING (TYPJ
-L-
46-
B4
A
B2
/ / N
/
STA. 11+65.00 -L-
/ `STA
GE I TEMP.CONC. / COLLAR & GUARDRAIL
SUPPLIER)
FLOW
/ CONSTRUCTION
JOINT
B1
22'-6" (STAGE IT)
45-0' (STAGE I)
27'-3"
40'-3"
67'-6"
CULVERT PLAN VIEW
FULLY WELDED ALUMINUM
STRUCTURAL PLATE HEAD
WALL AND WING WALLS
BAR TYPES
BILL OF MATERIAL
REINFORCING STEEL
I
BAR
NO.
SIZE
TYPE
LENGTH
(LBS.)
B1
5
-6
STR.
47'-8"
358
B2
5
6
STR.
-254
1
O
B3
5
-6
STR.
21
21'-3"
3"
l60
160
B4
5
^6
STR.
35'-2"
264
S1
140
-4
1
5'-4-
499
REINFORCING STEEL
1535
FOR FOOTINGS
LBS.
CLASSCONCRETE
17.2
ALL BAR DIMENSIONS ARE OUT TO OUT.
_A
FOR 1'-10"DEEP FOOTING
C.Y.
CONTINUOUS
CORRUGATED
CONCRETE
ALUMINUM PLATE
STRIP
LEAN NON -SHRINK GROUT
FOOTING
2"CLR.
q
(TYP.)
g"
•4S1 G) 12"CTS.
(5) •6 "B" Q 12'CTS.
CONT.)
2'-0'
SECTION A -A
EXTEND RE AR 2'-0"
BEYOND CONSTRUCTION CORRUGATED ALUMINUM
JOINT TO BE INCLUDED BOX CULVERT
IN STAGE II POUR CONCRETE STRIP FOOTING
STAGE I
(5)) •6 "B" BARS
END ELEVATION _ co2riTS.
CONCRETE STRIP — -
FOOTING 2"CLR. 2"CLR. 3"CLR.
STAGE II
STAGING CONTRUCTION JOINT — {
I I
I I
I I
I I
I I
1'-9"MIN.
LAP SPLICE
STAGE III STAGE I °4 Sl cd 12"CTS.
FOOTING ELEVATION Q CONSTRUCTION JOINT
4
PROJECT NO. 17BP.14.R.61
SEAL x
14455 -
CHEROKEE COUNTY
STATION: 11+65.00 —L
DESIGN ENGINEER OF RECORD
SHEET 2 OF REPLACES BRIDGE NO.190036
DATE:
DEPARTMENTEOFTRANSP0RTAT ION
GENERAL DRAWING
SINGLE 24'-0"X 5'-9"
ALUMINUM BOX CULVERT
60°SKEW
DOCUMENT NOT CONSIDERED gOOe
FINAL UNLESS ALL„"
SIGNATURES COMPLETED 9&OPRO 20z.00
A&0 PROJECT N0. 20I3.060
STR. �ox2oo3